Loading...
Planning Commission Agenda - 12/05/2023 (Joint Workshop)AGENDA JOINT MONTICELLO PLANNING COMMISSION/CITY COUNCIL WORKSHOP Tuesday, December 5, 2023 — 5:00 p.m. Monticello Community Center Planning Commissioners: Chair Paul Konsor, Vice Chair Andrew Tapper, Teri Lehner, Melissa Robeck, Eric Hagen City Councilmembers: Mayor Lloyd Hilgart, Charlotte Gabler, Sam Murdoff, Tracy Hinz, Lee Martie 1. Call to Order 2. Concept Stage Planned Unit Development Submittal for the proposed expansion of a commercial self -storage facility and/or guidance for continuation of interim use permit in the Pointes at Cedar Planned Development District Address: 36 Dundas Road, Monticello, MN 55362 PIDs: 155-213-002010, 155-500-142305, 155-500-142304 Applicant: Bruce Stainbrook 3. Adjournment I rittyan Consulting Ilc Steve.GrittmanConsulting@gmail.com Land Use MEMORANDUM TO: Angela Schumann Mayor Hilgart and Monticello City Council Monticello Planning Commission FROM: Stephen Grittman DATE: November 28, 2023 MEETING DATE: December 5, 2023 Planning - Zoning - RE: Monticello — Storage Link (Dundas) — Concept PUD Review GC FILE NO: 120.01— 23.02 PLANNING CASE NO: 2023-43 PROPERTY ID: 155-213-002010; 155-500-142304; 155-500-142305 Project Description. This memorandum reviews the elements of a proposed concept plan for an amendment to a Conditional Use Permit for Planned Unit Development governing the StorageLink facility at 36 Dundas Road. The site (a combination of 3 separate parcels) was granted a PUD, with subsequent amendments most recently accommodating a row of temporary storage units — sometimes known as PODs or Storage Boxes — along the south property line, in lieu of a permanent building. The original allowance for the temporary units was granted for a period of 10 years as an interim use, a term which expires in 2024. The allowance for these units was made at the time when the previous owner was anticipating expanding onto land to the south, owned at the time by another landowner. Since that time, the City completed an extensive planning and design effort for what is known as the Pointes at Cedar, a public space of approximately 100 acres, including the land adjoining and surrounding the StorageLink facility, as well as Dundas Road and other property. The current design would remove Dundas Road to accommodate the continuous connections for the Pointes open space amenities. Upon the removal of Dundas Road, a partial vacation of the right of way could potentially lead to additional development property for the StorageLink PUD. In anticipation of a final decision on Dundas Road, and upon the coming expiration of the temporary storage pod permit, the StorageLink owners are seeking an amendment to their PUD approval to do either of two options. Option 1. The first option would remove the temporary storage pods, and replace the storage space with two new self-storage buildings, one in place of the temporary pods at the south boundary of the site, and the other along the north boundary of the site, adjacent to the Dundas Road right of way. As a phase of the construction, the applicants suggest that they would create a perimeter wall around the facility facing the Pointes area, similar to the wall constructed as a part of the Storage Link facility along Chelsea Road. Photos of the existing condition and the proposed wall are included with the applicants' submission materials. Most of the new buildings would be constructed on or adjacent to existing pavement, and would impact impervious surface coverage only slightly. Both of the two new buildings would be single-loaded self-storage buildings, opening to the inside of the complex, with the screen wall facing the outside. Both buildings are shown to be at or near the property lines, requiring PUD flexibility to the building setbacks that would otherwise apply. Option 2. The second option proposed by the applicants would be to extend the interim use period for the temporary pods another 3-5 years, with no new construction at this time. The applicants suggest that this period would allow the City additional time to consider the ultimate design and removal of Dundas Road improvements as well as the right of way vacation, at which time the StorageLink expansion could proceed based on the final amended property limits. Land Use Process. The three existing subject parcels will require platting into a single lot at the time of any additional expansion. Either proposed option would entail revision to the development agreement, either for the extension of the temporary pods, or for the expanded building designs. For the project to proceed, there are a series of City approvals that will be required: o Consideration of an Amendment to Conditional Use Permit for PUD approval for the modifications to the Site Plan and Building Expansions — OR — extension of the temporary pod permit. o With a permanent expansion proposal, an amendment to the Conditional Use Permit for PUD, Planned Unit Development is required within the Pointes at Cedar Zoning District: Planned Unit Development zoning is discouraged within the Pointes at Cedar District, but existing Conditional Use PUDs may be modified with amendments specific to the facility, accommodating the uses unique to the existing use and regulating the uses via the approved plans. If no expansion is to occur at this time, the CUP Amendments would not be required. o Preliminary and Final Plats: The plat would create a single parcel subject to the PUD Amendment if new buildings are to proceed, PUD Conceot Review. For this PUD Concept Review, there is a policy question that may impact the City's approach to the two alternatives. The applicant proposes to expand toward the Dundas Road right of way, on the presumption that this right of way will ultimately be vacated and be added to the Storage Link property. Given the property lines, there is a possibility the northerly building could be constructed absent the vacation, but with a zero lot -line configuration similar to the south building. In the alternative, the applicant would defer new development pending a decision on Dundas Road, but retain the temporary pods until the Dundas Road right of way is resolved. As a PUD Concept Plan review, the first stage of review is not a formal zoning application, but rather is intended to provide the applicant an opportunity to get City feedback on a potential development proposal prior to more formal zoning review and the extensive supporting materials that such reviews require. The Planning Commission and City Council will have the opportunity to review the project, ask questions of the proposer, and provide comment as to the issues and elements raised by the project. Again, the applicant is also looking for specific feedback in the areas of PUD flexibility noted in their narrative. The neighboring property owners have been notified of the meeting, but it is not a formal public hearing. This memorandum provides an overview of the project and will serve as an outline for the discussion. No formal approval or denial is offered for a Concept Review. However, it is vital that Planning Commission and City Council members engage in a frank and open discussion of the project benefits and potential issues. The Concept Review process is most valuable when the applicants have the opportunity to understand how the City is likely to look at the project and the potential issues it presents. In this way, the subsequent land use and development details can be more finely tuned to address City policy elements. (1) Purpose and Intent The purpose of the Planned Unit Development (PUD) zoning district is to provide greater flexibility in the development of neighborhoods and non-residential areas in order to maximize public values and achieve more creative development outcomes while remaining economically viable and marketable. This is achieved by undertaking a process that results in a development outcome exceeding that which is typically achievable through the conventional zoning district. The City reserves the right to deny the PUD rezoning and direct the developer to re -apply under the standard applicable zoning district. (2) PUD Concept Proposal Prior to submitting formal development stage PUD, preliminary plat (as applicable) and rezoning applications for the proposed development, the applicant may, at its option, prepare an informal concept plan and present it to the Planning Commission and City Council at a concurrent work session, as scheduled by the Community Development Department. The purpose of the Concept Proposal is to: 1. Provide preliminary feedback on the concept plan in collaboration between the applicant, general public, Planning Commission, and City Council; 2. Provide a forum for public comment on the PUD prior to a requirement for extensive engineering and other plans. 3. Provide a forum to identify potential issues and benefits of the proposal which can be addressed at succeeding stages of PUD design and review. The intent of Concept Proposal review is to consider the general acceptability of the proposed land use, and identify potential issues that may guide the City's later consideration of a full PUD application. The City Council and Planning Commission meet in joint session to provide feedback to the developer, and may include an opportunity for informal public comment as they deem appropriate. Staff Preliminary Comments and Issues. For this proposal, the primary considerations evident at this point in the process include the following elements: L Land Use. The proposed land use would remain unchanged with either Option 1 or Option 2. Perhaps the most significant consideration is how the expansion might impact the City's expectations for the Pointes at Cedar area adjoining the site. The east boundary of the property would remain unchanged in either Option 1 or Option 2. Along the south boundary — if a permanent building is allowed, could raise issues related to grading and uses on the Pointes property to the south and would require coordination with the owner. That area is preliminarily programmed for parking and a potential skate park. Some significant grades are expected in this area, and would also be expected along the east boundary. Care would need to be taken to ensure that any building near the property line would not be impacted by necessary grading on the Pointe's side of the property line. ii. Parking and Circulation. Parking is provided along each of the buildings as with typical self -storage facilities. No significant changes to the access or circulation are foreseen with the expansion proposed. iii. Building Height and Architecture. The applicant has described the proposed buildings as being similar to those on the site, but with the added external stucco -finish screen wall around the facility. It would be important to understand and comment on the limits of the screen wall construction and ensure that it fully encompasses the facility along the east and south boundaries, at least. Total building expansion would be approximately 7,890 square feet between the two buildings, with a near zero setback as noted above. iv. Site Planning. The primary discussion related to the site planning is whether the City will accommodate an expansion in place of the existing temporary pods, or an extension of the permit timing for the temporary pods, pending a future determination of the design/removal of Dundas Road and its right of way. Other site development aspects are speculative, and would require additional plan development if the expansion is preferred. Those elements would include the above-mentioned screen wall, as well as landscaping, lighting, and other site elements. Summary. As noted, the Planning Commission and City Council provide comment and feedback to the developer at the Concept Review level. City officials should identify any areas of concern that would require amendment to avoid the potential for eventual denial, as well as any elements of the concept that the City would find essential for eventual approval. For this proposal, the primary discussion issue is likely to relate to which of the options presented by the applicant are preferable, and in that regard, whether the City is ready to accommodate expansion of the facility prior to final decisions about Dundas Road are made. The applicant's expansions appear to fit on the property, but require flexibility to setbacks through the PUD process. The notes listed above acknowledge that a significant amount of detail will be added as the project proceeds to a more advanced stage of land use application and plat review. 4110191:4 11 isICIJ_Al_1 A. Aerial Site Image B. Applicant Narrative C. Site Plan D. Building Elevations E. The Pointes at Cedar Master Plan a� � CF P�= /-iLm :., n n- P.O. Box 425 Tel: 3 , 25 .2377 Tel: 320.257.2323 SMAY9SELF TORkGE info@StorageLink.net www.StorageLink.net Greetings — We currently have "stand alone" storage units (often referred to as PODS) that line a portion of our South property line, at our Dundas Road location. These units are currently allowed as part of a Conditional Use Permit that is set to expire in 2024. With the city currently working through a master plan for The Points of Cedar, which surround this facility, we are proposing two options that would allow us to continue serving these current Tenants beyond the expiration of the Conditional Use Permit. Option 1- If the city is comfortable with The Points of Cedar master plan, we propose replacing the PODS with two narrow buildings along the North and South lot line. These two buildings would be constructed like our buildings at our Chelsea Road location, with EFIS (stucco) on the exterior walls facing out. This exterior would blend the facility with the adjoining commercial uses that are currently proposed in the master plan. This would allow us to continue serving our current Tenants and provide the city a more conforming look to The Points of Cedar. Option 2 - If the city is not ready to make this decision on the plan for The Points of Cedar, simply extend the Conditional Use Permit for the PODS an additional amount of time (3-5 years) to allow the city to fully develop The Points of Cedar plan. Once the plan is fully understood, it may change how the city would like our perimeter to look. This would also allow us to continue serving our current Tenants. I have included pictures of the PODS at the Dundas Road location along with pictures of the EFIS walls at our Chelsea Road location to help you visualize both. Thanks for your consideration. We look forward to working with the city on The Points of Cedar development. Sincerely, Bruce Stainbrook Contact Information: Bruce Stainbrook (owner) - Wayne Stark (Civil engineering) - Current Parcel is Commercially zoned Located at 36 Dundas Road. It is 153,291 sq ft in size. The existing impervious is 140,560 sq ft (91.7%). Nothing changes with Option 1. With Option 2, the proposed impervious would be 145,658 sq ft (95.0%) With Option 1 proposed, nothing would be done at this time. Option 2 would add two buildings. Building A would be 3,300 and Building B would be 4,590 sq ft. Both would be built with a zero lot line setback. Both buildings would be completed in the summer of 2024. �JL \lLl IVL�IJ.Li �LLL0.dON uopailslBaTJ aled M+WS'9'0 auReM r ano�o is �o �Nn�od�ols e7osauucyQ 'spcdag Kneg E609Z £Z/9Z/6 N TT96-66Z—OZ92v 'J04 uuoo .raaac8aa se s eimx Enos uulyy M WM a3NM0 213d £Z/9Z/6 0 K , Q agllosmelagl/apuniaaulBu3p OPIBa9 N3NM0 aid £Z/I/6 Nb�d �lIS 1d�ON00 blOS�NNIW 0�T1011NOW 111������ Rlnp a we l leyl pue uolswedns p jp a3NM0 213d £Z/Ol/9 w Ll Rw iapun/o'u Rq jgjjegj/qWm. podw AgweJI SNOISIA]a >KN 19V�]OlS GVON SbaNna x uaPeoPloatls'ueltl sl411a41 RJryas Rgae4 I I '.e:': a a U '.gyp... (.7 ®.Kxww W II AdvVti O Z N p w I '.e:': a J '.gyp... (.7 O Z N p w } 1Q7 W '.t ¢ ~ ~ U U W U LLJ I Z I J Z ~LLJ W S J O Z O > p ¢ CD Y Q U J U O C r m O N CD m Z 0 U J W U Z m 0LLJ caw co z (Y (7 ¢ Q c N N O C D J H U_ c n 0 0 cc J N w Q O ' O o O O_ O Q U w w d ~ Zp Z LC) ' N � I 0 - N o' U � W I: > U Z = = Q W W J 00 ~ � W JLLJ J O O Z p¢ Z~ p Z Ih Q¢ cn ZNO¢ m �ZUz Z SIJOf N ..a..: H Q O O ¢ NOLO e �C/ �� C/) ¢ W Z~� W Z U W U 0 O Q= O= I: cn cnC)f U Z Q� Y.Q z O U~ w~ C'-<� O XX O CD J � C/)r7 � Z O m O U Q N¢ O �= Cl) C:) CD N J U O¢ = � U N } F--> N LLJ _ NCf) 9 O a O Li W Of 0 H Z U O = L.� O > w Z a_<r H U N Q� a Z U w w¢ Z O a Z U Z � Q c n 0 � H N OJ � O n Q d ~ I Z U C� V] J¢ J—� V) V 0 J cn X Z~ W U U CD N X O~} ( D C-) Z Z O WI O W�� U U I a C/-) s•: J ZLLJ Ln (n OW W J 0- J H J of O d X X of mo ¢¢ W= / ¢a cn W W 0- 2: Z III III — N a r7 •..`,�: 4 I '.e:': J '.gyp... (.7 Z 1Q7 '.t I I I Z I J W J O p Do m N uj caw .. z .. Q O ' l7 O O I.9'..t 1 . a O ' N ~ W I: �+ m Z N ..a..: H a�'• X e r► x N I: I Y.Q XX l7 O O 9 a W P X X I W �.•/' :. I co s•: 1 1 / O Q III III a •..`,�: ... 0 ice. •g. . - IL I a:' �• d. I O .I a 5 I 1 1 II 1. co I y Q I I Z ., COM I I I. 0 I: a.� I' o 0 ' Z I' Z '.e:': J '.gyp... (.7 Z 1Q7 '.t Z J W J O p Do m N uj caw .. .. Q O ' l7 O O I.9'..t 1 . a O ' N ~ W I: �+ m Z N ..a..: H a�'• X e x I: I XX �.•/' :. I I s•: NII O Q III III `: •..`,�: ... 0 ice. •g. . - IL I II 1. Z PADDLE SPORT LAUNCH FISHING PIER 1)) FOOD TRUCKS INTERACTIVE WATER FEATURE ) MINI ARBORETUM `( PICNICKING U RESTING POINTS (1 FITNESS RESTROOMS NORTH BIOME I POPULUS = BIOMETRANSITION 1. ENTRY MONUMENT/PLAZA 2. GATEWAY & INFORMATIONAL KIOSK 3. NATURE TRAIL 4. "THE CLEARING" OVERLOOK 5. BABBLING CREEK WITH BRIDGE 6. SECONDARY GATEWAY 7. LAKESIDE TRAIL CENTRAL BIOME I TILIA 8. MURAL ALLEY (COMMERCIAL ENTRY) 9. OVERLOOK PIER 10. "BACKYARD GAME" PLAZA 11. THE MIDWAY - MAJOR GATEWAY 12. BRIDGE OVERLOOK PLAZA 13. PADDLEBOAT DOCK 14. SNACK SHACK PLAZA 15. FLEX LAWN / INTERACTIVE WATER FEATURE 16. THE PROMENADE GARDENS - MAJOR GATEWAY 17. SUNSET OVERLOOK TERRACE 18. GREAT EVENT LAWN 19. PICNIC SHELTER AND RESTROOM 20. THE PARK - MAJOR GATEWAY 21. SKATE PARK 22. 2 -STORY PARK PAVILION & LAKE PLAZA 23. MAINTENANCE & STORAGE FACILITY SOUTH BIOME I QUERCUS 24. NATURE TRAIL & BOARDWALK 25. SCULPTURE ALLEY -SECONDARY GATEWAY 26. THE RIBBON -SECONDARY GATEWAY 0' 100' 200' ~Scale in Feet MASTER PLAN Monticello, Minnesota September 2022 1 WSB Project number: 019376-000 CHELSEA RD 71 ���11►1TC� CITY OF Monticello