Planning Commission Agenda - 06/04/2024AGENDA
REGULAR MEETING — PLANNING COMMISSION
Tuesday, June 4, 2024 — 6:00 p.m.
Mississippi Room, Monticello Community Center
Commissioners: Chair Paul Konsor, Vice Chair Andrew Tapper, Teri Lehner, Melissa Robeck,
Rob Stark
Council Liaison: Councilmember Charlotte Gabler
Staff: Angela Schumann, Steve Grittman, Ron Hackenmueller, Hayden Stensgard
1. General Business
A. Call to Order
MERNIM.
C. Consideration of Additional Agenda Items
D. Approval of Agenda
E. Approval of Minutes
• Regular Meeting Minutes —May 7, 2024
F. Citizen Comments
2. Public Hearings
A. Consideration of an Amendment to the Monticello City Code, Title XV: Land Usage,
Chapter 153: Zoning Ordinance, Section 153.012 — Definitions, and 153.091— Use -
Specific Standards related to Wrecker & Towing Services as a Principal Use including
Definitions, Use -Specific Standards, and other regulations as necessary to define and
limit the intent or application of the proposed amendment
Applicant: City of Monticello
B. Consideration of a Request for Conditional Use Permit for Wrecker & Towing Services as
a Principal Use in the B-3, Highway Business District
Applicant: Nick Christenson
C. Consideration of a Request for Preliminary & Final Plat of Cedar Street Storage;
Revocation of an Existing Conditional Use Permit for Planned Unit Development;
Development & Final Stage Planned Unit Development; Rezoning to Planned Unit
Development
Applicant: Bruce Stainbrook
D. Consideration of an Amendment to the Monticello City Code, Title XV: Land Usage,
Chapter 153: Zoning Ordinance, Sections 153.012 — Definitions, 153.028 — Specific
Review Procedures & Requirements, 153.090 — Use Table, & 153.091— Use -Specific
Standards related to Contractor's Yard —Temporary, & Extraction of Minerals/Materials
as Principal Interim Uses including Definitions, Use -Specific Standards, & other
regulations as necessary to define and limit the intent or application of the proposed
amendment
Applicant: City of Monticello
E. Consideration of an Amendment to the Monticello City Code, Title XV: Land Usage,
Chapter 153: Zoning Ordinance, Section 153.091, Use -Specific Standards, as related to
Day Care Centers as a Principal Use in the Industrial & Business Campus (IBC) District
Applicant: City of Monticello
3. Regular Agenda
4. Other Business
A. Building Department Presentation
B. Community Development Director's Report
S. Adjournment
MINUTES
REGULAR MEETING — PLANNING COMMISSION
Tuesday, May 7, 2024 — 6:00 p.m.
Mississippi Room, Monticello Community Center
Commissioners Present: Chair Paul Konsor, Teri Lehner, Melissa Robeck, Rob Stark
Commissioners Absent: Vice Chair Andrew Tapper
Council Liaison Present: Councilmember Charlotte Gabler
Staff Present: Angela Schumann, Steve Grittman, Ron Hackenmueller, Hayden
Stensgard
1. General Business
A. Call to Order
Chair Paul Konsor called the regular meeting of the Monticello Planning
Commission to order at 6:00 p.m.
B. Roll Call
Mr. Konsor called the roll.
C. Consideration of Additional Agenda Items
None
D. Approval of Agenda
ROB STARK MOVED TO APPROVE THE MAY 7, 2024 REGULAR PLANNING
COMMISSION MEETING AGENDA. PAUL KONSOR SECONDED THE MOTION.
MOTION CARRIED UNANIMOUSLY, 4-0.
E. Approval of Meeting Minutes
• Joint Workshop Meeting Minutes —April 2, 2024
PAUL KONSOR MOVED TO APPROVE THE APRIL 2, 2024 JOINT
WORKSHOP MEETING MINUTES. MELISSA ROBECK SECONDED THE
MOTION. MOTION CARRIED UNANIMOUSLY, 4-0.
• Regular Meeting Minutes —April 2, 2024
PAUL KONSOR MOVED TO APPROVE THE APRIL 2, 2024 REGULAR
MEETING MINUTES. MELISSA ROBECK SECONDED THE MOTION.
MOTION CARRIED UNANIMOUSLY, 4-0.
• Joint Workshop Meeting Minutes — April 8, 2024
PAUL KONSOR MOVED TO APPROVE THE APRIL 8, JOINT WORKSHOP
MEETING MINUTES. ROB STARK SECONDED THE MOTION. MOTION
CARRIED UNANIMOUSLY, 4-0.
• Special Meeting Minutes — April 15, 2024
PAUL KONSOR MOVED TO APPROVE THE APRIL 15, 2024 SPECIAL
MEETING MINUTES. TERI LEHNER SECONDED THE MOTION. MOTION
CARRIED UNANIMOUSLY, 4-0.
Citizen Comment
None
2. Public Hearings
A. Continued —Consideration of an Amendment to the Monticello Citv Code. Title
XV: Land Usage, Chapter 153: Zoning Ordinance, Section 153.046 Overlay
Zoning Districts, Adopting the updated Flood Hazard Determination including
Flood Insurance Study and Flood Insurance Rate Maps for the City of
Monticello as part of the Official Zoning Map and the subiect Zoning Ordinance
Section herein.
Applicant: City of Monticello
Community Development Director Angela Schumann provided an overview of
the agenda item to the Planning Commission and the public. Wright County's
flood hazard determination was finalized by the Federal Emergency
Management Agency (FEMA), and the City of Monticello is required to adopt
new flood maps based on those determinations. The prior maps were from 1979
and 1981. This process began in 2011, and in 2016, public comment was taken
on the updated information and finalized in December of 2023. A requirement of
the National Flood Insurance Program, the City of Monticello is required to
update its Floodplain ordinance to reference the new maps to be in effect on
June 20, 2024, in order to remain eligible for the program. Notice of these
changes was provided to all property owners that have floodplain designation on
their property prior to the public hearing date. Staff's recommendation was for
approval of the ordinance amendment.
Ms. Schumann clarified that the public comment and appeal period was held in
2016, where property owners were initially notified, Staff noticed again following
FEMA's letter noting that the determinations were finalized in case property
ownership of any of the affected properties changed ownership. There were no
opportunities for appeals to the determinations following the 2016 comment
period.
Mr. Konsor asked for clarification on whether this step is a requirement of
affected cities and counties. Ms. Schumann confirmed that if the City wants to
remain eligible for the National Flood Insurance Program, adoption of the
updated FIRM panels is a required step.
Mr. Konsor opened the public hearing portion of the agenda item.
Mr. Konsor closed the public hearing portion of the agenda item.
PAUL KONSOR MOVED TO ADOPT RESOLUTION 2024-12 RECOMMENDING
ADOPTION OF ORDINANCE NO. 825 FOR AMENDMENT TO THE MONTICELLO
CITY CODE, TITLE XV: LAND USAGE, CHAPTER 153: ZONING ORDINANCE, SECTION
153.046: OVERLAY ZONING DISTRICTS, ADOPTING THE UPDATED FLOOD HAZARD
DETERMINATION INCLUDING FLOOD INSURANCE STUDY AND FLOOD INSURANCE
RATE MAPS FOR THE CITY OF MONTICELLO AS PART OF THE OFFICIAL ZONING
MAP AND THE SUBJECT ZONING ORDINANCE SECTION HEREIN, BASED ON THE
FINDINGS IN SAID RESOLUTION. MELISSA ROBECK SECONDED THE MOTION.
MOTION CARRIED UNANIMOUSLY, 4-0.
B. Consideration of a Request for a Conditional Use Permit for Accessory
Structures Exceeding 1,200 Square Feet in the R-1, Single -Family Residential
District.
Applicant: Ben Holland
Community & Economic Development Coordinator Hayden Stensgard provided
an overview of the agenda item to the Planning Commission and the public. The
request was for construction of a 640-square-foot detached accessory structure
along the south and east sides of the property with a driveway expansion
extending from its existing curb cut to the proposed structure. The site has an
existing 832-square-foot attached garage, and the proposed structure would
bring the total square footage of accessory structures to 1,472 square feet. The
proposed location was found by staff to be not in the front yard, as accessory
structures are not allowed in the front yard by ordinance. The existing layout of
the lot accommodates the proposed location in the side yard. The applicant also
proposed the installation of a parking pad along the east building line of the
proposed structure at 14 feet in width. Mr. Stensgard noted that while the use of
that pad for parking would not be compliant with the zoning ordinance language
referenced in the staff report, the zoning ordinance regulates only the use of the
proposed pad, and not the installation of it.
Councilmember Charlotte Gabler asked if the proposed parking pad would be
something calculated into the total impervious surface area on a property. Mr.
Stensgard confirmed.
Mr. Konsor opened the public hearing portion of the agenda item.
Mr. Konsor closed the public hearing portion of the agenda item.
TERI LEHNER MOVED TO ADOPT RESOLUTION PC-2024-13 RECOMMENDING
APPROVAL OF A CONDITIONAL USE PERMIT FOR ACCESSORY STRUCTURE SPACE
EXCEEDING 1,200 SQUARE FEET ON A PARCEL IN AN R-1, SINGLE-FAMILY
RESIDENTIAL DISTRICT, BASED ON THE FINDINGS IN SAID RESOLUTION AND
SUBJECT TO THE CONDITIONS IN EXHIBIT Z. PAUL KONSOR SECONDED THE
MOTION. MOTION CARRIED UNANIMOUSLY, 4-0.
C. Consideration of a Request for an Amendment to a Conditional Use Permit for
Electric Vehicle Charging Stations as an Accessory Use in the B-3, Highway
Business District.
Applicant: Doug Walkup
City Planner Steve Grittman provided an overview of the agenda item to the
Planning Commission and the public. The Holiday Store located at 110 Oakwood
Drive E., submitted a request to change the standard parking located in the rear
of the principal building (12 spaces) into electric vehicle charging stations. The
applicant noted in their narrative that the stations would be installed in phases,
and the first phase would consist of four parking stalls being converted. Per the
Monticello Zoning Ordinance, seven or more electric vehicle charging stations
are allowed in the B-3, Highway Business District by Conditional Use Permit.
Though the first phase will only convert four stalls, staff provided a
recommendation to the Planning Commission based on all phases, so the
applicant would not need to seek approval for each subsequent phase. Staff
recommended approval of the request conditioned on the comments identified
in Exhibit Z in the agenda item.
Mr. Konsor asked for clarification on the required setback of the mechanical
equipment. Mr. Grittman noted that due to the west property line being
adjacent to public right of way (Highway 25), the minimum setback for the
proposed mechanical equipment is 20 feet. If the equipment was shifted to the
east side of the property, the setback would need to be six feet.
Mr. Konsor opened the public hearing portion of the agenda item.
J. J. Benson, on behalf of the applicant, addressed the Planning Commission and
the public.
Mr. Konsor closed the public hearing portion of the agenda item.
PAUL KONSOR MOVED TO ADOPT RESOLUTION NO. PC-2024-14,
RECOMMENDING APPROVAL OF THE AMENDMENT TO A CONDITIONAL USE
PERMIT FOR ELECTRIC VEHICLE CHARGING FACILITIES AS AN ACCESSORY USE
BASED ON THE FINDINGS IN SAID RESOLUTION AND SUBJECT TO THE
CONDITIONS OF EXHIBIT Z. TERI LEHNER SECONDED THE MOTION. MOTION
CARRIED UNANIMOUSLY, 4-0.
D. Consideration of a Reauest for an Amendment to a Conditional Use Permit for
Planned Unit Development for a Restaurant as a Principal Use and Drive -
Through Services as an Accessory Use in the B-4, Regional Business District.
Applicant: Westwood Professional Services
Mr. Grittman provided an overview of the agenda item to the Planning
Commission and the public. The applicant's request to amend the CUP for PUD in
the Union Crossings commercial area is for a proposed new construction Panera
Bread location on a currently vacant lot, that would include a single drive -
through service aisle. Restaurants are a permitted use in the underlying zoning
district, which is B-4, Regional Business District, and drive-throughs as an
accessory use are allowed conditionally. Staff recommended approval noting the
identified conditions of approval in Exhibit Z of the agenda item.
Mr. Konsor noted concern about snow plowing and storage on site, given there
is little space between the parking and the alleyway along the east property line.
Mr. Konsor opened the public hearing portion of the agenda item.
Mike Gilbert, on behalf of the applicant, addressed the Planning Commission and
the public.
Mr. Konsor closed the public hearing portion of the agenda item.
PAUL KONSOR MOVED TO RECOMMEND APPROVAL OF THE AMENDED CUP/PUD
FOR RESTAURANT WITH DRIVE-THRU FACILITIES BASED ON THE FINDINGS IN
RESOLUTION NO. PC-2024-15 AND SUBJECT TO THE CONDITIONS OF EXHIBIT Z.
MELISSA ROBECK SECONDED THE MOTION. MOTION CARRIED UNANIMOUSLY,
4-0.
3. Regular Agenda
None
4. Other Business
A. Consideration of a Letter to Governor Walz Supporting Retention of Local Land Use
Authority
Ms. Schumann provided an overview of the agenda item to the Planning
Commission and the public. The 2024 state legislature introduced multiple bills that
affect local land use authority related to zoning items such as building materials,
parking, etc. The Planning Commission was asked to consider signing and submitting
a letter drafted by staff encouraging Governor Walz to vote against any legislation
that would further restrict local authority in these regards.
Commissioner Lehner asked if staff would be willing to copy Monticello's state
legislators on this letter as well. Ms. Schumann confirmed.
PAUL KONSOR MOVED TO AUTHORIZE THE SUBMISSION OF A LETTER TO
GOVERNOR WALZ SUPPORTING THE RETENTION OF LOCAL LAND USE AUTHORITY.
TERI LEHNER SECONDED THE MOTION. MOTION CARRIED UNANIMOUSLY, 4-0.
B. Community Development Director's Report
Ms. Schumann provided an overview of the agenda item to the Planning
Commission and the public.
No Action was taken on the agenda item.
5. Adjournment
ROB STARK MOVED TO ADJOURN THE MAY 7, 2024 REGULAR MEETING OF THE
MONTICELLO PLANNING COMMISSION. PAUL KONSOR SECONDED THE MOTION.
MOTION CARRIED UNANIMOUSLY, 4-0, MEETING ADJOURNED AT 7:20 P.M.
Planning Commission Agenda — 06/04/2024
2A. Public Hearine - Consideration of a Reauest for an Amendment to the Monticello
Code, Title XV: Land Usage, Chapter 153: Zoning Ordinance, Section 153.012 —
Definitions, and 153.091— Use -Specific Standards related to Wrecker & Towing
Services as a Principal Use includine Definitions. Use -Specific Standards, and other
regulations as necessary to define and limit the intent of application of the Proposed
Amendment. Applicant: Citv of Monticello.
Prepared by:
Meeting Date:
Council Date (pending
Stephen Grittman, Grittman
06/04/2024
Commission action):
Consulting, City Planner
06/24/2024
Additional Analysis by:
Community Development Director, Community & Economic Development Coordinator
ALTERNATIVE ACTIONS
Decision 1: Consideration of an Ordinance Amendment — Wrecker & Towing Services as a
Principal Use
1. Motion to adopt Resolution No. PC-2024-16 recommending approval of an Amendment
to the Monticello City Code, Title XV: Land Usage, Chapter 153: Zoning Ordinance,
Section 153.012 — Definitions, and 153.091— Use -Specific Standards related to Wrecker
& Towing Services as a Principal Use including Definitions, Use -Specific Standards, and
other regulations as necessary to define and limit the intent of application of the
proposed amendment, based on findings in said resolution.
2. Motion to deny the adoption of Resolution No. PC-2024-16 recommending approval of
an Amendment to the Monticello City Code, Title XV: Land Usage, Chapter 153: Zoning
Ordinance, Section 153.012 — Definitions, and 153.091— Use -Specific Standards related
to Wrecker & Towing Services as a Principal Use including Definitions, Use -Specific
Standards, and other regulations as necessary to define and limit the intent of
application of the Proposed Amendment based on findings to be made by the Planning
Commission.
3. Motion to table action on Resolution No. PC-2024-16.
REFERENCE AND BACKGROUND
Property: Legal Description: N/A
PID #: N/A
Planning Case Number: 2024-26
1
Planning Commission Agenda — 06/04/2024
Request(s): Amendment to the Monticello City Code, Title XV: Land Usage,
Chapter 153: Zoning Ordinance, Section 153.012 — Definitions,
and 153.091— Use -Specific Standards related to Wrecker &
Towing Services as a Principal Use including Definitions, Use -
Specific Standards, and other regulations as necessary to define
and limit the intent of application of the Proposed Amendment
Deadline for Decision: July 12, 2024 (60-day deadline)
September 10, 2024 (120-day deadline)
Land Use Designation: N/A
Zoning Designation: N/A
Overlays/Environmental
Regulations Applicable: N/A
Current Site Uses: N/A
Project Description: In a companion application, a business owner (Bob's Towing) is
seeking a Conditional Use Permit to continue operation of a
Wrecker and Towing Services business. In reviewing the existing
ordinance for the application, staff determined that amendments
to the existing language of the Zoning Ordinance establishing the
Use Standards applicable to Wrecker and Towing Services would
further clarify the ordinance.
ANALYSIS
Wrecker and Towing Services are allowed as a Conditional Use in the B-3 (highway Business)
District and as a Permitted Use 1-2 (Heavy Industrial) Zoning District. The zoning ordinance
defines Wrecker and Towing Services as follows:
WRECKER AND TOWING SERVICE. An establishment operated for the purpose of
temporary storage onsite of no more than nine wrecked or inoperable vehicles for
a period no longer than 90 days. If an establishment has ten or more inoperable
vehicles located on -site, stores inoperable vehicles for more than 90 days, stacks
vehicles top to bottom, or portions of the vehicles are dismantled or removed for
sale, it shall be considered a junkyard.
The proposed changes to the ordinance are largely related to the proximity and use aspects of
the business. The changes are meant to regulate towing and towing -related activities
separately from those more commonly associated with a salvage yard. Although the City does
Planning Commission Agenda — 06/04/2024
have a use classification for "Recycling & Salvage Center" the ordinance does not permit
salvage yards which dismantle vehicles in any zoning district. As such, aspects of the current
code are no longer applicable to this land use classification.
"Wrecker Services" are subject to a specific set of requirements in the ordinance. The proposed
changes to the standards are shown below.
(18) Wrecker and Towing Services.
(b a) All outside storage shall be enclosed by a sight -obscuring fence ofat lea up to
eight feet in height., ..� The fence and the materials used to construct it shall be
approved of by the city.
(c- b) No vehicles or junk shall be dismaRtled &F stored within the 100-year floodplain.
(d c) Upon receiving a motor vehicle which will not be repaired, the battery shall be
according to all applicable fed-e-Fal and state la.ys rules and regulatien.- the applicant will
take measures to ensure that no discharge of any fluids from any motor vehicle shall be
rmitted into or onto the Rround.
(e d) To FeduceReise, all No dismantling of motor vehicles shall be allowed. take place
(# e) No vehicles OF jUIF shall be stored within 300 feet of a well that
serves as a public or private water supply unless such well serves the business.
(if) No vehicles, 4 URk OF paFts ef etheF items shall be steFed eleseF than 100 feet ef aRY
pFepertyIine-Towed vehicles shall be stored only in areas behind the front building line
of the property, screened as required in this section. Towing equipment and vehicles may
be narked in specifically designated locations on an aaaroved site clan.
Planning Commission Agenda — 06/04/2024
The proposed amended use standards are intended to reasonably utilize property for motor
vehicle -related business as described in the B-3 purpose statement:
(E) Highway Business District, B-3. The purpose of the "B-3" (highway business) district
is to provide for limited commercial and service activities and provide for and limit the
establishment of motor vehicle oriented or dependent commercial and service
activities.
The amended use standards are also reasonable for Wrecker and Towing Services as permitted
uses located within the 1-2 District.
The limitations identified in the existing ordinance language appear to have been primarily
focused on limiting the potential impacts of salvage yard operations, which as noted, are no
longer allowed within the City.
Towing businesses are compatible with other B-3 business uses, including specifically those in
the immediate neighborhood of the proposed CUP in the companion application. With the
amendments to the use standards as proposed, staff believes that the language better reflects
the actual intent of the use classification and the districts in which the use may be allowed.
STAFF RECOMMENDED ACTION
Staff recommends approval of the amendment to the Zoning Ordinance as proposed. The
ordinance amendments are requested to better align the specific use standards applicable to
towing services.
SUPPORTING DATA
A. Resolution PC-2024-16
B. Draft Ordinance No. XXX
C. Monticello Zoning Ordinance, Excerpts
D. Monticello Official Zoning Map
la]
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC-2024-16
RECOMMENDING ADOPTION OF AN ORDINANCE AMENDING
THE ZONING ORDINANCE RELATED WRECKER AND TOWING SERVICES AS A PRINCIPAL USE
WHEREAS, the City of Monticello includes Wrecker and Towing Services as an allowed use
in B-3 and 1-2 zoning districts; and
WHEREAS, the zoning regulations applicable to Wrecker and Towing Services include
provisions relating primarily to salvage yards which is no longer an allowed land use in the
City; and
WHEREAS, the City finds that revision of the Code to specifically relate to Wrecker and
Towing Services would better serve both the City and the affected businesses; and
WHEREAS, the Planning Commission held a public hearing on June 4t", 2024 on the
application and the applicant City of Monticello and members of the public were provided
the opportunity to present information to the Planning Commission; and
WHEREAS, the Planning Commission of the City of Monticello makes the following Findings
of Fact in relation to the recommendation of approval:
The zoning amendment provides an appropriate means of furthering the
intent of the Comprehensive Plan by focusing the ordinance regulations the
specific use of Wrecker and Towing Services rather than Salvage Yards.
The proposed amendment makes no other changes to the nature of uses
that would otherwise exist in commercial or industrial districts.
3. The change in zoning language will accommodate reasonable and efficient
operation of existing or new businesses.
4. The change in language will have no expected impacts on public services,
including sewer, water, stormwater treatment, and traffic which have been
planned to serve commercial uses as expected.
5. The existing language of the code is outdated given the prohibition of
Salvage Yards in the City.
NOW, THEREFORE, BE IT RESOLVED, by the Planning Commission of the City of Monticello,
Minnesota, that the Planning Commission hereby recommends that the Monticello City
Council approves the zoning amendment to modify the regulations applicable to
Conditional Use Permits for Wrecker and Towing Services as defined in the proposed
ordinance.
ADOPTED this 41" day of June, 2024, by the Planning Commission of the City of
Monticello, Minnesota.
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC-2024-16
MONTICELLO PLANNING COMMISSION
M
ATTEST:
Paul Konsor, Chair
Angela Schumann, Community Development Director
2
MR111►Fill ►[yA01[SX.M
AN ORDINANCE AMENDING THE MONTICELLO CITY CODE XV,
CHAPTER 153, MONTICELLO ZONING ORDINANCE,
SECTIONS 153.091 (F)(18) RELATED TO
WRECKER AND TOWING SERVICES
THE CITY COUNCIL OF THE CITY OF MONTICELLO ORDAINS:
SECTION 1. § 153.091(F) is hereby amended to read as follows:
(18) Wrecker and Towing services.
(b a) All outside storage in shall be enclosed by a sight -obscuring fence of at
��up to eight feet in height_ h The fence and the materials used to construct it
shall be approved of by the city.
(e b) No vehicles er shall be ,air -anfle^' ^F stored within the 100-year floodplain.
(4 c) Upon receiving a motor vehicle which will not be repaired, the batter., shall he
_... ..,. .... _.._ _..�..._ .... .... _, ------------- ..--- , ........._ ......... - .... _110.11_ _-_-__-_-
be
acc rrding to all appliGable fo,dorall aAd State laws, rules aR d regal-,+,^n.. the applicant will
take measures to ensure that no discharge of any fluids from any motor vehicle shall be
permitted into or onto the ground.
(e d) wed Fuse, all No dismantling of motor vehicles shall be allowed. tal�e place
(f) Ne vehicle OF jURI( shall be dismaRtled er stered within 30-0- feet ef -;;Ay water b0dy-&F
r,laR d wetland regardless of size ()Nevehic.1es ems,<sha111 be Ste -Fed- v.fth1P 39feet frA-.PA the -der+., I;ne ^f a Ry
the p blie faeoli+.
(4 e) No vehicles e shall be disman. +1ed1 ^r stored within 300 feet of a well that
serves as a public or private water supply unless such well serves the business.
(i f) No vehiGles, J614 GF PaFtS of other items shall be stered eleser thaR 100 feet Of aW.'
pFeperty '*Re —.Towed vehicles shall be stored only in areas behind the front building line
of the property, screened as required in this section. Towing equipment and vehicles may
be parked in specifically designated locations on an approved site plan.
SECTION 2. The City Clerk is hereby directed to make the changes required by this
Ordinance as part of the Official Monticello City Code, Title XV, Chapter
153, Zoning Ordinance, and to renumber the tables and chapters
accordingly as necessary to provide the intended effect of this Ordinance.
The City Clerk is further directed to make necessary corrections to any
internal citations that result from said renumbering process, provided
that such changes retain the purpose and intent of the Zoning Ordinance
as has been adopted.
SECTION 3. This Ordinance shall take effect and be in full force from and after its
passage and publication. The ordinance in its entirety and map shall be
posted on the City website after publication. Copies of the complete
Ordinance and map are available online and at Monticello City Hall.
ATTEST:
Rachel Leonard, Administrator
AYES:
NAYS:
Lloyd Hilgart, Mayor
PA
§ 153.012 DEFINITIONS.
WRECKER AND TOWING SERVICE. An establishment operated for the purpose of temporary
storage onsite of no more than nine wrecked or inoperable vehicles for a period no longer than
90 days. If an establishment has ten or more inoperable vehicles located on -site, stores
inoperable vehicles for more than 90 days, stacks vehicles top to bottom, or portions of the
vehicles are dismantled or removed for sale, it shall be considered a junkyard.
§ 153.090 USE TABLE.
TABLE 5-1: USES BY DISTRICT
Use Types
Base Zoning Districts
Additional
Requirements
"P" = Permitted
AO
RA
R1
R2
TN
R3
R4
MH
B1
B2
B3
B4
CCD
PCD
IBC
11
12
"C" = Conditionally
Permitted
"I" = Interim
Permitted
Industrial Uses
Wrecker and towing
C
P
§ 153.091(F)(17)
services
§ 153.091 USE -SPECIFIC STANDARDS.
(F) Regulations for industrial uses.
(18) Wrecker services.
(a) No portion of any salvage yard or junkyard shall be located within 500 feet of
any residence district.
(b) All outside storage in such yards shall be enclosed by a sight -obscuring fence
of at least eight feet in height, which fence and the materials used to construct it shall be
approved of by the city.
(c) No vehicles or junk shall be dismantled or stored within the 100-year
floodplain.
(d) Upon receiving a motor vehicle which will not be repaired, the battery shall be
removed and the engine lubricant, transmission fluid, brake fluid and engine coolant
shall be drained into watertight, covered containers and shall be recycled or disposed of
according to all applicable federal and state laws, rules, and regulations. No discharge
of any fluids from any motor vehicle shall be permitted into or onto the ground.
(e) To reduce noise, all dismantling of motor vehicles shall take place during
timeframes deemed reasonable by the city.
(f) No vehicle or junk shall be dismantled or stored within 300 feet of any water
body or inland wetland, regardless of size.
(g) No vehicles or junk shall be stored within 300 feet from the property line of
any school, church, public playground, public park or cemetery or within ordinary view
from the public facility.
(h) No vehicles or junk shall be dismantled or stored within 300 feet of a well that
serves as a public or private water supply unless such well serves the business.
(i) No vehicles, junk or parts of other items shall be stored closer than 100 feet of
any property line.
L
Planning Commission Agenda — 06/04/2024
2B. Public Hearine - Consideration of a
uest for Conditional Use Permit for Wrecker
and Towing Services as a Principal Use in the B-3, Highway Business District.
Applicant: Nick Christenson o/b/o Bob's Towing.
Prepared by:
Meeting Date:
Council Date (pending
Stephen Grittman, Grittman
06/04/2024
Commission action):
Consulting, City Planner
06/24/2024
Additional Analysis by:
Community Development Director, Community & Economic Development Coordinator
ALTERNATIVE ACTIONS
Decision 1: Consideration of a Conditional Use Permit for Wrecker and Towing Services as a
Principal Use in the B-3, Highway Business District.
1. Motion to adopt Resolution No. PC-2024-17 recommending approval of a Conditional
Use Permit for Wrecker and Towing Services as a Principal Use in the B-3, Highway
Business District, based on the findings in said resolution and subject to the conditions
in Exhibit Z.
2. Motion to deny the adoption of Resolution No. PC-2024-17 recommending approval of a
Conditional Use Permit for Wrecker and Towing Services as a Principal Use in the B-3,
Highway Business District, based on findings to be made by the Planning Commission.
3. Motion to table action on Resolution No. PC-2024-17.
REFERENCE AND BACKGROUND
Property: Address: 217 & 219 Sandberg Road
Legal Description: A Portion of Lot 4, Block 2, Sandberg South
PID #: 155-027-002040
Planning Case Number: 2024-23
Request(s): Conditional Use Permit for Wrecker and Towing Services
as a Principal Use in the B-3, Highway Business District
Deadline for Decision: July 7, 2024 (60-day deadline)
September 5, 2024 (120-day deadline)
Land Use Designation: RC, Regional Commercial
1
Planning Commission Agenda — 06/04/2024
Zoning Designation: B-3, Highway Business
Overlays/Environmental
Regulations Applicable:
Freeway Bonus Sign District
Current Site Uses:
Wrecker and Towing Service, and Retail Sales (Two -Tenant
Facility)
Surrounding Land Uses:
North: Auto Body Repair —Major
East: Plumbing Service Company
South: Auto Body Repair —Major
West: Vacant Commercial Land
Project Description
ANALYSIS
The applicant is seeking a Conditional Use Permit to continue
operation of a Wrecker and Towing Services business. The
applicant utilizes a portion of the existing building for office and
dispatch purposes, and the rear portion of the site for temporary
storage of towing equipment and vehicles pending transport to
other locations.
An existing Conditional Use Permit for Planned Unit Development
is in place for the property. The CUP for PUD authorized vehicle
storage on site.
Wrecker and Towing Services are listed as a Conditional Use in the B-3 District, the applicable
zoning district for the subject property. The zoning ordinance defines Wrecker and Towing
Services as follows:
WRECKER AND TOWING SERVICE. An establishment operated for the purpose of
temporary storage onsite of no more than nine wrecked or inoperable vehicles for
a period no longer than 90 days. If an establishment has ten or more inoperable
vehicles located on -site, stores inoperable vehicles for more than 90 days, stacks
vehicles top to bottom, or portions of the vehicles are dismantled or removed for
sale, it shall be considered a junkyard.
The property in question has received approval of prior Conditional Use Permits that allowed
towing facilities in connection with both on -site and nearby auto repair facilities. However, the
auto -repair services are no longer associated with this property.
Planning Commission Agenda — 06/04/2024
As this applicant operates the wrecker and towing services at this property as a separate
business, the proposal seeks to formalize the "Wrecker and Towing" CUP provisions for the
current user.
The applicant has provided an illustration of the proposed site that shows an area generally
behind the principal building as being used for the storage of towed vehicles and 4-5 tow
vehicles. The area is enclosed by a solid fence that extends from the building's front corner and
along the side and rear property lines. Parking for staff and clients is available in the front area
of the property.
The proposed CUP, with the provisions identified by the applicant's narrative, reasonably
utilizes the site for motor vehicle -related business as described in the B-3 purpose statement:
(E) Highway Business District, B-3. The purpose of the "13-3" (highway business) district
is to provide for limited commercial and service activities and provide for and limit the
establishment of motor vehicle oriented or dependent commercial and service
activities.
Conditional Use Permit Criteria. Approval of a conditional use permit application (including
amendments) requires that the City find that conditions can be established to ensure that all the
following criteria will always be met:
(i) The conditional use will not substantially diminish or impair property values within the
immediate vicinity of the subject property.
Staff Comment: As an existing business, and consistency with the requirements of the
ordinance (as amended) and with other applicable code standards, it is not expected that
the CUP will result in any impact to property values.
(ii) The conditional use will not be detrimental to the health, safety, morals, or welfare of
persons residing or working near the use.
Staff Comment: The towing operation contributes to health and safety, and is a common
and important function. As it is located in an area of other similar businesses, there is no
expectation that the use will have detrimental impacts.
(iii) The conditional use will not impede the normal and orderly development of surrounding
property for permitted uses predominant in the area.
Staff Comment: Existing development patterns are well established and the CUP will not
change the pattern or intensity of uses in the area.
(iv) The conditional use will not pose an undue burden on public utilities or roads, and
adequate sanitary facilities are provided.
3
Planning Commission Agenda — 06/04/2024
Staff Comment: The CUP will accommodate a use that is already operating in the area,
and which is well -served by existing infrastructure.
(v) The conditional use can provide adequate parking and loading spaces, and all storage on
the site can be done in conformance with City Code requirements.
Staff Comment: The existing site supplies adequate on -site parking without the need for
the parking spaces being converted by this project. Storage areas are behind the building
and screen fence, as required by code regulations.
(vi) The conditional use will not result in any nuisance including but not limited to odor, noise,
or sight pollution.
Staff Comment: With adherence to the required screening and location standards of the
relevant codes, no nuisances are expected.
(vii) The conditional use will not unnecessarily impact natural features such as woodlands,
wetlands, and shorelines, and all erosion will be properly controlled.
Staff Comment: No impacts to any natural features are expected with this project.
(viii) The conditional use will adhere to any applicable additional criteria outlined in the Zoning
Ordinance for the proposed use.
Staff Comment: The applicant's site plan and other materials indicate that the project
will be in compliance with relevant zoning requirements.
Further, staff has proposed a companion application to amend the zoning ordinance language
to better reflect regulations specific to towing and towing -related activities.
The proposed amendments to the "Wrecker Services" use standards are as follows.:
(18) Wrecker and Towing Services.
(b a) All outside storage *^ SUGh YaFd shall be enclosed by a sight -obscuring fence of at
p up to eight feet in height_ h The fence and the materials used to construct it
shall be approved of by the city.
(c- b) No vehicles elk shall be dismantled ^F stored within the 100-year floodplain.
(4 c) Upon receiving a motor vehicle which will not be repaired, the batter„ shall he
aceardiRg to all plie bl federal and star laws, rules,and nd regulations. the applicant will
4
Planning Commission Agenda — 06/04/2024
take measures to ensure that no discharge of any fluids from any motor vehicle shall be
permitted into or onto the ground.
(e d) ToTedueeneise, all No dismantling of motor vehicles shall be allowed. take place
.d6 iFin . timeframes deemed r able by the e4
(g) No vehieles er junk shall be stored within 300 feet fre.m. the property iine of aRy
(# e) No vehicles eFjURk shall be disma^+I^,d ^r stored within 300 feet of a well that
serves as a public or private water supply unless such well serves the business.
(i f) ra-e vehicles, 614-eF p'aFtr Af Pthpr $h;411 he c+^r^id rI^c^r than 'I On feet ^f any
property line —.Towed vehicles shall be stored only in areas behind the front building line
of the property, screened as required in this section. Towing equipment and vehicles may
be parked in specifically designated locations on an approved site plan.
The towing business is compatible with other B-3 business uses, including specifically those in
the immediate neighborhood of the proposed CUP. The proposed amendments to the
ordinance would further support and define the requirements specific to wrecker and towing
services.
STAFF RECOMMENDED ACTION
Staff recommends approval of the CUP for Bob's Towing as proposed, with the conditions
identified in the revised ordinance text, and summarized in Exhibit Z. The proposed use is
consistent with prior use of the site for Auto Repair -Minor, and with uses generally anticipated
in the B-3 (Highway Business) District.
SUPPORTING DATA
A. Resolution PC-2024-17
B. Aerial Site Image
C. Applicant Narrative
D. Aerial Image Noting Vehicle Parking & Storage Locations
Z. Conditions of Approval
Planning Commission Agenda — 06/04/2024
EXHIBIT Z
Conditions of Approval
Conditional Use Permit for Wrecker and Towing Services
as a Principal Use in the B-3, Highway Business District
PI D: 155-027-002040
Legal: A Portion of Lot 4, Block 2, Sandberg South
Address: 217 & 219 Sandberg Road, Monticello, MN 55362
1. Consistent with the City's definition, no more than nine inoperable towed vehicles may
be stored on site at one time.
2. All outside storage in such yards shall be enclosed by a sight -obscuring fence of -up to
eight feet in height. The fence and the materials used to construct it shall be approved
of by the city.
3. No vehicles shall be stored within the 100-year floodplain.
4. Upon receiving a motor vehicle which will not be repaired, the applicant will take
measures to ensure that no discharge of any fluids from any motor vehicle shall be
permitted into or onto the ground.
5. No dismantling of motor vehicles shall be allowed.
6. No vehicles shall be stored within 300 feet of a well that serves as a public or private
water supply unless such well serves the business.
7. Towed vehicles shall be stored only in areas behind the front building line of the
property, screened as required in this section. Towing equipment and vehicles may be
parked in specifically designated locations on an approved site plan.
8. All employee parking is to occur on -site.
9. Comments and recommendations of other Staff and Planning Commission.
1.1
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC-2024-17
RECOMMENDING APPROVAL OF AN AMENDMENT TO A
CONDITIONAL USE PERMIT FOR A WRECKER AND TOWING SERVICES BUSINESS A B-3,
HIGHWAY BUSINESS DISTRICT
PID 155-027-002040
WHEREAS, the applicant has submitted a request to amend an existing Conditional Use
Permit for the operation of a Wrecker and Towing facility; and
WHEREAS, the proposed Wrecker and Towing facility would continue the previous use
consistent with the requirements of the prior approvals; and
WHEREAS, the proposed use would have no other expected impacts on the site; and
WHEREAS, the site is zoned Highway Business (B-3), which allows such use as an accessory
use by Conditional Use Permit; and
WHEREAS, the use would continue to be consistent with the long-term land use plan for the
City and the location, including the designation of the site for "Community Commercial"
uses; and
WHEREAS, the applicants have provided materials documenting that the proposed use
facilitate long-term use of the site under revised zoning regulations as proposed separately;
and
WHEREAS, the applicants have provided materials documenting that the proposed use will
comply with the terms and standards of the zoning ordinance with the recommendations
approved by the Planning Commission; and
WHEREAS, the Planning Commission held a public hearing on June 4t", 2024 on the
application and the applicant and members of the public were provided the opportunity to
present information to the Planning Commission; and
WHEREAS, the Planning Commission has considered all of the comments and the staff
report, which are incorporated by reference into the resolution; and
WHEREAS, the Planning Commission of the City of Monticello makes the following Findings
of Fact in relation to the recommendation of approval:
1. The applicant has provided plans demonstrating that the proposed facility will be
in compliance with the standards for Wrecker and Towing Service facilities found
in the zoning ordinance as proposed to be revised.
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC-2024-17
2. The applicant has provided plans demonstrating that the use will improve long-
term use of the site for the current and future facility.
3. The parcel is intended for commercial uses, which is the existing and proposed
use of the property.
4. The operation of the business will not create noise, odors, visual impacts, or
other noticeable impacts on the property or the neighborhood beyond those
expected for allowed uses in the zoning district.
5. The use will improve convenience to customers and to the public, consistent
with the City's economic development objectives for commercial property.
NOW, THEREFORE, BE IT RESOLVED, by the Planning Commission of the City of Monticello,
Minnesota, that the Planning Commission hereby recommends that the Monticello City
Council approve the amendment to the Conditional Use Permit for electric vehicle charging
facilities, subject to the conditions identified in Exhibit Z of the Staff report, as listed below:
Consistent with the City's definition, no more than nine inoperable towed
vehicles may be stored on site at one time.
All outside storage in such yards shall be enclosed by a sight -obscuring fence
of up to eight feet in height. The fence and the materials used to construct it
shall be approved of by the city.
No vehicles shall be stored within the 100-year floodplain.
4. Upon receiving a motor vehicle which will not be repaired, the applicant will
take measures to ensure that no discharge of any fluids from any motor
vehicle shall be permitted into or onto the ground.
5. No dismantling of motor vehicles shall be allowed.
6. No vehicles shall be stored within 300 feet of a well that serves as a public or
private water supply unless such well serves the business.
7. Towed vehicles shall be stored only in areas behind the front building line of
the property, screened as required in this section. Towing equipment and
vehicles may be parked in specifically designated locations on an approved
site plan.
8. All employee parking is to occur on -site.
9. Comments and recommendations of other Staff and Planning Commission.
ADOPTED this 41" day of June, 2024 by the Planning Commission of the City of
Monticello, Minnesota.
MONTICELLO PLANNING COMMISSION
2
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC-2024-17
M
ATTEST:
Paul Konsor, Chair
Angela Schumann, Community Development Director
Request for CUP for Wrecker & Towing Service as a Principal Use
PI D:155027002040 Address: 217 & 219 Sandberg Road Legal: Portion of Lot 4, Block 2, Sandberg South
Created by: City of Monticello
- - - - - - - - - - - - cHEpsa R�i&�17
164/7
�1 i f1
J,
y u•
�L
155027002040
70 • j
44 AA
I
or
155500142203
-A
A
Bob's Towing & Recovery Inc.
219 Sandberg Road
Monticello, MN 55362
April 30, 2024
City of Monticello
Land Use Application — Project Narrative
The primary use for this property is to utilize the space for business operations. We utilize the
front retail office as our dispatch center, break area, and meeting space. We utilize the buildings
to store our trucks and to complete maintenance on our fleet. Our fleet consists of 9 trucks.
During the day our fleet is being utilized throughout the area, at night, 4 trucks are kept at this
location, inside our gate. From time to time, drivers will have down time and come back to the
shop as their home base.
The impound/storage lot is another aspect of the locations use. We are contacted by multiple
law enforcement entities, such as the Wright County Sherriff's Office, Sherburne County
Sherriff's Office, Minnesota State Patrol, Becker Police Department, Big Lake Police Department,
and Metro Transit Police Department to respond to tow vehicles either involved in a crash or to
impound the vehicle for various reasons. For this location, we have approximately 12-15
vehicles a month that come in and go out. The typical time a vehicle is in impound is 3 days,
and for an accident 5 days. On occasion we are left with vehicles that are not picked up which
we dispose of at 45 days, per state statute.
A concern that may come up regarding vehicles that have crashed is leaking fluids. Most
accidents, if fluids leak, leak at the scene of an accident or on the road from the accident scene
to our lot. We utilize vehicle diapers, floor dry, siphon pumps, and other methods to mitigate
any fluid spills as much as possible. We would categorize ourselves as in line with any other
mechanic or body shop in the area.
Overall, we have great relationships built with our neighbors in the area. As small businesses,
we help each other out when needed and do our part to be good neighbors.
6jaqpueS s
IL
CU
2 1L
0
CJ
Ear
0
4-J
un
to
AM
V a
- $I- al
Planning Commission Agenda — 06/04/2024
2C. Public Hearine - Consideration of a Reauest for Preliminary & Final Plat of Cedar Street
Storage; Revocation of an Existing Conditional Use Permit for Planned Unit
Development; Development & Final Stage Planned Unit Development; Rezoning to
Planned Unit Development. Applicant: Bruce Stainbrook o/b/o StorageLink
Prepared by:
Meeting Date:
Council Date (pending
Stephen Grittman, Grittman
06/04/2024
Commission action):
Consulting, City Planner
06/24/2024
Additional Analysis by:
Community Development Director, Community & Economic Development Coordinator, Chief
Building Official/Zoning Administrator, Assistant City Engineer
ALTERNATIVE ACTIONS
Decision 1: Consideration of a Zoning Amendment creating the Cedar Storage PUD Zoning
District and rezoning the subject property from Pointes at Cedar District to Cedar Storage
PUD Zoning District.
1. Motion to adopt Resolution No. PC-2024-18 recommending approval of a Zoning
Amendment creating the Cedar Storage PUD Zoning District and rezoning the subject
property from Pointes at Cedar District to Cedar Storage PUD Zoning District subject to
the conditions in Exhibit Z and based on findings in said resolution.
2. Motion to deny the adoption of Resolution No. PC-2024-18 recommending approval of a
Zoning Amendment creating the Cedar Storage PUD Zoning District and rezoning the
subject property from Pointes at Cedar District to Cedar Storage PUD Zoning District
based on findings to be made by the Planning Commission.
3. Motion to table action on Resolution No. PC-2024-18.
Decision 2: Consideration of Development Stage PUD approval for Cedar Street Storage.
1. Motion to adopt Resolution No. PC-2024-19 recommending approval of a Development
Stage PUD for Cedar Storage Addition subject to the conditions in Exhibit Z and based on
findings in said resolution.
2. Motion to deny the adoption of Resolution No. PC-2024-19 recommending approval of a
Development Stage PUD approval for Cedar Storage Addition based on findings to be
made by the Planning Commission.
3. Motion to table action on Resolution No. PC-2024-19.
Planning Commission Agenda — 06/04/2024
Decision 3: Consideration of a Preliminary Plat for Cedar Street Storage.
1. Motion to adopt Resolution No. PC-2024-20 recommending approval of the Preliminary
Plat for Cedar Storage Addition subject to the conditions in Exhibit Z and based on
findings in said resolution.
2. Motion to deny the adoption of Resolution No. PC-2024-20 recommending approval of
the Preliminary Plat for Cedar Storage Addition based on findings to be made by the
Planning Commission.
3. Motion to table action on Resolution No. PC-2024-20.
Decision 4: Consideration of Revocation of a Conditional Use Permit for a PUD for the former
Amax Self Storage.
1. Motion to adopt Resolution No. PC-2024-21 recommending approval of Revocation of a
Conditional Use Permit for a PUD for the former Amax Self Storage, subject to the
conditions in Exhibit Z and based on findings in said resolution.
2. Motion to deny the adoption of Resolution No. PC-2024-21 recommending approval of
the Revocation of a Conditional Use Permit for a PUD for the former Amax Self Storage
based on findings to be made by the Planning Commission.
3. Motion to table action on Resolution No. PC-2024-21.
REFERENCE AND BACKGROUND
Property: Address: 36 Dundas Road
Legal Description: Lot 1, Block 2, AMAX Addition and Lengthy
Legal Descriptions —Contact City Hall
PID #: 155-213-002010, 155-500-142305, 155-500-
142304
Planning Case Number: 2024-21
Request(s): 1. Preliminary & Final Plat of Cedar Street Storage;
2. Revocation of an Existing Conditional Use Permit for
Planned Unit Development;
3. Development & Final Stage Planned Unit Development;
4. Rezoning to Planned Unit Development.
Deadline for Decision: July 1, 2024 (60-day deadline)
August 30, 2024 (120-day deadline)
K
Planning Commission Agenda — 06/04/2024
Land Use Designation: Commercial and Residential Flex
Zoning Designation: Pointes at Cedar District (Sub -District Tilia)
Overlays/Environmental
Regulations Applicable: NA
Current Site Uses: Commercial Self -Storage by CUP for PUD
Surrounding Land Uses: North: Vacant Pointes at Cedar District
East: Pointes at Cedar Park/Open Space
South: Pointes at Cedar Park/Open Space
West: B-3 Commercial
Project Description: The applicants seek updated PUD approvals to remove existing
temporary storage pods, which exist under an expiring Interim
Use Permit, and replace those temporary units with permanent
self -storage as an expansion of the existing Commercial Self -
Storage Use. The project requires a replat, replacement of the old
CUP for PUD with a revision to the Pointes at Cedar District and
rezoning to PUD, and Development and Final Stage PUD approvals
under the revised PUD zoning district.
ANALYSIS
Rezoning to PUD — Cedar Street Storage PUD District
The subject property is a Commercial Self -Storage facility, authorized under a prior Conditional
Use Permit for Planned Unit Development and a number of subsequent amendments. The site
is currently occupied by a series of individual commercial self -storage buildings (7 total), as well
as a series of individual portable storage pods that were placed along the south boundary of the
property by Interim Use Permit.
The IUP for the storage pods was issued nearly ten years ago, with a ten-year time limit which is
set to expire on June 9, 2024. The terms of the IUP are that upon expiration, the storage pods
must be removed. That IUP was issued as an amendment to the original Conditional Use Permit
for Planned Unit Development under a B-3, Highway Business zoning designation. The IUP
proposal was brought forward as a way of using the southerly portion of the property, with the
potential for future property acquisition to expand the storage business with permanent
buildings.
Subsequent to the IUP's issuance, the City created the Pointes at Cedar land use concept and
Zoning District, rezoning the subject property to the Pointes at Cedar District, its current
Planning Commission Agenda — 06/04/2024
designation. As a part of the Pointes at Cedar planning, the City negotiated to purchase the
adjacent surrounding property and planned for public use of the areas adjoining the self -
storage business property, foreclosing the acquisition of additional expansion land.
Commercial self -storage is not an allowed land use in the Pointes at Cedar District. Moreover,
4
§6L-,
L
• Dundas Rd
AL
Site
18
t
the Pointes at Cedar zoning district
anticipates a process separate from other
zoning designations in that it discourages
the use of PUD zoning, providing instead a
more comprehensive set of development
objectives and district standards.
Although the Pointes at Cedar discourages
the use of PUD, staff is recommending the
rezoning to PUD to establish a clear set of
regulations for this existing use that are in
closer alignment with The Pointes at Cedar
District, rather than continuation under
the prior series of amended Conditional
Use Permits for Planned Unit
Development. This requires rezoning the
site to a new PUD district and concurrently
retiring the old CUP/PUD. Although no
longer zoned Pointes at Cedar District
(PCD), the PUD ordinance proposed will
apply the standards of the PCD to this
project, recognizing the existing use and site development.
The rezoning is not necessary to continue the current business operation. It exists as a legal
non -conforming use in the Pointes at Cedar District, which also shows the current use in the
Pointes' site plan elements. As a legal nonconformity, it is permitted to continue to its current
extent, including the right to maintain, remodel, and reconstruct existing buildings and uses on
the property, but without expansion.
The rezoning is intended to facilitate the expansion of the permanent buildings on the site.
With the IUP expiring, and opportunities for land acquisition no longer available, the self -
storage property owner is seeking a way to continue the intensification of storage use on the
southerly portion of the property. The proposal would add an additional permanent storage
building along the south property line, generally in the location of the current storage pods.
la]
Planning Commission Agenda — 06/04/2024
As detailed in the applicant's site planning and other documents, to accommodate the
expansion as proposed, the new buildings would be placed on or near the south property line
with little or no setback.
Development and Final Stage PUD
The Development Stage PUD consists of a site and building plan showing the proposed location
of the additional southerly building. The building would generally follow the south property
line, a total of 310 feet in length, stepping the rear wall of the building in 5-foot increments of
depth (from 15 feet deep on the east to 25 feet deep on the west).
The interior drive -aisle width is approximately 20 feet in width. Access to the individual units
would be only from the interior side.
The applicants indicate that they would finish the exterior wall of the building with a stucco
finish facing the outward (south) wall portion. Images illustrating the proposed finish have been
provided.
While the stepping of the building is a positive in terms of breaking up the visual line of the
expanse of the south wall, the staggered nature of the building creates a series of small pockets
of property which would not be accessible to the property owners for maintenance, since the
corners of each "stagger -point" would touch the property line.
EXISTING STORAGE BUILDING
INLET PROTECTION
�•
EXISTIN
971.83
'/�
.. • 962.50
'962.50 983.00.. .. ' • . .983.00 963.50 ' .
977.93'
-so• PROPOSED BUILDING 'A' 15D
971.8a
'962.50
25 971.83 1 AREA = 6,300 SF 971'� 15'
�3.�
_ _ 962.50
SILT SOCK
Concerns about trash accumulation, weed growth, or other maintenance issues would raise
long-term issues in this area. The City's plans for the Pointes at Cedar include the area directly
south of this property line to be used as the primary access point to the public spaces of the
Pointes area. Landscape screening, and likely maintenance of these pocket areas, would fall to
the City as a part of its development of the Pointes at Cedar project. The maintenance options
for these areas should be resolved if the plan proceeds. Because the design of the building and
the zero -lot -line configuration create these areas of inaccessible property, it is unclear how
these areas would be maintained.
5
Planning Commission Agenda — 06/04/2024
The applicants suggest in their narrative that the buildings will be covered by a stucco finish
exterior similar to that used on the external walls of their Chelsea property to the west.
However, this plan shows no additional screen wall beyond the extent of the building length.
The site would otherwise continue to be visible from the Pointes area on the south and east
sides of the property, leaving the remainder of any desired screening and landscaping to the
City.
When considering PUD development, the Zoning Ordinance requires that the flexibility granted
under a PUD project from standard zoning regulations is justified by additional amenities or
development qualities that would not otherwise be likely to be included.
The flexibility for this PUD is both the additional building on a single lot (or across existing lot
lines if left unplatted), as well as a significant accommodation to building setback along the
south boundary of the site.
The applicants suggest that the PUD enhancement is the additional solid screening that the new
building would provide for views of the westerly two-thirds of the site's storage buildings.
Without the construction of this new unit, upon removal of the storage pods, the entire south
line of the building and door accesses of the existing permanent buildings will be fully visible
unless a new building is constructed.
If the plan is to be considered for PUD approval, additional screening and architectural
treatment would be required conditions of the project. There is some room along the south
boundary area, east of the proposed building, to add landscape screening, or additional wall
screening, or both. In addition, adding a screen wall to the east side of the existing property
would help buffer the views of the existing site from the future public spaces in the Pointes
open spaces. There is currently no additional landscaping included with the application.
Landscaping elements consistent with The Pointes at Cedar's central biome are recommended.
Revocation of prior Conditional Use Permit for PUD
The rezoning to PUD, if adopted, is intended to replace the prior CUP/PUD. The Interim Use
Permit for the temporary storage pods will expire under either the existing or new zoning. With
the adoption of a new PUD zoning district, revocation of the prior CUP/PUD would be an
appropriate companion action.
Preliminary and Final Plat
The existing site consists of three separate development parcels. A portion of the property is
currently unplatted. In the current site configuration, existing buildings cross property lines.
11
Planning Commission Agenda — 06/04/2024
1555001423 3
\r
�c 15 219 t I)II4DAcRP
1552 061 1U 15523 00010
� 1S°,tts�wtU1�
Q - _
W
" C9
r
" t �
i Y
{ � v
The proposed plat will resolve both conditions, platting all property and eliminating the
problematic lot and building configuration. The proposed plat would combine the parcels into a
single PUD zoning parcel and formally dedicate the balance of right of way for Dundas Road.
Dundas Road is currently in easement across the easterly portion of the site, rather than
dedicated as right of way.
The PUD zoning accommodates the multiple building layout on the single parcel.
The primary change from typical plat requirements is that the perimeter lot line drainage and
utility easement that would normally be required along the south boundary line would be
shifted to a location internal to the site, since a building would occupy what would normally be
the location of that easement. The City Engineer has recommended an internal drainage and
utility easement along the access drive aisle to accommodate typical easement needs in place
of the customary lot line easement.
The platting process will also require the vacation of existing easements to combine the parcels
as shown, with easements to be reestablished as required by the City Engineer with the plat.
No access modifications or changes to public utilities are required with this plat.
The City Engineer has provided a separate comment letter on the plat, as well as related
grading and drainage concerns.
STAFF RECOMMENDED ACTION
The rezoning and expansion of the current Commercial Self -Storage facility raises some land
use policy issues for the Pointes at Cedar District. Staff would recommend the PUD and related
7
Planning Commission Agenda — 06/04/2024
actions only with resolution of the screening, landscaping, and maintenance concerns raised in
this report.
SUPPORTING DATA
A. Resolution PC-2024-18, Rezoning to Cedar Street Storage PUD District
B. Resolution PC-2024-19, Development Stage PUD for Cedar Street Storage
C. Resolution PC-2024-20, Preliminary Plat of Cedar Street Storage
D. Resolution PC-2024-21, Revocation of CUP for PUD for the former AMAX Self Storage
E. Draft Ordinance No. 8XX
F. Draft Revocation of Conditional Use Permit for Planned Unit Development Proceedings
G. Aerial Site Image
H. Applicant Narrative
I. Preliminary Plat of Cedar Street Storage
J. Draft Final Plat of Cedar Street Storage
K. Grading Plan
L. Image of Exterior Wall Design of Proposed Building
M. Proposed Storage Building Design Plan Set
N. Trachte Building Systems Inc. Project Calculations
O. Chief Building Official/Zoning Administrator's Letter, Dated May 30, 2024
Z. Conditions of Approval
H.,
Planning Commission Agenda — 06/04/2024
EXHIBIT Z
Conditions of Approval
Preliminary Plat and Development Stage PUD
Cedar Storage Addition and Cedar Storage PUD District
The PUD is subject to submission of final stage site plans compliant with these
conditions, with no outdoor storage allowed on site.
2. The applicants identify a suitable maintenance process for the south side of the building
and site area, to be approved by the City Council.
3. The applicants supplement the request with a Landscape Plan that shows extensive
screen plantings consistent with the Central biome of The Pointes at Cedar along the
south boundary not occupied by the new building.
4. The applicants provide intense screening for the east property line area, or in the
alternative, the applicants extend the screen wall (similar to that used on the applicants'
Chelsea Road site) from the building to the east property line.
5. The City approves vacation of easements that lie under existing or proposed building
sites, with drainage and utility easements to be reestablished per the City Engineer's
recommendations.
6. Compliance with the terms of the Chief Building Official/Zoning Administrator's letter
dated May 30, 2024.
7. Comments and recommendations of the City Engineer's Office as applicable.
8. Comments and recommendations of other Staff and Planning Commission.
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC 2024-18
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF MONTICELLO AMENDING SECTION 153.047 OF THE
MONTICELLO CITY CODE, KNOWN AS THE ZONING ORDINANCE,
CREATING THE CEDAR STREET STORAGE PLANNED UNIT DEVELOPMENT DISTRICT,
AND REZONING THE SUBJECT PROPERTY TO CEDAR STREET STORAGE PUD DISTRICT
WHEREAS, the applicant is seeking a Planned Unit Development for a commercial project,
consisting of Commercial Self Storage, to be platted as Lot 1 of the concurrent request for the
Cedar Street Storage Addition plat; and
WHEREAS, the proposed PUD District would create the uses and standards applicable to all
development in the Cedar Street Storage District, to consist of a multiple -building commercial
self storage facility as an allowed use in the proposed Cedar Street Storage Planned Unit
Development zoning district; and
WHEREAS, the site is concurrently subject to requests for a preliminary plat for the proposed
project, and a Development Stage PUD approval for the Cedar Street Storage PUD District; and
WHEREAS, the proposed PUD and its associated plat creates a dedication for public easements,
and adequate right of way related to public streets along with drainage and utilities which will
serve various phases of the PUD; and
WHEREAS, the subject parcels will be consistent with requirements of the City's Subdivision and
Zoning Ordinance requirements under the adopted Cedar Street Storage PUD District
standards, as well as other applicable standards of the Monticello Zoning Ordinance; and
WHEREAS, the subject property will be developed under the requirements of the Monticello
Comprehensive Plan, which designate the land use for the property as Commercial and
Residential Flex, currently zoned as the Pointes at Cedar District; and
WHEREAS, the proposed Cedar Street Storage PUD District establishes standards and
development regulations which are inconsistent with the current Pointes at Cedar Zoning
District; and
WHEREAS, the Planning Commission has reviewed the application for the Amendment to the
Zoning Ordinance pursuant to the regulations of the applicable ordinances and land use plans
and policies; and
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC 2024-18
WHEREAS, the Planning Commission held a public hearing on June 41h, 2024 on the application
and the applicant and members of the public were provided the opportunity to present
information to the Planning Commission; and
WHEREAS, the Planning Commission has considered all of the comments and the staff report,
which are incorporated by reference into the resolution, and make the following Findings of
Fact in relation to the recommendation of approval:
1. The proposed Zoning District is required to address the existing use, and provide the
potential for expansion due to the intent and purpose of the plans, goals, and policies of
the Monticello Comprehensive Plan related to the Pointes at Cedar Small Area Plan.
2. The proposed uses will be consistent with the existing and future land uses in the area in
which they are located, provided the development is adequately screened from the
adjoining Pointes at Cedar area.
3. The impacts of the improvements are those anticipated by the existing and future land
uses and are addressed through standard review and ordinances as adopted.
4. The proposed PUD District and the associated development plans accommodate
additional public and private improvements, including streets, utilities, and stormwater
controls that ensure the project will continue to be consistent with the City's long-term
public service infrastructure.
5. The proposed PUD does not interfere with reasonable extensions of development and
infrastructure to serve other undeveloped property in the area.
6. As a property which has been used for commercial self storage for many years, the
proposed PUD is not anticipated to negatively impact surrounding properties or values.
7. Approval of the PUD will not result in the need for additional road or utility
infrastructure other than that being provided by and for the proposed use, and should
not otherwise negatively impact the health or safety of the community.
NOW, THEREFORE, BE IT RESOLVED, by the Planning Commission of the City of Monticello,
Minnesota recommends to the City Council that the proposed amendment to the Monticello
Zoning Ordinance creating the Cedar Street Storage PUD District, and rezoning the area being
platted as Lot 1 of the Cedar Street Storage PUD District, be approved subject to the conditions
of Exhibit Z of the staff report, as follows:
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC 2024-18
1. The PUD is subject to submission of final stage site plans compliant with these
conditions, with no outdoor storage allowed on site.
2. The applicants identify a suitable maintenance process for the south side of the building
and site area, to be approved by the City Council.
3. The applicants supplement the request with a Landscape Plan that shows extensive
screen plantings consistent with the Central biome of The Pointes at Cedar along the
south boundary not occupied by the new building.
4. The applicants provide intense screening for the east property line area, or in the
alternative, the applicants extend the screen wall (similar to that used on the applicants'
Chelsea Road site) from the building to the east property line.
5. The City approves vacation of easements that lie under existing or proposed building
sites, with drainage and utility easements to be reestablished per the City Engineer's
recommendations.
6. Compliance with the terms of the Chief Building Official/Zoning Administrator's letter
dated May 30, 2024.
7. Comments and recommendations of the City Engineer's Office as applicable.
8. Comments and recommendations of other Staff and Planning Commission.
ADOPTED this 4th day of June, 2024 by the Planning Commission of the City of
Monticello, Minnesota.
►Ti[IIIIIOII[Kitil Im'I iiel► ► ► etK� ►] 1► I�Y.Y[�I�I
-32
ATTEST:
Paul Konsor, Chair
Angela Schumann, Community Development Director
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF MONTICELLO RECOMMENDING APPROVAL OF A
DEVELOPMENT STAGE PUD FOR CEDAR STREET STORAGE ADDITION
WHEREAS, the applicant is seeking a development stage Planned Unit Development approval
for a addition to a multiple building commercial self storage project; and
WHEREAS, the proposed PUD would consist of development existing and proposed commercial
self storage buildings as an allowed use in the proposed Cedar Street Storage Planned Unit
Development zoning district; and
WHEREAS, the site is concurrently subject to requests a preliminary plat for the proposed
project, and an amendment to the City's PUD zoning ordinance and rezoning to Cedar Street
Storage PUD District; and
WHEREAS, the plat creates a dedication for public easements, and adequate right of way
related to public streets along with drainage and utilities which will serve various phases of the
PUD; and
WHEREAS, the subject parcels will be consistent with requirements of the City's Subdivision and
Zoning Ordinance requirements under the adopted PUD standards; and
WHEREAS, the subject property will be developed under the requirements of the Monticello
Comprehensive Plan, which designate the land use for the property as Commercial Residential
Flex uses; and
WHEREAS, the proposed Development Stage PUD addresses all additional improvements
serving the project, as well as site and architectural improvements on Lot 1 of the project and
plat; and
WHEREAS, the Planning Commission has reviewed the application for the Development Stage
PUD pursuant to the regulations of the applicable ordinances and land use plans and policies;
and
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
WHEREAS, the Planning Commission held a public hearing on June 41", 2024 on the application
and the applicant and members of the public were provided the opportunity to present
information to the Planning Commission; and
WHEREAS, the Planning Commission has considered all of the comments and the staff report,
which are incorporated by reference into the resolution, and make the following Findings of
Fact in relation to the recommendation of approval:
1. The proposed uses are consistent with the intent and purpose of the PUD, Planned Unit
Development District.
2. The proposed uses will be consistent with the existing and future land uses in the area in
which they are located, including the Monticello Comprehensive Plan.
3. The impacts of the improvements are those anticipated by the existing and future land
uses and are addressed through standard review and ordinances as adopted.
4. The proposed PUD accommodates additional public and private improvements,
including streets, utilities, and stormwater controls that ensure the project will continue
to be consistent with the City's long-term public service infrastructure.
5. The proposed access and development details meet the intent and requirements of the
applicable zoning regulations.
6. As a property which has been utilized for commercial self storage for many years, the
proposed PUD is not anticipated to negatively impact surrounding residential
properties.
7. Approval of the PUD will not result in the need for additional road or utility
infrastructure other than that being provided by and for the proposed use, and should
not otherwise negatively impact the health or safety of the community.
NOW, THEREFORE, BE IT RESOLVED, by the Planning Commission of the City of Monticello,
Minnesota recommends to the City Council that the proposed Development Stage PUD for
Cedar Street Storage Addition be approved, subject to the conditions of Exhibit Z of the staff
report, as follows:
The PUD is subject to submission of final stage site plans compliant with these
conditions, with no outdoor storage allowed on site.
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
2. The applicants identify a suitable maintenance process for the south side of the building
and site area, to be approved by the City Council.
3. The applicants supplement the request with a Landscape Plan that shows extensive
screen plantings consistent with the Central biome of The Pointes at Cedar along the
south boundary not occupied by the new building.
4. The applicants provide intense screening for the east property line area, or in the
alternative, the applicants extend the screen wall (similar to that used on the applicants'
Chelsea Road site) from the building to the east property line.
5. The City approves vacation of easements that lie under existing or proposed building
sites, with drainage and utility easements to be reestablished per the City Engineer's
recommendations.
6. Compliance with the terms of the Chief Building Official/Zoning Administrator's letter
dated May 30, 2024.
7. Comments and recommendations of the City Engineer's Office as applicable.
8. Comments and recommendations of other Staff and Planning Commission.
ADOPTED this 41h day of June, 2024 by the Planning Commission of the City of Monticello,
Minnesota.
MONTICELLO PLANNING COMMISSION
0
ATTEST:
Paul Konsor, Chair
Angela Schumann, Community Development Director
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC 2024-20
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF MONTICELLO RECOMMENDING APPROVAL OF A
PRELIMINARY PLAT FOR CEDAR STREET STORAGE ADDITION
WHEREAS, the applicant is seeking a preliminary plat of a parcel of currently developed land;
and
WHEREAS, the proposed plat would incorporate development opportunity an additional
commercial self storage building as an allowed use in the proposed Cedar Street Storage
Planned Unit Development zoning district; and
WHEREAS, the plat creates a dedication for public easements, and adequate right of way
related to public streets along with drainage and utilities; and
WHEREAS, the platted parcels will be consistent with requirements of the City's Subdivision and
Zoning Ordinance requirements under the appropriate PUD standards; and
WHEREAS, the subject property will be developed under the requirements of the Monticello
Comprehensive Plan, which designate the land use for the property as Commercial Residential
Flex uses; and
WHEREAS, the proposed preliminary plat shows a single development parcel, upon which the
existing and proposed buildings will be located, as well as other improvements; and
WHEREAS, the Planning Commission has reviewed the application for the plat pursuant to the
regulations of the applicable ordinances and land use plans and policies; and
WHEREAS, the Planning Commission held a public hearing on June 4th, 2024 on the application
and the applicant and members of the public were provided the opportunity to present
information to the Planning Commission; and
WHEREAS, the Planning Commission has considered all of the comments and the staff report,
which are incorporated by reference into the resolution, and make the following Findings of
Fact in relation to the recommendation of approval:
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
1. The proposed uses are consistent with the intent and purpose of the PUD, Planned Unit
Development District.
2. The proposed uses will be consistent with the existing and future land uses in the area in
which they are located, including the Monticello Comprehensive Plan.
3. The impacts of the improvements are those anticipated by the existing and future land
uses and are addressed through standard review and ordinances as adopted.
4. The proposed plat accommodates additional public and private improvements, including
streets, utilities, and stormwater controls that ensure the project will continue to be
consistent with the City's long-term public service infrastructure.
5. The proposed plat accommodates reasonable extensions of development and
infrastructure to serve other undeveloped property in the area.
6. The proposed access and development details meet the intent and requirements of the
applicable zoning regulations.
7. As a property which has been utilized for such uses for many years, the proposed plat is
not anticipated to negatively impact surrounding residential properties.
8. Approval of the plat will not result in the need for additional road or utility
infrastructure other than that being provided by and for the proposed use, and should
not otherwise negatively impact the health or safety of the community.
NOW, THEREFORE, BE IT RESOLVED, by the Planning Commission of the City of Monticello,
Minnesota recommends to the City Council that the proposed Preliminary Plat for Cedar Street
Storage Addition be approved, subject to the conditions of Exhibit Z of the staff report, as
follows:
1. The PUD is subject to submission of final stage site plans compliant with these
conditions, with no outdoor storage allowed on site.
2. The applicants identify a suitable maintenance process for the south side of the building
and site area, to be approved by the City Council.
3. The applicants supplement the request with a Landscape Plan that shows extensive
screen plantings consistent with the Central biome of The Pointes at Cedar along the
south boundary not occupied by the new building.
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC 2024-20
4. The applicants provide intense screening for the east property line area, or in the
alternative, the applicants extend the screen wall (similar to that used on the applicants'
Chelsea Road site) from the building to the east property line.
5. The City approves vacation of easements that lie under existing or proposed building
sites, with drainage and utility easements to be reestablished per the City Engineer's
recommendations.
6. Compliance with the terms of the Chief Building Official/Zoning Administrator's letter
dated May 30, 2024.
7. Comments and recommendations of the City Engineer's Office as applicable.
8. Comments and recommendations of other Staff and Planning Commission.
ADOPTED this 4t" day of June, 2024 by the Planning Commission of the City of
Monticello, Minnesota.
MONTICELLO PLANNING COMMISSION
IN
ATTEST:
Paul Konsor, Chair
Angela Schumann, Community Development Director
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC 2024-21
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF MONTICELLO RECOMMENDING REVOCATION OF A
PREVIOUS CONDITIONAL USE PERMIT FOR PLANNED UNIT DEVELOPMENT FOR CEDAR STREET
STORAGE ADDITION
WHEREAS, the applicant is seeking a zoning amendment and development stage Planned Unit
Development approval for an addition to a multiple building commercial self storage project;
and
WHEREAS, the proposed PUD would consist of development existing and proposed commercial
self storage buildings as an allowed use in the proposed Cedar Street Storage Planned Unit
Development zoning district; and
WHEREAS, the site is concurrently subject to requests for a preliminary plat for the proposed
project, and an amendment to the City's PUD zoning ordinance and rezoning to Cedar Street
Storage PUD District; and
WHEREAS, the plat creates a dedication for public easements, and adequate right of way
related to public streets along with drainage and utilities which will serve various phases of the
PUD; and
WHEREAS, the current CUP-PUD no longer accommodates the need for expansion, nor is it
consistent with the future land uses around the property; and
WHEREAS, the Planning Commission has reviewed the application for the Development Stage
PUD pursuant to the regulations of the applicable ordinances and land use plans and policies,
and recommends the Cedar Street Storage PUD as replacement for the current CUP-PUD; and
WHEREAS, the Planning Commission held a public hearing on June 4th, 2024 on the application
and the applicant and members of the public were provided the opportunity to present
information to the Planning Commission; and
WHEREAS, the Planning Commission has considered all of the comments and the staff report,
which are incorporated by reference into the resolution, and make the following Findings of
Fact in relation to the recommendation of approval:
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC 2024-21
1. The proposed uses are consistent with the intent and purpose of the PUD, Planned Unit
Development District.
2. The proposed uses will be consistent with the existing and future land uses in the area in
which they are located, including the Monticello Comprehensive Plan.
3. The impacts of the improvements are those anticipated by the existing and future land
uses and are addressed through standard review and ordinances as adopted.
4. The proposed PUD accommodates additional public and private improvements,
including streets, utilities, and stormwater controls that ensure the project will continue
to be consistent with the City's long-term public service infrastructure.
5. The proposed access and development details meet the intent and requirements of the
applicable zoning regulations.
6. As a property which has been utilized for commercial self storage for many years, the
proposed PUD is not anticipated to negatively impact surrounding residential
properties.
7. Approval of the PUD will not result in the need for additional road or utility
infrastructure other than that being provided by and for the proposed use, and should
not otherwise negatively impact the health or safety of the community.
NOW, THEREFORE, BE IT RESOLVED, by the Planning Commission of the City of Monticello,
Minnesota recommends to the City Council that the current Conditional Use Permit for Planned
Unit Development for Cedar Street Storage Addition be revoked, subject to the following
conditions:
1. The property is rezoned to Cedar Street Storage PUD District, and the Final PUD
and Final Plat for Cedar Street Storage are approved and recorded, along with
any required development agreements or other documents.
ADOPTED this 4th day of June, 2024 by the Planning Commission of the City of
Monticello, Minnesota.
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC 2024-21
MONTICELLO PLANNING COMMISSION
M
ATTEST:
Paul Konsor, Chair
Angela Schumann, Community Development Director
ORDINANCE NO.
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
AN ORDINANCE AMENDING TITLE XV, § 153.047
OF THE MONTICELLO CITY CODE, KNOWN AS THE ZONING ORDINANCE, ESTABLISHING THE
CEDAR STORAGE PLANNED UNIT DEVELOPMENT DISTRICT AND REZONING THE FOLLOWING
DESCRIBED PROPERTY TO CEDAR STREET STORAGE PUD:
PLAT OF CEDAR STREET STORAGE ADDITION
THE CITY COUNCIL OF THE CITY OF MONTICELLO HEREBY ORDAINS:
Section 1. Section § 153.047, PUD Districts, is hereby amended to add the following:
(W) Cedar Street Storage PUD District
(1) Purpose. The purpose of the Cedar Street Storage PUD District is to
provide for the development of certain real estate subject to the Planned
Unit Development District for commercial self -storage land uses.
(2) Phased Development. The Cedar Street Storage PUD District will be
developed in a single phase.
(3) Permitted Uses. Permitted principal uses in the Cedar Street Storage
PUD District shall be Commercial self -storage, as defined in the
Monticello Zoning Ordinance, along with administrative offices, subject
to the approved Final Stage PUD Development Plans dated
, and development agreement dated , and
subject to the conditions of approval imposed by City Council Resolution
No. , and as may be further amended. The introduction of any
other use or change in density shall be reviewed under the requirements
of the Monticello Zoning Ordinance, 153.028(0)(9)(b) — Planned Unit
Developments for Development Stage PUD.
(4) Accessory Uses. No other accessory uses shall be permitted in the
Cedar Street Storage PUD District, nor shall any outdoor storage be
allowed.
(5) District performance standards. Performance standards for the
development of any lot in the Cedar Street Storage PUD District shall
adhere to the approved Final Stage PUD plans and development
ORDINANCE NO.
agreement.
(5) The specific flexibility and conditions of the Cedar Street Storage PUD
District shall be as follows
A. Multiple principal buildings are permitted on the single parcel in
the district.
B. The PUD provides flexibility from building setback requirements,
particularly along the south boundary of a zero setback.
C. Parking for the facility shall be informal and scattered throughout
the district as required by tenants.
D. The Final Stage PUD architectural plans for Lot 2 are dated
E. Shared free-standing signage and landscaping shall be as per
approved Final Stage PUD Development Plans.
F. The location and widths of internal lot line drainage and utility
easements are as per the approved plat of Cedar Street Storage
Addition.
G. An executed and recordable easement and stormwater
maintenance agreement for the District shall be recorded with the
final plat in a form approved by the City.
(6) In such case where any proposed improvement is not addressed by
the Final Stage PUD, then the applicant shall seek a PUD Amendment per
the processes of the Monticello Zoning Ordinance and as directed by the
Community Development Department.
(7) Where there are any conflicts in the allowed uses or required
performance standards between the Cedar Street Storage PUD District
and any other applicable zoning regulations, the requirements of the
Cedar Street Storage PUD District and its associated plans shall prevail.
(8) Amendments. Where changes to the PUD are proposed in the
manner of use, density, site plan, development layout, building size,
mass, or coverage, or any other change, the proposer shall apply for an
amendment to the PUD under the terms of § 153.028(0)(10). The city
may require that substantial changes in overall use of the PUD property
be processed as a new project, including a zoning district amendment.
Section 2. The City Clerk is hereby directed to mark the official zoning map to reflect this
ordinance. The map shall not be republished at this time.
Section 3. The City Clerk is hereby directed to make the changes required by this Ordinance
as part of the Official Monticello City Code, Title XV, Zoning Ordinance, and to
IIA
ORDINANCE NO.
renumber the tables and chapters accordingly as necessary to provide the
intended effect of this Ordinance. The City Clerk is further directed to make
necessary corrections to any internal citations that result from said renumbering
process, provided that such changes retain the purpose and intent of the Zoning
Ordinance as has been adopted.
Section 4. This Ordinance shall take effect and be in full force from and after its passage
and publication. The ordinance in its entirety and map shall be posted on the
City website after publication. Copies of the complete Ordinance and map are
available online and at Monticello City Hall for examination upon request.
ADOPTED BYthe Monticello City Council this day of , 2024.
FA110.III
Rachel Leonard, City Administrator
AYES:
NAYS:
Lloyd Hilgart, Mayor
3
Return To:
City of Monticello
505 Walnut Street, Suite 1
Monticello, MN 55362
STATE OF MINNESOTA
COUNTY OF WRIGHT
APPLICANT: Bruce Stainbrook
FEE TITLE PROPERTY OWNER:
MONTICELLO CITY COUNCIL
REVOCATION OF CONDITIONAL
USE PROCEEDINGS
StorageLink of Monticello, LLC.
ORDER #2024-21 REVOKING CONDITIONAL USE PERMIT
The above entitled matter came to be heard before the Monticello City Council this 24th day of
June, 2024 on a request for Revocation of a Conditional Use Permit for Planned Unit
Development, pursuant to the City of Monticello Zoning Ordinance for the following described
property:
Lot 1, Block 2, Amax Addition, Wright County, Minnesota.
AND
That part of the South Half of the Northwest Quarter of Section 14, Township 121, Range
25, Wright County, Minnesota, described as follows: Commencing at the Northeast
corner of said South Half of the Northwest Quarter, thence on an assumed bearing of
South 89 degrees 08 minutes 38 seconds West, along the North line of said South Half of
the Northwest Quarter, 1056.00 feet, thence South 00 degrees 07 minutes 17 seconds
West, parallel with the East line of said South Half of the Northwest Quarter, 632.54 feet
to the centerline of a 80.00 foot roadway and utility easement and the actual point of
beginning, thence continue South 00 degrees 07 minutes 17 seconds West, on said
parallel line, 291.46 feet, thence South 89 degrees 08 minutes 38 seconds West, parallel
with the North line of said South Half of the Northwest Quarter, 319.14 feet to the East
line of a tract of land recorded in Book 293 of Deeds, page 872, in the Office of the
Wright County Recorder, thence North 00 degrees 09 minutes 07 seconds East along said
East line and its northerly extension, 342.26 feet to the centerline of said 80.00 foot
roadway and utility easement, thence North 89 degrees 08 minutes 38 seconds East,
along said centerline, 17.39 feet, thence continue along said centerline, 64.41 feet
Easterly along a tangential curve, concave southerly, having a central angle of 12 degrees
18 minutes 08 seconds and a radius of 300.00 feet, thence South 78 degrees 33 minutes
14 seconds East, along said centerline, tangent to curve, 159.19 feet, thence 63.27 feet
easterly along said centerline on a tangential curve, concave northerly, having a central
angle of 12 degrees 05 minutes 02 seconds and a radius of 300.00 feet, thence North 89
degrees 21 minutes 44 seconds East, along said centerline, 18.25 feet to the actual point
of beginning.
IT IS ORDERED that a Revocation of a Conditional Use Permit for Planned Unit
Development be granted to allow for a new Planned Unit Development District be established
based on the following findings:
1. The proposed uses are consistent with the intent and purpose of the PUD, Planned Unit
Development District.
2. The proposed uses will be consistent with the existing and future land uses in the area in
which they are located, including the Monticello Comprehensive Plan.
3. The impacts of the improvements are those anticipated by the existing and future land
uses and are addressed through standard review and ordinances as adopted.
4. The proposed PUD accommodates additional public and private improvements, including
streets, utilities, and stormwater controls that ensure the project will continue to be
consistent with the City's long-term public service infrastructure.
5. The proposed access and development details meet the intent and requirements of the
applicable zoning regulations.
6. As a property which has been utilized for commercial self storage for many years, the
proposed PUD is not anticipated to negatively impact surrounding residential properties.
7. Approval of the PUD will not result in the need for additional road or utility
infrastructure other than that being provided by and for the proposed use, and should not
otherwise negatively impact the health or safety of the community.
STATE OF MINNESOTA)
) ss
COUNTY OF WRIGHT )
CITY OF MONTICELLO
I, Rachel Leonard, City Administrator for the City of Monticello, do hereby certify that I
have compared the foregoing copy of Order #2024- granting a Revocation of a Conditional Use
Permit for Planned Unit Development with the original record thereof preserved in my office,
and have found the same to be a correct and true transcript of the whole thereof. A copy of this
Order has been forwarded to the applicant.
IN TESTIMONY WHEREOF, I have hereunto subscribed my hand at Monticello,
Minnesota, in the County of Wright on the day of , 2024.
Rachel Leonard, City Administrator
Drafted By:
Hayden Stensgard
City of Monticello
505 Walnut Street, Suite 1
Monticello, MN 55362
Request for Prelim & Final Plat - Dev & Final PUD
PIDs: 155-213-002010,155-500-142305, 155-500-142304 Address: 36 Dundas Road
Created by: City of Monticello
4k
w aK1lt
Z ,, 155. A
155258001Q�10
t1'S5500142210 O '; y ��
155R R ' 'Q - 455258000030
V�4� r 455265001010 �
y
155500142300
155500142308 �.,�
155500142303
-155--- DUNDAS RD
y _ _
N � 155230000010
155213001010
25 e
F.
155230001010
1'55162001'010
155162001020 155- 155269000010
15515000.1010N! nN
P.O. Box 425
Sartell, MN 56377
ink Tel: 320.257.2323 ' 71 Sf LF STORAGE Tel:
www.StorageLink.net
Greetings —
We currently have "stand alone" storage units (often referred to as PODS) that line a portion of our
South property line, at our 36 Dundas Road location. These units are currently allowed as part of a
Conditional Use Permit that is set to expire this year. With the city currently working through a master
plan for The Points of Cedar, which surround this facility, we are proposing an Amendment to the
existing Conditional Use Permit for PUD allowing us to remove the PODS and construct a building along
this portion of the South Property line. This building would only have doors facing into the facility and
the exterior facing South would be Stucco to create a nice -looking screen, like the exterior of our
Chelsea Road location. The site lighting, signage and landscaping will not be changing with this
application request. As part of this process, we would plat the three existing parcels into a single lot.
I have attached the supporting materials to help you fully visualize our proposal which include:
• Preliminary plat
• Final plat
• Civil Engineering plans
• Building Plans
• Pictures of the exterior wall
Thanks for your consideration. We look forward to working with the city on The Points of Cedar
development.
Sincerely,
Bruce Stainbrook
Vicinitv Map
CEDAR STREET STORAGE
LEGAL DESCRIPTION
7 North Quarter corner of -
��00 Sec. 14, Twp. 121, Ring. 25 \
t CHELSEA RD /
C
N rV00
11'
hr U z DUNDAS RD CD
-w
Site a _ _ _ z -
-- S 89 ° 00' 47" W 1056.00
EXISTING PID: 155-267-001010 o Z 5 89°08' 38" W (D)
Q SCHOOL O
OWNER: RRG HOLDINGS LLC- 7
� � NO SCALE ..... � % /
SEC 14, TWP 121, RNG 25 X /
•::.::..::•, . .. .:: the
:• %
North line of
51 /2 NW1 /4 Northeast corner -/
. .. ..... .. ..-. ..... ... r;;:. . . I : ... of the 51 /2 NW1 /4
, AR
i�/ \ I ' ' East line of the S1 /2 NW1 /4 0^
y , t•. (North south quarter section line) N
�� EXISTING PID: 155 500 142303 1 I ,r,
Former centerline of old - / i - - _ �''�.6.
Minnesota Highway No. 25 �\ '� / OWNER: CITY OF MONTICELLO - •Centerline of 80.00 foot wide - - Line parallel with the East line ``'
\� / S. / - _ _ _ _ _ _ _ _ _ _ _ - - - _ _ - _ �' Roadway Et Utility Easement per V " of the S1 /2 NW1 /4 0
i Book 75 of Misc., page 260 `9 tl
i� , -Centerline of 80.00 foot 1 - i N I o
/ ti�i � �i wide Roadway Et Utility t , N8 ° _ • -/ _ o . •.•• W.. M o
% Easement per Book 75 1 / 9 ...- ,-- - - f.
i of Misc. page 260 'K : • . . OQ 4 ,; •^-:^ 0 2 ° 18' �$ / ' _ _ _ _ I Ln
o
.m, / E�:� ;. f��: EXISTING PID: 155 230 000010 M
3 _ - :,. g
R-
:' is
H•
ER ITY F TI ELL 3 OWN C 0 MON C 0 0 3 0
/ .0 8
E
0•
I
-C _
4• •O
2' 1 - ___ 1 3 3 =0- 0 -
DO ---
- - - -
` -
0•
•..S .
1 .� 7
I
1 1
. 8
4
•. 6 1'
- 1.19 L 2
0
I
I
t
a ��
8° E
,E
3
3'
I > 3
4"
° 'S
E I.::R 9 .1
:. _ 4- 12 - �_ _ o f 05 0 - , �---r� 89
CB- N 89°46' 53 E _ _ - -�- 12 1 2 .x... ,......, ...N
_-- 8 08".
--- -
3
96 _ 5
-> -
L
6 3 "E
/ \
$• 4 _ 7
5 1 4
-_�_\ . H 21 83 ''•�••��• � 4 Ix
C .19
-::1 46:. - , - - - N 89 ° 00 4T E 108.42' r R R= 26 R= 30 :1a :: s9 2
Ic .. -Vyo 0 0o D�/ 0.00 N �) s
••..-. G ^/ 25 l Permanent easement
r
e u
D
1
$.
A
S11
•8 c _ ,
per 12 2
:; R e Doc. No. 659 9
- 0 P
�. = - A
D
// v Point 7o u o t f innin
$ R O be
7 l3 l3 •
,1+.'.T'; ,•r.T • • 4
8°
l
W
�.... 4
1'
0 t
5"
5
9 3
S,
�.I I
2� 0 9
3 �.
�, 3 -�.•
w g - _ 1/2 dia Iron Pipe . -+ ' ,. 05' 02" 0 9 I
i `3
,� 'i\ co / C ' = v
RLS 21729 t96; N I (. I L- 71 0
..
r..: 71 0 �.
l'
`3 • I
t. - 1
�..
R-
. , . 340. r .,.: 00
�. ,
- • .,.
1 - -
•
o.
I ;;l , 1 7: South Quarter corner of -
C -. ,y Sec. 14, Twp. 121, Rng. 25
' 1 4 r Existing storage building t ��' a
St} . ? i x�
k
..� '�.'.`: .'_ N
•..
1� •�. 0'. -. MAPPING LEGEND
.....
1.
... ... ... r . :. .
. . . ..i. 1 .'. k:
( I.• .
m
l.. -•.�
w
t:.,.$T •y •••
• .:...:.• 3
1
,. i, o STORM SEWER MANHOLE Q
Ii . '::964 s "9
i M
;'. L. .
I
I SANITARY SEWER MANHOLE ss
0 0
I I �. i r,� -� CATCH BASIN
I N o Office building o o Q
CULVERT APRON
p0, Existing storage building ; M N `^ "'
.. ...
O' / rM N �O WELL 1
p� , _ W T
c
HYDRAN
,: .... .::.•...,:,.•...
.. W O�
:.....;gyp.. .,.:
1 WATER VALVE E
N CV
E Da
1 +� 1 `.
1% , .
N
0
•t"
�• r f . r•
1 J•
.... V. �. ..:^ .,` ..;;,: .:?:... UTILITY HANDHOLE
LLI
OU
I
{ x N I
r r•
60
0 .
.. N't;
».. .x.
O1. -
P LE
_ U
o:
t
g
�•.•
0
LI
GHT 0
a�.
g
M
is •.N •. iZ
11 .1B•L� �K• 1
POLE
nnr UTILITY 0 V' 4►- L
W
z•
.l . �
N
r
I11
0
/ O
UTILITY POLE ANCHOR)
r ° 11 :r ..».... .
Temporary storage structure N 6O UTILITY PEDESTAL El
EXISTING PID: 155 213 001010 �` LOT 1 UTILITY METER13
OWNER: AUTOZONE PARTS INC ' ?' ^ °_ Existing storage building Existing storage building
I V O
V_ 1 i TANK (AS SPECIFIED) 0
° . Z SEWER CLEANOUT co
... ..... ...
• ......
M
t t.f. '. :i,
T STATION L LIFT S ON
L
mI. ❑
11.t...
I.
U
r r,. ,l
t S t
1 1
TREE DECIDUOUS
�.•
(DECIDUOUS)
ar.
. : . : TREE E EE ,.r (EV RGR N)
•i
t %2 ;t SOIL BORING SB#
Existing storage building C
SURFACE DRAINAGE ARROW ��
". EXIStI t0 bUlldl ELECTRIC LINE P-BUR
I Fri s ra a 'n 1 BURIED ELEC R C L N
:. :. ... TELEPHONE I r-BUR
.. ... ... ....' . i a'
. ...
+ BURIEDLINE
East of a tract land
.1.
E line BURIED FIBER OPTIC LINE F/0 -BUR
Co
_g
1
described in Book 293 6
Z.
t.
I G G-
B BURIED A LINE
e 872
. ,.
d a: ron
U GAS L
I
0
ST .
' of Deeds •a �I
Pe
RLS 15233
r..�
�,
�( 1
OVERHEAD POWER LINE
-OHP OHP-
f • i
Broken ca
0.3 feet norther! of corner .'
OVE OW
/, 0.2 feet easterly of corner Temporary stora a structure - - - - - - - " 965: It WATER LINE -
i - J J _ 206.13 IS 89 , 08' 38" W (D) 319.14 '� 1
.......•.. •..•. •... \ I STORM SEWER PIPE ->
Temporary t SANITARY SEWER »
----------------- - - - - -- „ qbh I 12LL L � I 5 age structure � SAN AR S W R PIPE
-----
t S 8 0'47" W 555.27--y�f,- ------
a 80 Benchmark: Top nut of hydrant %5- �/ S) Retaining ails CONC. CURB Et GUTTER
........ ..... ...
'n w
I 2 CA
►_J ....... .. . g�' Elev.= 966.63 (NAVD 88) // I PROPERTY LINE
1
0 I CONTROLLED ACCESS -0 0-
0 FZ- .....».... ..r E . .
oa _% . . .
o rn z
at)
N Y
Ln Q
�
0
'a
z Z)
U_
W W
3
0
PROPERTY BOUNDARY MONUMENT LEGEND
O SET IRON PIPE WITH CAP STAMPED "DELEO 40341"
• FOUND IRON MONUMENT
® SET MAGNETIC "PK" NAIL
QQ GOVERNMENT SECTION CORNER MONUMENT
(D) DIMENSION PER DEED OF RECORD
(CSA) DIMENSION PER CEDAR STREET ADDITION
Drainage and utility easements are shown thus:
121
I
I
I
12I- -
- - - - N N
Public way
Being 12 feet in width and
adjoining public ways, side lot
lines, and rear lot lines, unless
otherwise indicated on this plat.
Encroachment Agreement area
per Doc. No. 1270996
ORIENTATION OF THIS BEARING
SYSTEM ASSUMES THAT THE
EAST LINE OF THE SOUTH HALF
OF THE NORTHWEST QUARTER
QUARTER OF SEC. 14, TWR 121, RNG. 25
BEARS SOUTH 00'00' 30" EAST
0 40 80
SCALE IN FEET
i
Line parallel with the North line -'
of the S1 /2 NW1 /4
. .. . . . .... . :
rNO.
REVISIONS SINCE INITIAL DATE OF 02/12/2024
\
DATE
EXISTING PID: 155-230-000010
OWNER: CITY OF MONTICELLO
1120 Industrial Park Road
Brainerd, MN 56401
218-829-5333
13 North IIth Avenue
_ St Cloud, MN 56303
320-259-1266
CHAINLINK FENCE
WOOD FENCE
BARB WIRE FENCE
WOVEN WIRE FENCE
TREELINE
WETLAND
EXISTING CONTOURS
BUILDING SETBACK
SOILS TYPE BOUNDARY
CONCRETE
BITUMINOUS
GRAVEL
>
>__
xc - xc-
-xw xw-
1091
BSB -
I HEREBY CERTIFY THAT THIS PLAN, SURVEY, OR REPORT
WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION
AND THAT I AMA DULY REGISTERED LAND SURVEYOR
UNDER THE LAWS OF THE STATE OF MINNESOTA.
KRAMER LEAS DELEO /��<<c
SURVEYING • ENGINEERING - PLANNING Signature: a.#""4
B R A I N E R D S T. C L o U D Samuel J. DeLeo, MN License No. 40341
PROJECT NO. STORL2401
02/13/2024
Date
Lot 1, Block 2, Amax Addition, Wright County, Minnesota.
AND
That part of the South Half of the Northwest Quarter of Section 14, Township
121, Range 25, Wright County, Minnesota, described as follows: Commencing at the
Northeast corner of said South Half of the Northwest Quarter, thence on an
assumed bearing of South 89 degrees 08 minutes 38 seconds West, along the North
line of said South Half of the Northwest Quarter, 1056.00 feet, thence South 00
degrees 07 minutes 17 seconds West, parallel with the East line of said South
Half of the Northwest Quarter, 632.54 feet to the centerline of a 80.00 foot
roadway and utility easement and the actual point of beginning, thence continue
South 00 degrees 07 minutes 17 seconds West, on said parallel line, 291.46 feet,
thence South 89 degrees 08 minutes 38 seconds West, parallel with the North line
of said South Half of the Northwest Quarter, 319.14 feet to the East line of a
tract of land recorded in Book 293 of Deeds, page 872, in the Office of the
Wright County Recorder, thence North 00 degrees 09 minutes 07 seconds East along
said East line and its northerly extension, 342.26 feet to the centerline of
said 80.00 foot roadway and utility easement, thence North 89 degrees 08 minutes
38 seconds East, along said centerline, 17.39 feet, thence continue along said
centerline 64.41 feet Easterlyalong a tangential curve concave southerly,
1 1 1
g g Y
havinga central angle of 12 degrees 18 minutes 08 seconds and a radius of
g g
300.00 feet thence South 78 degrees 33 minutes 14 seconds East along said
g � g
centerline, tangent to curve, 159.19 feet, thence 63.27 feet easterly along said
centerline on a tangential curve, concave northerly, having a central angle of
12 degrees 05 minutes 02 seconds and a radius of 300.00 feet thence North 89
degrees 21 minutes 44 seconds East along said centerline 18.25 feet to the
g g
actual . point of beginning.
P g g
Existing Property Site Address: 36 Dundas Road, Monticello, MN 55362
Current Zoning =
The Pointes at Cedar District (PCD),
Central (Tilia) Sub -District
Part of currrent County Tax Parcel ID = 155-213-002010, 155-500-142304, Et
155-500-142305
Dundas Road Et Cedar Street are Local Roadways.
THE POINTES AT CEDAR DISTRICT REGULATIONS
There are no building setbacks.
There are no minimum lot dimensions.
There is no minimum or maximum building height.
A minimum Floor Area Ratio (FAR) of 0.4 shalll be maintained for single story
buildings.
5
There was no evidence of wetland observed within the area to be platted.
Topographic features shown hereon are from a field survey completed on
0111712024.
Access to property will be provided via an existing driveway to Dundas Road.
CONTACT INFORMATION
Owner and DeveloDer-
Bruce Stainbrook
36 Dundas Rd
Monticell, MN 55362
Phone: 320-257-2323
Land Surveyor -
Sam DeLeo
Kramer Leas DeLeo, P.C.
13 North 11 th Ave.
St. Cloud, MN 56303
Phone: 320-259-1266
Preliminary Plat of
PLAT AREAS (+/-
Entire Plat =
3.50 Acres
Block 1
Lot 1=
3.20 Acres
ROAD R/W=
0.30 Acres
CEDAR STREET STORAGE
For property at: 36 Dundas Road
City of Monticello, County of Wright, State of Minnesota
Located in Section 14, Township 121 North, Range 25 West
V_
4-
0
O
Z
a)
a)
Ln
PLAT AREAS +/-
ENTIRE PLAT =
3.50 Ac.
BLOCK 1 -
LOT 1 = 3.20 Ac.
ROAD R/W = 0.30 Ac.
North Quarter corner of -
Sec. 14, Twp. 121, Rng. 25
CEDAR STREET STORAGE
00
Lq
o_
M
S 89 ° 00' 47" W 1056.00 .
S 89 °08' 38" W (D)
T
.•� North line of the
S1 /2 NW1 /4 Northeast me Of the S1 /2 /4 ,
/ ••• '� g :: ;;.; East line of the S1 /2 NW1 /4 is
- -.w (North -south quarter section line) Ln
,.I
Line parallel with the East line W
/ --- - - ' of the S1 /2 NW1 /4 b
--- ---
- - Center line of 80.00 foot wide r�
Centerline of 80.00 foot I - - ,' roadway and utility easement Ln b
o i wide Roadway Et Utility I N
Easement per Book 75 89 °�0, � �= 12 ° 18- 64.41 08„ / - - ' ,6 0
/ 7�! of Misc., page 260 'I 47" [/�� I Ln
.39
--0=01°32' 13"- N00° 7 i •• -''-- --- - - - - - - - - - - -
L= 21.19 O1' 1(„� . / S�8o41' 05.,
Jc ► R= 790.00 40.41 I 33' 14„E-(0 159.19 9° 1'S 53
` CB= N 89 ° 46' 53" E Y p= 12 ° 18' ()8" = 12 ° 05' 02' .N 8 53 E
- - I CH= 21.19 N 89 ° 00' 47" E 108.42 R- 26p pp pUN�A R= 300.00 ;;' "ia9*2
•25 (D) r permanent easement
- - .S
N 47° 11' 46" E --- RO,q p - per Doc. No. 1265929
35.81 1------------ - - - -'- --- S78°4 g Point of beginning-'
!- 30 1 05 E 159.19 0= o °13y3 1
1- 1 /2" dia. Iron Pipe 12 05' 02" $9 I
- (RLS 21729) v - - _ _ L= 71. 71
R= 340.00 I /
I g -.
' I CO - South Quarter corner of -'
--------- - - - - -
'
_.... A
ORIENTATION OF THIS BEARING
SYSTEM ASSUMES THAT THE
EAST LINE OF THE SOUTH HALF
OF THE NORTHWEST QUARTER
QUARTER OF SEC. 14, TWP. 121, RNG. 25
BEARS SOUTH 00°00' 30" EAST
0 40 80
SCALE IN FEET
1120Industrial Park Road
Bralnent MN 55401
218-829-6 3
13 North 11 th Avenue
St. Cloud, MNW303
320259-12W
K-LD
,
- l
13c:1 �
I
'
�
1
I
I
I
I
I
�
'N�
1
I
o I
rn C4
I
O
O
i rh
•� I
w
41
I
►, W I
NO
11
N i pC+
Zz
1
BLOCK 1
00 W
/
1
I Ln
v
LOT 1
1
Z 1
I
M
1
If
/
�
I
/
I
/
East line of a tract land
/
described in Book 293
'
` �ti
1
of Deeds, page 872
1 /2" dia. Iron Pipe
- 1 /2" dia. Iron Pipe
(RLS 15233) 1
/ (Broken cap)
'
0.3 feet northerly of corner -
/ 0.2feet easterly ofcomer
- - - - -
' -
- - - -
-------------------------------------`
/ - - - - - - - - -
- - - - - - - - - - -
t
S 89 °08' 38" W (D) 319.14
_
206.13
',
S 89 ° 00' 47" W 525.27
».. I 525.22 (CSA) I
I
Line parallel with the North line
. .. ". of the S1 /2 NW1 /4
I•
Drainage and utility easements are shown thus:
121
1
1
1
121 - -
N N
Public way
Being 12 feet in width and
adjoining public ways, side lot
lines, and rear lot lines, unless
otherwise indicated on this plat.
PROPERTY BOUNDARY MONUMENT LEGEND
O SET IRON PIPE WITH CAP STAMPED "DELEO 40341"
• FOUND IRON MONUMENT
0 SET MAGNETIC "PK" NAIL
QQ GOVERNMENT SECTION CORNER MONUMENT
(D) DIMENSION PER DEED OF RECORD
(CSA) DIMENSION PER CEDAR STREET ADDITION
0
0
v
0
LU 3
brn
b�
00
00
LnLn
o%
cV
LLJ
0
M
0
0
0
0
Ln
SURVEYOR'S CERTIFICATION
Sec. 14, Twp. 121, Rng. 25
Vicinitv Map
I Samuel J. DeLeo do hereby certify that this plat was prepared by me or under my direct
supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this
plat is a correct representation of the boundary survey; that all mathematical data and
Labels are correctly designated on this plat; that all monuments depicted on this plat
have been, or will be correctly set within one year; that all water boundaries and wet
Lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this
certificate are shown and labeled on this plat; and all public ways are shown and labeled
on this plat.
Dated this day of , 20
Samuel J. DeLeo, Licensed Land Surveyor
Minnesota License Number 40341
STATE OF MINNESOTA
COUNTY OF STEARNS
The foregoing Surveyor's Certification was acknowledged before me this _
, 20 by Samuel J. DeLeo, Licensed Land Surveyor,
Minnesota License Number 40341.
Sidney Theis
Notary Public Stearns County, Minnesota
My commission expires January 31, 2027
day of
KNOW ALL PERSONS BY THESE PRESENTS:
That StorageLink of Monticello, LLC, a Minnesota limited liability company, owner of the
following described property situated in the City of Monticello, County of Wright, State of
Minnesota to wit:
Lot 1, Block 2, Amax Addition, Wright County, Minnesota.
AND
That part of the South Half of the Northwest Quarter of Section 14, Township 121, Range 25,
Wright County, Minnesota, described as follows: Commencing at the Northeast corner of said
South Half of the Northwest Quarter, thence on an assumed bearing of South 89 degrees 08
minutes 38 seconds West, along the North line of said South Half of the Northwest Quarter,
1056.00 feet, thence South 00 degrees 07 minutes 17 seconds West, parallel with the East line of
said South Half of the Northwest Quarter, 632.54 feet to the centerline of a 80.00 foot roadway
and utility easement and the actual point of beginning, thence continue South 00 degrees 07
minutes 17 seconds West, on said parallel line, 291.46 feet, thence South 89 degrees 08 minutes
38 seconds West, parallel with the North line of said South Half of the Northwest Quarter,
319.14 feet to the East line of a tract of land recorded in Book 293 of Deeds, page 872, in the
Office of the Wright County Recorder, thence North 00 degrees 09 minutes 07 seconds East along
said East line and its northerly extension, 342.26 feet to the centerline of said 80.00 foot
roadway and utility easement, thence North 89 degrees 08 minutes 38 seconds East, along said
centerline, 17.39 feet, thence continue along said centerline, 64.41 feet Easterly along a
tangential curve, concave southerly, having a central angle of 12 degrees 18 minutes 08 seconds
and a radius of 300.00 feet, thence South 78 degrees 33 minutes 14 seconds East, along said
centerline, tangent to curve, 159.19 feet, thence 63.27 feet easterly along said centerline on a
tangential curve, concave northerly, having a central angle of 12 degrees 05 minutes 02 seconds
and a radius of 300.00 feet, thence North 89 degrees 21 minutes 44 seconds East, along said
centerline, 18.25 feet to the actual point of beginning.
Has caused the same to be surveyed and platted as CEDAR STREET STORAGE and does hereby
dedicate to the public for public use forever the public way and drainage and utility easements
as created by this plat.
In witness whereof said StorageLink of Monticello, LLC, a Minnesota limited liability company,
has caused these presents to be signed by its proper officer this day of
20
Bruce K. Stainbrook
President
STATE OF MINNESOTA
COUNTY OF
This instrument was acknowledged before me this day of ,
20 by Bruce K. Stainbrook, President, of StorageLink of Monticello, LLC, a Minnesota
limited liability company, on behalf of the company.
(Notary Signature)
Notary Public
My commission expires
CITY OF MONTICELLO PLANNING COMMISSION
(Notary Printed Name)
County, Minnesota
Reviewed by the Planning Commission of the City of Monticello this day of
20
Chairperson Secretary
CITY COUNCIL, CITY OF MONTICELLO, MINNESOTA
Approved by the City of Monticello, Minnesota this day of ,
20
Mayor Clerk
WRIGHT COUNTY SURVEYOR
I hereby certify that in accordance with Minnesota Statutes, Section 505.021 Subd. 11, this plat
has been reviewed and approved this day of , 20
Wright County Surveyor
WRIGHT COUNTY AUDITOR/TREASURER
Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable for the year 20 on
the land hereinbefore described have been paid. Also, pursuant to Minnesota Statutes, Section
272.12, there are no delinquent taxes and transfer entered this day of
20
Wright County Auditor/Treasurer Deputy
WRIGHT COUNTY RECORDER
hereby certify that this instrument was filed in the Office of the County Recorder for record on
this day of , 20 , at o'clock . M., and was duly
recorded in Cabinet No. , Sleeve , as Document No.
02/12/2024
KRAMER LEAS DELEO
SURVEYING • ENGINEERING • PLANNING
BRAINERD ST. CLOUD
Wright County Recorder
DRAFT
II 1 I°'• Q
° c
°. ♦ •.
I : d . .
w .. ♦ , +�
d' q' a a
II
1
e ..
< <..
q. d
a
a' 4L. ° d. '
'd.
8
i' "a
A.
�' d P
.. .°.'
.. ,
OFFICE
°°:=
BUILDING
EXISTING STORAGE BUILDING
la °� :.°'.:A A.
IIIA.
I
1
III
m a/I
ti
1
w e�.�'.'
/a
/ I .e:.
.:4:
e .. e.
°.. a.
e
.. +. d' - ° d
P ..
a ',
�. d' . ° :°' &�.4.
.e .dEL
q d. :a d8
zz
.. .z4zzz.
A. ...
d1
dP
P 3
. e
d
d
4
II
8. .P
.'
�d $
a I
d` I
I
/
ed 9
a
: e
a q a
e .q. .9. P : •
° 2
a 'a d
. a
..'d r II
. d"t'
.:.
d .. °�
°
c
I
I I
..
d .. a ..... ,
a ° .. '_44 .. .. .. .: a :' <4'P'd"�
... d . , ... A ' ; .a.'. �.
. ° ..
.. a d.+
'1 °e° °
�,
° .
'�d d . •III
' °a
'
q
I
d ..
.P d.
..�'
., d ..° .. d'd...Q°
a . a .. e da
' e.' 4e � e.
° a' '. +"d: '
d ra
,. a. �e
... e
P
°.d ° °d
...a dae
a
a e .III
I
I
., ...q
a;.
...
ed ,. .. .• .dq.
v
.. '.
Pde
9
''4
P �;`
°'e.
e
d ..
°III
II
I
a d„ ° . ....
° , ° .
., d e ' r:
de a.
ae.
.. .;
/
,'
A...
4.11
III/
m 1 ...
a'
d °•e
w .'III
°
: d
d ..
Ill
d°I II
14�
I \
e'd. °
EXISTING STORAGE BUILDING
�,
all
I
EXISTING STORAGE BUILDING
we
Ili
I d
d
Q°: `` .
ed
,°'':
e P d' ..
•
1.d
d
.. e
9
e
a
' e
/l
..
d
_ .. tl
a ... °
$ ...
a
d' °e
.° 'g ad d w q'-1 • a
.. ., a a. e:
P.. e °
'<
,
q tr' . ..
..
'dP '.
d . . . .
�.II
I
.. , .. ,°' °
d ..q
,'d.'. ,'� d'
.. d
'.a •
d
.e
ea
d.°. M
.. .e da w
.P
I
I
.. ..
A. d: E
e
d d wd e
' '
�.P
4s .
d° a ta.
A. L
d ` .' III
/J
I
N
' a
d
a r .a a. ..
P ..
Pa '
q d .. a ., a Pa :
• ..
q e d. P. P °q d
.d e a •� '-A.✓ ..
:ee a• �d
.< 'd' .. d . I
,1. P d' .
11
/II
/
Y.\'" a/
d e° .. /...d. ,d..
<, .d..e. A a9 .� .. •'' d"l
"°d' -. a
:III
:, III
:d .
VA' .dI
.-. ,t '
wd e CU'U
. °
4 1
962.50 _ v /
I .: : 962.50 :" a.
963.00 P .'... .
d ' 963.00 ' ° ' .971.83 .... : A '
963.50 .
90 963.50 ° a
PROPOSED BUILDING 'A' 150 —--------------- 70/---•`_964``—�___a .._ _:.. ✓� II I �A 6
25/ I 20 971.83 15_—
/� 971.83 971.83 AREA = 6, 300 SF -
962.50 962.50 963.00 / L—
/%/ 971.83 / 6 971.83 96— 971.83 —
_ — — — /
s96 963.00 SILT SOCK 963.50 963.50 / / — 964 — — — — — — —
Ali l
Benchmark: Top nut of hydrant —
Elev.= 966.63 (NAVD 88)
GRAPHIC SCALE
30 0 15 30 60
1 IN IN Md
( IN FEET )
1 inch = 30 ft.
1. BASE PLAN USED IS A BOUNDARY SURVEY PREPARED BY KRAMER LEAS
DELEO, P.C.
2. ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE
APPROXIMATE ONLY. CONTRACTOR SHALL CONFIRM ALL LOCATIONS AND
ELEVATIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CONTACT
UTILITY COMPANIES VIA GOPHER STATE ONE -CALL.
3. ALL CONSTRUCTION SHALL CONFORM TO THE MOST RESTRICTIVE OF THE
PROJECT SPECIFICATIONS, THE STANDARD SPECIFICATIONS OF THE CITY
OF MONTICELLO AND THE LATEST EDITION OF MNDOT STANDARD
SPECIFICATIONS FOR CONSTRUCTION.
4. THE FOLLOWING SEQUENCE AND PROTOCOLS SHALL BE FOLLOWED FOR
EROSION AND SEDIMENT CONTROL DURING THE SITE DEVELOPMENT
PROCESS:
A. INSTALL PERIMETER CONTROLS (SILT SOCK) AS SHOWN ON THE PLANS
PRIOR TO START OF WORK.
B. NO CONCRETE WASHOUTS ARE ALLOWED ON THE PROJECT SITE. SOIL
STOCKPILES SHALL HAVE PERIMETER CONTROL AND HAVE TEMPORARY
SEED AND MULCH.
C. MAINTAIN ALL TEMPORARY EROSION CONTROL DEVICES IN PLACE
UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED.
INSPECT TEMPORARY EROSION CONTROL DEVICES ON A WEEKLY BASIS
AND AFTER EACH 1 /2" OR MORE RAIN EVENT. CLEAN OR MAINTAIN
THESE DEVICES AS NEEDED TO BE EFFECTIVE. REPLACE
DETERIORATED, DAMAGED OR ROTTED EROSION CONTROL DEVICES
IMMEDIATELY.
D. REMOVE ALL SOILS AND SEDIMENTS DEPOSITED ONTO PUBLIC AND/OR
PRIVATE PAVEMENT AREAS WITHIN 24 HOURS OF DEPOSITION.
REMOVAL OF TRACKING MATERIALS SHALL BE COMPLETED AT THE END
OF EACH WORK DAY WHEN IT OCCURS. SWEEPING MAY BE ORDERED
AT ANY TIME IF CONDITIONS WARRANT.
E. PERFORM SITE REMOVALS, GRADING, EXCAVATION AND EMBANKMENT.
SEED AND MULCH ALL DISTURBED AREAS OUTSIDE OF PROPOSED
PAVEMENT AND BUILDING AREAS IMMEDIATELY AFTER THIS WORK WHEN
ACTIVITY WILL BE CEASED FOR 7 DAYS.
F. CONSTRUCT BUILDING. FINE GRADE SITE AND RESTORE GREEN AREAS
WITH PERMANENT VEGETATION OF SEED, MULCH AND FERTILIZER PER
PLANS.
G. REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES
AFTER SITE HAS UNDERGONE FINAL STABILIZATION AND PERMANENT
VEGETATION HAS BEEN ESTABLISHED WITH AT LEAST 70% COVERAGE.
5. MPCA CONSTRUCTION STORMWATER PERMIT IS NOT REQUIRED SINCE LESS
THAN ONE ACRE WILL BE DISTURBED.
6. REMOVE EXISTING CONCRETE CURB AND PAVEMENT AS NEEDED TO
CONSTRUCT PROPOSED BUILDING. REPLACE CONCRETE PAVEMENT TO
MATCH EXISTING SECTION.
co
0 0
C V)
Q)
N CO
C\2
CC\2 d
co O cd
+� C\2
E
1�
C�7
�
www
�
Ld
U
Z
3:w3:
>
z
0
U)0
0U)
z0
ED
L'i
LLJ w
o
�
U
LLJ
N
N
0
N
r�
ro
�
O O
zQ:�
lL
�L
o
z
O
wQ
I
O
I
U
Q
O
�u
0111
(�
__z
(n
z
1
o
o�
Q
O
O
z
Q::�
__1
I
WU
U
LL]
QU
Q
z
z
..
O
)O
o�
o>�U
SHEET
C-1
OF 1 SHEETS
REVISION 7'y7
Sheet index
PAGE DESCRIPTION
i ` A1.0 FLOOR PLAN BUILDING A-1
B1.0 FOUNDATION PLAN AND DETAILS
MIN STORAGE BUILD NG C1.0 INTERIOR WALL FRAMING ELEVATION
C2.0 END WALL FRAMING ELEVATION
C2.1 END WALL FRAMING ELEVATION
C3.0 ROOF FRAMING PLAN
D T 11°2 C E1.0 SIDEWALL ELEVATIONS DETAILS
oLL—AN TO E1.1 SIDEWALL ELEVATIONS BLDG G
E1.2 SIDEWALL ELEVATIONS BLDG H
E2.0 STEP PAGE
F1.0 INTERIOR PARTITION WALL PANEL DETAILS
F2.0 EXTERIOR PANEL PAGE DETAILS
G1.0 STANDING SEAM ROOF
J1.0 GUTTER PAGE
U
Abbreviations Glossary S
& Code Summary E-
Anchor Bolts -- Bolts used to anchor eave/base angles or channels, and base plates to a foundation CODE 2020 MINNESOTA BUILDING CODE EO �
Terms Terms Colors (Concrete Screws) z Q � �
or other support. CONSTRUCTION TYPE TYPE II B Q o
BEW Blank Endwall NTS. Not To Scale ASGY Ash Gray USE GROUP MODERATE HAZARD STORAGE S-1 Q �'
Angle, Eave/Base -- An angle or channel used at the base or top of a paneled wall section. Channels are
g usual) used when the wall section is insulated. ° N
BSW Blank sidewall O.C. On Center BWHT Bright White Channel, Eave/Base Y GROUND SNOW LOAD 50 psf �
BLDG. Building OPP. Opposite CDRD Cedar Red SNOW EXPOSURE CATEGORY B
CNR Corner PART Partition CLBG Classic Beige Base Plate -- A plate attached to the bottom of a column or jamb which rests on a foundation or E- k x m
9 2 Revision Indicator SNOW IMPORTANCE FACTOR 1 x a
COL Column PT Partition CRMB Cream Beige other support, usually secured by anchor bolts. U �
9 WIND VELOCITY (V ULT) 115 mph , o Q
CTR. Center PSF Pounds Per Sq. Foot CONB Conti. Brown WIND VELOCITY (V ASD) 89 mph E-
DIA. Diameter PTD. Painted DTAN Desert Tan Bracing -- Angles or straps used in the plane of the roof and walls to transfer loads, such as Notation Reference WIND EXPOSURE CATEGORY B
DBL. Double QTY. Quantity EVGN Evergreen wind, seismic and crane thrusts to the foundation. RISK CATEGORY II
EPDM Ethylene -Prop rene REQ'D. Required GARN Garnet
EW Endwall R.O. Rough Opening IWHT Iced White Detail SPECTRAL RESPONSE ACCELERATION (SS) 0.050
EXT Exterior S.D. Self Drilling ORAN Sunset Orange Bridging -- Series of bracing used in the roof framing to stiffen purlins. Page Detail Identification/Reference SPECTRAL RESPONSE ACCELERATION (Si) 0.023
SPECTRAL RESPONSE ACCELERATION (SDS) 0.053
F.O. Finished Opening STR. Starter PLBL Polar Blue
F.M. Field ModifyTYP. Typical ROYB Royal Blue SPECTRAL RESPONSE ACCELERATION (SDI) 0.037
YP Y Clip -- A plate or angle used to fasten two or more members together. SITE CLASS D
GA. Gauge WWF Welded Wire Fabric SGRY Slate Gray Detail Detail Identification SEISMIC DESIGN CATEGORY A
GALV. Galvanized
GALVM. Galvalume Column -- A main member used in a vertical position on a building to transfer loads from main
I.D. Inside Diameter roof rafters, or purlins to the foundation.
Detail
INT Interior Section Identification/Reference k-y e n e r a l Notes
MISC. Miscellaneous Eave -- The line along the sidewall formed by the intersection of the planes of the roof and Page
MPH Miles Per Hour wall. Structural Fasteners
NOM. Nominal Trachte structural bolts are SAE J429-Grade-2 or ASTM A307A unless specifically noted.
(HE
Footing -- A pad or mat, usually of concrete, located under a column, wall or other structural Part Number Identification These are typically Trachte Part No's 760110 & 764200. All bolt holes shall be aligned to
member, that is used to distribute the loads from that member into the supporting permit insertion of bolts without undue damage to threads. Bolts shall be placed in all
■ holes and nuts threaded to complete assembly. Compacting joint to snug -fit condition shall
p � r + NT -i -i wm � o ve � r% ty soil. Droaress systematically from most rigid part of ioint. Snug -tightened condition is tightness
10—DIGIT PART NUMBER
Gl1 l.. 1'N %A111 :✓ V JL 111
Girt -- A horizontal structural member that is attached to sidewall or endwall columns and
- RISe/Run Identification
4
attained with a few impacts of impact wrench or full effort of ironworker using ordinary
spud wrench to bring connected plies into firm contact.
5000
5000
00
supports paneling.
Specification for Structural Joints Using High Strength Bolts, December 31, 2009
2—DIGIT CODE
Self D ri I l i n Fasteners
9
COMPONENT
NUMBER
COLOR
GAUGE
1r%rk1'r1r1CC \A ATCnI A 1 hr11 nn nn f• A I II• E'15;1
INLI`I 1 if ILJ M/11 LR1/'1L VVLVR VR V/'1VVL
—
u er — light gauge metal member aan eave, valley or parapetdesignedo carry water
y
North Arrow
use self -drilling screws in the locations, quantities, and methods shown or noted on these
STRUCTURAL PARTS USE GAUGE CODE
from the roof to downspouts or drains.
�
o
drawings. Self -Drilling Fasteners should be used in accordance with SAE J78 specifications
g g p
NON—STRUCTURAL PARTS USE COLOR CODE
Z
for Self -Drilling Screws.
4-DIGIT RANDOM NUMBER
RANGE FROM 0000 TO 9999
Header -- The horizontal framing member located at the top of a framed opening, (doors).
WARNING: When installing Self -Drilling screws, take care to minimize exposed screwpoint
hazard, by locating screws next to panel bends and near recessed corners of angles.
MOST COMPONENTS WILL FOLLOW A LOGICAL SEQUENCE
•.
BASED ON HOW OR WHERE THEY ARE USED ON A BUILDING
�' Concrete
Structural Bracing
4—DIGIT COMPONENT CODE
Jamb -- The vertical framing members located at the sides of an opening (doors).
'
All structural bracing is an integral part of the structural system and should be installed
THIS IDENTIFIES A CLASS OF PARTS
= =
where noted or shown on the Floor Plans & Roof Framing Plans all connections should be
SUCH AS COLUMNS, HEADERS, BASEPLATES ETC.
-
Purlin — A horizontal structural member which supports roof covering.
_� �_� �_� Earth
consistent with all details related to installation of bracing components. Removal or
alteration of bracing without prior authorization is prohibited.
Temporary Bracing
0 la
Imaginary
Rafter -- The main beam supporting the roof system.
Temnornnry sunnorts or hrnc'Inn required to erect the huildinn is the resnonsihili+v of the
. , o kv
9—DIGIT NUMBER
Decimal
Point
5-DIGIT LENGTH
RIRCT—r11C:ITC - INC I-IRC
Rake Angle -- Angle fastened to purlins at rake for attachment of endwall or partition panels.
C+r11rf11rnl I ino -- lJsunlly chalk lines Inid nut nn the fnuncintion to nid in nlncinn columns rind nther
Insulation
. _._.r _. _. / ---rr- "_ _" _" __.._� . __ .- - --. _._- - .. - --r -_. _.___._I - ._._
erector to determine, furnish, install and remove.
Permits
It is the responsibility of the Building Owner/ Contractor/ Erector to obtain all appropriate
w pq
Z Z
E--1 a o
� W A W
_ C`J Z E-3
W
�
a
3 7
J
—
----
COMPONENT
FINISH
LENGTH
"
LAST 2-DIGITS ARE DECIMAL (FRACTION)
..... ` - — `"' """ - - - - ' - - - _ .. _ _ _ _ _ _ _ ... - - - - - - . - - - r - - - 17 - - - - -- - - _
structural components of a building floor plan. Accurate placement of these lines is
approvals and necessary permITs Trom LITy, LounTy, ZOTare, or Omer agencies as required.
w �
o U %
a a
q F'
pi
ALWAYS IMAGINE A DECIMAL
POINT BEFORE
LAST 2-DIGITS
critical to erecting
a building.
DS Down Spout
Structural Lines
:a o
oz
2-DIGIT CODE
IDENTIFIES MATERIAL COLOR OR GAUGE
Rake Trim -- A trim desi designed to
close the opening between the roof and endwall
structural lines are referenced often throughout our drawing details. These relate to the
�
o
U
STRUCTURAL PARTS USE GAUGE CODE
g
panels.
P g P
chalk lines that are to be laid out on the foundation. The lines should always be laid out
NON-STRUCTURAL PARTS USE COLOR CODE
taking into consideration the inherent imperfections commonly associated with foundations.
;
Date
2-DIGIT PROFILE CODE
edge of a foundation is seldom straight enough to use as a base for dimensioning. It
THIS IDENTIFIES A STANDARD PROFILE
Ridge -- The horizontal line
formed bypp opposing sloping sides of a roof running with
g pig g parallel
is begin layout at 10'" fthe f"Lti
s recommendedto n your -1from e sidewalledge (refer to "Locating
5 24
4/ /
SUCH AS PANELS, TRIMS, STUDS, ETC.
the building length.
The First Line" in the Trachte Erection Manual). All other lines should be placed accurately
from the first line.
Drawn by
BRM
2—DIGIT 2—DIGIT 2—DIGIT 2—DIGIT 2—DIGIT 2—DIGIT
GAUGE CODES WALL do TRIM DOOR or TRIM DOOR or TRIM
COLOR CODES
S.S. Roof
Special
Scale
COLOR CODES COLOR CODES COLOR CODES COLOR CODES
12 = 12—GAUGE 10 = Regal White 28 = Clay
B Others
Y
14 = 14—GAUGE 60 = Cream Beige 21 = Ash Gray 44 = Conti. Brown
16 = 16—GAUGE 61 = Slate Gray 26 = Matte Black 45 = Garnet
11 =Roman Blue
12 = Evergreen
33 =Polar White
37 = Sand Stone
The design, detailing, and materials for items designated as „ By Others" are not the
N. T. S.
18 = 18—GAUGE 62 = Classic Beige 31 = Patriot Red 46 = Evergreen
63 =Iced White 40 = Sunset Orange 47 Red
13 = Patrician Bronze 38 = VP Charcoal Black
responsibility of Trachte Building Systems, Inc.
Plan No.
=Cedar
2—DIGIT 27 =Light Stone 41 =Desert Tan 48 =Shale
COLOR CODES 42 = Polar Blue 63 = Iced White
14 =Surrey Beige
23 =Regal/Harbor
39 = VP Patrician Bronze
Blue 49 =Natural Stone
Field Cutting and Drilling
54717 B
43 = Royal Blue 64 Bright White Door
80 = Galvanized 32 = Lime Green (Door only) g
24 = Colonial Red
26 = Matte Black
65 = Yellow
66 = Silver Metallic
Field cutting and drilling of some parts will be required.
Order No.
82 =Galvalume
82 =Galvalume
67 =Birch White
NOTICE:
— —
6-DIGIT PART NUMBERS ARE ALSO USED. THESE FOLLOW NO SPECIFIC STRUCTURE.
Sheet No.
THEY ARE COMMONLY USED FOR FASTENERS, SWING DOORS, PEAK BOXES,
AND SOME
OTHER PARTS.
THE SPECIFIC PROJECT INFORMATION PROVIDED TO MONTS BUILDING SYSTEMS, INC. iPAS
Most of Trachte s standard color codes are shown. Special colors are not shown. Permit
show the correct color of your desired building. The final erection set of drawings may
plans may not
show the
USED IN THE DEVELOPMENT OF THE ENGINEERING DRAWINGS, DETAILS, MATERIALS LIST AND
PRICING. ANY DISCREPANCIES BETWEEN THIS INFORMATION AND THE ACTUAL JOB CONDITIONS
WILL AFFECT THE ACCURACY OF THIS )PORK TRACHTE IS NOT RESPONSIBLE FOR ANY
Cover
correct colors ordered. The colors may not always be shown within the
drawing set but
the material
ADDITIONAL MATERIALS OR ANY LAYOUT PROBLEMS CAUSED BY INACCURATE SITE INFORMATION.
listing will always show the correct color for the part listed.
PLEASE RECHECK THIS INFORMATION CAREFULLY.'
A
0
I
LO
c
0
I
iA
a 0 -0
I 1
in in
N
0
I
�n
0
I
in
F
8" BLOCK
FIREWALL
.00K
MLL
END WALL ELEVATION
SIDE WALL ELEVATION
'—d" /W-10$1 /Q'—d" P-0\/P' 1 /d• 1 9 PITPN AAIK11 CTOR0r`P- RI III nI ir` 0—
DOOR SCHEDULE
QTY
CODE
TYPE
SIZE
ROUGH OPENING
MANUF.
DESCRIPTION
1
DD
ROLL —UP
8'-0"
x 7'-0"
8'-0"
x 7'-0"
TRAC—RITE/eq.
ROLL —UP
DOOR,
944
1
DE
ROLL —UP
8'-8"
x 7'-0"
8'-8"
x 7'-0"
TRAC—RITE/eq.
ROLL —UP
DOOR,
944
5
DF
ROLL —UP
9'-0"
x 7'-0"
9'-0"
x 7'-0"
TRAC—RITE/eq.
ROLL —UP
DOOR,
944
1
DND
ROLL —UP
8'-0"
x 8'-0"
8'-0"
x 8'-0"
TRAC—RITE/eq.
ROLL —UP
DOOR,
944
1
DNE
ROLL —UP
8'-8"
x 8'-0"
8'-8"
x 8'-0"
TRAC—RITE/eq.
ROLL —UP
DOOR,
944
7
DNF
ROLL —UP
9'-0"
x 8'-0"
9'-0"
x 8'-0"
TRAC—RITE/eq.
ROLL —UP
DOOR,
944
2
DNG
ROLL —UP
8'-8"
x 7'-6"
8'-8"
x 7'-6"
TRAC—RITE/eq.
ROLL —UP
DOOR,
944
13
DNH
ROLL —UP
9'-0"
x 7'-6"
9'-0"
x 7'-6"
TRAC—RITE/eq.
ROLL —UP
DOOR,
944
ROLL -UP DOORS MEET ASTM EJJO DO
NOT
ORDER
DOORS BY
OTHERS PRIOR
TO RECEIVING THE ERECTION SET.
RO
AND
DOOR
SIZES
MAY
VARY
DUE
TO
ENGINEERING
ISSUES.
END WALL ELEVATION
118 -I J-0°
0
SIDE WALL ELEVA TION 118 1 0
�w�
Kt VIJIVIV
Date
C m �
ui
W S2
o o a�
cn � Ct a
z QQ� ZQ,
o �n
Q 10,I
W o, U E o
3 k OJ 5 3
O N -Q Ln O
= N
Q o o a o
I
z
x
A
�z
pq x O
GU
zzx
z
o
a�a
a
�zw
a
Uf�AF'
°0 z
O
i 00
M
ro
Q
�
O
m
�
Date
4/5/24
Drawn by
BRM
Scale
Plan No.
54717 B
Order No.
Sheet No.
Al*0
By
A
0
I
in
B
0
I
in
C
_ a
I 0
I
N 0
D
1A Vq
1 LO
E
I
Ln
F
2
3
m
5
70'-0" (15'-1" WIDE)
9
7
i
9
10
11
12
13
14
15
130'-0" (150'-0" OVERALL 20'-1" WIDE)
16
17
In
19
0
121
11
0
I
in
I
I I I I I I I I
6" STEP HEIGIIT
I I I I I I I 1
I
10'-0"J_ J_ J_ J_ J_ J_ J_ J_ J_ J_ J_ J_ J_ J_ J_ J_ J_ J
10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0"
CONCRETE
SCREW
#4 REINFORCING BAR
1
CONTINUOUS
WELDED WIRE
VAPOR BARRIER
9
FABRIC
52"
4"
_ _ _ _ _
_ _ _
SLAB THICKNESS
CLEAR
(SEE LEGEND)
r
5 t `
4" FILL
3"
—
CLEAR
—
'I
III
6"
III
III
��
1'—o"
FLOATING SLAB
DETAIL,
NOTCHED
90'-0" (25'-1" WIDE)
1A 3 24 25 26 27 1, 28 29 30 31 IZJA
20'-0" (150'-0" OVERALL 20'-1" WIDE)
Lo /
1A
2 1'
3 I I I I 1' I I C I/
r
�1.rv0
1 1
N 6" STEP HEIGHT B
1. B SIM
1.
I I
FOUNDATION BLOCK FIREWALL
GENERAL FOUNDATION NOTES - - (BY OTHERS) 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10' On 10'-0" 10'-0" 10'-0" 10'-0"
FOUNDATION SPECIFICATIONS LEGEND GRADE LINE 1
1. FLOOR SLAB SHALL BE (SEE LEGEND) THICK WITH 6
X 6 — W1.4 X W1.4 WELDED WIRE FABRIC. PAVING OR
FLASHED GRADE 310'-0" OVERALL LENGTH 1
2. CONCRETE SHALL BE OF A MIXTURE AND DENSITY TO II #3 REINFORCING BAR
YIELD A 2,500 PSI COMPRESSIVE STRENGTH AT 28 DAYS. WATERPROOFING II CONTINUOUS ® 1' O.C.
NOTE: STRUCTURAL DESIGN IS BASED ON 2,500 PSI. FREE DRAINING
HOWEVER, 3,000 PSI IS PREFERRED. 1 `.+: :". ; INORGANIC BY OTHERS I FOUNDATION PLAN for MINI STORAGE BUILDING A —1
GRANULAR FILL 2" CLEAR I
3. REINFORCING STEEL SHALL CONFORM TO ASTM A-615, •` �'>"'
GRADE 60 FOR #4 AND LARGER BARS, AND GRADE 40 " iI o
FOR #3 BARS AND ALL DOWELS AND TIES. STEEL SHALL #3 HOOKED BAR ® 11 O.C.
BE KEPT CLEAN AND FREE OF RUST. LAP ALL
REINFORCING A MINIMUM OF 28" AT SPLICES AND AROUND EARTH FREE DRAINING GRANULAR FILL
CORNERS. WRAPPED IN GEOTEXTILE MATERIAL II
4. WELDED WIRE FABRIC SHALL CONFORM WITH ASTM DRAIN BY OTHERS II #3 REINFORCING BAR
A-185, AND SHALL BE LAPPED 8 INCHES MINIMUM AT SLAB THICKNESS'` CONTINUOUS
ALL SIDE AND END LAPS. NOTE: WELDED WIRE FABRIC IS .;:'; •'• I WELDED WIRE
USED IN THE STRUCTURAL DESIGN OF THE FLOOR SLAB. » I I FABRIC VAPOR BARRIER
THEREFORE, FIBER REINFORCING CANNOT BE USED AS AN
ALTERNATE. II _ SLAB THICKNESS
(SEE LEGEND)
5. VAPOR BARRIER SHALL BE A MINIMUM OF 6 MIL CONCRETE SCREW
POLYETHYLENE WITH JOINTS LAPPED NOT LESS THAN 6 I I / ".`" : '� . ' .'' . ' .... •• 4" FILL
INCHES. (INTERIOR)
6. STRUCTURAL ANCHORS SHALL BE CONCRETE SCREWS
8" x 2 1/2
TO BE PROVIDED BY TRACHTE BUILDING SYSTEMS. 3 /
INSTALLATION INSTRUCTIONS ARE SPECIFIED IN NOTE 01 3" CLEAR
ON THE ERECTION DETAIL PAGES. CONCRETE SCREW
+•. a:
7. NON—STRUCTURAL ANCHORS SHALL BE EITHER
(EXTERIOR)
POWDER ACTUATED ANCHORS OR TAPCON SCREW
ANCHORS. THESE ANCHORS ARE NOT SUPPLIED BY �� ��
TRACHTE BUILDING SYSTEMS. INSTRUCTIONS FOR LOCATING 3 /8 x 2 1 /2 3'-0'
NON—STRUCTURAL ANCHORS ARE SPECIFIED IN NOTE 02
ON THE ERECTION DETAIL PAGES. NON—STRUCTURAL
ANCHORS SHALL BE INSTALLED PER MANUFACTURERS
SPECIFICATIONS. 1 A RETAINING WALL DETAIL
8. FREE DRAINING GRANULAR FILL SHALL BE A NON
FROST SUSCEPTIBLE FILL MATERIAL CONSISTING OF
COURSE SAND, CRUSHED ROCK, OR AN APPROVED
EQUIVALENT.
t UUNUA I IUN UtSIUM NU 1 Q*
1. FOUNDATION PLAN SHOWN IS DESIGNED FOR A
PRESUMED 1,500 PSF ALLOWABLE BEARING PRESSURE.
2. PLEASE NOTIFY ENGINEER OF ANY UNUSUAL
CONDITIONS.
GENERAL FOUNDATION NOTES:
1. NOTCH SHALL BE LEVEL WITH NO PITCH.
2. FOUNDATION MUST BE SQUARE AND LEVEL.
3. PROVIDE CONTROL JOINTS AT 15'-0" ON CENTER
MAXIMUM SPACING. ALL CONTROL JOINTS SHOULD BE DIMENSION VARIES
LOCATED AT LEAST 1 FOOT OFF OF THE TRACHTE 2j"MIN.
BUILDING SYSTEMS COLUMN GRID SHOWN ON THE
FOUNDATION PLAN.
NOTE
TRACHTE BUILDING SYSTEMS, INC. IS ONLY
RESPONSIBLE FOR THE DESIGN OF THE FOUNDATION
TO ACCEPT OUR BUILDINGS. THE DESIGN IS BASED
ON THE PARAMETERS SPECIFIED IN THE NOTES,
AND THE LOADS IMPOSED BY OUR BUILDING
SYSTEM. IT IS THE OWNERS RESPONSIBILITY TO
NOTIFY TRACHTE'S ENGINEERING DEPARTMENT OF
ANY UNUSUAL SITE CONDITIONS OR OF ANY
MATERIALS NOT SUPPLIED BY TRACHTE, THAT WILL
IMPOSE LOADS ON THE FOUNDATION SYSTEM.
ACTUAL CONSTRUCTION OF THE FOUNDATION,
INCLUDING LABOR AND MATERIALS FOR PLACING OF
REINFORCING STEEL AND CONCRETE IS BY OTHERS
AND THEREFORE, NOT THE RESPONSIBILITY OF
TRACHTE BUILDING SYSTEMS.
CONCRETE SCREW DIMENSION VARIES
24"MIN.
INSIDE EDGE OF POURED WALL D
A CONCRETE SCREW LOCATION,
CORNER
WELDED WIRE VAPOR BARRIER
FABRIC
SLAB THICKNESS
(SEE LEGEND)
t . 4" FILL
2 SLAB,
INTERIOR SECTION
D
rid
DIMENSION VARIES ine
5"MIN.
CONCRETE SCREW
DIMENSION
VARIES
24"MIN.
FOUNDATION EDGE •
INSIDE EDGE OF POURED WALL
® SIM.
B CONCRETE SCREW LOCATION,
EXTERIOR
#4 REINFORCING BAR
CONTINUOUS
WELDED WIRE
VAPOR BARRIER FABRIC 5"
CLEAR
SLAB THICKNESS
(SEE LEGEND) STEP HEIGHT
4" FILL ; " ::.:::.s; \ (SEE FOUNDATION PLAN)
SLAB THICKNESS
8" PAD (SEE LEGEND)
3"CLEAR �..:`..r.� �:.•:.•::•: 4" FILL
III -ill
NOTE: II III
THE SUPPORTING WALL MUST REST
ON THE HIGH SIDE OF THE STEP.
8" 8"
3 FLOATING SLAB DETAIL, STEP
CONCRETE SCREW
FOUNDATION EDGE
rid
22„ ine
REF. •
INTERIOR COLUMN n rld
ine
BASEPLATE
I
CONCRETE SCREW 2" REF. l
SEE FLOOR PLAN TO LOCATE CONCRETE SCREW ANCHOR TO BE ERECTOR
& ORIENTATE BASEPLATE & INSTALLED IN LIEU OF CAST -IN -PLACE ANCHOR
INTERIOR COLUMNS SCREWS. MINIMUM EMBEDMENT DEPTH
= (CONCRETE SCREW LENGTH) +
C CONCRETE SCREW LOCATION, D CONCRETE SCREW,
INTERIOR BASEPLATE SECTION FOUNDATION EDGE
nc vi �iviv
Date
U
,c
c
o,
In
Ld
ap Co
13 -
cn
� CL Q
zL
J
O
o cv
m
'0
� � o
W
a
o
U
�
x C6
Q
.�?
In o 0
a
W
A
�
x
O
o
a
zzx
�a�o4
z
O
W
A W
Z
W �
A
°
_
f�
A
z
�
.a
O
O
(� co
co
f�
o
$
T
F
Date
4/5/24
Drawn
by
BRM
Scole
Plan No.
54717 B
Order No.
— —
Sheet No.
B1*0
PART # INDEX
PART #
DESCRIPTION
5050020012
12
a.
Interior base plate
5050020112
12
a.
DBL. iamb base plate
5050022218
18
a.
DBL. iamb clip
5950000118
18
a.
PT. support iamb
5950000318
18
a.
PT. support iamb 9'-4"
5950010418
18
a.
support, BSW 8'-7.75" EV.
5950015818
18
a.
support, BSW 9'-10.25" EV.
5950031118
18
a.
PT. support iamb 8'-10"
5950031918
18
a.
support, JAMB 9'-3" EV.
5970000163
18
a.
DBL. iamb 8'-4" IWHT
5970000263
18
a.
DBL. iamb 9'-4" IWHT
5970020163
18
a.
double iamb 8'-10" IWHT
5987000018
18
a.
PT. rake angle 5' Ion
5990000116
16
a.
interior column 3.63" x 2"
5' EV
5990000316
16
a.
interior column 3.63" x 2"
10' EV
5990000516
16
a.
interior column 3.63" x 2"
15' EV
5992000116
16
a.
interior column 3.63" x 2"
5' EV
5992000316
16
a.
interior column 3.63" x 2"
10' EV
5992010116
16
a.
interior column 3.63" x 2"
5' EV
5992010316
16
a.
interior column 3.63" x 2"
10' EV
5992010516
16
a.
interior column 3.63" x 2"
15' EV
5992010716
16
a.
interior column 3.63" x 2"
20' EV
5994000718
18
a.
BSW column 3.63" x 1.5"
8-7.75EV
5994002918
18
a.
BSW column 3.63" x 1.5"
9-10.25EV
5994010818
118ga.
BSW column 3.63" x 1.5"
9-3EV
PURLIN
O i
1
�Nr�RAKE
n
tructural
_ine
4 PLCS COLUMN TABS OVI
tructural
ine
INTERIOR COLUMN, PURLIN,
RAKE ANGLE CONNECTION
ct i
NOTE:
3
HR
BLOCK
SIRE
WALL
AT
BLANK
HIGH
SIDE
LL:
W
a
0
INTERIOR WALL FRAMING ELEVATION, 1/ f 4 yy PITCH LEAN—TO
PARTITION PANEL NOT SHOWN,
SEE PARTITION DETAILS
01 PRIMARY CONCRETE ANCHOR INSTALLATION
1) USING THE PROPER DRILL BIT SIZE, DRILL A HOLE INTO THE BASE MATERIAL TO THE
REQUIRED DEPTH. THE TOLERANCES OF THE DRILL BIT USED SHOULD MEET THE
REQUIREMENTS OF ANSI STANDARD B212.15.
2) REMOVE DUST AND DEBRIS FROM HOLE DURING DRILLING (E.G. DUST EXTRACTOR,
HOLLOW BIT) OR FOLLOWING DRILLING (E.G. SUCTION, FORCED AIR) TO EXTRACT LOOSE
PARTICLES CREATED DURING DRILLING.
3)SELECT A TORQUE WRENCH OR POWERED IMPACT WRENCH AND DO NOT EXCEED THE
MAXIMUM TORQUE, TIN8T MAX OR TIMPACT,MAX RESPECTIVELY FOR THE SELECTED ANCHOR
DIAMETER AND EMBEDMENT. ATTACH AN APPROPRIATE SIZED HEX SOCKET/DRIVER TO
THE IMPACT WRENCH. MOUNT THE SCREW ANCHOR HEAD INTO THE SOCKET.
4) DRIVE THE ANCHOR INTO THE HOLE UNTIL THE HEAD OF THE ANCHOR COMES INTO
CONTACT WITH THE FIXTURE. THE ANCHOR MUST BE SNUG AFTER INSTALLATION. DO NOT
SPIN THE HEX SOCKET OFF THE ANCHOR TO DISENGAGE.
(_AA_INTERIOR WALL FRAMING ELEVATION, 1 f 4" PITCH LEAN—TO
PARTITION PANEL NTnm 0T_TnTATKT OVV T7 A DmTmTnAT T%VrP A TT c
PURLIN CONNECTIONS - 7". 9". 11 ". AND 12" WEB
7" (SHOWN) AND 9" PURLINS REQUIRE TWO BOLT CONNECTIONS ON EACH END.
11" AND 12" PURLINS REQUIRE THREE BOLT CONNECTIONS ON EACH END.
1 g PARTITION SUPPORT AT BLANK WALL
BLANK SIDEWALL PARTITION SUPPORT IS ONLY REQUIRED WHERE AN
INTERIOR PARTITION PANEL WALL INTERSECTS WITH THE BLANK SIDEWALL.
REVIEW YOUR FLOOR PLAN FOR LOCATION AND QUANTITY OF BLANK
SIDEWALL SUPPORTS. THE BLANK SIDEWALL SUPPORT MAY NEED TO BE
FIELD CUT TO THE PROPER HEIGHT. INSULATED SIDEWALLS WILL USE A
ZEE SHAPED SUPPORT, DIFFERENT FROM THE ONE SHOWN. SEE
INSULATION DETAILS IF YOU HAVE INSULATED SIDEWALLS. SEE FLOOR
PLAN FOR PARTITION CHANNEL PART NUMBERS.
00
C INTERIOR WALL FRAMING ELEVATION, 1 f 4" PITCH LEAN—TO
PARTITION PANEL NOT SHOWN, SEE PARTITION DETAILS
39 EXTERIOR COLUMN dt NOTCH LAYOUT
FOUNDATION SHOWN WITH A NOTCH. REFER TO FOUNDATION PLAN FOR
ACTUAL FOUNDATION LAYOUT. INSTALL SILL PLATE SEALER (#102702)
UNDER THE BASE TRACK AT ANY NO NOTCH BLANK WALL.
BASE PLATE REFERENCE HOLES
HOLES AT THE CENTER OF THE BASE PLATES ARE USED AS A AID TO
LOCATE BASEPLATES ON THE STRUCTURAL LINES (CHALK LINES).
NOTES:
NOTE: RIGHT SIDE SHOWN, LEFT SIDE MIRROR THIS
DETAIL.
NOTE: RIGHT SIDE SHOWN,
LEFT SIDE MIRROR THIS DETAIL.
NOTE: LEFT SIDE SHOWN,
RIGHT SIDE MIRROR THIS DETAIL.
NOTE: LEFT SIDE SHOWN, RIGHT SIDE MIRROR THIS DETAIL.
NOTE: RIGHT SIDE SHOWN, LEFT SIDE MIRROR THIS DETAIL.
1)SEE FLOOR PLAN FOR PROPER BASE PLATE AND COLUMN LOCATIONS.
2) COLUMN OPENING SHOULD FACE NEAREST 'LOW' EAVE.
760602
tructural
�
structural SUPPORT, BW
amine
3) (1) PRIMARY ANCHOR REQUIRED AT EACH BASE PLATE, SUPPLIED BY
tructural
ine
1 9
TBS.
FIELD CUT
TRACK ine
tructural
ine
4) (1) SECONDARY ANCHOR (CONCRETE SCREW, POWDER ACTUATED, OR
AS NEEDED
'�
EAVE/TOP
RAKE FIELD CUT
HAMMER DRIVE) REQUIRED AT EACH BASE PLATE, 502840 SUPPLIED BY
��<a`
JAMB CLIPS
�� ANGLE AS NEEDED
TBS
SINTERIOR COLUMN
�Cv e
`r °
RAKE
ANGLE
COLUMN
HEX HEAD BOLT HEX NUT
0
PLATE
®
®
TRACK
760110
760300
760110
SUPPORT, SW
, ® ®
760300
° O
tructural
tag
<��e�
NOTE: REFER TO SIDEWALL
6
PRIMARY ANCHOR /
0
JAMB ° 0
Line
PAGE FOR INSTALLATION
OF EAVE TOP TRACK
/
760110
®
SUPPORT, BW 19
760110
CONCRETE SCREW 01
760300
9
COLUMN
SUPPORT, SW
760300
°`� 2 PLCS
SUPPORT
�-'
COLUMN
760110
tructural
n e
\
760300
760300
2 BASE PLATE
tructural
SECONDARY ANCHOR
ine
ructurcl
ine
Q1 CONCRETE SCREW
tructural
~ine
502840 BASE PLATE
INTERIOR COLUMN/BASE PLATE
D
3
JAMB/SUPPORT/RAKE
ANGLE
4 JAMB/SUPPORT/BASE PLATE
5 SIDEWALL
COLUMN/RAKE ANGLE
(DSIDEWALL COLUMN/BASE ANGLE
7 BLANK SIDEWALL
COLUMN
CONNECTION
CONNECTION
CONNECTION
CONNECTION
Q BLANK WALL
CONNECTION Q BLANK WALL
SUPPORT CONNECTION
nc vi �iviv
Date
U
c
C
m
W
cf)
i
cf) CL Z5 D
O
L
Z
�sEl
4
L L
W
a
U E o
3
k m co 3
U
-6
Q
:S Q03 Q
a_
W
A
z
o
A
w
x
P
a
zz
:4
h a
U) o
U2 W
A W
P4
c�z�,
o
A z
a
O
W
o
pq�
O
co
z
o
�
Date
4/5/24
Drawn
by
BRM
Scole
1/2" = 1'-0"
Plan No.
54717 B
Order No.
— —
Sheet No.
c
1 0 0
PART # INDEX
PART #
DESCRIPTION
436312000
26
a.
CNR. trim panel/panel, IWHT 10'-0"
502840
screw,
to con 1 4" x 1.25"
5050004014
14
a.
purlin span clip
5050020412
12
a.
STR. jamb base plate
5050022316
16
a.
STR. jamb clip
5911000214
14
a.
EXT. wall base track 3.88" x 5' Ion
5974000163
18
a.
STR. jamb RH 8'-4" IWHT
5985000218
18
a.
EXT. girt, 4'-11 1 4" Ion
5987001018
18
a.
PT. rake angle, 16' Ion
5991000118
18
a.
EW column 3.63" x 1.5" 5'-0 EV
5991010118
18
a.
EW column 3.63" x 1.5" 5'-0 EV
5991010318
18
a.
EW column 3.63" x 1.5" 10'-0 EV
5991010518
18
a.
EW column 3.63" x 1.5" 15'-0 EV
5991010718
18
a.
EW column 3.63" x 1.5" 20'-0' EV
5994000118
18
a.
BSW column 3.63" x 1.5" 8-4EV
5994000718
18
a.
BSW column 3.63" x 1.5" 8-7.75EV
5994002918
18
a.
BSW column 3.63" x 1.5" 9-10.25EV
775203
breakaway clip for FW. 2"x2"
779051
26
a.
FW. door trim CRMB
779600
foam
closure 3'-0" r— an out a— an ins
01 PRIMARY CONCRETE ANCHOR INSTALLATION
1) USING THE PROPER DRILL BIT SIZE, DRILL A HOLE INTO THE BASE MATERIAL TO THE
REQUIRED DEPTH. THE TOLERANCES OF THE DRILL BIT USED SHOULD MEET THE
REQUIREMENTS OF ANSI STANDARD B212.15.
2) REMOVE DUST AND DEBRIS FROM HOLE DURING DRILLING (E.G. DUST EXTRACTOR,
HOLLOW BIT) OR FOLLOWING DRILLING (E.G. SUCTION, FORCED AIR) TO EXTRACT LOOSE
NOTE0
:
PARTICLES CREATED DURING DRILLING.
3)SELECT A TORQUE WRENCH OR POWERED IMPACT WRENCH AND DO NOT EXCEED THE
MAXIMUM TORQUE, TINST MAX OR TIMPACT,MAX RESPECTIVELY FOR THE SELECTED ANCHOR
DIAMETER AND EMBEDMENT. ATTACH AN APPROPRIATE SIZED HEX SOCKET/DRIVER TO
THE IMPACT WRENCH. MOUNT THE SCREW ANCHOR HEAD INTO THE SOCKET.
4) DRIVE THE ANCHOR INTO THE HOLE UNTIL THE HEAD OF THE ANCHOR COMES INTO
CONTACT WITH THE FIXTURE. THE ANCHOR MUST BE SNUG AFTER INSTALLATION. DO NOT
SPIN THE HEX SOCKET OFF THE ANCHOR TO DISENGAGE.
04 LEAN—TO ENDWALL ELEVATIONS
ACTUAL ENDWALL LAYOUT MAY MIRROR THIS ELEVATION. SEE FLOOR PLAN FOR ACTUAL
LAYOUT AND LOCATION OF HIGH SIDE. STARTER JAMBS ARE LEFT & RIGHT HANDED. IF
CONSTRUCTING A MIRROR VIEW OF THIS ELEVATION USE THE OPPOSITE STARTER JAMB.
STARTER JAMB PART NUMBERS ARE DIFFERENT BUT SIMILAR. SEE BILL OF MATERIAL FOR
CORRECT PART NUMBER.
08 FIELD CUTTING
PROVIDED COMPONENTS OFTEN REQUIRE FIELD CUTTING. TO ENSURE AN APPROPRIATE
APPEARANCE AND MINIMIZE CAULK REQUIRED, USE ACCURATE MEASUREMENTS AND QUALITY
TOOLS FOR FIELD CUTS. SILL TRIM OFTEN REQUIRES NOTCHING TO AVOID CONFLICTS WITH
FASTENERS. LAP JOINTS SHOULD BE ARRANGED TO SHED WATER FROM OVERHEAD OR
PREVAILING WIND DIRECTION.
02 SECONDARY CONCRETE ANCHORS (SUPPLIED dt INSTALLED BY OTHERS
INSTALL SECONDARY ANCHORS (CONCRETE SCREW, POWDER ACTUATED, OR HAMMER DRIVE)
24" ON CENTER, AND STRICTLY IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS. NOTE: SOME COMPONENTS. SUCH AS BASE TRACK. SPECIFICALLY REQUIRE
BOTH PRIMARY AND SECONDARY ANCHORS.
08 FIELD CUTTING
PROVIDED COMPONENTS OFTEN REQUIRE FIELD CUTTING. TO ENSURE AN APPROPRIATE
APPEARANCE AND MINIMIZE CAULK REQUIRED, USE ACCURATE MEASUREMENTS AND QUALITY
TOOLS FOR FIELD CUTS. SILL TRIM OFTEN REQUIRES NOTCHING TO AVOID CONFLICTS WITH
FASTENERS. LAP JOINTS SHOULD BE ARRANGED TO SHED WATER FROM OVERHEAD OR
PREVAILING WIND DIRECTION.
INSULATION FLAME AND SMOKE RATING
THE COMPOSITE OF FIBERGLASS AND FACING SHALL HAVE SURFACE
BURNING CHARACTERISTICS NOT TO EXCEED 25 FLAME SPREAD AND 50
SMOKE WHEN TESTED IN ACCORDANCE WITH UNDERWRITERS LABORATORIES
723 TEST METHOD OR ASTM E-84 TEST METHOD. INSULATION BY OTHERS
TO MEET OR EXCEED THESE REQUIREMENTS.
Lom
BLOCK
HR BLOCK
WALL ON
OF STEM
PURLIN CONNECTIONS — 7". 9". 11 ". AND 12" WEB
7" (SHOWN) AND 9" PURLINS REQUIRE TWO BOLT CONNECTIONS ON EACH END.
11" AND 12" PURLINS REQUIRE THREE BOLT CONNECTIONS ON EACH END.
1 g PARTITION SUPPORT AT BLANK WALL
BLANK SIDEWALL PARTITION SUPPORT IS ONLY REQUIRED WHERE AN
INTERIOR PARTITION PANEL WALL INTERSECTS WITH THE BLANK SIDEWALL.
REVIEW YOUR FLOOR PLAN FOR LOCATION AND QUANTITY OF BLANK
SIDEWALL SUPPORTS. THE BLANK SIDEWALL SUPPORT MAY NEED TO BE
FIELD CUT TO THE PROPER HEIGHT. INSULATED SIDEWALLS WILL USE A
ZEE SHAPED SUPPORT, DIFFERENT FROM THE ONE SHOWN. SEE
INSULATION DETAILS IF YOU HAVE INSULATED SIDEWALLS. SEE FLOOR
PLAN FOR PARTITION CHANNEL PART NUMBERS.
FIF
TO
WAS
21 PARTITION SUPPORTS AT BLANK ENDWALL
SEE FLOOR PLAN FOR LOCATIONS AND QUANTITY OF PARTITION SUPPORTS. ALIGN BOTTOM
BOLT HOLE OF SUPPORT WITH BOTTOM GIRT OF ENDWALL. FIELD —CUT SUPPORT JUST
BELOW PURLIN. SUPPORT WILL REQUIRE FIELD —NOTCHING TO ALLOW FOR THE TOP
FASTENER CONNECTION.
39 EXTERIOR COLUMN do NOTCH LAYOUT
FOUNDATION SHOWN WITH A NOTCH. REFER TO FOUNDATION PLAN FOR
ACTUAL FOUNDATION LAYOUT. INSTALL SILL PLATE SEALER (#102702)
UNDER THE BASE TRACK AT ANY NO NOTCH BLANK WALL.
47 ROOF INSULATION
INSULATION MUST STOP ON BOTH SIDES OF FIREWALL. INSULATION CANNOT
RUN CONTINUOUS ACROSS TOP OF WALL.
56 BREAK AWAY CUPS
CLIPS ATTACH TO STRUCTURAL MEMBERS WITH (1) #760600 SCREW, FOR
BLOCK FIREWALL USE (1) TAPCON SCREW #502840. USE (2) #760615 TO
FASTEN.
57 BLOCKWALL TERMINATION
BLOCKWALL MUST RUN THE ENTIRE WIDTH OF BUILDING AND TERMINATE AT
THE EXTERIOR A —PANEL OR JAMB. BLOCKWALL MUST RUN THE ENTIRE
HEIGHT FROM THE FLOOR TO THE ROOF SHEETING. GROUT MUST BE USED
TO FILL ANY VOIDS.
PURLIN SPAN CUPS
TWO PURLIN SPAN CLIPS ARE REQUIRED TO BUTT TO THE TRACKS OF A
GYPSUM COVERED STUD FIREWALL. FOR BLOCK FIREWALLS TWO SPAN CLIPS
WILL BUTT AT THE CENTER LINE OF THE BLOCK WALL AND SLOTS ARE TO
BE CUT FOR THE FLANGES TO FIT IN AND GROUT MUST FILL ANY VOIDS
UP TO THE ROOF LINE.
01 Bearing & Nonbearing Wall Rating U904 - 3 HR Firewall
Concrete Blocks - Various designs. Classification C-3 (3 hr). See Concrete Blocks
category for lists of eligible manufacturers.
Mortar - Blocks laid in full bed of mortar, nom. 3/8" thick, of not less than 2-1/4" and
not more than 3-1/2" parts of clean sharp sand to 1 part Portland Cement (proportioned by
volume) and not more than 50 percent hydrated lime (by cement volume). Vertical joints
staggered.
NOTE: TYPICAL CONNECTIONS AT OPPOSITE END MIRROR THIS DETAIL.
436312000
NOTE: TYPICAL CONNECTIONS AT OPPOSITE END MIRROR THIS DETAIL.
FASTENERS
BY OTHERS
779051
°
o a
°
a GIRT
a o
0
a
a
° a
*INSTALL INSULATION 8" REF
FROM THE EXTERIOR
WHEN POSSIBLE
�14 x 7/8"
AC HEAD
°
� a a
a
°
GROUT FILLED 7
ROOF SHEETING
20
o ® INSULATION* 47
5050004014 62
RAKE ANGLE
62 5050004014
1
PURLIN
a d as
a d
a a
a
a
779600
OQ
d d0
oil
a
RAKE TRIM °d
PURLINO.E-0.1a
Q - OQ
O d
�4 d.�
BLocK
0,0
C],
a a a d
0 d a
a ° a d ai
°
BLOCK
a�
d
502840 °
°
BREAKAWAY CLIP
BLOCK
a
° SW COLUMN
TOUCH UP PAINT a Q
FRC GIRT
��
BASE TRACK
EW COLUMN
Mf
BASE PLATE
° BASE TRACK
PURLIN SPAN a
INT COLUMN
m
BLOCK
o
ENDWALL COLUMN
°
d ° a a
CLIP
-. �-
BLOCK 01
ENDWALL
BASE TRACK
.. °
d d e�ocK
a a d d
BASE TRACK
BASE TRACK
STARTER JAMB
tructural
ine
a ° Al"
SECTION OF
BLOCK
,C' 0\
��°e BLOCK
BLOCK FIRE RESISTIVE
CONSTRUCTION SECTION
BLOCK FIRE RESISTIVE
CONSTRUCTION SECTION
ENDWALL FIRE RESISTIVE
EXTERIOR FIRE
3
RESISTIVE
EXTERIOR BLOCK FIRE
BLOCK FIRE RESISTIVE
CONSTRUCTION
SECTION
A
2 CONSTRUCTION Q SIDEWALL
CONSTRUCTION
4
RESISTIVE CONSTRUCTION
5
DETAIL
BLANK SIDEWALL
DOOR SIDEWALL
nc inns BY
rcc vi-Diviv
Dote
ui
w
N i C Q
Z Q
Q
mLo
o
E o
W U
x m
Ln
Q ��roa �
z
O
0
P �z
0
zz
a
�� O
a
W
a
a
W A W
U F
o G� A
:a z
A
O
CO O
LO
A co
W
o
o
�
Date
4/5/24
Drawn by
BRM
Scale
1/2" = 1'-0"
Plon No.
54717 B
Order No.
Sheet No.
C2.0
PART # INDEX
PART #
DESCRIPTION
5050020012
12
a.
Interior base plate
5050020112
12
a.
DBL. iamb base plate
5050022218
18
a.
DBL. iamb clip
5950000118
18
a.
PT. support iamb
5950010418
18
a.
support, BSW 8'-7.75" EV.
5950031118
18
a.
PT. support iamb 8'-10"
5950031918
18
a.
support, JAMB 9'-3" EV.
5970000163
18
a.
DBL. iamb 8'-4" IWHT
5970020163
18
a.
double iamb 8'-10" IWHT
5987000018
18
a.
PT. rake angle, 5' Ion
5990000116
16
a.
interior column 3.63" x 2"
5' EV
5990000316
16
a.
interior column 3.63" x 2"
10' EV
5990000516
16
a.
interior column 3.63" x 2"
15' EV
5992000116
16
a.
interior column 3.63" x 2"
5' EV
5992000316
16
a.
interior column 3.63" x 2"
10' EV
5992000516
16
a.
interior column 3.63" x 2"
15' EV
5994000718
18
a.
BSW column 3.63" x 1.5"
8-7.75EV
5994010818
18
a.
BSW column 3.63" x 1.5"
9-3EV
01 PRIMARY CONCRETE ANCHOR INSTALLATION
1) USING THE PROPER DRILL BIT SIZE, DRILL A HOLE INTO THE BASE MATERIAL TO
THE
REQUIRED DEPTH. THE TOLERANCES OF THE DRILL BIT USED SHOULD MEET THE
REQUIREMENTS OF ANSI STANDARD B212.15.
2) REMOVE DUST AND DEBRIS FROM HOLE DURING DRILLING (E.G. DUST EXTRACTOR,
HOLLOW BIT) OR FOLLOWING DRILLING (E.G. SUCTION, FORCED AIR) TO EXTRACT
LOOSE
PARTICLES CREATED DURING DRILLING.
3)SELECT A TORQUE WRENCH OR POWERED IMPACT WRENCH AND DO NOT EXCEED
THE
MAXIMUM TORQUE, TiNST MAX OR TiMPACT.MAX RESPECTIVELY FOR THE SELECTED ANCHOR
DIAMETER AND EMBEDMENT. ATTACH AN APPROPRIATE SIZED HEX SOCKET/DRIVER
TO
THE IMPACT WRENCH. MOUNT THE SCREW ANCHOR HEAD INTO THE SOCKET.
4) DRIVE THE ANCHOR INTO THE HOLE UNTIL THE HEAD OF THE ANCHOR COMES INTO
CONTACT WITH THE FIXTURE. THE ANCHOR MUST BE SNUG AFTER INSTALLATION.
DO NOT
SPIN THE HEX SOCKET OFF THE ANCHOR TO DISENGAGE.
BLOCK
WAIL ON
OF STEM
TO
WAS
PT PANEL
SW SUPPORT
A —PANEL
INSIDE
CORNER TRIM
A —PANEL
SIDEWALL
COLUMN (2)
PT PANEL
tmc ural
L SW SUPPORT
ENDWALL
COLUMN (1)
GIRT
D(VIEW
TYP. INSIDE CORNER DETAIL
MAY BE MIRRORED)
INTERIOR WALL FRAMING ELEVATION, 1/ f 4 1) PITCH LEAN—TO
PARTITION PANEL NOT SHOWN,
SEE PARTITION DETAILS
BLANK
SIDEWALL
BLOCK
FIREWALL
rCE vl.Diviv
Date
C ( rn
Ld
o ; .6 o Q E
�
Z
H xm Loo
U E a
Q p �h p\Ts Q
F.?�ps� o 0
U1
a
Ei
w
A
E-
W
U)
w
w
O
0
z
0
:a
��D
aq
0
Date
Drawn by
Scale
Plan No.
Order No.
Sheet No.
C2*1
�w�
03 STRAP CROSS BRACING 34 PURLIN ORIENTATION 07 EAVE SPAN CHANNEL
FASTEN STRAP WITH (4) #12 X 1.25" SELF DRILLING SCREWS, P/N 760602, AT EACH THE PURLINS ARE ORIENTATED AS SHOWN. THE WEBS OF THE PURLIN AND WHEN INSTALLING THE EAVE SPAN CHANNELS START WITH A 5' CHANNEL FOLLOWED
END. NOTE THE STRAPS MUST BE INSTALLED AFTER WALLS OR ROOF SECTIONS ARE INTERIOR COLUMN WILL FALL ON THE STRUCTURAL LINE. THE OPEN CAVITY WITH 10' AND END WITH A 5' EAVE SPAN CHANNEL. CHANNELS WILL OVERLAP AT EACH
SQUARED & PLUMBED. ALL STRAPS ARE TO BE INSTALLED SO THEY ARE STRAIGHT & OF THE PURLIN AND INTERIOR COLUMN SHOULD FACE THE EAVE OF THE END. SPAN CHANNELS SHOULD START AND END AT THE MIDPOINT OF A BAY WHENEVER
TIGHT (UNDER TENSION). REFER TO ROOF PLAN OR FLOOR PLAN FOR EXACT LOCATION BUILDING POSSIBLE. SEE ROOF FRAMING PLAN TO DETERMINE WHICH P/N'S TO START & END
AND PLACEMENT OF ALL BRACING. WITH. INSTALL BOLTS TO SPAN CHANNELS THROUGH TOP TRACKS OR HEADERS ® 2'-0"
OC. FIELD CUT EXCESS AT END OF RUN.
T2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
5900000716 5900000816 5900000816
i
5900000716 5900000816 5900000716
00 2316 6000000316 I
478024000
� / 5987000018 i� �� I
6002002316 6001000316 6000000316 i 6000000316 6000000316
v 5987000018 `� ��
6002002316 6001000316 6000000316 �� � I
5900000116 5900000216 6 — —
C3.0
MATCH
LINE
1 22 23 2
5900000716 5900000816
I ,
5900000816 5900000716 �\ /
I � 600200 316
PART # INDEX
PART #
DESCRIPTION
478024000
16
a.
strap bracing 20'-0" Ion
5900000116
16
a.
SW span channel 5'-0" Ion
5900000216
16
a.
SW span channel 10'-0" Ion
5900000716
16
a.
high side SW span channel 5'-0" Ion
5900000816
16
a.
high side SW span channel 10'-0" Ion
5987000018
18
a.
PT. rake angle, 5' Ion
6000000316
16
a.
typical purlin, 7" x 3" x 10'-0"
6001000316
16
a.
starter purlin, 7" x 3" x 9'-8"
6002002316
16
a.
endwall purlin, 7" x 3" x 9'-5.5"
760602
DOOR JAMB
0
DOUBLE JAMB
BASE PLATE
PART. SUPPORT
RAKE ANGLE
c�tural
e
tructural NOTE:
FIELD CUT RAKE
ine ANGLE WHEN
NECESSARY
0 RAKE ANGLE Q DOOR JAMB
CONNECTION DETAIL
NOTE: 760602
TYPICAL BLANK SIDEWALL
CONNECTION SHOWN.
ALL SIDEWALL CONNECTION W/
MANSARD ARE SIMILAR.
TOP TRACK
1Or
0
RAKE ANGLE
-ptttx,tural
SIDEWALL in e
COLUMN NOTE:
FIELD CUT RAKE ANGLE
WHEN NECESSARY
ructural
qtine
310'— 0"
ROOF FRAMING PLAN FOR 81-4'/8'-10"/9'-4" EAVE,
NOTE: OPPOSITE SIDE MIRRORS THIS DETAIL
0260602
RAKE ANGLE @ BLANK SIDEWALL STRAP BRACING @ DBL JAMB
2 CONNECTION DETAIL 6 CONNECTION DETAIL
NOTE: OPPOSITE SIDE MIRRORS THIS DETAIL
O STRAP BRACING SIDEWALL
CONNECTION DETAIL
El
6000000316
6000000316
25
2
26 27 C3,
5987000018
�—(-59-8-70000�18
7
28 29 30 31 32
59 0000816 5900000716
1
` 6002002316 C3.0
6002002316
478024000
i 6002002316
6002002316
C3.
5900000216 5900000116
1 /4:12 PITCH, MINI STORAGE BUILDING A-1
NOTE: TYPICAL INTERIOR CONNECTION SHOWN, ENDWALL CONNECTION NOTE: ACTUAL LAYOUT MAY MIRROR THIS DETAIL.
MIRRORS THIS DETAIL.
PURLIN NOTE: SEE ROOF FRAMING PAGE FOR
CORRECT PURLIN ORIENTATION.
03 760602 /�
0 / \ "- / 5irnuectural
J
ine u y
STRAP BRACING @ PURLIN
CONNECTION
*NOTE' ACTIJAI I AYOIIT MAY MIRRORS
THI
11 STRAP BRACING @ DOOR/BLANK STRAP BRACING @ BLANK/BLANK
� 2
CORNER CONNECTION DETAIL CORNER CONNECTION DETAIL
Kt VIJIVIV
Date
r\
N 3
Ld a�i °� CO
>-
0 vi CL �° O
Z
p i i i
Ld o, U E � o
3 k m 5� 3
a o Ln o
=
Q o o a o
z
x
0 �z
a
Pgx0
z
zzx
a Oa
E-� 4
zw
w
U
s A
:a z
0
0
Q4 El 0
(� m co �i
P
a
�
o
m
P
Date
4/5/24
Drawn by
BRM
Scale
Plan No.
54717 B
Order No.
Sheet No.
C3.0
BY
PART # INDEX
PART #
DESCRIPTION
436312000
26 a. CNR. trim panel/panel, IWHT 10'-0"
779600
foam closure 3'-0" r— an out a— an ins
37 EXTRA DOOR CUP AND JOR GIRT O THE HIGH SIDE
FOR ALL HIGH SIDES THAT EXCEED A 10'-0" EAVE HEIGHT THERE WILL BE
AN EXTRA LINE OF GIRTS (#5985------ ), DOUBLE JAMB CLIP
(#5050022218) AND OR STARTER JAMB CLIP (#5050022316). THIS IS NOT
SHOWN IN THE ELEVATIONS. THESE EXTRA PARTS WILL BE FASTENED THE
SAME WAY AS THE OTHER CLIPS/GIRTS.
01 PRIMARY CONCRETE ANCHOR INSTALLATION
1) USING THE PROPER DRILL BIT SIZE, DRILL A HOLE INTO THE BASE MATERIAL TO THE
REQUIRED DEPTH. THE TOLERANCES OF THE DRILL BIT USED SHOULD MEET THE 19
REQUIREMENTS OF ANSI STANDARD B212.15.
2) REMOVE DUST AND DEBRIS FROM HOLE DURING DRILLING (E.G. DUST EXTRACTOR,
HOLLOW BIT) OR FOLLOWING DRILLING (E.G. SUCTION, FORCED AIR) TO EXTRACT LOOSE
PARTICLES CREATED DURING DRILLING.
3)SELECT A TORQUE WRENCH OR POWERED IMPACT WRENCH AND DO NOT EXCEED THE
MAXIMUM TORQUE, TINST MAX OR TIMPACT,MAX RESPECTIVELY FOR THE SELECTED ANCHOR
DIAMETER AND EMBEDMENT. ATTACH AN APPROPRIATE SIZED HEX SOCKET/DRIVER TO
THE IMPACT WRENCH. MOUNT THE SCREW ANCHOR HEAD INTO THE SOCKET.
4) DRIVE THE ANCHOR INTO THE HOLE UNTIL THE HEAD OF THE ANCHOR COMES INTO
CONTACT WITH THE FIXTURE. THE ANCHOR MUST BE SNUG AFTER INSTALLATION. DO NOT
SPIN THE HEX SOCKET OFF THE ANCHOR TO DISENGAGE.
O6 STARTER BAY
A STARTER BAY IS
A BAY WHERE
2 ROWS OF COLUMNS FALL
IN—BETWEEN THE 10'
STRUCTURAL LINES
OF THE FLOOR
PLAN LAYOUT. TYPICAL 10'
BAYS WILL ONLY HAVE ONE
ROW OF COLUMNS
WITHIN THE 10'
STRUCTURAL LINES. THERE
IS ALWAYS AT LEAST ONE
10' STARTER BAY.
THERE MAY BE
MORE THAN ONE IF YOUR BUILDING
HAS CORRIDORS.
THESE AREAS WILL
BE MARKED AS
A "STARTER BAY" ON THE
FLOOR PLAN AND SIDE
WALL PAGES. IT IS
CRITICAL THAT
THE STARTER BAY BE ERECTED
CORRECTLY.
07 EAVE SPAN CHANNEL
WHEN INSTALLING THE EAVE SPAN CHANNELS START WITH A 5' CHANNEL FOLLOWED
WITH 10' AND END WITH A 5' EAVE SPAN CHANNEL. CHANNELS WILL OVERLAP AT EACH
END. SPAN CHANNELS SHOULD START AND END AT THE MIDPOINT OF A BAY WHENEVER
POSSIBLE. SEE ROOF FRAMING PLAN TO DETERMINE WHICH P/N'S TO START & END
WITH. INSTALL BOLTS TO SPAN CHANNELS THROUGH TOP TRACKS OR HEADERS ® 2'-0"
OC. FIELD CUT EXCESS AT END OF RUN.
PARTITION SUPPORT AT BLANK WALL
BLANK SIDEWALL PARTITION SUPPORT IS ONLY REQUIRED WHERE AN
INTERIOR PARTITION PANEL WALL INTERSECTS WITH THE BLANK SIDEWALL.
REVIEW YOUR FLOOR PLAN FOR LOCATION AND QUANTITY OF BLANK
SIDEWALL SUPPORTS. THE BLANK SIDEWALL SUPPORT MAY NEED TO BE
FIELD CUT TO THE PROPER HEIGHT. INSULATED SIDEWALLS WILL USE A
ZEE SHAPED SUPPORT, DIFFERENT FROM THE ONE SHOWN. SEE
INSULATION DETAILS IF YOU HAVE INSULATED SIDEWALLS. SEE FLOOR
PLAN FOR PARTITION CHANNEL PART NUMBERS.
01 Bearing & Nonbearing Wall Rating U904 - 3 HR Firewall
Concrete Blocks - Various designs. Classification C-3 (3 hr). See Concrete Blocks
category for lists of eligible manufacturers.
Mortar - Blocks laid in full bed of mortar, nom. 3/8" thick, of not less than 2-1/4" and
not more than 3-1/2" parts of clean sharp sand to 1 part Portland Cement (proportioned by
volume) and not more than 50 percent hydrated lime (by cement volume). Vertical joints
staggered.
02 SECONDARY CONCRETE ANCHORS (SUPPLIED do INSTALLED BY OTHERS
INSTALL SECONDARY ANCHORS (CONCRETE SCREW, POWDER ACTUATED, OR HAMMER DRIVE)
24" ON CENTER, AND STRICTLY IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS. NOTE: SOME COMPONENTS. SUCH AS BASE TRACK. SPECIFICALLY REQUIRE
BOTH PRIMARY AND SECONDARY ANCHORS.
06 STARTER BAY
A STARTER BAY IS A BAY WHERE 2 ROWS OF COLUMNS FALL IN—BETWEEN THE 10'
STRUCTURAL LINES OF THE FLOOR PLAN LAYOUT. TYPICAL 10' BAYS WILL ONLY HAVE ONE
ROW OF COLUMNS WITHIN THE 10' STRUCTURAL LINES. THERE IS ALWAYS AT LEAST ONE
10' STARTER BAY. THERE MAY BE MORE THAN ONE IF YOUR BUILDING HAS CORRIDORS.
THESE AREAS WILL BE MARKED AS A "STARTER BAY" ON THE FLOOR PLAN AND SIDE
WALL PAGES. IT IS CRITICAL THAT THE STARTER BAY BE ERECTED CORRECTLY,
INSULATION FLAME AND SMOKE RATING
THE COMPOSITE OF FIBERGLASS AND FACING SHALL HAVE SURFACE
BURNING CHARACTERISTICS NOT TO EXCEED 25 FLAME SPREAD AND 50
SMOKE WHEN TESTED IN ACCORDANCE WITH UNDERWRITERS LABORATORIES
723 TEST METHOD OR ASTM E-84 TEST METHOD. INSULATION BY OTHERS
TO MEET OR EXCEED THESE REQUIREMENTS.
47 ROOF INSULATION
INSULATION MUST STOP ON BOTH SIDES OF FIREWALL. INSULATION CANNOT
RUN CONTINUOUS ACROSS TOP OF WALL.
NOTE: LEFT EW SHOWN RIGHT EW WILL MIRROR THIS DETAIL
NOTE: LEFT EW SHOWN
RIGHT EW WILL MIRROR THIS DETAIL
NOTE: LEFT EW SHOWN RIGHT EW WILL MIRROR THIS DETAIL
tl
tWe
tructural
tructural
RAKE ANGLE
19 SUPPORT,
BSW
ool
I ine STARTER JAMB
ine
760300
GIRT760110
STARTER JAMB760300
SW COLUMNSJAMB
CLIP
760110
SW COLUMN
SPAN CHANNEL 07
0
o JAMB CLIP
TRACK
SW COLUMNS
STARTER JAMB
a a °i
0 0
GIRT
JAMB CLIP
a a 760110
760300 '
SW COLUMN
BASE PLATE
°
760300
760110
760300
760110 tructural
a e
e ® 760110 760300
SW COLUMNS
GIRT
a , , �� 760110 760300
ine
a e
NOTE: ONLY ONE BOLT
REQUIRED AT EACH GIRT
e a
CONCRETE SCREW 01
SUPPORT, BSW
19
tructural
LOCATION TO BOLT
COLUMNS TOGETHER.
tructural
5SCREW
CONCRE�
SIDEWALL
01 CONCRETE
SCREW
tructural VIEW
%ueintural
truC
_$
TRACK Ir ctural
ine
tructural
ine
tine tural
ine
ine t �rq I
in�
I ine
1
STARTER JAMB TOP
2
GIRT
TO STARTER JAMB
3
TRACK TO STARTER JAMB
4
BLANK SW COLUMNS TO
5
BLANK SW COLUMNS TO
6 BLANK SW COLUMNS TO
CONNECTION
CONNECTION
CONNECTION
EAVE
TRACK CONNECTION
GIRT
CONNECTION
TRACK CONNECTION
NOTE: RIGHT SW SHOWN LEFT SW WILL MIRROR THIS DETAIL
NOTE: RIGHT SW SHOWN LEFT SW WILL MIRROR THIS DETAIL
NOTE: ACTUAL ASSEMBLY MAY MIRROR THIS DETAIL
NOTE: ACTUAL ASSEMBLY MAY MIRROR THIS DETAIL
NOTE: ACTUAL ASSEMBLY MAY MIRROR THIS DETAIL
TRACK
760300
°
tructural
tructural
tructural
ine
760110
760100
ine �d�
�r
SPAN CHANNEL07
ne
EAVE SPAN
TRACK 07
ine
0 0 760110
o 0 760300S.
CHANNEL °
BASE PLATE
a�
SPAN CHANNEL
ENS
o
a e a s a
a e a SW COLUMN
Ak
SW COLUMN
SUPPORT, SW
DOOR
JAMB
<
0
a
ENDWALL
760300
sw COLUMN 7so110
SUPPORT, SW
HEADER
VIEW
NOTE: THIS DETAIL SHOWS
a aa19 a
THE HOLES TO USE WHEN
76030o
TEK
BOLT:HOLES RENWIF O o
e a
a o B a
COLUMNS ARE ON A
760110
AN OPTION
0 SUPPORT, SW
rruectural
NOTCHED FOUNDATION.
DOOR JAMB
760600
TRACK
01 CONCRETE SCREW a
CONCRETE SCREW 01
JAMB
CLIP
°
NOTE: HEADERS ARE
DESIGNED TO BE I"
BASE PLATE
760300
ABOVE THE TOP OF THE
DOUBLE JAMBS WHEN
tructural
TRACK A
760110
INSTALLED. CORNER
JAMBS AND STARTER
ine
1
FIELD
E�7
CUT SIB NI
DOOR JAMB JAMBS SHOULD LINE UP
VIE
FLUSH WITH TOP OF
760600
HEADERS..
7
SIDEWALL
BLANK SW TO VIEW
8
BLANK SW TO BLANK EW
9
COLUMN TO EAVE TRACK
CONNECTION
1
BOTTOM OF DOOR JAMB
11
DOOR JAMB
CLIP DETAIL
TOP OF DOOR JAMB
12
BLANK EW CONNECTION
TRACK CONNECTION
CONNECTION DETAIL
CONNECTION DETAIL
NOTE:
NON—WINDLOCK DOOR BRACKET SHOWN. SEE
NOTE: TYPICAL CONNECTIONS AT OPPOSITE END MIRROR THIS DETAIL.
NOTE: TYPICAL CONNECTIONS AT OPPOSITE
END MIRROR THIS DETAIL.
WINDLOCK DETAIL WHEN MOUNTING WINDLOCK DOORS
NOTE:
TYPICAL DOOR JAMB SHOWN. ALL OTHER DOOR
° ° `
o o 1 INSULATION 47 20
d ° °
JAMBS
ARE SIMILAR
a o o EAVE CHANNEL
®® TOP TRACK
a
a
ROOF LINE
° a SIDEWALL COLUMN
BLOCK 01
® D
43631200
a
EAVE ANGL
IM
a
°
ad
5/16-18 1" BOLT)*
a0
d ° a s ° a
779600 a°
0 x
0
°
NOTE: GABLE SHOWN,
LEAN—TO SIMILAR.
� � —
o
BLOCK
ESIDEWALL
MN
a
° —
a BLOCK 01
SW COLUMN
GROUT FILL TOP
LOCK
COURSE OLINE
P D
BASE TRACK
�
4
TO ROOF
a
BASE TRACK 02 INT COLUMN
O ® m
A —PANEL
d
BASE TRACK 02
Q
D
SIDEWALL
COLUMNS
BLOCK 01
DOOR
JAMB
BASE TRACKTEK—SCREW
,\
INCLUDED IN
a F
760110 02
DOOR HARDWARE
tructural
ine
BASE TRACK 02
760300
PACKAGE
BLOCK FIRE RESISTIVE
tructural
Line
$
19
DOOR BRACKET AND DOOR
31
CONSTRUCTION SECTION
BLANK SIDEWALL
32
SIDEWALL FIRE RESISTIVE
i
33 SECTION OF EXTERIOR FIRE
34
Y< Ja�JCp\
'°e
TYPICAL COLUMN CONNECTION
BLOCK FIRE RESISTIVE
000NSTRUCTION
JAMB CONNECTION DETAIL
CONSTRUCTION Q ENDWALL
SECTION DETAIL
RESISTIVE CONSTRUCTION
nc vi �iviv
Date
U
c
c
—
r o,
c CO ni
LEI
aO
i
Cf) CL D
Z
4 L
J
Z
LLI
a
o
6
x m co k
U
z
x
o
o
�z
�
zz0
w
a
� aU)o
w
�wAw
a
c�z�,
W 4
�D
0
z
W
G� F-
oco
A
co
to
o
�
Date
4/5/24
Drawn
by
BRM
Scole
1/2" = 1'-0"
Plan No.
54717 B
Order No.
Sheet No.
E1*0
PART # INDEX
PART #
DESCRIPTION
5910000114
14
a.
eave
top track 3.88" x 3.13" x 10' Ion
5911000114
14
a.
EXT.
wall base track 3.88"
x 10' Ion
5985000118
18
a.
EXT.
girt, 9'-11 1 4" Ion
5985000318
18
a.
EXT.
girt, 9'-8" Ion
5994000718
18
a.
BSW
column 3.63" x 1.5"
8-7.75EV
5994002918
118ga.
BSW
column 3.63" x 1.5"
9-10.25EV
5994010818
118ga.
BSW
column 3.63" x 1.5"
9-3EV
07 EAVE SPAN CHANNEL
WHEN INSTALLING THE EAVE SPAN CHANNELS START WITH A 5' CHANNEL FOLLOWED
WITH 10' AND END WITH A 5' EAVE SPAN CHANNEL. CHANNELS WILL OVERLAP AT EACH
END. SPAN CHANNELS SHOULD START AND END AT THE MIDPOINT OF A BAY WHENEVER
POSSIBLE. SEE ROOF FRAMING PLAN TO DETERMINE WHICH P/N'S TO START & END
WITH. INSTALL BOLTS TO SPAN CHANNELS THROUGH TOP TRACKS OR HEADERS ® 2'-0"
OC. FIELD CUT EXCESS AT END OF RUN.
1 g PARTITION SUPPORT AT BLANK WALL
BLANK SIDEWALL PARTITION SUPPORT IS ONLY REQUIRED WHERE AN
INTERIOR PARTITION PANEL WALL INTERSECTS WITH THE BLANK SIDEWALL.
REVIEW YOUR FLOOR PLAN FOR LOCATION AND QUANTITY OF BLANK
SIDEWALL SUPPORTS. THE BLANK SIDEWALL SUPPORT MAY NEED TO BE
FIELD CUT TO THE PROPER HEIGHT. INSULATED SIDEWALLS WILL USE A
ZEE SHAPED SUPPORT, DIFFERENT FROM THE ONE SHOWN. SEE
INSULATION DETAILS IF YOU HAVE INSULATED SIDEWALLS. SEE FLOOR
PLAN FOR PARTITION CHANNEL PART NUMBERS.
01 PRIMARY CONCRETE ANCHOR INSTALLATION
1) USING THE PROPER DRILL BIT SIZE, DRILL A HOLE INTO THE BASE MATERIAL TO THE
REQUIRED DEPTH. THE TOLERANCES OF THE DRILL BIT USED SHOULD MEET THE
REQUIREMENTS OF ANSI STANDARD B212.15.
2) REMOVE DUST AND DEBRIS FROM HOLE DURING DRILLING (E.G. DUST EXTRACTOR,
HOLLOW BIT) OR FOLLOWING DRILLING (E.G. SUCTION, FORCED AIR) TO EXTRACT LOOSE
PARTICLES CREATED DURING DRILLING.
3)SELECT A TORQUE WRENCH OR POWERED IMPACT WRENCH AND DO NOT EXCEED THE
MAXIMUM TORQUE, TijwMAX OR TiMPACT.MAX RESPECTIVELY FOR THE SELECTED ANCHOR
DIAMETER AND EMBEDMf NT. ATTACH AN APPROPRIATE SIZED HEX SOCKET/DRIVER TO
THE IMPACT WRENCH. MOUNT THE SCREW ANCHOR HEAD INTO THE SOCKET.
4) DRIVE THE ANCHOR INTO THE HOLE UNTIL THE HEAD OF THE ANCHOR COMES INTO
CONTACT WITH THE FIXTURE. THE ANCHOR MUST BE SNUG AFTER INSTALLATION. DO NOT
SPIN THE HEX SOCKET OFF THE ANCHOR TO DISENGAGE.
06 STARTER BAY
A STARTER BAY IS
A BAY WHERE
2 ROWS OF COLUMNS FALL
IN—BETWEEN THE 10'
STRUCTURAL LINES
OF THE FLOOR
PLAN LAYOUT. TYPICAL 10'
BAYS WILL ONLY HAVE ONE
ROW OF COLUMNS
WITHIN THE 10'
STRUCTURAL LINES. THERE
IS ALWAYS AT LEAST ONE
10' STARTER BAY.
THERE MAY BE
MORE THAN ONE IF YOUR BUILDING
HAS CORRIDORS.
THESE AREAS WILL
BE MARKED AS
A "STARTER BAY" ON THE
FLOOR PLAN AND SIDE
WALL PAGES. IT IS
CRITICAL THAT
THE STARTER BAY BE ERECTED
CORRECTLY.
37 EXTRA DOOR CUP ANDJOR GIRT O THE HIGH SIDE
FOR ALL HIGH SIDES THAT EXCEED A 10'-0" EAVE HEIGHT THERE WILL BE
AN EXTRA LINE OF GIRTS (#5985_____), DOUBLE JAMB CLIP
(#5050022218) AND OR STARTER JAMB CLIP (#5050022316). THIS IS NOT
SHOWN IN THE ELEVATIONS. THESE EXTRA PARTS WILL BE FASTENED THE
SAME WAY AS THE OTHER CLIPS/GIRTS.
01 Bearing & Nonbearing Wall Rating U904 - 3 HR Firewall
Concrete Blocks - Various designs. Classification C-3 (3 hr). See Concrete Blocks
category for lists of eligible manufacturers.
Mortar - Blocks laid in full bed of mortar, nom. 3/8" thick, of not less than 2-1/4" and
not more than 3-1/2" parts of clean sharp sand to 1 part Portland Cement (proportioned by
volume) and not more than 50 percent hydrated lime (by cement volume). Vertical joints
staggered.
02 SECONDARY CONCRETE ANCHORS (SUPPLIED St INSTALLED BY OTHERS)
INSTALL SECONDARY ANCHORS (CONCRETE SCREW, POWDER ACTUATED, OR HAMMER DRIVE)
24" ON CENTER, AND STRICTLY IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS. NOTE: SOME COMPONENTS. SUCH AS BASE TRACK. SPECIFICALLY REQUIRE
BOTH PRIMARY AND SECONDARY ANCHORS.
06 STARTER BAY
A STARTER BAY IS A BAY WHERE 2 ROWS OF COLUMNS FALL IN-BETWEEN THE 10,
STRUCTURAL LINES OF THE FLOOR PLAN LAYOUT. TYPICAL 10' BAYS WILL ONLY HAVE ONE
ROW OF COLUMNS WITHIN THE 10' STRUCTURAL LINES. THERE IS ALWAYS AT LEAST ONE
10' STARTER BAY. THERE MAY BE MORE THAN ONE IF YOUR BUILDING HAS CORRIDORS.
THESE AREAS WILL BE MARKED AS A "STARTER BAY" ON THE FLOOR PLAN AND SIDE
WALL PAGES. IT IS CRITICAL THAT THE STARTER BAY BE ERECTED CORRECTLY.
INSULATION FLAME AND SMOKE RATING
THE COMPOSITE OF FIBERGLASS AND FACING SHALL HAVE SURFACE
BURNING CHARACTERISTICS NOT TO EXCEED 25 FLAME SPREAD AND 50
SMOKE WHEN TESTED IN ACCORDANCE WITH UNDERWRITERS LABORATORIES
723 TEST METHOD OR ASTM E-84 TEST METHOD. INSULATION BY OTHERS
TO MEET OR EXCEED THESE REQUIREMENTS.
47 ROOF INSULATION
INSULATION MUST STOP ON BOTH SIDES OF FIREWALL. INSULATION CANNOT
RUN CONTINUOUS ACROSS TOP OF WALL.
0
2
C�
w
w
a
w
in
N
a
M
BLOCK WALL ON TOP OF STEM WALL NOT SHOWN
-- - ATCH ----- --M/33\LSE---- -34
5910000114
5910000114
I
I
5910000114
I
I
I
I
5910000114
5994010818
5994010818
5985000118
5994010818
5994010818
II
5985000118
I
5994010818
I
i 5985000118
5994010818
5994010818
5994010818
5985000118
5911000114
II
I
I
I
5911000114
I
I
I
I
I
5911000114
I
5911000114
10'-0" 10'-0" �\ ,1 101_0" J 101_0„
�----------- MATCH SINE
5910000114
5910000114
5910000114
5910000114
5994000718
5994000718
5985000118
5994000718
5994000718
5985000118
599400071
5994000718
5985000118
5994000718 5994000718
5994000718
5985000318
5911000114
5911000114
35
V-O
5911000114
I
5911000114
10'-0" _ _ 10'-0" _ _ 10'-0" _ _ 10'-0"
JILJLVV/-\LL LL_L V/"\ I IIJIV <<IIV 1 L_I\I VI\ VILVV)
A (TYP. SIDEWALL ELEVATIONS SHOWN. LENGTH MAY VARY)
BLOCK LO
ENDWALL r-,
31 00
nc vi �iviv
Date
U
.c
c
r o,
Ld
�
o;.�oa E
0
0 O
Z
L
4 c
p
L L i
w
a
U c E I o
3
k m co 3
o�
a�-QL0
Q
z
x
O
O
O
O
>
zz�o
ha
w
a
�wAw
a
W
�D
:a
� 0
z
W
OLo
A
co
co
to
Date
4/5/24
Drawn
by
BRM
Scole
1/2" = 1'-0"
Plan No.
54717 B
Order No.
— —
Sheet No.
E1.1
PART # INDEX
PART #
DESCRIPTION
5050020112
12
a.
DBL.
iamb base plate
5050020412
12
a.
STR.
iamb base plate
5050022218
18
a.
DBL.
iamb clip
5050022316
16
a.
STR.
iamb clip
5050022418
18
a.
STR.
iamb clip at step
5950000118
18
a.
PT.
support iamb
5950000318
18
a.
PT.
support iamb 9'-4"
5950031118
18
a.
PT.
support iamb 8'-10"
5955000163
18
a.
SW
EW header, 9'-0" IWHT
5955000263
18
a.
SW
EW header, 8'-8" IWHT
5955000763
18
a.
SW
EW header, 8'-0" IWHT
5970000163
18
a.
DBL.
iamb 8'-4" IWHT
5970000263
18
a.
DBL.
iamb 9'-4" IWHT
5970020163
18
a.
double iamb 8'-10" IWHT
5974000163
18
a.
STR.
iamb RH 8'-4" IWHT
5974000263
18
a.
STR.
iamb LH 8'-4" IWHT
5974000363
18
a.
STR.
iamb RH 9'-4" IWHT
5974000463
18
a.
STR.
iamb LH 9'-4" IWHT
5974050163
18
a.
starter iamb RH 8'-10" IWHT
5974050263
18
a.
starter iamb LH 8'-10" IWHT
5994000118
18
a.
BSW
column 3.63" x 1.5" 8-4EV
BLOCK
ENDWALL~
PRIMARY CONCRETE ANCHOR INSTALLATION
1) USING THE PROPER DRILL BIT SIZE, DRILL A HOLE INTO THE BASE MATERIAL TO THE
REQUIRED DEPTH. THE TOLERANCES OF THE DRILL BIT USED SHOULD MEET THE
REQUIREMENTS OF ANSI STANDARD B212.15.
2) REMOVE DUST AND DEBRIS FROM HOLE DURING DRILLING (E.G. DUST EXTRACTOR,
HOLLOW BIT) OR FOLLOWING DRILLING (E.G. SUCTION, FORCED AIR) TO EXTRACT LOOSE
PARTICLES CREATED DURING DRILLING.
3)SELECT A TORQUE WRENCH OR POWERED IMPACT WRENCH AND DO NOT EXCEED THE
MAXIMUM TORQUE, TINST MAX OR TIMPACT,MAX RESPECTIVELY FOR THE SELECTED ANCHOR
DIAMETER AND EMBEDMENT. ATTACH AN APPROPRIATE SIZED HEX SOCKET/DRIVER TO
THE IMPACT WRENCH. MOUNT THE SCREW ANCHOR HEAD INTO THE SOCKET.
4) DRIVE THE ANCHOR INTO THE HOLE UNTIL THE HEAD OF THE ANCHOR COMES INTO
CONTACT WITH THE FIXTURE. THE ANCHOR MUST BE SNUG AFTER INSTALLATION. DO NOT
SPIN THE HEX SOCKET OFF THE ANCHOR TO DISENGAGE.
12 19 C
1.0 1.0
.�
I�
.
C.
5050020112
i
5050020112
"
5955000263
5955000163
5955000163
5955000163
5955000263
5994000118
11
/
1.0
\
5050022418
I
5050022316 5050022218
I
5050022218
"
I
I
�
26
5974000463 59700003
5970000163
5974000363
C
I
I
0 5950000318
�0 5950000118
Iz.I
8'-8" F.O.
9'-0" F.O.
9'-0$1 F.O.
9'-0" F.O.
8'-8" F.O.
10
5050020412 5050020112 �
I
I 1'
5050020112
5050020412
C
o
IFE
Fr0
10'-0" 10'-0" 103-0" 10'-0" 10'-0"
STARTER BAY
A STARTER BAY IS
A BAY WHERE
2 ROWS OF COLUMNS FALL IN—BETWEEN THE 10'
I
STRUCTURAL LINES
OF THE FLOOR
PLAN LAYOUT. TYPICAL 10' BAYS WILL ONLY HAVE ONE
ROW OF COLUMNS
WITHIN THE 10'
STRUCTURAL LINES. THERE IS ALWAYS AT LEAST ONE
10' STARTER BAY.
THERE MAY BE
MORE THAN ONE IF YOUR BUILDING HAS CORRIDORS.
THESE AREAS WILL
BE MARKED AS
A "STARTER BAY" ON THE FLOOR PLAN AND SIDE
M
A
TrH
I
I
N
F
WALL PAGES. IT IS
CRITICAL THAT
THE STARTER BAY BE ERECTED CORRECTLY.
20 PARTITION SUPPORT AT DOOR SIDEWALL
DOOR SIDEWALL PARTITION SUPPORT IS NEEDED AT EVERY DOUBLE JAMB
ALONG THE SIDEWALL. THE SIDE FLANGE OF THE SUPPORT WILL ALWAYS
FALL ON THE STRUCTURAL LINE. THE SUPPORT WILL BE ON THE SAME SIDE
OF THE STRUCTURAL LINE AS THE INTERIOR COLUMNS. SEE FLOOR PLAN
FOR CORRECT ORIENTATION.
SAVE SPAN CHANNEL
WHEN INSTALLING THE EAVE SPAN CHANNELS
START WITH A 5'
CHANNEL FOLLOWED
WITH 10' AND
END WITH
A 5' EAVE SPAN
CHANNEL. CHANNELS
WILL OVERLAP
AT EACH
END. SPAN CHANNELS
SHOULD START AND
END AT THE MIDPOINT
OF
A BAY WHENEVER
POSSIBLE. SEE ROOF
FRAMING PLAN
TO DETERMINE
WHICH P/N'S TO
START & END WITH.
INSTALL BOLTS
TO SPAN
CHANNELS THROUGH TOP
TRACKS OR HEADERS
® 2'-0" OC.
FIELD CUT
EXCESS AT END OF
RUN.
/ \ DOUBLE JAMB
BASE CUP
HEADER
I I
I I
I I
DOUBLE JAMB
CLIP
I I
I I
I I
D I
I I
I I
I I
I I
I I
SIDEWALL JAMB
SUPPORT
I I
DOOR JAMB
I I
DOUBLE JAMB
BASE CUP
C TYP. DOOR SW SECTION
JAMB SUB —ERECTION DETAIL
----------------------------------------------------------------------
I
"I
5050020112
C
5955000263
5974050263
5050022418
8'-8" F.O.
5955000163
9'-0" F.O.
5955000163
9'-0" F.O.
5955000163
�p
j�
9'-0" F.O.
O
I
00
5955000263
5050022218
5970020163 5974050163
5950031118 20
8'-8" F.O.
C .
5050020412
5050020112 5050020412
10'-0" 10'-0" 10'-0" 10'-0" 10'-0"
--------..... -..... --ATCH LINE
m\F-� �_o
--------
5050022418
I\
5050020112 "I
5050020112
5955000263
5955000163
5955000163
5955000163
11
1.0
5955000763
/
\ 5994000118
J
I
5050022218
5050022218 5050022316
�
I
I
I
I
5974000163
5970000163
I
5970000163 5974000263
p
00
5950000118 20 I
5950000118 20
-
rl
I
I
5050022418 , „
8 - 8 F. 0.
, „
9 - 0 F. 0.
, „
9 - 0 F. 0.
, „
9 - 0 F. 0.
,
8 - 0 F. 0.
10
5050020412
5050020112
1'0
5050020112 5050020412
06 STARTER BAY ,
10'- 0"
10'- 0"
10'- 0"
10'- 0"
10'- 0"
SIDEWALL ELEVATION (INTERIOR VIEW
(TYP. SIDEWALL ELEVATIONS SHOWN. LENGTH MAY VARY)
BLOCK
~ENDWALL
nc vi �iviv
Date
U
.c
c
r o,
Ld
(~
:E E
O
a U
ZL
O
m
w
a
U c E I o
x m co k
o�
a�-QLn
Q
z
x
O
O
�z
�
w
z0
z
a
h a
O
W
U)
�wAw
a
c�z�,
W Qi
�D i--i
:a
�oAz
W
0.i E1
c0 0co
A
co
co
o
o
�
Date
4/5/24
Drawn
by
BRM
Scole
1/2" = 1'-0"
Plan No.
54717 B
Order No.
Sheet No.
E1*2
�w�
PART # INDEX
PART #
DESCRIPTION
5045010026
26
a.
eave
trim dsw 10'-2" MBLK
5045012163
26
a.
batten trim 10' long, IWHT
5050020412
12
a.
STR.
iamb base plate
5050022418
18
a.
STR.
iamb clip at step
5900000216
16
a.
SW span
channel 10'-0" Ion
5900000816
16
a.
high
side SW span channel 10'-0" Ion
5920004326
26
a.
H.S.
facet eavetrim bsw MBLK
EXTERIOR ELEVATION
STEP AT DOOR SIDEWALL ELEVATION
01 PRIMARY CONCRETE ANCHOR INSTALLATION
1) USING THE PROPER DRILL BIT SIZE, DRILL A HOLE INTO THE BASE MATERIAL TO THE
REQUIRED DEPTH. THE TOLERANCES OF THE DRILL BIT USED SHOULD MEET THE
REQUIREMENTS OF ANSI STANDARD B212.15.
2) REMOVE DUST AND DEBRIS FROM HOLE DURING DRILLING (E.G. DUST EXTRACTOR,
HOLLOW BIT) OR FOLLOWING DRILLING (E.G. SUCTION, FORCED AIR) TO EXTRACT LOOSE
PARTICLES CREATED DURING DRILLING.
3)SELECT A TORQUE WRENCH OR POWERED IMPACT WRENCH AND DO NOT EXCEED THE
MAXIMUM TORQUE, TINST MAX OR TIMPACT.MAX RESPECTIVELY FOR THE SELECTED ANCHOR
DIAMETER AND EMBEDMENT. ATTACH AN APPROPRIATE SIZED HEX SOCKET/DRIVER TO
THE IMPACT WRENCH. MOUNT THE SCREW ANCHOR HEAD INTO THE SOCKET.
4) DRIVE THE ANCHOR INTO THE HOLE UNTIL THE HEAD OF THE ANCHOR COMES INTO
CONTACT WITH THE FIXTURE. THE ANCHOR MUST BE SNUG AFTER INSTALLATION. DO NOT
SPIN THE HEX SOCKET OFF THE ANCHOR TO DISENGAGE.
3
I
e
e
e B
e
I
TEK SCREW
THIS SIDE
I
2
2,
I
I SUPPORT, BW
(HIGH SIDE)
5050022418
5050022418
5050020412
1 I
2' I
�
5GREW
THIS SIDE
INTERIOR ELEVATION @ SW
0
(na
w LLI
CD J
Q_' in
O
INTERIOR ELEVATION @ SW
FOUNDATION STEP AT BLANK SIDEWALL ELEVATION
STEP AT INTERIOR WALL ELEVATION
BATTEN TRIM
FASTEN BATTEN
NOTE: KEEP THESE
SCREWS AS CLOSE
TO THE LIP OF THE
oo
ptructural
2 PLCS TYP.
WITH COLORED
CONCRETE SCREW 01
STARTER JAMB AS'I'l
e
Line
SCREWS AT
POSSIBLE. THE �
�
760600
PARTITION PANEL
TOP / BOTTOM
STR JAMB
HIGH SIDE
SW COLUMN
HIGH SIDE
BATTEN STRIP WILL
COVER THESE
a
5' RAKE AN
Q A
AND EACH
�
STR JAMB
INT COLUMN
JAMB CLIP
MINIMUM.
SUPPORT, SW
SW COLUMN
SCREWS. USE 760600
2 PLCS TYP. AT TOP
DOOR CLIP
a a
FIELD CUT VERTICAL
� �
STEP CLIP
o
760300
LOW SIDE
/ BOTTOM AND EACH
GIRT a a 760110
LEG IF NEEDED
�`
760110
BASE PLATE
JAMB CLIP MINIMUM.
SUPPORT, SW
\ \
BASE PLATE
a
760600
\
STR JAMB
760300
°
Q
STR JAMB
SW COLUMN
° �` °
LOW SIDE
/
760110
760110
HIGH SIDE
HIGH SIDE
760110
`� STEP
DOOR CLIP
11*00
55-
r �
760300
TRACK
0 o
a. o
a
STR JAMB
760300
�� HEIGHT
FLOOR
�
CONCRETE SCREW
°
LOW SIDE
SW COLUMN
760600
/
/
01
Low SIDE
62SUPPORT, SW
\
Q
truc al
J
STARTER JAMB
Q o STARTER JAMB
°
tructural
ine
760110
a a
®�
i n e
ON
760300
� a B
\ a
P
FpU►��
7sosoo
a
SEE
FOUNDATION
tructural
�ON
PLAN
FOR TYPICAL
ine
a FOO
DETAILS
& NOTES.
a
1
1 A
BLANK SW
COLUMN
2 STARTER
JAMB
CLIPS
@ STEP
2A
SW COLUMNS
3
RAKE ANGLE
@ STEP
6
TYPICAL
FOUNDATION STEP AT
STR
JAMB CONNECTION
@ STEP
AND TRACK
@ STEP
AND GI R TS @ STEP
CONNECTION
DETAIL
WALL
YCt VIJIVIV
Date
C m �
o N
r\
N 3
w
>- a)
o a
vi CL � O
z QQ Z3
J � a
Q r-T, O
m
o, o
Z3 Etz
w U
3 k m 5 3
= O N N -Q Ln O
U a)\ E
Q o o a o
O O
x
O
O
O
zzx
~—1 Oa
W
a
wX4
:a 0 0 z
w
L El Q4OOm
m
_
co i
a
o
F
Date
4/5/24
Drawn by
BRM
Scale
1/2" = 1'— 0"
Plan No.
54717 B
Order No.
Sheet No.
E2*0
PART # INDEX
PART #
DESCRIPTION
308211900
29
a. PT.
panel,
9'-11" Ion
308217200
29
a. T.
panel,
14'-4" Ion
308217900
129ga.
PT.
panel,
14'-11" Ion
308223300
129ga.
PT.
panel,
19'-5" Ion
GALVALU M E PANEL
STRUCTURAL BEARING LEG
4" 4" 4"
1'-0" 1'-0" 1'-0"
3'-0" COVERAGE REF.
TRACHTE PARTITION PANEL
PROFILE
NOTE: WHEN CONSTRUCTING AN
INTERIOR PANEL WALL IT MAY BE
NECESSARY TO FLIP THE TOP
PANEL. THIS WILL ALLOW THE
LOAD BEARING LEG TO REST
AGAINST THE RAKE ANGLE. WE DO
NOT RECOMMEND ATTACHING THE_
PARTITION PANEL TO THE RAKE
ANGLES.
AT o�VERLAPDETAIL
IF INSULATED. 760800 ONE SIDE
710969 OTHER SIDE
PANEL
29 ga. GALVANIZED
(LENGTH VARIES)
LOAD
BEARING LEG
° FOUNDATION °
PARTITION PANEL FASTENING DETAIL
6 ATTENTION: Partition wall panel lengths were determined with
the panel starting at least 3Jj" in from the sidewall. All
buildings 25' or more will have 2—panels that lap at a interior
column line. The panels should overlap at least by 1".
C�OLEW
or
BLANK SIDEWALL or ENDWALL DOOR SIDEWALL or ENDWALL
DPARTITION PANEL EXTERIOR
CONNECTION
a
0
I
00
31"
2
REF. TYP.
I
00
3T"
REF. TYP.
I
00
E-
14'-4" PANEL LENGTH
15'-0" REF.
TRANSVERSE PANEL LAYOUT 8'-4" EAVE, 15' WIDE LEAN-TO
n
n---
n
---------------I
I•
I•
I II II
I
I
I
I I
II I I•
I.
1
1
11
1
I•
19'-5" PANEL LENGTH
20'-0" REF.
It, �— —4-1 —1
6 tructural
F1.0 I ine
12
1 /4
n
—
--I�------ —- ------------ II.
II II I
I
----
II
I
308217900
I I I I 11•I
I.I
I
308211900
I I'I I'I II'I
II II III
I'I
II
I
I
I I'I I•I 11•I
II II 11•I
I•I
II
I'
I
308217900
I'I
II II III
I'I
II
308211900
7
I•I
11 11 III
IIIrL,7
I•I
II
1.0
i
I
II
i II II III
I.I I I 11•I
II
I•I
i I
I
1.0
i
I
308217900
1
1
it •
1
1
1 308211900
1
I•
1
I I I'I I'I II'I
I I II 11 III
I•I
I•I
II
1 1•
1 1
I
1
14'-11" PANEL LENGTH 22" REF. OVERLAP
25'-0" REF.
32"
REF. TYP.
Kt VIJIVIV
Date
C m �
r\
ui '1)
:2 (3 N 3
Ld �
o 6 o a�
(� vi CL �° O
m
Ld o, U E � o
1-- 3 k m 3
Q o o a o
.S2 O O
E-
W
A
a
x
z
0
�z
E-
zz�
ha��
a
U� w Q W
Qom'
O
U � A �
:a O z
w
E1
O
a
o
�
Date
4/5/24
Drawn by
BRM
Scale
1/2" = 1'—C
Plan No.
54717 B
Order No.
Sheet No.
F1*0
PART #INDEX
PART #
DESCRIPTION
322619200
rake trim
MLBK
16'-0" Ion
376312000
26 a.
CNR.
trim
panel/frame IWHT 10'-0"
436312000
26 a.
CNR.
trim
panel/panel, IWHT 10'-0"
5045010026
26 a.
eave
trim
dsw 10'-2" MBLK
5920004326
26 a.
H.S.
facet
eavetrim bsw MBLK
04 LEAN—TO ENDWALL ELEVATIONS
ACTUAL ENDWALL LAYOUT MAY MIRROR THIS ELEVATION. SEE FLOOR PLAN FOR ACTUAL
LAYOUT AND LOCATION OF HIGH SIDE. STARTER JAMBS ARE LEFT & RIGHT HANDED. IF
CONSTRUCTING A MIRROR VIEW OF THIS ELEVATION USE THE OPPOSITE STARTER JAMB.
STARTER JAMB PART NUMBERS ARE DIFFERENT BUT SIMILAR. SEE BILL OF MATERIAL FOR
CORRECT PART NUMBER.
07 EAVE SPAN CHANNEL
WHEN INSTALLING THE EAVE SPAN CHANNELS START WITH A 5' CHANNEL FOLLOWED
WITH 10' AND END WITH A 5' EAVE SPAN CHANNEL. CHANNELS WILL OVERLAP AT EACH
END. SPAN CHANNELS SHOULD START AND END AT THE MIDPOINT OF A BAY WHENEVER
POSSIBLE. SEE ROOF FRAMING PLAN TO DETERMINE WHICH P/N'S TO START & END
WITH. INSTALL BOLTS TO SPAN CHANNELS THROUGH TOP TRACKS OR HEADERS ® 2'-0"
OC. FIELD CUT EXCESS AT END OF RUN.
08 FIELD CUTTING
PROVIDED COMPONENTS OFTEN REQUIRE FIELD CUTTING. TO ENSURE AN APPROPRIATE
APPEARANCE AND MINIMIZE CAULK REQUIRED, USE ACCURATE MEASUREMENTS AND QUALITY
TOOLS FOR FIELD CUTS. SILL TRIM OFTEN REQUIRES NOTCHING TO AVOID CONFLICTS WITH
FASTENERS. LAP JOINTS SHOULD BE ARRANGED TO SHED WATER FROM OVERHEAD OR
PREVAILING WIND DIRECTION.
SILL TRIM LAP JOINT DIRECTIONS
WHEN JOINING SILL TRIM TO SILL TRIM OVERLAP PARTS 2" MAX. ADD
SEALANT TO LAP JOINT OF SILL TRIMS.
*MINOR RIB TAPE SEALER NOT REQUIRED AT HIGH EAVE
IF FACET TRIM IS INSTALLED*
1 1 /2" O.C.
#14 X 7/8" COLOR —MATCHING TRI—BEAD
SCREW WITH RUBBER WASHER, TAPE SEALER
OUTSIDE CLOSURE /— SSR PANEL
EAVE SPAN CHANNEL
FACET TRIM 0 0 EAVE TOP TRACK
#12-14 X 1 1 /4" 0 0
COLOR —MATCHING SCREW
WITH RUBBER WASHER
#12-14 X 3/4-
COLOR—MATCHING SCREW
OUTSIDE CLOSURE
A —PANEL SIDEWALL COLUMN
5A HIGH EAVE CONNECTIONS -
BLANK SIDEWALL, SSR
STARTER JAMB
STRUCTURAL COMPONENTS
tructural
ine
FOAM CLOSURE --' RIVET
EXTERIOR WALL PANEL 36" O.C.
1 1/4" COLOR MATCHING SCREW CORNER TRIM
WALL PANEL SHOULD NOT EXTEND BEYOND FACE OF JAMB. FIELD —CUT
CORNER TRIM TO APPROPRIATE HEIGHT, SOME SITUATIONS MAY REQUIRE
FIELD —NOTCHING. FASTEN CORNER TRIM TO UNDERLYING PANEL/JAMB
WITH COLOR MATCHING RIVETS. ENSURE CORNER TRIM IS PLUMB.
TEMPORARILY FASTEN EAVE TRIM WITH 2—SCREWS. PLACE SCREWS WITH
CONSIDERATION AS TO WHERE ROOF CLOSURES AND FASTENERS WILL
BE INSTALLED LATER. BACK SCREW THE BOTTOM OF THE TRIM TO
CLOSE THE GAPS. BE SURE TO HIT THE LIP OF THE TRIM.
ROOF PANEL
760600 ®_INSIDE ROOF CLOSURE
2—PLCS I (REFER TO ROOF PAGE)
0
EAVE SPAN CHANNEL
DOOR SIDEWALL
*EAVE TRIM
*NOTE:
EAVE TRIM TELESCOPES 0
WITH THE I EET END
OPENING BEING THE
LARGER SIZE. INSTALL 0
LEFT TO RIGHT.
ODOOR FRAME SIDEWALL W/ BLANK ENDWALL ELEVATION
36" ON CENTER
RIVET
O
STRUCTURAL
t
760600 tt""ctural 779600
BACK SCREW 3'-0" O.C. C�OIM ne
43_ COLORED SIDE
EXTERIOR 26GA. WALL PANEL
HEADER TRIM WALL PANEL SO IT DOES NOT EXTEND BEYOND 1 r FROM
THE STRUCTURAL LINES. FIELD CUT TRIM PIECE TO DESIRED
JAMB HEIGHT. SOME SITUATIONS MAY REQUIRE FIELD NOTCHING.
DRILL & RIVET THE TRIM IN PLACE WITH MATCHING COLORED
RIVITS. THE CORNER TRIM SHOULD BE PLUMB.
O DOOR SIDEWALL/EAVE TRIM
CONNECTION DETAIL
ROOF OVERHANG AT EAVE TRIM
—BUILDING WITH GUTTER: 1-1/2" BEYOND FACE OF EAVE TRIM,
SEE GUTTER PAGE FOR RAKE TRIM TERMINATION
—BUILDING WITHOUT GUTTER: 4" TO 6" BEYOND FACE OF EAVE TRIM,
TERMINATE END OF RACK TRIM AT THE END OF ROOF SHEET
13 EXTERIOR PANEL/JAMB, OUTSIDE 29
CORNER TRIM CONNECTION
EAVE TRIM AND RAKE TRIM
CONNECTION DETAIL
EXTERIOR CORNER TRIM BLANK
SIDEWALL & ENDWALL
12 FASTENING DETAIL
O29A H.S. EAVE TRIM AND RAKE
TRIM CONNECTION DETAIL
13
376312000
DOOR
SIDEWALL
C
*SOME COMPONENTS AND MATERIALS NOT SHOWN FOR CLARITY*
RAKE TRIM LAPPING:
1) OVERLAP ADJACENT RAKE TRIMS BY 1" TO 2".
2) APPLY A BEAD OF CAULK BETWEEN ALL OVERLAPPING RAKE TRIM
SURFACES.
3) FASTEN TRIMS TOGETHER AT LAP AS SHOWN: CONNECT TRIMS AND
UNDERLYING ADAPTER TRIM, TRIMS AT INTERIOR MOST EDGE ON TOP,
AND TRIMS WITH UNDERLYING HEADERS/JAMBS OR PANELS AT
DOWNWARD FLANGE.
4) DOWN —SLOPE TRIM MUST BE NESTED INSIDE UP —SLOPE TRIM.
COLOR —MATCHING SCREW
WITH RUBBER WASHER
11
RAKE TRIM
4< _
�o
ADAPTER TRIM ` / \_ #12-14 X 3/4"
�J/ COLOR —MATCHING SCREW
RAKE TRIM OVERLAP
L
OBLOCK SIDEWALL PANEL W/BLANK ENDWALL ELEV (HIGH SIDE
(WITH GUTTER AT LOW SIDE)
BLOCK
FIRE WALL
25'-0"
ENDWALL PANEL DETAIL ELEVATION. 1/4 " PITCH
*SOME COMPONENTS AND MATERIALS NOT SHOWN FOR CLARITY*
FACET TRIM LAPPING:
1) OVERLAP ADJACENT FACET TRIMS BY 1" TO 2".
2) APPLY A BEAD OF CAULK BETWEEN ALL OVERLAPPING FACET TRIM
SURFACES.
3) FASTEN TRIMS TOGETHER AT LAP AS SHOWN: CONNECT TRIMS AND
UNDERLYING SSR OUTSIDE CLOSURE, TRIMS AT INTERIOR MOST EDGE
ON TOP, AND TRIMS WITH UNDERLYING HEADERS/JAMBS OR PANELS
AT DOWNWARD FLANGE.
COLOR —MATCHING SCREW
WITH RU
FACET TRIM
SSR OUTSIDE CLOSUR
COLOR —MATCHING SCREW
FACET TRIM OVERLAP
NOTE: IF NEEDED, NOTCH OR SLIT END CAP FOR ROOF
PANEL OR ADAPTER TRIM CLEARANCE. THIS WILL
MINIMIZE ROOF LEAKAGE AND THE AMOUNT OF CAULK
NEEDED WHEN INSTALLING.
END CAP NOTCH AT RAKE TRIM
12
436312000
BLOCK
SIDEWALL
nc vi �iviv
Date
U c
c r o,
r\
LEI ap c
O a � U
CL o
ZL
p L L i
'2'
a
c I o-
LLI U
3 0 m co 3
Q
x
a
O
G4
W
O �4
zzP4o
a
ha
� a
P4
W A W
O
o Uf�AF'
zz
W
a O
m
fq co Co �21
W
o
$
;
Date
4/5/24
Drawn by
BRM
Scole
1/2" = 1'-0"
Plan No.
54717 B
Order No.
Sheet No.
F2e0
By
PART #INDEX
PART #
DESCRIPTION
5920019982
26 a. adapter trim 16'-0" Ion
710881
Tri—Bead Tape Sealer
710892
Minor Rib Tape Sealer
710911
Metal Inside Closure
710933
fixed utility clip
710969
12-14 x 1.25" Hex head screw
710977
#12 x 1.25" SDWW zac screw, GALVM
71194_
Rake Support Angle, length varies
760600
12 x 3 4" HWHSD screw
766000
1.5" o.d. fender washer
INSULATION FLAME AND SMOKE RATING
THE COMPOSITE OF FIBERGLASS AND FACING SHALL HAVE SURFACE
BURNING CHARACTERISTICS NOT TO EXCEED 25 FLAME SPREAD AND 50
SMOKE WHEN TESTED IN ACCORDANCE WITH UNDERWRITERS LABORATORIES
723 TEST METHOD OR ASTM E-84 TEST METHOD. INSULATION BY OTHERS
TO MEET OR EXCEED THESE REQUIREMENTS.
25 RAKE ANGLE / ADAPTER TRIM
PLACE ACROSS END WALL FRAMING WITH VERTICAL LEG FLUSH WITH
STRUCTURAL LINE. INSTALL 3" LEG VERTICAL. NOTE THAT RAKE ANGLE
AND ADAPTER TRIM ARE NOT TO EXTEND BEYOND THE STRUCTURAL EAVE
LINE OF THE BUILDING.
28 INSIDE CLOSURE
FIELD CUT CLOSURE AT STRUCTURAL LINE IF END WALL HAS CLOSETS.
CUT CLOSURE TO EXTEND 1 Y4" PAST STRUCTURAL LINE IF END WALL IS
A —PANEL.
29 ROOF CLIP
POSITION THE CLIP AT EACH PURLIN. ROTATE THE CLIP ON THE MALE LIP
UNTIL VERTICAL. IT IS IMPORTANT THAT THE CLIPS PROJECTING LEDGE FITS
SNUGLY UNDER THE PANEL'S HORIZONTAL LEG AS SHOWN. FASTEN TO
PURLIN. THE PANEL CLIP HAS FACTORY APPLIED SEALANT IN THE UPPER
LIP. IF A CLIP MUST BE REMOVED, A NEW CLIP MUST BE USED OR
GUN —GRADE SEALANT INSTALLED IN THE UPPER LIP.
43 INSULATION INSTALLATION
IT IS THE RESPONSIBILITY OF THE ERECTOR TO INSTALL THE INSULATION
WITH CONSIDERATION THAT ALL VOIDS IN AN INSULATED WALL NEED TO BE
FILLED WITH INSULATION. CARE SHOULD BE TAKEN TO ASSURE THAT
EXTERIOR AIR INFILTRATION TO THE INTERIOR OF THE BUILDING IS
MINIMIZED. LIGHT SHOULD NOT BE VISIBLE THROUGH CRACKS AND
CREVICES. CAULK OR OTHER REMEDIES TO THESE SITUATIONS IS NOT
SUPPLIED BY TRACHTE AND IS TO BE USED AND SUPPLIED AT THE
DISCRETION OF THE ERECTOR AND/OR OWNER.
YOU MUST INSTALL THE INSULATION WITH THE VAPOR BARRIER TO THE
CLIMATE CONTROLLED SIDE OF THE WALL & ROOF (INTERIOR).
93 RAKE TRIM ADAPTER
WHEN ATTACHING RAKE ANGLE TRIM ADAPTOR STOP A BIT BACK FROM
STRUCTURAL EAVE LINE, SNIP END TO FORM TABS THEN FOLD OVER TABS
TO CLOSE END OPENING.
LAY FEMALE LIP OF PANEL OVER RAKE
SUPPORT ANGLE. SECURE FEMALE UP TO
RAKE SUPPORT ANGLE WITH CLAMP OR
TEMPORARY FASTENERS. PANEL WILL NOT BE
FASTENED PERMANENTLY TO RAKE SUPPORT
ANGLE UNTIL ADAPTER TRIM IS INSTALLED.
25 Z STANDING SEAM ROOF P
71194-
lg/I6„ 710892
IA
28 710911 710881
710911
trJG� loll-,
/
he �1U'tulIdal
*710892 NOT REQUIRED UNDER MINOR RIBS AT HIGH
EAVE OF LEAN—TO WITH HIGH EAVE TRIM AND 710892
OUTSIDE CLOSURES* �0.l�
SSR PANEL OVERHANG AT EAVE J
— BUILDING WITH GUTTER: 1-1/2" TO 2-1/4" BEYOND FACE OF EAVE TRIM
— BUILDING WITHOUT GUTTER: 5" TO 6" BEYOND FACE OF EAVE TRIM EAVE TRIM
0FIRST PANEL INSTALLATION
r- TRI-BEAD TAPE SEALER
PROTECTIVE PAPER
MALE FEMALE
CORRECT INCORRECT
PLACE TRI-BEAD TAPE SEALER OVER ENTIRE WIDTH OF PANEL.
REMOVE PROTECTIVE PAPER.
CAUTION: FORCING TAPE SEALER BACK INTO CORNERS WILL LESSEN
THICKNESS OF TAPE SEALER WHERE IT IS NEEDED MOST.
O TRI-BEAD TAPE SEALER
APPLICATION
12-14x1.25" ZAC HEAD
0881 SEE EAVE FASTENER
PATTERN DETAIL
710881 APPLY A CONTINUOUS
LINE OVER EACH INSIDE
CLOSURE FOR THE ENTIRE EAVE
UNE ALONG EAVE SPAN ANGLE
710881 tHEADER or CHANNEL
EAVE SPAN ANGLE
;OLUMN & STARTER JAMB
CONFIRM COLUMN POSITION
V FLOOR PLAN)
. 0•G
1� r<
8R
6
BLANK ENDWALL &
OSTANDING SEAM ROOF O
10 DETAIL AT EAVE 11
�k LOWER RAKE ANGLE IS NOT NEEDED ON 1/4.12 PITCH BUILDING W/ ENDWALL DOORS
OPTION: SEAMS STAPLED TOGETHER OPTION: SEAMS OVERLAPPED
(STAPLE AS CLOSE TO BOTTOM
AS POSIBLE)
2'-0" STANDING SEAM 0 r
ROOF PANEL 24 GA.
5 711940 J
FASTEN METAL INSIDE CLOSURE TO EAVE
W/ (2) #12-14 x 1 1/4" HEX HEAD
SELF -DRILLING FASTENERS (#710969)
TRI-BEAD TAPE SEALER
BLANK ENDWALL &
STANDING SEAM ROOF
DETAIL AT PURLIN
*TAPE SEALER NOT SHOWN FOR CLARITY*
710977 SSR PANEL
,1 2 8 7 6 5 43�
EAVE TRIM CLOSURE (TYP.)
- ATTACH PANELS TO EAVE AND INSIDE CLOSURES AT THESE (8)
LOCATIONS USING #12-14 x 1 1/4" ZAC`' HEX HEAD SELF-DRILUNG
FASTENERS
- FASTENERS MUST PENETRATE TRI-BEAD TAPE SEALER, INSIDE
CLOSURES, EAVE TRIM AND UNDERLYING EAVE SPAN CHANNEL
- IT IS ESSENTIAL THAT NOMINAL PANEL WIDTH IS MAINTAINED AT
EAVE, WITH PROPER INSTALLATION OF INSIDE CLOSURES AND BY
INSTALLING FASTENERS IN PROPER SEQUENCE
EAVE FASTENER SEQUENCE
0
INSTALL OUTSIDE CLOSURE DIRECTLY OVER TRI-BEAD TAPE SEALER.
USING (9) #14 x 7/8" COLOR -MATCHING SCREWS WITH RUBBER
WASHERS, FASTEN THROUGH CLOSURE, TAPE SEALER, AND PANEL
FOLLOWING PROVIDED SEQUENCE. DO NOT FASTEN TO PURUNS.
POSITION CLOSURES AS SHOWN WITH PRE -PUNCHED HOLES 1 1/2"
O.C. FROM END OF PANEL.
APPLY TRI-BEAD TAPE SEALER OVER TOP OF CLOSURES. DO NOT
REMOVE PAPER BACKING UNTIL RIDGE CAP OR FACET TRIM
INSTALLATION.
AFTER FASTENING, APPLY A CONTINUOUS BEAD OF TUBE SEALANT
ALONG ALL EDGES OF CLOSURE THAT CONTACT ROOF PANELS, TRIM,
AND/OR ADJACENT CLOSURES.
CONTINUOUS BEAD OF SEALANT,
BOTH SIDES OF CLOSURE
OUTSIDE CLOSURE ENDWALL PURUN
SSR PANEL
FILL VOIDS
WITH SEALANT CLOSURE/PANEL
OUTSIDE CLOSURE PROFILE —MAJOR RIB
NOTE: DO NOT EXTEND RAKE ANGLE OR ADAPTER TRIM BEYOND STRUCTURAL LINE.
ROOF PANEL IS NOT TO BE CUT OUT AS SHOWN. PANEL IS ONLY CUT AWAY TO
SHOW PARTS UNDER IT.
710881 710881 ���
3 5920019982
SSR PANEL
SEALANT
EAVE TRIM
(TYP
APPLY SEALANT DIRECTLY
INTO SSR MALE:FEMALE
CONNECTION
0CAULK UNDER SSR PANEL O3
0
JP
2-14 X 1-1/4" SCREW
PER CUP
ROOF INSULATION
-VAPOR BARRIER
STARTING END o0o mm
(OR RESTART O BOTTOM
OF ROOF STEP) 6'-0" ROLL 6'-0" ROLL
ENDWALL PURUN
tructurcl
ine
D ROOF PANEL & R-2 INSULATION LAYOUT/LAP DETAIL
*SOME COMPONENTS AND MATERIALS NOT SHOWN FOR CLARITY* *SOME COMPONENTS AND MATERIALS NOT SHOWN FOR CLARITY*
RAKE TRIM LAPPING: FACET TRIM LAPPING:
1) OVERLAP ADJACENT RAKE TRIMS BY 1" TO 2". 1) OVERLAP ADJACENT FACET TRIMS BY 1" TO 2".
2)APPLY A BEAD OF CAULK BETWEEN ALL OVERLAPPING RAKE TRIM 2)APPLY A BEAD OF CAULK BETWEEN ALL OVERLAPPING FACET TRIM
SURFACES. SURFACES.
3) FASTEN TRIMS TOGETHER AT LAP AS SHOWN: CONNECT TRIMS AND 3) FASTEN TRIMS TOGETHER AT LAP AS SHOWN: CONNECT TRIMS AND
UNDERLYING ADAPTER TRIM, TRIMS AT INTERIOR MOST EDGE ON TOP, UNDERLYING SSR OUTSIDE CLOSURE, TRIMS AT INTERIOR MOST EDGE
AND TRIMS WITH UNDERLYING HEADERS/JAMBS OR PANELS AT ON TOP, AND TRIMS WITH UNDERLYING HEADERS/JAMBS OR PANELS
DOWNWARD FLANGE. AT DOWNWARD FLANGE.
4) DOWN -SLOPE TRIM MUST BE NESTED INSIDE UP -SLOPE TRIM.
COLOR -MATCHING SCREW
COLOR -MATCHING SCREW WITH RU
WITH RUBBER WASHER mac.
JQi > FACET TRIM
RAKE TRIM
ADAPTER TRIM J / #12-14 X 3/4"
1/ COLOR -MATCHING SCREW
RAKE TRIM OVERLAP
SSR OUTSIDE CLOSUR
COLOR -MATCHING SCREW
FACET TRIM OVERLAP
ROOF PANEL
#12-14x1.25" ZAC HEAD
OUT TO FORM AROUND \<� //DE WALL
THE TRIM
CORNER TRIM
EAVE TRIM
`STARTER JAMB �✓
NOTE: HEADER & JAMB SIDEWALL IS
SHOWN. 51DEWALL MAY BE A —PANEL. SIDE WALL
G STANDING SEAM ROOF
& RAKE TRIM DETAIL
(PLACE ACROSS END WALL FRAMING AND
FASTEN TO PURUN SPAN CUPS w/(2) SELF
DRIUJNG SCREWS #710969, VERTICAL LEG FLUSH
w/ STRUC. UNE) INSTALL 3" LEG VERTICAL
TEMPORARILY FASTEN THE LAST PANEL
NTH A FASTENER OR VISE —GRIPS. THE
PANEL WALL BE ATTACHED PERMANENTLY
WHEN THE RAKE TRIM AND ADAPTER TRIM
ARE INSTALLED.
OTERMINATION PANEL
2'-0"
2'-0" MCELROY STANDING SEAM
(NOMINAL) ROOF PANELS 24 ga.
M
(#12-14x1.25" ZAC HEAD
STANDING SEAM ROOF PANEL
BELOW CLOSURE ONLY 710881
OVER CLOSURE & 710881
ENTIRE EAVE
(EAVE TRI
EAVE SPAN AN(
USE A 2" x 2" CUT TO 23 3/4" LONG AS A SPACER
TO HOLD 24" CENTERUNES FROM PANEL TO PANEL (AT FASTENING LOCATIONS)
ON SHEET WIDTH)
RAKE SUPPORT
2 PER
FOLD EXCESS FLAP OVER
i
ROOF INSULATION W/VAPOR BARRIER
INSTALLED TO INTERIOR OF BUILDING
20
2 PER
S I D E V�ILR TO PAGE "F2" FOR
MF OUTSIDE CLOSURE #710875
W/ GH SIDE WITH FACET TRIM
OROOF INSULATION w/SS-ROOF
V-6"
(NOMINAL) 1'-6" McELROY STANDING SEAM
ROOF PANELS 24 ga.
M o
PURUN
SEAMING NOTE:
VISUALLY CHECK TO SEE THAT THE DO NOT WALK ON THE MINOR RIBS. WALKING ON THE MINOR RIBS MAY RESULT IN
SSR TOOL SEAMS HAVE SNAPPED THE ENTIRE PERMANENT DAMAGE TO THE ROOF PANEL. DAMAGE MAY INCLUDE ROOF LEAKS,
LENGTH OF PANEL. WHEN ASSEMBLED STANDING WATER, OR AESTHETIC DAMAGE.
CORRECTLY, THE SEAM WILL LOCK DO NOT, UNDER ANY CIRCUMSTANCES, STEP ON THE PANEL AT THE PANEL ENDS
_;
TOGETHER WITH REASONABLE PRESSURE UNTIL THE PANEL IS FULLY ATTACHED. THE ROOF PANEL MAY NOT SUPPORT THE
APPLIED WITH HAND OR FOOT. WEIGHT OF A PERSON AT THESE LOCATIONS.
HOWEVER, IF A PROBLEM IS
ENCOUNTERED IN FULLY SNAPPING THE SEAMS TOGETHER, SUCH AS IF THE PANEL MUST BE WALKED ON, PROTECT IT NTH 2x12 PLANKS THAT SPAN
AN INCORRECTLY INSTALLED CUP, DAMAGED PANEL UP, OR A BUBBLE ACROSS A MINIMUM OF 3 PURUNS. THESE PLANKS WALL HELP TO DISTRIBUTE THE
CAUSED BY FAULTY ASSEMBLY, A SHAPING TOOL IS RECOMMENDED LOAD, BUT PANEL DAMAGE MAY STILL OCCUR IF THE LOADS OR FREQUENCY OF
THAT SHOULD ENABLE THE SEAM TO BE LOCKED WITH A MINIMUM TRAVEL ARE EXCESSIVE.
EFFORT. THE ROOF SHOULD BE SWEPT CLEAN OF DRILL SHAVINGS AT THE
END OF EACH
WORK DAY. FAILURE TO DO SO MAY RESULT IN
STANDING SEAM
0ROOF PROFILES 16
SSR PANEL OVERHANG AT EAVE
� 9 (1 /4:12 & 1 /2:12 PITCHES) 2�
® ® / SSR
3'
710892
APPLY TRI-BEAD TAPE SEALER
TO MALE LEG OF SSR PANEL
DIRECTLY OVER INSIDE CLOSURE
TAPE SEALER AT NOTCH
V
NOT REQ'D O
ENDS, STEPS, OR
EAVES
UP
2-14xl.25" ZAC HEAD
STANDING SEAM ROOF
710881 BELOW CLOSURE ONLY
710881 OVER CLOSURE &
ENTIRE EAVE
EAVE TRIM
EAVE SPAN ANGLE
BLANK
SIDEWALL
SSR PANEL (TYP.)
APPLY ONE HALF OF MINOR RIB TAPE SEALER AT
EACH OF THESE LOCATIONS TO COMPLETE SEAL AT
EAVE.
71�i
710881
CUT MINOR RIB TAPE SEALER IN HALF WIDTH -WISE
AND APPLY ONE HALF TO UNDERSIDE OF EVERY
MINOR RIB OF SSR PANELS, POSITIONED TO CROSS
TRI-BEAD TAPE SEALER AT EAVE; NOT REQUIRED
AT HIGH EAVE OF LEAN-TO WITH HIGH EAVE TRIM
AND OUTSIDE CLOSURES.
APPLY TRI-BEAD TAPE SEALER ON
TOP AND SIDES OF EACH INSIDE
CLOSURE TO COMPLETE SEAL AT EAVE.
APPLY TRI-BEAD TAPE SEALER CONTINUOUSLY ACROSS TOP OF EAVE
TRIM, POSITIONED TO CONTACT UNDERSIDE OF INSIDE CLOSURES AND
TRI-BEAD TAPE SEALER APPLIED OVER INSIDE CLOSURES.
TAPE SEALER APPLICATION AT EAVE
710892
T
I
F Y- NSIDE
CLOSURE (TYP.)
1 7�
r E vl Dlv(v
Date
6
— c op o
r"
Ld 00
0
z o U)
c -_j
p L �
�
o �
c i I c
Ld
3 x m 3
LO
s o
Q O\ o Q
0
x
0
0 z
o�
w
zzx
v�
�a�o
1-4
�7
�wqW
z
�oAz
z
Q 0
a E-
o � i/1 Co
a�
Date
4/5/24
Drawn by
BRM
Scol e
N. T. S.
Plan No.
54717 B
Order No.
Sheet No.
G 1. 0
PART # INDEX
PART #
DESCRIPTION
5920010126
26
a.
qutter,
sculpted, MBLK
5920010226
26
a.
gutter,
endcap, LH MBLK
5920010326
26
a.
qutter,
endcap, RH MBLK
5920010582
26
a.
trim hanger, utter, GALV
5920112326
18
a.
gutter,downspout strap 4" x 6" MBLK
5920134226
26
a.
downs
out assembly, 4" x 6" MBLK 8'4 EAVE
5920175526
26
a.
downs
out assembly, 4" x 6" MBLK 9'4 EAVE
6051050390
10.1
oz. tube
metal roof sealant
08 FIELD CUTTING
PROVIDED COMPONENTS OFTEN REQUIRE FIELD CUTTING. TO ENSURE AN APPROPRIATE
APPEARANCE AND MINIMIZE CAULK REQUIRED, USE ACCURATE MEASUREMENTS AND QUALITY
TOOLS FOR FIELD CUTS. SILL TRIM OFTEN REQUIRES NOTCHING TO AVOID CONFLICTS WITH
FASTENERS. LAP JOINTS SHOULD BE ARRANGED TO SHED WATER FROM OVERHEAD OR
PREVAILING WIND DIRECTION.
GUTTER CAULKING DIRECTIONS AND LOCATIONS
APPLY CAULK AT GUTTER JOINTS BEFORE ASSEMBLY AND APPLY A SECOND
BEAD OF CAULK AFTER GUTTER IS ASSEMBLED.
31 DOWN SPOUT SPACING & LOCATIONS
DOWN SPOUTS ARE TYPICALLY LOCATED 40' O.C. (MAX). SEE FLOOR PLAN
FOR ACTUAL LOCATIONS.
FOR 8'—10" EAVE HEIGHT FIELD MODIFY 9'—4" EAVE DOWNSPOUT ASSEMBLY
AO DOOR
tructural
Line
FRAME SIDEWALL WITH GUTTER
OSTEP AT DOOR SIDEWALL WITH GUTTER
m
in
a
Is
GUTTER
\ FIELD DRILL & RIVET
3 SIDES
FIELD BEND TABS
DOWN 90'. TABS LAP
INSIDE OF DOWNSPOUT.
DOWNSPOUT
ODOWNSPOUT DROP AND
GUTTER CONNECTION
#14 X 7/8" SCREW
GUTTER HANGER
W/EPDM WASHERS
0 2' O.C.
17ES NO
GUTTER
SS —ROOF PANEL
INSTALL RIVETED
FASTENERS SHOULD BE
TABS LAP INSIDE
OF DOWNSPOUT.
14 X 7/8" SCREW
OPTIONAL STARTER
TO
INSTALLED ON "OPEN"
SIDE OF SEAM.
GUTTER BOTTOM 6"
HOLE TO CUT TABS
BUOILD NGO S DEEAM
GUTTER HANGER
RIVET
3 SIDES.
EAVE TRIM
JAMBS/PANEL
/
DOWNSPOUT
DOOR JAMB
ANGLE TOWARD
OR A -PANEL
4 1 /2" REF. 4"
BLDG.
— —
DOWNSPOUT STRAP
SSR PANEL
ONE AT MID OF DOWNSPOUT.
ONE 10" FROM BOTTOM.
1/4" REF.
APPLY SEALANT
AROUND CORNERS
=FIELDDRILL
VET
RIVET
TO CREATE TABS, FIELD CUT AT
LOCATIONS OF DASHED LINES
z 6" DOWNSPOUT
10" REF.
4 PER STRAP
AT LOCATIONS OF SOLID LINES,
BEND TABS DOWNWARD 90'
r-loo
FIELD CUT FROM TOP
TO DESIRED HEIGHT
tructu rcl
GROUND -- --
-- == -- GROUND
GUTTER
DETAIL
2 DOWNSPOUT
DROP HOLE
3
DOWNSPOUT AND STRAP
STANDING SEAM ROOF
SS
ROOF
CONNECTION
GUTTER HANGER SECU REM EN T
PRIOR TO INSTALLING GUTTER
OPTION 1
OPTION 2
CAULKED DRIP EDGE
SEE OWNER FOR PREFERRED OPTION.
SEE OWNER FOR PREFERRED
OPTION.
(option 1) ROOF PANEL
IF NEEDED NOTCH GUTTER AS
REMOVE REAR TAB
RAKE TRIM
SHOWN TO ALLOW FOR A LAP
JOINT. CAULK WITH ROOF SEALANT
IF NEEDED TO
CLEAR ROOF PANEL.
STANDING SEAM ROOF
STANDING SEAM ROOF 6
W ENDCAP *SCREW 6" O.C.
X 7 SCREW
AT THE JOINT. SMOOTH EXCESS
W W
W EPDM WASHERS
CAULK TO ALLOW FREE FLOW OF
WATER.
All
q�F
GUTTER
GUTTER
o
\
i
REMOVE FLANGE
HAND FORMED EDGE
(option 2)
RIVIT
\
RIVIT
®
i
�
08
GUTTER HANGER
BEFORE INSTALLING GUTTER. OPTION 1 CREATES A 1/8" BEAD
4 PLCS. MIN.
APPLY SEALANT AT
5 PLCS. MIN.
APPLY SEALANT AT
2' O.C.
OF SILICONE BASED RTV CAULK ALONG THE ENTIRE UNDERSIDE
RIVET LOCATIONS
RIVET LOCATIONS
5920010226
#14 X 7/8" SCREW
GUTTER W/END
EDGE OF THE ROOF PANEL TO PREVENT WATER FROM
5920010326
W EPDM WASHERS
CAP INSTALLED
RUNNING UP THE PANEL (DO NOT USE BUM CAULK or ROOF
" "
SEALANT HERE). IN LIEU OF THIS A 1 /8 TO 1 /4 BEND
127 6051050390
GUTTER
6051050390
TABS LAP INSIDE
#14 X 7/8" SCREW
SEAMING
CAN BE HAND FORMED ON THE LOW EDGE WITH SEAMING
SEALANT
SEALANT ONLY
OF GUTTER.
GUTTER W/END
CAP INSTALLED
W PDM WASHERS
GUTTER HANGER
PLIERS TO CREATE A DRIP EDGE. TAKE CARE TO OBTAIN A
RAKE TRIM
W ENDCAP
2' O.C.
GOOD APPEARENCE WHEN CHOOSING THIS PREFERRED METHOD.
REQUIRED DRIP EDGE ON ROOF
GUTTER
SEAM/LAP DETAIL
GUTTER ENDCAP DETAIL
GUTTER AND RAKE TRIM
GUTTER AND RAKE TRIM
PANEL Q GUTTER ONLY
CONNECTION DETAIL
CONNECTION
DETAIL
nc vi �iviv
Date
U c
C m
W
cf)CL ZQ
ZL
O
w a U c E o
3 k m co 3
Q ZE Q03 Q
x
O
0
oZ
zzrx
w
ha o4
a
U2 w A W
0 E-
:a z
Ew-
h
O
O
o
o
Date
4/5/24
Drawn by
BRM
Scole
1/2" = 1'-0"
Plan No.
54717 B
Order No.
Sheet No.
11.0
Trachte Building Systems, Inc.
Project Calculations
Per 2020 Minnesota Building Code
Bruce Stainbrook
Monticello, MN
TBS Plan Number: P54717 Phase B
4/ 1 /2024
Table of Contents
Building Al Pages Al — B2
ASCE 7 Hazard Report Pages C 1 C3
Prepared By
David J. Urke
Reviewed By
TRACHTE BUILDING SYSTEMS, INC.
PROJECT CALCULATIONS
Customer Bruce Stainbrook
Prepared By: David J. Urke
Location Monticello, MN
Revised By:
Plan Number P54717 Phase B
Building Al
Code Body 2020 Minnesota Building Code
Buildinq Description
ROOF PITCH 0.25 in/ft
Bay Width
10 ft Purlin Bridging
No
ROOF ANGLE 1.19 Deg
Building Height
9.33 ft Roof Type
SSR
ROOF SLOPE Lean-to
Building Width
25 ft Purlin Spacing
5 ft
RISK CATEGORY II
Building Length
310 ft Int. PT Panel
Yes
Floor to Floor
0.00 ft Int. Lateral Bridging
No
Snow Load
Seismic Load
GROUND SNOW LOAD (Pg)
50 psf
Analysis Procedure
Equivalent lateral force
ROOF SNOW LOAD MIN
42 psf
Building Frame Systems
-ight Frame Wall w/ Flat Strap Bracirn
SNOW EXPOSURE CATEGORY
B
Seismic Site Class
D
SNOW INPORTANCE FACTOR (Is)
1
Short Period Spectral Acc. (Ss)
0.050
THERMAL FACTOR (Ct)
1.2
1 Second Period Spectral Acc. (S1)
0.023
SNOW EXPOSURE
Partial
Spectral Response Acc. (SIDS)
0.053
ROOF LIVE LOAD (Lr)
20 psf
Spectral Response Acc. (SD1)
0.037
FLAT ROOF SNOW LOAD (Pf)
42 psf
Response Factor
4
UNBALANCED SNOW LOAD
42.0 psf
Seismic Design Category
A
SNOW LOAD USED IN DESIGN
42.00 psf
Seismic Response Coefficient (Cs)
0.01
RAIN SURCHARGE
0 psf
Soils Report Required
NO
Wind Load
Dead Load
BASIC DESIGN WIND SPEED (V)
115 mph
ALLOWABLE WIND SPEED (Vasil)
89 mph
Roof Dead Load
3 psf
WIND EXPOSURE CATEGORY
B
Partition Dead Load
3 psf
EDGE STRIP WIDTH
3.00 ft
Additional Long. Dead Load
0 psf
Additional Trans. Dead Load
0 psf
COMPONTENTS AND CLADDING (METHOD 2)
ENDWALL GIRT
22 psf
Base Shear Lonqitudinal
Transverse
SIDEWALL GIRT
21 psf
Seismic
933 Ibs 30 Ibs
PURLIN
-35 psf
Wind
1151 Ibs 508 Ibs
MAIN WIND FORCE (METHOD 2)
WALL (PRESSURE AND SUCTION) 16.00 psf
ROOF 8 psf
P54717_A1.xlsx Al 4/1 /2024
Anchor Information
EDGE DISTANCE
(�N
TVs
(�Vc
3 in
0.65 (TABLE 3 ESR-3889)
0.60 (TABLE 4 ESR-3889)
0.70 (TABLE 4 ESR-3889)
CONCRETE STRENGTH
LPcn 1 in
kc 17
Np 0 kip
2500 psi
Units
Notation
3/8" Anchors
1/2" Anchors
Nominal Anchor Diameter
in
do
0.375
0.375
0.375
0.5
0.5
0.5
Nom. Embedment Depth
in
hnom
2.00
2.50
3.25
2.50
3.00
4.25
Effective Embedment
in
hef
1.33
1.75
2.39
1.75
2.17
3.23
Minimum Concrete thickness
in
t
3.50
4.00
5.00
4.50
5.25
6.75
Minimum Edge Distance
in
c_min
cmin = 1.5 for smin >_3,
smin =2 for cmin>_2
1.75
1.75
1.75
Minimum Spacing Distance
in
s-min
2.75 2.75
2.75
Minimum Nom. Anchor Length
in
lanch
2.50
3.00
4.00
3.00
4.00
5.00
Critical Edge Distance
in
c_ac
5.00
6.30
7.80
3.30
5.90
8.10
Steel Strength - Tension
lb
Nsa
8730
8730
8730
20475
20475
20475
Steel Strength - Shear
lb
Vsa
3465
3465
4345
8860
8860
11175
Seismic Steel Strength - Shear
lb
Vsa_eq
2415
2415
3030
7090
7090
8940
Load Bearing Length
in
le
1.33
1.75
2.39
1.75
2.17
3.23
'Values Obtained from ICC-ES Evaluation Report ESR-3889
Corner Anchor
nc
1
number of bolts at column
ca1_c
2.75 in
distance between bolts from edge 2
s1c
0 in
distance between bolts along edge 1
ca2_c
2.75 in
distance of bolts from edge 1
s2_c
0 in
distance between bolts along edge 2
en_c
0 in
distance from resultant tension load to centroid of anchors in tension
ev_c
0 in
distance from resultant shear load to centroid of anchors in shear
Exterior Anchors
ne
2
number of bolts at column
ca1_e
2.75 in
distance between bolts from edge 2
s1_e
0 in
distance between bolts along edge 1
ca2_e
100 in
distance of bolts from edge 1
s2_e
5 in
distance between bolts along edge 2
en_e
0 in
distance from resultant tension load to centroid of anchors in tension
ev_e
0 in
distance from resultant shear load to centroid of anchors in shear
Interior Anchors
ni
1
number of bolts at column
ca1_i
100 in
distance between bolts from edge 2
s1_i
0 in
distance between bolts along edge 1
ca2_i
100 in
distance of bolts from edge 1
s2i
0 in
distance between bolts along edge 2
en_i
0 in
distance from resultant tension load to centroid of anchors in tension
ev_i
0 in
distance from resultant shear load to centroid of anchors in shear
P54717_A1.xlsx A2 4/1 /2024
Anchor Force Summary
Shear
Uplift
Wind/Long/Int
0 lb
130 lb
Wind/Long/Ext
192 lb
334 lb
Wind/Trans/Int
42 lb
130 lb
Wind/Trans/Ext
169 lb
381 lb
Seismic/Long/Int
0 lb
-346 lb
Seismic/Long/Ext
444 lb
241 lb
Seismic/Trans/Int
5 lb
-346 lb
Seismic/Trans/Ext
19 lb
-137 lb
Ultimate Loads For Anchors
Tension (Int) 847.44 lb Tension (Ext) 1316.03 lb
Shear (Int) 912.63 lb Shear (Ext) 1247.40 lb
Anchor Bolt Interaction Check (Applied Uplift/Tension + Applied Shear < 1.2)
Longitudinal
Transverse
Interior Anchors
Wind
0.15
Wind
Seismic
0.00
Seismic
Exterior Anchors
Wind
0.41
Wind
Seismic
0.69
Seismic
Corner Anchors
Wind
0.21
Wind
Seismic
0.00
Seismic
Anchor Size
Interior
3/8" x 2.5"
Exterior
3/8" x 2.5'
0.20
0.01
0.42
0.02
0.21
0.00
P54717_A1.xlsx A3 4/1 /2024
Panel Check
Panel Capacity
53 plf
Longitudinal Shear Panel Required
21.72 ft
Longitudinal Shear Panel
0 ft
Transverse Shear Panel Required
9.58 ft
Transverse Shear Panel
15 ft
Longitudinal Shear Wall
NOT OK
Transverse Shear Wall
OK
Strap Braces (if Reauired
Longitudinal
4
Transverse
0
Allowable Tension in Strap
3742.51 lb
Longitudinal Strap Angle
43.03 degrees
Transverse Strap Angle
43.03 degrees
Longitudinal Tension in Strap
1575 lb
Transverse Tension in Strap
0 lb
(IF PANEL CHECK IS "OK" NO STRAP BRACES REQUIRED FOR LATERAL FORCE
RESISTING SYSTEM. BUT STRAPS MAY BE REQUIRED FOR ANCHORING)
COMPRESSION
MEMBER
V,s V T,
OR OR
freight Uplift
T
Brace,9r e-,$.T
V
Braced Qie
bay P �a��
Input Values
Load Combinations
Purlin Bridge Spacing
5 ft
Depth of Purlin
7 in
LC1 = Dead + max(Snow and Roof Live Load)
Min. Depth of Purlin
7 in
LC2 = Dead + max(0.75'Snow and 0.75'Roof Live Load)
Height of Horizontal Bracing
4.8646 ft
LC3 = Dead + max(0.6'Wind or 0.7"Seismic)
Web of Interior Column
3.5 in
LC4 = Dead + 0.45'Wind + max(0.75*Snow and 0.75*Roof Live Load)
Web of Sidewall Column
3.5 in
LC5 = Dead + 0.525' Seismic+ 0.75"Snow
Web of Endwall Column
3.5 in
LC6 = 0.6'Dead + Max(0.6*Wind or 0.7'Seismic)
Depth of Large Stub Header 9 in
Qty of Large Stub Headers 1
Depth of Small Stub Header 5.5 in
Qty of Small Stub Header 1
Web of Sidewall Girt 3.5 in
Qty of Sidewall Girts 1
Web of Endwall Girts 3.5 in
Qty of Endwall Girts 1
P54717_A1.xlsx A4 4/1 /2024
Purlin Information
Purlin Loads Uniform Load End Reaction
Moment
LC1
225.00 plf
1125.00 Ibs
2812.50 ft-Ibs
LC4
187.70 plf
938.49 Ibs
2346.22 ft-Ibs
LC6
-44.15 plf
-220.73 Ibs
-551.83 ft-Ibs
LC6(end area)
-85.13 plf
-425.67 Ibs
-1064.18 ft-Ibs
Purlin Member
7 x 16ga, 50ksi Cee Purlin
Purlin Interaction (Positive)
0.88 Purlin Interaction (Negative)
0.33
Purlin Bracing Conditions
Lx 118.50 in
Lypos 118.50 in
Ltpos
118.50 in
Lyneg 118.50 in
Ltneg
118.50 in
Stub Header Information
Stub Header Loads
Reaction
Moment
LC1
1125.00 Ibs
5625.00 ft-Ibs
LC4
938.49 Ibs
4692.44 ft-Ibs
LC6
-425.67 Ibs
-2128.37 ft-Ibs
Member Sizes
Large Stub Header
9 x 3.2 x 14ga 50 ksi Stub Header
Large Stub Header Length
10 ft
Large Stub Header Interaction
0.94
Large Stub Header Bracing Conditions
Lx 120 in
Ly 120 in
Lt
120 in
Small Stub Header
5.5 x 3.2 x 12ga 50 ksi Stub Header
Small Stub Header Length
5 ft
Small Stub Header Interaction
0.97
Small Stub Header Bracing Conditions
Lx 60 in
Ly 60 in
Lt
60 in
Interior Column Information
Interior Column Load
Axial Load
Moment
LC1
2250 Ibs
0 ft-Ibs
LC3
390 Ibs
0 ft-Ibs
LC4
1905 Ibs
222 ft-Ibs
LC5
1729 Ibs
222 ft-Ibs
Interior Column Member
3.63 x 2 x 16ga, 50 ksi Interior Column
Interior Column Interaction
0.96
Interior Column Bracing Condition
Lx 111.25 in
Ly 12.00 in
Lt
111.25 in
P54717_A1.xlsx A5 4/1 /2024
Sidewall Column Information
Sidewall Column Loads
LC1
LC3
LC4
Sidewall Column Member
Sidewall Column Interaction
Sidewall Bracing Conditions
Lx
Endwall Column Information
Endwall Column Loads
LC1
LC3
LC4
Endwall Column Member
Endwall Column Interaction
Endwall Bracing Conditions
Lx
Girt Information
Girt Loads
Sidewall Girt in Mid Zone
Sidewall Girt in End Zone
Endwall Girt in Mid Zone
Endwall Girt in End Zone
Sidewall Girt Member
Sidewall Girt Interaction
Sidewall Girt Bracing
Lx
Endwall Girt Member
Endwall Girt Interaction
Endwall Girt Bracing
Lx
Studs in Mid Zone
Studs in End Zone
Stud Member
Stud Interaction
Stud Bracing
Lx
P54717_A1.xlsx
Axial
1125 Ibs
356 Ibs
1073 Ibs
3.63 x 1.5 x 18ga 33 ksi Column
0.415
118 in
Ly 39 in
Axial
1125 Ibs
356 Ibs
1073 Ibs
3.63 x 1.5 x 18ga 33 ksi Column
0.969
111 in
Ly 44 in
Uniform Load
35 plf
41 plf
40 plf
49 plf
3.5 x 1.75 x 18ga 33 ksi Girt
0.761
119 in
Ly 12 in
3.5 x 1.75 x 18ga 33 ksi Girt
0.224
59 in
Ly 12 in
Uniform Load
16 plf
18 plf
3.625 x 2 x 20ga 33 ksi Stud
0.389
118 in
Ly in
A6
Moment
0 ft-Ibs
Lt
Uniform Load
48 plf
36 plf
Lt
End Reaction
176 Ibs
206 Ibs
202 Ibs
243 Ibs
Lt
Lt
Moment
199 ft-Ibs
223 ft-Ibs
39 Lt
39 in
Moment
583 ft-Ibs
437 ft-Ibs
44 in
Moment
440 ft-Ibs
516 ft-Ibs
126 ft-Ibs
152 ft-Ibs
119 in
59 in
39 in
4/1 /2024
Jambs
Jambs Loads
Axial Load
Moment
LC1
1125 Ibs
NA
LC3
356 Ibs
LC3
296 Ibs
NA
LC4
1073 Ibs
LC5
1028 Ibs
NA
Sidewall Jamb Uniform Load
100 plf
Sidewall Jamb Applied Moment
131 Ib`ft
Endwall Jamb Uniform Load
52 plf
Endwall Jamb Applied Moment
69 Ib`ft
Jamb Axial Load
1125.00 lb
Jamb Moment Capacity
971.08 Ib'ft
Jamb Axial Capacity
5691.00 lb
Sidewall Jamb Check
OK
Endwall Jamb Check
OK
Endwall Header Checks
Endwall header moment capacity 2922.5 Ib`ft
Endwall Applied Moment 2812.5 Ib'ft
16" Endwall Header Check 16 in EW Header - OK
22" Endwall Header Check 22 in EW Header - OK
Foundation Information
Interior Column Reactions
Gravity 2250 Ibs
Uplift 150 Ibs
Exterior Column Reactions
Gravity 1125 Ibs
Uplift 774 Ibs
Allowable Soil Bearing Pressure 1500 psf
Slab Thickness
6.00 in
Pad Width
NA
Pad Depth
NA
131 ft-Ibs
99 ft-Ibs
P54717_A1.xlsx A7 4/1 /2024
Job Name
Job Location
Plan #
Rmt� i,G= jq40 )b N =Au
Sheet # of
By Date
(�oo,A rom F^U)
T-11 Cc) 12
�5.
_ 31
9.0193 - 4� 39-
0, vy >> 0. Oar
�= q
'-2 S� 9 6� Lt� -2. L ft -216 0
(�qo PW ::�
u Y- 13
B1
Job Name
Job Location
Sheet # of
Plan # By _
i7evry prMP�l P�7 , rC
100 NOOV
60000
fie - I.0
Y(-z (Con5ee-v0"ik)
000OF"..of(0.7)(lio)
Cn-I Z
Date
oL
B2
ASCE
AMERICAN SOCIM OF CIVIL ENGINEERS
Address:
36 Dundas Rd
Monticello, Minnesota
55362
ASCE Hazards Report
Standard: ASCE/SE17-16 Latitude: 45.289884
Risk Category: II Longitude:-93.801109
Soil Class: D - Default (see Elevation: 963.8113295230639 ft
Section 11.4.3) (NAVD 88)
\'.l eel nik
Wind
Results:
Wind Speed
109 Vmph
10-year MRI
75 Vmph
25-year MRI
82 Vmph
50-year MRI
87 Vmph
100-year MRI
93 Vmph
Data Source: ASCE/SEI 7-16, Fig. 26.5-1 B and Figs. CC.2-1—CC.2-4, and Section 26.5.2
Date Accessed: Mon Apr 01 2024
Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear
interpolation between contours. Wind speeds are interpolated in accordance with the 7-16 Standard. Wind speeds
correspond to approximately a 7% probability of exceedance in 50 years (annual exceedance probability =
0.00143, MRI = 700 years).
Site is not in a hurricane -prone region as defined in ASCE/SEI 7-16 Section 26.2.
https://ascehazardtool.org/ C1 Mon Apr 01 2024
ASCE®
AMERICAN SOCIM OF CIVIL ENGINEERS
Seismic
Site Soil Class: D - Default (see Section 11.4.3)
Results:
SS
0.05
S,
0.023
Fa
1.6
F
2.4
SMS :
0.081
SM1
0.056
SIDS :
0.054
Seismic Design 1&&b
pRnse Spectrum
0`-
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0 _
Sa (g) vs T(s)
0.045
0.040
0.035
0.030
0.025
0.020
0.015
0.010
0
SW
TL
PGA:
PGA M
F PGA
I :
C, :
o.oR
0.0
0.0
0.0
0.0
0.0
10 12 14 0
0.038
12
0.024
0.038
1.6
1
0.7
Design Response Spectrum
Sa(g) vs T(s)
MC;FR Vertical Response Spectrum ,,,,,,, Design Vertical Response Spectrum
10
Sa(9) vs T(s)
r
0.025
0.020
0.015
0.010
W&AS 0.005
15 2.0 0 10 15 20
Sa(9) vs T(s)
Data Accessed: Mon Apr 01 2024
Date Source:
USGS Seismic Design Maps based on ASCE/SEI 7-16 and ASCE/SEI 7-16 Table 1.5-2. Additional data for
site -specific ground motion procedures in accordance with ASCE/SEI 7-16 Ch. 21 are available from USGS.
https://ascehazardtool.org/ C2 Mon Apr 01 2024
ASCE®
AMERICAN SOCIM OF CIVIL ENGINEERS
Snow
Results:
2
Ground Snow Load, pg : 50 Ib/ft
Mapped Elevation: 963.8 ft
Data Source: ASCE/SEI 7-16, Table 7.2-8
Date Accessed: Mon Apr 01 2024
Values provided are ground snow loads. In areas designated "case study
required," extreme local variations in ground snow loads preclude mapping at
this scale. Site -specific case studies are required to establish ground snow
loads at elevations not covered.
Snow load values are mapped to a 0.5 mile resolution. This resolution can
create a mismatch between the mapped elevation and the site -specific
elevation in topographically complex areas. Engineers should consult the local
authority having jurisdiction in locations where the reported `elevation' and
`mapped elevation' differ significantly from each other.
The ASCE Hazard Tool is provided for your convenience, for informational purposes only, and is provided "as is" and without warranties of any
kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or
has been extrapolated from maps incorporated in the ASCE standard. While ASCE has made every effort to use data obtained from reliable
sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or
quality of any data provided herein. Any third -party links provided by this Tool should not be construed as an endorsement, affiliation,
relationship, or sponsorship of such third -party content by or from ASCE.
ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent
professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such
professionals in interpreting and applying the contents of this Tool or the ASCE standard.
In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors,
employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential
damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by
law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data
provided by the ASCE Hazard Tool.
https://ascehazardtool.org/ C3 Mon Apr 01 2024
CITY OF
Monticello
May 301h, 2024
PHONE:763-295-2711 Fax:763-295-4404
505 Walnut Street Suite 1 Monticello, MN 55362
Re: 36 Dundas Road, Applicant: Bruce Stainbrook, Storage Link of Monticello LLC.
The Department of Building Safety and Fire Department have the following comments:
• Verify the exterior walls adjacent to the property line meet the Building Code.
• Verify the locations of the existing fire hydrants are approved by the Fire Chief.
• Verify the fire truck turning radius to enter the property is approved by the Fire Chief.
These items may be reviewed with Building Permit application. Please contact the Building
Department, or the Fire Department with any questions.
Sincerely,
Ron Hackenmueller
rm /V ULtl"�'M�
Chief Building Official
www.ci.monticel lo.mmus
Planning Commission Agenda — 06/04/2024
2D. Public Hearine - Consideration of an Amendment to the Monticello Citv Code. Title XV:
Land Usage, Chapter 153: Zoning Ordinance, Sections 153.012 — Definitions, 153.028 —
Specific Review Procedures & Requirements, 153.090 — Use Table, & 153.091— Use -
Specific Standards related to Contractor's Yard — Temporary, & Extraction of
Minerals/Materials as Principal and Interim Uses including Definitions, Use -Specific
Standards, & other regulations as necessary to define and limit the intent or
application of the proposed amendment. Applicant: City of Monticello.
Prepared by:
Meeting Date:
Council Date (pending
Stephen Grittman, Grittman
06/04/2024
Commission action):
Consulting, City Planner
06/24/2024
Additional Analysis by:
Community Development Director, Community & Economic Development Coordinator
ALTERNATIVE ACTIONS
Decision 1: Consideration of amendments to the Zoning Ordinance regulating Temporary
Contractors' Yards, Extraction and Mining Uses, and related sections.
1. Motion to table action on Resolution No. PC-2024-22 recommending approval of an
Amendment to the Monticello Zoning Ordinance Sections 153.012 — Definitions, 153.028 —
Specific Review Procedures & Requirements, 153.090 — Use Table, and 153.091— Use -
Specific Standards related to Contractor's Yars— Temporary, and Extraction of
Minerals/Materials as a Principal and Interim Uses including Definitions, Use -Specific
Standards, and continue the hearing to July 2, 2024.
REFERENCE AND BACKGROUND
Property: Legal Description: N/A
PID #: N/A
Planning Case Number: 2024-24
Request(s): Amendment to the Zoning Ordinance regulating Extraction
of Materials/Minerals and Temporary Contractors' Yards, and
facilities related to such uses.
Deadline for Decision: July 7, 2024 (60-day deadline)
September 5, 2024 (120-day deadline)
Land Use Designation: N/A
Zoning Designation: N/A
1
Planning Commission Agenda — 06/04/2024
Overlays/Environmental
Regulations Applicable: N/A
Current Site Uses: N/A
Surrounding Land Uses: N/A
Project Description: The proposed amendments supplement existing City zoning
regulations managing the temporary use of land for construction
of public infrastructure and/or materials mining activities. By their
nature, these uses are limited in time, but for their duration, have
the potential for significant impacts on both the surrounding area
in which they are located, the streets and other infrastructure
they utilize during their operation, as well as the condition and
future use of the land they occupy.
ANALYSIS
City staff is proposing a series of amendments to the regulations pertaining to the use
classification "Extraction of minerals". The updates are considered to be valuable
improvements over the existing language, better protecting the City, the neighborhoods which
may be near these uses, and the public infrastructure used or impacted by these activities.
The proposed amendments are being provided to the Commission for review and discussion,
with a request to table action to the July regular meeting to allow for additional staff
discussion, and to incorporate any comments and feedback of the Commission into the final
language.
The additional Extraction language is drawn largely from the recent updated amendments
made to the Wright County zoning regulations, which are also effective in the Monticello
Orderly Annexation Area. The ordinances do not align perfectly as the proposed City regulations
are slightly more restrictive in some areas.
The attached ordinance language is presented in redline, relating to Definitions (Section
153.012) and three sets of Industrial Use Standards in Section 153.091 related to Temporary
Contractor's Yard (F)(4), Extraction of Materials (F)(5), and Land Reclamation (F)(6).
The regulations proposed include additional Definitions language for Extractive Use (by adding
reference to local ordinance regulations) and Contractor's Yard —Temporary (creating a new
Definition.
For Temporary Contractor's Yards, the proposed amendment adds language related to the
protection of local streets from the heavy use by contractor's equipment, and specifically keeps
Planning Commission Agenda — 06/04/2024
such traffic from residential streets, except when the City Engineer finds that a particular local
street is needed for access to a construction site.
For Extraction of Minerals, the proposed amendment makes two technical changes - (1)
Limiting the Interim Use Permit period to a 5-year interval, after which a new IUP would be
required, and (2) add the Pointes at Cedar District to a viable location for extractive uses and
deleting prior commercial district language. The proposed language further adds a significant
amount of clarifying detail to the expectations for Extraction IUPs, including performance
standards, submission requirements, and financial security provisions. As noted above, much
of this language is borrowed from the Wright County ordinances.
Finally, a Land Reclamation plan is also included as an integral part of an Extraction IUP. Land
Reclamation permits require a separate Conditional Use Permit.
STAFF RECOMMENDED ACTION
At this time, staff recommends tabling action on the amendments to allow for additional staff
review. Overall, staff recommends the amendments to strengthen the City's ability to manage
this use. While it is acknowledged that utilization of the sand and gravel resources is a
necessary requirement of responsible development, these uses can also create significant
impacts on the locations in which they are sited. The proposed amendments are intended to
address those impacts.
SUPPORTING DATA
A. Resolution PC-2024-22
B. Draft Summary of Ordinance Amendments
C. Monticello Zoning Ordinance, Excerpts
D. Wright County Ordinance, Excerpts
E. Monticello Official Zoning Map
CITY OF MONTICELLO
WRIGHT COUNTY, MINNNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC-2024-22
RECOMMENDING ADOPTION OF AN ORDINANCE AMENDING
THE ZONING ORDINANCE RELATED TO EXTRACTION OF MATERIALS, LAND RECLAMATION,
AND TEMPORARY CONTRACTOR'S YARDS
WHEREAS, the City of Monticello regulates Extraction of Materials, Land Reclamation, and
Temporary Contractor's Yards by Interim Use Permit in a variety of locations; and
WHEREAS, the zoning regulations applicable to these uses both facilitate and limit their
locations in ways that the City finds are inadequate to utilize the resources while providing
for adequate protections; and
WHEREAS, the City finds that revision of the Code to add more specificity and direction is in
the public interest; and
WHEREAS, the Planning Commission held a public hearing on June 4th, 2024 on the
application and the applicant City of Monticello and members of the public were provided
the opportunity to present information to the Planning Commission; and
WHEREAS, the Planning Commission of the City of Monticello makes the following Findings
of Fact in relation to the recommendation of approval:
The zoning amendment provides an appropriate means of furthering the
intent of the Comprehensive Plan by focusing the ordinance regulations on
the needs of the community.
The proposed amendment makes no other changes to the nature of uses
that would otherwise exist in commercial or industrial districts.
The change in zoning language will accommodate reasonable and efficient
operation of existing or new mining or contractor's facilities when working
on public projects.
4. The change in language will have no expected impacts on public services,
including sewer, water, stormwater treatment, and traffic which have been
planned to serve commercial uses as expected.
5. The existing language of the code will benefit from additional consistency
with the requirements of Wright County which are effective in the MOAA.
NOW, THEREFORE, BE IT RESOLVED, by the Planning Commission of the City of Monticello,
Minnesota, that the Planning Commission hereby recommends that the Monticello City
Council approves the zoning amendment to modify the regulations applicable to Extraction
of Materials, Land Reclamation, and Temporary Contractor's Yards as defined in the
proposed ordinance.
ADOPTED this 4th day of June, 2024, by the Planning Commission of the City of
Monticello, Minnesota.
CITY OF MONTICELLO
WRIGHT COUNTY, MINNNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC-2024-22
Paul Konsor, Chair
ATTEST:
Angela Schumann, Community Development Director
2
Draft Ordinance Language
Section 153.012 (Definitions)
EXTRACTIVE USE. The use of land for surface or subsurface removal of sand,
gravel, rock, industrial minerals, other nonmetallic minerals, and peat not regulated
under M.S. §§ 93.44 to 93.51, and as regulated by this Chapter, as they may be
amended from time to time.
CONTRACTORS YARD — TEMPORARY. A location on which a construction
contractor operating with a current permit for construction of public utilities,
infrastructure, or other project on public property, rights -of -way, or public easements,
stores eauioment. temporary office soace. vehicles. and materials for no more than a
two-year period.
Section 153.091 (F)(4) Contractors yard — temporary.
(a) Temporary contractor's yards shall be allowed only by interim use permit,
subject to the standards of § 153.028(E).
(b) Temporary contractor's yards shall be accommodated only in association with
the construction of public infrastructure projects on public property, rights -of -way, or
public easements.
(c) Temporary contractor's yards shall be located only on property directly
abutting a county, state or federal highway, and shall minimize use of local streets. No
local streets may be used by Temporary Contractor equipment, with the exception of
streets or utilities currently under construction or reconstruction for that purpose, or
which are deemed necessary for such use by the Citv Enaineer to provide access to a
permitted construction site.
(d) Such yards shall provide haul routes for approval by the City Engineer.
(e) Such yards shall provide adequate securities, as determined by the City
Council, for the restoration of any municipal infrastructure damaged due to the operation
of the yard.
(f) Such yards shall provide, as a condition of their permit, for adequate
stormwater management, dust control, traffic control, and other requirements of the City
Engineer.
(g) Interim use permits for temporary contractor's yards shall include a
restoration plan ensuring the restoration of the property to a condition meeting the
zoning and nuisance standards of the city.
Section 153.091 (F)(5) Extraction of materials.
(a) All regulations in this chapter shall be met.
(b) Plans shall be provided to illustrate how the land will be left in a useable
condition upon cessation of extraction activities, shall prove that the finished grade will
not adversely affect the surrounding land or future development of the site on which the
mining is being conducted, and the route of trucks moving to and from the site.
(c) The interim use permit authorizing the extraction of materials shall regulate:
1. The type(s) of material being mined on the site;
2. A program for rodent control;
3. A plan for fire control and general maintenance of the site;
4. Controls for vehicular ingress and egress, and for control of material
disbursed from wind or hauling of material to or from the site;
5. A calendar of specific dates when mining operations will be conducted,
including specific beginning and ending dates, but not for a period exceeding five (5)
years from beginning to end of permit; and
6. The submission of a surety by the applicant in an amount determined by the
Community Development Department to be equal to 100% of the value of the cost of
restoring land whereupon mining is to occur and repairing the degradation of roadways
used to transport soils.
(d) On -site sales may be allowed as part of the interim use permit subject to all
conditions established by the City Council to ensure the health, safety, and welfare of
those visiting the site and of surrounding property owners.
(e) For extraction of materials under this section within the Pointes at Cedar, B-3
aPA-or B-4 zoning districts, no such permit shall be issued except where:
1. The city has an interest in the subject property ownership;
2. The city is conducting the extraction under a contract with the fee title owner
or representative; or
3. The city approves such a permit for another government agency and/or its
contractor for a public project.
(f) In the Pointes at Cedar, B-3 orate B-4 Districts, and at the city's sole
discretion, the UP under this section may include screening, concrete mixing, asphalt
plant operation, or other activities utilizing the raw materials being extracted from the
site, provided the city finds that no adverse impact on adjoining property use will occur,
including, but not limited to, noise, odors, dust, or other particulate matter.
(g) For the purposes of this section, mining or excavation shall mean solely the
removal of minerals, including sand, stone, clay, gravel, or soil in quantities of more
than 100 cubic yards, and hauling of said materials from the site. For quantities of less
than 100 cubic yards, or for projects that extract and relocate the materials on the same
project site regardless of quantity, administrative grading permits may be issued without
need for an IUP.
h) For minina operations which will last only one season, such as for public road
construction projects, the City Council may issue a temporary mining permit. Such
permit may include the placement of a bituminous hot mix plant and other accessory
equipment. Said permits shall only apply if the mining site is to be opened, closed and
reclaimed within one year. The Zoning Administrator may waive some of the information
required by division (C) below in the case of a temporary mining permit. A temporary
mining permit shall be administered as an interim use permit.
i) For minina operations issued an Interim Use Permit under this section, the
City may, at its sole discretion, approve the import of recyclable concrete or asphalt
materials for the purpose of crushing and re -use of those materials off -site. No
crushing, washing, refining, processing, or other recycling machinery shall be operated
within 500 feet of any residential property boundary, nor shall such machinery be
operated for more than two (2) weeks in any calendar year. Any such crushing or
similar activity shall be operational only during the hours of 8:00 a.m. and 6:00 p.m.,
Monday through Friday.
(0) Any mining IUP issued under this Section (5) shall include, as a component of
the IUP, a mandatory Land Reclamation permit, as regulated under Section 153.091(F)
(10) of this Section.
k) Information reauired. The followina information shall be provided by the
person requesting the permit:
1 Name and address of person requesting the mining permit;
2 The exact legal property description and acreage of area to be mined;
3 The followina mans of the entire site and to include all areas within 100
feet of the site.
a) Map A. existina conditions to include:
(1) Contour lines at five two -foot intervals;
(2) Existing vegetation;
(3) Existing drainage and permanent water areas;
(4) Existing structures; and
(5) Existina wells.
(b) Map B, proposed operations to include:
(1) Structures to be erected;
(2) Location of sites to be mined showing depth of proposed
excavation;
(3) Location of tailings deposits showing maximum height of deposits;
(4) Location of machinery to be used in the mining operation;
(5) Location of storaae of mined materials. showina heiaht of storaae
deposits;
(6)Location of vehicle parking, truck staging, queueing, or stacking
area. access roads and local truck routes:
(7) Location of storage of explosives, equipment, and other equipment
materials;
8) Erosion and sediment control structures;
9) Screenina, berms, and proposed plantinas, and
(10) Location of leak containment structures, in the event of a
petrochemical leak or spill.
(c) Map C, reclamation plan to include-
(1) All of the information required in Land Reclamation, Section
153.091 (F)(10).
(1) —Financial Guarantee
The City shall require a cash escrow, or irrevocable letter of credit in a
form and from a financial institution acceptable to the City, to guarantee
compliance with this Ordinance and terms and specifications of the interim
use permit. The City shall have the right to use the financial guarantee to
remove stockpiles, complete site rehabilitation, and correct other
deficiencies or problems, in the event the owner or operator is in default of
the permit obligations. The amount of financial guarantee shall be equal to
five thousand ($5,000) dollars for every permitted acre or any other
amount deemed acceptable by the City Council. The financial guarantee
may be adjusted periodically to reflect ongoing progress, at the discretion
of the Zoning Administrator, and shall remain in full force and effect until
all conditions of the permit have been met. includina site restoration.
m) Exceptions — A minina and extraction permit shall not be reauired for anv of
the following:
1 Excavation for a foundation, basement, or other building activity, if such
work has been properly permitted.
2 Excavation by state, county, city, or township authorities in connection
with construction and maintenance of roads, highways, bridges, or utilities
conducted solelv within the permanent easement areas or riahts-of-way.
3 Grading and removal of materials in accordance with the development
of an approved plat or development, if the activity was reviewed as part of
the approval process.
Section 153.091 (F)(10) Land reclamation. The conditional use permit authorizing
land reclamation shall regulate:
(a) A finished grade plan which will not adversely affect the adjacent land;
(b) The type of fill permitted;
(c) A program for rodent control;
(d) A plan for fire control and general maintenance of the site;
(e) Controls for vehicular ingress and egress, and for control of material
disbursed from wind or hauling of material to or from the site;
(f) A soil erosion and sediment control plan;
(gf) A calendar of specific dates when land reclamation operations will be
conducted, including specific beginning and ending dates; and
(hg) The submission of a surety by the applicant in an amount determined by the
Community Development Department to be equal to 100% of the value of the cost of
restoring land whereupon land reclamation is to occur and repairing the degradation of
roadways used to transport soils.
i) Unless otherwise required by the City Council, a minimum of four (4) inches
of clean, uncontaminated topsoil shall be placed on all final graded and
rehabilitated areas. The peaks and depressions of the area shall be graded
and backfilled to a surface which will result in a gently rolling topography in
substantial conformity to the land area immediately surrounding area, and
which will minimize erosion due to rainfall. No finished slope shall exceed
25% in grade.
§ 153.012 DEFINITIONS.
EXTRACTION OF MATERIALS. The development or extraction of a natural resource
in excess of 400 cubic yards from its natural occurrences on affected land without
processing.
EXTRACTIVE USE. The use of land for surface or subsurface removal of sand,
gravel, rock, industrial minerals, other nonmetallic minerals, and peat not regulated
under M.S. §§ 93.44 to 93.51, as they may be amended from time to time.
LAND RECLAMATION. The reclaiming of land by the importation, depositing, or grading of
soils in excess of 400 cubic yards so as to elevate the grade.
§ 153.090 USE TABLE.
TABLE 5-1: USES BY DISTRICT
Use Types Base Zoning Districts Additional
Requirements
"P" = Permitted
"C" = Conditionally A I R I R I R I T I R I R I M I B I B I B I B C C D P C D I B I I I I
Permitted O A 1 2 N 3 4 H 1 2 3 4 C 1 2
"I" = Interim
Permitted
I Industrial Uses
Contractor's yard,
I
I
I
§ 153.091(F)(4)
temporary
See Table
5- IA
See
Ordinance
Extraction of
I
I
I
I
I
§ 153.091(F)(5)
minerals
No.
Land Reclamation
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
§ 153.091(F)(9)
§ 153.091 USE -SPECIFIC STANDARDS.
(F) Regulations for industrial uses.
(4) Contractors yard — temporary.
(a) Temporary contractor's yards shall be allowed only by interim use permit,
subject to the standards of § 153.028(E).
(b) Temporary contractor's yards shall be accommodated only in association with
the construction of public infrastructure projects on public property, rights -of -way, or
public easements.
(c) Temporary contractor's yards shall be located only on property directly
abutting a state or federal highway, and shall minimize use of local streets.
(d) Such yards shall provide haul routes for approval by the City Engineer.
(e) Such yards shall provide adequate securities, as determined by the City
Council, for the restoration of any municipal infrastructure damaged due to the operation
of the yard.
(f) Such yards shall provide, as a condition of their permit, for adequate
stormwater management, dust control, traffic control, and other requirements of the City
Engineer.
(g) Interim use permits for temporary contractor's yards shall include a
restoration plan ensuring the restoration of the property to a condition meeting the
zoning and nuisance standards of the city.
(5) Extraction of materials.
(a) All regulations in this chapter shall be met.
(b) Plans shall be provided to illustrate how the land will be left in a useable
condition upon cessation of extraction activities, shall prove that the finished grade will
not adversely affect the surrounding land or future development of the site on which the
mining is being conducted, and the route of trucks moving to and from the site.
(c) The interim use permit authorizing the extraction of materials shall regulate:
1. The type(s) of material being mined on the site;
2. A program for rodent control;
3. A plan for fire control and general maintenance of the site;
4. Controls for vehicular ingress and egress, and for control of material
disbursed from wind or hauling of material to or from the site;
5. A calendar of specific dates when mining operations will be conducted,
including specific beginning and ending dates; and
6. The submission of a surety by the applicant in an amount determined by the
Community Development Department to be equal to 100% of the value of the cost of
restoring land whereupon mining is to occur and repairing the degradation of roadways
used to transport soils.
(d) On -site sales may be allowed as part of the interim use permit subject to all
conditions established by the City Council to ensure the health, safety, and welfare of
those visiting the site and of surrounding property owners.
(e) For extraction of materials under this section within the B-3 and B-4 zoning
districts, no such permit shall be issued except where:
1. The city has an interest in the subject property ownership;
2. The city is conducting the extraction under a contract with the fee title owner
or representative; or
3. The city approves such a permit for another government agency and/or its
contractor for a public project.
(f) In the B-3 and B-4 Districts, and at the city's sole discretion, the UP under this
section may include screening, concrete mixing, asphalt plant operation, or other
activities utilizing the raw materials being extracted from the site, provided the city finds
that no adverse impact on adjoining property use will occur, including, but not limited to,
noise, odors, dust, or other particulate matter.
(g) For the purposes of this section, mining or excavation shall mean solely the
removal of minerals, including sand, stone, clay, gravel, or soil in quantities of more
than 100 cubic yards, and hauling of said materials from the site. For quantities of less
than 100 cubic yards, or for projects that extract and relocate the materials on the same
project site regardless of quantity, administrative grading permits may be issued without
need for an IUP.
(10) Land reclamation. The conditional use permit authorizing land reclamation shall
regulate:
(a) A finished grade plan which will not adversely affect the adjacent land;
(b) The type of fill permitted;
(c) A program for rodent control;
(d) A plan for fire control and general maintenance of the site;
(e) Controls for vehicular ingress and egress, and for control of material
disbursed from wind or hauling of material to or from the site;
(f) A calendar of specific dates when land reclamation operations will be
conducted, including specific beginning and ending dates; and
(g) The submission of a surety by the applicant in an amount determined by the
Community Development Department to be equal to 100% of the value of the cost of
restoring land whereupon land reclamation is to occur and repairing the degradation of
roadways used to transport soils.
Wright County, MN Code of Ordinances
§ 155.003 RULES AND DEFINITIONS.
(30) CONTRACTORS YARD, NON-COMMERCIAL. Buildings and structures, including
limited outdoor storage, located on the homestead of a contractor in the building trades or other
similar business, for the purpose of storing machinery and equipment related to the business
which is primarily conducted off -site. All storage and screening requirements in
§§ 155.076 through 155.079 of this chapter must be met, all building size requirements must be
met and the use must be clearly incidental to the primary use of the property as a homestead.
(Pre-existing yards will not be required to obtain an interim use permit; provided, all ordinance
requirements are met.)
(43) EXTRACTIONAREA. Any non-agricultural artificial excavation of earth exceeding fifty
square feet of surface area or two feet in depth, excavated or made by the removal from the
natural surface of the earth, or sod, soil, sand, gravel, stone or other natural matter, or made by
turning, or breaking or undermining of the earth.
(92) MINING. The extraction of sand, gravel, rock, soil or other material from the land in the
amount of one thousand cubic yards or more and the removing thereof from the site shall
be MINING. The only exclusion from this definition shall be removal of minerals associated with
construction of a building provided such removal is an approved item in the building permit.
§ 155.075 PURPOSE.
(A) The performance standards established in this subchapter are designed to encourage a high standard of
development by providing assurance that neighboring land uses will be compatible. The performance standards are
designed to prevent and eliminate those conditions that cause blight. All future development in all districts shall be required
to meet these standards. The standards shall also apply to existing development where so stated. The County Board shall
be responsible for enforcing the standards.
(B) (1) Before any building permit is approved, the Zoning Administrator shall determine whether the proposed use will
conform to the performance standards. The developer or land owners shall supply data necessary to demonstrate such
conformance.
(2) Such data may include description of equipment to be used, hours of operation, method of refuse disposal and type
and location of exterior storage.
§ 155.100 MINING AND EXTRACTION.
(A) Purpose. Modern lifestyles create the indisputable need for a continued and uninterrupted supply of aggregate
material. Accordingly, mining is a necessary land use that shall be balanced with the impact on the environment, health,
welfare, safety, and quality of life of Wright County residents and future generations. The purpose of this section is to
regulate mining operations so as to minimize conflicts with adjacent land uses and ensure that mining operations are
reclaimed with a use compatible with surrounding land uses and a use as designated in the Comprehensive Land Use Plan.
(B) Administration; permit review.
(1) An interim use permit shall be required for all commercial mining operations. Said permit shall be valid for a period
of time set by the County Planning Commission but shall not exceed ten years; after which, a new interim use permit shall
be required. Except that an interim use permit for a hot mix asphalt plant shall not be issued for a term in excess of two
years.
(2) Persons requesting a mining permit shall submit said fee to the County Planning Commission together with all
information required in this section.
(3) For mining operations which will last only one season, such as for road projects, the Planning Commission may
issue a temporary mining permit. Such permit may include the placement of a bituminous hot mix plant and other accessory
equipment. Said permits shall only apply if the mining site is to be opened, closed and reclaimed within one year. The
Zoning Administrator may waive some of the information required by division (C) below in the case of a temporary mining
permit. A temporary mining permit shall be administered as an interim use permit.
(4) If the request is denied, no reapplication shall be made for a period of six months.
(C) Information required. The following information shall be provided by the person requesting the permit:
(1) Name and address of person requesting the mining permit;
(2) The exact legal property description and acreage of area to be mined;
(3) The following maps of the entire site and to include all areas within 500 feet of the site. All maps shall be drawn to a
scale as determined by the Zoning Administrator and submitted on scale -size paper, otherwise stated below:
(a) Map A, existing conditions to include:
1. Contour lines at two -foot intervals;
2. Existing vegetation;
3. Existing drainage and permanent water areas;
4. Existing structures; and
5. Existing wells.
(b) Map B, proposed operations to include:
1. Structures to be erected;
2. Location of sites to be mined showing depth of proposed excavation;
3. Location of tailings deposits showing maximum height of deposits;
4. Location of machinery to be used in the mining operation;
5. Location of storage of mined materials, showing height of storage deposits;
6. Location of vehicle parking, truck staging, queueing, or stacking area, access roads and local truck routes;
7. Location of storage of explosives, equipment, and other materials;
8. Erosion and sediment control structures;
9. Screening, berms, and proposed plantings; and
10. Location of leak containment structures, in the event of a petrochemical leak or spill.
(c) Map C, end use plan to include:
1. Final grade of proposed site showing elevations and contour lines at two -foot intervals;
2. Location and species of vegetation to be replanted; and
3. Location and nature of any structures to be erected in relation to the end use plan.
(4) A soil erosion and sediment control plan;
(5) A plan for dust and noise control;
(6) A full and adequate description of all phases of the proposed operation to include an estimate of duration of the
mining operation; and
(7) Any other information requested by the Planning Commission or Zoning Administrator.
(D) Use restrictions.
(1) Mining operations shall be an interim use in the Agricultural District.
(2) The crushing, washing, refining or processing, other than the initial removal of material, shall be considered a
separate interim use.
(3) In stone quarries, the production or manufacturing of veneer stone, sills, lintels, cut flagstone, hearthstones, paving
stone and similar architectural or structural stone and the storing or stockpiling of such products on the site shall be
considered a separate interim use.
(4) The manufacture of concrete building blocks or other similar blocks, the production or manufacture of lime products,
the production of ready -mixed concrete and any similar production or manufacturing processes which might be related to the
mining operation shall be considered as a separate interim use.
(5) The crushing, heating, storage, washing, refining, or processing of asphalt or bituminous material for the production
of bituminous asphalt material shall be considered a separate interim use.
(6) A new interim use permit shall be required for any mining operation where the amount of imported material exceeds
the amount of material extracted or the primary use changes from the extraction of aggregate resources to the processing of
materials.
(7) The Planning Commission may impose additional performance standards as part of the interim use permit.
(E) Performance standards.
(1) General provisions.
(a) Weeds and any other unsightly or noxious vegetation shall be cut or trimmed as may be necessary to preserve a
reasonably neat appearance and to prevent seeding on adjoining property.
(b) No sand and gravel operation shall be conducted on parcels of less than 20 acres in size. This limitation shall not
apply when the tract of land is contiguous to an active mining operation, provided that both tracts are being operated by the
same sand and gravel producer.
(c) All equipment used for mining operations shall be constructed, maintained and operated in such a manner as to
minimize, as far as is practicable, noises and vibrations which are injurious or substantially annoying to persons living in the
vicinity. All non -conforming uses shall apply for and obtain an interim use permit.
(d) All hot mix asphalt plants must utilize odor control technology or additives to reduce the odors emitted from the hot
mix asphalt plant. The applicant for a hot mix asphalt plant interim use permit shall state in their application the means and
methods they will be utilizing for effective odor control. Any technologies or products used must be stated in the annual
report if required under § 155.100(I).
(2) Water resources.
(a) The mining operation shall not be allowed to interfere with surface water drainage beyond the boundaries of the
mining operation.
(b) The mining operation shall not adversely affect the quality of surface or subsurface water resources.
(c) Surface water originating outside and passing through the mining district shall, at its point of departure from the
mining site, be of equal quality to the water at the point where it enters the mining site. The mining operator shall perform
any water treatment necessary to comply with this provision.
(3) Safety fencing. Any mining operation adjacent to a residential zone or within 300 feet of two or more residential
structures shall comply with the following standards.
(a) Where collections of water occur that are one and one-half feet or more in depth existing for any period of at least
one month, and occupy an area of 700 square feet or more, all access to such collections of water shall be barred by a fence
or some similarly effective barrier such as a snow fence at least four feet in height.
(b) In locations where slopes occur that are steeper than one foot vertical to three feet horizontal existing for a period
of one month or more, access to such slopes shall be barred by a fence or some similarly effective barrier such as a snow
fence of at least four feet in height.
(4) Mining access roads. The location of the intersection of mining access roads with any public roads shall be selected
such that traffic on the access roads will have a sufficient distance of the public road in view so that any turns onto the public
road can be completed with a margin of safety. Access roads connecting to public roads or highways shall be sufficiently
wide to accommodate two-way hauling traffic. Intersections of public roads with access roads shall be maintained by the
mine operator and shall be kept clean and free from mud, debris or asphalt tracked out from the mining site. Such
intersections shall also be repaired by the mine operator if the public road surface or shoulders have broken down due to
repeated traffic by mining trucks and equipment. The need for turn lanes, road improvements, maintenance, or repair will be
determined by the road authority. Upon written notification from a local road authority directing the repair, maintenance, or
other such actions due to the repeated traffic by mining trucks and equipment, the property owner or operator shall have 14
days to comply with the directives of the local road authority. If the property owner or operator fails to comply within that
time, the Zoning Administrator may suspend any interim mining permit. Any suspension shall be in effect until all conditions
or requirements from the local road authority are brought into compliance. No mining, extraction, or processing activities
shall occur during a suspension.
(5) Screening barrier.
(a) To minimize problems of dust and noise and to shield mining operations from public view, a screening barrier shall
be maintained between the mining site and adjacent residential and commercial properties. A screening barrier shall also be
required between the mining site and any public road within 500 feet of any mining or processing operations. The type and
extent of the barrier shall be set by the Planning Commission. The Planning Commission may waive or alter screening
requirements in this section.
(b) Existing trees and ground cover along public road frontage or property lines shall be preserved and maintained (or
supplemented), for the depth of the roadside or property line setback, except where traffic safety requires cutting and
trimming.
(c) Any trees or shrubs approved for use as a screening barrier must be mature and at least six feet in height. Any
tree or shrub which is overcome with disease or that is deceased must be replaced with a new mature tree at least six feet
in height and of the same type within 30 days. All trees and shrubs must be irrigated as needed to prevent disease or death.
(6) Setback.
(a) Processing of minerals shall not be conducted closer than 100 feet to the property line, nor closer than 500 feet to
any residential or commercial structures located prior to commencement of processing operations. The processing of
minerals shall not be conducted within shoreland principal structure setback distances.
(b) Mining operations, not to include berms or screening barriers, shall not be conducted closer than 30 feet to the
boundary of an adjoining property line.
(c) Unless approved in writing by the applicable road authority, mining operations, not to include berms or screening
barriers, shall not be conducted closer than 30 feet to the right-of-way line of any existing or platted street, road or highway;
except that, excavating may be conducted within such limits in order to reduce the elevation thereof in conformity to the
existing or platted street, road or highway.
(7) Appearance. All buildings, structures and plants used for the production of processing of sand and gravel shall be
maintained in such a manner as is practicable and according to acceptable industrial practice as to assure that such
buildings, structures and plants will not become dangerously dilapidated.
(8) Days and hours of operation.
(a) All mining operations shall be conducted between the hours of 7:00 a.m. and 7:00 p.m. Monday through
Saturday, unless otherwise specified by the Planning Commission;
(b) Any operations not conducted between the hours of 7:00 a.m. and 7:00 p.m. shall require a new or amended
interim use permit. Such permits shall be granted for public or private emergency, for government work required by agency
contracts, or whenever any reasonable or necessary repairs to equipment are required to be made.
(c) Operations shall include the loading and unloading of trucks and the moving and processing of materials. Trucks
may enter the mining site no earlier than 6:00 a.m. and leave the mining site no later than 7:00 p.m. At no time may trucks
park, queue, or stack on public rights -of -way. The Planning Commission may authorize work outside of the restrictions
stated herein as part of an interim use permit hearing.
(d) Operations shall be prohibited on county designated holidays as of January 1, 2023.
(9) Dust and dirt.
(a) All equipment used for mining operations shall be constructed, maintained and operated in such a manner as to
minimize, as far as practicable, dust conditions.
(b) All mining operators will be responsible for providing water or other suitable methods to control dust on roads
utilized by trucks hauling to or from mining operations. Roads that require cleaning or dust control because of mining
operations shall be tended to when conditions warrant, or a potential safety hazard exists.
(c) The Planning Commission may require dust control measures within mining operations when it is determined that
airborne dust from extraction areas, processing activities, stockpiles, internal roads, or other mining related activities may
create a public nuisance. Such dust control measures may include berming, landscaping, or enclosures for processing
equipment.
(10) Signage. An information sign shall be erected at the intersection of the primary access road and the public road
servicing the site identifying the name of the company or landowner responsible for the operations at the site. This sign shall
also include a telephone number(s) for the company or responsible landowner, shall be clearly visible from the public road,
and shall conform to the signage requirements in § 155.097 of this chapter.
(11) Other regulations. All operations must abide by all other local, state, and federal rules, laws, regulations and
provisions. Any violation of these other provisions may result in the revocation of the interim use permit.
(12) Inactivity. In the event less than 10,000 cubic yards of material has been removed from the mining operation in any
five-year period, as indicated through the Aggregate Removal Tax program, the Planning Commission may require a hearing
to review the facility and may terminate the mining permit.
(F) Land rehabilitation. All mining sites shall be rehabilitated immediately after mining operations cease. The Planning
Commission shall review and require a staged reclamation when applicable. Rehabilitation shall be complete within one year
or within the terms specified in the interim use permit. The following standards shall apply.
(1) Within 12 months after completion of mining activities or after termination of the permit, all equipment, vehicles,
machinery, structures, processing plants, materials, and debris shall be removed from the site.
(2) Unless otherwise stated by the Planning Commission, a minimum of four inches of clean, uncontaminated topsoil
shall be placed on all final graded and rehabilitated areas. The peaks and depressions of the area shall be graded and
backfilled to a surface which will result in a gently rolling topography in substantial conformity to the land area immediately
surrounding area, and which will minimize erosion due to rainfall. No finished slope shall exceed 25% in grade.
(3) For reclaimed areas that include water features, the banks of such features shall be sloped to the water line at a
slope no greater than two feet horizontal to one foot vertical.
(4) All restored areas shall be seeded with a mixture consistent with Minnesota Department of Transportation
specifications for rights -of -way or a mixture recommended by the Wright County Soil and Water Conservation District, or
returned to crop production, unless otherwise specified or approved by the Planning Commission.
(5) The finished grade shall be such that it will not adversely affect the surrounding land or future development of the
site upon which mining operations have been conducted. The finished plan shall restore the mining site to a condition
whereby it can be utilized for the type of land use proposed to occupy the site after mining operations cease.
(6) Unless otherwise amended or approved by the Planning Commission, all final grades and site restoration shall be
consistent with Map C, the End Use Plan.
(G) Financial guarantee. The county shall require a performance bond, cash escrow, or irrevocable letter of credit in a
form and from a financial institution acceptable to the county, to guarantee compliance with this chapter and terms and
specifications of the interim use permit. The county shall have the right to use the financial guarantee to remove stockpiles,
complete site rehabilitation, and correct other deficiencies or problems, in the event the owner or operator is in default of the
permit obligations. The amount of financial guarantee shall be equal to $5,000 for every permitted acre or any other amount
deemed acceptable by the Planning Commission. The financial guarantee may be adjusted periodically to reflect ongoing
progress, at the discretion of the Zoning Administrator, and shall remain in full force and effect until all conditions of the
permit have been met, including site restoration.
(H) Exceptions. A mining and extraction permit shall not be required for any of the following:
(1) Excavation for a foundation, cellar, or basement of a building or subsurface sewage treatment system, if such work
has been properly permitted.
(2) Excavation by state, county, city, or township authorities in connection with construction and maintenance of roads,
highways, bridges, or utilities conducted solely within the permanent easement areas or rights -of -way.
(3) Grading and removal of materials in accordance with the development of an approved plat or development, if the
activity was reviewed as part of the approval process.
(I) Annual report. All property owners and operators with an active conditional or interim use permit, regardless of when
the permit was issued, for mining shall submit for the previous year an annual report, on a form as provided by the Office of
Planning and Zoning, to the Zoning Administrator in paper and electronic portable document format ("pdf') on or before
January 31 of each year. The annual report form shall include at a minimum the following:
(1) The actual rate of mining and the remaining minable reserves which includes at a minimum the operating life of the
mine, including the rate of mining and anticipated changes in that rate, and the factors used to determine the minable
reserves and changes which would expand or diminish such reserves;
(2) The actual mining activities including the types, amounts, sequence, and schedule for mining the material on site
and stockpiling materials, including the distinctions among all aggerate resources and waste material;
(3) The actual reclamation activities including the methods, sequence, and schedules of reclamation which address the
goals and meets the requirements of this chapter and any conditions of the permit held on file with the Wright County Office
of Planning and Zoning; and
(4) The amount and type of imported aggregate and imported material brought to the property; and
(5) A map which depicts the status of mining, construction, reclamation, and watershed modifications, at a scale which
is normally used by the operator for the mine planning purposes, which:
(a) defines the shape and extent of the aggregate material which will support the operating life of the mine; and
(b) identifies all known and inferred mineral reserves or resources which are located within the mining area but which
have not been included as part of the mining plan;
(c) identifies lands proposed for use as vegetative reference and screening areas, depict the detailed drainage
patterns for waters which may contact leachable materials; and
(d) depicts at appropriate intervals, approved by the Zoning Administrator, the status of: all mining (including shape,
extent, and content) and reclamation (including contouring, dust control, temporary stabilization, vegetation, and
deactivation) of each: stockpile, basin, mine, drainage control, settling basin, and auxiliary facilities.
(6) Failure to timely file an annual report is prima facia evidence that the gravel operation is inactive.
(Ord. 18-4, passed 6-19-2018; Ord. 23-1, passed 5-2-2023)
§ 155.101 LAND ALTERATIONS.
(A) Permit required.
(1) A land alteration permit shall be required in all cases where excavation, grading and/or filling of any land within the
county would result in a substantial alteration of existing ground contour or would change existing drainage or would cause
flooding or erosion or would deprive an adjoining property owner of lateral support and would remove or destroy the present
ground cover resulting in less beneficial cover for present and proposed development, uses and enjoyment of any property
in the county.
(2) (a) Substantial alteration shall be defined as the extraction, grading or filling of land involving movement of earth
and materials in excess of 50 cubic yards in the shorelands districts, and in excess of 500 cubic yards in all other districts
except drain tiles and ditch cleaning in agricultural areas. Such substantial alteration shall require a conditional use permit.
(b) The creation of wildlife ponds, pollution control structures and erosion control structures shall not require a
conditional use permit, provided that said construction is approved by an official of the Soil and Water Conservation District
and abides by all other applicable rules, regulations and ordinances.
(3) The extraction, grading or filling of land involving the movement of earth and materials in excess of ten cubic yards
within shore, bluff impact zones or steep slopes in shoreland areas shall require an administrative permit, but not a
conditional use permit.
(4) Public road improvement projects, and grading and excavation directly related to such projects (not to include gravel
pits), shall not require a land alteration permit; provided, the work is directly supervised by the County Engineer or the
governing body of a local unit of government.
(5) A land alteration permit is also required from the county and from the Commissioner of Natural Resources for any
alteration in the Floodplain District and the Shorelands Districts. Such alteration shall include any filling, dredging,
channeling or any other work in the beds of public waters which would change the course, current or cross-section of a
public water.
(6) A land alteration permit shall be valid for a period of six months from the date of issue. A land alteration permit shall
be administered in the same manner as a conditional use permit.
(B) Requirements. Before the issuance of a land alteration permit or an administrative land alteration permit, it must be
established that all of the following conditions are met. These conditions must also be adhered to during the issuance of
construction permits, permits, conditional use permits, interim use permits, variances and subdivision approvals.
(1) Grading or filling in any type 2, 3, 4, 5, 6, 7 or 8 wetland must be evaluated to determine how extensively the
proposed activity would affect the following functional qualities of the wetland (this evaluation must also include a
determination of whether the wetland alteration being proposed requires permits, reviews or approvals by other local, state
or federal agencies such as a watershed district, the state's Department of Natural Resources or the United States Army
Corps of Engineers. The applicant will be so advised):
(a) Sediment and pollutant trapping and retention;
(b) Storage of surface runoff to prevent or reduce flood damage;
(c) Fish and wildlife habitat;
(d) Recreational use;
(e) Shoreline or bank stabilization; and
(f) Noteworthiness, including special qualities such as historic significance, critical habitat for endangered plants and
animals or others.
(2) Alterations must be designed and conducted in a manner that ensures only the smallest amount of bare ground is
exposed for the shortest time possible.
(3) Mulches or similar materials must be used, where necessary, for temporary bare soil coverage and a permanent
vegetation cover must be established as soon as possible.
(4) Methods to minimize soil erosion and to trap sediments before they reach any surface water feature must be used.
(5) Altered areas must be stabilized to acceptable erosion control standards consistent with the field office technical
guides of the local soil and water conservation districts and the United States Soil Conservation Service.
(6) Fill or excavated material must not be placed in a manner that creates an unstable slope.
(7) Plans to place fill or excavated material on steep slopes must be reviewed by qualified professionals for continued
slope stability and must not create finished slopes of 30% or greater.
(8) Fill or excavated material must not be placed in bluff impact zones.
(9) Any alterations below the ordinary high water level of public waters must first be authorized by the Commissioner
under M.S. §§ 103G.301 through 130G.315, as it may be amended from time to time.
(10) Alterations of topography must only be allowed if they are accessory to permitted, interim, or conditional uses and
do not adversely affect adjacent or nearby properties.
(11) Placement of natural rock riprap, including associated grading of the shoreline and placement of a filter blanket, is
permitted if the finished slope does not exceed three feet horizontal to one foot vertical, the landward extent of the riprap is
within ten feet of the ordinary high water level, and the height of the riprap above the ordinary high water level does not
exceed three feet.
(C) Connections to public waters. Excavations where the intended purpose is connection to a public water, such as boat
slips, canals, lagoons, and harbors, require a conditional use permit. Permission for excavations may be given only after the
Commissioner has approved the proposed connection to public waters.
(Ord. 18-4, passed 6-19-2018; Ord. 23-1, passed 5-2-2023)
L
Planning Commission Agenda — 06/04/2024
2E. Public Hearing - Consideration of an Amendment Title XV: Land Usage, Chapter 153
Zoning Ordinance, Section 153.091, Use -Specific Standards, as related to Day Care
Centers as a Principal Use in the Industrial & Business Campus (IBC) District.
Applicant: City of Monticello.
Prepared by:
Meeting Date:
Council Date (pending
Community Development Director
6/4/2024
Commission action):
6/24/2024
Additional Analysis by:
City Planner, Community & Economic Development Coordinator
ALTERNATIVE ACTIONS
1. Motion to adopt Resolution No. PC-2024-23 recommending approval of the amendment
related to Use -Specific Standards, as related to Day Care Centers as a Principal Use in the
Industrial & Business Campus based on findings in said resolution.
2. Motion to deny the adoption of Resolution No. PC-2024-23 recommending approval of the
amendment related to Use -Specific Standards, as related to Day Care Centers as a Principal
Use in the Industrial & Business Campus based on findings to be made by the Planning
Commission.
3. Motion to table action on Resolution No. PC-2024-23.
REFERENCE AND BACKGROUND
Property: Legal Description: N/A
PID #: N/A
Planning Case Number: 2024-27
Request(s): Consideration of a request for an amendment to the
Zoning Ordinance addressing Day Care standards as
principal uses.
Deadline for Decision: N/A
Land Use Designation: N/A
Zoning Designation: N/A
1
Planning Commission Agenda — 06/04/2024
Overlays/Environmental
Regulations Applicable: N/A
Current Site Uses: N/A
ANALYSIS
In early 2023, the City adopted a series of zoning ordinance amendments intended to make
clerical corrections to the zoning ordinance and to address changing land use and development
conditions.
At about the same time, an application relating to a day care facility proposed on an 1-1 zoned
parcel was moving through the formal land use review process. Day care facilities were
permitted uses in the Industrial Business Campus (IBC) District at the time of the land use
application and continue to be permitted uses in within the current code. The day care facility
was seeking rezoning to IBC as the zoning ordinance limits day care facilities in 1-1 Districts to
secondary uses within principal use industrial buildings. The application for rezoning of the
applicant's site to IBC was successful.
In a clerical error that was likely intended to address the allowance for day care facilities in the
IBC District based on the prior discussion, the larger zoning ordinance amendment processed
incorrectly. It included the addition of "IBC" within the section of the "day care center"
regulations pertaining specifically to day care uses in 1-1, Light Industrial areas, which limits day
care facilities as secondary uses within an industrial business.
The intent of the City's past discussions and decisions on day care facilities was to specifically
allow these as principal uses in Industrial Business Campus Districts. As such, staff is requesting
the City adopt an ordinance amendment consistent with this direction and correcting the error.
With the change, the Use Table will continue to show day care centers as permitted uses in the
IBC and the applicable regulations will allow day care facilities as a principal use subject to the
principal use requirements of that section.
STAFF RECOMMENDED ACTION
Staff recommends adoption of the proposed amendment. The proposed ordinance is consistent
with the most recent direction of the City in regard to the ability to locate child care facilities
within Industrial Business Campus District.
SUPPORTING DATA
A. Resolution PC-2024-23
B. Ordinance No. XXX, DRAFT
C. Monticello Zoning Ordinance, Excerpt
D. March 7, 2023 Regular Planning Commission Meeting Minutes
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC-2024-23
RECOMMENDING APPROVAL OF AN AMENDMENT TO TITLE XV: LAND USAGE, CHAPTER
153 ZONING ORDINANCE, SECTION 153.091, USE -SPECIFIC STANDARDS, AS RELATED TO
DAY CARE CENTERS AS A PRINCIPAL USE IN THE
INDUSTRIAL & BUSINESS CAMPUS (IBC) DISTRICT
WHEREAS, City staff has identified zoning ordinance language requiring amendment
to correct an error in applicable use standards; and
WHEREAS, City staff has proposed the amendment to the zoning ordinance intended
to address the error and further conformity to the City's goals and policies as identified in
the Monticello 2040 Vision + Plan Comprehensive Plan
WHEREAS, the Planning Commission held a public hearing on June 4, 2024 on the
amendment and the applicant and members of the public were provided the opportunity to
present information to the Planning Commission; and
WHEREAS, the Planning Commission has considered all of the comments and the
staff report, which are incorporated by reference into the resolution; and
WHEREAS, the Planning Commission of the City of Monticello makes the following
Findings of Fact in relation to the recommendation of approval:
1. The Zoning Ordinance amendment provides an appropriate means of
furthering both the intent and the specific goals and policies for land use in
the Monticello 2040 Comprehensive Plan.
2. The proposed amendments eliminate concerns over imprecise language.
4. The proposed amendment is expected to have no negative impacts on
municipal public services.
NOW, THEREFORE, BE IT RESOLVED, by the Planning Commission of the City of
Monticello, Minnesota, that the Planning Commission hereby recommends that the
Monticello City Council approves the Zoning Ordinance amendment, based on the findings
listed above.
ADOPTED this 4th day of June, 2024 by the Planning Commission of the City of Monticello,
Minnesota.
MONTICELLO PLANNING COMMISSION
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
PLANNING COMMISSION
RESOLUTION NO. PC-2024-23
M
ATTEST:
Paul Konsor, Chair
Angela Schumann, Community Development Director
ORDINANCE NO.8XX
AN ORDINANCE AMENDING THE MONTICELLO CITY CODE XV,
CHAPTER 153, MONTICELLO ZONING ORDINANCE,
SECTIONS 153.091 (C) FOR COMEMRCIAL DAY CARE REGULATIONS
THE CITY COUNCIL OF THE CITY OF MONTICELLO ORDAINS:
SECTION 1. § 153.046(E) — Regulations for commercial uses is hereby amended as
follows:
(11) Day care center.
(a) No overnight facilities shall be provided for children served by the daycare.
Children must be delivered and removed from the facility daily.
(b) An outdoor recreational facility:
1. Shall be appropriately separated from the parking lot and driving areas by a
fence not less than four feet in height;
2. Shall be located continuous to the day-care facility;
3. Shall not be located in any yard abutting a major thoroughfare;
4. Shall not have an impervious surface for more than one-half of the playground
area;
5. Shall extend at least 60 feet from the wall of the building or to an adjacent
property line, whichever is less, or shall be bound on not more than two sides by parking
and driving areas; and
6. Shall be a minimum size of 2,000 sq. ft., or in the alternative 75 sq. ft. per
child at licensed capacity, whichever is the greater figure.
(c) All state laws and statutes governing such use are strictly adhered to and all
required operating permits are secured.
(d) In addition to divisions (a) through (c) above, day care centers in the IBC— an
I -I district, —shall adhere to the following additional requirements:
1. Only be allowed as a secondary combination use which complements a
primary business;
2. Only be conducted in the principal building, and not exceed 20% of the total
principal building square footage;
3. Be physically separated from the other activities occurring in the principal
building;
4. Not have a dedicated entrance (other than emergency exits) from the exterior
of the principal building;
5. Not have dedicated off-street parking or signage.
SECTION 2. The City Clerk is hereby directed to make the changes required by this
Ordinance as part of the Official Monticello City Code, Title XV, Chapter
153, Zoning Ordinance, and to renumber the tables and chapters
accordingly as necessary to provide the intended effect of this Ordinance.
The City Clerk is further directed to make necessary corrections to any
internal citations that result from said renumbering process, provided that
such changes retain the purpose and intent of the Zoning Ordinance as has
been adopted.
SECTION 3. This Ordinance shall take effect and be in full force from and after its
passage and publication. The ordinance in its entirety and map shall be
posted on the City website after publication. Copies of the complete
Ordinance and map are available online and at Monticello City Hall.
ATTEST:
Rachel Leonard, Administrator
AYES:
NAYS:
Lloyd Hilgart, Mayor
2
§ 153.090 USE TABLE.
(A) Explanation of use table structure.
(1) Organization of Table 5-1. Table 5-1 organizes all principal uses by use classifications and use types
(a) Use classifications. The use classifications are: agricultural uses; residential uses; civic and institutional uses;
commercial uses; and industrial uses. The use classifications provide a systematic basis for assigning present and future
land uses into broad general classifications (e.g., residential and commercial uses). The use classifications then organize
land uses and activities into specific "use types" based on common functional, product, or physical characteristics, such as
the type and amount of activity, the type of customers or residents, how goods or services are sold or delivered and site
conditions.
(b) Use types. The specific use types identify the specific uses that are considered to fall within characteristics
identified in the use classifications. For example; detached dwellings, parks and recreational areas, and schools are "use
types" in the Single-family Residence District.
(2) Symbols used in Table 5-1.
(a) Permitted Uses = P. A "P" indicates that a use is permitted by right, subject to compliance with all other applicable
provisions of this chapter. Uses may be subject to special regulations as referenced in the "additional requirements" column.
(b) Conditionally Permitted Uses = C. A "C" indicates that a use is permitted provided the city can establish conditions
necessary to ensure the use is compatible to the proposed location and surrounding properties. Inability of the city to
establish conditions to adequately control anticipated impacts is justification for denial of a conditionally permitted use.
Conditional uses may also be subject to special regulations as referenced in the "additional requirements" column.
(c) Interim Permitted Uses = 1. An "I" indicates that a use maybe permitted for a brief period of time provided certain
conditions are met, and a specific event or date can be established for discontinuance of the use. Inability of the city to
establish conditions to adequately control anticipated impacts is justification for denial of an interim permitted use. Interim
permitted uses may also be subject to special regulations as referenced in the "additional requirements" column.
(d) Prohibited Uses = Shaded cells.A shaded cell indicates that the listed use is prohibited in the respective base
zoning district.
(e) Uses not provided for within zoning districts. In any zoning district, whenever a proposed use is neither specifically
allowed nor denied, the use will be considered prohibited in which case an amendment to the ordinance text would be
required to clarify if, where and how a proposed use could be established.
Use Types
"P" = Permitted
"C» _
Conditionally
Permitted
"I" = Interim
Permitted
Base Zoning Districts
Agricultural Uses
Agriculture I P I P I P I P I P I P I P I P I P I P I P I P
Agricultural P
Sales
Community P P P P P P P P P
Gardens
Stables C
Residential Uses
Attached Dwelling Types
r • - ■■■M■M
• • - ■■■M■H
Additional
Requirements
PCD IBC 1 11 1 12
Multiple -
family
See See
Table Ordinance
1=001%
§ 153.091(B)
(1)
§ 153.091(B)
(2)
§ 153.091(13)
(3)
§ 153.091(B)
(4)
§ 153.091(C)
(1)
§ 153.091(C)
(2)(a )
§ 153.091(C)
(2)(b )
§ 153.091(C)
(2)(c )
§ 153.091(C)
(2)(d )
Detached P Dwelling P P P P P
Group
residential P P P P P
facility,
single-family
Group
residential C C C
facility, multi-
family
Mobile and
manufactured C C C P C
home park
Civic and Institutional Uses
Active park
facilities P P P P P P P P P P P P
(public)
1A I No I III None
§ 153.091(C)
(3)
§ 153.091(C)
(3)
§ 153.091(C)
(4)
=OOQm-
TABLE 5-1: USES BY DISTRICT
Use Types
Base Zoning Districts
Additional
Requirements
"P" = Permitted
"C„ _
Conditionally
C
p
Permitted
A
R
R1
R
T
R
R
M
B
B
B
B
I B
11
12
O
A
2
N
3
4
H
1
2
3
4
DC
p
C
"I" = Interim
Permitted
TABLE 5-1: USES BY DISTRICT
Use Types
Base Zoning Districts
Additional
Requirements
"P" = Permitted
„C„ _
Conditionally
I
Permitted
A
R
R
R
T
R
R
M
B
B
B
B
C C D
P C D
B
11
12
O
A
1
2
N
3
4
H
1
2
3
4
C
"I" = Interim
Permitted
Civic and Institutional
Uses
Active park
§ 153.091(D)
facilities
P
P
P
P
P
P
P
(1)
(private)
Assisted living
C
P
C
C
P
§ 153.091(D)
facilities
(2)
Cemeteries
C
C
C
C
C
C
C
§ 153.091(D)
(3)
Clinics/medic
C
P
P
C
None
al services
Essential
P
P
P
P
P
P
P I
P
P
P
P
P
P
P
P
None
services
Hospitals
C
P
P
C
§ 153.091(D)
(4)
Nursing/
§ 153.091(D)
convalescent
C
C
C
C
C
C
C
C
C
C
P
(5)
home
Passenger
C
C
C
C
None
terminal
See
See
Passive parks
Table
Ordinance
and open
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
5- 1A
No.
space
Place of § 153.091(D)
public C C C C C P C (6)
assembly
Public
buildings or C C C C C C C P C C P P C P P § 153.091(D)
uses (�)
Public
warehousing I 1 1 § 153.091(D)
temporary (8)
Schools, K-12 C C C C C C I I § 153.091(D)
(9)
Schools,
higher C
education
Utilities C C CT10)
153.091(D)
(major)
TABLE 5-1: USES BY DISTRICT
Use Types
Base Zoning Districts
Additional
Requirements
"P" = Permitted
„C„=
Conditionally
C
p
Permitted
A
R
R1
R
T
R
R
M
B
B
B
B
/ B
11
12
O
A
2
N
3
4
H
1
2
3
4
p
p
C
"I" = Interim
Permitted
TABLE 5-1: USES BY DISTRICT
Use Types
Base Zoning Districts
Additional
Requirements
"P" = Permitted
„C„=
Conditionally
I
Permitted
A
R
R
R
T
R
R
M
B
B
B
B
C C D
P C D
B
11
12
O
A
1
2
N
3
4
H
1
2
3
4
C
` I" = Interim
Permitted
Commercial Uses
Adult uses
P
P
§ 153.046(T)
Auction house
C
§ 153.091(E)
(2)
Auto repair -
C
C
P
P
§ 153.091(E)
minor
(3)
Automotive
P
C
§ 153.091(E)
wash facilities
(4)
Bed and
C
C
C
C
C
§ 153.091(E)
breakfasts
(5)
Brew pub
P
P
§ 153.091(E)
(6)
Business
support
P
P
P
P
P
None
services
Commercial
P
P
P
§ 153.091(E)
lodging
See
Table
5- 1A
See
Ordinance
(7)
Commercial
self -storage
C
C
§ 153.091(F)
(3)
No.
Communicatio
§ 153.091(E)
ns/
P
P
P
P
(8)
broadcasting
Convenience
C
P
P
LP
§ 153.091(E)
retail
(9)
Country club
C
§ 153.091(E)
(10)
Day care
C
C
C
P
P
C
§ 153.091(E)
centers
(11)
Entertainment/
recreation,
P
P
C
C
C
§ 153.091(E)
indoor
(12)
commercial
Entertainment/
recreation,
C
C
C
C
§ 153.091(E)
outdoor
(13)
commercial
TABLE 5-1: USES BY DISTRICT
Use Types
Base Zoning Districts
Additional
Requirements
"P" = Permitted
C
P
"C„ =
Conditionally
Permitted
A
R
R1
R
T
R
R
M
B
B
B
B
C
C
I B
11
12
O
A
2
N
3
4
H
1
2
3
4
C
"I" = Interim
D
D
Permitted
TABLE 5-1: USES BY DISTRICT
Use Types
Base Zoning Districts
Additional
Requirements
"P" = Permitted
C
P
„C„=
Conditionally
Permitted
A
R
R
R
T
R
R
M
B
B
B
B
C
C
I
B
11
12
O
A
1
2
N
3
4
H
1
2
3
4
C
`I" = Interim
D
D
Permitted
Commercial Uses
Animal
§ 153.091(E)
kennel/boarding
C
C
C
C
(1 �)
(commercial)
Event center
C
C
C
§
153.091(E)14)
Financial
P
P
P
§ 153.091(E)
institution
(15)
Funeral
P
P
§ 153.091(E)
services
(16)
Landscaping/
§ 153.091(E)
nursery
P
(18)
business
Offices,
commercial and
P
P
P
P
P
P
P
§ 153.091(E)
professional
(20)
services
Personal
C
P
P
P
§ 153.091(E)
services
See
See
(22)
Production
brewery or
Table
Ordinance
P
P
§ 153.091(F)
micro- distillery
5- 1A
No.
(12)
without taproom
Production
§ 153.091(E)
brewery or
(23)
micro- distillery
C
C
C
C
C§
153.091(F)
with taproom or
(13)
cocktail room
Recreational
vehicle camp C
site
Repair
establishment
Restaurants
IM■N
■ee11
§ 153.091(E)
(24)
P P § 153.091(E)
(25)
C § 153.091(E)
(26)
TABLE 5-1: USES BY DISTRICT
Use Types
Base Zoning Districts
Additional
Requirements
"P" = Permitted
„C„ =
Conditionally
Permitted
A
R
R1
R
T
R
R
M
B
B
B
B
C
p
I B
11
12
O
A
2
N
3
4
H
1
2
3
4
DC
p
C
"I" = Interim
Permitted
TABLE 5-1: USES BY DISTRICT
Use Types
Base Zoning Districts
Additional
Requirements
"P" = Permitted
„C„ =
Conditionally
I
Permitted
A
R
R
R
T
R
R
M
B
B
B
B
C C D
P C D
B
11
12
O
A
1
2
N
3
4
H
1
2
3
4
C
"I" = Interim
Permitted
Commercial Uses
Retail
commercial
uses (other)
P
P
P
§ 153.091(E)
buildings less
(27)
than 10,000
sq. ft.
Retail
commercial
§ 153.091(E)
uses (other)
C
P
P
(27)
buildings over
10,000 sq. ft.
Retail service
§ 153.048
P
P
P
Specialty
eating
C
P
P
P
§ 153.091(E)
establishment
(28)
s
See
Table
5- 1A
See
Ordinance
No.
Vehicle fuel
sales
C
C
C
§ 153.091(E)
(29)
Vehicle sales
§ 153.091(E)
❑❑
C
and rental
(30)
Veterinary
§ 153.091(E)
C
❑❑
facilities (rural)
(31)
Veterinary
facilities
C
C
C
§ 153.091(E)
(neighborhoo
(31)
d)
LL
Wholesale
P
P
P
None
sales
Industrial Uses
Auto repair -
§ 153.091(F)
major
C
P
P
(1)
Bulk fuel sales
and storage
§ 153.091(F)
(2)
TABLE 5-1: USES BY DISTRICT
Use Types
Base Zoning Districts
Additional
Requirements
"P" = Permitted
„C„ =
Conditionally
Permitted
A
R
R1
R
T
R
R
M
B
B
B
B
C
p
CD
I B
11
12
O
A
2
N
3
4
H
1
2
3
4
DC
C
"I" = Interim
Permitted
TABLE 5-1: USES BY DISTRICT
Use Types
Base Zoning Districts
Additional
Requirements
"P" = Permitted
„C„ =
Conditionally
I
Permitted
A
R
R
R
T
R
R
M
B
B
B
B
C C D
P C D
B
11
12
O
A
1
2
N
3
4
H
1
2
3
4
C
`I" = Interim
Permitted
Industrial Uses
Contractor's
§ 153.091(F)
yard,
y
I
I
I
(4)
temporary
Extraction of
I
I
I
I
I
§ 153.091(F)
minerals
(5)
General
C
P
P
§ 153.091(F)
warehousing
(6)
Heavy
C
§ 153.091(F)
manufacturing
(7)
Industrial
C
P
None
s
services
Industrial self-
§ 153.091(F)
storage
s
C
C
(8)
facilities
See
Table
5-1A
See
Ordinance
No.
Land
reclamation
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
§ 153.091(F)
(9)
Light
§153.091(F)
manufacturing
P
P
P
(10)
Machinery/tru
153.091(F)
ck repair and
C
(11)
(
sales
Recycling and
C
§ 153.091(F)
salvage center
(14)
Truck or
C
§ 153.091(F)
freight terminal
(15)
Waste
§ 153.091(F)
disposal and
C
(16)
incineration
Wrecker and
§ 153.091(F)
towing
C
P
(17)
services
TABLE 5-1A: CENTRAL COMMUNITY DISTRICT (CCD) USES SUB -AREA
Riverfront (A)
Broadway (B)
walnut &
pine (D)
General
Notes
Cedar (C)
CCD
Retail,
Office,
Entertainment
Retail,
supported
large
Housing,
and open
supported b
supp y
by
space
supported
Use Types
space,
entertainment;
housing
retail
by limited
supported by
housing 2nd
and
users,
retail and
retail
services
and retail
services
service
TABLE 5-1A: CENTRAL COMMUNITY DISTRICT (CCD) USES SUB -AREA
Riverfront (A)
Broadway (B)
walnut &
pine (D)
General
Notes
Cedar (C)
CCD
Retail,
Office,
Entertainment
Retail
supported
large
Housing,
and open
supported b
b
space
supported
Use Types
space,
entertainment;
housing
retail
by limited
supported by
housing 2nd
and
users,
retail and
retail
and retail
services
services
service
Additional use requirements applicable per § 153.091
Uses:
Residential Uses
Single- family
P*
CUP
*Upper
floors only
Multi 3 du or under
P*
CUP*
P
*Upper
floors only
*Townhous
es on
Townhouse
CUP
CUP*
CUP
P
Broadway
east of Pine
only
Multi 4-12 du
CUP
CUP
CUP
CUP
Multi 13+ du
CUP
CUP
CUP
CUP
CUP
*Allowed on
ground floor
for
Ground floor
CUP*
P
P
townhouses
on
Broadway
east of Pine
Commercial
Brew Pub <10,000 sq. ft.
P
P
P
P
Brew Pub >10,000 sq. ft.
CUP
P
CUP
P
Commercial Day Care
CUP
CUP
P
Commercial Lodging
P
CUP
CUP
P
Uses:
Commercial
Entertainme nt/Recreation,
<10,000 sq.
Indoor Commercial (including
CUP*
CUP*
CUP*
CUP
ft. only
theaters)
Entertainme nt/Recreation
Outdoor Commercial
Subject to §
Event centers
CUP
CUP
CUP
CUP
CUP
153.091(F)
(14 )
Funeral services
CUP
Personal services
P
P
P
P
CUP
Places of public assembly
CUP
CUP
CUP
CUP
CUP
Production brewery/ taproom
P
P
P
P
Micro- distillery/ cocktail room
P
P
P
P
Professional office - services
CUP*
P
P
P
P
Upper floors
and retail
preferred
CUP* - not
P/CUP* on
P/CUP*
Upper floors
Commercial office
allowed on
ground
on ground
P
preferred
ground floor
floor
floor
Financial
P
P
P
P
Drive thru
by CUP
Restaurants, bars <10,000
P
P
P
P
CUP
sq. ft.
Restaurants, bars > 10,000
CUP
P
CUP
P
CUP
sq. ft.
Retail Sales <10,000 sq. ft.
P
P
P
P
P
Retail Sales >10,000 sq. ft.
CUP
CUP
CUP
P
CUP
Retail with service
CUP
P
P
P
P
Specialty Eating
Establishments <10,000 sq.
P
P
P
P
CUP
ft.
Vehicle fuel sales
CUP
Veterinary facilities < 10,000
CUP
CUP
CUP
CUP
No outdoor
sq. ft.
uses
Industrial Uses
Industrial PUD
PUD Only
PUD Only
Civic and Institutional Uses
Clinics/ medical services
CUP
CUP
P
P
Public buildings or uses (incl.
P
CUP
P
CUP
CUP
public parks)
Schools Pre- K-12
CUP
CUP
CUP
TABLE 54B THE POINTES AT CEDAR DISTRICT (PCD)
See § 153.048
(Ord. 762, passed 8-23-2021; Ord. 780, passed 7-25-2022; Ord. 791, passed 11-14-2022; Ord. 797, passed 2-13-2023;
Ord. 799, passed 2-27-2023; Ord. 804, passed 8-14-2023)
street.
1. A hotel or motel shall have its principal frontage, access, and orientation direction on an arterial street or collector
2. Vehicular access from a local residential street is prohibited.
3. No more than one security or caretakers quarters may be provided on the site, and such quarters shall be
integrated into the building's design.
(b) In the CCD District, the following additional standards shall apply:
1. The principal building lot coverage is no less than 50% of the property, exclusive of easements devoted to public
pedestrian use or other outdoor public spaces.
2. The building, site, and signage meet the standards for the "CCD" District.
3. The proposed use demonstrates compatibility and consistency with the City's Comprehensive Plan and as
detailed in the Comprehensive Plan Amendment entitled "Downtown Monticello Small Area Plan."
(8) Communications/broadcasting. All communication antennas, antenna support structures and satellite dishes shall
adhere to the applicable accessory use requirements for such outlined in § 153.092.
(9) Convenience retail. In the B-1 zoning district, the following conditions shall apply:
(a) The site is adequately served by a collector street.
(b) Access point to the site shall be limited to a collector street.
(c) Conformity with the surrounding neighborhood is maintained.
(d) Adequate screening and landscaping from neighborhood residential districts is provided in accordance with this
chapter.
(e) Traffic generated by the proposed use does not exceed the capacity of surrounding streets and intersections to
accommodate it.
(f) The site shall conform to parking requirements as provided in this chapter.
(g) Building setback from residential uses must be 30 feet or greater.
(h) Parking lot setback from residential uses must be 15 feet or greater.
(i) The site shall conform to signage requirements as recommended by the city. At no time shall the signage exceed
the requirements as provided in this chapter.
Q) The site shall conform to lighting requirements as provided in this chapter. The lighting shall be restricted to be
consistent with the hours of operation, within one half hour of open and close times.
(k) The hours of operation shall be limited to 6:00 a.m. to 9:00 p.m., except as may be approved by conditional use
permit.
(1) In addition to the above requirements, if in the CCD, the following conditions shall apply:
1. Building architecture shall be designed to reflect retail street -level architecture as defined in the City's
Comprehensive Plan, and detailed in the Comprehensive Plan Amendment entitled "Downtown Monticello Small Area Plan."
2. Site planning shall maximize building exposure to the street.
3. Drive -through facilities shall be located to minimize their exposure to the street.
4. Accessory structures, including canopies, menu boards, pay windows, and other structures supporting drive -
through functions shall be constructed of materials to match those of the principal building.
5. Site planning shall be designed to emphasize connections to pedestrian facilities.
(10) Country club.
(a) The principal use, function, or activity is open, outdoor in character.
(b) Not more than 5% of the land area of the site be covered by buildings or structures.
(c) When abutting a residential use, the property shall be screened with at least an aesthetic buffer Table 4-2, Buffer
Type "B") in accordance with § 153.060(G).
(d) The land area of the property containing such use or activity meets the minimum established for the districts.
(11) Day care center.
(a) No overnight facilities shall be provided for children served by the daycare. Children must be delivered and
removed from the facility daily.
(b) An outdoor recreational facility:
1. Shall be appropriately separated from the parking lot and driving areas by a fence not less than four feet in
height;
2. Shall be located continuous to the day-care facility;
3. Shall not be located in any yard abutting a major thoroughfare;
4. Shall not have an impervious surface for more than one-half of the playground area;
5. Shall extend at least 60 feet from the wall of the building or to an adjacent property line, whichever is less, or
shall be bound on not more than two sides by parking and driving areas; and
6. Shall be a minimum size of 2,000 sq. ft., or in the alternative 75 sq. ft. per child at licensed capacity, whichever is
the greater figure.
(c) All state laws and statutes governing such use are strictly adhered to and all required operating permits are
secured.
(d) In addition to divisions (a) through (c) above, day care centers in the IBC and 1-1 district, shall adhere to the
following additional requirements:
1. Only be allowed as a secondary combination use which complements a primary business;
2. Only be conducted in the principal building, and not exceed 20% of the total principal building square footage;
3. Be physically separated from the other activities occurring in the principal building;
4. Not have a dedicated entrance (other than emergency exits) from the exterior of the principal building;
5. Not have dedicated off-street parking or signage.
(12) Entertainment/recreation —indoor commercial.
(a) No auctions shall take place on the premises.
(b) Outdoor storage shall be prohibited.
(c) Noise shall be controlled consistent with the standards of this chapter.
(d) When abutting a residential use, the property shall be screened with an aesthetic buffer (Table 4-2, Buffer Type
"B") in accordance with § 153.060(G).
(13) Entertainment/recreation — outdoor commercial.
(a) When abutting a residential use, the property shall be screened with at least a semi -opaque buffer fable 4-2,
Buffer Type "C") in accordance with § 153.060(G).
(b) Adequate measures to contain the proposed activity on the subject site shall be provided.
(c) Dust and noise are controlled consistent with City Ordinance.
(d) No auctions shall take place on the premises.
(e) Hours of operation shall be limited to 7:00 a.m. to 10:00 p.m..
(f) All lighting shall be in compliance with §153.063.
(14) Event centers.
(a) Proximity to residential uses. Property upon which event centers are located shall not abut residentially zoned
property, with the exception of R-3 and R-4 zoned properties.
(b) Parking. Off-street parking for event centers shall be provided in accordance with §153.067.
(c) Event size. Event centers shall be allowed a maximum event size as specified by the conditional use permit.
(d) Number of events.
1. Event centers in the B-3 and B-4 District are not restricted in the number of events allowed unless restricted by
the conditional use permit.
2. Event centers in the B-2 District maybe limited to certain days or number of events by the City Council per the
conditional use permit.
(e) Hours of operation. Event center hours of operation shall be as established by the City Council per the conditional
use permit.
(f) Noise regulations. Event centers shall be subject to the noise -related provisions of City Code.
(g) Food regulations. Event centers may serve food and beverages as an accessory activity in accordance with all
applicable federal, state, and city regulations.
MINUTES
REGULAR MEETING - MONTICELLO PLANNING COMMISSION
Tuesday, March 7, 2023 - 6:00 p.m.
Mississippi Room, Monticello Community Center
Commissioners Present: Paul Konsor, Andrew Tapper, Eric Hagen, Melissa Robeck
Commissioners Absent: Teri Lehner
Council Liaison Present: Charlotte Gabler
Staff Present: Angela Schumann, Steve Grittman (NAC), Hayden Stensgard, and
Ron Hackenmuelier
1. General Business
A. Call to Order
Planning Commission Chair Paul Konsor called the regular meeting to order at
6:04 p.m.
B. Consideration of approving minutes
a. Joint Workshop Meetine Minutes—February7. 2023
ANDREW TAPPER MOVED TO APPROVE THE FEBRUARY 7, 2023 JOINT
WORKSHOP MEETING MINUTES. PAUL KONSOR SECONDED THE
MOTION. MOTION CARRIED UNANIMOUSLY, 4-0.
b. Regular Meeting Minutes —February 7. 2023
ANDREW TAPPER MOVED TO APPROVE THE FEBRUARY 7, 2023
REGULAR MEETING MINUTES. PAUL KONSOR SECONDED THE
MOTION. MOTION CARRIED UNANIMOUSLY, 4-0.
C. Citizen Comments
None
D. Consideration of adding items to the agenda
None
E. Consideration to approve agenda
ANDREW TAPPER MOVED TO APPROVE THE MARCH 7, 2023 REGULAR MEETING
AGENDA. PAUL KONSOR SECONDED THE MOTION. MOTION CARRIED
UNANIMOUSLY, 4-0.
2. Public Hearings
A. Consideration of an Amendment to the Monticello Zonine Ordinance Related
to Retail Rental Uses Including, but not Limited to Definition, Zoning Districts
and Standards
Applicant: Michelle Rice
City Planner Steve Grittman provided an overview of the agenda item to the
Planning Commission and the public. This item was brought forth after an inquiry
from General Rental Center, an existing business in Monticello looking to expand
operations into a new facility. It was found that retail uses specific to rental
service was not included in the Zoning Code language. The requested text
amendment would add language to include a rental aspect to the "retail
commercial uses (other)" definition within the Monticello Zoning Ordinance
Mr. Konsor asked if there are any additional, unforeseen items that would be
allowed to be rented out with the proposed ordinance. Mr. Grittman clarified
that the items currently allowed to be sold at a retail establishment by ordinance
are the limitations to what can be rented.
Councilmember Charlotte Gabler asked if Planned Unit Developments would be
affected by this proposed ordinance. Mr. Grittman noted that it would depend
on the language given to the specific Planned Unit Developments. If the PUD
language included provision for "retail commercial uses (other)" or the base
zoning district of the PUD allows "retail commercial uses (other)", it would then
be permitted in the PUD.
Councilmember Gabler asked if auto sales establishments within the city would
be affected by the proposed ordinance. Mr. Grittman clarified that the auto sales
establishments are classified as a separate use, and would not be affected by the
proposed ordinance.
Councilmember Gabler asked if staff and Planning Commissioners discussed
amendments related to retail uses in 2022. Community Development Director
Angela Schumann clarified that staff and Planning Commissioners did review
potential amendments in 2022, and subsequently approved an ordinance
amendment related to retail. The rental aspect of retail uses was not
acknowledged at that time, nor at the time of adoption of the new code in 2011.
Mr. Konsor opened the public hearing portion of the agenda item
Mr. Konsor closed the public hearing portion of the agenda item.
PAUL KONSOR MOVED, TO ADOPT RESOLUTION NO. PC-2023-07
RECOMMENDING APPROVAL OF ORDINANCE NO. X FOR AMENDMENT TO THE
MONTICELLO ZONING ORDINANCE RELATED TO RETAIL RENTAL USES, SECTION
153.012, DEFINITIONS, BASED ON THE FINDINGS IN SAID RESOLUTION. ANDREW
TAPPER SECONDED THE MOTION. MOTION CARRIED UNANIMOUSLY, 4-0.
Ms. Schumann noted the item was anticipated to be included in the City Council
consent agenda at their regular meeting on March 271h, 2023.
B. Consideration of an Amendment to the Monticello Lakes Planned Unit
Development District affecting Parkin¢. accessory buildings, lot coverage and
related site impacts.
Applicant: Monticello Lakes, U.C.
Mr. Grittman provided an overview of the agenda item to the Planning
Commission and the public. Originally approved by the City Council in December
of 2021, the amendment request was specifically related to the removal of the
approved resident parking garages on site. The amendment also addressed a
change in the configuration of the clubhouse on site as well. An updated
landscape plan was also included in the proposed changes, due to the added
greenspace on site following garage removal.
Mr. Konsor opened the public hearing portion of the agenda item.
Mr. Konsor closed the public hearing portion of the agenda item.
ANDREW TAPPER MOVED TO ADOPT RESOLUTION NO. PC-2023-08
RECOMMENDING AN AMENDMENT TO THE MONTICELLO LAKES PLANNED UNIT
DEVELOPMENT DISTRICT, AMENDING THE APPROVED PLANS FOR SAID PUD,
BASED ON THE FINDINGS IN SAID RESOLUTION AND WITH CONDITIONS AS
LISTED IN EXHIBIT Z OF THE STAFF REPORT OF MARCH 7, 2023. PAUL KONSOR
SECONDED THE MOTION. MOTION CARRIED UNANIMOUSLY, 4-0.
Ms. Schumann noted the item was anticipated to be included in the City Council
consent agenda at their regular meeting on March 131h, 2023.
C. Consideration of an Amendment to the Monticello 2040 Vision + Plan
(Comprehensive Plan). Chapter 3. "Land Use, Growth and Orderly Annexation'.
re -guiding certain parcels from their existing Industrial designations to
alternative Industrial. Employment, and Commercial categories, and amending
the text of the Plan to add flexibility for implementation of the Plan's goals and
land use objectives.
Applicant: City of Monticello
Mr. Grittman provided an overview of the agenda item to the Planning
Commission and the public. This item arose from a discussion related to item 2D
of the current agenda, where the subject site does not meet the current land use
guidance and zoning for the applicant's proposed use. It was then understood
that the properties east of Edmonson Avenue, north of Chelsea Road and south
of Interstate 94, as well as properties in the vicinity along the eastern side of
Fallon Avenue NE, had Comprehensive Plan land use designations that did not
match the companion zoning districts respective to each property. The request
was directly related to correcting what staff believed to have been an error
during the drafting of the Monticello 2040 Vision + Plan. The amendments
requested are to re -guide the land use designation for the properties listed
within the staff report from General Industrial, to Light Industrial Park or
Regional Commercial, depending on the sites' current zoning district.
Eric Hagen asked why the parcel at 108 Thomas Circle was not being considered
to be re -guided as Regional Commercial. Mr. Grittman clarified that the reason
this property was proposed to change designation from General Industrial to
Light Industrial Park was due the current zoning district of the property is 1-1,
Light Industrial District, which is reflective of the Light Industrial Park
designation.
Andrew Tapper did not agree with some of the parcels listed to be re -guided, as
he felt certain parcels reflected the General Industrial designation more so than
the proposed Light Industrial Park designation.
Mr. Grittman noted that the intent of Light Industrial Park zoning designation is
in part to act as a buffer between General Industrial and Regional Commercial
designations. Though the existing uses on those properties may not reflect the
designation, it is anticipated that as uses change, those properties would become
more conforming with their respective designations and the transitional area in
which they are located.
Ms. Schumann added that the properties in question had been historically zoned
1-1, Light Industrial, and the land use designations are established as a guide for
future uses on a given site.
Councilmember Gabler asked what the guidance of the location for the new
Wiha Tools facility is anticipated to be. Ms. Schumann clarified that the existing
zoning district for the site is Industrial Business Campus (IBC), and the property's
land use designation in the Comprehensive Plan is Employment Campus.
Councilmember Gabler noted that it is reasonable to re -guide the properties but
questioned whether the Employment Campus designation would be more fitting
than the proposed Light Industrial Park designation. Ms. Schumann had clarified
that the reason staff proposed re -guidance to Light Industrial Park was directly
related to the current zoning districts of the properties. The 1-1, Light Industrial
zoning district directly correlates to Light Industrial Park designation within the
Comprehensive Plan.
Councilmember Gabler asked where General Industrial is currently designated
within the City. Ms. Schumann noted that the Oakwood Industrial Park is still a
designated area for General Industrial, and there are pages within Chapter 3 of
the Comprehensive Plan that break down land use designations by acreage. One
reason for the limitation of General Industrial guidance within the 2040 Plan is
the city's focus on job and tax base creation, which occurs more often at a higher
rate or density in Light Industrial Park and Employment Campus designations.
Councilmember Gabler asked whether if it is necessary to continue including the
General Industrial designation in the Comprehensive Plan. Ms. Schumann
explained it is important to continue including General Industrial as a
designation, due to the need for a designated location for business that fit the
standards established by the designation in the Comprehensive Plan.
Mr. Tapper reiterated that he did not necessarily see the need to re -guide certain
parcels away from General Industrial if the current uses on site reflect that
designation.
Mr. Grittman noted that the main differences between light and heavy industrial
users has to do with external impacts of the use on a given site.
Ms. Schumann also noted that land use guidance is the broad land use plan, but
the existing zoning of a property is what controls the property in terms of uses
and standards. The parcels in question to be re -guided to Light Industrial Park are
already zoned the corresponding 1-1, Light Industrial.
Mr. Konsor noted a page within Chapter 3 of the Comprehensive Plan that uses
Polaris as an example of a General Industrial use. Ms. Schumann noted that it is
more likely that use is Light Industrial in nature, although it would also be
allowed in General Industrial areas.
Mr. Hagen noted that even though Polaris is an example of General Industrial,
the guidance of the land could be different, due to the Comprehensive Plan
acting as a future plan for property within the City.
Mr. Tapper raised the question of why there is separate guidance for Light
Industrial Park and General Industrial, and why those two are not bunched in to
one designation.
Mr. Hagen noted the broadness of the 2008 Comprehensive Plan, with guidance
like Places to Work, Places to Shop, and Places to Live, then narrowing down of
classification to what they are now provides a more established future plan for
the City. The more detailed designation also provides potential businesses to
easily understand where within the City their business would fit in with the long-
term Comprehensive Plan.
Mr. Konsor asked if all the parcels included in the discussion are currently zoned
1-1, Light Industrial. Ms. Schumann clarified that parcels proposed to be re -
guided to Light Industrial Park are currently zoned 1-1, Light Industrial. The
parcels proposed to be re -guided to Regional Commercial are currently zoned B-
4, Regional Business District.
Ms. Schumann also noted that the detailed designations compared to
designations in prior Comprehensive Plan is to address the fact that they also
serve a purpose to promotes other sections and goals of the Comprehensive
Plan.
Mr. Konsor opened the public hearing portion of the agenda item.
Mr. Grittman reiterated that the amendments proposed include the changes to
the Land Use Designation map in within Chapter 3 of the Comprehensive Plan as
well as a change the text within Chapter 3 to broaden the inclusivity of the Light
Industrial Park designation to include both 1-1, Light Industrial, and IBC districts.
Mr. Tapper asked if there is already a designation in the Comprehensive Plan that
reflects the IBC zoning district already. Mr. Grittman clarified that the
Employment Campus designation currently reflects the IBC zoning, but the
intention of the text amendment proposed would be to include the IBC under
the Light Industrial Park designation.
Mr. Konsor closed the public hearing portion of the agenda item.
Mr. Konsor noted that he was indifferent on the decision at hand
Councilmember Gabler asked if there was ever a discussion of a
business/industrial flex designation in the Comprehensive Plan, or if there is one
already established. Ms. Schumann clarified that the flexibility within the current
designations was discussed at the time of the Comprehensive Plan drafting, and
that the intention was to include both commercial and industrial uses within the
Employment Campus designation, but not to include those same commercial
uses within any of the Industrial designations.
Ms. Schumann added that if the Planning Commission was ever interested in
looking at the Comprehensive Plan further, they have the authority to direct staff
to prepare information on it and bring continue this discussion at a workshop
meeting in the future.
Mr. Tapper noted he understood the intention of he proposed amendments to
the Comprehensive Plan following the discussion. Mr. Tapper was interested in
the idea of bringing the discussion had to a subsequent workshop meeting to
further discuss.
ANDREW TAPPER MOVED TO ADOPT RESOLUTION NO. PC-2023-09,
RECOMMENDING APPROVAL OF AMENDMENTS TO THE COMPREHENSIVE PLAN
LAND USE MAP AND CATEGORIES REGUIDING CERTAIN PROPERTIES FROM
GENERAL INDUSTRIALTO LIGHT INDUSTRIAL PARK, AND AMENDING THE TEXT OF
THE PLAN TO ADD FLEXIBILITY FOR IMPLEMENTATION OF THE PLAN'S GOALS
AND LAND USE OBJECTIVES, BASED ON THE FINDINGS IN SAID RESOLUTION.
PAUL KONSOR SECONDED THE MOTION. MOTION CARRIED UNANIMOUSLY, 4-0.
ANDREW TAPPER MOVED TO ADOPT RESOLUTION NO. PC-2023-10
RECOMMENDING APPROVAL OF AMENDMENTS TO THE COMPREHENSIVE PLAN
LAND USE MAP AND CATEGORIES REGUIDING CERTAIN PROPERTIES FROM
GENERAL INDUSTRIAL TO REGIONAL COMMERCIAL FOR IMPLEMENTATION OF
THE PLAN'S GOALS AND LAND USE OBJECTIVES, BASED ON THE FINDINGS IN SAID
RESOLUTION. PAUL KONSOR SECONDED THE MOTION. MOTION CARRIED
UNANIMOUSLY, 4-0.
Ms. Schumann mentioned this item would go forth to the City Council for final
decision on March 27, 2023, and the City Council will be informed of the
discussion on the item at the Planning Commission meeting.
D. Consideration of an Amendment to the Monticello 2040 Vision + Plan
(Comprehensive Plan). Chapter 3. "Land Use. Growth and Orderly Annexation"
as related to Future Land Use Designations and Mao: Consideration of Rezoning
108 Thomas Circle from 1-1, Light Industrial District to Industrial Business
Campus (IBC) District.
Applicant: Darrin Juve
Mr. Grittman provided an overview of the agenda item to the Planning
Commission and the public. The applicant sought rezoning of the parcel to
accommodate the operation of a head start facility at 108 Thomas Circle. With
the current zoning of the property being 1-1, Light Industrial, it limits the ability of
a childcare use to a conditional use that must be accessory to a principal
industrial use at the same location. The rezoning to IBC would allow them to
operate in compliance, as a childcare facility use is permitted as a principal use in
the IBC district. The concurrent request would be to amend the Comprehensive
Plan so that the land use designation of the parcel would correspond with the
proposed rezoning.
Ms. Schumann noted that the prior item did not re -guide 108 Thomas Circle, so
that it is necessary for the Planning Commission to act on the Comprehensive
Plan amendment specific to this parcel. Staff also provided information related
to the state of child care within Wright County to the Planning Commissioners for
reference. This information has since been added to the agenda on the City of
Monticello's website.
Mr. Konsor opened the public hearing portion of the agenda item.
Dean Williamson, of Frauenshuh Inc., on behalf of the applicant, addressed the
Planning Commission and the public, noting they were in attendance if any
questions arose.
Councilmember Gabler asked for clarification on how the group seeking to
occupy the building would be considered a childcare facility under the Zoning
Ordinance language, rather than a school. Mr. Grittman clarified that the
Monticello Zoning Ordinance defines schools as K-12 programs, under the
current language of the code, preschools and other head start programs are
defined as childcare facilities.
Mr. Konsor closed the public hearing portion of the agenda item.
Ms. Schumann noted that the decision for amending the Comprehensive Plan
related to this agenda item does not include what designation to re -guide this
parcel to. Staff recommended a re -guidance to Light Industrial Park. With the
prior item being recommended for approval, it would then correspond with the
rezoning request to IBC.
ANDREW TAPPER MOVED TO ADOPT RESOLUTION NO. PC-2023-11
RECOMMENDING APPROVAL OF AN AMENDMENT TO THE MONTICELLO 2040
VISION + PLAN (COMPREHENSIVE PLAN), CHAPTER 3, "LAND USE, GROWTH AND
ORDERLY ANNEXATION" AS RELATED TO THE FUTURE LAND USE DESIGNATIONS
AND MAP, BASED ON THE FINDINGS IN SAID RESOLUTION. PAUL KONSOR
SECONDED THE MOTION. MOTION CARRIED UNANIMOUSLY, 4-0.
PAUL KONSOR MOVED TO ADOPT RESOLUTION NO. PC-2023-12
RECOMMENDING ADOPTION OF ORDINANCE NO. X, REZONING 108 THOMAS
CIRCLE FROM 1-1, LIGHT INDUSTRIAL DISTRICT TO INDUSTRIAL BUSINESS
CAMPUS (IBC), BASED ON FINDINGS IN SAID RESOLUTION. ANDREW TAPPER
SECONDED THE MOTION. MOTION CARRIED UNANIMOUSLY, 4-0.
Ms. Schumann mentioned this item would move forward to the City Council for
final decision on March 27. 2023.
Before the Planning Commission proceeded to the regular agenda to discuss
whether the Comprehensive Plan item on the agenda should be further
discussed at a workshop meeting in the future. The consensus was to plan for a
workshop in the future.
3. Regular Agenda
A. Consideration of Community Development Director's Report
Ms. Schumann provided an overview of the agenda item to the Planning
Commission and the public.
Chief Building Official/Zoning Administrator Ron Hackenmueller addressed the
Planning Commission regarding a personnel change within the Building
Department. Building Inspector Bob Ferguson steeped into a new position as
Building Official/Fire Inspector to assist with the restarting of the fire inspection
program. The Building Department is also adding a third building inspector to the
department following the personnel change noted.
4. Added Items
None
S. Adjournment
MELISSA ROBECK MOVED TO ADJOURN THE REGULAR MEETING OF THE MONTICELLO
PLANNING COMMISSION. ANDREW TAPPER SECONDED THE MOTION. MOTION CARRIED
UNANIMOUSLY, 4-0. MEETING ADJOURNED AT 7:50 P.M.
Recorded By: Hayden Stensgard �'
Date Approved: April 4, 2023
ATTEST:
J"ILL==:�
Angela SchulAankiXommunity Development Director
-jlMonticello
BUILDING SAFETY 8. CODE
ENFORCEMENT DEPARTMENT
Serving residents and businesses by supporting new
construction projects, renovation of existing properties,
and building expansion within the City of Monticello.
City Staff:
• Ron Hackenmueller —Chief Building Official
• Kim Sipprell —Bldg. Dept. Coordinator /
Inspector (6 mo. Full Time)
• Bob Ferguson —Inspector /recently
promoted to Fire Inspector (4yrs)
• Wayne Kalla —Inspector (2.5 yrs)
• Mark Gerber— Inspector (1 yr)
2023
P41X
CITY OF
Montic
I
KEEPING OUR
COMMUNITY
BEAUTIFUL:
Helpful information from Monticello's
Department of Building Safety
16
A
CITY (_)I
Monticello
BUILDING SAFETY
Department Brochures: these are handed out to the public and explain
what our department does, offers detailed descriptions of public
nuisances/blights, enforcement, and how they can make a report.
n
u
• Dedicated to user-friendly, professional
customer service
• Providing comprehensive, clear and
consistent education and information
• Supporting stakeholders' ability to achieve
their building objectives
• Maintaining compliance with building, fire,
and city codes
CITY OF
Monticello
70,000,000.00
I-TOWSTOTSYSTOTS] Me
50,000,000.00
40,000,000.00
30,000,000.00
. vusw ...
10,000,000.00
Valuation of work being completed
59,426,683.00
2011 2012 2013 2014 2015 2o16 2017 2o18 2019 2020 2021 2022 2023
Revenue vs. Budgeted Expenses
Including Rental License Revenue
$1,000,000
$900,000
$800,000
$700,000
$600,000
$500,000
$400,000
$300,000
$200,000
$100,000
$o
2011 2012 2013 2014
■ Revenue Totals
111111
2015 2oi6
■ Expense Totals
11111111111
2017 2o18 2019 2020
■ Net Revenue Totals
Imm MEW ■■I
2021 2022 2023
Total Building Permits Issued
2012 2013 2014 2015
zo16
4500
4000
3500
3000
2500
2000
1500
l000
500
0
Total Numbe
Inspec
1333
1117
2011 2012
1917
16o6
r of Building
tions
�467 2437
2100
2076 2048
3212
3802
2965
3836
3 2014 2015 2o16 2017 2o18 2019 2020 2021 2022 2023
■ Totals
New Con
Single Fa
100
90
8o
70
6o
50
40
30
20
10
0
72
struction House Permits:
mily Attached and Detached
95
61 4
58 6
5
44
2014 2015 2016 2017 MA 2019
2023 22 Single Family Detached
22 Single Family Attached units
44
35
2020 2021 2022 2023
online Permit
Our online
permits went
live in August
2021.
In 2022 we
issued
a total
of
471 online
permits.
In 2023 we
issued
a total
of
465 online
permits; 36% of
Total
Permits Issued
HOW IT WORKS:
• They apply for their basic "over the counter"
permits on our website. (permits that do not
require a plan review)
• They then receive an e-mail with a link for
them to pay for their permit.
• Once they pay, they receive another e-mail
which has their permit attached.
• Then their application and permit
automatically gets filed into Laserfiche.
Application
Permit
Rental Ordinance & Licensing
Purpose: To maintain our current housing stock in a safe,
healthy, and code compliant status.
• Benefits property owners, renters, and the community
• Rental Ordinance has been in place since 2007
• Continued efforts maintain a responsive and efficient
program.
1.
Rental Applications Received
600
500
399
400
358
300
200
100
494 486
68
434 446 40 4� 421 425 0 ■ ■
o
2011 2012 2013 2014 2015 2o16 2017 2018 2019 2020 2021 2022 2023
460 Properties with total of 1932 Rental Units
Rental Fee Collected
$70,000.00
$60,OOo.oO $58,565.00
$49,ozo.00 $49,600.00
$50,000.00 $47,645.00
$46,959•00
$45,235•00 $45,210.00 $45,500.00
$43,67i.00 $
$42,835.0044,110.00
$40,000.00 $38,850.00 . 0
.
$30,000.00
$ 20, 000.00
$1O,000.00
$0.00
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
450
400
350
300
276
250
zoo
150
100
50
0
Single Family Home Rentals
343
313
358
349
EM
319
331
324
394 387 386
2012 2013 2014 2015 2o16 2017 2o18 2019 2020 2021 2022 2023
Number of Rental Inspections
•In 2023 we performed a total of 1519
Rental Initial Inspections and
Re -inspections combined for our odd
addresses
•A reminder that inspections are
completed on an odd/even address basis
year to year
The City Adopts Codes and Zoning Policies to Protect the Health, Safety,
and Quality of Life of Monticello Residents.
Enforcement of these Regulations Results in a More Beautiful Community,
Stable Neighborhoods, and a Safe, Secure, and Balanced Environment.
NNW
nn nnnn
Vo Mow May
City Council approved `No Mow May' in
Monticello again for 2024.
This approval suspends nuisance
enforcement for grass lengths per City
Ordinance 91.06 for the month of May.
The goal of No Mow May is to allow grass
to grow unmown for the month of May,
creating habitat and forage for early season
pollinators.
Please note: if you plan on participating,
enforcement will resume June 1 and all
lawns must be maintained. For more
information visit our website at
www.ci.monticello.mn.us/541
HOW TO HELP
OUR12MM000
NO
MOW
MAY
vQP°�M'S
�NBE 0 p`g�
/ CITY OF
Monticello
PLANT BEE
FLOWERS/
NATIVE
PLANTS
pFS BFF.
FR�� pF
•11111111111 [are I N Is
SPRING NUISANCE REMINDERS
THE EXTERIOR OF RESIDENTIAL PROPERTIES MUST BE FREE OF THE FOLLOWING
JUNK VEHICLES
AM
makk
Ij
r.
,. , fOR MORE INFORMATION VISIT OUR WEBSITE:
WWW.CI.MONTICELLO MN.US/348/NUISANCE-BLIGHTS
SPRING NUISANCE REMINDERS
THE EXTERIOR OF RESIDENTIAL PROPERTIES MUST BE FREE OF THE FOLLOWING
NON -TRASH ITEMS
,, I� FOR MORE INFORMATION VISIT OUR WEBSITE:
W WW.CI.MONTICELLO MN US/348/NUISANCE-BLIGHTS
SPRING NUISANCE REMINDERS
THE EXTERIOR OF RESIDENTIAL PROPERTIES MUST BE FREE OF THE FOLLOWING:
VEGETATION
•r
FOR MORE INFORMATION VISIT OUR WEBSITE:
WWW.CI.MON7ICfLLO.MN.US/348/NUISANCE•BLIGHTS
Public Nuisance
Since the transition to
a complaint -only -basis,
generally fewer
violations cited.
In the last few years,
the property
maintenance concerns
have been increasing.
700
600
500
400
300
200
100
0
623
505
142
225
2010 2011 2012 2013 2014 2015 2o16 2017 2o18 2019 2020 2021 2022 2023
Number of Blights Mowed by Contractor
In 2010 and 2011 the numbers were higher because the City
conducted a "sweep" every spring.
"REPORT A PROBLEM"
ONLINE NUISANCE REPORTING
Added "Report a Problem" on our website for
residents to register concerns
Located on main page of website
(� CP Monticello, MN I Official Website X +
�j n https://www.ci.monticello.mn.us A" �}
..68WWr:%
0 C : C 01�b
(D 0 0
Agendas & Minutes City Employment Online Payments Report a Problem Licenses & Permits Projects
Latest News
-
0
x
q
Help You? 911
O
R
STAY UP TO DATE WITH MONTICELLO G select Language v) --
https://www.ci.monticello.mn.us/forms.aspx?fid=62 Go gk Translate v
Ell C7 Forms • Report a PrcL•lem x +
httpsJjwww.ci.monticello.mn.us/forms.aspx?fid=62
Report a Problem
The City of Monticello's Report a Problem Form will help us identify a problem in your area — and respond as soon as
possible. Should a problem require urgent attention, please call us immediately If this is an emergency, please call 911
Otherwise, call (763) 295-2711
Report a Problem - Select a Request Category
Cl Animal Control
D Cemetery
D City Compost Facility
O Code Enforcement Complaint
D Debris Trees/Branches
D Graffiti and/or Vandalism
D My Neighbor's Yard
CI My Trees/Branches
D Parks & Playgrounds
O Potential Diseased Tree
D Report a Pothole
D Sidewalks & Pathways
O Snow Removal
D Streetlights
D Street Sign
O Traffic Signal
D Water Curb Stop
D Other
Do you have a photo? If able. please add a photo. It helps us to better identify your request, plus we can often
pull your location from the photo.
Choose File I No file chosen
Convert to PDF?
(DOC, DOCX, XLS, XLSX, TXT)
Please answer the following questions.
Details - what is the description the problem? Please be as detailed as possible
a x
H Liu 1), Ell �= rp o -v 4
Vebsite Sign In q
How Can We Help You? Q I
GSelect Language v I
{°
Go- -gee Translate •
2023 Noteworthy Projects I Completed
V, Sunny Days — Completed
7,000 SF
Suburban Manufacturing
Addition — Completed
21,400 SF
Take 5 Carwash—
Completed/ Closed
West Metro Ophthalmology
with North Risk Partners
tenant
Completed
wt
-' a Kwik Trip —Completed
500 SF addition and Remodel,
and new tanks/canopy
installation
Block 52 — Mostly complete
Broadway side tenant buildout
underway
....,. Tr
2022m2O23 Noteworthy Projects
- Wiha Tools -
Completed
il
IF
a J
Scooters Coffee
Savanna Vista � I _
(2) 100 unit
r,
Apartment _-.� .l�- � � -
buildings - "- Savanna Vista
Clubhouse
NEW NEIGHBORHOODS UNDER CONSTRUCTION
Haven Ridge 2"d Addn
59 lots total
10 lots permitted to date
Stony Brook Village
28 lots total
-_fw--- For sale
Country Club 2nd — Senior Living
60 units
22 permits issued in 2023
<-- then and now 4
NEW NEIGHBORHOODS I UNDER CONSTRUCTION
�. Edmonson Ridge Addition
54 Single Family Lots
21 permits issued
20 Lots available
Featherstone 5t" Addition
27 Single Family Lots
27 permits issued
Complete
Featherstone 6t" Addition
21 Single Family Lots
� No more lots available
Fire Inspection Program
Building Inspections by Classification
• High Hazard —Every Year
•Moderate Hazard =Every Other Year
• Low Hazard =Every Three Years
• Light Hazard =Every Four Years
ANT 1 C E<<
e��o
7
A
QUE
Feel free to stop in or call
us at (763) 295-3060
Planning Commission Agenda—06/02/24
413. Community Development Director's Report
Council Action on/related to Commission Recommendations
• Continued —Consideration of an Amendment to the Monticello City Code, Title XV:
Land Usage, Chapter 153: Zoning Ordinance, Section 153.046 Overlay Zoning
Districts, Adopting the updated Flood Hazard Determination including Flood
Insurance Study and Flood Insurance Rate Maps for the City of Monticello as part of
the Official Zoning Map and the subject Zoning Ordinance Section herein. Applicant:
City of Monticello
Approved on the City Council consent agenda on May 13, 2024. Will be forwarded
to DNR and FEMA following full publication of ordinance.
• Consideration of a Request for a Conditional Use Permit for Accessory Structures
Exceeding 1,200 Square Feet in the R-1, Single -Family Residential District. Applicant:
Ben Holland
Approved on the City Council consent agenda on May 28, 2024.
• Consideration of a Request for an Amendment to a Conditional Use Permit for
Electric Vehicle Charging Stations as an Accessory Use in the B-3, Highway Business
District. Applicant: Doug Walkup
Approved on the City Council consent agenda on May 28, 2024.
• Consideration of a Request for an Amendment to a Conditional Use Permit for
Planned Unit Development for a Restaurant as a Principal Use and Drive -Through
Services as an Accessory Use in the B-4, Regional Business District. Applicant:
Westwood Professional Services
Approved on the City Council consent agenda on May 28, 2024.
Rental Connections Update
The first Rental Connections meeting took place on May 15th, 2024. Rental Connections
brings together property managers and/or owners of our local apartment complexes with
other partners, such as representatives from the Wright County Sheriff's Office, Fire
Department, and Wright County Community Action.
The attendance at the first meeting was positive, with over a dozen representatives
present on behalf of multi -family properties. The focus of the first meeting was to
introduce the Rental Connections program, develop familiarity with the properties
themselves, and present available City resources.
Through these meetings, we hope to achieve two goals. The first is to increase
information sharing on existing City programs of benefit to the apartments, including the
rental licensing program and fire inspection program. The second is to talk with the
apartment management team about ways to build communication with tenants.
Planning Commission Agenda—06/02/24
Increasing communication opportunities with our rental residents is a great way to build
relationships and help them feel more connected to our community.
Housing Workshop
A date for the rescheduled Housing Workshop has been set for Monday, June 24h.
Members of the City Council, Economic Development, and Planning Commission are all
invited to attend. Board members are encouraged to review the 2023 Housing Needs &
Market Demand report prior to the meeting. A reminder to please complete and return
the attached worksheet by June 15.
Development Status
Current status update through May is attached.
MONTICELLO DEVELOPMENT PROJECTS
Concept Projects
Mastercraft Outdoors PUD
Project Type
Industrial
Address/Location Description
1.46 acre vacant lot long the West side of Fallon Ave NE between Washburn Concept Stage review for a planned unit development of a vacant site foran Industrial
Computer Group and Norland Truck Sales Service use
Review Date & Info
Reviewed on 1/2/2024
Progress Report
Post Concept Stage PUD, Pre -Development Stage PUD Application Submittal
Haven Ridge West
Residential
Nearthe Southeastcornerof85th Street NEand Fallon Ave NE,Also Southof
85th Street NE between Eislele Ave NE and Edmonson Ave NE
Concept Stage review for a planned unit development for a 298-unit residential
development with various lot sizes and townhome section
Reviewed on 3/4/2024
Post Concept Stage PUD, Pre -Development Stage PUD Application Submittal
Projr.V
Commercial/Light Industrial
88 acres parcel bounded by The Meadows to the North, Highway 25 to the
West, 85th Street NE to the South, and the Featherston Residential
neighbohood to the East
Concept Stage review fora planned unit development fora multi -phase Medical Office
Concept
roughly 25acrel with ,unit t mentor to -phase cal follow.
B.ildigs on roug y subsequent p private development
Reviewed on 3/25/2024
Port Concept Stage PU D,Pre-Development Stage PUD Application Submittal
6321E. Broadway Street bound by Interstate 94 to the North and East
Concept Stage PU D fora 76-room hotel, 15,000 square -foot event center, 6,8W square -foot
Broadway Plaza PUD
Commercial
Broadway Street to the South
restaurant, and a 6,000 square foot post frame building.
Reviewed on 4/2/2024
Post Concept Stage PU D,Pre-Development Stage P UD Application Submittal
Concept Plan for construction of a 98-room hotel and restaurant in the northern "Populus"
Post Pointe, at Cedar Concept Plan Submittal Review Meeting, Pre-
GoodNeighbor- Pointes at Cedar Development
Commercial
Along south side of Chelsea Road directly north of Deephaven Apartments
biome of the Pointes at Cedar District
Reviewed on 4/8/2024
Development Stage Permit Application Submittal
Preliminary&Final Plat of Cedar Street Storage,D..& Final Stage PUD for expansion of Planning Commission Public
StorageLink (Dundas Site)PUD and Plat Commercial 36 Dundas Road (Southeast corner of Dundas Road and Cedar Street) permanent storage area Hearing on 6/4/2024 Application submitted.
Conditional Use Permit Request for Wrecker &Towing Service as a Principal Use in the B-3, Planning Commission Public
Bob's Towing Conditional Use Permit Commercial 219 Sandberg Road Highway Business District Hearing on 6/4/2024 Application submitted.
Ir
Savanna Vista Apartments
Residential
Southeast area of The Pointes at Cedar
2100 unit multi -family apartments
12/13/2021
Under Construction- First Building Ant. Complete in Summer
Twin Pines Apartments
Residential
South Side of School Blvd. East of Wal-Mart
96 multi -family unit apartment building
2 28 2022
yet to Break Ground/Received Plat E#. on 1/22/24
Block 52 Redevelopment
Milted -Use
NE Corner of Highway 25 and Broadway St
87 multi -family units with rougly 30,000 sq ft of 1A floor commercial
7 11 2022
Received Temporary CO/Residemal Units Being Rented
Featherstone 6th Addition
Residential
North of 85th St NE and West of Highway 25
21 Single-family lots with commercially guided outlots for future development
4 25 2022
Under Construction (Last New Const. Permit Pulled)
Haven Ridge 2nd Addition
Residential
South of Farmstead Ave and West of Fallon Ave NE
59 Single -Family Lot Development
Reapproved 8/28/2023
Site Grading Commenced (Building Permits Being Issued)
Headwaters West Development
Residential
Along South side of 7th St W between Elm St and Golf Course Rd
82 Twinhomes Senior 55+Development
4 22 2024
Under Construction
Sunny Days Therapy
Commercial
Along South side of 7th St E West of Old McDonald's Location
Development of an Occupational Child Therapy Facility
812212022
Completed - Ribbon Cutting was held on 11/16/2023
Ca m ping W. rid
Commercial
3801 Chelsea Rd
Installation of an attached paint booth(1,100 sq ft)
8222022
Nearing Completion
Wiha Tools USA
Industrial
Along South Side of 7th St E across from Wright St and Ramsey St
New construction light manufacturing(72,540 sq ft)
11/28/2022
Completed- Ribbon Cutting on 4/9/2024
Scooter's Coffee
Commercial
1007th St W.
New Construction of Drive -Through Coffee Shop
1z32023
Completed
Deephaven 3(Lot 2)
Commercial
Southeast corner of Cedar St and Chelsea Rd
New Construction of a Clinic/Medical Service Facility(10,000 sq ft)
N/A (Permitted Use)
Nearing Completion
Jimmy Johns/Baskin Robbins
Commercial
Southeast Corner of Oakwood Drive E and Cedar Street
New Construction of Quick Service Restaurant with Drive Through Service
12z2024
Not Started
Big River Vacant property north of Chelsea Rd, south of Interstate 94, and west of PUD for New Construction of two commercial lots for a quick -service restaurant and
Commercial Fenning Avenue a coffee shop, with 6 lots platted for subsequent commercial development. 482024 Not Started
New Construction of a Pa—. Bread Location (Restaurant and Drive -through service) in the
Panes Bread Commercial Vaunt Lot west of Ma[[ress Firm/AT&T )oration on E. ][h Street Not Started
B-4, Regional Business District 5 28 2024
Holiday Store EV Charging Stations Commercial 110 Oakwood Drive E. Installation of up to 12 Elettric Vehicle Charging Stations in Lot behind Building 5282024 Not Started
volunteer recognition
27
As a BIG THANK YOU...
City of Monticello volunteers and their
families are invited to join us for a picnic at
Ellison Park Log Shelter!
Rain or Shine
(In case of rain the picnic will be moved indoors to the Community Center)
Please RSVP with number attending to
HR@ci.monticello.mn.us by June 24th.
CITY OF
Monticello