Loading...
City Council Resolution 2024-121CITY OF MONTICELLO WRIGHT COUNTY, MINNESOTA RESOLUTION NO. 2024-121 APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING ADVERTISEMENT FOR BIDS FOR THE SCHOOL BOULEVARD INTERSECTION IMPROVEMENT PROJECT WHEREAS, pursuant to approval by the City Council on November 12, 2024, Hakanson Anderson prepared plans and specifications for the School Boulevard Intersection Improvement Project, which includes: • Replacement of the current all -way stop controlled intersection at School Boulevard and Cedar Street with a single lane roundabout. • Replacement of the current all -way stop controlled intersection at School Boulevard and Edmonson Avenue with a single lane roundabout. • Full depth reclamation of School Boulevard between Highway 25 and Country Lane. • Full depth reclamation as required for Cedar Street and Edmonson Avenue for roundabout construction. • Construction of approximately 600 feet of 10-foot-wide bituminous trail along the south side of School Boulevard between Edmonson Avenue and Country Lane. • Removal of the center medians between Cedar Street and Edmonson Avenue on School Boulevard and construction of a two-way left turn lane. • Replacement of all non -compliant ADA ramps throughout the project area and installation of new ADA ramps and sidewalk as required for the roundabout construction. • Installation of pathway lights where new pathways are added to connect to existing lighting system. • Replacement of street trees removed for the pathways and addition of irrigation for tree watering. • Installation of roundabout landscaping consistent with the Pointes at Cedar Zoning district. WHEREAS, the Public Works Director/City Engineer presented such plans and specifications to the Council for approval; NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE CITY OF MONTICELLO: 1. Such plans and specifications, a copy of which is on file in the office of the City Clerk, are hereby approved. 2. The designated authority shall prepare and cause to be inserted in the official paper and in a recognized industry trade journal an advertisement for bid upon the making of such improvement under such approved plans and specifications. The advertisement shall be published no less than three weeks before the last day for submission of bids, once in the City's legal publication and at least once in either a newspaper published in a city of the first class or a trade paper. To be eligible as a trade paper, a publication shall have all the qualifications of a legal newspaper except that, instead of the requirement that it shall contain general and local news, such trade paper shall contain building and construction news of interest to contractors in this state, among whom it shall have a general circulation. Any bidder whose responsibility is questioned during consideration of the bid will be given an opportunity to address the Council on the issue of responsibility. No bids will be considered unless sealed and filed as set forth in the instructions to bidders in compliance with the requirements of electronic bidding and bid security. ADOPTED BYthe Monticello City Council this 25t" day of November, 2024. ATTEST: r M - V4" ee nife c re ber, City Clerk CITY OF MONTICELLO r Lloyd Hilgart, Mayor