City Council Resolution 2023-99CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2023-99
ACCEPTING FEASIBILITY REPORT FOR 7th STREET RETAINING WALL, RECTANGULAR RAPID
FLASHING BEACON, AND SIDEWALK IMPROVEMENT PROJECT
WHEREAS, a Feasibility Report has been prepared for the 7T" Street Retaining Wall,
Rectangular Rapid Flashing Beacon, and Sidewalk Improvement Project:
WHEREAS, the report was received by the City Council on November 27, 2023; and
WHEREAS, the report included the retaining wall and sidewalk improvements include the
following:
• The reconstruction of approximately 385 feet of retaining wall along the south side of
7th Street just west of Locust Street.
• Construction of sidewalk along the north side of 7th Street connecting Locust Street to
Walnut Street.
Replacement of the rectangular rapid flashing beacon located at the intersection of
Walnut Street and 7th Street.
• Construction of sidewalk along the south side of 7th Street between where it ends
east of Cedar Street to Washington Street excluding the portion of sidewalk scheduled to
be installed by Wiha Tools.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNICL OF MONTICELLO, MINNESOTA:
1. The Council will consider the proposed improvements of sidewalks in accordance with the
Feasibility Report and the assessment of abutting properties for all or a portion of the cost of
the improvements pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost of
the improvements of $748,709 with $337,930 proposed to be assessed.
2. A public hearing shall be held on such proposed improvements on the 111h day of December,
2023 in the Council Chambers of City Hall at 6:30 p.m. and the Clerk shall give mailed and
published notice of such hearing and improvements as required by law.
ADOPTED BYthe Monticello City Council this 27th day of November, 2023.
ATTEST:
1
Je-inifer chr r, City Clerk
CITY OF MONTICELLO
s
Lloyd Hilgart, I6ayor U