City Council Resolution 2022-78CITY OF MONTICELLO
WRIGHT COUNTY, MINNNESOTA
CITY COUNCIL
RESOLUTION NO. 2022-78
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MONTICELLO APPROVING A FINAL
PLAT AND DEVELOPMENT AGREEMENT FOR BLOCK 52 FIRST ADDITION
PID: 155-010-052031; 155-010-052060; 155-010-052070;
155-010-052071; 155-010-052090; 155-010-052101;
155-010-052102; 155-010-052110; 155-010-052120;
155-010-052131; 155-010-052132; 155-010-052140;
155-010-052150
WHEREAS, the applicant proposes a mixed use residential and commercial project
on the above captioned parcels in the Central Community District; and
WHEREAS, the applicant has submitted a request to plat the property to
accommodate said use, and in cooperation with the City of Monticello and its EDA, manage
circulation and parking on the site for the benefit of the development as well as the existing
uses in the area; and
WHEREAS, the applicant proposes to develop the property for residential multi-
family uses on upper floors, and commercial uses on the street level, consistent with the
economic development and redevelopment goals of the city for the described property; and
WHEREAS, the site is guided for Downtown Mixed Uses in the City's Comprehensive
Plan; and
WHEREAS, the proposed plat is consistent with the long-term use and development
of the property for mixed downtown use; and
WHEREAS, the Planning Commission held a public hearing on May 18, 2022 on the
application and the applicant and members of the public were provided the opportunity to
present information to the Planning Commission; and
WHEREAS, the Planning Commission has considered all of the comments and the
staff report, which are incorporated by reference into the resolution; and
WHEREAS, the City Council has considered the Planning Commission's
recommendation and all of the comments and the staff report; and
WHEREAS, the City Council of the City of Monticello makes the following Findings of
Fact in relation to the approval:
CITY OF MONTICELLO
WRIGHT COUNTY, MINNNESOTA
CITY COUNCIL
RESOLUTION NO. 2022-78
1. The Plat provides an appropriate means of furthering the intent of the
Comprehensive Plan for the site by putting the existing and proposed buildings to
uses and architecture which are consistent with the goals and objectives of the
Monticello 2040 Comprehensive Plan, including Downtown Small Area Plan.
2. The proposed improvements on the site under the PUD are consistent with the
needs of the development in this location as a prime corner site Monticello's
downtown area.
3. The improvements will have expected impacts on public services, including sewer,
water, stormwater treatment, and traffic which have been planned to serve the
property for the development as proposed.
4. The improvements on the site facilitate redevelopment of the subject block and are
consistent with the objectives of the City's downtown redevelopment projects
through its EDA and other agencies.
5. The PUD flexibility for the project, including parcels without public street access,
structured parking, mixed uses, commercial development on the street -level floor,
restaurant location overlooking the public areas to the north, and reconstruction of
the Walnut Street access through the site to River Street, are consistent with the
intent of the City's economic development objectives, as well as with the intent of
the PUD zoning regulations.
NOW, THEREFORE, BE /T RESOLVED, by the City Council of the City of Monticello,
Minnesota, that the Final Plat for Block 52 First Addition is hereby approved, subject to the
conditions listed in Exhibit Z of the staff report as follows:
1. Approval of the final plat for Block 52 First Addition shall be conditioned on the
approval of the final stage PUD.
2. Approval of the final stage PUD and rezoning for Block 52 First Addition shall be
conditioned on the approval of the final plat.
3. The final plat is to be revised to accurately reflect Lot 1 and Lot 2 acreages and the
internal lot line boundary as recommended to maintain intact the City -owned public
parking parcels.
4. A revised site plan based on the certificate of survey and illustrating proposed plat
easements relative to proposed improvements and lot lines is required.
5. A revised site plan detailing the reconfiguration of the public parking lot on Lot 1,
Block 1 is required. The modified site plan will retain an area of green space along
the north wall of the existing building adjacent to the public parking lot, as well as
bollards or curb stops along the east wall of the same building. All corresponding
plans will require revision following finalization of the parking plan.
K
CITY OF MONTICELLO
WRIGHT COUNTY, MINNNESOTA
CITY COUNCIL
RESOLUTION NO. 2022-78
6. The site plan is required to be revised to provide internal sidewalk connections for
users and residents of the Lot 2 building to the external sidewalks surrounding the
block.
7. The applicant will verify that the sidewalk extends completely around the perimeter
of the building and revise site plans to detail continuous sidewalk around the
building and including connections to external sidewalks.
8. The applicant will comply with the requirements of the Chief Building Official and
the city's designated structural engineer in regard to site demolition and structural
plans.
9. As part of the approved PUD, a cross -access and parking easement for both private
and public parking and access shall be executed. Such easement shall be subject to
review and approval by the City. Public cross -access and parking is required for the
parking areas which are to be conveyed to the developer.
10. Easement -related issues shall be subject to review and approval by the City Engineer
and City Attorney.
11. Park dedication requirements of the City shall be satisfied.
12. Commercial uses in the proposed mixed-use building shall be limited to permitted
and conditional uses allowed within the CCD, Central Community District.
Additionally ground floor commercial uses along Broadway shall accommodate
office uses on the street level, an element of flexibility from the Downtown Small
Area Plan.
13. The project site and building elements shall be subject to the following
requirements:
a. Authentic brick is to be used on the building.
b. The building design elevations shall be revised to incorporate a red, or red -based
color (such that gray is not the dominant building color), similar to that of the
original concept rendering.
c. Where exterior wall -mounted utility meters are utilized, they be shall screened
from view with materials complementary to the building design.
d. Color and stamping shall be applied to concrete retaining walls throughout the
project.
e. Embed City entrance sign into retaining wall.
f. Work with City to create an historical sign location.
g. Parking lot lighting and fixtures should match the City's lighting theme.
3
CITY OF MONTICELLO
WRIGHT COUNTY, MINNNESOTA
CITY COUNCIL
RESOLUTION NO. 2022-78
h. Underground parking spaces must be included in rent structure for units to
support full utilization of facility.
i. Add downcast lighting under canopies and overhang, or other locations that
feature the building and deemphasize the light source.
j. Raised planters shall be used for shrubs and perennials which are located at the
corner at Broadway and Pine Street.
k. Cornice and parapet treatments on the two building wings shall be
modified/expanded to be more distinct and reflect the designs shown in the
concept rendering.
I. Brick sills and detailing shall be provided on all walls and surfaces and building
wall articulation preserves the shadowing and interest of the concept rendering.
m. A covering over a portion of the outdoor restaurant patio be provided (to avoid
direct weather and residential balcony exposure).
n. Freestanding planters shall be integrated in exterior hardscape areas.
o. Additional screening fencing shall be provided along the Pine Street and River
Street corner (possibly a mesh fence material) to limit exposure from restaurant
patio to street traffic.
p. An architecturally appropriate patio railing shall be provided, a detail of which
shall be provided to the City for review and approval.
q. Rooftop mechanical equipment, if provided, shall be screened from view in
compliance with Ordinance requirements.
14. The project signage shall be subject to the following requirements:
a. Wall signage that consists of channel -letter style signage, individually mounted
and lit letters, or similar style, prohibiting box or painted panel signage.
b. Clarification and detail of the projecting sign identifying the complex.
c. Work with the City to embed the Monticello city entrance sign into the retaining
wall at the corner of River and Pine.
d. Work with the City to develop an historical marker sign in the public spaces along
the project.
e. Sign plans, with dimensions, shall be reviewed and approved by the City for each
tenant space and shall be limited to no more than 15% of wall area for each
tenant space
f. Window signage for commercial space shall be limited to no more than 40% of
any window panel.
FA
CITY OF MONTICELLO
WRIGHT COUNTY, MINNNESOTA
CITY COUNCIL
RESOLUTION NO. 2022-78
15. The applicant shall provide a parking management plan which specifies how overlap
period parking issues will be addressed.
16. All proposed boulevard plantings shall be subject to review and approval by the City
to ensure salt tolerance.
17. Additional landscaping recommendations are as follows:
a. Change the Broadway Street trees to Honey locust, matching the theme
planting currently in place throughout the downtown area. The City would
require planting wells and/or pervious tree boxes to avoid root growth
interference with the sidewalk paving.
b. Remove the eastern -most proposed overstory trees along River Street to avoid
screening the views of the park and river from the restaurant and lower -level
residential units.
c. Add more shrub plantings throughout the project, supplementing (or replacing)
the current perennial plantings to develop a more robust year-round planting
palette. These may include additional evergreen shrubs and/or deciduous
shrubs with winter features (color/fruit, etc.). This includes an enhanced
planting plan for the green space/side yard adjacent to the westerly portion of
the building and along the parking lot edges, boulevards and internal site green
spaces.
d. Specify alternative pavements in the pedestrian areas to avoid flat grey
concrete and/or asphalt surface. This should include a pedestrian path to each
of the streets through the parking areas reinforcing the building sidewalks to
those street connections.
18. Building drains designed to avoid exiting over public sidewalks.
19. An internal site is designated for pet activity.
20. An easement for public pedestrian purposes is provided through the parklet/green
space feature on Lot 2.
21. A stormwater maintenance agreement shall be executed.
22. Issues related to grading, drainage and utilities shall be subject to comment and
recommendation by the City Engineer.
23. Comments from Fire Chief, including:
a. Verify the ground clearance for the ladder truck will be sufficient for the
River Street entrance.
5
CITY OF MONTICELLO
WRIGHT COUNTY, MINNNESOTA
CITY COUNCIL
RESOLUTION NO. 2022-78
b. Verify the turning radius for the ladder truck will be met, entering from the
two entrances.
c. Verify that hydrant locations will meet the requirements of the Fire Code.
24. Compliance with the terms of the City's Engineering Staff letter dated April 28, 2022
and July 7, 2022.
25. An easement for drainage, utility, right of way and appurtenant purposes over a
portion of plaza area at the southeast corner of Lot 2, Block 1, at the intersection of
Broadway and Pine Streets is executed should it be necessary at the time of plat
recording.
26. The applicant shall provide all required legal descriptions and exhibits necessary for
the cross easements, right of way, and pedestrian pathway easements.
27. The applicant shall provide a revised site plan and sidewalk/retaining wall design for
the Pine Street sidewalk, subject to MnDOT review and including execution of any
required easement or permit necessary with MnDOT.
28. A development agreement specifying the terms and conditions of plat and PUD
approval for Block 52 First Addition is executed.
29. Comments of City Council.
BE IT FURTHER RESOLVED BY THE CITY COUNCIL OF MONTICELLO, MINNESOTA, that the
document titled "Development Contract and Planned Unit Development for "Block 52 First
Addition" with assignment of the specific terms and conditions for public improvements
and the specific terms and conditions for plat development, is hereby approved.
ADOPTED this 111h day of July, 2022, by the City Council of the City of Monticello,
Minnesota.
ATTEST:
r rOeV
C)Jnnifert
chrei er, City Clerk
MONTICELLO CITY COUNCIL
r�
By:
Lloyd Hi gart, May r
6