Loading...
City Council Resolution 2020-95CITY OF MONTICELLO WRIGHT COUNTY, MINNESOTA RESOLUTION NO. 2020-95 RECOMMENDING APPROVAL OF A PRELIMINARY PLAT FOR FEATHERSTONE 5th ADDITION WHEREAS, the applicant seeks to develop a portion of property legally described as Outlot A, Featherstone 4th Addition; and WHEREAS, the applicant has submitted a request for Preliminary Plat to plat said property into twenty-six parcels, and develop it for single family residential use and related public amenities; and WHEREAS, the site is guided for residential uses as "Mixed Neighborhood" in the City's Comprehensive Plan; and WHEREAS, the proposed Preliminary Plat is consistent with the long-term use and development of the property for residential uses; and WHEREAS, the Planning Commission held a public hearing on December 1 st, 2020 on the application and the applicant and members of the public were provided the opportunity to present information to the Planning Commission; and WHEREAS, the City Council has considered all of the comments and the staff report, which are incorporated by reference into the resolution; and WHEREAS, the City Council of the City of Monticello makes the following Findings of Fact in relation to the recommendation of approval: 1. The Plat provides an appropriate means of furthering the intent of the Comprehensive Plan for the site by putting the existing and proposed buildings to residential use. 2. The proposed improvements on the site under the Preliminary Plat are consistent with the needs of the development in this location as an residential area. 3. The improvements will have expected impacts on public services, including sewer, water, stormwater treatment, and traffic which have been planned to serve the property for the development as proposed. 4.. The Plat is consistent with the intent of the City's economic development objectives, as well as with the intent of the R-1, Single Family zoning regulations. NOW THEREFORE, BE IT RESOL VED BY THE CITY COUNCIL OF MONTICELL0, MINNESOTA, that the preliminary plat of the Featherstone 5th Addition, with drainage and utility easements and right of way as required, is hereby approved contingent upon meeting all conditions of the subdivision ordinance; and the following conditions: CITY OF MONTICELLO WRIGHT COUNTY, MINNESOTA RESOLUTION NO. 2020-95 1. Lots on curves are re -notated to indicate actual lot width per Zoning Ordinance definition. 2. Street extension for 89th Street NE is constructed to its full extent in the plat. 3. Street extension for Street 6 is constructed to its full extent and connects to 89th Street NE. 4. The applicant will work with the City Engineer's office on the final design for 891h Street roadway construction. 5. The street name for "Street" shall be shown as Eaton Circle NE. 6. The final plat will be revised to illustrate an outlot meeting the 11 % required land dedication in satisfaction of the park dedication requirements, consistent with the 2003 preliminary plat approval. 7. The outlot shall be deeded to the City in satisfaction of park dedication requirements. 8. The infiltration basins will be covered by a drainage and utility easement with conservation easement signs installed. 9. Compliance with the terms of the City Engineer's report, dated November 19th, 2020 and as required based on revised plat plans to be submitted. 10. The applicant enters into a development agreement as a condition of Final Plat and Final PUD approval. 11. Compliance with the comments of other staff and City Council. ADOPTED BY the Monticello City Council this 14th day of December, 2020. 2 CITY OF MONTICELLO rian Stumpf, ayor