Loading...
Parks Commission Minutes 08-13-2001 Special . . . PARKS COMMISSION MINUTES Special Meeting Monday, August 13, 2001 - 2 p.m. Members Present: Larry Nolan, Nancy McCaffrey, Earl Smith, Rick Traver and Council Liaison, Roger Carlson. Members Absent: Fran Fair Staff: Gregg Engle, Parks Superintendent 1. Call to Order. Chair Larry Nolan called the special meeting to order at 2 p.m. The date of the regular meeting was discussed. Since a number of members would not be able to make the August 16th meeting, the Parks Commission decided to cancel the August 16th meeting date and reschedule it for August 23, 2001 at 4:30 p.m. 2. Tour of West Brid!!e and East Bridee Park The Parks Commission reviewed the work that has been completed at West Bridge Park and discussed landscaping plans for the hill area from behind the existing trees up to River Street. Gregg Engle suggested that river rock (4"to 6" in size) be placed along the hillside. Nancy McCaffrey suggested that some larger boulders be interspersed among the river rock as that would help break up the pattern. In addition, the park staff is proposing to install some posts designed to give it a more nautical appearance and thus tying this area in with the playground structure. It was also suggested that some hostas or other perennials be planted around the trees. Rick Traver asked if the river rock posed any kind of liability risk. Gregg Engle indicated that the size of the river rock made it fairly stable and there was less maintenance cost. Bids for the playground structure will be opened Friday, August 17,2001 at 2 p.m. The Parks Commission discussed the placement of the playground structure and the landscaping around it. The playground structure is approximately sixty feet in length. In addition there needs to be a 10' area behind the wheel section of the playground structure. Gregg Engle cautioned that they didn't want to do anything in West Bridge Park that they would have to remove if there were changes to River Street. Roger Carlson stated that he didn't believe there would be any changes to River Street any time soon and he felt the Parks Commission could proceed with their plans for the area. Gregg Engle also noted that the staff was going to reseed the area by the picnic tables and perhaps plant some additional trees but they planned to keep the open view of the river. The Parks Commission also discussed the proposed location of the fishing pier and the erosion that is occurring along the riverbank in that area. The pier is scheduled for construction for next year. -1- . . . Special Park Meeting - 8/13/01 Larry Nolan and Earl Smith suggested a small satellite play area in West Bridge Park for toddlers but located a little ways from the big kids play area. Earl Smith also suggested that some trees be planted to shade the play structure once it is installed. Gregg Engle indicated that MCP had adopted West Bridge Park but has not been active. The Parks Commission also reviewed the East Bridge Park and the irrigation system that was installed. 3. Ballfields Gregg Engle reported that the Monticello Baseball Association and the Monticello Polecats want to build a 14' x 14' building to store their supplies and equipment. Gregg Engle pointed out the proposed location ofthe building (in the area of the 3rd base dugout) and asked the Parks Commission if they had any concerns with that particualr use or that location. The Parks Commission felt comfortable with this proposal. The baseball association would be funding the cost of construction. The Parks Commission also discussed use of the land adjacent to the ballfields. At one time there was a proposal to use this area for soccer fields but access was a concern. Earl Smith felt that access to this area would be from Orchard Road. In discussion of use of this area it was suggested that football fields might be considered. 4. Other The Parks Commission also viewed the trail that was constructed at Meadow Oaks. The segment of 10' pathway was put in at a cost of $2,700 and provides an approach to the play structure that is ADA accessible. The Parks Commission also viewed the 4th Street park. 5. Adiourn The Parks Commission meeting concluded at 3:40 p.m. o QA.J. ~ .... H......A..o<:::' s....A-v'\.Q il...-... Recording Secretary 6 -2-