City Council Resolution 2023-73CITY OF MONTICELLO WRIGHT COUNTY, MINNESOTA RESOLUTION NO. 2023-73 ACCEPTING BIDS AND AWARDING CONTRACT FOR THE BERTRAM CHAIN OF LAKES REGIONAL PARK PHASEII IMPROVEMENTS PROJECT WHEREAS, pursuant to an advertisement for bids for the project, the following improvements for the Bertram Chain of Lakes Regional Athletic Park Project; and WHEREAS, the project includes the following improvements: • Expand the existing North gravel parking lot • Add a new gravel parking lot to the south of the pond • Add gravel roadway connecting the existing park drive around the west side of the pond and to connect to the park's main entrance road to the south • Expand the gravel trail system • Add bituminous accessible parking stalls • Concrete curb • Add potable water supply and three drinking fountains • Add a concrete pad for portable restrooms • Stormwater • Park Kiosk footings • Vehicular signage/pavement markings • Native seeding • Complete grading design with storm water culverts • Extend irrigation mainlines to provide expanded coverage with Kifco units WHEREAS, the following items were included as bid alternates for the project: • Alternate 1— Shelter electrical, footings and rockface columns • Alternate 2 — Parking lot light fixture • Alternate 3 - Concrete wheel stops • Alternate 4- Landscape Boulders • Alternate 5- Tree planting • Alternate 6 - Irrigation booster pump • WHEREAS, bids were received, opened, and tabulated, and the following seven bids were found to comply with the advertisement for bids: Contractor Addendum NO Addendum No. 2 Bid Security (51,�) Alternate at Alternate 92 Alternate a3 Alternate #d Alternate 05 Alternate #6 Base Bid Total 1 3unram Construction, Inc Y$92 552.30 $15,802.30 $25,37' : ; $25,150 00 $75,1g5 00 $45,000.00 WI 3 2 �� Inc. X 7 X $127,630 85 $18151,45 $45.675.00 $20,120 00 $78,636,00 $30,780.00 $1,018,123,61 3 New look Contracting, Inc. X X X $N106.50 $1510.50 $65,250.00 $82,995 00 $113,370.00 $10.000.00 $1,117,059.00 4 Veit BCompany. Inc. X X X $111.47800 $16.952.75 $84.235.00 $84.001.00 $113,460.00 $1.10 $1,169,139,75 5 Peterson Companies X X, X $108.32501 $18,182.18 S29.0NN $71,828.40 $90,540,78 $0.00 $1198,63911 6 Meyer Contracting, Inc X, X X $62,805.25 $12.095.45 $23.,761,15 $12,05188 $58.917 94 111,500.00 51 t34,556 52 7 J R 44be Inc X X X $0.00 $17,319.00 $72,500.00 $100,600,00 $128,400.00 $0.00 S1,567,477 00 Engineer's Opinion of Cost $106,864.50 $12,564.50 $85.250.00 $50.300 00 $90.00 00 540.000 00 $1.043.764,50 WHEREAS, the base bid from Sunram Contracting Inc. in the amount of $961,253.00 and Alternate 2 in the amount of $15,802.30, Alternate 5 in the amount of $75,195, and Alternate 6 in the amount of $45,000 for the total bid for the construction of said improvements for the Bertram Chain of Lakes Regional Athletic Park Phase II Improvement Project, in accordance with the approved plans and specifications and advertisement for bids, is the lowest responsible bidder and shall be and hereby is accepted. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF MONTICELLO: 1. The Mayor and City Administrator are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Monticello. 2. The City Administrator is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of the successful bidder and the next lowest bidder shall be retained until a contract has been executed. ADOPTED BYthe Monticello City Council this 14t" day of August 2023. ATTEST: vz-,1-30e� )en ifer S +b,y Clerk CITY OF MONTICELLO Lloy gart, 5Mayor