City Council Agenda Packet 11-12-20241. Agenda Documents
Documents:
11-12-24 AGENDA. PDF
2A PAYMENT OF BILLS.PDF
2B NEW HIRES AND DEPARTURES.PDF
2C PROPERTY.PDF
2D PLANNING COMMISSION APPOINTMENT.PDF
2E IEDC ORDINANCE AMDMT AND APPOINTMENTS.PDF
2F PROFESSIONAL PLANNING CONTRACT.PDF
2G LMC HAIL CLAIM AGENDA.PDF
2H CHELSEA POND RELOCATION.PDF
21 SCHOOL BOULEVARD ADVANCE CONSTRUCTION AGREEMENT.PDF
2J SAFE STREETS 4 ALL PROFESSIONAL SERVICES AGREEMENT.PDF
3A 7TH STREET - ASSESSMENT PUBLIC HEARING.PDF
3B SCHOOL BOULEVARD IMPROVEMEN PUBLIC HEARING.PDF
4A GENERAL ELECTION RESULTS.PDF
4B MEADOWS SEWER CHARGE ADJUSTMENT.PDF
1.1. Agenda Documents
Documents:
2B NEW HIRE AND TERMS CITY COUNCIL - REVISED.PDF
3A 7TH STREET PUBLIC HEARING ADDITIONAL INFORMATION.PDF
3B SCHOOL BOULEVARD IMPROVEMEN PUBLIC HEARING ADDITIONAL
INFORMATION.PDF
4B MEADOWS SEWER ADJUSTMENT ADDITIONAL INFORMATION.PDF
AGENDA
REGULAR MEETING — MONTICELLO CITY COUNCIL
Tuesday, November 12, 2024
Mississippi Room, Monticello Community Center
6:30 p.m.
Mayor: Lloyd Hilgart
Council Members: Charlotte Gabler, Tracy Hinz, Lee Martie, Sam Murdoff
1. General Business
A. Call to Order & Pledge of Allegiance
B. Approval of Agenda — Councilmembers or the City Administrator may add items
to the agenda for discussion purposes or approval. The City Council may or may
not take official action on items added to the agenda.
C. Citizen Comments — Individuals may address the City Council about any item not
contained on the agenda. Each speaker will be allotted three minutes with a
maximum of five speakers. The Mayor may allow for additional time and/or
speakers. The City Council generally takes no official action of items discussed,
except for referral to staff for future report.
D. Public Service Announcements/Updates
• Winter Parking Restrictions
• Winter Coat Drive
E. Council Liaison Update
• Planning Commission
• Industrial & Economic Development Committee (IEDC)
F. Department Updates
• Animal Control Update
• Construction Update
2. Consent Agenda — All items listed on the Consent Agenda are considered standard or
may not need discussion prior to approval. These items are acted upon by one motion
unless a councilmember, the city administrator, or a citizen requests the item by
removed from consent for additional discussion.
A. Consideration of approving payment of bills
B. Consideration of approving new hires and departures for City departments
C. Consideration of approving the sale/disposal of surplus city property
D. Consideration of approving an appointment of Richard Kothenbeutel to the
Monticello Planning Commission
E. Consideration of adopting an Ordinance amending the Industrial Economic
Development Committee (IEDC) Membership and Organizational Guidelines
eliminating student member slots and approving the appointments of Aaron
Holthaus, Mike Huey, Sonja McElroy, and Sean Hafen
F. Consideration of approving a 2025 contract for professional planning services
with Grittman Consulting, LLC
G. Consideration of approving the solicitation of a request for proposals for
architectural services and preparation of bid documents for the replacement of
damaged properties from recent storm events
H. Consideration of authorizing payment to Buchholz Properties for the relocation
of a temporary stormwater pond along Chelsea Road in the amount of $129,524
I. Consideration of adopting Resolution 2024-109 approving an Advance
Construction agreement with Minnesota Department of Transportation
(MNDOT) for the School Boulevard Roundabouts and Reconstruction Project
Consideration of authorizing an amendment to the Professional Services
Agreement with Stonebrook Engineering, Inc., in the amount of $61,471 for
Comprehensive Safety Action Plan in conjunction with the Safe Streets 4 All
(SS4A) federal grant program
2A. Consideration of items removed from the consent agenda for discussion
3. Public Hearings
A. Consideration of adopting Resolution 2024-110 approving assessments for the
71h Street Retaining Wall, Rectangular Rapid Flashing Beacon (RRFB), and
Sidewalk Improvement Project, City Project No. 23C005 and continuing the
public hearing to November 12, 2024 (Continued from October 28, 2024
meeting)
B. Consideration of adopting Resolution 2024-111 ordering improvements for the
School Boulevard Intersection Improvements Project (ML)
4. Regular Agenda
A. Consideration of canvassing the returns and adopting Resolution 2024-112
declaring the results of the 2024 General Election for the City of Monticello
offices
B. Consideration of approving a request for an adjustment of sewer charges by The
Meadows Manufactured Home Park
5. Adjournment
City Council Agenda: 11/12/2024
2A. Consideration of approving payment of bills
Prepared by:
Finance Director
Reviewed by:
N/A
ACTION REQUESTED
Meeting Date
11/12/2024
Approved by:
City Administrator
® Consent Agenda Item
❑ Regular Agenda Item
Motion to approve the bill and purchase card registers for a total amount of $1,016,678.42.
REFERENCE AND BACKGROUND
City staff submits the attached bill registers and purchasing card registers for approval by
Council. The bill registers contain all invoices processed and the purchasing card registers
contain all card purchases made since the last Council meeting. Subject to MN Statutes, most
invoices require Council approval prior to releasing checks for payment. The day following
Council approval, payments will be released unless directed otherwise. A credit purchasing
agreement and policy was approved by Council initially and card purchases must comply with
the policy.
If Council has no questions or comments on the bill and purchase card registers, these can be
approved with the consent agenda. If requested, this item can be removed from consent and
discussed prior to making a motion for approval.
I. Budget Impact: N/A
II. Staff Workload Impact: No additional work.
III. Comprehensive Plan Impact: N/A
STAFF RECOMMENDED ACTION
City staff recommends approval of bill and purchase card registers as presented.
SUPPORTING DATA
• Bill registers and purchase card registers
Accounts Payable
Checks by Date - Summary by Check Date
User: debbie.gulbrandson
Printed: 11/l/2024 2:17 PM
� MontiTY ce-o
Check No
Vendor No
Vendor Name
Check Date
Check Amount
ACH
1102
CENTERPOINT ENERGY
10/31/2024
4,840.83
ACH
1585
XCEL ENERGY
10/31/2024
19,652.24
ACH
1593
MN DEPT OF REVENUE - ACH
10/31/2024
55,826.00
ACH
2O50
DEMVI LLC
10/31/2024
213.86
ACH
2439
DEPT OF EMPLOYMENT & ECON DEN
10/31/2024
218.73
ACH
3241
LINCOLN FINANCIAL GROUP
10/31/2024
3,500.56
ACH
4732
MONEY MOVERS, INC.
10/31/2024
14.75
ACH
5188
HEALTHY CONTRIBUTIONS
10/31/2024
8.60
ACH
5646
JACK HENRY & ASSOCIATES, INC.
10/31/2024
52.42
ACH
6041
HEALTHEQUITY INC
10/31/2024
799.73
ACH
6271
CLUB AUTOMATION - DAXCO LLC
10/31/2024
1,460.08
Total for 10/31/2024:
86,587.80
Report Total (I I checks): 86,587.80
The preceding list of bills payable was reviewed and approved for payment.
Date: 11/13/24 Approved by:
Mayor Lloyd Hilgart
AP Checks by Date - Summary by Check Date (11/1/2024 2:17 PM) Page 1
Accounts Payable
Checks by Date - Summary by Check Date
User: julie.cheney
Printed: 11/7/2024 8:54 AM
CITY OF � Monti*ce_o
Check No
Vendor No
Vendor Name
Check Date
Check Amount
ACH
1036
APEC AQUISITIONS INC
11/13/2024
817.67
ACH
1062
BEAUDRY OIL COMPANY
11/13/2024
4,090.41
ACH
1065
BELLBOY CORPORATION
11/13/2024
14,612.23
ACH
1074
BOLTON AND MENK INC
11/13/2024
16,634.53
ACH
1079
BOYER TRUCKS - ST MICHAEL
11/13/2024
1,202.14
ACH
1083
BRAUN INTERTEC CORPORATION
11/13/2024
2,570.00
ACH
1091
CAMPBELL KNUTSON PA
11/13/2024
7,778.41
ACH
1106
CENTRAL MCGOWAN INC
11/13/2024
198.97
ACH
1129
DAHLHEIMER BEVERAGE LLC
11/13/2024
56,876.17
ACH
1153
ECM PUBLISHERS INC
11/13/2024
2,156.17
ACH
1187
FORCE AMERICA DISTRIBUTING LLC
11/13/2024
934.93
ACH
1207
ELIZABETH GREEN
11/13/2024
89.91
ACH
1223
HAWKINS INC
11/13/2024
6,990.95
ACH
1239
NORTH CENTRAL INTERNATIONAL L]
11/13/2024
159.59
ACH
1273
KIWI KAI IMPORTS, INC.
11/13/2024
1,302.08
ACH
1303
M AMUNDSON CIGAR & CANDY CO, I
11/13/2024
1,660.76
ACH
1386
M-R SIGN CO INC
11/13/2024
4.37
ACH
1411
OLSON & SONS ELECTRIC INC
11/13/2024
18,173.65
ACH
1413
GOPHER STATE ONE CALL INC
11/13/2024
288.90
ACH
1417
OSC OXYGEN SERVICE COMPANY
11/13/2024
56.91
ACH
1524
TK ELEVATOR
11/13/2024
785.01
ACH
1537
UHL COMPANY INC
11/13/2024
3,613.00
ACH
1550
VEOLIA WATER N AM OPERATING SE]
11/13/2024
70,514.63
ACH
1552
VIKING COCA COLA BOTTLING CO
11/13/2024
667.77
ACH
1561
WATER LABORATORIES INC
11/13/2024
270.00
ACH
1684
VINOCOPIA
11/13/2024
696.00
ACH
1726
MARCO TECHNOLOGIES
11/13/2024
1,475.00
ACH
2139
ADVANCED FIRST AID INC
11/13/2024
26,416.00
ACH
2890
BROTHERS FIRE & SECURITY CO
11/13/2024
352.00
ACH
3446
WARNING LITES OF MN INC
11/13/2024
2,766.80
ACH
4470
US BANK - BONDS
11/13/2024
227,187.50
ACH
4633
PERFORMANCE FOOD GROUP INC
11/13/2024
582.81
ACH
4646
CAPITOL BEVERAGE SALES L.P.
11/13/2024
24,398.80
ACH
4832
TIFCO INDUSTRIES, INC.
11/13/2024
461.85
ACH
4962
RENGEL PRINTING COMPANY, INC
11/13/2024
336.37
ACH
5027
ERICA WITZMANN
11/13/2024
2,425.00
ACH
5201
DICK FAMILY, INC.
11/13/2024
670.75
ACH
5211
RANDI O'KEEFE KRIER
11/13/2024
1,946.88
ACH
5444
JULIA KAROS
11/13/2024
560.00
ACH
5512
HYDROCORP HYDRO -DESIGNS, INC.
11/13/2024
741.00
ACH
5585
SBRK FINANCE HOLDINGS INC
11/13/2024
65,077.63
ACH
5635
WK & ASSOCIATES LLC
11/13/2024
725.00
ACH
6306
STONEBROOKE ENGINEERING INC
11/13/2024
30,131.26
ACH
6436
CHERI BUTLER
11/13/2024
135.16
129237
6463
ALL SEASONS GARAGE DOOR CO
11/13/2024
1,194.00
129238
1021
AME RED E MIX INC
11/13/2024
660.00
129239
3491
ARTISAN BEER COMPANY
11/13/2024
276.60
AP Checks by Date - Summary by Check Date (11/7/2024 8:54 AM) Page 1
Check No
Vendor No
Vendor Name
Check Date
Check Amount
129240
1044
ASCAP
11/13/2024
445.67
129241
2886
AUSCO DESIGN AND MARKETING
11/13/2024
1,337.00
129242
1368
AUTO VALUE MONTICELLO
11/13/2024
1,230.93
129243
5606
B & E RECYCLING SERVICES INC
11/13/2024
180.00
129244
1067
BERNICK'S
11/13/2024
5,096.54
129245
6099
BITCO INSURANCE COMPANIES
11/13/2024
148,601.00
129246
4618
BOUND TREE MEDICAL, LLC
11/13/2024
826.68
129247
4328
BREAKTHRU BEVERAGE MN WINE &
11/13/2024
9,455.18
129248
5248
CORNERSTONE FORD & CHRYSLER
11/13/2024
4,904.21
129249
1147
DOUBLE D ELECTRIC INC
11/13/2024
2,100.00
129250
1179
FIRE SAFETY USA INC
11/13/2024
554.52
129251
6313
GOVERNMENTJOBS.COM INC
11/13/2024
9,544.50
129252
1205
GRAINGER INC
11/13/2024
39.62
129253
4326
HD SUPPLY INC
11/13/2024
6,894.05
129254
6508
HOLIDAY
11/13/2024
614.00
129255
6375
THE HOME CITY ICE COMPANY
11/13/2024
270.24
129256
3971
INTL UNION OF OPER ENGINEERS LO
11/13/2024
23,600.00
129257
1263
JOHNSON BROTHERS LIQUOR CO.
11/13/2024
22,726.79
129258
6248
JP BROOKS
11/13/2024
4,000.00
129259
5389
KNIFE RIVER
11/13/2024
1,821.51
129260
5839
KRIS ENGINEERING, INC.
11/13/2024
2,891.79
129261
5309
MHSRC/RANGE
11/13/2024
1,220.00
129262
6428
MIDWEST NURSERY
11/13/2024
968.00
129263
5578
MINNESOTA CONCRETE LIFTING LLC
11/13/2024
4,200.00
129264
1370
MONTICELLO DEPUTY REG #002
11/13/2024
2,588.83
129265
4691
MONTICELLO MEMORIALS, LLC
11/13/2024
225.00
129266
3184
MONTICELLO PET HOSPITAL
11/13/2024
51.20
129267
2512
MONTICELLO PLBG HTGAC LLC
11/13/2024
749.28
129268
1913
NEW FRANCE WINE
11/13/2024
464.00
129269
5988
NYSTROM PUBLISHING CO INC
11/13/2024
5,486.33
129270
1412
OMANN BROTHERS INC
11/13/2024
2,193.18
129271
1427
PHILLIPS WINE & SPIRITS CO
11/13/2024
17,028.26
129272
5431
QUADIENT FINANCE USA INC
11/13/2024
170.64
129273
1453
RECREATION SUPPLY COMPANY
11/13/2024
317.85
129274
6509
RTL EQUIPMENT
11/13/2024
3,677.73
129275
4705
S2 SERVICES INC
11/13/2024
15,002.00
129276
4148
SHERWIN WILLIAMS CO. #3442
11/13/2024
403.88
129277
3309
SOUTHERN GLAZER'S WINE AND SPII
11/13/2024
6,746.75
129278
6159
TAMARACK LAND PROPERTIES LLC
11/13/2024
5,644.13
129279
1543
US BANK TRUST SERVICES
11/13/2024
1,600.00
129280
3972
VARITECH INDUSTRIES INC
11/13/2024
7,824.81
129281
1573
WINE MERCHANTS INC
11/13/2024
3,471.94
129282
1679
ZEP SALES AND SERVICE
11/13/2024
1,257.01
Total for 11/13/2024: 930,090.62
Report Total (90 checks): 930,090.62
The preceding list of bills payable was reviewed and approved for payment.
Date: 11/12/24 Approved by:
Mayor Lloyd Hilgart
AP Checks by Date - Summary by Check Date (11/7/2024 8:54 AM) Page 2
City Council Agenda: 11/12/2024
2B. Consideration of approving new hires and departures for Citv departments
Prepared by:
Human Resources Manager
Reviewed by:
N/A
ACTION REQUESTED
Meeting Date
11/12/2024
Approved by:
City Administrator
® Consent Agenda Item
❑ Regular Agenda Item
Motion to approve new hires and departures for city departments.
REFERENCE AND BACKGROUND
The Council is asked to ratify the attached list of new hires and departures for the City. This
listing includes full-time, part-time, seasonal, and temporary employees. The listing may also
include status changes and promotions.
I. Budget Impact: Positions are generally included in the budget.
II. Staff Workload Impact: If new position, there may be some training involved. If
terminated position, existing staff will cover hours as needed, until replacement.
III. Comprehensive Plan Impact: N/A
STAFF RECOMMENDED ACTION
City staff recommends approval of new hires and departures as identified on the attached list.
SUPPORTING DATA
• List of new hires and terminated employees.
NEW EMPLOYEES
Name
Title
Department
Hire Date
Class
Shawn Gellert
Supervised Play Attendant
MCC
11/1/2024
PT
Caleb Myhrer
Slide
MCC
11/5/2024
PT
Janet Baumgarten
Guest Service
MCC
11/6/2024
PT
Jeremy Jensen*
Streets Foreman
Streets
11/16/2024
FT
Bob Ferguson*
Chief Building Official
Building
11/30/2024
FT
* Promotion
TERMINATING EMPLOYEES
Name
Reason
Department
Effective Date
Class
Sophia Lange
Voluntary
Parks
6/7/2024
Seasonal
Christine Simonson
Voluntary
MCC
6/29/2024
PT
New Hire and Terms City Council 2024: 11/6/2024
City Council Agenda: 11/12/2024
2C. Consideration of approving the sale or disposal of surplus Citv property
Prepared by: Meeting Date: ® Consent Agenda Item
N/A
11/12/2024 ❑ Regular Agenda Item
Reviewed by: Approved by:
N/A N/A
There is no report this City Council Cycle.
City Council Agenda: 11/12/2024
2D. Consideration of appointing Richard Kothenbeutel to the Monticello Planning
Commission for a term to expire on December 31, 2027
Prepared by:
Community Development Director
Reviewed by:
City Clerk
ACTION REQUESTED
Meeting Date:
11/12/2024
Approved by:
City Administrator
® Consent Agenda Item
❑ Regular Agenda Item
Motion to approve the appointment of Richard Kothenbeutel to the Monticello Planning
Commission with a term effective November 12, 2024, and ending December 31, 2027.
REFERENCE AND BACKGROUND
City Council is asked to appoint a representative to the Monticello Planning Commission for the
position that was held by Paul Konsor, who recently resigned.
The Planning Commission recommends the appointment of Richard Kothenbeutel to fill the
position, with a term to expire on December 31, 2027. The Planning Commission interviewed
the candidate on November 4, 2024. The Commission voted unanimously to appoint Mr.
Kothenbeutel.
Mr. Konsor's current three-year term would have ended on December 31, 2024. The City
Council is therefore asked to appoint the position effective upon action and extending through
a new three-year term, as Mr. Konsor will not be returning for the December meeting.
The Planning Commissioners recognize their role as advisory for this appointment. The council
has the authority on final appointments and City Council may wish to interview the candidates
separately prior to final appointment of the position. The council was invited to attend the
November 4, 2024, interviews.
I. Budget Impact: Commissioners are paid a stipend for meetings, which is a budgeted
expense.
II. Staff Workload Impact: Staff time is limited to the preparation for interview and the
appointment report.
III. Comprehensive Plan Impact: A full complement of Planning Commission members
provides the city with citizen representation on planning and zoning matters in support
of the Monticello 2040 Vision + Plan.
STAFF RECOMMENDED ACTION
City Council Agenda: 11/12/2024
City staff recommends approval of the appointment.
SUPPORTING DATA
A. Application
B. Planning Commission Ordinance Excerpt
10/31/24, 8:47AM
OHC - Print Job Application
CITY OF
+�
Monticello
MINNI S01A
POSITION TITLE:
Planning Commission Member (Volunteer)
NAME: (Last, First, Middle)
Kothenbeutel, Richard, Allen
ADDRESS: (Street, City, State, Zip Code)
HOME PHONE:
EMAIL ADDRESS:
DRIVER'S LICENSE:
Yes
State: MN Number: C'-'--"-'3
EMPLOYMENT APPLICATION
City of Monticello
505 Walnut Street
Monticello, Minnesota - 55362
htto://www.ci.monticello.mn.us(httD://www.Ci.monticello.mn.us)
Kothenbeutel, Richard, Allen
Planning Commission Member (Volunteer)
PERSONAL INFORMATION
Job Number:
2024-00026
PERSON ID:
59717225
Received: 9/22/24, 2:28 PM
For Official Use Only:
QUAL:
DNQ:
❑ Experience
❑ Training
❑ Other:
ALTERNATE PHONE:
NOTIFICATION PREFERENCE:
Email
LEGAL RIGHT TO WORK IN THE UNITED HIGHEST LEVEL OF EDUCATION:
STATES?: Some College
■ Yes ❑ No
WHAT TYPE OF JOB ARE YOU LOOKING FOR?
Regular
TYPES OF WORK YOU WILL ACCEPT:
Part Time
SCHOOL NAME:
Iowa Lakes Community College
LOCATION:(City, , State)
Estherville, IA
DATES:
from August/2002 to Present
ADDRESS: (Street, City, State, Zip Code):
PHONE NUMBER:
PREFERENCES
EDUCATION
DID YOU GRADUATE?
❑ Yes ■ No
WORK EXPERIENCE
EMPLOYER:
Xcel Energy
SUPERVISOR:
Darren Allen - Senior Licensed Operator /
Control Room Supervisor
POSITION TITLE:
Operator
MAY WE CONTACT THIS EMPLOYER?
■ Yes ❑ No
HOURS PER WEEK:
40
DUTIES:
Take rounds and readings on different systems within a Nuclear Power plant. Manage the overall well being of the RAD Waste system water and solids.
REASON FOR LEAVING:
Still working.
https://secure. neogov.com/h iri ngcenter/pri nt/jobapplication/f8ae40feO89919d4O38l ca56dd6c00533e848cO4e88b852a/5l 9beOc8c4344b l 2626bcad97f... 1 /3
10/31/24, 8:47AM
OHC - Print Job Application
CERTIFICATES AND LICENSES
TYPE:
Minnesota State Boilers 1A
DATE ISSUED:
July 2024
TYPE:
Commercial Pilot
DATE ISSUED:
May 2010
OFFICE SKILLS:
Nothing Entered For This Section
OTHER SKILLS:
Nothing Entered For This Section
LANGUAGE(S):
Nothing Entered For This Section
SUPPLEMENTAL INFORMATION
Nothing Entered For This Section
1. Are you at least 18 years old?
Yes
2. How did you hear about this position?
Referral
3. If you marked "Other" please specify.
N/A
EXPIRATION DATE: NUMBER: ISSUING
July 2027 1 1 AGENCY:
EXPIRATION DATE: I NUMBER: I ISSUING
No expiration AGENCY:
SKILLS
Agency - Wide Questions
4. Why are you interested in serving on this Board or Commission?
I have always had an interest in the Monticello city government and have kept myself up to date by watching the different city meetings on the city's
local TV feed.
5. Please list your qualifications for this volunteer appointment.
I'm very detail oriented and want to see the city of Monticello grow within the city Ordinances. I run multiple meetings at my current job in different
capacity's.
6. Please list all City Boards, Commissions, or Committees you're currently serving on or have served on in the past. Write N/A if this question
doesn't apply.
N/A
By clicking on the Accept & Submit' button, I hereby certify that all of the information provided by me in this application (or any other
accompanying or required documents) is correct, accurate and complete to the best of my knowledge. I understand that the falsification,
misrepresentation or omission of any facts in said documents may be cause for denial of employment or immediate termination of
employment regardless of the timing or circumstances of discovery.
I understand that submission of an application does not guarantee employment. I understand that none of the documents, policies,
procedures, actions, statements of the City of Monticello or its representatives used during the employment process is deemed a contract
of employment, real or implied. In consideration for employment with the City of Monticello, if employed, I agree to conform to the rules,
regulations, policies and procedures of the City of Monticello at all times and understand that such obedience is a condition of employment.
I understand that if offered a position with the City of Monticello, I may be required to submit to a drug screening and background check as
a condition of employment. I understand that unsatisfactory results from, refusal to cooperate with, or any attempt to affect the results of
these pre -employment tests and checks will result in withdrawal of any employment offer or termination of employment if already
employed.
https://secure.neogov.com/hiringcenter/print/jobapplication/f8ae40fe089919d4038l ca56dd6c00533e848c04e88b852a/5l 9be0c8c4344bl2626bcad97f... 2/3
10/31/24, 8:47AM
OHC - Print Job Application
With my signature below, I am providing the City of Monticello authorization to verify all information I provided within this application,
including contacting current or previous employers. However, I understand that if, in the Employment Experience section I have answered
"No" to the question, "May we contact your current employer?", contact with my current employer will not be made without my specific
authorization.
This application was submitted by Kothenbeutel, Richard, Allen
Signature
Date
https://secure.neogov.com/hiringcenter/print/jobapplication/f8ae40fe089919d4038l ca56dd6c00533e848c04e88b852a/5l 9be0c8c4344bl2626bcad97f... 3/3
PLANNING COMMISSION
§ 32.001 NAME OF THE COMMISSION.
The name of the organization shall be the Monticello Planning Commission.
(Prior Code, § 2-1-1)
§ 32.002 AUTHORIZATION.
(A) The authorization for the establishment of this Commission is set forth under M.S. Ch. 462, Municipal Planning
Enabling Act, as it may be amended from time to time.
(B) The Planning Commission is hereby designated the planning agency of the city pursuant to the Municipal Planning
Act.
(Prior Code, § 2-1-2)
§ 32.003 MEMBERSHIP.
The Planning Commission shall consist of five members appointed by the City Council. All members shall be residents of
the city and shall have equal rights and privileges.
(Prior Code, § 2-1-3)
§ 32.004 TERM OF OFFICE.
(A) Appointments. All members shall be appointed for three-year terms ending on December 31 of a given year; however,
the term may be terminated earlier by the City Council. Terms shall be staggered so that no more than two members' terms
shall expire in a given year. The terms are to commence on the day of appointment by Council. Every appointed member
shall, before entering upon the discharge of his or her duties, take an oath that he or she will faithfully discharge the duties
of office.
(B) Renewals. When an expiring member's term is up, such member may be reappointed by Council with the effective
date of the new term beginning on the first day of the next year following the expiration.
(Prior Code, § 2-1-4)
§ 32.005 ATTENDANCE.
It is the City Council's intention to encourage Planning Commission members to attend all Planning Commission meetings.
Should any Planning Commission member be absent for more than three meetings in a calendar year, that member may be
subject to replacement by the Council.
(Prior Code, § 2-1-5)
§ 32.006 VACANCY.
Any vacancy in the regular or at -large membership shall be filled by the City Council, and such appointee shall serve for
the unexpired term so filled.
(Prior Code, § 2-1-6)
§ 32.007 OFFICERS.
(A) Elections. The City Planning Commission shall elect at its January meeting from its membership a Chair, Vice Chair,
and a Secretary who shall serve for a term of one year and shall have powers as may be prescribed in the rules of the
Commission.
(B) Duties of Chair. The Chair shall preside at all meetings of the Planning Commission and shall have the duties
normally conferred and parliamentary usage of such officers.
(C) Duties of Vice Chair. The Vice Chair shall act for the Chair in his or her absence.
(D) Duties of Secretary.
(1) A Secretary may be appointed who is not a member of the Planning Commission but can be employed as a
member of city staff.
(2) The Secretary shall keep the minutes and records of the Commission; and with the assistance of staff as is
available shall prepare the agenda of the regular and special meetings for Commission members, arrange proper and legal
notice of hearings when necessary, attend to correspondence of the Commission, and handle other duties as are normally
carried out by a Secretary.
(Prior Code, § 2-1-7)
§ 32.008 MEETINGS.
(A) The Planning Commission shall hold at least one regular meeting each month. This meeting shall be held on the first
Tuesday. Regular meeting times shall be established by the Commission and approved annually with the regular meeting
schedule of Council and Commission. Hearings shall be heard as soon thereafter as possible. The Planning Commission
shall adopt rules for the transaction of business and shall keep a record of its resolutions, transactions, and findings, which
record shall be a public record. The meeting shall be open to the general public.
(B) In the event of conflict for a regularly -scheduled meeting date, a majority at any meeting may change the date, time,
and location of the meeting.
(C) Special meetings maybe called by the chair or two members of the Planning Commission together, as needed, and
shall be coordinated with city staff.
(Prior Code, § 2-1-8)
§ 32.009 QUORUM.
A majority of all voting Planning Commission members shall constitute a quorum for the transaction of business.
(Prior Code, § 2-1-9)
§ 32.010 DUTIES OF THE COMMISSION.
(A) The Commission has the powers and duties assigned to it under M.S. Ch. 462, Municipal Planning Enabling Act, as it
may be amended from time to time, by this code, and state law.
(Prior Code, § 2-1-10)
(B) The Planning Commission shall act as the Board of Adjustment and Appeals for the Monticello zoning ordinance and
shall act according to procedures as established by the Monticello zoning ordinance.
§ 32.011 AMENDMENTS.
This subchapter may be amended as recommended by the majority vote of the existing membership of the Planning
Commission and only after majority vote of the City Council.
(Prior Code, § 2-1-11)
§ 32.012 COMPENSATION.
Compensation of members of the Commission shall be as set forth in city code for fee schedule.
(Prior Code, § 2-1-12) (Ord. 336, passed 11-22-1999; Ord. 337, passed 1-10-2011; Ord. 593, passed 3-10-2014; Ord. 607,
passed 1-26-2015)
City Council Agenda: 11/12/2024
2E. Consideration of adopting an Ordinance amending the Industrial Economic
Development Committee (IEDC) Membership and Organizational Guidelines
eliminating student member slots and approving appointments of Aaron Holthaus,
Mike Huev, Sonia McElroy, and Sean Hafen
Prepared by: Meeting Date: ® Consent Agenda Item
Economic Development Manager 11/12/2024 ❑ Regular Agenda Item
Reviewed by: Approved by:
Community Development Director City Clerk
ACTION REQUESTED
Motion to adopt an ordinance amending the IEDC Membership and Organizational Guidelines
eliminating student member slots and approving appointments of Aaron Holthaus (term ending
12/31/2026), Mike Huey (term ending 12/31/2025), Sonja McElroy (term ending 12/31/2025)
and Sean Hafen (term ending 12/31/2027)
REFERENCE AND BACKGROUND
The IEDC discussed and approved a proposed amendment to its ordinance (Ordinance No. 32)
and its Membership and Organizational Guidelines at its regular November 6, 2024, meeting.
It also approved the appointment of two new members and two additional members (a total of
four) contingent on approval of the proposed Ordinance amendment. The proposed ordinance
amends the Organizational and Membership Guidelines by eliminating the two high school
student membership slots (voting slots) and allowing two business/citizen representatives to be
appointed. A total of 18 members are authorized in the IEDC Organizational documents (two
slots for high school students). Since early 2020, the high school students have not been
participating in the IEDC due to a variety of factors. It is the interest of the existing Committee
membership to have full participation which enhances information sharing and discussion of
development issues and information. Currently, the IEDC has 14 members. By adopting the
ordinance amendment, the IEDC would immediately have four open seats to be filled. The four
membership candidates and their respective terms are noted below.
✓ Aaron Holthaus; term ending December 31, 2026
✓ Mike Huey; term ending December 31, 2025
✓ Sonja McElory; contingent appointment — term ending December 31, 2025
✓ Sean Hafen; contingent appointment — term ending December 31, 2027
City Council Agenda: 11/12/2024
If the appointment of all four applicants is ratified by the City Council, there will be no other
vacancies on the IEDC. Per the IEDC's Ordinance and the Organizational and Membership
Guidelines, members recommended for appointment to the IEDC must be ratified by the City
Council. The submitted applications for each candidate are also attached to this report.
I. Staff Workload Impact: There is minimal staff impact in considering the IEDC
appointment.
II. Budget Impact: The budget impact is minimal. IEDC Members do not receive a meeting
stipend.
III. Comprehensive Plan Impact: N/A
STAFF RECOMMENDED ACTION
Staff recommend approval of the proposed Ordinance and the Organizational and Membership
Guidelines amendment as well as the appointment of the four applicants noted in the report
for the respective terms.
SUPPORTING DATA
A. IEDC Ordinance —Title 2, Chapter 10 markup strikeout
B. IEDC Organizational and Membership Guidelines Proposed Clean
C. IEDC Organizational and Membership Guidelines Proposed Redline
D. IEDC Membership Applications
E. 2024 Annual IEDC Membership Roster
INDUSTRIAL AND ECONOMIC DEVELOPMENT COMMITTEE
§ 32.075 NAME OF COMMITTEE.
The name of the organization shall be the city's Industrial and Economic Development Committee (IEDC).
(Prior Code, § 2-10-1)
§ 32.076 AUTHORIZATION.
Duties are delegated to the IEDC by the City Council by the ordinance codified herein dated June 28, 2010, and by Res.
2008-44, approved May 27, 2008.
(Prior Code, § 2-10-2)
§ 32.077 MEMBERSHIP.
The city's IEDC shall consist of 16 to 18 regular members to be appointed by the City Council. The Committee members
shall consist of city business representatives or residents of the city. Specific general membership eligibility on the IEDC
shall be defined in the Organizational and Membership Guidelines. One councilmember shall be appointed annually to serve
on the IEDC. The Director of the city's Chamber of Commerce and Industry shall be an ex-officio member of the IEDC. Up to
two Monticello High School senior students may serve as voting members during their appointed term. The High School
Principal shall recommend their membership on the IEDC. The IEDC and the City Council shall confirm their appointment.
(Prior Code, § 2-10-3) (Ord. 637, passed 4-25-2016; Ord. 715, passed 3-25-2019; Ord. 782, passed 8-8- 22022)
§ 32.078 TERM OF OFFICE.
The term of the regular members shall be for three years and shall be staggered so that no more than one-half of the
terms expire in a given year. All regular terms shall expire on December 31 of any given year.
(Prior Code, § 2-10-4)
§ 32.079 ATTENDANCE.
It is the City Council's intention to encourage IEDC members to attend all IEDC meetings. It is desired that IEDC members
attend at least 75% of meetings in a calendar year. Members may be subject to replacement by the Council in the event
attendance does not meet this standard.
(Prior Code, § 2-10-5)
§ 32.080 VACANCY.
Any vacancy in the regular or at large membership shall be filled by the City Council, and such appointee shall serve for
the unexpired term so filled.
(Prior Code, § 2-10-6)
§ 32.081 OFFICERS.
(A) Elections. The city's IEDC shall elect at its annual meeting from its membership a Chair, Vice Chair, and a Secretary
who shall serve for a term of one year and shall have powers as may be prescribed in the rules of the Committee.
(B) Duties of Chair. The Chair shall preside at all meetings of the IEDC and shall have the duties normally conferred and
parliamentary usage of such officers.
(C) Duties of Vice Chair. The Vice Chair shall act for the Chair in his or her absence.
(D) Duties of Secretary. The Secretary shall keep the minutes and records of the Committee with the assistance of city
staff.
(Prior Code, § 2-10-7)
§ 32.082 MEETINGS.
Regular meetings shall be held on a date established by the IEDC. In the event of a conflict with a holiday or special
events, a majority at any meeting may change the date and location of the meeting. The meeting shall be open to the
general public.
(Prior Code, § 2-10-8)
§ 32.083 QUORUM.
A majority of the total IEDC members shall constitute a quorum for the transaction of business.
(Prior Code, § 2-10-9)
§ 32.084 DUTIES OF THE COMMITTEE.
It shall be the duty of the Committee, with staff assistance, to advocate and make recommendations to the Economic
Development Authority and City Council, relative to and including influencing industrial and economic development in and for
the city, with an emphasis on industrial land, increasing tax base and number of livable wage -level jobs by promoting
industrial and economic growth, and working to maintain a desirable business environment.
(Prior Code, § 2-10-10)
§ 32.085 AMENDMENTS.
This subchapter may be amended as recommend by the majority vote of the existing membership of the IEDC and only
after majority vote of the City Council.
(Prior Code, § 2-10-11) (Ord. 519, passed 8-23-2010)
MONTICELLO INDUSTRIAL & ECONOMIC DEVELOPMENT COMMITTEE
(IEDC)
ORGANIZATIONAL AND MEMBERSHIP GUIDELINES
I. Meeting Time and Place: Regular meetings are held the first Tuesday of each month
at 7:00 a.m. at the Monticello Community Center. Special meetings may be
called by the Chair.
II. Mission Statement and Obiectives: As written and adopted by the Monticello IEDC
in the Annual Action Statement.
III. Committee Size: While there is no set or definite size established, it is generally
understood that the committee will not exceed 16-18 members.
IV. Make-un of the Committee: Committee members must either work or reside in the
community of greater Monticello. Individuals who are involved in an occupation or
profession that provides services to the community of Monticello but is not
headquartered within the community may also serve as members of the committee.
Standing Committee Members: The City Council shall appoint a representative of
either the Mayor or a Council Member to the IEDC as a voting member. The Board
of Directors of the Monticello Chamber of Commerce & Industry shall appoint a
voting member to the IEDC. These members shall be considered in committee size.
City Staff Members: Non -voting
Administrator of the City of Monticello
Economic Development Manager of the City of Monticello
(serves as the EDA Executive Director)
Community Development Director of the City of Monticello (in
the absence of the Economic Development Manager)
V. Officers: The Chair, the Vice Chair, and the Secretary shall be appointed annually at
the January meeting. Length of office term shall not exceed three consecutive years.
Minutes of each meeting are the responsibility of the Secretary. Committee
correspondence is the responsibility of the Economic Development Manager.
VI. Lenatth of Membership Term: Members shall serve for three-year terms on a three-year
rotating basis so that approximately one-third of the membership expires each year.
PAGE 2. IEDC ORGANIZATIONAL AND MEMBERSHIP GUIDELINES
Individuals wishing to continue serving on the committee may so indicate prior to the
expiration of their term. Any member wishing to relinquish his/her position on the IEDC
may do so by submitting a letter of resignation.
VI. Filling a Vacant Position: A list of potential committee members shall be kept by the
Executive Director. The IEDC must recommend approval of new members by a majority
vote. The City Council must ratify the appointment of new members to the IEDC.
VII. Membership Attendance: In order to make a positive contribution to the committee, each
member is expected to attend at least 75 percent of the meetings in any given year. A
year is defined as beginning on the 1st of January and ending on the 3Is' of December
Amended: 01/05/2016, 12/06/2016, 03/05/2019, 11/12/2024
MONTICELLO INDUSTRIAL & ECONOMIC DEVELOPMENT COMMITTEE
(IEDC)
ORGANIZATIONAL AND MEMBERSHIP GUIDELINES
I. Meeting Time and Place: Regular meetings are held the first Tuesday of each month
at 7:00 a.m. at the Monticello Community Center. Special meetings may be
called by the Chair.
II. Mission Statement and Obiectives: As written and adopted by the Monticello IEDC
in the Annual Action Statement.
III. Committee Size: While there is no set or definite size established, it is generally
understood that the committee will not exceed 16-18 members.
IV. Make-up of the Committee: Committee members must either work or reside in the
community of greater Monticello. Individuals who are involved in an occupation or
profession that provides services to the community of Monticello but is not
headquartered within the community may also serve as members of the committee.
Standing Committee Members: The City Council shall appoint a representative of
either the Mayor or a Council Member to the IEDC as a voting member. The Board
of Directors of the Monticello Chamber of Commerce & Industry shall appoint a
voting member to the IEDC. Up to two (2) Meff cello High Sehool Senior- St aor��
may sefve—as voting members. The gh Seheel nc/pa15hall -moommend th�;,
member -ship or the 1E These members shall be considered in committee size.
City Staff Members: Non -voting
Administrator of the City of Monticello
Economic Development Manager of the City of Monticello
(serves as the EDA Executive Director)
Community Development Director of the City of Monticello (in
the absence of the Economic Development Manager)
V. Officers: The Chair, the Vice Chair, and the Secretary shall be appointed annually at
the January meeting. Length of office term shall not exceed three consecutive years.
Minutes of each meeting are the responsibility of the Secretary. Committee
correspondence is the responsibility of the Economic Development Manager.
VI. Len2tth of Membership Term: Members shall serve for three-year terms on a three-year
rotating basis so that approximately one-third of the membership expires each year.
PAGE 2. IEDC ORGANIZATIONAL AND MEMBERSHIP GUIDELINES
Individuals wishing to continue serving on the committee may so indicate prior to the
expiration of their term. Any member wishing to relinquish his/her position on the IEDC
may do so by submitting a letter of resignation.
VI. Filling a Vacant Position: A list of potential committee members shall be kept by the
Executive Director. The IEDC must recommend approval of new members by a majority
vote. The City Council must ratify the appointment of new members to the IEDC.
VIL Membership Attendance: In order to make a positive contribution to the committee, each
member is expected to attend at least 75 percent of the meetings in any given year. A
year is defined as beginning on the 1st of January and ending on the 31 st of December
Amended: 01/05/2016, 12/06/2016, 03/05/2019, 11/12/2024
1=9124, 1142 AM
CHIC - Print Job Appllca9on
EMPLOYMENT APPLICATION
City of Monticello
Received: 5/21/24,10,20
usY or
505 Walnut Street
AM
.�,
For Official Use Only:
Monticello, Minnesota - 55362
DUAL:
Monticello
CHO:
M lNhrsor�
Hohhaus, March
❑Experience
Industrial and Economic Development Committee Member (Volunteer)
❑Training
❑Other.
PERSONAL INFORMATION
POSITION TITLE:
Jab Number:
Industrial and Economic Development Committee Member (Volunteer)
2023-00035
NAME: (Last, First, Middle)
PERSON ID:
HoIthaus,Aaron
581MO7
ADDRESS:
HOME PHONE:
EMAI S:
NOTIFICATION PREFERENCE:
Emaa
DRIVER'S LICENSE:
LEGAL RIGHT TO WORK IN THE UNITED
HIGHEST LEVEL OF EDUCATION:
Yes
STATES?:
Bachelor's Degree
State: AN Number: Z.............. 5
0 Yes ❑ No
PREFERENCES
WHAT TYPE OF JOB ARE YOU LOOKING FOR?
Temporary
TYPES OF WORK YOU WILL ACCEPT:
Part Time
EDUCATION
1
SCHOOL NAME:
University of Minnesota
LOCATION:(City,State)
DID YOU GRADUATE?
DEGREE RECEIVED:
Twin Cities, MN
■ Yes ❑ No
I
Bachelors
MAJOR/MINOR:
Economics
WORK EXPERIENCE
DATES:
EMPLOYER:
POSITION TITLE:
from January12004 to Present
I JAT Restaurants
I Owner
ADDRESS:
PHONE IAaron SUPERVISOR: I MAY WEICONTACT THIS EMPLOYER?
HOURS PER WEEK:
50
DUTIES:
We have seven restaurants and three convenience stores m the area, as well as some commercial buildings
Nips //secure.neogovwu idngeenter/pdnVlobapplicationl2b7beg7f6688d58D04fa2bfO6931943ac743c97057cd28d0/6W307b89eaM35602aWa73c17... 1/3
10/2924, 11 42 AM OHC - Print Job Application
REASON FOR LEAVING:
Current Owner
CERTIFICATES AND LICENSES
Nothing Entered For This Section
SKILLS
OFFICE SKILLS:
Nothing Entered For This Section
OTHER SKILLS:
Nothing Entered For This Section
LANGUAGE(Sk
Nothing Entered For This section
SUPPLEMENTAL INFORMATION
Nothing Entered For This Section
REFERENCES
Nothing Entered For This Section
1. Are you at least 16 was old?
Yes
2. Are you at least 18 years old?
Yes
3. How did you hear about this position?
Referral
4. If you marked "Other" please specify.
j,A5, I£G1 S,,,lemental Ouesdome
1. Marie tell us why you are Interested in serving on this Board or Commission?
My family has been involved in commercial and residential development for over 40 years. We currently have multiple businesses in town and we
are working on more.I have a passion for economics and development.
2. Marie list your qualifications for this volunteer appolnument
I have an Economics degree from the University of Minnesota. I have also been involved in the development of our restaurants, converdence stores.
and commercial buildings
3. Please list any city boards, commissions, or committees you're currently serving on or have served on In the past
I have no prior experience on any city boards, commissions, or committees However, l have been the chairman of our restaurant brands na0onal
association and adveraing committees.
By clicking on the 'Accept & Submit' button, I hereby certify that all of the Information provided by me in this application (or any other
accompanying or required documents( is correct, accurate and complete to the best of my knowledge. I understand that the falsification,
misrepresentation or omission of any facts in said documents may be cause for dental of employment or Immediate termination of
employment regardless of the timing or circumstances of discovery.
I understand that submission of an application does not guarantee employment. I understand that none of the documents, policies,
procedures, actions, statements of the City of Monticello or its representatives used during the employment process is deemed a contract
of employment, real or Implied. In consideration for employment with the City of Monticello, if employed, I agree to conform to the rules,
regulations, policies and procedures of the City of Monticello at all times and understand that such obedience Is a condition of employment
I understand that If offered a position with the City of Monticello, I may be required to submit to a drug screening and background check as
a condition of employment. I understand that unsatisfactory results from, refusal to cooperate with, or any attempt to affect the results of
these pre -employment tests and checks will result In withdrawal of any employment offer or termination of employment if already
employed.
14ips:Rsecure neogov.wo inngcenter/pdnVlobappllcatloN2b7be97f6688d5a004fa2bM6931943ac'143c97057cd28d0/89d307b89eaM35602acda7307... 2/3
10129124,1142 AM
OHC - Print Job Application
With my signature below, I am providing the City of Monticello authorization to verify all information I provided within this application,
including contacting current or previous employers. However, I understand that If. in the Employment Experience section I have answered
"No" to the question, "May we contact your current employer?", contact with my current employer will not be made without my specific
authorization.
This application was submitted by Holthaus, Aaron
Signatures
Nice /Isewm.neogov.cumlhinngcenledpnnVjobappiictiDn2b?be9?f6688d5a004fa2bf06931943ac]43c9]05]cd28d0/69d30]b89eaf93%02acda93cf/. W3
10/29/24, 11:43 AM
CHIC - Print Job Application
EMPLOYMENT APPLICATION
Cityof Monticello
CITY n OF
505Walnut Stme
�TL,,{{�� {,
Monticello, Minnesota - 55362
BLto„r+<*'wci manticelp.lnn us ippp/,www<imonncello.mr:.us)
1Y1Vntiaello
MIN NisOrA
Irog SciA
Industrial and Economic Development Committee Member (Volunteer)
PERSONAL INFORMATION
POSITION TIME:
Industrial and Economic Development Committee Member (Volunteer)
NAME: (Lan, First. Middle)
McElroy. Sonja, A
ADDRESS: (Sheet, City, State, Zip Code)
HOME PHONE:
EMAIL SS:
DRIVER'S LICENSE:
Yes
State: MN Number: T"""""'S
Job Number:
20234)0035
PERSON ID:
502624T7
ALTERNATE PHONE:
NOTIFICATION PREFERENCE:
Email
Received: 10/10/34. 599 PM
For Official Use Only:
DUAL:
DNO
❑Experience
❑Training
❑ Otbec
LEGALRIGHTTO WORK IN THE UNITED I HIGHEST LEVEL OF EDUCATION:
STATES?: Some College
IN Yes ❑ No
PREFERENCES
WHAT TYPE OF JOB ARE YOU LOOKING FOR?
Regular
TYPES OF WORK YOU WILL ACCEPT:
Part Time
EDUCATION
I
SCHOOL NAME:
Professional Development and Leadership Programs
LOCAMM(City,State)
DIDYOUGRADUATE?
DEGREE RECEIVED:
Bloomington, MN
■ Yes ❑ No
I
Certification
MAJOR/MINOR:
Professional Development and Leadership
I
SCHOOLNAME:
Blgfork High School
LOCATION:(City, Ste")
DID YOU GRADUATE?
DEGREE RECEIVED:
Bigfork, MN
IN Yes ❑ No
High School Diploma
I
SCHOOL NAME:
Bemidji State Unmersity
LOCATION:(City, State)
DID YOU GRADUATE?
DEGREE RECEIVED:
Bemidji, MN
❑ Yes ■ No
I
Other
MAJOR/MINOR:
1 and 1/2 years
SCHOOL NAME:
St Cloud Technical College
helps://semm.neogor.wr hldngcenter/pdnVjobapplicalion/26cfaa7Of4Mb7d8aMbc ld4fm74eef5168c09ed783241adde55er22ab474a334261dc M2 . 1/5
10112924. 1143 AM OHC - Prat Job Application
LUCJlD1ON:(Cfty, Sai
DID YOU GRADUATE'
DEGREE RECEIVED:
St Cloud MN. MN
0Yes ■No
Certification
MAIOILMINOR:
I
2 .is
I
SCHOOL NAME:
IBM Technical Training
LOCATION(CRY. Slate)
DID YOU GRADUATE7
DEGREE RECEIVED:
Minneapolis, MN
yes ONO
Cenmcatlon
MAIORrMINOR:
2 years
I
SCHOOLNAME:
Benchmark Learning Microsoft Certifications
LOCATION:(City. State)
I DID YOUGRADUATE7
I DEGREE RECEIVED:
Bloomington. MN
■ Yes ❑ No
Cedifcation
MAJORtMINOR:
Microsoft Certifications. ITIL, Development
WORK EXPERIENCE
h�om� bruary2001 m May2022 I �ays COom�pames Inc. I Director�M Information Systems
ADDRESS: (Street Cry, Slate, Zip Code):
PHONE NUMBER: SUPERVISOR: MAY WE CONTACT THIS EMPLOYER'
- -- CFO Hays Companies, aYes ❑No
Iz
HOURS PER WEEK:
GO
DUTIES:
For 22 years I lead technology for Hays Companies, Inc. We grew our business from 10 million to over 200 million until sdtl free years ago to Brown
and Brown After the acguisftioMransNon I made me decision to step back. work less and make family first.
During my Rademhip at Have 11e d countless business techoolagy projects the projects ranged from Innovation. Application dev Ment art
Infrastructure. Many of these projects differentiated! Hays Companies as a leader In lechrio" I'm not only a leader; I'm a technologist wah a keen
business accolade.
REASON FOR LEAVING:
Decale l to take time off and decide what I want to do wnh the next charter of my I6e.
DATES:
from MamM996 to February2001
ADDRESS: (Street CRY. State, ZIP Code):
PRONE NUMBER:
EMPLOYER: POSITION TITLE:
Aon Risk Services Director of Information Systems
SUPERVEiOR: MAY WE CONTACT THIS EMPLOYER?
- . Managing Director of Ann Risk E Yes ON.
of MN
HOURS PER WEEK:
GO
DUTIES:
Lead Technology for the Midwest Region of Aon RISK Services.
Lead Aon Corporate on most Ann Ma/or Infrastructure and Development protects.
REASON FOR LEAVING:
Opportunity with Hays Companies. Inc
sCoordinetorTEI,
PeaIPesi
from tier1989 to MercM996 Ihm
m
I Do
hhllps.//settee neogov.convbimgcwWr/print&obapphcetiaJ ea7Of4c4b7tl 218 eIMfm74ee1516kO9ed7832410dde55e22ab4748334261dcd162.. 215
10/29/24, 11.43AM
OHC - Print Job Application
ADDRESS: (Street, City, State, Zip Cote).
Elk River, MN 55362
SUPERVISOR:
--County Auditor
HOURS PER WEEK:
40
MAY WE CONTACT THIS EMPLOYER?
IN Yes 0 No
DUTIES:
IT operations, Lead Business Analyst for property tax programming for MN property tax calculations. To provide regvirements and specifications for
programmers you need to understand all areas of property tax calculations. This includes Marketvalue/Assessed value, revenue expenditures, Tax
incrementfinancing/special assessments and lever rates. Essentially every element involved in property tax calculations/tracking Ialsoveninvolkedin
GPS/9ll addressing and property tax records management (land parceling). Early information system layering to our good Geographical Information
systems.
REASON FOR LEAVING:
Opportunity for better Job salary wah Aon Risk Services
CERTIFICATES AND LICENSES
TYPE:
Countess Technology Certifications Microsoft, Project Management ITIL. SOC2 Security.
DATEISSUED: EXPIRATION DATE: NUMBER:
January 1999 1 May2022 I Countess Tech certifications
r
TYPE:
Professional Development and Leadership Annual Classed provide by Employer
DATE ISSUED: EXPIRATION DATE:
January 1995 1 January2022
SKILLS
OFFICE SKILLS:
TYPIng: 40 WPM
Data Entry 2200 KPH
OTHER SKILLS:
Keyboarding - Expert -45 years, 5 months
LANGUAGE(S):
English
■ Speak ■ Read ■ Write
SUPPLEMENTAL INFORMATION
Nothing Entered for This Section
REFERENCES
I
REFERENCE TYPE: NAME:
Professional -
ADDRESS: (Street, City. State. Zip Code)
EMAIL ADDRESS:
I:PISJ84:A
POSITION:
ISSUING
AGENCH
Microsoft
benchmark
Learning,
etc.
ISSUING
AGENCY:
Aon and
Hays
Compnmes
Inc
https'//secure.neogovmWhinngcenter/pnnVjobappliwtoN26cfaa7M4v b7d8a2f8bca 1d4f a74eef5188c09edT8324/adde55ef22ab4]4a334261 dcdf62... 3/5
10/29124, 11 43AM OHC - Print Job Application
REFERENCE TYPE: NAME: POSITION:
Personal -
ADDRESS: (Street, City, Stale, Zip Cade)
EMAILADDRESS:
1. Are you at least 16 years old?
Yes
2. Are you at least 18 years old?
Yes
3. How did you hear about this position?
City of Monticello Website
4. Hyou marked "Other" please specify.
A9g1lFY • Wltle Oue4lbsM
Jobe mifi� nnbmn nr QnMinn
PHONE NUMBER:
t. Please tell us why you are Interested in serving on this Board or Commission?
In my professional life I have alway been enaged in business operations and growth. I understand the challenges of doing business. I have lived in
Monticello for 39 years and love seeing this City grow.
2. Please list your qualifications for this volunteer appointment.
I have 30 years of business experience and I also worked for Sherburne County in the auditors office working with zoning, the Assessors once and
treasury. I understand taxation and tax increment tax zoning
3. Please list any city boards, commissions, or committees you're currently serving on or have serval on in the part.
None recently named.
By clicking on the 'Accept & Subri button, I hereby certify that all of the information provided by me in this application (or any other
accompanying or required documents) is correct, accurate and complete to the best of my knowledge. I untlerstantl that the falsification
misrepresentation or omission of any fads in said documents may be cause for denial of employment or immediate termination of
employment regardless Of the timing or circumstances of discovery
I understand that submission of an application does not guarantee employment. I understand that none of the documents, policies,
procedures, actions, statements of the City of Monticello pills representatives used during the employment process is deemed a contract
of employment. real or implied. In consideration for employment with the City of Monticello, if employed I agree to conform to the rules,
regulations, policies and procedures of the City of Monticello at all times and understand that such obedience is a condition of employment
I understand that if offered a position with the City of Monticello, I may be required to submit to a drug screening and background check as
a condition of employment. I understand that unsatisfactory results from, refusal to cooperate with, or any attempt to affect the results of
these pre -employment tests and checks will result in withdrawal of any employment offer or termination of employment if already
employed.
With my signature below, I am providing the City of Monticello authorization to verify all information I provided within this application.
including contacting current or previous employers. However, I understand that if, in the Employment Experience section I have answered
'No" to the question, "May we contact your current employer?', contact with my current employer will not be made without my specific
authorization.
This application was submitted by McElroy, Sonja, A
Signature
hdps:l/secure.neogov.comlhinngcenter/pnngjobappliwtion/26cfea7M4c4b]d8a2f86ca1 d4fce74eef516Bc09e 78324/adde55ef22ab474a334261 dcdf62 4/5
IMS/24, 11:43AM
DHC - Print Job Application
Dat^
Mips I/secure.neegw.cov iringcenter/prinbobappliwtionl26cfaa76f4c b7d8a2f8bc ld4fm74eef5168cW d78324/adde55ef22ab474a33426idWf62... 5/5
lO2824,11:42A1
OHC - Pdn1 Job Appiicaaon
EMPLOYMENT APPLICATION
City of Marmicallo
RawHed: WIMh1. 8.59
cnY UI
SOS Worm Street
AM
For OT6tlal Ilea Only:
MontkNb. Mi...-SS%2
DUAL:
M�,{� /gyp
onticello
mwu mnnureiin tan us iMp/wwo nnncrlln tan tt)
ONO:
MINNIS111A
HaeY I.�k
❑Experience
Industrial and Economic Devebpment Comminae Member (VolumeaN
❑ Training
❑Omer:_
PERSONAL INFORMATION
POSDION TIRE
Indusmal and Economic Development Committee Member (Volunteer)
NAME:6asL First, Mmdle)
Huey. Mike
1 ADDRESS: (Street, City. State, Zip Code)
HOME PHONE:
EMRL ADDRESS:
DRIVER'S LICENSE: LEGAL RIGHT TO WORK IN THE UNITED
Yes STATES?:
State: MN Number. C"""""'6 ■ Yes ❑ No
WHAT TYPE OF JOB ARE YOU LOOKING FOR?
TYPES OF WORK YOU WILL ACCEPT:
PREFERENCES
EDUCATION
SCHOOL RARE:
North Central University
LOCATION:(CM. State) I DID YOU GRADUATE?
Minneapolis. MN ■ yes ON.
MAIORMINOR:
Theology
WOW EXPERIENCE
DATES:
EMPLOYER:
from July/I021 to Present
Scalable Sales Solutions
ADDRESS: (SVeeI. Cry. State, Zip Code).
%ZONE
I SUPERWSOR:
Self
HOURS PER WEEK
60
DUTIES:
Consulmg small to raid -size business owners around the country on scaloig their business
REASON FOR LEIIWNG:
Currently waking here
Job Number
2023 OD35
PERSON ID:
59,1119,51
NOTIFICATION PREFERENCE:
Email
HIGHEST LEVEL OF EDUCATION:
Master's Degree
DEGREE RECEIVED
Bachelors
PORTION TITLE: t
PreNdmVQmer
MAY WE CONTACT THIS EMPLOYER? I7
■ Yes ONO
htWIsetae.neogoycDr O.rirK,e rlpnnVjobeppk8bon"cdl55D979a398B37039398C979d2c7/OeEle6a78ecDUe5161I283bebc59eW2e8009D7.. W
10/29/24, 11:42 AM
CHIC - Print Job Application
I
TYPE:
Exit Planning Certified Advisor
DATE ISSUED:
April 2024
OFFICE SKULLS:
Nothing Entered For This Section
OTHER SKILLS:
Nothing Entered For This Section
LANGUAGE(S):
Nothing Entered For This 6ectiOn
SUPPLEMENTAL INFORMATION
Nothing Entered For This Section
I
REFERENCE TYPE:
Professional
ADDRESS: (Street City, Slid, Zip Code)
EMAILADDRESS:
1. Are you at least 16 years old?
Yes
2. Are you at least 16 years old?
yes
3. How did you Mar about this position?
Referral
4. If you marked "Other" please specify
CERTIFICATES AND LICENSES
EKPIRATION DATE:
April 2026
NAME:
SKILLS
REFERENCES
NUMBER:
POSRION:
PHONE
ISSUING
AGENCY:
Exit
Planning
Institute
Job Sceclflc Sunolemental Questions
1. Please tell us why you are interested In serving on this Board or Commission?
1 help companies around the country grow from local businesses to regional and national. I think that experience may help our city. On the other
hand I can learn a lot about the needs of a city and translate that to help my clients.
2. Please list your qualifications for this volunteer appointment.
I have been scaling businesses since 2009 and consulting company for the last five years.
3. Please list any city boards, commissions, or committees you're currently serving on or have served an in the past.
None. I'm relatively new (6 years) to Monticello and would like to contribute
By clicking on the 'Accept & Submit' button, I hereby certify that all of the information provided by me in this application (or any other
accompanying or required documents) Is correct, accurate and complete to the best of my knovAedge. I understand that the falsification,
misrepresentation or omission of any facts in said documents may be Cause for denial of employment or immediate termination of
employment regardless of the timing or circumstances of discovery.
hRps//secum.neogov coMhuingcenter/pnntlobapplicationl38dcd1 S504T4a396d3?b3039649T4d2cTT0aflfe6a?aec04/e51614293bebc59e0T2e60b80?. 2/3
IWW24. 11:42 AM
OHC - Print Job Application
I understand that submission of an application does not guarantee employment. I understand that none of the documents, policies,
procedures, actions, statements of the City of Monticello or its representatives used during the employment process Is deemed a contract
of employment, real or implied. In consideration for employment with the City of Monticello, If employed, I agree to conform to the rules,
regulations, policies and procedures of the City of Monticello at all times and understand that such obedience is a condition of employment.
I understand that if offered a position with the City of Monticello, I may be required to submit to a drug screening and background check as
a condition of employment. I understand that unsatisfactory results from, refusal to cooperate with, or any attempt to affect the results of
Mesa pre -employment tests and checks will result in withdrawal of any employment offer or termination of employment if already
employed.
With my signature below, I am providing the City of Monticello authorization to verify all information I provided within this application,
including contacting current or previous employers. However, I understand that if. In the Employment Experience section I have answered
"No" to the question. Way we contact your current employer?', contact with my current employer will not be made without my specific
authorization.
This application was submitted by Huey, Mike
Signature
D-1-
httpsJiwwre.neogov.wo inngcenterlpnntriobappliwtiorv38dcd15504]4a3g6d3]b3038649]4d2c1]OaMe6a]aec04le51614293bebc59e0]2e60b80] . 313
2024 ANNUAL BOARD AND COMMISSION MEMBERS
COMMISSIONS/BOARDS NAME
TERM
EXPIRES
Planning Commission Teri Lehner
3 yr
12/2026
(3-year staggered terms) Rob Stark
3 yr
12/2026
Andrew Tapper
3 yr
12/2024
Paul Konsor
3 yr
12/2024
Melissa Robeck
3 yr
12/2025
Parks, Arts, and Recreation Commission
Danielle Murdoff
(3-year staggered terms)
Daryl Tindle
Maria Onnen
Janine Kopff
Julie Jelen
Mercedes Turner
Adam Leiferman
Library Board
Jamie Driscoll
(3-year staggered terms)
Shea Roskowiak
Lisa Bush
Beth Metzger
Joan Brezlin
Economic Development Authority
Steve Johnson
(6-year staggered terms)
011ie Koropchak-White
Jon Morphew
Hali Sittig
Rick Barger
Tracy Hinz (voting)
Lloyd Hilgart (voting)
IEDC:
Andrew Tapper
(3-year staggered terms)
Eric Olson
Rob Stark
Tony Velishek
VACANCY
Sarah Kortmansky
Jarred Merchant
Darek Vetsch
Luke Dahlheimer
Randy Skarphol
Corey Ritter
Joni Pawelk
Wayne Elam
Tracy Hinz
VACANCY
Liz Kokesh
VACANCY
VACANCY
Chamber Director
Bertram Chain of Lakes Advisory Council
Daryl Tindle
(3-year staggered terms)
Dawn Larson (at large)
Tom Vetsch (at large)
3 yr
3 yr
3 yr
3 yr
3 yr
3 yr
3 yr
3 yr
3 yr
3 yr
3 yr
3 yr
6 yr
6 yr
6 yr
6 yr
6 yr
Council rep
Council rep
3 yr
3 yr
3 yr
3 yr
3 yr
3 yr
3 yr
3 yr
3 yr
3 yr
Chamber Rep
3 yr
3 yr
3 yr
3 yr
3 yr
Student Rep
12/2026
12/2026
12/2024
12/2024
12/2025
12/2025
12/2025
12/2026
12/2026
12/2024
12/2024
12/2025
12/2029
12/2024
12/2026
12/2027
12/2028
M 1 1
'i LitL�c�
12/2026
12/2026
12/2026
12/2026
12/2026
12/2024
12/2024
12/2024
12/2024
12/2024
12/2025
12/2025
12/2025
12/2025
12/2025
Student Rep
ex -off icio
Parks rep
12/2026
3 yr
12/2025
3 yr
12/2026
City Council Agenda: 11/12/2024
2F. Consideration of approving a contract for professional planning services with Grittman
Consulting, LLC and appointing Grittman Consulting, LLC as City Planner as of January
1, 2025
Prepared by:
Community Development Director
Reviewed by:
Chief Building Official, Community &
Economic Development Coordinator,
City Attorney
ACTION REQUESTED
Meeting Date
11/12/2024
Approved by:
City Administrator
® Consent Agenda Item
❑ Regular Agenda Item
Motion to approve a contract for professional planning services with Grittman Consulting, LLC
and to appoint Grittman Consulting, LLC as City Planner, with both contract and appointment
effective as of January 1, 2025.
REFERENCE AND BACKGROUND
The City Council is asked to consider continuing its relationship with Steve Grittman as the
primary City Planner for the City of Monticello, adopting a slightly amended contract for 2025.
The 2025 contract includes a minor change to clarify the provisions for contract termination,
and adjustments for 2025 rates. The rate adjustment increases the hourly rates for both private
and non -retainer City planning assistance. There was no rate increase for planning services in
2024 and no adjustment to the public assistance retainer is proposed for 2025. Both the
retainer rate and the hourly rates include all mileage, copying and other incidental expenses.
As a reminder, under the existing and proposed contract the City pays a retainer rate for City -
related planning assistance. The services covered by the retainer are detailed within the
contract. The retainer model provides consistency in budget expectations month to month and
year to year and in the anticipated overall cost of actual services and time commitment for
planning services.
The contract also outlines the scope and hourly rate for private planning assistance, which is
billed to the escrows submitted with private land use applications and project review.
Regarding level and delivery of service, Mr. Grittman has served the community for over 30
years. He has significant experience with the community and knowledge of the City's land use
plans and ordinances. He has been involved in important community planning initiatives,
including park master planning and The Pointes at Cedar Master Plan among others. Mr.
City Council Agenda: 11/12/2024
Grittman has been the primary planner in the review and analysis of many of the community's
major development projects, from residential subdivisions to large commercial and institutional
planned unit developments.
Grittman Consulting, LLC continues to serve municipal clients only. This provides a continued
network for reference in municipal planning trends and information sharing. In addition, Mr.
Grittman maintains his professional and colleague network to benefit his client communities on
land use trends and case law.
I. Budget Impact: The 2025 Planning and Zoning budget has sufficient funding to
accommodate the monthly retainer rate of $4,167 for the coming year. If the contract is
approved, the City will need to adopt a fee schedule change for the hourly private and
City -planning related expenses for the 2025 fee schedule.
II. Staff Workload Impact: Staff time spent reviewing the revised contract hours is limited
and estimated at less than 2 hours.
III. Comprehensive Plan Impact: It is expected that any consulting planning service will
continue to utilize the City's current adopted comprehensive plan as a guide for land use
assistance.
STAFF RECOMMENDED ACTION
City staff recommend approval of a 2025 contract with Grittman Consulting, LLC based on Mr.
Grittman's extensive experience with Monticello and his depth of knowledge in the land use
field. Mr. Grittman also brings a background in landscape architecture and law to his land use
practice.
The City Attorney has reviewed the contract revisions and finds the change noted acceptable.
Planning, Building and Economic Development staff have expressed their support for
maintaining a professional services contract with Mr. Grittman.
SUPPORTING DATA
A. Proposed 2025 Contract, Grittman Consulting, LLC
B. Proposed 2025 Contract, Grittman Consulting, LLC - Redline
January 1, 2025
AGREEMENT FOR PROFESSIONAL PLANNING SERVICES
THIS AGREEMENT, entered into by and between the CITY OF MONTICELLO,
MINNESOTA, hereinafter referred to as the "Client" or "City" and GRITTMAN
CONSULTING, LLC., hereinafter referred to as the "Consultant".
WITNESSETH:
ARTICLE 1. AREA OF SERVICE
That the Client does hereby agree to employ the Consultant to render professional
technical planning, zoning, and development assistance services to the extent and kind
described in Article 2 below in and for the City of Monticello, Minnesota.
ARTICLE 2. SERVICES OF THE CONSULTANT
The Consultant hereby agrees to render the professional services as follows after receipt
of work authorization by the Community Development Director (the Client's
representative), or their designee.
A. Technical Planning and Development Assistance
CITY -INITIATED TECHNICAL ASSISTANCE: The Consultant shall provide
general assistance and consultation to the Client, including:
a. Advise, consult, and report regarding the Client's planning, zoning, and
development related functions and activities.
b. The Consultant will be available to attend routine staff meetings for
purposes including, but not limited to, regular site review, pre -design
and/or pre -application, application review, post -approval staff meetings,
assist and advise the Client on the administration, structure, forms,
procedures and processing of the recommendations which are received
and accepted by the Client.
c. Prepare staff reports, resolutions, ordinances and other documents
analyzing and supporting staff or consultant research and
recommendations on City -initiated planning items, whether or not
scheduled for public review. Such documents may include review and
reporting for projects initiated by other government agencies where the
Consultant prepares such reviews for use by the City in consideration of
the City's participation in, or response to such projects. Examples of
such agencies may include, but not be limited to the Monticello Orderly
Annexation Area Board, multi -jurisdictional study groups, or similar
entities. Direct production of research and materials on behalf of such
entities shall be subject to the terms of Paragraph A.3.
d. On a monthly basis, attend up to one (1) regularly scheduled Planning
Commission meeting, up to one (1) regularly scheduled City Council
meeting, and up to one (1) additional evening meeting provided the
Consultant's schedule permits. Meetings under this section may include
those held by other governmental agencies at which the Consultant is in
attendance representing the City's interests.
e. Services under the section shall be rendered on an as needed basis to
be determined by the Client's representative as noted herein. Any
services performed under this Article will be billed on a monthly basis as
per Article 4.A. (Retainer) of this Agreement.
f. The meetings included in Subp. d. of this section are a general obligation
of the Consultant, and meetings missed for pre -scheduled vacation,
illness, or unforeseen circumstances shall not impact the fees charged
under this section. The Consultant agrees that foreseeable absences,
including vacations, will be coordinated with the City in advance, and
that the Consultant agrees to make every effort to schedule in such a
way as to minimize such absences.
2. PRIVATELY -INITIATED TECHNICAL ASSISTANCE. The Consultant shall
provide general assistance and consultation to the Client, including:
a. Advise and report regarding the Client's planning, zoning, and
development applications, and other related functions and activities
initiated through an inquiry and/or formal application from a Non -Client
party.
b. The Consultant will be available to attend staff meetings chargeable to
the Applicant's fee and/or escrow account, assist and advise the Client
on the administration, structure, forms, procedures and processing of
the recommendations which are received and accepted by the Client.
c. Prepare staff reports, resolutions, and other documents analyzing and
supporting staff research and recommendations on Privately -initiated
planning items, whether or not scheduled for public review.
d. Services shall be rendered on an as needed basis to be determined by
the Client's representative as noted herein. Any services performed
under this Article will be billed on a monthly basis as per Article 4.13.
(Hourly Rate) of this Agreement.
3. CITY -INITIATED ASSISTANCE NOT INCLUDED IN RETAINER. From
time to time, projects that exceed the routine review and analysis or
common city processes for planning and zoning -related issues may be
found to be outside the scope of the items identified in 2.A.1. In such
matters, the Client may request a specific quote or proposal and scope of
services for the identified project, the work for which would be invoiced
separately per the Consultant's charge rates found in the Rate Schedule.
For such projects, no work shall be commenced, nor compensation owed,
until a written approval is granted by the Client and the work is expressly
directed. The Consultant hereby agrees that any such work is eligible at all
times to be submitted for competitive bid, to the Consultant and/or outside
consultants, without obligation of the Client to the Consultant under this
Contract. The Consultant hereby agrees to not unreasonably refuse any
reasonable work required under the retainer, and the Client hereby agrees
to not unreasonably require it.
Services shall be rendered on an as needed basis to be determined by the
Client's representative as noted herein. Any services performed under this
Article will be billed on a monthly basis as per Article 4.13. (Hourly Rate) of
this Agreement, and according to the agreed budget.
ARTICLE 3. SERVICES OF THE CLIENT
The Client hereby agrees to furnish to or make available for examination or use by the
Consultant, without charge, the following:
A. Agendas for all meetings when attendance of the Consultant is required within a
reasonable time to allow for review of each relevant item on the agenda.
B. All materials and documents applicable to all agenda items. Such material and
documents shall be submitted to the Consultant within a reasonable period of time
before any meeting at which time they are to be considered.
C. Material and documents, as determined by the Consultant, that are necessary for
the services to be performed, including meeting minutes, development regulations,
Comprehensive Plan documents, or other related documents.
ARTICLE 4. PAYMENT
A. Technical Planninq and Development Assistance
The Client hereby agrees to pay the Consultant for professional services included
in Article 2. of this Agreement as follows:
RETAINER PAYMENT FOR CITY -INITIATED TECHNICAL ASSISTANCE.
The work described in Article 2.A.1 shall be invoiced pursuant to the
monthly Retainer in accordance with the rate schedule attached hereto.
Said Retainer shall be a fixed monthly amount, invoiced separately from
other costs invoiced under Articles 2.A.2 and 2.A.3. At the Client's request,
the Consultant may itemize the work done under said Retainer. The rate
schedule shall be subject to adjustment each calendar year.
2. PAYMENT FOR PRIVATELY -INITIATED TECHNICAL ASSISTANCE. The
work described in Article 2.A.2 shall be invoiced on a time and materials
basis in accordance with the rate schedule attached hereto for "Privately -
Initiated Rates". The Consultant shall provide an invoice itemizing work
completed by project name and number. The rate schedule shall be subject
to adjustment each calendar year.
3. PAYMENT FOR CITY -INITIATED ASSISTANCE NOT INCLUDED IN THE
RETAINER. The work described in Article 2.A.3 Shall be invoiced on a
time and materials basis in accordance with the rate schedule attached
hereto for "City -Initiated Rates", if hourly, and/or for the agreed -upon
fixed fee if applicable. The rate schedule shall be subject to adjustment
each calendar year. This Section includes night meetings in excess of
those included in the Retainer when directed by the Client and agreed to
by the Consultant.
4. If the Client finds it necessary to abandon requested work, the Client shall
notify the Consultant in writing and the Consultant shall be compensated
for all work completed and materials expended prior to said notice.
5. The Consultant shall submit a statement of services rendered under
Article 2. on a monthly basis payable by the Client.
ARTICLE 5. OTHER PARTIES
A. It is mutually agreed that this Agreement is not transferable by either party to a
third party without the written consent of the other. The Consultant, at its own
discretion, may seek professional assistance with certain aspects of any project.
Such work shall at all times be subject to the Client's acceptance as if it were
completed wholly by the Consultant, and shall be invoiced as such, under the
requirements of Articles 2 and 4 of this agreement and in compliance with
Minnesota Statutes §471.425.
B. The Consultant's reports and other materials prepared in the performance of this
Agreement are instruments of services and remain the property of the Client.
However, any further distribution of these reports by the Client must note the
Consultant as the source.
C. For lawsuits or legal actions brought by a third party against the Client, which also
names the consultant, resulting from negligence, reckless, or improper actions of
the Client or the consultant, each party shall be liable for its own acts to the extent
provided by law, and each party hereby agrees to indemnify, hold harmless and
defend the other, its officers and employees against any and all liability, loss, costs,
damages, expenses, claims or actions, including attorney's fees which the other,
its officers and employees may hereafter sustain, incur or be required to pay,
arising out of or by reason of any act or omission of the party, its agents, servants
and employees in the execution, performance or failure to adequately perform its
obligations pursuant to this Agreement.
D. Insurance Requirements. The Consultant agrees that, in order to protect itself, as
well as the Client, under the indemnity provision set forth above, it will at all times
during the term of this Agreement keep in full force and effect the following
insurance protection in amounts not less than the limits specified below, or greater
as necessary:
Commercial General Liability - $2,000,000.00 per incident, including the
following endorsements:
a. Automobile coverage - $100,000/$300,000.
Any policy obtained and maintained under this clause shall provide that it shall not
be canceled, materially changed or not renewed without thirty (30) days prior
notice thereof to the Client.
E. In the event that the Client consists of two (2) or more municipal or corporate
entities, each shall be jointly and severably liable for all payments due the
Consultant authorized pursuant to this contract.
ARTICLE 6. TERMINATION
A. This Agreement may be terminated by either party upon thirty (30) days written
notice for any reason. This Agreement shall remain in force until such time as
either party elects to terminate it as specified under this Article.
B. In the event of termination by the Client, the Client shall pay the Consultant for
work completed prior to the termination date on a time plus materials basis, such
payment to be made within thirty (30) days after receipt of Client of a final invoice
showing work completed and delivery of all materials prepared for the Client for
which payment has been made.
C. In the event of termination by the Consultant, the Consultant shall forward to the
Client on or prior to the termination date any unearned fees or retainers held by
the Consultant within thirty (30) days of termination date.
/_1:4 III [WI FRS] 111:I 4 ZA a ZIS ►TJ RI Is] L1 RI
A. MINNESOTA GOVERNMENT DATA PRACTICES ACT. Consultant must comply
with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter
13, as it applies to (1) all data provided by the City pursuant to this Agreement,
and (2) all data, created, collected, received, stored, used, maintained, or
disseminated by Consultant pursuant to this Agreement. Consultant is subject to
all the provisions of the Minnesota Government Data Practices Act, including but
not limited to the civil remedies of Minnesota Statutes Section 13.08, as if it were
a government entity if a Court of competent jurisdiction so finds. In the event
Consultant receives a request to release data, Consultant must immediately notify
City. City will give Consultant instructions concerning the release of the data to the
requesting party before the data is released. Consultant agrees to defend,
indemnify, and hold City, its officials, officers, agents, employees, and volunteers
harmless from any claims resulting from Consultant's officers', agents', partners',
employees', volunteers', assignees' or subcontractors' unlawful disclosure and/or
use of protected data. The terms of this paragraph shall survive the cancellation
or termination of this Agreement.
B. COPYRIGHT. Consultant shall defend actions or claims charging infringement of
any copyright or software license by reason of the use or adoption of any software,
designs, drawings or specifications supplied by it, and it shall hold harmless the
City from loss or damage resulting therefrom, but the Consultant shall not be liable
for any defense of the City's use of such software, designs, drawings, or
specifications when the Consultant has provided written notice of the source of any
such materials.
C. RECORDS. Consultant shall maintain complete and accurate records of hours
worked and expenses involved in the performance of services for a period of no
less than thirty six (36) months following said work.
D. WAIVER. Any waiver by either party of a breach of any provisions of this
Agreement shall not affect, in any respect, the validity of the remainder of this
Agreement.
CONDITIONS HEREIN AGREED TO:
GRITTMAN CONSULTING, LLC.
Stephen W. Grittman, Principal Date
MONTICELLO, MINNESOTA
Mayor
Date
City Administrator Date
Please Sign and Return One Copy
Exhibit A
Fee and Rate Schedule
Article 2.A.1. - Annual Retainer Amount, billed monthly*:
Article 2.A.2. - Private Technical Assistance:
Article 2.A.3 - Non -Retainer City Technical Assistance:
$50, 000.00
$188.00 per hour
$172.00 per hour
*Retainer inclusive of all direct costs, including routine travel, printing and
reproduction, business overhead, or other office expenses related to the
attendance at meetings or production of required documents and materials.
Other Charges:
• Expenses related to required travel out of state or overnight (direct cost of
travel and hotel, plus per diem). Other routine expenses covered by the
Retainer as noted above.
• Charges for sub -consultants identified to and approved by the community
development/ administration staff beforehand, at a rate to be determined
based on personnel -for privately generated work only. (No assignment of
projects by consultant to any other personnel may occur without prior
approval of the client).
• Charges for expert or other testimony arising from legal proceedings
involving the community, in which the consultant is called for depositions,
witness testimony, general advice, or other purpose, and any related
preparation and research - to be invoiced separately at the hourly rate for
Privately -initiated Technical Assistance.
May 31,2023 January 1, 2025
AGREEMENT FOR PROFESSIONAL PLANNING SERVICES
THIS AGREEMENT, entered into by and between the CITY OF MONTICELLO,
MINNESOTA, hereinafter referred to as the "Client" or "City" and GRITTMAN
CONSULTING, LLC., hereinafter referred to as the "Consultant".
WITNESSETH:
ARTICLE 1. AREA OF SERVICE
That the Client does hereby agree to employ the Consultant to render professional
technical planning, zoning, and development assistance services to the extent and kind
described in Article 2 below in and for the City of Monticello, Minnesota.
ARTICLE 2. SERVICES OF THE CONSULTANT
The Consultant hereby agrees to render the professional services as follows after receipt
of work authorization by the Community Development Director (the Client's
representative), or their designee.
A. Technical Planninq and Development Assistance
CITY -INITIATED TECHNICAL ASSISTANCE: The Consultant shall provide
general assistance and consultation to the Client, including:
a. Advise, consult, and report regarding the Client's planning, zoning, and
development related functions and activities.
b. The Consultant will be available to attend routine staff meetings for
purposes including, but not limited to, regular site review, pre -design
and/or pre -application, application review, post -approval staff meetings,
assist and advise the Client on the administration, structure, forms,
procedures and processing of the recommendations which are received
and accepted by the Client.
c. Prepare staff reports, resolutions, ordinances and other documents
analyzing and supporting staff or consultant research and
recommendations on City -initiated planning items, whether or not
scheduled for public review. Such documents may include review and
reporting for projects initiated by other government agencies where the
Consultant prepares such reviews for use by the City in consideration of
the City's participation in, or response to such projects. Examples of
such agencies may include, but not be limited to the Monticello Orderly
Annexation Area Board, multi -jurisdictional study groups, or similar
entities. Direct production of research and materials on behalf of such
entities shall be subject to the terms of Paragraph A.3.
d. On a monthly basis, attend up to one (1) regularly scheduled Planning
Commission meeting, up to one (1) regularly scheduled City Council
meeting, and up to one (1) additional evening meeting provided the
Consultant's schedule permits. Meetings under this section may include
those held by other governmental agencies at which the Consultant is in
attendance representing the City's interests.
e. Services under the section shall be rendered on an as needed basis to
be determined by the Client's representative as noted herein. Any
services performed under this Article will be billed on a monthly basis as
per Article 4.A. (Retainer) of this Agreement.
f. The meetings included in Subp. d. of this section are a general obligation
of the Consultant, and meetings missed for pre -scheduled vacation,
illness, or unforeseen circumstances shall not impact the fees charged
under this section. The Consultant agrees that foreseeable absences,
including vacations, will be coordinated with the City in advance, and
that the Consultant agrees to make every effort to schedule in such a
way as to minimize such absences.
2. PRIVATELY -INITIATED TECHNICAL ASSISTANCE. The Consultant shall
provide general assistance and consultation to the Client, including:
a. Advise and report regarding the Client's planning, zoning, and
development applications, and other related functions and activities
initiated through an inquiry and/or formal application from a Non -Client
party.
b. The Consultant will be available to attend staff meetings chargeable to
the Applicant's fee and/or escrow account, assist and advise the Client
on the administration, structure, forms, procedures and processing of
the recommendations which are received and accepted by the Client.
c. Prepare staff reports, resolutions, and other documents analyzing and
supporting staff research and recommendations on Privately -initiated
planning items, whether or not scheduled for public review.
d. Services shall be rendered on an as needed basis to be determined by
the Client's representative as noted herein. Any services performed
under this Article will be billed on a monthly basis as per Article 4.13.
(Hourly Rate) of this Agreement.
3. CITY -INITIATED ASSISTANCE NOT INCLUDED IN RETAINER. From
time to time, projects that exceed the routine review and analysis or
common city processes for planning and zoning -related issues may be
found to be outside the scope of the items identified in 2.A.1. In such
matters, the Client may request a specific quote or proposal and scope of
services for the identified project, the work for which would be invoiced
separately per the Consultant's charge rates found in the Rate Schedule.
For such projects, no work shall be commenced, nor compensation owed,
until a written approval is granted by the Client and the work is expressly
directed. The Consultant hereby agrees that any such work is eligible at all
times to be submitted for competitive bid, to the Consultant and/or outside
consultants, without obligation of the Client to the Consultant under this
Contract. The Consultant hereby agrees to not unreasonably refuse any
reasonable work required under the retainer, and the Client hereby agrees
to not unreasonably require it.
Services shall be rendered on an as needed basis to be determined by the
Client's representative as noted herein. Any services performed under this
Article will be billed on a monthly basis as per Article 4.13. (Hourly Rate) of
this Agreement, and according to the agreed budget.
ARTICLE 3. SERVICES OF THE CLIENT
The Client hereby agrees to furnish to or make available for examination or use by the
Consultant, without charge, the following:
A. Agendas for all meetings when attendance of the Consultant is required within a
reasonable time to allow for review of each relevant item on the agenda.
B. All materials and documents applicable to all agenda items. Such material and
documents shall be submitted to the Consultant within a reasonable period of time
before any meeting at which time they are to be considered.
C. Material and documents, as determined by the Consultant, that are necessary for
the services to be performed, including meeting minutes, development regulations,
Comprehensive Plan documents, or other related documents.
ARTICLE 4. PAYMENT
A. Technical Planninq and Development Assistance
The Client hereby agrees to pay the Consultant for professional services included
in Article 2. of this Agreement as follows:
RETAINER PAYMENT FOR CITY -INITIATED TECHNICAL ASSISTANCE.
The work described in Article 2.A.1 shall be invoiced pursuant to the
monthly Retainer in accordance with the rate schedule attached hereto.
Said Retainer shall be a fixed monthly amount, invoiced separately from
other costs invoiced under Articles 2.A.2 and 2.A.3. At the Client's request,
the Consultant may itemize the work done under said Retainer. The rate
schedule shall be subject to adjustment each calendar year.
2. PAYMENT FOR PRIVATELY -INITIATED TECHNICAL ASSISTANCE. The
work described in Article 2.A.2 shall be invoiced on a time and materials
basis in accordance with the rate schedule attached hereto for "Privately -
Initiated Rates". The Consultant shall provide an invoice itemizing work
completed by project name and number. The rate schedule shall be subject
to adjustment each calendar year.
3. PAYMENT FOR CITY -INITIATED ASSISTANCE NOT INCLUDED IN THE
RETAINER. The work described in Article 2.A.3 Shall be invoiced on a
time and materials basis in accordance with the rate schedule attached
hereto for "City -Initiated Rates", if hourly, and/or for the agreed -upon
fixed fee if applicable. The rate schedule shall be subject to adjustment
each calendar year. This Section includes night meetings in excess of
those included in the Retainer when directed by the Client and agreed to
by the Consultant.
4. If the Client finds it necessary to abandon requested work, the Client shall
notify the Consultant in writing and the Consultant shall be compensated
for all work completed and materials expended prior to said notice.
5. The Consultant shall submit a statement of services rendered under
Article 2. on a monthly basis payable by the Client.
ARTICLE 5. OTHER PARTIES
A. It is mutually agreed that this Agreement is not transferable by either party to a
third party without the written consent of the other. The Consultant, at its own
discretion, may seek professional assistance with certain aspects of any project.
Such work shall at all times be subject to the Client's acceptance as if it were
completed wholly by the Consultant, and shall be invoiced as such, under the
requirements of Articles 2 and 4 of this agreement and in compliance with
Minnesota Statutes §471.425.
B. The Consultant's reports and other materials prepared in the performance of this
Agreement are instruments of services and remain the property of the Client.
However, any further distribution of these reports by the Client must note the
Consultant as the source.
C. For lawsuits or legal actions brought by a third party against the Client, which also
names the consultant, resulting from negligence, reckless, or improper actions of
the Client or the consultant, each party shall be liable for its own acts to the extent
provided by law, and each party hereby agrees to indemnify, hold harmless and
defend the other, its officers and employees against any and all liability, loss, costs,
damages, expenses, claims or actions, including attorney's fees which the other,
its officers and employees may hereafter sustain, incur or be required to pay,
arising out of or by reason of any act or omission of the party, its agents, servants
and employees in the execution, performance or failure to adequately perform its
obligations pursuant to this Agreement.
D. Insurance Requirements. The Consultant agrees that, in order to protect itself, as
well as the Client, under the indemnity provision set forth above, it will at all times
during the term of this Agreement keep in full force and effect the following
insurance protection in amounts not less than the limits specified below, or greater
as necessary:
Commercial General Liability - $2,000,000.00 per incident, including the
following endorsements:
a. Automobile coverage - $100,000/$300,000.
Any policy obtained and maintained under this clause shall provide that it shall not
be canceled, materially changed or not renewed without thirty (30) days prior
notice thereof to the Client.
E. In the event that the Client consists of two (2) or more municipal or corporate
entities, each shall be jointly and severably liable for all payments due the
Consultant authorized pursuant to this contract.
ARTICLE 6. TERMINATION
A. This Agreement may be terminated by either party upon thirty (30) days written
notice for any reason. This Agreement shall remain in force until such time as
either party elects to terminate it as specified under this Article.
B. In the event of termination by the Client, the Client shall pay the Consultant for
work completed prior to the termination date on a time plus materials basis, such
payment to be made within thirty (30) days after receipt of Client of a final invoice
showing work completed and delivery of all materials prepared for the Client for
which payment has been made.
C. In the event of termination by the Consultant, the Consultant shall forward to the
Client on or prior to the termination date any unearned fees or retainers held by
the Consultant within thirty (30) days of termination date.
ARTICLE 7. OTHER PROVISIONS
A. MINNESOTA GOVERNMENT DATA PRACTICES ACT. Consultant must comply
with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter
13, as it applies to (1) all data provided by the City pursuant to this Agreement,
and (2) all data, created, collected, received, stored, used, maintained, or
disseminated by Consultant pursuant to this Agreement. Consultant is subject to
all the provisions of the Minnesota Government Data Practices Act, including but
not limited to the civil remedies of Minnesota Statutes Section 13.08, as if it were
a government entity if a Court of competent jurisdiction so finds. In the event
Consultant receives a request to release data, Consultant must immediately notify
City. City will give Consultant instructions concerning the release of the data to the
requesting party before the data is released. Consultant agrees to defend,
indemnify, and hold City, its officials, officers, agents, employees, and volunteers
harmless from any claims resulting from Consultant's officers', agents', partners',
employees', volunteers', assignees' or subcontractors' unlawful disclosure and/or
use of protected data. The terms of this paragraph shall survive the cancellation
or termination of this Agreement.
B. COPYRIGHT. Consultant shall defend actions or claims charging infringement of
any copyright or software license by reason of the use or adoption of any software,
designs, drawings or specifications supplied by it, and it shall hold harmless the
City from loss or damage resulting therefrom, but the Consultant shall not be liable
for any defense of the City's use of such software, designs, drawings, or
specifications when the Consultant has provided written notice of the source of any
such materials.
C. RECORDS. Consultant shall maintain complete and accurate records of hours
worked and expenses involved in the performance of services for a period of no
less than thirty six (36) months following said work.
D. WAIVER. Any waiver by either party of a breach of any provisions of this
Agreement shall not affect, in any respect, the validity of the remainder of this
Agreement.
CONDITIONS HEREIN AGREED TO:
GRITTMAN CONSULTING, LLC.
Stephen W. Grittman, Principal Date
MONTICELLO, MINNESOTA
Mayor
Date
City Administrator Date
Please Sign and Return One Copy
Exhibit A
Fee and Rate Schedule
Article 2.A.1. -Annual Retainer Amount, billed monthly*: $50,000.00
Article 2.A.2. - Private Technical Assistance: $1884-86.00 per
hour
Article 2.A.3 - Non -Retainer City Technical Assistance: $1724-65.00 per
hour
*Retainer inclusive of all direct costs, including routine travel, printing and
reproduction, business overhead, or other office expenses related to the
attendance at meetings or production of required documents and materials.
Other Charges:
• Expenses related to required travel out of state or overnight (direct cost of
travel and hotel, plus per diem). Other routine expenses covered by the
Retainer as noted above.
• Charges for sub -consultants identified to and approved by the community
development/ administration staff beforehand, at a rate to be determined
based on personnel -for privately generated work only. (No assignment of
projects by consultant to any other personnel may occur without prior
approval of the client).
• Charges for expert or other testimony arising from legal proceedings
involving the community, in which the consultant is called for depositions,
witness testimony, general advice, or other purpose, and any related
preparation and research - to be invoiced separately at the hourly rate for
Privately -initiated Technical Assistance.
City Council Agenda: 11/12/2024
2G. Consideration of approving the solicitation of a request for proposals for architectural
services and preparation of bid documents for the replacement of damaged properties
from recent storm events
Prepared by: Meeting Date: ® Consent Agenda Item
Facilities Maintenance Manager 11/12/2024 ❑ Regular Agenda Item
Reviewed by: Approved by:
Public Works Director/City Engineer, City Clerk
Parks, Arts and Recreation Director,
Finance Director
ACTION REQUESTED
Approving the solicitation of a request for proposals for architectural services and preparation
of bid documents for the replacement of damaged properties from recent storm events.
REFERENCE AND BACKGROUND
Following the July hailstorm, the League of MN Cities Insurance Trust (LMCIT) and City staff
inspected City owned facilities. It was found that 15 buildings were damaged because of the
storm. LMCIT indicated that they would cover 100% of the cost for 13 properties and 70% for
the remaining two properties that only received cosmetic damage.
The Parks, Arts, and Recreation Department would like to add a rooftop A/C unit to the shelter
at West Bridge Park and recommend that this be included in the bid package as an alternate bid
for future City Council consideration.
The roof at River Mill Park shelters and Soccer Club building received cosmetic damage which
would be 70% covered. It is proposed that these roofs are not replaced at this time. Further
evaluation is planned for these roofs, and a claim could be filed later for this. LMCIT did not
provide a specific deadline for claims related to this storm but indicated a year or two is
acceptable.
The proposed scope of work includes the following:
• Preparation of plans and specifications and bid documents for the replacement of
storm damage repairs in accordance with all state and local codes
• Structural analysis and the preparation of plans and specifications for the addition of
a bid alternate for the addition of a rooftop A/C unit at the West Bridge Park shelter.
City Council Agenda: 11/12/2024
The anticipated bid date for the project is the spring of 2025 with construction starting in the
summer of 2025.
Budget Impact: This agenda item only authorizes the release of a request for proposals
and has no budget impact. Upon approval of a contract, which is a separate future
decision, LMCIT will reimburse the City for the costs of the architectural services and bid
document preparation for the storm damage items. Design costs for the rooftop A/C
unit would be paid by the Parks budget in the General Fund.
II. Staff Workload Impact: Facilities Staff will manage and coordinate this project.
III. Comprehensive Plan Impact: N/A
STAFF RECOMMENDED ACTION
City staff recommends approval of proceeding with a request for proposals.
SUPPORTING DATA
• Facility Damage Summary
City Council Agenda: 11/12/2024
Location/Building
Covered Damage
WWTP Admin Building
Front Elevation- 1 down spout
Right Elevation-1 downspout
Left Elevation -All fascia
Left Elevation-1 downspout
Back left siding
Roof Replacement
Parks Barn
Building inspection garage
Roof Replacement
Booster Station
Front Downspout
Left Facia
Roof Replacement
4th St Shelter
Left Fascia
Roof Replacement
Well House #5
Front -OH Garage Door
Back- Louvered Vent
Left- Louvered Vent
Roof Replacement
Bridge Park West
Roof Replacement
Add Roof Curb and HVAC Improvements as bid alternate
DMV
Roof Replacement
Xcel Ball fields
Roof Replacement
Soccer Facility
Roof coverage 70% of cost; Estimated $250k
Replacement not recommended at this time
Drawers of Davlee
1 Roof Elevation.
River Mill Park - 3 metal roofs
Roof coverage 70% of cost
Replacement not recommended at this time
Groveland Park Shelter
Roof Replacement
Reservoir
Broken Skylight.
Pump House #2
Broken Skylight.
City Council Agenda: 11/12/2024
2H. Consideration of authorizing payment to Buchholz Properties for the relocation of a
temporary stormwater pond along Chelsea Road in the amount of $129,524
Prepared by: Meeting Date: ® Consent Agenda Item
Public Works Director/City Engineer 11/12/2024 ❑ Regular Agenda Item
Reviewed by: Approved by:
Finance Director, Community City Clerk
Development Director
ACTION REQUESTED
Motion to authorize payment to Buchholz Properties for the relocation of a temporary
stormwater pond along Chelsea Road in the amount of $129,524.
REFERENCE AND BACKGROUND
A stormwater pond was constructed in 2000 for the Chelsea Road Improvements Project on the
south side of Chelsea Road between Cedar Street and Edmonson Avenue. A temporary
easement was granted to the City of Monticello for construction, operation and maintenance of
the stormwater facility in 1999.
The temporary easement indicated that the site shall be restored to normal condition by the
City of Monticello which should include grading and replacement of vegetation when a
permanent stormwater pond is constructed. As part of the Deephaven Apartments project, a
permanent underground stormwater detention pond system was installed by Buchholz
Properties.
The developer provided an estimate for completing the restoration of the stormwater area in
the amount of $129,524, and this work was performed as part of their mass site grading effort.
Budget Impact: While this item wasn't included in the 2024 budget, this project will be
funded from the trunk stormwater fund. This fund collects fees as part of every
development in the city for costs of this nature.
II. Staff Workload Impact: N/A
III. Comprehensive Plan Impact: N/A
STAFF RECOMMENDED ACTION
Staff recommend authorizing payment to Buchholz Properties for the restoration of the
temporary easement area.
City Council Agenda: 11/12/2024
SUPPORTING DATA
A. Estimate
B. Temporary Easement
Rolstad Construction
1855 20TH ST SE
BUFFALO, MN 55313
Phone # 763-682-3765 Fax # 763-682-6761
Name / Address
BUCHHOLZ PROPERTIES
3854 10TH ST N
FARGO, ND 58102
Description
Qty
Rate
ESTIMATE
Date Estimate #
10/28/2024 1589-55
Total
ESTIMATE TO FILL POND
0.00
0.00
EARTH WORK ((180 x 80 x 10) / 27)) * 1.4 compaction =
7,466 yds
TRUCKING (7466 Yards x $9.50)
7,466
9.50
70,927.00
LEVELING & COMP (7466 Yards x $4.50)
7,466
4.50
33,597.00
SMH (Small Manhole 48 ")
1
4,000.00
4,000.00
HDPE Pipe Installed (100' of 18")
100
150.00
15,000.00
Sales Tax
7.375%
0.00
Thank you for your business.
Total $123,524.00
V�
BUCHHOLZ
P R 0 P E R T I E
Invoice
4379 33rd Ave S. # 121 Fargo ND 58104
TO: City of Monticello
ATTN: Matt Leonard
DATE: 8/1 /2024
JOB NAME: Deephaven Storm Water Retenation Chambers
JOB LOCATION: 1243 Edmonson Ave, Monticello MN 55362
INCLUDES: Sub Total:
Rolstad Construction $ 123,524.00
Erosion Control, Stabilization, &Seeding, $6,000
SWPP, Silt Fence Material and Placement, Restabilization, Grading, Seeding, Insurance,
Temp Toilet, Daily Clean Up, Mobilization, Site Safety, Geotechnical Testing and Analysis
Original Amount $ 129,524.00
Change $ -
Total $ $ 129,524.00
Attachment 1
Attachment 1
City Council Agenda: 11/12/2024
21. Consideration of adopting Resolution 2024-109 approving an Advance Construction
agreement with MNDOT for the School Boulevard Roundabouts and Reconstruction
Project
Prepared by:
Meeting Date: ® Consent Agenda Item
PW Director/City Engineer
11/12/2024 ❑ Regular Agenda Item
Reviewed by:
Approved by:
Finance Director
City Clerk
ACTION REQUESTED
Motion to adopt Resolution 2024-109 approving an agreement with MNDOT for Advance
Construction of the School Boulevard Roundabouts and Reconstruction, MNDOT Project
Number SP 222-105-003.
PREVIOUS COUNCIL ACTION
July 10, 2023: Authorized the preparation of a feasibility report for the School
Boulevard Intersection Improvements Project and approved a contract
with Hakanson Anderson to provide engineering in the amount of
$235,500.
May 13, 2024: Authorized the purchase of permanent and temporary easements for the
Edmonson and School Boulevard Roundabout.
July 8, 2024: Approved the submission of a Public Interest Finding with MNDOT for the
School Boulevard Intersection Improvements Project.
July 22, 2024: Approved the purchase of right-of-way for the School Boulevard
Intersection Improvements Project.
September 9, 2024: Approved a resolution restricting on -street parking on School Boulevard
from Highway 25 to Country Lane.
October 14, 2024: Accepted feasibility study setting public hearing for the School Boulevard
Intersection Improvements Project.
REFERENCE AND BACKGROUND
There are two roundabout improvements planned along School Boulevard: one at the
intersection with Edmonson Avenue and the other at the intersection with Cedar Street. Two
grants were received for this project from MNDOT. A Carbon Reduction Program Grant (CRPG)
City Council Agenda: 11/12/2024
in the amount of $485,600 for federal Fiscal Year 2024 and a Surface Transportation Block
Grant (STBG), in the amount of $1,000,000 for federal Fiscal Year 2027.
MNDOT acts as a pass -through agent for federal funds due to Monticello's population. This
standard agreement defines the City's and MNDOT's responsibilities for the project completion
and grant agreement. Additionally, because the projects are being completed together in 2025
and the federal grant funding for the School Boulevard/Cedar Street roundabout portion relates
to a future federal fiscal year, an advance construction agreement is required. This advance
construction agreement indicates that, should funding become available earlier, it is possible
the City may receive the STBG funds sooner, but the $1,000,000 federal grant funds for Fiscal
Year 2027 wouldn't likely be received until after October 1, 2026 from MNDOT.
Budget Impact: The total project costs are estimated at $3,600,000, including
engineering, right-of-way acquisition, construction, legal services, and contingency. Of
these costs, $1,485,600 to be paid by federal grant funds and $483,170 is proposed to
be assessed. The local costs are anticipated to be $1,251,230 paid by the Capital
Projects Fund and $380,000 paid by the Street Lighting Fund.
II. Staff Workload Impact: Staff will continue to be involved throughout the project
development process.
III. Comprehensive Plan Impact: The Pointes at Cedar Master Plan is an adopted appendix
to the Monticello 2040 Vision + Comprehensive Plan; the document calls for both
roundabouts to improve safety and efficiency along the collector roadway of School
Boulevard.
STAFF RECOMMENDED ACTION
City staff recommend approval of the resolution.
SUPPORTING DATA
A. Resolution 2024-109
B. Grant Agreement
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2024-109
APPROVING AN ADVANCE CONSTRUCTION AGREEMENT WITH MNDOT FOR THE SCHOOL
BOULEVARD ROUNDABOUTS AND RECONSTRUCTION PROJECT
WHEREAS: There are two roundabouts planned along School Boulevard, one at the
intersection of Cedar Street and another at Edmonson Avenue as well as roadway reconstruction;
amd
WHEREAS: The City of Monticello received $485,600 from MNDOT through their Carbon
Reduction Program, CRP, for fiscal year 2024 for the construction of the roundabout at School
Boulevard and Edmonson Avenue; and
WHEREAS: The City of Monticello received $1,000,000 from MNDOT through their Local
Surface Transportation Block Grant Program, STBGP, for fiscal year 2027; and
WHEREAS: The City of Monticello intends to advance construct the improvements prior to
fiscal year 2027 when STBGP federal funds are available.
THEREFORE, BE IT RESOLVED THAT: that pursuant to Minnesota Stat. Sec.161.36,the
Commissioner of Transportation be appointed as Agent of the City of Monticello to accept as its agent,
federal aid funds which may be made available foreligible transportation related projects.
BEITFURTHER RESOLVED, the Mayorand the City Clerkare hereby authorized and directed forand
on behalf oftheCity of Monticello to execute and enter into an agreement with the Commissionerof
Transportation prescribing the terms and conditions of said federal aid participation assetforth and
contained in"Minnesota Department of Transportation Mn DOT Contract Number 1057749," a copy
of which said agreement was before the City Council and which is made a part hereof by reference.
ADOPTED BYthe Monticello City Council this 12t" day of November, 2024.
CITY OF MONTICELLO
Lloyd Hilgart, Mayor
ATTEST:
Jennifer Schreiber, City Clerk
MnDOT Contract No. 1057749
STATE OF MINNESOTA
AGENCY AGREEMENT
for
FEDERAL PARTICIPATION IN ADVANCE CONSTRUCTION
State Project Number: 222-105-003
FAIN Number: STBG-CRP 8624(295)
This Agreement is entered into by and between the City of Monticello ("Local Government") and the State of Minnesota
acting through its Commissioner of Transportation ("MnDOT").
RECITALS
1. MnDOT Contract Number dcp(1052179) which has been executed between the Local Government and MnDOT,
appoints MnDOT as the Local Government's agent to receive and disburse transportation related federal funds, and
sets forth duties and responsibilities for letting, payment, and other procedures for a federally funded contract let
by the Local Government; and
2. Pursuant to Minnesota Statutes Section 161.36, the Local Government desires MnDOT to act as the Local
Government's agent to accept and disburse federal funds for the construction, improvement, or enhancement of
transportation financed in whole or in part by federal funds, hereinafter referred to as the "Project"; and
3. The Local Government is proposing a federal aid project for School Boulevard Roundabouts and Reconstruction,
hereinafter referred to as the "Project"; and
4. The Project is eligible for the expenditure of federal aid funds and is programmed in the approved federally
approved STIP for fiscal years 2024 and 2027, and is identified in MnDOT records as State Project 222-105-003, and
in Federal Highway Administration ("FHWA") records as Minnesota Project STBG-CRP 8624(295); and
5. The Local Government desires to proceed with the construction of the project in advance of the year it is
programmed for the federal funds; and
6. It is permissible under Federal Highway Administration procedures to perform advance construction of eligible
projects with non-federal funds, with the intent to request federal funding for the federally eligible costs in a
subsequent federal fiscal year(s), if sufficient funding and obligation authority are available; and
7. The Local Government desires to temporarily provide Local Government State Aid and/or other local funds in lieu of
the federal funds so that the project may proceed prior to the fiscal year(s) designated in the STIP; and
8. MnDOT requires that the terms and conditions of this agency be set forth in an agreement.
AGREEMENT TERMS
1. Term of Agreement
1.1. Effective Date. This Agreement will be effective upon execution by the Local Government and by
appropriate State officials, pursuant to Minnesota Statutes Section 16C.05, and will remain in effect for five
Updated October 9, 2024
MnDOT Contract No. 1057749
(5) years from the effective date or until all obligations set forth in this Agreement have been satisfactorily
fulfilled, whichever occurs first.
Local Government's Duties
2.1. The Local Government will perform all of its duties and obligations in MnDOT Contract Number
dcp(1052179), which is incorporated herein by reference, in the solicitation, letting, award, and
administration of the construction of the Project.
3. MnDOT's Duties
3.1. MnDOT will perform all of its duties in accordance with MnDOT Contract Number dcp(1052179), which is
incorporated herein by reference.
3.2. MnDOT will make the necessary requests to the FHWA for authorization to use federal funds for the Project,
and for reimbursement of eligible costs pursuant to the terms of this Agreement.
3.3. MnDOT will request the conversion of the Project to federal funding of eligible costs, when funding and
obligation authority are available.
3.4. At such time that the project is converted to federal funding and such funding is received by MnDOT,
MnDOT will reimburse to the Local Government the federal aid share of the federally eligible costs,
previously provided by the Local Government. Reimbursement for Local Government State Aid funds used in
lieu of federal funds, will be deposited in the Local Government's State Aid Account. Reimbursement for
other Local Government funds used in lieu of federal funds will be forwarded to the Local Government.
4. Time
4.1. The Local Government must comply with all time requirements described in this Agreement. In the
performance of this Agreement, time is of the essence
4.2. The period of performance is defined as beginning on the date of federal authorization and ending on the
date defined in the federal financial system or federal agreement ("end date"). No work completed after
the end date will be eligible for federal funding. Local Government must submit all contract close out
paperwork to MnDOT at least twenty-four months prior to the end date.
5. Payment
5.1. It is estimated that the total cost of the Project is $2,377,000. The remaining share will be paid by the Local
Government. 80% of the eligible costs will be eligible for CRP and STBG funds in federal fiscal years 2024
and 2027, respectively. The amount of CRP funds is $485,600 and the amount of STBG funds is $1,000,000.
5.2. The Local Government will pay any part of the cost or expense of the work that the FHWA does not pay.
5.3. Request for reimbursement of the federal aid share of the federally eligible costs can be made any time
after the work is completed, however payment may not be made until after October 1, 2023 for federal
fiscal year 2024 and October 1, 2026 for federal fiscal year 2027. It could be earlier if funding and obligation
authority are available (subject to the Area Transportation Partnership (ATP) policy).
5.4. The Local Government will make requests for reimbursement in accordance with the payment provisions in
MnDOT Contract Number dcp(1052179), which is incorporated by reference, and will comply with the
requirements of 2 CFR Part 200.
Authorized Representatives
6.1. MnDOT's Authorized Representative is:
Name: Aneela Mun3hv . or their successor.
MnDOT Contract No. 1057749
Title: State Aid, Federal Plans Engineer
Phone: 612-271-6210
Email: angela.murphv@state.mn.us
MnDOT's Authorized Representative has the responsibility to monitor Local Government's performance and
the authority to accept the services provided under this Agreement. If the services are satisfactory, MnDOT's
Authorized Representative will certify acceptance on each invoice submitted for payment.
6.2. The Local Government's Authorized Representative is:
Name: Mr. Matt Leonard or their successor.
Title: City of Monticello Engineer
Phone: 763-271-3271
Email: matt.leonard@ci.monticello.mn.us
If the Local Government's Authorized Representative changes at any time during this Agreement, the Local
Government will immediately notify MnDOT.
7. Assignment Amendments, Waiver, and Agreement Complete
7.1. Assignment. The Local Government may neither assign nor transfer any rights or obligations under this
Agreement without the prior written consent of MnDOT and a fully executed Assignment Agreement,
executed and approved by the same parties who executed and approved this Agreement, or their successors
in office.
7.2. Amendments. Any amendments to this Agreement must be in writing and will not be effective until it has
been executed and approved by the same parties who executed and approved the original agreement, or
their successors in office.
7.3. Waiver. If MnDOT fails to enforce any provision of this Agreement, that failure does not waive the provision
or MnDOT's right to subsequently enforce it.
7.4. Agreement Complete. This Agreement contains all negotiations and agreements between MnDOT and the
Local Government. No other understanding regarding this Agreement, whether written or oral, may be used
to bind either party.
7.5. Severability. If any provision of this Agreement or the application thereof is found to be invalid or
unenforceable to any extent, the remainder of the Agreement, including all material provisions and the
application of such provisions, will not be affected and will be enforceable to the greatest extent permitted
by the law.
7.6. Electronic Records and Signatures. The parties agree to contract by electronic means. This includes using
electronic signatures and converting original documents to electronic records.
7.7. Certification. By signing this Agreement, the Local Government certifies that it is not suspended or
debarred from receiving federal or state awards.
8. Liability and Claims
8.1. Tort Liability. Each party is responsible for its own acts and omissions and the results thereof to the extent
authorized by law and will not be responsible for the acts and omissions of any others and the results
thereof. The Minnesota Tort Claims Act, Minnesota Statutes Section 3.736, governs MnDOT liability.
8.2. Claims. The Local Government acknowledges that MnDOT is acting only as the Local Government's agent
for acceptance and disbursement of federal funds, and not as a principal or co -principal with respect to the
MnDOT Contract No. 1057749
Project. The Local Government will pay any and all lawful claims arising out of or incidental to the Project
including, without limitation, claims related to contractor selection (including the solicitation, evaluation,
and acceptance or rejection of bids or proposals), acts or omissions in performing the Project work, and any
ultra vires acts. To the extent permitted by law, the Local Government will indemnify, defend (to the
extent permitted by the Minnesota Attorney General), and hold MnDOT harmless from any claims or costs
arising out of or incidental to the Project(s), including reasonable attorney fees incurred by MnDOT. The
Local Government's indemnification obligation extends to any actions related to the certification of DBE
participation, even if such actions are recommended by MnDOT.
9. Audits
9.1. Under Minn. Stat. § 16C.05, Subd.5, the books, records, documents, and accounting procedures and
practices of the Local Government, or any other party relevant to this Agreement or transaction, are subject
to examination by MnDOT and/or the State Auditor or Legislative Auditor, as appropriate, for a minimum of
six years from the end of this Agreement, receipt and approval of all final reports, or the required period of
time to satisfy all state and program retention requirements, whichever is later. The Local Government will
take timely and appropriate action on all deficiencies identified by an audit.
9.2. All requests for reimbursement are subject to audit, at MnDOT's discretion. The cost principles outlined in 2
CFR 200.400-.476 will be used to determine whether costs are eligible for reimbursement under this
Agreement.
9.3. If Local Government expends $750,000 or more in Federal Funds during the Local Government's fiscal year,
the Local Government must have a single audit or program specific audit conducted in accordance with 2
CFR Part 200.
10. Government Data Practices. The Local Government and MnDOT must comply with the Minnesota Government
Data Practices Act, Minn. Stat. Ch. 13, as it applies to all data provided by MnDOT under this Agreement, and as it
applies to all data created, collected, received, stored, used, maintained, or disseminated by the Local
Government under this Agreement. The civil remedies of Minn. Stat. §13.08 apply to the release of the data
referred to in this clause by either the Local Government or MnDOT.
11. Workers Compensation. The Local Government certifies that it is in compliance with Minn. Stat. §176.181, Subd.
2, pertaining to workers' compensation insurance coverage. The Local Government's employees and agents will
not be considered MnDOT employees. Any claims that may arise under the Minnesota Workers' Compensation
Act on behalf of these employees and any claims made by any third party as a consequence of any act or omission
on the part of these employees are in no way MnDOT's obligation or responsibility.
12. Governing Law, Jurisdiction, and Venue. Minnesota law, without regard to its choice -of -law provisions, governs
this Agreement. Venue for all legal proceedings out of this Agreement, or its breach, must be in the appropriate
state or federal court with competent jurisdiction in Ramsey County, Minnesota.
13. Termination; Suspension
13.1. Termination by MnDOT or Commissioner of Administration. MnDOT or Commissioner of Administration
may unilaterally terminate this Agreement with or without cause, upon 30 days written notice to the Local
Government. Upon termination, the Local Government will be entitled to payment, determined on a pro
rata basis, for services satisfactorily performed.
13.2. Termination for Cause. MnDOT may immediately terminate this Agreement if MnDOT finds that there has
been a failure to comply with the provisions of this Agreement, that reasonable progress has not been
made, that fraudulent or wasteful activity has occurred, that the Local Government has been convicted of a
criminal offense relating to a state agreement, or that the purposes for which the funds were granted have
not been or will not be fulfilled. MnDOT may take action to protect the interests of MnDOT of Minnesota,
4
MnDOT Contract No. 1057749
including the refusal to disburse additional funds and requiring the return of all or part of the funds already
disbursed.
13.3. Termination for Insufficient Funding. MnDOT may immediately terminate this Agreement if:
13.3.1. Funding is not obtained from the Minnesota Legislature; or
13.3.2. Funding cannot be continued at a level sufficient to allow for the payment of the services covered
here. Termination must be by written or fax notice to the Local Government. MnDOT is not
obligated to pay for any services that are provided after notice and effective date of termination.
However, the Local Government will be entitled to payment, determined on a pro rata basis, for
services satisfactorily performed to the extent that funds are available. MnDOT will not be assessed
any penalty if the Agreement is terminated because of the decision of the Minnesota Legislature, or
other funding source, not to appropriate funds. MnDOT will provide the Local Government notice of
the lack of funding within a reasonable time of MnDOT's receiving that notice.
13.4. Suspension. MnDOT may immediately suspend this Agreement in the event of a total or partial government
shutdown due to the failure to have an approved budget by the legal deadline. Work performed by the
Local Government during a period of suspension will be deemed unauthorized and undertaken at risk of
non-payment.
14. Data Disclosure. Under Minn. Stat. § 270C.65, Subd. 3, and other applicable law, the Local Government consents
to disclosure of its social security number, federal employer tax identification number, and/or Minnesota tax
identification number, already provided to MnDOT, to federal and state tax agencies and state personnel involved
in the payment of state obligations. These identification numbers may be used in the enforcement of federal and
state tax laws which could result in action requiring the Local Government to file state tax returns and pay
delinquent state tax liabilities, if any.
15. Fund Use Prohibited. The Local Government will not utilize any funds received pursuant to this Agreement to
compensate, either directly or indirectly, any contractor, corporation, partnership, or business, however
organized, which is disqualified or debarred from entering into or receiving a State contract. This restriction
applies regardless of whether the disqualified or debarred party acts in the capacity of a general contractor, a
subcontractor, or as an equipment or material supplier. This restriction does not prevent the Local Government
from utilizing these funds to pay any party who might be disqualified or debarred after the Local Government's
contract award on this Project.
16. Discrimination Prohibited by Minnesota Statutes §181.59. The Local Government will comply with the provisions
of Minnesota Statutes §181.59 which requires that every contract for or on behalf of the State of Minnesota, or
any county, city, town, township, school, school district or any other district in the state, for materials, supplies or
construction will contain provisions by which Contractor agrees: 1) That, in the hiring of common or skilled labor
for the performance of any work under any contract, or any subcontract, no Contractor, material supplier or
vendor, will, by reason of race, creed or color, discriminate against the person or persons who are citizens of the
United States or resident aliens who are qualified and available to perform the work to which the employment
relates; 2) That no Contractor, material supplier, or vendor, will, in any manner, discriminate against, or
intimidate, or prevent the employment of any person or persons identified in clause 1 of this section, or on being
hired, prevent or conspire to prevent, the person or persons from the performance of work under any contract on
account of race, creed or color; 3) That a violation of this section is a misdemeanor; and 4) That this contract may
be canceled or terminated by the state of Minnesota, or any county, city, town, township, school, school district or
any other person authorized to contracts for employment, and all money due, or to become due under the
contract, may be forfeited for a second or any subsequent violation of the terms or conditions of this Agreement.
17. Appendix II 2 CFR Part 200. The Local Government agrees to comply with the following federal requirements as
identified in 2 CFR 200, Uniform Administrative Requirements, Cost Principles and Audit Requirements for Federal
MnDOT Contract No. 1057749
Awards, and agrees to pass through these requirements to its subcontractors and third party contractors, as
applicable. In addition, the Local Government shall have the same meaning as "Contractor" in the federal
requirements listed below.
17.1.1. Contracts for more than the simplified acquisition threshold, which is the inflation adjusted amount
determined by the Civilian Agency Acquisition Council and the Defense Acquisition Regulations
Council (Councils) as authorized by 41 U.S.C. 1908, must address administrative, contractual, or legal
remedies in instances where contractors violate or breach contract terms, and provide for such
sanctions and penalties as appropriate.
17.1.2. All contracts in excess of $10,000 must address termination for cause and for convenience by the
non -Federal entity including the manner by which it will be effected and the basis for settlement.
17.1.3. Equal Employment Opportunity. Except as otherwise provided under 41 CFR Part 60, all contracts
that meet the definition of "federally assisted construction contract" in 41 CFR Part 60-1.3 must
include the equal opportunity clause provided under 41 CFR 60-1.4(b), in accordance with Executive
Order 11246, "Equal Employment Opportunity" (30 FR 12319, 12935, 3 CFR Part, 1964-1965 Comp.,
p. 339), as amended by Executive Order 11375, "Amending Executive Order 11246 Relating to Equal
Employment Opportunity," and implementing regulations at 41 CFR part 60, "Office of Federal
Contract Compliance Programs, Equal Employment Opportunity, Department of Labor."
17.1.4. Davis -Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation,
all prime construction contracts in excess of $2,000 awarded by non -Federal entities must include a
provision for compliance with the Davis -Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as
supplemented by Department of Labor regulations (29 CFR Part 5, "Labor Standards Provisions
Applicable to Contracts Covering Federally Financed and Assisted Construction"). In accordance with
the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less
than the prevailing wages specified in a wage determination made by the Secretary of Labor. In
addition, contractors must be required to pay wages not less than once a week. The non -Federal
entity must place a copy of the current prevailing wage determination issued by the Department of
Labor in each solicitation. The decision to award a contract or subcontract must be conditioned
upon the acceptance of the wage determination. The non -Federal entity must report all suspected
or reported violations to the Federal awarding agency. The contracts must also include a provision
for compliance with the Copeland "Anti -Kickback" Act (40 U.S.C. 3145), as supplemented
by Department of Labor regulations (29 CFR Part 3, "Contractors and Subcontractors on Public
Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States").
The Act provides that each contractor or subrecipient must be prohibited from inducing, by any
means, any person employed in the construction, completion, or repair of public work, to give up
any part of the compensation to which he or she is otherwise entitled. The non -Federal entity must
report all suspected or reported violations to the Federal awarding agency.
17.1.5. Contract Work Hours and Safety Standards Act (40 U.S.C. 3701-3708). Where applicable, all
contracts awarded by the non -Federal entity in excess of $100,000 that involve the employment of
mechanics or laborers must include a provision for compliance with 40 U.S.C. 3702 and 3704, as
supplemented by Department of Labor regulations (29 CFR Part 5). Under 40 U.S.C. 3702 of the Act,
each contractor must be required to compute the wages of every mechanic and laborer on the basis
of a standard work week of 40 hours. Work in excess of the standard work week is permissible
provided that the worker is compensated at a rate of not less than one and a half times the basic
rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40
U.S.C. 3704 are applicable to construction work and provide that no laborer or mechanic must be
required to work in surroundings or under working conditions which are unsanitary, hazardous or
dangerous. These requirements do not apply to the purchases of supplies or materials or articles
C1
MnDOT Contract No. 1057749
ordinarily available on the open market, or contracts for transportation or transmission of
intelligence.
17.1.6. Rights to Inventions Made Under a Contract or Agreement. If the Federal award meets the definition
of "funding agreement" under 37 CFR § 401.2 (a) and the recipient or subrecipient wishes to enter
into a contract with a small business firm or nonprofit organization regarding the substitution of
parties, assignment or performance of experimental, developmental, or research work under that
"funding agreement," the recipient or subrecipient must comply with the requirements of 37 CFR
Part 401, "Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under
Government Grants, Contracts and Cooperative Agreements," and any implementing regulations
issued by the awarding agency.
17.1.7. Clean Air Act (42 U.S.C. 7401-7671q.) and the Federal Water Pollution Control Act (33 U.S.C. 1251-
1387), as amended - Contracts and subgrants of amounts in excess of $150,000 must contain a
provision that requires the non -Federal award to agree to comply with all applicable standards,
orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal
Water Pollution Control Act as amended (33 U.S.C. 1251-1387). Violations must be reported to the
Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA).
17.1.8. Debarment and Suspension (Executive Orders 12549 and 12689) - A contract award (see 2 CFR
180.220) must not be made to parties listed on the governmentwide exclusions in the System for
Award Management (SAM), in accordance with the OMB guidelines at 2 CFR 180 that implement
Executive Orders 12549 (3 CFR part 1986 Comp., p. 189) and 12689 (3 CFR part 1989 Comp., p. 235),
"Debarment and Suspension." SAM Exclusions contains the names of parties debarred, suspended,
or otherwise excluded by agencies, as well as parties declared ineligible under statutory or
regulatory authority other than Executive Order 12549.
17.1.9. Byrd Anti -Lobbying Amendment (31 U.S.C. 1352) - Contractors that apply or bid for an award
exceeding $100,000 must file the required certification. Each tier certifies to the tier above that it
will not and has not used Federal appropriated funds to pay any person or organization for
influencing or attempting to influence an officer or employee of any agency, a member of Congress,
officer or employee of Congress, or an employee of a member of Congress in connection with
obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier must
also disclose any lobbying with non -Federal funds that takes place in connection with obtaining any
Federal award. Such disclosures are forwarded from tier to tier up to the non -Federal award.
17.1.10. Local Government will comply with 2 CFR § 200.323.
17.1.11. Local Government will comply with 2 CFR § 200.216.
17.1.12. Local Government will comply with 2 CFR § 200.322.
17.2. Drug -Free Workplace. The Local Government will comply with the Drug -Free Workplace requirements
under subpart B of 49 C.F.R. Part 32.
17.3. Title VI/Non-discrimination Assurances. The Local Government hereby agrees that, as a condition of
receiving any Federal financial assistance under this Agreement, it will comply with Title VI of the Civil Rights
Act of 1964 (78 Stat. 252, 42 U.S.C. § 2000d), related nondiscrimination statutes (i.e., 23 U.S.C. § 324,
Section 504 of the Rehabilitation Act of 1973 as amended, and the Age Discrimination Act of 1975), and
applicable regulatory requirements to the end that no person in the United States shall, on the grounds of
race, color, national origin, sex, disability, or age be excluded from participation in, be denied the benefits
of, or otherwise be subjected to discrimination under any program or activity for which the Local
Government receives Federal financial assistance.
7
MnDOT Contract No. 1057749
The Local Government hereby agrees to comply with all applicable US DOT Standard Title VI/Non-
Discrimination Assurances contained in DOT Order No. 1050.2A, and in particular Appendices A and E, which
can be found at: https://edocs-
public.dot.state.mn.us/edocs_public/DMResultSet/download?docld=11149035. If federal funds are
included in any contract, the Local Government will ensure the appendices and solicitation language within
the assurances are inserted into contracts as required. State may conduct a review of the Local
Government's compliance with this provision. The Local Government must cooperate with State throughout
the review process by supplying all requested information and documentation to State, making Local
Government staff and officials available for meetings as requested, and correcting any areas of non-
compliance as determined by State.
17.4. Buy America. The Local Government must comply with the Buy America domestic preferences contained in
the Build America, Buy America Act (Sections 70901-52 of the Infrastructure Investment and Jobs Act, Public
Law 117-58) and as implemented by US DOT operating agencies.
17.5. Federal Funding Accountability and Transparency Act (FFATA).
17.5.1. This Agreement requires the Local Government to provide supplies and/or services that are funded
in whole or in part by federal funds that are subject to FFATA. The Local Government is responsible
for ensuring that all applicable requirements, including but not limited to those set forth herein, of
FFATA are met and that the Local Government provides information to the MnDOT as required.
Reporting of Total Compensation of the Local Government's Executives.
The Local Government shall report the names and total compensation of each of its five most
highly compensated executives for the Local Government's preceding completed fiscal year, if
in the Local Government's preceding fiscal year it received:
80 percent or more of the Local Government's annual gross revenues from Federal
procurement contracts and Federal financial assistance subject to the Transparency Act,
as defined at 2 CFR 170.320 (and subawards); and
ii. $25,000,000 or more in annual gross revenues from Federal procurement contracts (and
subcontracts), and Federal financial assistance subject to the Transparency Act (and
subawards); and
iii. The public does not have access to information about the compensation of the
executives through periodic reports filed under section 13(a) or 15(d) of the Securities
Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue
Code of 1986. (To determine if the public has access to the compensation information,
see the U.S. Security and Exchange Commission total compensation filings at
htti)://www.sec.Rov/answers/execomP.htm.).
Executive means officers, managing partners, or any other employees in management
positions.
Total compensation means the cash and noncash dollar value earned by the executive during
the Local Government's preceding fiscal year and includes the following (for more information
see 17 CFR 229.402(c)(2)):
Salary and bonus.
Awards of stock, stock options, and stock appreciation rights. Use the dollar amount
recognized for financial statement reporting purposes with respect to the fiscal year in
accordance with the Statement of Financial Accounting Standards No. 123 (Revised
2004) (FAS 123R), Shared Based Payments.
91
MnDOT Contract No. 1057749
iii. Earnings for services under non -equity incentive plans. This does not include group life,
health, hospitalization or medical reimbursement plans that do not discriminate in favor
of executives, and are available generally to all salaried employees.
iv. Change in pension value. This is the change in present value of defined benefit and
actuarial pension plans.
V. Above -market earnings on deferred compensation which is not tax qualified.
17.5.2. Other compensation, if the aggregate value of all such other compensation (e.g. severance,
termination payments, value of life insurance paid on behalf of the employee, perquisites or
property) for the executive exceeds $10,000.
17.5.3. The Local Government must report executive total compensation described above to the MnDOT by
the end of the month during which this Agreement is awarded.
17.5.4. The Local Government will obtain a Unique Entity Identifier (UEI) number and maintain this number
for the term of this Agreement. This number shall be provided to MnDOT on the plan review
checklist submitted with the plans for each project.
17.5.5. The Local Government's failure to comply with the above requirements is a material breach of this
Agreement for which the MnDOT may terminate this Agreement for cause. The MnDOT will not be
obligated to pay any outstanding invoice received from the Local Government unless and until the
Local Government is in full compliance with the above requirements.
[THE REMAINDER OF THIS PAGE HAS INTENTIONALLY BEEN LEFT BLANK.]
MnDOT Contract No. 1057749
City of Monticello
City of Monticello certifies that the appropriate
person(s) have executed the contract on behalf of the
Local Government as required by applicable articles,
bylaws, resolutions or ordinances
By
Title:
Date:
By
Title:
Date:
DEPARTMENT OF TRANSPORTATION
By:
Title: State Aid Engineer
Date:
COMMISSIONER OF ADMINISTRATION
By:
Date:
10
City Council Agenda: 11/12/2024
2J. Consideration of authorizing an amendment to the Professional Services Agreement
with Stonebrook Engineering, Inc., in the amount of $61,471 for the Comprehensive
Safetv Action Plan in coniunction with the Safe Streets 4 All (SS4A) federal grant
program
Prepared by: Meeting Date: ® Consent Agenda Item
Community Development Director 11/12/2024 ❑ Regular Agenda Item
Reviewed by: Approved by:
Public Works Director/City Engineer, City Administrator
Finance Director
ACTION REQUESTED
Motion to accept a proposal and approve an amendment to Professional Services Agreement
with Stonebrook Engineering, Inc., in the amount of $61,471 for additional deliverables and
services related to the completion of a Comprehensive Safety Action Plan in conjunction with
the Safe Streets 4 All (SS4A) federal grant program, contingent on scope approval by Federal
Highway Administration.
PREVIOUS COUNCIL ACTION
July 10, 2023: City Council approved entering into a Safe Streets and Roads for All grant
agreement, a federal Action Plan Grant awarded to the City of
Monticello.
September 11, 2023: City Council approved a contract in the amount of $186,901 with
Stonebrooke Engineering, Inc. for completion of a Comprehensive Safety
Action Plan.
REFERENCE AND BACKGROUND
City staff, Stonebrooke Engineering Inc., and the Safe Streets Task Force have been working
toward a final draft of the Monticello Comprehensive Safety Action Plan (CSAP). In completing
the first -round draft, it was determined that the development of additional plan deliverables
would benefit the plan's use and implementation.
Monticello's Comprehensive Safety Action Plan identifies roadway improvements to increase
multi -modal transportation safety with the goal of eliminating serious injury and fatality
accidents in Monticello. The draft CSAP already includes the following components, which were
authorized under the prior contract scope of work.
City Council Agenda: 11/12/2024
• Community stakeholder and public engagement, with an emphasis on equity
considerations and multi -modal solutions.
• Data collection and review, including a summary of existing plans, programs, and
policies.
• Crash data review, including an analysis of regional trends, contributing factors, and
patterns of transportation -related accidents in the community.
• Progress and communication tools for performance measurement tracking.
• Prioritized implementation plan for safety measures including:
Policies, programs, innovative practices, and low-cost/high-impact strategies
Specific construction projects including scope and recommended timeline;
projects will also be identified for funding opportunity through the Safe Streets
infrastructure program.
The proposed contract amendment augments these base items with tools and graphics which
provide a more complete project prioritization and public understanding. These items will
include:
• Final Safe Streets Task Force meeting to review the final draft plan
• One additional community engagement event, held at this year's Walk & Roll event
• Project prioritization mapping illustrating a prioritized group of safety improvements
and policies for Monticello's transportation network (similar to the maps created with
the Safe Routes to School project)
• Interactive project story map using a web-based/GIS platform
• Update to the current Pathway Connection Map, integrating CSAP prioritization
information
The amended scope will enhance the engineering -based analysis, turning the results of the
study and engagement into a more usable public document that will support future system
improvements and infrastructure grant applications.
Budget Impact: As noted above, there is no direct cost to the City for the contract
amendment because the original contract with Stonebrooke only used $186,901 of the
total $250,000 grants awarded to the city for the project. The additional $61,471 will
use the remainder of the grant funding.
II. Staff Workload Impact: Stonebrooke Engineering, Inc. and City staff will be involved
throughout various steps of the project's development.
City Council Agenda: 11/12/2024
III. Comprehensive Plan Impact: In Chapter 4, "Mobility and Connectivity" of the Comp
Plan, the first item listed under Priority Projects is "Continued evaluation of collector
street network improvements for safety, intersection and congestion improvements."
The work and results completed as part of this Action Plan will promote this priority
project by highlighting where, within the City of Monticello's transportation system,
safety can be improved. The Comp Plan also identifies "Complete Streets" roadway
designs that involve consideration of needs of all roadway users. The SS4A Action Plan
Grant will benefit the City's implementation of this design concept by identifying
roadway needs and accessibility considerations during the planning process, ensuring
they will be included in final design (Implementation Grant phase).
STAFF RECOMMENDED ACTION
City staff recommend approval of the contract amendment. The additional project deliverables
will benefit the final Action Plan and enhance its implementation potential. The CSAP planning
document is a necessary first step prior to seeking infrastructure funding through the Safe
Streets program.
SUPPORTING DATA
• Professional Services Agreement Amendment Proposal, City of Monticello
Comprehensive Safety Action Plan
12279 Nicol let Ave
Burnsville, MN 55337
November 1, 2024
Angela Schumann
Community Development Director
City of Monticello, MN
Re: Contract Amendment — SS4A Comprehensive Safety Action Plan (CSAP)
Dear Angela,
952.402.9209 fax 952.403.6803 main
stonebrookeengineering.com
Thank you for the opportunity to submit our request for additional funds in the amount of $61,471 for additional
deliverables and services related to the completion of a Comprehensive Safety Action Plan in conjunction with
the Safe Streets 4 All (SS4A) federal grant program. We look forward to continuing to work with Monticello and
successfully delivering this final project. Some of the items relating to this request include:
1. Final Safe Streets Task Force meeting to review the final draft plan
2. One additional community engagement event, held at this year's Walk & Roll event
3. Project prioritization mapping illustrating a prioritized group of safety improvements
4. Interactive project story map using a web-based/GIS platform
5. Update to the current Pathway Connection Map, integrating CSAP prioritization information
6. Review risk factors and intersection projects related to the implementation of roundabouts at some
signalized intersections
Attached is a spreadsheet of the costs associated with the request. This amendment request is still within the
funding provided by both the FHWA and the MnDOT State Aid local match.
Thank you for consideration of this request. Stonebrooke Engineering has enjoyed working with the City of
Monticello on this project as well as the trail project. Please contact me at any time if you have any questions.
Sincerely,
Digitally signed by
6a62386c-2ebd-4d84-9a17-6fcf1
9bc3f88
Date: 2024.11.08 11:33:09-06'00'
John Brunkhorst, PE
Project Manager
Amendment 1
a: Is
Safe Streets for All Comprehensive Safety Action Plan
Stonebrooke
City of Monticello
CLIENT: City of Monticello John Britt Kelly Howard Rick
PROJECT:
Safe Streets for All Comprehensive Safety Action Plan
CONSULTANT:
Stonebrooke Engineering, Inc.
Project
Deputy
Project
Traffic
Quality
Staff
Graphics
PM/Senior
Safety
Manager
Engineer
Engineer
Engineer
Staff
Planner
Expert
IM
A1.1
lAdditionalPMTMeeting- November
4
4
�• •',
SUBTOTAL HOURS - TASK 1.0
4
4
0
0
0
0
0
1• •',
A2.1
Additional effort for crash analysis
24
3
•',
A2.2
Additional effort for systemic risk assessment
30
3
•' ,
SUBTOTAL HOURS - TASK 2.0
54
0
0
6
0
0
0
is 11.
1
A3.1
Additional Walk and Roll Engagement Event
1
8
4
4
•',
SUBTOTAL HOURS -TASK 3.01
1
1 8 1
0 1
0
1 0
1 4
1 4
1 •',
1
0
0
0
0
0
0
0
1'
• i
SUBTOTAL HOURS -TASK 4.0
r
A5.1
Additional effort for identification of projects/strategies
32
3
A5.2
Review signalized intersections for RAB implementation
24
6
A5.3
Update decision trees for signals and RABs
20
3
SUBTOTAL HOURS - TASK 5.0
76
0
0
12
0
0
0
.1 •',
1
r
A6.1
lAdditional policy revisions for Monticello related projects
8
16
12
• 11.
SUBTOTALHOURS-TASK6.0
8
16
0
0
0
12
0
�• •',
A8.1 Live Issues Area Map - Transition GIS Map to Monticello
2
4
20 -
SS4A mapping with issues area (similar to Safe Routes mapping),
14
A8.2 including priority ranking, and then listing implementation
10
16
24 10 0 N.6
alternatives and policies applicable
A8.3 Pathways connections map update
6
4
25
SUBTOTAL HOURS -TASK 8.0
18
24
0 0 0 69 10 7121 100.0%
TOTAL HOURS:
161
52
0 18 0 85 14 r
Stonebrooke
CLIENT: City of Monticello
PROJECT: Safe Streets for All Comprehensive Safety Action Plan
CONSULTANT: Stonebrooke Engineering, Inc.
Task No.
Work Task Description
TASK 1.0
Project Management
TASK 2.0
Data Collection & Assessment
TASK 3.0
Stakeholder Engagement
TASK 4.0
System Evaluation
TASK 5.0
Project/Strategy Selection
TASK 6.0
Implementation
TASK 7.0
Equity/Federal Review
TASK 8.0
Final Plan
HOURLY RATE
TOTAL LABOR COST
Safe Streets for All Comprehensive Safety Action Plan
City of Monticello
John Britt Kelly Howard Rick
Project Deputy Project Traffic Safety Quality Staff Graphics %of
PM/Senior
Manager Engineer Expert Engineer Engineer Staff Hours
Planner
4 4
54 0
1 8
0 0
76 0
8 16
0 0
18 24
0
0
0
0
0
0
0
0
0
6
0
0
12
0
0
0
0
0
0
0
0
0
0
0
0
0
4
0
0
12
0
69
0
0
4
0
0
0
0
10
2.4%
18.2%
5.2%
0.0%
26.7%
10.9%
0.0%
36.7%
100.0%
$225.00 I $145.00 I $193.00 I $220.00 I $210.00 I $128.00 I $119.00
$36,225.00 I $7,540.00 $0.00 I $3,960.00 $0.00 I $10,880.00 $1,666.00I
EXPENSES (printing, mileage, etc.)
Previous Contract: $186,901.00
New Total NOT TO EXCEED FEE $248,372.00
City Council Agenda: 11/12/2024
3A. Continuation of Public Hearing- Consideration of adopting Resolution 2024-110
approving assessments for the 7th Street Retaining Wall, Rectangular Rapid Flashing
Beacon (RRFB), and Sidewalk Improvement Project, Citv Project No. 23CO05
Prepared by: Meeting Date: ❑ Consent Agenda Item
PW Director/City Engineer 11/12/2024 ® Public Hearing Item
❑ Regular Agenda Item
Reviewed by: Approved by:
Finance Director City Clerk
ACTION REQUESTED
Motion to adopt Resolution 2024-110 approving assessments for the 7th Street Retaining Wall,
Rectangular Rapid Flashing Beacon (RRFB), and Sidewalk Improvement Project, City Project No.
23C005.
PREVIOUS COUNCIL ACTION
November 27, 2023: Accepted the feasibility report and setting a public hearing for
December 11, 2023, for the Broadway Street Roadway and Utility
Improvements Project and 7th Street Retaining Wall, Rectangular
Rapid Flashing Beacon (RRFB), and Sidewalk Improvement
Project.
December 11, 2023: City Council ordered the improvement for the 7th Street Retaining
Wall, RRFB, and Sidewalk Improvement Project.
April 8, 2024: City Council accepted bids and awarded the Broadway Street
Roadway and Utility Improvement Project and 7th Street
Retaining Wall, RRFB, and Sidewalk Improvement Project to Valley
Paving, Inc. in the amount of $2,780,717.60.
September 23, 2024: City Council declared costs to be assessed, ordering the
preparation of an assessment roll and called for an Assessment
Hearing for October 28, 2024, for the 7th Street Retaining Wall,
Rectangular Rapid Flashing Beacon (RRFB), and Sidewalk
Improvement Project.
October 28, 2024: City Council continued the public hearing for approving the final
assessments until November 12, 2024.
City Council Agenda: 11/12/2024
REFERENCE AND BACKGROUND
The 7th Street Retaining Wall, Rectangular Rapid Flashing Beacon (RRFB), and Sidewalk
Improvement Project is nearing completion. The project included the following improvements
along 7th Street:
• The reconstruction of approximately 385 feet of retaining wall along the south side of
7th Street just west of Locust Street.
• Construction of sidewalk along the north side of 7th Street connecting Locust Street to
Walnut Street.
• Replacement of the rectangular rapid flashing beacon located at the intersection of
Walnut Street and 7th Street.
• Construction of sidewalk along the south side of 7th Street between where it ends east
of Cedar Street to Washington Street excluding the portion of sidewalk scheduled to be
installed by Wiha Tools.
The City's current assessment policy indicates sidewalks are assessed 50% for developed
commercially zoned parcels, and 25% for developed industrial zoned parcels. The policy also
indicates that vacant industrially zoned parcels are assessed 100% for the cost of the sidewalk.
A City Council work session was held on October 14, 2024, to discuss the assessment policy
methodology. There was a consensus to modify the sidewalk assessment amounts to $50 per
linear foot, which would be included in the fee schedule ordinance in 2025 and modified
annually based on construction cost index price increases. A consensus was also reached for
reducing the assessment amounts for the retaining wall. Updated amounts are included in the
accompanying updated final assessment roll.
The change in methodology causes an increase in one industrial property owner's sidewalk
assessment. There was a consensus of the City Council at the October 14 work session to follow
the current policy for this parcel using the lower assessment amount.
The assessment is proposed at a 10-year term at a 10% interest rate, which is 2% over the
current prime rate per the city's assessment policy.
I. Budget Impact: The project was funded by the Capital Projects Fund. The feasibility
study indicated that $337,930 is proposed to be assessed but the updated final
assessment roll indicates $160,011 assessed to benefiting property owners for the
project. No bonds were issued for this project, so while the lower assessment revenue
will have an impact on the Capital Projects Fund over time, there is no impact to the
city's debt service funds.
II. Staff Workload Impact: Staff workload impacts will include mailing assessment letters
and working with Wright County to process assessments.
City Council Agenda: 11/12/2024
III. Comprehensive Plan Impact: N/A
STAFF RECOMMENDED ACTION
City staff recommends adoption of the resolution approving the assessments.
SUPPORTING DATA
A. Resolution 2024-110
B. Feasibility Study
C. Updated Final Assessment Roll
3A (1)
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION 2024-110
ADOPTING ASSESSMENT ROLL CERTIFYING
THE 7" STREET RETAINING WALL, RECTANGULAR RAPID FLASHING BEACON, AND SIDEWALK
IMPROVEMENT PROJECT, CITY PROJECT 23CO05
FOR 2025 PAYABLE TAX YEAR
WHEREAS, pursuant to proper notice duly given as required by law, the Council has met and
heard and passed upon all objections to the proposed assessment for the 7th Street Retaining
Wall, Rectangular Rapid Flashing Beacon, and Sidewalk Improvement Project, City Project
23C005, including retaining wall reconstruction, sidewalk construction, rectangular rapid
flashing beacon installation; and other necessary appurtenant work; and
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF MONTICELLO, MINNESOTA:
Such proposed assessment, copies of which are attached hereto and made a part
hereof, is hereby accepted and shall constitute the special assessment against the lands
named therein, and each tract of land therein included is hereby found to be benefitted
by the proposed improvement in the amount of the assessment levied against it.
2. Such assessment shall be payable in annual installments extending over a period of ten
years, the first of the installments to be payable in the tax year of the first Monday in
January 2026 and shall bear interest at the rate of 10% (percent). To the first
installment, there shall be added interest on the entire assessment from November 12,
2024 (date of the assessment adoption) until December 31, 2025. To each subsequent
year's installment, interest for entire year shall be added on the unpaid balance. Credit
card payments are not accepted for special assessments.
3. The owner of any property so assessed may, at any time up to the end of day December
12, 2024, pay the whole of the assessment on such property to the city, with no
interest. In any subsequent year, the owner may pay to the city the entire principal
amount of the assessment remaining unpaid, with the exception of the amount
assessed on the current taxes. Such payment shall be made by November 151h or
interest will be charged through December 315t of the next succeeding year.
4. The clerk shall forthwith transmit a certification of this assessment to the County
Auditor to be extended on the property tax lists of the county. Such assessments shall
be collected and paid over in the same manner as other municipal taxes.
5. The right to partially prepay the assessment is not available.
ADOPTED BYthe Monticello City Council this 121h day of November, 2024.
3A (2)
CITY OF MONTICELLO
Lloyd Hilgart, Mayor
ATTEST:
Jennifer Schreiber, City Clerk
3A (3)
FEASIBILITY REPORT
FOR THE
7TH STREET RETAINING WALL, RRFB, AND
WALK IMPROVEMENT PROJECT
CITY OF MONTICELLO, MINNESOTA
November 14, 2023
Prepared by:
Hakanson
7 Anderson
Hakanson Anderson
3601 Thurston Avenue
Anoka, MN 55303
Telephone: 763-427-5860
I hereby certify that this plan, specification or report was prepared by me or under my direct
supervision and that I am a duly Licensed Professional Engineer under the laws of the State of
P innesota.
I -
23461 November 14, 2023
Crai J. Joe um, P.E. Lic. No. Date
3A (4)
H a ka n s o n Main Office: 45
3601 Thurston Avenue, Anoka, MN 55303
1]1 Anderson Phone: 763/427-5860 Fax: 763/427-0520
www.haa-inc.com LIM=
November 14, 2023
Matt Leonard, Public Works Director / City Engineer
City of Monticello
505 Walnut Street
Monticello, MN 55362
RE: Feasibility Report
7th Street Retaining Wall, RRFB, and Walk Improvement Project
Dear Mr. Leonard:
Enclosed please find the Feasibility Report for the City of Monticello's 7th Street Retaining Wall,
RRFB, and Walk Improvement Project. This project will include the reconstruction of an existing
retaining wall, the construction of new sidewalks in three areas along 7th Street, and the
construction of a new Rectangular Rapid Flashing Beacon (RRFB) at the intersection of 7th Street
and Walnut Street. A location map of the project areas is shown on Exhibit 1.
The proposed improvements are technically feasible and will benefit the areas served. The total
estimated project cost for the 7th Street Retaining Wall, RRFB, and Walk Improvement Project is
$687,509. The project costs include construction costs plus 20 percent for construction
contingency, engineering, legal, and administrative expenses.
We would welcome the opportunity to present and discuss the contents of this report with you and
your staff, the City Council, the benefiting property owners, and other interested parties. If you
have any questions or need additional information, please call me at 763-852-0485.
Sincerely,
Hakanson Anderson
I .
Craig J. toc um, P.E.
Project Engineer
3A (5)
TABLE OF CONTENTS
TITLE PAGE
LETTER OF TRANSMITTAL
TABLEOF CONTENTS.......................................................................................................TC-1
1. PROJECT DESCRIPTION................................................................................................ 1-4
2. ESTIMATED COSTS.............................................................................................................5
3. PROPOSED ASSESSMENTS................................................................................................5
4. PROJECT SCHEDULE..........................................................................................................6
5. CONCLUSIONS......................................................................................................................6
EXHIBIT
Location Map
APPENDIX
Appendix A Estimated Quantities and Project Costs
Appendix B Property List and Assessment Summary
TC - 1
3A (6)
7TH STREET RETAINING WALL, RRFB, AND
WALK IMPROVEMENT PROJECT
CITY OF MONTICELLO, MINNESOTA
1. PROJECT DESCRIPTION
This project will include the reconstruction of an existing retaining wall, the construction of new
sidewalks in three areas along 7th Street, and the construction of a new Rectangular Rapid
Flashing Beacon (RRFB) at the intersection of 7th Street and Walnut Street. A map showing the
project locations is included on Exhibit 1.
A. Wall Construction
This part of the project will include the reconstruction of approximately 385 lineal feet of
modular block retaining wall. The wall location is shown below. The existing wall height ranges
from 1 to 6 feet in height and is currently showing signs of failure. A significant amount of
impervious surface area from the commercial parking lots drain to the low area in the parking
lots which is approximately 100 feet west of the east end of the wall. Stormwater is collected at
the low area by two catch basins which discharge into an 18" storm pipe.
Based on the stormwater model that was developed to analyze the system capacity, the low area
will overflow the curb to the north which then overflows the existing retaining wall for all
rainfalls greater than a 2-year storm event. The continuous overflow of stormwater over the wall
is contributing to the wall failure.
To eliminate the stormwater from overflowing the wall, it is proposed to construct the new wall
approximately 1 foot higher than the existing wall and to construct an overflow in the curb. This
design will direct stormwater for larger events to the east between the curb and the new wall.
Legend v co
a
Wall Construction
v
�y sTyST
W
U
O
v
/.
J
2
7TH-ST W Q
1�
JR & R !1, LLC BBF
Froperhes, Inc
C
CO
24(/
Q�
3A (7)
B. Area 1 Sidewalk and RRFB Construction
Area I includes the construction of a new sidewalk segment on the north side of 7th Street
between Locust Street and Walnut Street. It also includes the construction of a RRFB at the
intersection of Walnut Street and 7th Street. The location of the proposed improvements is shown
below. The new sidewalk section will facilitate directing pedestrians to the intersection of
Walnut Street and 7th Street where they can cross 7th Street at the new RRFB. To eliminate the
need for retaining walls on the new sidewalk segment, the north curb line on 7th Street between
Locust Street and Walnut Street will be reconstructed approximately 5 feet south of its current
location.
Legend 6Ty
Sidewalk Construction `STD
A,
CO
A,
J�
G
O
v
David W.
Brinl�ma�
A,
CO
-- ,,
J
SPO. LLC v
NTH ST
Area 1 dM
RRFB
PA
3A (8)
C. Area 2 Sidewalk Construction
Area 2 includes the construction of a new segment of sidewalk on the south side of 7th Street
from the US Post Office to Wright Street. The location of this sidewalk segment is shown below.
The construction of this sidewalk along with the sidewalk construction in Area 3 will complete
the pedestrian route on the south side of 7th Street from Highway 25 to Washington Street. This
sidewalk segment starts at the east side of the US Post Office driveway and will connect to a
new sidewalk segment that is being built as part of the site improvements that are currently in
progress on the property just east of the Monticello Training Center property. This sidewalk will
also cross one existing driveway.
Legend
- Sidewalk Construction
C:p':
Area 2
Q-
OT
Q
7TH S
TF
CO
?
e
us
TySTF
Postal Bravera
Monticello
service Bank
Training
Center
�NTERSTgTE
94 N E
�
3A (9)
D. Area 3 Sidewalk Construction
Area 3 includes the construction of a new segment of sidewalk on the south side of 7th Street
from the Washington Street Roundabout to the east end of the sidewalk that is currently being
constructed on the property just east of the Monticello Training Center property. The location of
this sidewalk segment is shown below. The construction of this sidewalk along with the sidewalk
construction in Area 2 will complete the pedestrian route on the south side of 7th Street from
Highway 25 to Washington Street.
Legend #
Sidewalk Construction AV
h
CO
.4c/
SrF Area 3
Bluffs in
Monticello, LLC
i
E
3A (10)
2. ESTIMATED COSTS
The total estimated cost for this project is $687,509. The estimated project cost includes a 20
percent contingency for construction, engineering, legal, and administrative expenses. A
summary of the project costs by project area is shown below. Appendix A includes a detailed
breakdown of the estimated quantities and project costs.
Area
Construction
Overhead &
Contingency
Total
Wall Construction
$244,842
$48,968
$293,810
Area 1- Sidewalk Construction
$128,814
$25,763
$154,577
Area 2 - Sidewalk Construction
$104,138
$20,828
$124,966
Area 3 - Sidewalk Construction
$37,422
$7,484
$44,906
RRFB Construction
$57,709
$11,542
$69,251
SUMMARY OF TOTAL COSTS
$572,924
$114,585
$687,509
3. PROPOSED ASSESSMENTS
The public improvement and property assessment process shall be carried out in accordance with
Minnesota Statutes Chapter 429. The assessments shall be calculated in accordance with the
current City Special Assessment and Trunk Area Policies and Procedures for Public
Improvements and Maintenance Costs. The assessments for this project shall be calculated based
on the "front footage" method of assessment for non-residential properties.
The front footage assessment method applies to non-residential properties and is measured at the
property line. Individual parcels can differ considerably in shape and area. In these cases, the
actual physical dimensions of a parcel abutting an improvement (i.e., street, sewer, water, etc.)
may not be construed as the frontage utilized to calculate the assessment for a particular parcel.
Rather, an "adjusted front footage" will be determined. The purpose of this method is to equalize
assessment calculations for lots of similar size. Individual parcels by their very nature differ
considerably in shape and area.
Per Section I O.B. Lc of the policy, new sidewalks along existing undeveloped properties shall
be assessed 100% on a front foot basis for non-residential properties. This policy will apply to
two properties in Area 2 and the property in Area 3.
Per Section IO.B. Ld of the policy, new sidewalks either as a stand-alone project or as part of a
street reconstruction project, shall be assessed 50% on a front foot basis for non-residential
commercially zoned properties and assessed 25% for non-residential industrial zoned properties
that abut the sidewalk. This policy will apply to the remaining properties not mentioned above.
The cost of the RRFB's will not be assessed and it is proposed to assess the retaining wall
construction at 50% of the project cost based on the footage of the wall on each property.
The total estimated project cost is $687,509. The total cost proposed to be assessed to the
benefitting properties is $337,930. Appendix B provides a list of the properties proposed to be
assessed and the assessment calculations.
3A (11)
4. PROJECT SCHEDULE
The proposed schedule for the 7th Street Retaining Wall, RRFB, and Sidewalk Improvements
Project shall be as follows.
2023 Monday November 27 City Council Approves Feasibility Report and Sets the
Public Improvement Hearing Date
Wednesday November 29
Thursday November 28
Monday December 11
Monday December 11
Wednesday December 13
Thursday December 21
2024 Monday
January 8
Tuesday
January 23
Monday
February 12
Monday
May 6
Wednesday
July 3
Friday
August 2
Friday
August 2
Monday
August 26
Wednesday August 28
Wednesday August 28
Monday September 23
5. CONCLUSIONS
Send Hearing Notice to Monticello Times for
publication on December 7 and December 14
Mail Public Improvement Hearing Notices to Property
Owners
City Council Holds Public Improvement Hearing and
Orders Preparation of Plans and Specifications
City Council Authorizes Advertisement for Bid
Send Advertisement for Bid to Monticello Times and
Finance and Commerce
Advertisement for Bid Notice Published in the
Monticello Times and Finance and Commerce
City Council Approves Plans and Specifications
Open Bids at City Hall
City Council Approves Bids and Awards Contract
Start Construction
Construction Substantial Completion
Construction Final Completion
Prepare Final Assessment Roll
City Council Approves Final Assessment Roll and
Sets the Assessment Hearing Date
Send Advertisement for Assessment Hearing to
Monticello Times for publication on September 1
Mail Public Assessment Hearing Notices to Property
Owners
City Council Holds the Assessment Hearing
The proposed improvements are necessary, cost-effective, and feasible and will benefit the
properties listed in Appendix B of this report. In our opinion, this improvement should be
combined and completed with the East Broadway Avenue Improvement Project. Both of these
projects are anticipated to be constructed in 2024. The City, its financial consultant, and the
persons assessed should review the project for benefit to determine the economic feasibility of
the proposed improvements. It is recommended that the City Council accept this Feasibility
Report at their November 27, 2023 regular City Council meeting and schedule the date for the
Public Improvement Hearing.
2
3A (12)
EXHIBIT
Location Map
by
0
Wall
Construction
111
4
Q
'NZ TAtE gq E
Area 2
7th Street Retaining Wall,
CITY '+ OF N RRFB, and Walk Improvements
MY1 1. Legend
ont" Wall Construction
MINNESOTA
Sidewalk Construction
Area 3
Exhibit 1
Location Map
3A (14)
APPENDIX A
Estimated Quantities and Project Costs
3A (15)
Item
No.
Description
Unit
Unit Cost
1
MOBILIZATION
LUMP SUM
$20,000.00
2
CLEARING
EACH
$300.00
3
GRUBBING
EACH
$200.00
4
PAVEMENT MARKING REMOVAL
LIN FT
$2.00
5
PAVEMENT MARKING REMOVAL
SO FT
$4.00
6
SALVAGE CASTING
EACH
$500.00
7
SALVAGE SIGN
EACH
$100.00
8
SAWING CONCRETE CURB AND GUTTER
LIN FT
$8.00
9
SAWING CONCRETE PAVEMENT - FULL DEPTH
LIN FT
$6.00
10
SAWING BITUMINOUS PAVEMENT - FULL DEPTH
LIN FT
$3.00
11
REMOVE RETAINING WALL
LIN FT
$50.00
12
REMOVE FENCE
LIN FT
$5.00
13
REMOVE CURB AND GUTTER
LIN FT
$10.00
14
REMOVE CONCRETE PAVEMENT
SO FT
$3.00
15
REMOVE BITUMINOUS PAVEMENT
SO FT
$1.00
16
SALVAGE LANDSCAPING
SO YD
$25.00
17
EXCAVATION - COMMON
CU YD
$30.00
18
COMMON EMBANKMENT (CV)
CU YD
$50.00
19
HAUL AND DISPOSE OF EXCAVATED MATERIAL (LV)
CU YD
$20.00
20
WATER
MGAL
$75.00
21
AGGREGATE BASE CLASS 5
TON
$30.00
22
MILL BITUMINOUS SURFACE (2")
SO YD
$4.00
23
BITUMINOUS MATERIAL FOR TACK COAT
GALLONS
$10.00
24
TYPE SP 9.5 WEARING COURSE MIXTURE (2;B) 2.0" THICK
SO YD
$30.00
25
TYPE SP 12.5 NON WEARING COURSE MIXTURE (2;B) 2.5' THICK
SO YD
$35.00
26
PRECAST CONCRETE STONE RETAINING WALL
SO YD
$572.00
27
MODULAR BLOCK RETAINING WALL
SO YD
$300.00
28
PIPE RAILING
LIN FT
$150.50
29
SALVAGE AND INSTALL SPRINKLER HEAD
EACH
$200.00
30
ADJUST GATE VALVE BOX
EACH
$450.00
31
INSTALL CASTING
EACH
$600.00
32
CONCRETE CURB R GUTTER
LIN FT
$35.00
33
4" CONCRETE WALK
SO FT
$7.50
34
6" CONCRETE WALK
SO FT
$15.00
35
8" CONCRETE WALK
SO FT
$12.00
36
TRUNCATED DOMES
SQ FT
$85.00
37
INSTALL LANDSCAPE
SO YD
$25.00
38
TRAFFIC CONTROL
LUMP SUM
$20,000.00
39
INSTALL SIGN
EACH
$100.00
40
PEDESTRIAN CROSSWALK FLASHER SYSTEM
SYSTEM
$48,000.00
41
DECIDUOUS TREE 2" CAL BR
EACH
$800.00
42
STORM DRAIN INLET PROTECTION
EACH
$225.00
43
SILT FENCE; TYPE MS
LIN FT
$2.50
44
SEDIMENT CONTROL LOG TYPE WOOD CHIP
LIN FT
$3.00
45
LOAM TOPSOIL BORROW (LV)
CU YD
$50.00
46
SITE RESTORATION
SO YD
$4.00
47
4" SOLID LINE MUTI-COMPONENT
LIN FT
$1.00
48
12" SOLID LINE MUTI-COMPONENT
LIN FT
$7.00
49
4" DOUBLE SOLID LINE MUTI-COMPONENT
LIN FT
$2.00
50
PAVEMENT MESSAGE MULTI -COMPONENT
SO FT
$7.00
51
CROSSWALK MULTI -COMPONENT
SO FT
$6.00
C ONSTRUCTIC
N SUBTOTAL
OVERHEAD AND CONSTRUCTION CONTINGENCY (20 % )
ESTIMATED PROJECT TOTAL
Retaining Wall
Sidewalk Area 1
Sidewalk Area 2
Sidewalk
Area 3
RRFB
Total
Estimated
Estimated Cost
Estimated
Cost
Estimated
Cost
Estimated
Estimated
Estimated
Estimated Cost
Estimated
Total Estimated
Quantit Y
QuantityEstimated
QuantityEstimated
Quantity
Y
Cost
Quantity
Y
Quantity
Cost
042
$8400
0.22
$4,400
0.19
$3,800
0.07
$1,400
0.10
$2,000
1
$20,000
4.00
$1,200
2.00
$600
6
$1,800
4.00
$800
2.00
$400
6
$1,200
636.00
$1,272
636
$1,272
144.00
$576
144
$576
2.00
$1,000
1.00
$500
1.00
$500
4
$2,000
4.00
$400
1.00
$100
5
$500
4
$32
14.00
$112
3.00
$24
21
$168
77.00
$462
26.00
$156
12.00
$72
13
$78
128
$768
20.00
$60
382.00
$1,146
48
$144
450
$1,350
368.00
$18,400
368
$18,400
337.00
$1,685
337
$1,685
20.00
$200
363.00
$3,630
45.00
$450
8
$80
436
$4,360
1,306.00
$3,918
108.00
$324
120
$360
1,534
$4,602
60.00
$60
3,416.00
$3,416
3,476
$3,476
68.00
$1,700
68
$1,700
117.00
$3,510
208.00
$6,240
54.00
$1,620
379
$11,370
59.00
$2,950
104.00
$5,200
32.00
$1,600
195
$9,750
152.00
$3,040
270.00
$5,400
70.00
$1,400
492
$9,840
3.40
$255
5.00
$375
10.00
$750
5.00
$375
23
$1,725
2.60
$78
255.00
$7,650
230.00
$6,900
75.00
$2,250
563
$16,890
66.00
$264
66
$264
12.00
$120
4.00
$40
16
$160
9.00
$270
340.00
$10,200
66.00
$1,980
9
$270
424
$12,720
4.50
$158
255.00
$8,925
11.00
$385
5
$175
276
$9,660
250.00
$143,000
250
$143,000
17.00
$5,100
17
$5,100
368.00
$55,384
368
$55,384
10.00
$2,000
10.00
$2,000
8.00
$1,600
28
$5,600
1.00
$450
1
$450
2.00
$1,200
1.00
$600
1.00
$600
4
$2,400
20.00
$700
376.00
$13,160
46.00
$1,610
442
$15,470
980.00
$7,350
5,265.00
$39,488
1,736.00
$13,020
7,981
$59,858
776.00
$11,640
252.00
$3,780
120
$1,800
1,148
$17,220
1,415.00
$16,980
102.00
$1,224
1,517
$18,204
24.00
$2,040
12.00
$1,020
24
$2,040
60
$5,100
68.00
$1,700
68
$1,700
0.42
$8,400
0.22
$4,400
0.19
$3,800
0.07
$1,400
0.10
$2,000
1
$20,000
4.00
$400
1.00
$100
5
$500
1
$48,000
1
$48,000
4.00
$3,200
2.00
$1,600
6
$4,800
4.00
$900
4.00
$900
3.00
$675
2.00
$450
13
$2,925
290.00
$725
290
$725
420.00
$1,260
350.00
$1,050
1,110.00
$3,330
222.00
$666
2,102
$6,306
40.00
$2,000
50.00
$2,500
75.00
$3,750
20.00
$1,000
185
$9,250
900.00
$3,600
500.00
$2,000
1,312.00
$5,248
211.00
$844
2,923
$11,692
209.00
$209
209
$209
40.00
$280
40
$280
449.00
$898
449
$898
45.00
$315
45
$315
90.00
$540
127
$762
217
$1,302
$244,842
$128,814
$104,138
$37,422
$57,709
$572,924
$48,968
$25,763
$20,828
$7,484
$11,542
$114,585
$293,810
$154,577
$124,966
$44,906
$69,251
$687,509
ESTIMATED QUANTITIES 9-8-2023 Page 1 of 1
3A (16)
APPENDIX B
Property List and Assessment Summary
3A (17)
Property List and Preliminary Assessment Summary
7tn Street Retaining Wall, RRFB, and Walk Improvements
FRONT
ASSESSMENT
TOTAL PRELIMINARY
PID
I PROPERTY ADDRESS
I OWNER/TAXPAYER
I OWNER ADDRESS
I ZONING
I FOOTAGE
I PERCENTAGE
I OWNER ASSESSMENT
Retaining Wall Construction
I
155-068-001020
300 7TH ST W
JR&R II, LLC
901 HIGHWAY 59
CCD: Central Community District
110
50%
$43,912
MARSHALL, MN 56258
155-068-000030
UNASSIGNED
JR&R II, LLC
901 HIGHWAY 59
CCD: Central Community District
92
50%
$36,726
MARSHALL, MN 56258
155-076-000010
206 7TH ST W
BBF PROPERTIES, INC
PO BOX 990
CCD: Central Community District
48
50%
$19,162
MINNEAPOLIS, MN 55440
155-076-001010
206 7TH ST W
BBF PROPERTIES, INC
PO BOX 990
CCD: Central Community District
118
50%
$47,105
MINNEAPOLIS, MN 55440
Sidewalk Area I
I
155-010-006040
611 WALNUT ST
SPO LLC
201 W 7TH ST
CCD: Central Community District
133
50%
$30,962
MONTICELLO, MN 55362
155-010-006030
UNASSIGNED
SPO LLC
201 W 7TH ST
CCD: Central Community District
33
50%
$7,682
MONTICELLO, MN 55362
155-010-006031
UNASSIGNED
DAVID W BRINKMAN
6400 46TH AVE SE
CCD: Central Community District
33
50%
$7,682
SAINT CLOUD, MN 56304
155-010-006010
221 7TH ST W
DAVID W BRINKMAN
6400 46TH AVE SE
CCD: Central Community District
133
50%
$30,962
SAINT CLOUD, MN 56304
Sidewalk Area 2
I
155-029-002040
UNASSIGNED
UNITED STATES POSTAL SERVICE
6800 64TH ST W
OVERLAND PARK, KS 66202
IBC: Industrial and Business Campus District
185
100%
$24,726
155-029-002050
UNASSIGNED
BRAVERA BANK
220 1ST AVE W
IBC: Industrial and Business Campus District
190
100%
$25,394
DICKINSON, ND 58601
155-029-002070
406 7TH ST E
MONTICELLO TRAINING CENTER LLC
15440 45TH ST NE
SAINT MICHAEL, MN 55376
IBC: Industrial and Business Campus District
560
25%
$18,711
Sidewalk Area 3
I
155-050-000020 UNASSIGNED BLUFFS IN MONTICELLO LLC 3339 CRYSTAL BAY RD I IBC: Industrial and Business Campus District 279
WAYZATA, MN 55391
100% I $44,906
3A (18)
Property List and Final Assessment Summary- Updated
PID
Retaining Wall Construction
155-068-001020
155-068-000030
155-076-000010
155-076-001010
Sidewalk Area I
155-010-006040
155-010-006030
155-010-006031
155-010-006010
Sidewalk Area 2
155-029-002040
155-029-002050
155-029-002070
Sidewalk Area 3 W
155-050-000020
PROPERTY ADDRESS
I OWNER/TAXPAYER
I OWNER ADDRESS
300 7TH ST W
JR&R II, LLC
901 HIGHWAY 59
MARSHALL, MN 56258
UNASSIGNED
JR&R II, LLC
901 HIGHWAY 59
MARSHALL, MN 56258
206 7TH ST W
BBF PROPERTIES, INC
PO BOX 990
MINNEAPOLIS, MN 55440
206 7TH ST W
BBF PROPERTIES, INC
PO BOX 990
MINNEAPOLIS, MN 55440
611 WALNUT ST
SPO LLC
201 W 7TH ST MONTICELLO, MN
55362
UNASSIGNED
SPO LLC
201 W 7TH ST MONTICELLO, MN
55362
UNASSIGNED
DAVID W BRINKMAN
640046TH AVE SE SAINT
CLOUD, MN 56304
221 7TH ST W
DAVID W BRINKMAN
6400 46TH AVE SE SAINT
CLOUD, MN 56304
UNASSIGNED
UNITED STATES POSTAL SERVICE
6800 64TH ST W OVERLAND PARK,
KS 66202
UNASSIGNED
BRAVERA BANK
220 1ST AVE W DICKINSON, ND
58601
406 7TH ST E
MONTICELLO TRAINING CENTER LLC
15440 45TH ST NE SAINT MICHAEL,
MN 55376
UNASSIGNED I BLUFFS IN MONTICELLO LLC I 3339 CRYSTAL BAY RD
WAYZATA, MN 55391
FRONT
ASSESSMENT TOTAL PRELIMINARY ASSESSMENT AMOUNT PER TOTAL FINAL OWNER
FOOTAGE
PERCENTAGE (PER OWNER ASSESSMENT LF ( PROPOSED UPDATED
ASSESSMENT
ZONING
CURRENT POLICY)
POLICY)
■
CCD: Central Community District
110
50%
$43,912
$250
1
$27,500
CCD: Central Community District
92
50%
$36,726
$250
$23,000
CCD: Central Community District
48
50%
$19,162
$250
$12,000
CCD: Central Community District
118
50%
$47,105
$250
$29,500
CCD: Central Community District
133
50%
$30,962
$50
$6,650
CCD: Central Community District
33
50%
$7,682
$50
$1,650
CCD: Central Community District
33
50%
$7,682
$50
$1,650
CCD: Central Community District
133
50%
$30,962
$50
$6,650
I
IBC: Industrial and Business Campus District
185
100%
$24,726
$50
$9,250
IBC: Industrial and Business Campus District
190
100%
$25,394
$50
$9,500
IBC: Industrial and Business Campus District
560
25%
$18,711
$50
$18,711
IBC: Industrial and Business Campus District
I 279
I` 100%
$44,906
$50
$13,950
TOTAL ASSESSMENT
$337,930.00
$160,011.00
City Council Agenda: 11/12/2024
3B. Public Hearing - Consideration of adopting Resolution 2024-111 ordering
improvements for the School Boulevard Intersection Improvements Proiect
Prepared by: Meeting Date: ❑ Consent Agenda Item
PW Director/City Engineer 11/12/2024 ® Public Hearing Item
❑ Regular Agenda Item
Reviewed by: Approved by:
Finance Director, Community City Clerk
Development Director
ACTION REQUESTED
Motion to adopt Resolution 2024-111 ordering the improvements for the School Boulevard
Intersection Improvements Project.
PREVIOUS COUNCIL ACTION
July 10, 2023: Authorized the preparation of a feasibility report for the School
Boulevard Intersection Improvements Project and approved a contract
with Hakanson Anderson to provide engineering in the amount of
$235,500.
May 13, 2024: Authorized the purchase of permanent and temporary easements for the
Edmonson and School Boulevard Roundabout.
July 8, 2024: Approved the submission of a Public Interest Finding with MNDOT for the
School Boulevard Intersection Improvements Project.
July 22, 2024: Approved the purchase of right-of-way for the School Boulevard
Intersection Improvements Project.
September 9, 2024: Approved a resolution restricting on -street parking on School Boulevard
from Highway 25 to Country Lane.
October 14, 2024: Accepted feasibility study and ordered an improvement hearing for the
School Boulevard Intersection Improvements Project.
REFERENCE AND BACKGROUND
The City Council authorized the preparation of a feasibility study for the construction of two
roundabouts on School Boulevard: one at the intersection with Edmonson Avenue and the
City Council Agenda: 11/12/2024
other at the intersection with Cedar Street. Both intersections are currently controlled with 4-
way stop signs. The scope of improvements includes the following:
• Replacement of the current all -way stop controlled intersection at School Boulevard and
Cedar Street with a single lane roundabout.
• Replacement of the current all -way stop controlled intersection at School Boulevard and
Edmonson Avenue with a single lane roundabout.
• Full depth reclamation of School Boulevard between Highway 25 and Country Lane.
• Full depth reclamation as required for Cedar Street and Edmonson Avenue for
roundabout construction.
• Construction of approximately 600 feet of 10-foot-wide bituminous trail along the south
side of School Boulevard between Edmonson Avenue and Country Lane.
• Removal of the center medians between Cedar Street and Edmonson Avenue on School
Boulevard and construction of a two-way left turn lane.
• Replacement of all non -compliant ADA ramps throughout the project area and
installation of new ADA ramps and sidewalk as required for the roundabout
construction.
• Installation of pathway lights where new pathways are added to connect to existing
lighting system.
• Replacement of street trees removed for the pathways and addition of irrigation for
tree watering.
• Installation of roundabout landscaping consistent with the Pointes at Cedar Zoning
district.
The Feasibility Report concluded that the proposed improvements are necessary, cost-effective,
and feasible and will benefit the properties that are proposed to be assessed per Minnesota
Statutes section 429.021 and 459.14, subd 7 and the City's Assessment Policy.
The City has received right-of-way certification from MNDOT and FHWA and is anticipating a
bid date in December of 2024 with construction starting in the spring of 2025.
Budget Impact: The total project costs are estimated at $3,600,000, including
engineering, right-of-way acquisition, construction, legal services, and contingency. Of
these costs, $1,485,600 to be paid by federal grant funds and $483,170 is proposed to
be assessed. The local costs are anticipated to be $1,251,230 paid by the Capital
Projects Fund and $380,000 paid by the Street Lighting Fund.
City Council Agenda: 11/12/2024
II. Staff Workload Impact: Staff will continue to be involved throughout the project
development process.
III. Comprehensive Plan Impact: The Pointes at Cedar Master Plan is an adopted appendix
to the Monticello 2040 Vision + Comprehensive Plan; the document calls for both
roundabouts to improve safety and efficiency along the collector roadway of School
Boulevard.
STAFF RECOMMENDED ACTION
City staff recommend approval of the resolution.
SUPPORTING DATA
A. Resolution 2024-111
B. Feasibility Report
3B (1)
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2024-111
RESOLUTION ORDERING THE SCHOOL BOULEVARD INTERSECTION IMPROVEMENTS PROJECT
WHEREAS, a Feasibility Report has been prepared by the City Engineer for the School
Boulevard Intersection Improvements Project which includes the following improvements and
other necessary appurtenant work:
• Replacement of the current all -way stop controlled intersection at School Boulevard
and Cedar Street with a single lane roundabout.
• Replacement of the current all -way stop controlled intersection at School Boulevard
and Edmonson Avenue with a single lane roundabout.
• Full depth reclamation of School Boulevard between Highway 25 and Country Lane.
• Full depth reclamation as required for Cedar Street and Edmonson Avenue for
roundabout construction.
• Construction of approximately 600 feet of 10-foot-wide bituminous trail along the
south side of School Boulevard between Edmonson Avenue and Country Lane.
• Removal of the center medians between Cedar Street and Edmonson Avenue on School
Boulevard and construction of a two-way left turn lane.
• Replacement of all non -compliant ADA ramps throughout the project area and
installation of new ADA ramps and sidewalk as required for the roundabout
construction.
• Installation of pathway lights where new pathways are added to connect to existing
lighting system.
• Replacement of street trees removed for the pathways and addition of irrigation for
tree watering.
• Installation of roundabout landscaping consistent with the Pointes at Cedar Zoning
district.
WHEREAS, the report was received by the City Council on October 14, 2024, providing
information as to whether the improvements are necessary, cost-effective, and feasible;
whether it should be made as proposed or in connection with some other improvement; the
estimated cost of the improvement as recommended; and a description of the methodology
used to calculate individual assessments for affected parcels; and
3B (2)
WHEREAS, a resolution of the City Council adopted the 141" day of October 2024, fixed a
date for a council hearing on the proposed street improvements within the project area; and
WHEREAS, ten days' mailed notice and two weeks' published notice of hearing was
given, and the hearing was held thereon on the 121" day of November, 2024, at which all
persons desiring to be heard were given an opportunity to be heard thereon.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF MONTICELLO,
MINNESOTA:
1. Such improvement is necessary, cost-effective, and feasible as detailed in the
feasibility report.
ADOPTED BYthe Monticello City Council this 12t" day of November, 2024.
ATTEST:
Jennifer Schreiber, City Clerk
CITY OF MONTICELLO
Lloyd Hilgart, Mayor
3B (3)
,Q
FEASIBILITY REPORT
FOR THE
SCHOOL BOULEVARD IMPROVEMENT PROJECT
aa.,w6-
1
• 4-
v
CITY OF MONTICELLO, MINNESOTA
Prepared by:
IIIHakanson
Anderson
Hakanson Anderson
3601 Thurston Avenue
Anoka, MN 55303
Telephone: 763 -427-5 860
I hereby certify that this report was prepared by me or under my direct supervision and that I am a
dul- Licensed Professional Engineer under the laws of the State of Minnesota.
i
23461 10/9/2024
Craig J Jc ,hu p, P.E. Lic. No. Date
Hakanson
Anderson
October 9, 2024
Main Office:
3601 Thurston Avenue, Anoka, MN 55303
Phone: 763/427-5860
www.haa-inc.com
Matt Leonard, Public Works Director / City Engineer
City of Monticello
505 Walnut Street
Monticello, MN 55362
RE: Feasibility Report
School Boulevard Improvement Project
Dear Mr. Leonard:
45
m
Enclosed please find the Feasibility Report for the City of Monticello's School Boulevard
Improvement Project. This project includes improvements to approximately 3,200 lineal feet of School
Boulevard from Highway 25 to Country Lane. The major components of this project include:
1. The replacement of the current all -way stop controlled intersections at School Boulevard and
Cedar Street with a single lane roundabout.
2. The replacement of the current all -way stop controlled intersections at School Boulevard and
Edmonson Avenue with a single lane roundabout.
3. The construction of approximately 600 feet of 10-foot-wide bituminous trail along the south
side of School Boulevard between Edmonson Avenue and Country Lane.
4. The center medians between Cedar Street and Edmonson Avenue will be removed and replaced
with a two-way left turn lane.
5. This project also includes reconstructing the pavement surface on School Boulevard between
the two roundabouts and the pavement between the Edmonson Avenue roundabout and
Country Lane.
6. Lastly, the proposed improvements will bring all intersections up to current ADA standards.
The total estimated project cost for this project is $3,570,369. The project costs include the construction
costs, right-of-way acquisition costs, and a 15 percent contingency for construction, engineering, legal,
administrative, and fiscal expenses. A summary of the estimated project costs is included in Table 1.
Table 1 also includes a summary of the total proposed assessment cost. We would welcome the
opportunity to present and discuss the contents of this report with you and your staff, City Council, the
benefiting property owners, and other interested parties. If you have any questions or need additional
information, please call me at 763-852-0485.
Sincerely,
Hakanson Anderson
I - J
rai J. oc
Project , P.E.
jEngineer
3B (5)
TABLE OF CONTENTS
TITLE PAGE
LETTER OF TRANSMITTAL
TABLEOF CONTENTS.......................................................................................................TC-1
1. INTRODUCTION....................................................................................................................I
2. PROJECT DESCRIPTION....................................................................................................I
3. ESTIMATED COSTS.............................................................................................................3
4. PROPOSED ASSESSMENTS................................................................................................3
5. PROJECT FUNDING.............................................................................................................3
6. PROJECT SCHEDULE..........................................................................................................4
7. CONCLUSIONS......................................................................................................................4
TABLES
Table 1 — Summary of the Total Estimated Project and Assessed Costs
FIGURES
Figure 1 —Project Limits
Figure 2 — Cedar Street Roundabout Layout
Figure 3 — Edmonson Avenue Roundabout Layout
Figure 4 — Roundabout Landscaping Plan
Figure 5 — Detour Plan — West Leg of Cedar Street
Figure 6 — Detour Plan — North and South Leg of Edmonson Avenue
Figure 7 — Detour Plan - Edmonson Avenue Closure
APPENDIX
Appendix A — Right -of -Way and Easement Information
Appendix B — Assessment Information
TC - 1
3B (6)
School Boulevard Improvement Project
CITY OF MONTICELLO, MINNESOTA
1. INTRODUCTION
Existing Conditions
The current land use along this segment of School Boulevard includes a mix of commercial and multi-
family and single family residential. Several parcels north of School Boulevard and west of Edmonson
Avenue are undeveloped. School Boulevard is a single lane divided urban roadway that includes
concrete curb and gutter and divided concrete medians. School Boulevard serves as a primary east -
west connection through the City of Monticello. Most of the traffic on School Boulevard consists of
passenger vehicles that are accessing major Monticello School District facilities, residential
developments, and commercial retail and service businesses. Most of the truck traffic includes trucks
servicing local businesses, however, School Boulevard services as a freight route connecting Trunk
Highway 25 to Wright County State Aid Highway 18.
Project Needs
School Boulevard is one of the busiest non-state/county roadways located in the City of Monticello.
It has traffic volumes greater than many Wright County roadways with traffic volumes of over 8,000
vehicles per day. With retail businesses, including Walmart, Kwik Trip, and Aldi, accessing School
Boulevard at Cedar Street, this has become a busy intersection with a high accident rate. The City has
completed several projects to increase safety at this intersection. These improvements have included
installing the following: an all -way stop controlled intersection, turn lanes for all directions, center
medians, crosswalks, intersection lighting, and pathway lighting. While these improvements have
helped increase safety, the improvements were installed over 10 years ago.
This intersection has become increasingly congested, and accidents have continued to occur. Over the
last 10 years, 38 accidents have occurred within the project area. Most of the accidents have primarily
occurred at the intersection of School Boulevard and Cedar Street with seven having resulted in
injuries. To address the issues, several intersection improvements were reviewed, and it was
determined that the construction of a roundabout would provide the largest benefit/cost for these
intersections. The main purpose of the project is to improve the traffic flow and safety at the current
all -way stop controlled intersections; a secondary benefit of the improved traffic flow includes a
reduction in carbon emissions.
2. PROJECT DESCRIPTION
Overview
This project includes improvements to approximately 3,200 lineal feet of School Boulevard from
Highway 25 to Country Lane. All new medians and curb and gutter will be concrete. No new
stormwater ponding is required with this project. The project limits are shown in Figure 1.
The major components of this project include:
1. The replacement of the current all -way stop controlled intersections at School Boulevard and
Cedar Street with a single lane roundabout.
2. The replacement of the current all -way stop controlled intersections at School Boulevard and
Edmonson Avenue with a single lane roundabout.
3. The construction of approximately 600 feet of 10-foot-wide bituminous trail along the south side
of School Boulevard between Edmonson Avenue and Country Lane.
1
3B (7)
4. The center medians between Cedar Street and Edmonson Avenue will be removed and replaced
with a two-way left turn lane.
5. In addition to the improvement to traffic flow and safety through roundabout construction, this
project will enhance the transportation infrastructure by improving the pavement condition for
School Boulevard. This will be accomplished by reclaiming and paving the portions of the
roadway that will not be reconstructed. The proposed improvements will also bring all
intersections up to current ADA standards.
Roundabout Construction
Both intersections will be reconstructed with single lane roundabouts. The center roundabout
diameters will be 58' — 6" and will include a I wide truck apron. Splitter islands will be constructed
on all four approach legs. The layout of the Cedar Street and Edmonson Avenue roundabouts are
included as Figure 2 and Figure 3, respectively.
The center of the roundabouts will be landscaped with native vegetation and irrigated. The proposed
landscaping is shown in Figure 4. The project will also include reuse of the existing lighting at the
intersections and the construction of new lights where required.
Trail Construction
A new 10-foot-wide segment of bituminous trail will be constructed on the south side of School
Boulevard from Edmonson Avenue to Country Lane.
Center Medians
Currently there are center concrete medians on School Boulevard between Cedar Street and Edmonson
Avenue. This project proposes to remove the center median and replace them with a two-way left turn
lane.
Traffic Control
During Phase 1 construction of the Cedar Street roundabout, it is anticipated that westbound School
Boulevard between Cedar Street and Highway 25 will be closed. Westbound traffic on School
Boulevard will be detoured north on Cedar Street. During Phase 2 construction, it is anticipated that
eastbound School Boulevard from Highway 25 to Cedar Street will be closed for a short period of
time. Traffic on Highway 25 will be detoured to Dundas Road. This will require closing the
northbound right turn lane and southbound left turn lane on Trunk Highway 25. This detour is shown
in Figure 5. A single lane will always be maintained for north/southbound traffic on Cedar Street.
It is anticipated that the north and south legs of Edmonson Avenue will be closed during the Phase 1
construction of the Edmonson Avenue roundabout. Northbound traffic will detour to Dundas Road
and southbound traffic will detour to 85th Street. This detour is shown in Figure 6. Phase 2 construction
of the Edmonson Roundabout will include closing the entire Edmonson Avenue intersection for a short
period of time. The detour for this closure is shown in Figure 7.
Easements and Right -of -Way
This project will require temporary and permanent easements from 7 parcels. A total of 11,775 square
feet of temporary easement, 2,775 square feet of permanent easement, and 2,311 square feet of right-
of-way is needed for this project. Appendix A includes a summary of the easement and right-of-way
areas and exhibits.
2
3B (8)
3. ESTIMATED COSTS
The total estimated project cost for this project is $3,570,369. The project costs include the construction
costs, right of way acquisition costs, and a 15 percent contingency for construction, engineering, legal,
administrative, and fiscal expenses. Table 1 includes a detailed breakdown of the estimated quantities
and project costs.
Table 1 also includes a summary of the total assessable costs which is estimated at $1,942,047. All costs
were considered assessable except for the concrete medians and curb and gutter associated with the
roundabout splitter medians and center circle, the new storm sewer and watermain items associated with
the roundabout splitter medians and center circle, the street lighting, the irrigation and landscaping, and
the new trail construction.
4. PROPOSED ASSESSMENTS
The public improvement and property assessment process shall be carried out in accordance with
Minnesota Statutes Chapter 429. The assessments shall be calculated in accordance with the current
City Special Assessment and Trunk Area Policies and Procedures for Public Improvements and
Maintenance Costs. The assessments for this project shall be calculated based on the "front footage"
method of assessment for non-residential properties.
The front footage assessment method applies to non-residential properties and is measured at the
property line. Individual parcels can differ considerably in shape and area. In these cases, the actual
physical dimensions of a parcel abutting an improvement (i.e., street, sewer, water, etc.) may not be
construed as the frontage utilized to calculate the assessment for a particular parcel. Rather, an
"adjusted front footage" will be determined. The purpose of this method is to equalize assessment
calculations for lots of similar size. Individual parcels by their very nature differ considerably in shape
and area.
Per Section 10.A.2.c of the policy, reconstruction of Collector Roadways shall be assessed 50% on a
front foot basis for non-residential commercially zoned properties. This policy will apply to the parcels
being assessed on this project.
As discussed above the total assessable cost is estimated at $1,942,047. The total proposed amount to be
assessed to the benefitting properties is $490,561. Appendix B provides the front footage calculations,
a summary of the properties being assessed, and the proposed assessment calculations and amounts.
5. PROJECT FUNDING
This project will be financed with four different funding sources including: Assessment Funds,
Electric Utility Funds, Federal Grant Funds, and Municipal State Aid Funds. The funding summary
by source is presented below:
Assessment Funds $ 490,561
Electric Utility Funds $ 384,608
Federal Grant Funds $1,485,000
City_ Funds $ 1,210,200
Total Project Cost $3,570,369
3
3B (9)
6. PROJECT SCHEDULE
The proposed schedule for the School Boulevard Improvement Project is as follows.
2024 Monday
October 14
City Council Approves Feasibility Report and Sets
the Public Improvement Hearing Date
Wednesday
October 16
Send Hearing Notice to Monticello Times for
publication on October 24 and October 31
Thursday
October 17
Mail Public Improvement Hearing Notices to
Property Owners
Tuesday
November 12
City Council Conducts Improvement Hearing
Tuesday
November 12
City Council Approves Plans and Specifications and
Authorizes Advertisement for Bid
Wednesday
November 13
Send Advertisement for Bid to Monticello Times
and Finance and Commerce
Thursday
November 21
Advertisement for Bid Notice Published in the
Monticello Times and Finance and Commerce
Tuesday
December 17
Open Bids at City Hall
Monday
January 13
City Council Approves Bids and Awards Contract
Monday
April 21
Start Construction
Friday
August 11
Construction Substantial Completion
2025
Friday
September 5
Construction Final Completion
Friday
September 5
Prepare Final Assessment Roll
Monday
September 22
City Council Approves Final Assessment Roll and
Sets the Assessment Hearing Date
Wednesday
September 24
Send Advertisement for Assessment Hearing to
Monticello Times for publication on October 2
Wednesday
September 24
Mail Public Assessment Hearing Notices to Property
Owners
Monday
October 27
City Council Holds the Assessment Hearing
7. CONCLUSIONS
The proposed improvements are necessary, cost-effective, and feasible and will benefit the
properties listed in Appendix B of this report. This project can be completed as proposed and
need not be constructed in conjunction with any other project. The City, its financial consultant,
and the persons assessed should review the project for benefit to determine the economic
feasibility of the proposed improvements. It is recommended that the City Council accept this
Feasibility Report at their October 14, 2024 regular City Council meeting and schedule the date
for the Public Improvement Hearing.
11
3B (10)
TABLE
Summary of the Total Estimated Project and Assessed Costs
3B (11) TABLE 1
SUMMARY OF ESTIMATED
PROJECT AND ASSESSMENT COSTS
TOTAL PROJECT
ASSESSED PROJECT
COSTS
COSTS
Estimated
Estimated
Estimated
Estimated
Quantity
Cost
Quantity
Cost
Item No.
Ref No.
Description
Unit
Unit Cost
1
2021.501
MOBILIZATION
LUMP SUM
$125,000.00
1
$125,000
0.54
$67,500
2
2101.502
CLEARING
EACH
$460.00
8
$3,680
3
2101.502
GRUBBING
EACH
$140.00
9
$1,260
4
2104.502
REMOVE LIGHTING UNIT
EACH
$500.00
2
$1,000
5
2104.502
REMOVE LUMINAIRE
EACH
$250.00
10
$2,500
6
2104.502
REMOVE MANHOLE OR CATCH BASIN
EACH
$820.00
9
$7,380
7
2104.502
REMOVE CASTING
EACH
$195.00
9
$1,755
8
2104.502
REMOVE GATE VALVE AND BOX
EACH
$300.00
2
$600
9
2104.502
REMOVE VALVE BOX
EACH
$270.00
2
$540
10
2104.502
REMOVE HYDRANT
EACH
$500.00
2
$1,000
11
2104.502
REMOVE SIGN
EACH
$150.00
53
$7,950
12
2104.502
REMOVE EQUIPMENT PAD
EACH
$650.00
1
$650
13
2104.502
REMOVE LIGHT FOUNDATION
EACH
$650.00
7
$4,550
14
2104.502
REMOVE SERVICE CABINET
EACH
$600.00
1
$600
15
2104.502
SALVAGE CASTING
EACH
$280.00
27
$7,560
27
$7,560
16
2104.502
SALVAGE HANDHOLE
EACH
$500.00
1
$500
1
$500
17
2104.502
SALVAGE LIGHTING UNIT TYPE SPECIAL 1
EACH
$400.00
5
$2,000
18
2104.503
SAWING CONCRETE PAVEMENT- FULL DEPTH
LIN FT
$4.50
316
$1,422
316
$1,422
19
2104.503
SAWING BITUMINOUS PAVEMENT- FULL DEPTH
LIN FT
$2.45
1,890
$4,631
1,890
$4,631
20
2104.503
REMOVE WATER MAIN
LIN FT
$25.00
37
$925
21
2104.503
REMOVE SEWER PIPE (STORM)
LIN FT
$33.00
288
$9,504
22
2104.503
REMOVE CURB AND GUTTER
LIN FT
$9.45
4,126
$38,991
4,126
$38,991
23
2104.503
REMOVE WOOD FENCE
LIN FT
$15.00
50
$750
24
2104.503
REMOVE UNDERGROUND WIRE
LIN FT
$1.05
3,650
$3,833
25
2104.504
REMOVE CONCRETE MEDIAN
SQ YD
$5.00
1,900
$9,500
26
2104.504
REMOVE CONCRETE WALK
SQ YD
$5.00
923
$4,615
923
$4,615
27
2104.504
REMOVE CONCRETE DRIVEWAY PAVEMENT
SQ YD
$18.00
113
$2,034
113
$2,034
28
2104.504
REMOVE BITUMINOUS PAVEMENT
SQ YD
$2.00
13,246
$26,492
13,246
$26,492
29
2104.518
REMOVE BITUMINOUS WALK
SQ FT
$2.00
7,317
$14,634
7,317
$14,634
30
2104.604
SALVAGE LANDSCAPE ROCK
SQ YD
$50.00
15
$750
15
$750
31
2106.507
EXCAVATION - COMMON
CU YD
$20.00
2,540
$50,800
1,270
$25,400
32
2106.507
SELECT GRANULAR EMBANKMENT (CV)
CU YD
$45.00
222
$9,990
33
2106.507
COMMON EMBANKMENT (CV)
CU YD
$20.00
2,437
$48,740
1,218
$24,360
34
2106.607
EXCAVATION SPECIAL
CU YD
$10.00
2,610
$26,100
1,305
$13,050
34
2130.523
WATER
MGAL
$45.00
225
$10,125
225
$10,125
35
2221.507
SHOULDER BASE AGGREGATE (CV) CLASS 2
CU YD
$60.00
9
$540
9
$540
36
2211.509
AGGREGATE BASE CLASS 5
TON
$25.00
754
$18,850
37
2215.504
FULL DEPTH RECLAMATION
SQ YD
$2.25
11,705
$26,336
11,705
$26,336
38
2215.507
HAUL FULL DEPTH RECLAMATION (CV)
CYYD
$18.00
1,951
$35,118
1,951
$35,118
39
2232.504
MILL BITUMINOUS SURFACE (2.0")
SQ YD
$2.25
82
$185
82
$185
40
2357.506
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
$2.35
2,904
$6,824
2,904
$6,824
41
2360.504
TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) 3.0" THICK
SQ YD
$25.00
1,521
$38,025
42
2360.504
TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,B) 2.5' THICK
SQ YD
$26.00
1,177
$30,602
43
2360.509
TYPE SP 9.5 WEARING COURSE MIXTURE (3,C)
TON
$97.00
3,062
$297,014
3,062
$297,014
44
2360.509
TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,C)
TON
$95.00
6,125
$581,875
6,125
$581,875
45
2433.603
SAW AND SEAL JOINT
LIN FT
$19.00
100
$1,900
100
$1,900
46
2503.503
12" RC PIPE SEWER CLASS V
LIN FT
$120.00
118
$14,160
47
2503.503
15" RC PIPE SEWER CLASS V
LIN FT
$130.00
57
$7,410
48
2503.503
18" RC PIPE SEWER CLASS V
LIN FT
$140.00
146
$20,440
49
2503.503
24" RC PIPE SEWER CLASS III
LIN FT
$160.00
48
$7,680
50
2503.602
CONNECT TO EXISTING STORM SEWER
EACH
$1,100.00
9
$9,900
51
2504.601
IRRIGATION SYSTEM
LUMP SUM
$25,000.00
1
$25,000
52
2504.602
CONNECT TO EXISTING WATER MAIN
EACH
$1,100.00
5
$5,500
53
2504.602
HYDRANT
EACH
$7,000.00
2
$14,000
54
2504.602
VALVE BOX
EACH
$900.00
2
$1,800
55
2504.602
ADJUST VALVE BOX
EACH
$550.00
10
$5,500
10
$5,500
56
2504.602
1" CORPORATION STOP
EACH
$500.00
2
$1,000
57
2504.602
6" GATE VALVE AND BOX
EACH
$1,100.00
2
$2,200
58
2504.602
1" CURB STOP AND BOX
EACH
$500.00
2
$1,000
59
2504.602
SALVAGE SPRINKLER HEAD
EACH
$50.00
50
$2,500
50
$2,500
60
2504.602
INSTALL SPRINKLER HEAD
EACH
$90.00
50
$4,500
50
$4,500
61
2504.603
6" WATERMAIN DUCTILE IRON CL 52
LIN FT
$75.00
25
$1,875
62
2504.603
16" WATERMAIN DUCTILE IRON CL 50
LIN FT
$110.00
65
$7,150
63
2504.603
3" PVC CASING PIPE
LIN FT
$18.00
246
$4,428
64
2504.603
4" PVC CASING PIPE
LIN FT
$20.00
512
$10,240
65
2504.608
DUCTILE IRON FITTINGS
POUND
$10.00
566
$5,660
66
2506.502
INSTALL CASTING
EACH
$550.00
27
$14,850
27
$14,850
67
2506.502
CASTING ASSEMBLY
EACH
$1,600.00
18
$28,800
68
2506.503
CONSTRUCT DRAINAGE STRUCTURE DESIGN H
LIN FT
$1,000.00
3
$3,000
69
2506.503
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020
LIN FT
$1,100.00
47
$51,700
70
2506.503
CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020
LIN FT
$1,550.00
5
$7,750
ESTIMATED PROJECT COSTS Page 1 of 2
3B (12) TABLE 1
SUMMARY OF ESTIMATED
PROJECT AND ASSESSMENT COSTS
TOTAL PROJECT
ASSESSED PROJECT
COSTS
COSTS
Estimated
Estimated
Estimated
Estimated
Quantity
Cost
Quantity
Cost
Item No.
Ref No.
Description
Unit
Unit Cost
71
2506.602
CONNECT INTO EXISTING DRAINAGE STRUCTURE
EACH
$1,500.00
4
$6,000
72
2506.603
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL
LIN FT
$960.00
14
$13,440
73
2521.518
4" CONCRETE WALK
SQ FT
$6.50
6,955
$45,208
6,955
$45,208
74
2521.518
4" COLORED CONCRETE WALK
SQ FT
$10.00
14,169
$141,690
75
2521.518
6" CONCRETE WALK
SQ FT
$11.00
600
$6,600
76
2521.518
8" COLORED CONCRETE WALK
SQ FT
$12.00
5,040
$60,480
77
2521.602
DRILL AND GROUT REINF BAR (EPDXY COATED)
EACH
$11.00
338
$3,718
238
$2,618
78
2521.618
6" CONCRETE WALK (ADA)
SQ FT
$14.00
3,825
$53,550
2,825
$39,550
79
2531.503
CONCRETE CURB AND GUTTER DESIGN B412
LIN FT
$30.00
376
$11,280
376
$11,280
80
2531.503
CONCRETE CURB AND GUTTER DESIGN B618
LIN FT
$30.00
618
$18,540
618
$18,540
81
2531.503
CONCRETE CURB AND GUTTER DESIGN B624
LIN FT
$35.00
2,716
$95,060
2,716
$95,060
82
2531.503
CONCRETE CURB AND GUTTER DESIGN R424
LIN FT
$30.00
544
$16,320
83
2531.503
CONCRETE CURB AND GUTTER DESIGN S524
LIN FT
$35.00
4,085
$142,975
84
2531.503
CONCRETE CURB AND GUTTER DESIGN V4
LIN FT
$50.00
182
$9,100
85
2531.504
7" CONCRETE DRIVEWAY PAVEMENT
SQYD
$100.00
113
$11,300
113
$11,300
86
2531.603
CONCRETE SILL
LIN FT
$15.00
3,338
$50,070
87
2531.618
TRUNCATED DOMES
SQ FT
$53.00
564
$29,892
436
$23,108
88
2540.602
RELOCATE PLANTER
EACH
$300.00
8
$2,400
89
2540.604
INSTALL LANDSCAPE ROCK
SQ YD
$50.00
15
$750
15
$750
90
2545.502
LIGHT UNIT TYPE SPECIAL
EACH
$11,000.00
17
$187,000
91
2545.502
LIGHT UNIT TYPE SPECIAL 1
EACH
$6,500.00
5
$32,500
92
2545.502
LIGHT FOUNDATION DESIGN E
EACH
$1,400.00
22
$30,800
93
2545.502
SERVICE CABINET
EACH
$9,000.00
1
$9,000
94
2545.502
EQUIPMENT PAD
EACH
$1,850.00
1
$1,850
95
2545.502
HANDHOLE
EACH
$2,500.00
5
$12,500
96
2545.503
2" NON-METALLIC CONDUIT
LIN FT
$8.50
4,615
$39,228
97
2545.503
UNDERGROUND WIRE 1/C 2 AWG
LIN FT
$2.75
310
$853
98
2545.503
UNDERGROUND WIRE 1/C 6 AWG
LIN FT
$1.95
9,880
$19,266
99
2545.503
UNDERGROUND WIRE 1/C 8 AWG
LIN FT
$1.70
4,940
$8,398
100
2563.601
TRAFFIC CONTROL
LUMP SUM
$35,000.00
1
$35,000
0.54
$18,900
101
2563.601
TRAFFIC CONTROL SUPERVISOR
LUMP SUM
$5,500.00
1
$5,500
0.54
$2,970
102
2563.601
ALTERNATE PEDESTRIAN ROUTE
LUMP SUM
$4,000.00
1
$4,000
0.54
$2,160
103
2564.518
SIGN TYPE C
SQ FT
$65.00
461
$29,965
104
2565.602
INSTALL HANDHOLE
EACH
$500.00
1
$500
1
$500
105
2565.602
RIDGID PVC LOOP DETECTOR 6' X 6'
EACH
$1,800.00
2
$3,600
2
$3,600
106
2571.502
DECIDUOUS TREE 2" CAL B&B
EACH
$750.00
7
$5,250
107
2571.502
ORNAMENTAL TREE 1.75" CAL B&B
EACH
$700.00
11
$7,700
108
2571.502
ORNAMENTAL TREE 2" CAL B&B
EACH
$750.00
6
$4,500
109
2571.502
DECIDUOUS SHRUB NO 5 CONT
EACH
$5.00
194
$970
110
2571.502
PERENNIAL NO 1 CONT
EACH
$3.00
742
$2,226
111
2572.503
TEMPORARY FENCE
LIN FT
$3.90
2,500
$9,750
2,500
$9,750
112
2573.501
STABILIZED CONSTRUCTION EXIT
LUMP SUM
$3,500.00
1
$3,500
0.54
$1,890
113
2573.501
EROSION CONTROL SUPERVISOR
LUMP SUM
$2,500.00
1
$2,500
0.54
$1,350
114
2573.502
STORM DRAIN INLET PROTECTION
EACH
$410.00
36
$14,760
36
$14,760
115
2573.503
SILT FENCE, TYPE MS
LIN FT
$2.75
4,615
$12,691
4,615
$12,691
116
2573.503
SEDIMENT CONTROL LOG TYPE WOOD CHIP
LIN FT
$3.15
2,420
$7,623
2,420
$7,623
117
2574.507
LOAM TOPSOIL BORROW
CU YD
$35.00
1,056
$36,960
528
$18,480
118
2575.507
MULCH MATERIAL TYPE 6
CU YD
$30.00
45
$1,350
119
2575.604
SITE RESTORATION
SQ YD
$1.75
8,401
$14,702
8,401
$14,702
120
2582.503
4" SOLID LINE PAINT
LIN FT
$0.20
22,770
$4,554
22,770
$4,554
121
2582.503
4" DOUBLE SOLID PAINT
LIN FT
$0.40
5,745
$2,298
5,745
$2,298
122
2582.503
4" SOLID LINE MUTT -COMPONENT
LIN FT
$1.00
6,541
$6,541
6,541
$6,541
123
2582.503
6" SOLID LINE MUTT -COMPONENT
LIN FT
$1.50
9,017
$13,526
9,017
$13,526
124
2582.503
24" SOLID LINE MUTT -COMPONENT
LIN FT
$20.00
65
$1,300
65
$1,300
125
2582.503
4" BROKEN LINE MUTT -COMPONENT
LIN FT
$1.50
594
$891
594
$891
126
2582.503
12" DOTTED LINE MUTT -COMPONENT
LIN FT
$10.00
144
$1,440
127
2582.503
4" DOUBLE SOLID LINE MUTT -COMPONENT
LIN FT
$2.00
604
$1,208
604
$1,208
128
2582.518
PAVEMENT MESSAGE MULTI -COMPONENT
SQ FT
$13.20
720
$9,504
720
$9,504
129
2582.518
PAVEMENT MESSAGE PAINT
SQ FT
$8.00
265
$2,120
265
$2,120
130
2582.518
CROSSWALK MULTI -COMPONENT
SQ FT
$10.40
1,017
$10,577
1,017
$10,577
TOTAL CONSTRUCTION
COST
$3,044,447
$1,628,515
RIGHT - OF
- WAY AND EASEMENT ACQUISITION
$69,255
$69,255
OVERHEAD AND
CONSTRUCTION CONTINGENCY (15%)
$456,667
$244,277
TOTAL ESTIMATED PROJECT COST
$3,570,369
$1,942,047
ESTIMATED PROJECT COSTS Page 2 of 2
3B (13)
FIGURES
Figure 1 — Project Limits
Figure 2 — Cedar Street Roundabout Layout
Figure 3 — Edmonson Avenue Roundabout Layout
Figure 4 — Roundabout Landscaping Plan
Figure 5 — Detour Plan — West Leg of Cedar Street
Figure 6 — Detour Plan — North and South Leg of Edmonson Avenue
Figure 7 — Detour Plan - Edmonson Avenue Closure
3B (14)
too 0 too
200
TOWNSHIP:
121
RECLAIM AND PAVE SURFACE. SPOT
�SOPEE IN
FI.
RANGE:
025
� REPAIR OF CONCRETE CURB AND GUTTER.
1t
SECTION:
14
EXISTING TRAIL/SIDEWALK
BEGIN PROJECT
it
i
L'
I
I
'
CONSTRUCT SINGLE
\
LANE ROUNDABOUT AT
EXISTING ALL -WAY
/
STOP CONTROLLED
INTERSECTION �/
O
/
c
REMOVE THE CENTER MEDIANS
AND REPLACE WITH TWO-WAY
h
/
LEFT TURN LANE CEDAR STREET
EXISTING
\
/
TO EDMONSON AVENUE
I
STORM POND
/
�,� •� -
�
END PROJECT' T r__
PR
i
i
EXISTINGRIGHT \ \�
\------
ill JI
OFWAY
CONSTRUCT SINGLE
--
(LANE
ROUNDABOUT AT
EXISTING ALL -WAY
- J
STOP CONTROLLED
INTERSECTION
�T
CONSTRUCT NEW
TRAIL, TRAIL LIGHTING,
IRRIGATION, AND TREES
/
I
Ei
+
_
DATE
REVISION
Hakanson Anderson
FIGURE 1
Civil Engineers Ana Lana
SCHOOL BOULEVARD INTERSECTION
PROJECT LIMITS
_
Minn
Thurston Ave0 Anoka, Minnesota 55303
IMPROVEMENTS
763"27-5860 FA% 763-427-0320
....hAkAnson-And—n.—
CITY OF MONTICELLO, MINNESOTA
1
EE
3B (15)
h G ice• �a * •a\ / / /
Al
/
/
At \
` n
C
fr /
/
�o a ao ao
1. FEET
FIGURE 2 s"EEr
Hakanson Anderson SH
Civil Engineers and Land S�neyors SCHOOL BOULEVARD IMPROVEMENT PROJECT CEDAR STREET ROUNDABOUT OF
3601 Thurston Av.., 0 Anoka, k-42 — 5 56303
763-427-5860 FA% 763-427-0520
www.hokanson—anderson.— CITY OF MONTICELLO, MINNESOTA ee
M0305
3B (16)
SCHOOL BOULEVARD
\
VT \
s \ \
\ \
a \
z \
scA E IN i
m�
Hakanson Anderson
FIGURE 3
Th Engineers and Land s;..f. s EDMONSON AVENUE ROUNDABOUT aN
3601 Thurston Ave., Anoka, klinnesota 5
1303 SCHOOL BOULEVARD IMPROVEMENT PROJECT
763-427-5860 FAX 763-427-0520
w,,.h,k,n,0n-0naera0n.,0m CITY OF MONTICELLO, MINNESOTA as rs {
M0305
313 (17)
d
DATE REVISION ereo nrorymalni.pizn. �m®om
aanreaaWmeuunaermra{u ,. a
reerep za� ` ,smmx
i z 4
a 4 4
PLANT SCHEDULE
SYMBOL
CITY SCIENTIFIC NAME/COMMON NAME
I SIZE I ROOT I REMARKS
ORNAMENTAL TREE (ALL TREES TO HAVE STRAIGHT TRUNK & SINGLE LEADER)
0
3
CRATAEGUS CRUS-GALLI VAR. INERMIS
2"
B13
SPACE 20' O C.
THORNLESS COCKSPUR HAWTHORN
DECIDUOUS SHRUBS
020
CEANOTHUS AMERICANUS
#1
CONT.
SPACE 2' O.C. I
NEWJERSEYTEA
I
O58
DIERVILLA LONICERA
#5
CONT.
SPACE 3' O.C. I
DWARF BUSH HONEYSUCKLE
I
PERENNIALS
I
O
24
RATIBIDA PINNATA
#1
CONT. SPACE 2' O.C. I
YELLOW CONEFLOWER
I
18
SYMPHYOTRICHUM LAEVE
#1
CONT. SPACE 2' O.C. I
SMOOTH ASTER
I
ORNAMENTAL GRASS
_
42
SCHIZACHYRIUM SCOPARIUM
_
#1
_
CONT. SPACE 2' O.C.
LITTLE BLUESTEM
0
371
SPOROBOLUS HETEROLEPIS
#1
CONT. SPACE 2' O.C. I
I
PRAIRIE DROPSEED
I
NOTES.
1. SEES EET L3 FOR PLANTING DETAILS 8 LANDSCAPE SPECIFICATIONS
2. SEE SHEETS 11-14
FOR IRRIGATION PLAN AND DETAILS.
4
�
1t
\
0 0
BCAIE IN
8 I6
Ti.
SP 222-105-003
LANDSCAPE ARCHITECT:
Carmen Simonet Design LLC
5-o273eBlvd, St imonedN5gn.c
Hakanson Anderson
cIvI1 Engineers and Land surveyors
3601 Thurston Ave., Anoka, Minnesota 55303
SCHOOL BOULEVARD IMPROVEMENT PROJECT
I
FIGURE
LANDSCAPE PLAN
IT
�Li
nF
(851)695-0273 carmen@simonettlesign.com
(651)
www slmonetdesign com
763W 427-5860 FAX 763 —0520
SCHOOL BOULEVARD
L3
...on.
ww.hakanson—anderson.com
CITY OF MONTICELLO, MINNESOTA
SHEETS
M03C>
313 (18)
LEGEND
WORK SPACE
REFERENCE NOTES:
(I)CONTRA CTOR SHALL CLOSE THE LEFT TURN LANE ON HIGHWAY 25 PER LAYOUT 6K-33
IN THE MINNESOTA TEMPORARY TRAFFIC CONTROL FIELD MANUAL — 2018.
Q2 CONTRACTOR SHALL CLOSE THE RIGHT TURN LANE ON HIGHWAY 25 PER LAYOUT 6K-33
IN THE MINNESOTA TEMPORARY TRAFFIC CONTROL FIELD MANUAL — 2018.
Y/
600
L SCAIE IN
600 FEET
FEET
SP 222 `105-003
DATE
REVISION I n.rec c.n rn.F m. pl°^, ntren rC°E.n, .r n w°
arepar a by �m r „^ er my .°p°nbl°^ ana Fnot
awy U aA p'-1 Ion. EnTine.r .r . Lwa
ceny6o
If In, s,.F..F
ompE1R
CJJ
'
Hakanson Anderson
Civil Engineers and Lana Survey—
3601 Thurston Ave, Anoka, Minn ..1a 55303
SCHOOL BOULEVARD IMPROVEMENT PROJECT
FIGURE 5
DETOUR PLAN — WEST LEG OF SCHOOL
SHEET
TCl 1 /
IN•Tm
SGJ
JO UM, P.Entl
i
vuoon.
763-427-5860 FAX 763-427-0520
BLVD CLOSURE
TC13
a/a//2a Lic. NE. 23461
rAE
y,y,..nakan6 n anderson a m
CITY OF MONTICELLO, MINNESOTA
E
M0305F
3B (19)
LEGEND
_ WORK SPACE
/I
600 1200
meT EEEi
SP 222-105-003
DATE
REVISION nerec cen rnat m• pm�, •D•=m=Ur•n, or n wU
arcpur a by 'm r Un er my dl— ,up.—i- ana mm
6Uly E ,a pa,•,,,O,p En„n••r..6•r .I.w,
OT . s or.'o7" .,o h
ompRl R:
CJJ
Hakanrs a Anderson
CWiI Enginee s ana Land suaYo s
3so1 Th.nd"n Ave., Anoka, Minnesota 55303
SCHOOL BOULEVARD IMPROVEMENT PROJECT
FIGURE 6
DETOUR PLAN — EDMONSON AVE NORTH
SHEET
Tc�z
oETC13
N„ T
SGj
���11yy��MM 91b�� --
i 'KSf6 IJO UM, P.E.
vuoo1,
763-427-5860 FAX 763-427-0520
AND SOUTH BOUND CLOSURE
4/4/24 Lic. No. 23461
rAE
w,,.h,k,n,on—onaerson.-m
CITY OF MONTICELLO, MINNESOTA
:NEEi
M0305
313 (20)
LEGEND
_ WORK SPACE
�IT
1t
600 0 B00 1100
SaAD NFEET
SP 222-105-003
DATE
REVISION l I n.rec -d rnal mm pm^,a p�circ°r.^, .r n w°
I If In, ° ar Im r °^ •r m, •°°°^'•'°^ °�° I^°'
awb a .a r a1...m^° c ...r .r . °.•
cen;6o
If In, sl.I. °�
ompmR
CJJ
Hakanson Anderson
Civil Engineers and Lana Sl,neyor6
3601 Than Ave, Anoka, Minn eat. SS3o3
SCHOOL BOULEVARD IMPROVEMENT PROJECT
FIGURE 7
DETOUR PLAN — SCHOOL BLVD AND
SrvEET
TC13
worm
SGJ
i
JO UM, P.EnaR�
763-427-5860 FAX 763-427-0520
EDMONSON AVE CLOSURE
TC13
a/a/2a Lic. N.. 23461
rAE
—.h.k— n and —on a In
CITY OF MONTICELLO, MINNESOTA
fi
M03051
3B (21)
APPENDIX A
Right -of -Way and Easement Information
3B (22)
Right -of -Way and Easement Summary
Parcel No. Property
Type
PARCEL 1 Commercial
PARCELS
Commercial
PARCELS
Commercial
PARCEL?
Commercial
PARCEL 12
Residential
PARCEL 13
Residential
PARCEL 15
Residential
PROPERTY INFORMATION
Property Address
9234 STATE HWY 25 NE
MONTICELLO MN 55362
9320 CEDAR ST
MONTICELLO MN 55362
9350 CEDAR ST
MONTICELLO MN 55362
UNASSIGNED
UNASSIGNED
UNASSIGNED
9165 FIELDCREST CIR
MONTICELLO MN 55362
Owner
SB24LLC
WAL-MART REAL EST BUSINESS TR
CHENS 668 PROPERTY LLC
OCELLO LLC
VILLAS OF AUTUMN RIDGE HOA
VILLAS OF KLEIN FARMS ASSOC
TAYLOR MCCLISH
I:l ICU III Eel Will &V1JilJiM:x1
Temporary
Permanent
Easement (SF)
Easement (SF)
1744
1926
3407
597
1595
407
1897
265
1311
177
1224
TOTALS 11,775 2,775
Right -of -Way
(SF)
1130
351
345
485
2,311
3b (23)
Permanent Easement
for Right -Of -Way purposes
per Doc.#768619
Most Northerly corner of
Lot 1, Block 1, 6
MONTICELLO BUSINESS
CENTER SECOND ADDITION
21.93 -1-
S55'55'58"E/_
2.00
M°A
n°
` z30 Cely R °
` \ SFCO 1 I
_ " y
J V / °
LG02°FOR \ Cf)Vjee.
rn� "ess c "'h F R SFC`Ot
17.00
N32'03'3}/: n n q00 h
nON
c� / cm41L
Ru BS \
a,zr zpo
d �_ 06Zp.
wG o
9\
2 'I's Rs
jet
/ PARCEL 1
MONnc e \�
cIz
9l
Zw
°NO q°° nON
(`
ye=
(JAl
\ o'oG /
f�
Easement Exhibit
r,
City of Monticello
PROPOSED SIDEWALK EASEMENT DESCRIPTION:
A permanent easement for sidewalk purposes over, under and across that part of Lot 1, Block
1, MONTICELLO BUSINESS CENTER SECOND ADDITION, Wright County, Minnesota; lying North of
the following described line and its extensions:
Beginning at the most Northerly corner of said Lot 1; thence South 55 degrees 55 minutes 58
seconds East, assuming the southerly line of said Lot 1 bears South 59 degrees 22 minutes
43 seconds East, a distance of 21.93 feet; thence South 62 degrees 30 minutes 02 seconds
East a distance of 71.58 feet; thence South 59 degrees 07 minutes 04 seconds East a
distance of 111.38 feet; thence southeasterly 58.65 feet along a tangential curve concave to
the north, said curve having a radius of 152.00 feet and a central angle of 22 degrees 06
minutes 27 seconds to the Northeasterly line of said Lot 1 and said line there terminating.
EXCEPT
That part of said Lot 1 described as a permanent right of way easement per Document
Number 768619.
ALSO EXCEPT
The Northeasterly 2.00 feet of said Lot 1.
PROPOSED TEMPORARY EASEMENT DESCRIPTION:
A temporary easement for construction purposes over, under, and across that part of Lot 1,
Block 1, MONTICELLO BUSINESS CENTER SECOND ADDITION, Wright County, Minnesota; lying
Northeasterly and Easterly of the following described line and its extensions:
Commencing at the most Easterly comer of said Lot 1; thence South 34 degrees 26 minutes
29 seconds West, assumed bearing along the Southeasterly line of said Lot 1, a distance of
42.17 feet to the point of beginning of the line to be described; thence North 09 degrees 09
minutes 46 seconds West a distance of 34.38 feet; thence North 50 degrees 50 minutes 18
seconds West a distance of 46.34 feet; thence North 55 degrees 39 minutes 03 seconds West
a distance of 81.71 feet; thence North 32 degrees 03 minutes 37 seconds East a distance of
17.00 feet to the Northeasterly line of said Lot 1 and said line there terminating.
EXCEPT
That part of said Lot 1 lying North of the following described line and its extensions:
Commencing at the most Northerly corner of said Lot 1; thence South 55 degrees 55 minutes
58 seconds East a distance of 21.93 feet, assuming the southerly line of said Lot 1 bears
South 59 degrees 22 minutes 43 seconds East; thence South 62 degrees 30 minutes 02
seconds East a distance of 71.58 feet; thence South 59 degrees 07 minutes 04 seconds East
a distance of 111.38 feet; thence southeasterly 58.65 feet along a tangential curve concave to
the north, said curve having a radius of 152.00 feet and a central angle of 22 degrees 06
minutes 27 seconds to a point on the Northeasterly line of said Lot 1 and said line there
terminating.
ALSO EXCEPT
That part of said Lot 1 described as a permanent street, utility, and drainage easement per
Document Number A1012890.
ALSO EXCEPT
The Northeasterly 2.00 feet of said Lot 1. ' T
Property Owner: SB 24, LLC
PIN# 155148001010
9234 STATE H WY 25 NE
DATE REVISION
02/20/24 Revise Tvpoaraphical Error I hereby certify that this survey, plan or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Professional Land Surveyor under the laws of the
State gonesota,,-2Bn
Date 01/18/24 Ua. No. 49138
Proposed Permanent
r&a�n Easement = 1926 SF
30 0 30 so
I/ Proposed Temporary
SCALE IN FEET
Ij"/� Easement =
1744 SF
DESIGNED BY.
BP
Parcel 1
SHEET
Hakanson Anderson
DRAWN 0'.
Civil Engineers and Land Surveyors
JJ
3601 Thurston Ave., Anoka, Minnesota 55303 Right of Way and
or
amgy..
763-427-5860 FAX 763-427-0520
Easement Exhibit
1
BP
www.haa—inc.com
DATE 01/18/24 1 FILE NO. M0305
SHEETS
Jb (L4)
%j
Easement Exhibit
C-1
T"
Cj
City of Monticello
PROPOSED RIGHT OF WAY EASEMENT DESCRIPTION:
A permanent easement for right of way purposes over, under and across that part of Lot 1,
Block 1, MONTICELLO BUSINESS CENTER 4TH ADDITION, Wright County, Minnesota; lying Northerly
and Northeasterly of the following described line and its extensions:
Commencing at the most Northerly corner of said Lot 1; thence South 35 degrees 53 minutes
39 seconds West, assumed bearing along the Northwesterly line of said Lot 1, a distance of
29.95 feet to the point of beginning of the line to be described; thence South 87 degrees 52
minutes 18 seconds East a distance of 11.14 feet; thence South 79 degrees 32 minutes 33
seconds East a distance of 17.46 feet; thence South 65 degrees 19 minutes 05 seconds East
a distance of 32.15 feet; thence South 63 degrees 01 minutes 22 seconds East a distance of
46.59 feet to the northeasterly line of said Lot 1 and said line there terminating.
PROPOSED TEMPORARY EASEMENT DESCRIPTION:
A temporary easement for construction purposes over, under, and across that part of Lot 1,
Block 1, MONTICELLO BUSINESS CENTER 4TH ADDITION, Wright County, Minnesota; lying
Northeasterly, Northwesterly, and Northerly of the following described line and its extensions:
Commencing at the most Northerly corner of said Lot 1; thence South 35 degrees 53 minutes
39 seconds West, assumed bearing along the Northwesterly line of said Lot 1, a distance of
135.57 feet to a comer of said Lot 1; thence South 63 degrees 57 minutes 45 seconds East
along the Northeasterly line of Lot 2, said Block 1 a distance of 10.15 feet to the point of
beginning of the line to be described; thence North 35 degrees 53 minutes 39 seconds East a
distance of 100.00 feet; thence North 78 degrees 36 minutes 30 seconds East a distance of
22.63 feet; thence South 61 degrees 20 minutes 25 seconds East a distance of 42.62 feet;
thence South 52 degrees 33 minutes 06 seconds East a distance of 224.49 feet; thence North
37 degrees 26 minutes 54 seconds East a distance of 10.00 feet to the Northeasterly line of
said Lot 1 and said line there terminating.
EXCEPT
That part of said Lot 1 lying Northerly and Northeasterly of the following described line and its
extensions:
� 4TH ADDITION (o \ V r�ON `�. ____— - � o
<j�z 7
Commencing at the most Northerly corner of said Lot 1; thence South 35 degrees 53 minutes
39 se / n Qo��nON�` \ \ �q 29.95feetsto the point of beginniWest, assumed ng along gofthe li eNorthwesterly
betdelscribed;line fthe thence South 87said Lot 1, a sdegreestance f c52
minutes 18 seconds East a distance of 11.14 feet; thence South 79 degrees 32 minutes 33
seconds East a distance of 17.46 feet; thence South 65 degrees 19 minutes 05 seconds East
a distance of 32.15 feet; thence South 63 degrees 01 minutes 22 seconds East a distance of
------- y 46.59 feet to the northeasterly line of said Lot 1 and said line there terminating.
/ N
Property Owner: WAL—MART REAL EST BUSINESS TR
PIN# 155207001010
9320 CEDAR STREET
WOMMM� Way = 1 30gSF of
30 0 30 V1111A
proposed Temporary
SCALE IN FEETEasement = 3407 SF
DATE REVISION DFSMED 91"' SHEET
02/07/24 Revise Riqht of Wav Easement/Revise Temporary Easement I hereby certify that this survey, plan or report was prepared BP Hakanson Anderson Parcel 3
by me or under my direct supervision and that I am a duly I
Licensed Professional Land Surveyor under the laws of the DRAWN D': Civil Engineers and Land Surveyors
State of nesota. OF
JJ 3601 Thurston Ave., Anoka, Minnesota 55303 Right Of Way ar1C�
r�erf� 763-427-5860 FAX 763-427-0520
B erson0�' www.haa—inc.com Easement Exhibit
Date 01/18/24 Lic. No. 49138 BP DATE 01/18/24 1 FILE NO. MO305 SHEETS
,its (t5)
Qj
w
arjya14t \
J 302'14.24"w15.55 PARCEL 3
SS'12
/ N B Siry °r CO \ \ � i ✓ � (�� f ICJ
V
�v,
.T w�1
DATE REVISION
02/07/24 Revise Temporary Easement
Easement Exhibit
City of Monticello
PROPOSED TEMPORARY EASEMENT DESCRIPTION:
A temporary easement for construction purposes over, under, and across that part of Lot 2,
Block 1, MONTICELLO BUSINESS CENTER 4TH ADDITION, Wright County, Minnesota; lying
Northwesterly and Westerly of the following described line and its extensions:
Commencing at the most Northerly comer of said Lot 2; thence South 63 degrees 57 minutes
45 seconds East, assumed bearing along the Northeasterly line of said Lot 2, a distance of
10.15 feet to the point of beginning of the line to be described; thence South 44 degrees 22
minutes 35 seconds West a distance of 43.82 feet; thence southwesterly 74.56 feet along a
non —tangential curve concave to the southeast, said curve having a radius of 952.93 feet, a
central angle of 04 degrees 29 minutes 00 seconds and a chord that bears South 31 degrees
39 minutes 44 seconds West; thence South 02 degrees 14 minutes 24 seconds West, not
tangent to the last described curve, a distance of 15.55 feet to the Southwesterly line of said
Lot 2 and said line there terminating.
Property Owner: CHENS 668 PROPERTY LLC
PIN # 155207001020
9350 CEDAR STREET
W
■
30 0 30 60
Proposed Temporary
SCALE IN FEET
V1111A
Easement = 597 SF
I hereby certify that this survey, plan or report was prepared
DESIGNED ��
BP
H k s o Anderson
SHEET
Parcel 5
by me or under my direct supervision and that I am a duly
a a n n
1
Licensed Professional Land Surveyor under the laws of the
State of nesota.
DRAWN B':
JJ
Civil Engineers and Land Surveyors
3601 Thurston Ave., Anoka, Minnesota 55303
OF
Right of Way and
i —
763-427-5860 FAX 763-427-0520
Easement Exhibit
B Person��'
Date 01/18/24 U, No. 49138
BP
www.haa—inc.com
DATE 01/18/24 1 FILE NO. MO305 SHEETS
Ob (Lb)
\ I
� I
\ J I E' R F
�o z�
Ymw
`o=
PARCEL 5 I w0
— F
Z
O O
2
I
/
i
I v '—
Drainage and Utility Easement per
MONTICELLO BUSINESS CENTER
Sidewalk Easement
per Doc# 1015455
SCHOOL BOULEVARD
South line of Outlot A.
MONTICELLO BUSINESS CENTER
EIGHTH ADDITION
\I
3st comer of Outlot A,
ELLO BUSINESS CENTER
ADDITION
Easement Exhibit
boa
City of Monticello
PROPOSED RIGHT OF WAY EASEMENT DESCRIPTION:
A permanent easement for right of way purposes over, under and across that part of Outlot A, MONTICELLO
BUSINESS CENTER EIGHTH ADDITION, Wright County, Minnesota; lying Southeasterly of the following described line
and its extensions:
Commencing at the Southeast corner of said Outlot A; thence North 00 degrees 00 minutes 30 seconds West,
assumed bearing along the East line of said Outlot A, a distance of 17.67 feet to the point of beginning of the
line to be described; thence South 58 degrees 46 minutes 50 seconds West a distance of 10.94 feet; thence
South 71 degrees 16 minutes 24 seconds West a distance of 37.39 feet to the South line of said Outlot A and
said line there terminating.
PROPOSED SIDEWALK EASEMENT DESCRIPTION:
A permanent easement for sidewalk purposes over, under and across that part of Outlot A, MONTICELLO
BUSINESS CENTER EIGHTH ADDITION, Wright County, Minnesota; lying Southeasterly of the following described line
and its extensions:
Commencing at the Southeast corner of said Outlot A; thence North 00 degrees 00 minutes 30 seconds West,
assumed bearing along the East line of said Outlot A, a distance of 35.05 feet to the point of beginning of the
line to be described; thence South 48 degrees 25 minutes 20 seconds West a distance of 16.04 feet; thence
South 70 degrees 48 minutes 09 seconds West a distance of 74.26 feet to the South line of said Outlot A and
said line there terminating.
EXCEPT
The South 12.00 feet of said Outlot A
ALSO EXCEPT
That part of Outlot A which lies Southeasterly of the following described line:
Commencing at the Southeast corner of said Outlot A; thence North 00 degrees 00 minutes 30 seconds West,
assumed bearing along the East line of said Outlot A, a distance of 17.67 feet to the point of beginning of the
line to be described; thence South 58 degrees 46 minutes 50 seconds West a distance of 10.94 feet; thence
South 71 degrees 16 minutes 24 seconds West a distance of 37.39 feet to the South line of said Outlot A and
said line there terminating.
A temporary easement for construction purposes over, under and across that part of Outlot A, MONTICELLO
BUSINESS CENTER EIGHTH ADDITION, Wright County, Minnesota; lying Southeasterly of the following described line
and its extensions:
Commencing at the Southeast corner of said Outlot A; thence North 00 degrees 00 minutes 30 seconds West,
assumed bearing along the East line of said Outlot A, a distance of 69.44 feet to the point of beginning of the
line to be described; thence South 35 degrees 33 minutes 01 seconds West a distance of 32.76 feet; thence
South 73 degrees 07 minutes 33 seconds West a distance of 147.50 feet to the South line of said Outlot A
and said line there terminating.
EXCEPT
The South 12.00 feet of said Outlot A
ALSO EXCEPT
The East 12.00 feet of said Outlot A.
W
MEMMMIq Way = 351 SF of
Property Owner: OCELLO, LLC Proposed Sidewalk
PIN# 155269000010 Easement = 407 SF
NA
20 0 20 40 Proposed Temporary
SCALE IN FEET Ij// �/,II Easement = 1595 SF
DATE REVISION DESIGNED 0' SHEET
02/20/24 Revise Typoomphical Error I hereby certify that this survey, plan or report was prepared BP H a k a n s o n Anderson P a rc e I 7 1by me or under my direct supervision and that I am a duly
Licensed Professional Land Surveyor under the laws of the DRAWN BY: Civil Engineers and Land Surveyors
State of nesota. OF
JJ 3601 Thurston Ave., Anoka, Minnesota 55303 Right Of Way arlC�
ci _ 763-427-5860 FAX 763-427-0520
e erson '0�' www.haa—inc.com Easement Exhibit
Date 01/18/24 Uc. No. 49138 BP DATE 01/18/24 FILE NO. MO305 SHEETS
Easement Exhibit
I
r City of Monticello
' PROPOSED RIGHT OF WAY EASEMENT DESCRIPTION:
A permanent easement for right of way purposes over, under and across that part of Outlot
A, AUTUMN RIDGE VILLAS, Wright County, Minnesota; lying Northeasterly of the following
described line and its extensions:
Commencing at the Northeast corner of said Outlot A; thence South 89 degrees 59 minutes
31 seconds West, assumed bearing along the North line of said Outlot A, a distance of 21.94
feet to the point of beginning of the line to be described; thence South 41 degrees 03
minutes 43 seconds East a distance of 14.59 feet; thence South 26 degrees 02 minutes 27
SCHOOL BOULEVARD seconds East a distance of 28.17 feet to the East line of said Outlot A and said line there
terminating.
PROPOSED SIDEWALK EASEMENT DESCRIPTION:
-
A permanent easement for sidewalk purposes over, under and across that part of Outlot A,
AUTUMN RIDGE VILLAS, Wright County, Minnesota; lying Northeasterly of the following described
line and its extensions:
Northeast ofcorner
Outlot A Commencing at the Northeast corner of said Outlot A; thence South 89 degrees 59 minutes
A comer of North line of Outlot A ADTUMN RIDGE 31 seconds West, assumed bearing along the North line of said Outlot A, a distance of 116.72
Outlot A__ AUTUMN RIDGE VILLAS' VILLAS feet to a comer of said Outlot A; thence South 07 degrees 42 minutes 39 seconds West
Sidewalk Easement AUTUMN RIDGE `, 1 `� along the West line of said Outlot A a distance of 11.10 feet; thence North 89 degrees 59
P.
r Doc. $A1353648-�- \ VILLAS
� � , S89'59'31"W minutes 31 seconds East a distance of 74.39 feet to the point of beginning of the line to be
\ \ _ _ _ _ '116.72 _ - 21.94 - described; thence southeasterly 50.96 feet along a non —tangential curve concave to the
S07.42'39"W -� S41'03'43"E,f southwest, said curve having a radius of 35.71 feet, a central angle of 81 degrees 46 minutes
11.10 N89'59'31"E t4.s9 05 seconds and a chord that bears South 42 degrees 18 minutes 08 seconds East to the
_ 74.3s _ \ West line of that part of said Outlot A described as a permanent city trail and sidewalk
easement per Document Number A1353648 and said line there terminating.
i
o too \, EXCEPT
I
o s \ i That part of said Outlot A described as a permanent city trail and sidewalk easement per
_ 0 Document Number A1353648.
a.
e rc L=50.96-- w ALSO EXCEPT
z R=35.71
m� I [1=81'46'O5" N�
j C.BRG=s4218'O8"E LLJ The North 11.00 feet of said Outlot A.
; PROPOSED TEMPORARY EASEMENT DESCRIPTION:
I I I I PARCEL 6 Q A temporary easement for construction purposes over, under and across that part of the
North 31.00 feet of Outlot A, AUTUMN RIDGE VILLAS, Wright County, Minnesota; lying South of
O the North 11.00 feet and West of the following described line and its extensions:
Commencing at the Northeast corner of said Outlot A; thence South 89 degrees 59 minutes
(n 31 seconds West, assumed bearing along the North line of said Outlot A. a distance of 116.72
Z feet to a comer of said Outlot A; thence South 07 degrees 42 minutes 39 seconds West
D I j� J I a J O along the West line of said Outlot A a distance of 11.10 feet; thence North 89 degrees 59
minutes 31 seconds East a distance of 74.39 feet to the point of beginning of the line to be
ow described; thence southeasterly 50.96 feet along a non —tangential curve concave to the
southwest, said curve having a radius of 35.71 feet, a central angle of 81 degrees 46 minutes
LLJ 05 seconds and a chord that bears South 42 degrees 18 minutes 08 seconds East to the
West line of that part of said Outlot A described as a permanent city trail and sidewalk
% easement per Document Number A1353648 and said line there terminating.
J/
5
vPro
\ \�\� \�. �(1\��/ \ ` MOMMMIq Way = 3451 SF ht of
/ n \ Proposed Sidewalk
Property Owner: VILLAS OF AUTUMN RIDGE HOA Easement = 265 SF
PIN# 155245000010
NA 20 0 20 40/
Proposed Temporary
SCALE IN FEET Easement = 1897 SF
DATE REVISION DESIGNED li"' SHEET
02/20/24 Revise Tvpoomphical Error I hereby certify that this survey, plan or report was prepared BP H a k a n s o n Anderson Parcel 12 1
by me or under my direct supervision and that I am a duly
Licensed Professional Land Surveyor under the laws of the DRAWN BY: Civil Engineers and Land Surveyors
State of nesota. OF
JJ 3601 Thurston Ave., Anoka, Minnesota 55303 Right Of Way arlC�
�)]
ai _ 763-427-5860 FAX 763-427-0520
a arson '��' www.haa—inc.com Easement Exhibit
Date 01/18/24 U, No. 49138 BP DATE 01/18/24 FILE NO. M0305 SHEETS
Ob (ZO)
Easement Exhibit
City of Monticello
r•19@1110.>�9u1X441I:a��y0•11111,1ED]*1i17129[61
A permanent easement for sidewalk purposes over, under, and across Lot 35, Block 1, KLEIN
FARMS ESTATES 3RD ADDITION, Wright County, Minnesota, lying Southwesterly of the following
described line and its extensions:
Commencing at the Southwest corner of said Lot 35; thence North 00 degrees 00 minutes 30
seconds West, assumed bearing along the West line of said Lot 35, a distance of 22.79 feet
to the point of beginning of the line to be described; thence southeasterly 30.89 feet along a
non —tangential curve concave to the northeast, said curve having a radius of 44.93 feet, a
central angle of 39 degrees 23 minutes 15 seconds and a chord that bears South 41 degrees
49 minutes 41 seconds East to the South line of Lot 35 and said line there terminating.
PROPOSED TEMPORARY EASEMENT DESCRIPTION:
A temporary easement for construction purposes over, under, and across that part of Lot 35,
Block 1, KLEIN FARMS ESTATES 3RD ADDITION, Wright County, Minnesota, lying Southwesterly of
the following described line and its extensions:
Commencing at the southwest corner of said Lot 35; thence North 00 degrees 00 minutes 30
seconds West, assumed bearing along the west line of said Lot 35, a distance of 75.86 feet
to the point of beginning of the line to be described; thence South 22 degrees 08 minutes 57
seconds East a distance of 49.15 feet; thence southeasterly 17.18 feet along a tangential
curve concave to the northeast, said curve having a radius of 25.00 feet and a central angle
of 39 degrees 21 minutes 58 seconds; thence South 61 degrees 30 minutes 54 seconds East,
tangent to the last described curve, a distance of 33.31 feet to the south line of said Lot 35
and said line there terminating.
EXCEPT:
That part of said Lot 35 lying Southwesterly of the following described line and its extensions:
Commencing at the Southwest corner of said Lot 35; thence North 00 degrees 00 minutes 30
seconds West, assumed bearing along the West line of said Lot 35, a distance of 22.79 feet
to the point of beginning of the line to be described; thence southeasterly 30.89 feet along a
non —tangential curve concave to the northeast, said curve having a radius of 44.93 feet, a
central angle of 39 degrees 23 minutes 15 seconds and a chord that bears South 41 degrees
49 minutes 41 seconds East to the South line of Lot 35 and said line there terminating.
W
Property Owner: VILLAS OF KLEIN FARMS ASSOC Proposed Sidewalk
P Y Easement = 177 SF
PIN# 155110001350
NA 20 0 20 40 I/ proposed Temporary
'SCALE IN FEET I�// Easement = 1311 SF
DATE REVISION
02/20/24 Revise Tvooaraahical Error I hereby certify that this survey, plan or report was prepared
by me or under my direct supervision and that I am a duly
Licensed Professional Land Surveyor under the laws of the
State of
' nesoto. —
i
B erson
Date 01 /18/24 Lic. No. 49138
DESIGNED fff.
BP
Parcel 13
SHEET
Hakanson Anderson
1
DMWNDI.
Civil Engineers and Land Surveyors
11
3601 Thurston Ave., Anoka, Minnesota 55303
Right of Way and
OF
a01Dft
763-427-5860 FAX 763-427-0520
Easement Exhibit
1
Bp
www.haa—inc.com DATE
01/18/24 1 FILE NO. MO305
SHEETS
,Jb 1Zy1
I
u
Easement Exhibit
I
I
I
--
- -
--
City of Monticello
PROPOSED RIGHT OF WAY EASEMENT DESCRIPTION:
SCHOOL B OULEVARD
rl
A permanent easement for right of way purposes over, under and across that part of Lot 9,
Block 1, KLEIN FARMS 3RD ADDITION, Wright County, Minnesota; lying North of the following
described line and its extensions:
Commencing at the Northwest corner of said Lot 9; thence South 00 degrees 00 minutes 20
`
seconds West, assumed bearing along the West line of said Lot 9, a distance of 20.00 feet to
•
the point of beginning of the line to be described; thence North 63 degrees 47 minutes 29
seconds East a distance of 22.57 feet; thence North 72 degrees 01 minutes 29 seconds East
a distance of 37.59 feet to the North line of said Lot 9 and said line there terminating.
^
oo�ner
Noc hot 9 F P M
1,
� —
PROPOSED TEMPORARY EASEMENT DESCRIPTION:
/ t, K�PpO«ON
/ 3RD
North line of Lot 9, 'lock
KLEIN FARMS 3RD ADDITION
—
— —
A temporary easement for construction purposes over, under and across that part of the
_ —
North 20 feet of Lot 9, Block 1, KLEIN FARMS 3RD ADDITION, Wright County, Minnesota; lying
_
South of the following described line and its extensions:
Commencing at the Northwest corner of said Lot 9; thence South 00 degrees 00 minutes 20
Ni2o�2eE
i0o
Ai`i
seconds West, assumed bearing along the West line of said Lot 9, a distance of 20.00 feet to
/
t
the point of beginning of the line to be described; thence North 63 degrees 47 minutes 29
i22.57/
- -��N63.47'29"E
\
seconds East a distance of 22.57 feet; thence North 72 degrees 01 minutes 29 seconds East
a distance of 37.59 feet to the North line of said Lot 9 and said line there terminating.
\
�o
o
mQ
�
\
n
Jy
`
m<
PARCEL 7
-W
I
--
3x
-
t
--______---
-
doe OTa�
d utttt3�p P�
I
I
on �5
o o K��N F FR
A r
/
w
-0
o
\
w
>
v
Q
o
�v\
\
Property Owner: TAYLOR MCCLISH
p
�
PIN# 155102001090
°
9165 FIELDCREST CIRCLE
WOMMMM
Proposed Right of
I
Ld
a
r
J
\
Way = 485 SF
.�
\
zo o zo 40
I/
proposed Temporary
�scALF IN FEET
I�//
Easement = 1224 SF
DATE REVISION
DFSMED 91"' SHEET
I hereby certify that this survey, plan or report was prepared BP H a k a n s o n Anderson Parcel 15
by me or under my direct supervision and that I am a duly
Licensed Professional Land Surveyor under the laws of the DRAWN BY:
State of nesota. JJ
Civil Engineers and Land Surveyors
OF
3601 Thurston Ave., Anoka, Minnesota 55303 Right Of Way ar1C�
�)) I
�er4f� i
- a0ID�,
763-427-5860 FAX 7-0520
Easement Exhibit
B ersaa
Date 01/18/24 Li, No. 49136 BID
www.naa—ina.aam
c.com
DATE 01/18/24 FILE NO. MO305 SHEETS
3B (30)
APPENDIX B
Assessment Information
Awuia
��99 ll�l�1��11 8�•111 �
Kwik Trip Project
Limit
Project 9?��
Limit Aldi
O
U . 29A
O
O
Project
Limit ,
9
SCHOOLB(DULEVARDU 10
n
�J IMPROVEMENT PROJECT
o
N d
�U \
Z
L j
� 1
soh
O
O286 10 1 1 361
Legend
OParcel Number �T
337 Street Frontage In Feet 1�
ioo o ioo zoo
Property Line SCALE N
Project
Limit
Project
Limit
12
nc,
Project
Limit
101 18 �f
16 17
i
i
O
1
(n
C,
O
W
A
3B (32)
SCHOOL BOULEVARD FRONT FOOTAGE CALCULATIONS
PROPERTY INFORMATION
FRONT FOOTAGE CALCULATIONS
Cedar Street
Summary
School Boulevard Summary
Property
Parcel No.
PID
Property Address
Owner
Taxpayer
Taxpayer Address
Cedar Street
Cedar Street
Assessable
School Blvd
School Blvd
Assesseble
Type
Comment
Comment
Frontage
Factor
Frontage
Frontage
Factor
Frontage
PARCEL 1
Commercial
155-148-001010
9234 STATE HWY 25 NE
S B 24 LLC
S B 24 LLC
9234 STATE HIGHWAY 25 NE
254
50%
127
Rear with
359
25%
89.8
Side no access
MONTICELLO MN 55362
MONTICELLO MN 55362
access
PARCEL 2
Commercial
155-150-001010
9440 STATE HWY 25
KT REAL ESTATE HOLDINGS LLC
KT REAL ESTATE HOLDINGS LLC
PO BOX 2107
190
50%
95
Rearwith
385
25%
96.3
Side no access
MONTICELLO MN 55362
LACROSSE WI 54603
access
155-207-001010
9320 CEDAR ST
WAL-MART REAL EST BUSINESS TR
WAL-MART REAL EST BUSINESS TR
PO BOX 8050
136
100%
136
Front
995
100%
995.0
Side -short side of
PARCEL 3
Commercial
MONTICELLO MN 55362
BENTONVILLE AR 72716-0555
lot with access
PARCEL4
Commercial
155-227-001010
9400 CEDAR ST
ALDI INC
ALDI INC
PO BOX 460049
210
100%
210
Front with
298
25%
74.5
Side no access
MONTICELLO MN 55362
HOUSTON TX 77056
access
PARCELS
Commercial
155-207-001020
9350 CEDAR ST
CHENS 668 PROPERTY LLC
CHENS 668 PROPERTY LLC
21873 MAJESTIC DR
123
100%
123
Front with
0
0.0
MONTICELLO MN 55362
ST AUGUSTA MN 55320
access
PARCEL 6
Commercial
155-227-000010
UNASSIGNED
OCELLO LLC
OCELLO LLC
4065 CHELSEA RD W
0
0
377
100%
377.0
Front with access
MONTICELLO MN 55362-3349
PARCEL 7
Commercial
155-269-000010
UNASSIGNED
OCELLO LLC
OCELLO LLC
4065 CHELSEA RD W
0
0
1256
100%
1256.0
Front with access
MONTICELLO MN 55362-3349
155-221-001010
4134 SCHOOL BLVD
JACOBSON VETERINARY PROPERTIES
JACOBSON VETERINARY PROPERTIES
4134 SCHOOL BLVD
0
0
104
100%
104.0
PARCELS
Commercial
MONTICELLO MN 55362
MONTICELLO MN 55362-4678
Front with access
155-221-000010
UNASSIGNED
BRICK BY BRICK DEVELOPMENT LLC
BRICK BY BRICK DEVELOPMENT LLC
900 AMERICAN BLVD E SUITE 300
0
0
128
100%
128.0
PARCEL9
Commercial
Front with access
BLOOMINGTON MN 55420
PARCEL 10
Residential
155-147-000010
UNASSIGNED
AUTUMN RIDGE TWNHMS ASSOC INC
AUTUMN RIDGE TWNHMS ASSOC INC
10500 BREN RD E SUITE 120
0
0
286
0%
0.0
Residential no
MINNETONKA MN 55343-9070
access
PARCEL 11
Residential
155-245-000020
UNASSIGNED
AUTUMN RIDGE TWNHMS ASSOC INC
AUTUMN RIDGE TWNHMS ASSOC INC
10500 BREN RD E SUITE 120
0
0
361
0%
0.0
Residential no
MINNETONKA MN 55343-9070
access
PARCEL 12
Residential
155-245-000010
UNASSIGNED
VILLAS OF AUTUMN RIDGE HOA
VILLAS OF AUTUMN RIDGE HOA
PO BOX 5233
0
0
117
0%
0.0
Residential no
HOPKINS MN 55343-5233
access
155-110-001350
UNASSIGNED
VILLAS OF KLEIN FARMS ASSOC
VILLAS OF KLEIN FARMS ASSOC
8525 EDINBROOK CROSSING
0
0
388
0%
0.0
Residential no
PARCEL 13
Residential
BROOKLYN PARK MN 55443
access
PARCEL 14
Residential
155-096-003090
9285 COUNTRY UN
BILLY WARD 1R&SHERI DEMARS-WARD
BILLY WARD 1R&SHERI DEMARS-WARD
9285 COUNTRY UN
0
0
164
0%
0.0
Residential no
MONTICELLO MN 55362
MONTICELLO MN 55362
access
PARCEL 15
Residential
155-102-001090
9165 FIELDCREST CIR
TAYLOR MCCLSH
TAYLOR MCCLISH
9165 FIELDCREST CIR
0
0
73
0%
0.0
Residential no
MONTICELLO MN 55362
MONTICELLO MN 55362
access
PARCEL 16
Residential
155-102-001100
9175 FIELDCREST CIR
LAURA LOPEZ-DE-MIRELES & RENE MIRELES
LAURA LOPEZ-DE-MIRELES & RENE MIRELES
9175 FIELDCREST CIR
0
0
214
0%
0.0
Residential no
MONTICELLO MN 55362
MONTICELLO MN 55362
access
PARCEL 17
Residential
155-102-001110
9183 FIELDCREST CIR
KAYLA BELDEN
KAYLA BELDEN
9183 FIELDCREST CIR
0
0
107
0%
0.0
Residential no
MONTICELLO MN 55362
MONTICELLO MN 55362
access
PARCEL 18
Residential
155-102-001130
9221 COUNTRY AVE
MICHAEL R UTLEY & AMBER BLISS
MICHAEL R UTLEY & AMBER BLISS
9221 COUNTRY AVE
0
0
175
0%
0.0
Residential no
MONTICELLO MN 55362-8453
MONTICELLO MN 55362-8453
access
PARCEL 19
Residential
155-102-001080
9153 FIELDCREST CIR
BRIGHAM 1 LINDBOM
BRIGHAM 1 LINDBOM
9153 FIELDCREST CIR
0
0
0
0.0
MONTICELLO MN 55362
MONTICELLO MN 55362
PARCEL 20
Commercial
155-269-001010
UNASSIGNED
MONTICELLO LAKES LLC
MONTICELLO LAKES LLC
6718 COVE POINT RD
0
0
0
0.0
MINNETRISTA MN 55331
913
691
5787
3120.6
Edmonson Street Summary
Assessment Summary
Edmonson Edmonson
Assesseble
Comment
Adjusted
%of Total
Street
Factor
Frontage
Footage
0
0
217
2.76%
0
0
191
2.43%
0
0
1131
14.38%
0
0
285
3.62%
0
0
123
1.56%
0
0
377
4.79%
188
25%
47
Side no
1303
16.56%
access
0
0
104
1.32%
0
0
128
1.63%
0
0
0
0.00%
0
0
0
0.00%
279
0%
0
Residential
0
0.00%
no access
303
0%
0
Residential
0
0.00%
no access
0
0
0
0.00%
176
0%
0
Residential
0
0.00%
no access
0
0
0
0.00%
0
0
0
0.00%
0
0
0
0.00%
104
0%
0
Residential
0
0.00%
no access
116
100%
116
Front with
116
1.47%
access
1166
163
50.52%
3B(33) SCHOOL BOULEVARD PROPOSED ASSESSMENTS
ASSESSMENT CALCULATIONS
PROPERTY INFORMATION
• Assessable Project Amount
$1,942,047
Assessment
Summary
Property
Parcel No.
PID
Property Address
p y
Owner
Adjusted
Assessment
Assessment Factor -
Total Proposed
Type
% of Total
Footage
Subtotal
Reconstruction
Assessment
155-148-001010
9234 STATE HWY 25 NE
S B 24 LLC
217
2.76%
$53,600.50
50%
$26,800.25
PARCEL 1
Commercial
MONTICELLO MN 55362
155-150-001010
9440 STATE HWY 25
KT REAL ESTATE HOLDINGS LLC
191
2.43%
$47,191.74
50%
$23,595.87
PARCEL 2
Commercial
MONTICELLO MN 55362
155-207-001010
9320 CEDAR ST
WAL-MART REAL EST BUSINESS TR
1131
14.38%
$279,266.36
50%
$139,633.18
PARCEL 3
Commercial
MONTICELLO MN 55362
155-227-001010
9400 CEDAR ST
ALDI INC
285
3.62%
$70,302.10
50%
$35,151.05
PARCEL4
Commercial
MONTICELLO MN 55362
155-207-001020
9350 CEDAR ST
CHENS 668 PROPERTY LLC
123
1.56%
$30,295.93
50%
$15,147.97
PARCELS
Commercial
MONTICELLO MN 55362
155-227-000010
UNASSIGNED
OCELLO LLC
377
4.79%
$93,024.05
50%
$46,512.03
PARCEL 6
Commercial
155-269-000010
UNASSIGNED
OCELLO LLC
1303
16.56%
$321,602.98
50%
$160,801.49
PARCEL 7
Commercial
155-221-001010
4134 SCHOOL BLVD
JACOBSON VETERINARY PROPERTIES
104
1.32%
$25,635.02
50%
$12,817.51
PARCEL 8
Commercial
MONTICELLO MN 55362
155-221-000010
UNASSIGNED
BRICK BY BRICK DEVELOPMENT LLC
128
1.63%
$31,655.37
50%
$15,827.69
PARCEL 9
Commercial
155-147-000010
UNASSIGNED
AUTUMN RIDGE TWNHMS ASSOC INC
0
0.00%
$0.00
50%
$0.00
PARCEL 10
Residential
155-245-000020
UNASSIGNED
AUTUMN RIDGE TWNHMS ASSOC INC
0
0.00%
$0.00
50%
$0.00
PARCEL 11
Residential
155-245-000010
UNASSIGNED
VILLAS OF AUTUMN RIDGE HOA
0
0.00%
$0.00
50%
$0.00
PARCEL 12
Residential
155-110-001350
UNASSIGNED
VILLAS OF KLEIN FARMS ASSOC
0
0.00%
$0.00
50%
$0.00
PARCEL 13
Residential
155-096-003090
9285 COUNTRY LN
BILLY WARD JR&SHERI DEMARS-WARD
0
0.00%
$0.00
50%
$0.00
PARCEL 14
Residential
MONTICELLO MN 55362
155-102-001090
9165 FIELDCREST CIR
TAYLOR MCCLISH
0
0.00%
$0.00
50%
$0.00
PARCEL 15
Residential
MONTICELLO MN 55362
155-102-001100
9175 FIELDCREST CIR
LAURA LOPEZ-DE-MIRELES & RENE MIRELES
0
0.00%
$0.00
50%
$0.00
PARCEL 16
Residential
MONTICELLO MN 55362
155-102-001110
9183 FIELDCREST CIR
KAYLA BELDEN
0
0.00%
$0.00
50%
$0.00
PARCEL 17
Residential
MONTICELLO MN 55362
155-102-001130
9221 COUNTRY AVE
MICHAEL R UTLEY & AMBER BLISS
0
0.00%
$0.00
50%
$0.00
PARCEL 18
Residential
MONTICELLO MN 55362-8453
155-102-001080
9153 FIELDCREST CIR
BRIGHAM J LINDBOM
0
0.00%
$0.00
50%
$0.00
PARCEL 19
Residential
MONTICELLO MN 55362
155-269-001010
UNASSIGNED
MONTICELLO LAKES LLC
116
1.47%
$28,548.09
50%
$14,274.05
PARCEL 20
Commercial
50.52%
$490,561.09
3A (1)
City Council Agenda: 11/12/2024
4A. Consideration of canvassing the returns and adopting Resolution 2024-112 declaring
the results of the 2024 General Election for the Citv of Monticello offices
Prepared by: Meeting Date: ❑ Consent Item
City Clerk 11/12/2024 ® Regular Agenda Item
Reviewed by: Approved by:
N/A City Administrator
ACTION REQUESTED
Motion to adopt Resolution 2024-112 declaring the results of the 2024 General Election for the
City of Monticello offices.
REFERENCE AND BACKGROUND
MN State Statue 205.185, Subd. 3 calls for the City Council to canvass the election results
between the third and tenth days after a general election. Therefore, the results must be
canvassed and declared at this meeting.
Prior to Election Day, Tuesday, November 5, Monticello had 8,972 registered voters. New
registrations for early voting and election day voting totaled 967. There were 4,450 voters
recorded on Election Day and 3,415 absentee ballots received for a total of 7,865 voters.
The results of the local races are as follows:
Mayor: Lloyd Hilgart
Citv Council: Kip Christianson
Lee Martie
The winning candidates will be sworn in when their terms begin on January 13, 2025.
The Local Option Sales Tax question for Bertram Chain of Lakes Regional Park passed by a close
vote. This % cent sales tax will take effect in Spring 2025. The Pointes at Cedar question did not
pass.
I. Budget Impact: N/A
II. Staff Workload Impact: N/A
III. Comprehensive Plan Impact: N/A
STAFF RECOMMENDED ACTION
City staff recommend approving the canvassing of election results and adopting Resolution
2024-112 declaring the election results.
3A (2)
City Council Agenda: 11/12/2024
SUPPORTING DATA
• Resolution 2024-112
4A (1)
CITY OF MONTICELLO
WRIGHT COUNTY
RESOLUTION NO. 2024-112
CANVASSING ELECTION RETURNS AND DECLARING RESULTS OF THE
2024 GENERAL ELECTION FOR CITY OF MONTICELLO MAYOR
AND COUNCIL MEMBER OFFICES AND LOCAL OPTION SALES TAX QUESTION
WHEREAS, the City Clerk/Elections Administrator has duly presented to the City Council the
results tapes of ballots cast in the November 5, 2024 General Election, and election summary
statements have been sworn to by the Judges of the General Election; and
WHEREAS, the total votes cast for the municipal offices voted upon are as follows:
For Mavor (2 year terml
Lloyd Hilgart 4,242
Charlotte Gabler 2,359
Write -Ins 39
For Council Member 2 elected for 4 vear terms
Kip Christianson 3,651
Lee R. Martie 3,068
Sam Murdoff 2,423
Write -Ins 83
Citv Question 1 (Local Option Sales Tax — Bertram Chain of Lakes
YES 3,656 (50.52%)
NO 3,581 (49.48%)
Citv Question 2 (Local Option Sales Tax — The Pointes at Cedar!
YES 3,152 (43.92%)
NO 4,024 (56.08%)
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF MONTICELLO,
MINNESOTA, that the totals listed above are deemed to be correct, the election is deemed to
be valid, and the Mayor and City Council winners of the election are declared to be as follows:
For Mayor (2 year term): Lloyd Hilgart
For Council Member (4 year term): Kip Christianson
Lee Martie
NOW THEREFORE, FUTHERMORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF
MONTICELLO, MINNESOTA, that the totals listed above are deemed to be correct, the election
is deemed to be valid, and the Local Option Sales Tax of Y2 of 1 percent be adopted for the
Betram Chain of Lakes as described in question.
4A (2)
ADOPTED BYthe City Council of Monticello, Minnesota this 1211 day of November, 2024.
ATTEST:
Jennifer Schreiber, City Clerk
Lloyd Hilgart, Mayor
4A (3)
Abstract of Votes Cast
In the Precincts of the City of Monticello
State of Minnesota
at the State General Election
Held Tuesday, November 5, 2024
as compiled from the official returns.
4A (4)
Abstract print version 46834, generated 11/12/2024 6:45:20 AM
Number of persons registered as of 7 a.m.
Number of persons registered on Election Day
Summary of Totals
City of Monticello
Tuesday, November 5, 2024 State General Election
8972
686
Number of accepted regular, military, and overseas absentee ballots and mail ballots 3425
Number of federal office only absentee ballots
Number of presidential absentee ballots
Total number of persons voting
7872
Abstract print version 46834, generated 11/12/2024 6:45:20 AM Page 1 of 7
4A (5)
KEY TO PARTY ABBREVIATIONS
NP - Nonpartisan
Mayor (Monticello)
Summary of Totals
City of Monticello
Tuesday, November 5, 2024 State General Election
NP NP
Lloyd Hilgart Charlotte Gabler
4242 2359
Council Member (Monticello) (Elect 2)
NP NP
Kip Christianson Lee Martie
3651 3068
CITY QUESTION 1 (Monticello)
NP
NP
YES
NO
3656
3581
CITY QUESTION 2 (Monticello)
NP
NP
YES
NO
3152
4024
WI
WRITE-IN
39
NP WI
Sam Murdoff WRITE-IN
2423 83
Page 2 of 7
4A (6)
Detail of Election Results
City of Monticello
Tuesday, November 5, 2024 State General Election
Precinct
Persons Registered
Persons Registered
Total Number of
as of 7 A.M.
on Election Day
Persons Voting
86 0125 : MONTICELLO P1
2690
203
2330
86 0127 : MONTICELLO P2
1971
176
1736
86 0128 : MONTICELLO P3
3023
207
2671
86 0129 : MONTICELLO P4
1288
100
1135
City of Monticello Total:
8972
686
7872
Page 3 of 7
4A (7)
Detail of Election Results
City of Monticello
Tuesday, November 5, 2024 State General Election
Office Title: Mayor (Monticello)
Precinct
NP
NP
WI
Lloyd Hilgart
Charlotte Gabler
WRITE-IN
86 0125 :
MONTICELLO P1
1216
743
14
86 0127 :
MONTICELLO P2
995
479
11
86 0128 :
MONTICELLO P3
1439
802
12
86 0129 :
MONTICELLO P4
592
335
2
Total:
4242
2359
39
Office Title:
Council Member (Monticello) (Elect 2)
Precinct
NP
NP
NP
WI
Kip Christianson
Lee Martie
Sam Murdoff
WRITE-IN
86 0125 :
MONTICELLO P1
1091
1024
737
26
86 0127 :
MONTICELLO P2
817
711
577
23
86 0128 :
MONTICELLO P3
1264
965
761
23
86 0129 :
MONTICELLO P4
479
368
348
11
Total:
3651
3068
2423
83
Office Title: CITY QUESTION 1 (Monticello)
Precinct
NP
NP
YES
NO
86 0125 :
MONTICELLO P1
1023
1118
86 0127 :
MONTICELLO P2
896
712
86 0128 :
MONTICELLO P3
1250
1218
86 0129 :
MONTICELLO P4
487
533
Page 4 of 7
4A (8)
Office Title: CITY QUESTION 1 (Monticello)
Total:
Office Title: CITY QUESTION 2 (Monticello)
Precinct
86 0125
: MONTICELLO P1
86 0127
: MONTICELLO P2
86 0128
: MONTICELLO P3
86 0129
: MONTICELLO P4
Total:
Detail of Election Results
City of Monticello
Tuesday, November 5, 2024 State General Election
3656 3581
NP
NP
YES
NO
825
1291
758
837
1152
1315
417
581
3152
4024
Page 5 of 7
4A (9)
We, the legally constituted county canvassing board, certify that we have herein specified the names of the persons receiving votes and the number of votes received by each
office voted on, and have specified the number of votes for and against each question voted on, at the State General Election held on Tuesday, November 5, 2024
As appears by the returns of the election precincts voting in this election, duly returned to, filed, opened, and canvassed, and now remaining on file in the office of the City of
Monticello Clerk. Witness our official signature at in County this day of
2024.
Member of canvassing board
Member of canvassing board
Member of canvassing board
Member of canvassing board
Member of canvassing board
Member of canvassing board
Member of canvassing board
Page 6 of 7
4A (10)
State of Minnesota
City of Monticello
I, , Clerk of the City of Monticello do hereby certify the within and foregoing pages to be a full
and correct copy of the original abstract and return of the votes cast in the City of Monticello State General Election held on Tuesday, November 5, 2024.
Witness my hand and official seal of office this day of 12024.
Page 7 of 7
City Council Agenda: 11/12/2024
4B. Consideration of a Request for an Adiustment of Sewer Charges by The Meadows
Manufactured Home Park
Prepared by: Meeting Date: ❑ Consent Agenda Item
Finance Director 11/12/2024 ® Regular Agenda Item
Reviewed by: Approved by:
Public Works Director/City Engineer City Clerk
ACTION REQUESTED
Motion to approve the request for an adjustment of sewer charges by The Meadows
Manufactured Home Park in the amount of $35,452.57.
REFERENCE AND BACKGROUND
The Meadows manufactured home park is located on the south end of Monticello with area on
both the west and east sides of TH25. The individual residences within the park are
consolidated into two utility billing (UB) accounts with the City: one for the west side and one
for the east side. The Meadows is served by private wells for water service but discharges
wastewater into the City's sewer system for treatment at the wastewater treatment facility.
The property owner, Monticello MN MHC, LLC., outsources management of the properties to
Lakeshore Management, who submitted the request for adjustment on the owner's behalf.
The City's typical practice is to bill sewer charges based on the water used by the property.
However, since The Meadows does not get water from the city's water system, there is no
water meter installed. Instead, The Meadows has its own privately -owned system ("flow
totalizer stations") for measuring flow into the City's sewer system. It is the property owner's
responsibility to maintain the equipment to ensure accurate readings.
The Meadows neighborhoods were previously owned by Kjellberg's Inc. until they were sold to
Monticello MN MHC, LLC. in January 2021. The City and Kjellberg's Inc. entered into an
agreement in 2002 that, because the equipment used to register flow should be cleaned daily,
allows a one -day adjustment in any billing period with a high reading. This agreement was
assumed by Monticello MN MHC, LLC. when the property purchase occurred.
Representatives from Lakeshore Management spoke during Citizen Comments at the October
28, 2024 City Council meeting and presented a request to council for adjustment to the sewer
charges from June and July in 2024 (billed in July and August of 2024). Per the discharge
agreement from 2002, adjustments may be made for one day and only if there are "major blips
in the reading chart that spike off the chart". Past adjustments have been based on information
City Council Agenda: 11/12/2024
taken from paper charts, which cannot be done because the chart paper was not replaced
weekly as it should be and has been either missing or recording over itself for quite some time.
As a City, we shouldn't collect an erroneous amount on a reading that is truly not accurate,
however, the customer cannot be absolved of the responsibility for maintaining the privately -
owned equipment that provides readings used to calculate the City's cost in treating sewage. It
is the City's practice to process utility billing adjustments on individual accounts, so staff
calculated an adjustment recommendation for Council's consideration.
The Meadows East
No adjustment for either month on The Meadows East utility billing account because the
difference in consumption is not clearly caused by an inaccurate reading.
2021-2023
2024 Average
Month Consumption Consumption
July 613,000 885,000
June 510,000 434,000
The Meadows West
Grant an adjustment of $35,452.57, which is calculated for both months as follows:
• Start with the 2024 consumption
• Subtract the 2021-2023 average consumption for each respective month (and factoring
in the one -day adjustment already granted)
• Multiply the difference by the sewer rate in the 2024 Fee Schedule
• Divide the adjustment by two
Adjusted
2021-2023
2024
One -Day
2024
Average
Month Consumption
Adjustment
Consumption
Consumption
July 8,854,000
(285,613)
8,568,387
765,000
June 4,769,000
(158,967)
4,610,033
1,846,333
2024 Rate Adjustment
Variance per 1,000gal
Amount
7,803,387 $ 6.71
$52,360.73
2,763,700 $ 6.71
$18,544.42
Total
$70,905.15
Half
$35,452.57
Dividing the adjustment in half allows for the assumption the reading was clearly inaccurate
while also acknowledging the significant staff time that the city has incurred to investigate the
issue; educate the new owner on the equipment's required calibrations, maintenance and
cleaning; and perform the one -day adjustments; and analyze the customer's request for
adjustment, while also conveying the necessity to monitor the system daily to ensure accurate
readings going forward.
City Council Agenda: 11/12/2024
While staff has calculated a reasonable adjustment based on prior data, consideration of this
adjustment, and the final adjustment amount, if any, is a Council decision based on policy and
to what extent Council wishes to enforce the discharge agreement.
I. Budget Impact: Any amount of adjustment would lower the revenues in the Sewer Fund
in 2024.
II. Staff Impact: Staff impact in processing this adjustment falls within normal work duties.
III. Comprehensive Plan Impact: N/A
STAFF RECOMMENDED ACTION
Staff's recommendation for adjustment is based on a 3-year average of consumption for the
months of June and July for The Meadows West manufactured home park. However, it is the
property owner's responsibility to maintain and calibrate all equipment to ensure accurate
readings used for billing sewer charges.
SUPPORTING DATA
A. Memo and Photos from Water Superintendent
B. West Park Sanitary Discharge Agreement
C. Requested adjustment from Lakeshore Management on behalf of The Meadows
manufactured home park
4B (1)
CIOF Memorandum
O
niiceflonli To: City Council
From: Mat Stang, Utilities Superintendent
I was asked to provide further explanation regarding the Meadows West sanitary sewer June and July 2024
billing. The Meadows have been informed several times since they have taken ownership of the park that
the daily inspection and any maintenance of the flow totalizer stations on the east and westside parks are
their responsibility.
Anyone visiting the site daily should be able to recognize any issues or any irregularities in the flow. Part of
the maintenance on a weekly basis is changing out the chart paper on the recorder. For the chart
recordings for the months of June and July, it was noted that when the charts were removed as part of our
monthly meter reading, they had not been changed for weeks as each chart had several weeks of flow
recorded over itself. Becky was notified of our findings and insisted that they visit the site daily and have not
witnessed any issues with the site. If this was the case, I have no reason to question the recordings that
were taken for billing purposes.
After analyzing the graph paper charts, it was clear to me that there was something going on at the site. A
site that typically charted flows of less than 50gal/min. was consistently charting flows of 200 to
250gal/min. Anyone in charge of performing maintenance or visiting that site daily should have picked up
on the issue the first day the flow had spiked. If the charts had not been over recorded, you are able to
pinpoint within the hour the spike occurred.
On 7/23/241 was asked to follow up with Becky, The Meadows Park manager about a "Very High Meadows
Bill". On 7/24/241 visited the flow totalizer site at The Meadows West. Several things were noted at the site.
A calibration log was found in the cabinet, indicating that the flow totalizer had not been calibrated since
October 5th, 2021. A procedure that should be performed yearly as part of the West Park Sanitary Discharge
Agreement as well as to ensure the accuracy of the totalizer. A picture was taken of the chart that had
shown it had been recording over itself since the beginning of the month as well as the flow totalizer
reading. As mentioned before, the charts are only capable of recording 7 days of flow and are required to be
changed weekly to provide the best information about the sites' flow trends. After opening the cabinet, it
was clear to me that the flow that was being recorded was higher than what I would consider "normal" for
that site, this also should have stood out to anyone performing daily site inspections. Please refer to the
attached email (West Side Park Flow Meter) to Becky at The Meadows for photos and my findings at the site.
Since the issues of the June and July billings, it appears that the totalizers have been calibrated, but the
chart recorder for the East Side Park remains missing, providing me with no information on the flow trending
to base any requested adjustments, The Meadows has also stopped charting the flow on the West Side Park
as well. Becky has been informed that I will not authorize any billing adjustments without the ability to view
the charted daily flow as I will have no information to base any requested adjustment from.
Please note that two adjustments were made, one for June and one for July per the West Park Sanitary
Discharge Agreement.
909 GOLF COURSE RD, MONTICELLO, MN 55362
T 763-295-3170 U CLMONTICELLO.MN.US
4B (2)
West Side Park Flow Meter.
Mat Stang
To Rebecca Miller
Cc Matt Leonard; O Pat Kovich
Tranducer Monitoring Well with sludge.jp
2 MB
June Over Recored Chartjpg
i 4 M B
7.26.24 Flow Reading 8765000 Gallons jpg
Fj Reply «j Reply All Forward 1® U
Fri 7/26/202410:54 AM
g Over Recorded Chart 7,25.24 jpg
v 3 MB v
Calibration Log.jpg v
3 MB
7,26.24 Chart Recording.jpg
i
A
Per our conversation, you will find the attached pictures I had taken. Included in the pictures you will find:
The Calibration Log indicating that the flow meter has not had its yearly calibration performed, and that the last known
calibration was performed 10.05.21
The last 2 months of Charts that had not been changed weekly as they should, as they recorded over themselves week
after week.
2 pictures of daily readings, 7.25.24 and 7.26.24. 7.24.24 was taken but not pictured, the reading that was taken was
8,451,000
7.24.24 Meter Reading 8,451,000
7.25.24 Meter Reading (Pictured Above) 8,755,000 Gallons a difference of 304,000 Gallons indicating a usage of
304kgaVday. On this day I took it upon myself to perform the much -needed service of the station and removed the sludge
from the transducer monitoring well (before pictured above).
7.26.24 Meter Reading (Pictured Above) 8,765,000 Gallons a difference of 10,000 Gallons indicating a significant differ-
ence in the daily usage. Also included is a picture of the graph I had taken showingthe significant difference in trending
pattern that would be obvious to anyone looking after the station on a regular basis.
You will see on the charts, the 7.26.24 after the wellwas cleaned, the chart recorded trend pattern near the center of
the chart below 50 gaVmin vs the last 2 months of charts with the flow way outside of what I would consider normal
ftow which appears tobe200to250gaVmin. Just ataglance,itappears that the recorded flow for the month ofJuly will
be significantly high as well. Anyone that is looking after this station on a regular basis should notice a large change in
recorded flow and immediately start to investigate the cause.
These graphs and flow stations are very important for all parties involved; they are great tools to help identify issues. This
is another reason why I urge the Meadows to replace the recorder on the East Side Park flow totalizer.
Mat Stang
Monticello Utilities Supt. V
4B (3)
Transducer Monitoring Well with Sludge
Calibration Lov
, .ibhra,'n ticrvice� Provbded
' fir• Fld ihiilY/' s iY�.S
f
\irirrTy//�' � bluJei
F�4'0V
X1 y PIeIs
Sign & Unte Next Calibration Due
si'if'Tnll
Over Recorded Charts
T7 Ix
�►
3
4B (4)
WEST PARK SANITARY SEWER DISCHARGE AGREEMENT
BETWEEN
KJELLBERG'S INC. AND THE CITY OF MONTICELLO
Whereas, Kjellberg's Inc. wishes to discharge domestic wastewater from the existing 200 units
in the West Park into the City of Monticello's sanitary sewer system; and
Whereas, the volume of wastewater must be measured in order to calculate the sewer usage
bill at the prevailing rates; and
Whereas, Kjellberg's Inc. has purchased a prefabricated flow monitoring station consisting of
a below -ground chamber with proper access and ventilation, a partial flume, and measuring and
recording device, which is read above ground.
It is therefore agreed between the City of Monticello and Kjellberg's Inc. that the City shall
have the right of entry to regularly read the measuring and recording devices and perform routine
inspections of the below ground chamber, partial flume, and wastewater discharge. It is further
agreed that Kjellberg's Inc. shall maintain the monitoring station and its appurtenances as to provide
for safe access and reliable operation of the monitoring system. Kjellberg's Inc. will be responsible
for daily monitoring and inspection ofthe metering station to uncover any blockages which may affect
future readings and that this is the responsibility of Kjellberg's Inc., not City personnel. The City will
only adjust a consumption reading for major blips in the reading chart that spike off the chart. In
addition, adjustments will only be made for a period of one day, regardless of the length of any
particular abnormal reading caused by failure to properly inspect for blockage. The City of
Monticello shall notify Kjellberg's Inc. immediately upon the discovery of any deficiencies in the
monitoring station. Kjellberg's Inc. shall perform the necessary repairs or cleaning operations to
correct the deficiencies as reported by the City.
Kjellberg's Inc. shall provide and pay for the services of a factory -authorized technician to
make repairs to the metering devices upon notification from the City of a system or device failure or
suspected miscalibrations. Kjellberg's Inc. shall also provide and pay for the services of a certified
laboratory or testing firm to calibrate the devices at least once per year on or about the anniversary
date of the installation or replacement of the measuring and recording equipment.
Kjellberg's Inc. shall perform their maintenance work within five (5) working days of receipt
of notification of a deficiency (subject to availability of necessary parts and required personnel) and
shall order repairs of the measuring and recording equipment within one (1) working day after receipt
of notification of a problem. Kjellberg may request an extension to
C.\BETH\WORDPROC\JOHNWGREEMTS\KJELL-WEST-SEW-AGR: 12/30/02 - PAGE 1 -
4B (5)
the 5-day repair period for completing maintenance work. In making the request for an extension,
Kjellberg shall describe in writing the cause of the delay and identify a date by which the maintenance
work shall be completed. City staff will then consider granting the request for the extension. During
equipment outages or repair periods, the City shall estimate the wastewater flows from previous
records or portable flow monitoring devices installed by the City. In the case of a power outage, the
City shall use the highest measured flow in gallons per minute ever measured at the station to
calculate the flow during the power outage.
Failure of Kjellberg's Inc. to perform the necessary maintenance and/or order and pay for the
repair or calibration services as previously described shall be sufficient cause for the City to order the
work performed and bill Kjellberg's Inc. for those services over and above the prevailing sewer usage
rate. Failure to pay these charges or sewer use charge for the West Park will result in an assessment
against the East Park property in the same manner as provided for by city ordinance for unpaid sewer
use charges. When the West Park is annexed into the City any sewer related unpaid charges
pertaining to the West Park will be assessed to the West Park.
KJELLBERG'S INC.
r ` p
Title: J
Date: ��`
Cf
CITY OF MONTICELLO
By: C �"(�
0
Title: City Ad Yrator
Z
Mayor
Date: December 30. 2002
C.\BETH\WORDPROC\JOHN\AGREEMTS\KJELL-WESTSEW-AGR: 12/30/02 - PAGE 2 -
4B (6)
Mr. Mayor and Members of the City Council,
I hope this message finds you well. I am writing on behalf of Lakeshore Management to formally request
a credit adjustment of $89,689 on our sewer bill. We are currently billed for our sewer bill based on the
consumption of water pumped from our well systems. After reviewing our water consumption, we
noticed abnormally high-water usage in June and July 2024, which significantly impacted our sewer bill.
These months do not represent our typical usage patterns, and we believe they are an outlier. The usage
listed for the month of July would mean each home is using an average of 30,000 gallons per month or
1,000 gallons per day. This far exceeds our current metered averages per home. For example, in
September 2024 the average metered usage per home was approximately 4,200 gallons per month, or 140
gallons per day. We also monitor and track ourwell water consumption every week, and did not observe
any significant spikes during this period.
The City has already granted our request for a one -day credit amounting to $2,983, for which we are
grateful. We have also brought this issue to the attention of City Finance Director. Both the billing
department and the city finance director requested we bring this to the city council's attention. We
understand they are only able to give this one day credit due to policy.
Below is a summary of our water usage for the relevant period (We currently operate on two meters):
Month East (Bill 95853) West (Bill 95852) Total Gal
Billed
Aug-24
533,000
681,000
1,214,000
Jul-24
613,000
8,854,000
9,467,000
Jun-24
510,000
4,769,000
5,279,000
May-24
756,000
662,000
1,418,000
Apr-24
785,000
585,000
1,370,000
Mar-24
2,351,000
749,000
3,100,000
Revised Average and Charge Calculation:
Average usage over the past 6 months (excluding June and July) is 1,915,000 gallons.
• Revised average charge for sewer at $6.71 per KGL (1,000 gallons): 1,915,000 gallons x
6.71 per KGL= $12,849.65 per month.
However, our bills for June and July are significantly higher:
• June: $36,246 + $6,045 = $42,291
• July: $63,312 + $9,785 = $73,097
Difference Between Expected Average Bills and June and July Bills:
• June: $42,291 - $12,849.65 = $29,441.35
0 July: $73,098 - $12,849.65 = $60,248.35
4B (7)
Given this discrepancy, we are requesting a total credit of $89,689 on our sewer bill. We believe this
adjustment will more accurately reflect our typical water usage and the corresponding sewer charge.
Mat Stang, the utilities superintendent, informed us that the presence of sludge on the flow monitor
appeared to create the misread. We have since cleaned and recalibrated the meter. Please see all
underlying data and exhibits attached.
We sincerely appreciate your attention to this matter and are happy to provide any further details or
supporting documentation as needed. Lakeshore prides ourselves on providing high quality affordable
housing. We appreciate our working relationship with the City of Monticello and hope we can reach a
resolution on this item. Thank you for your time and consideration.
Sincerely,
Name
Lakeshore Management
4B (8)
Exhibits: Bills paid over the past 24 months.
Month
Aug-24
1 ul-24
Jun-24
May-24
Apr-24
Mar-24
Feb-24
Jan-24
Dec-23
Nov-23
Oct-23
Sep-23
Aug-23
Jul-23
Jun-23
May-23
Apr-23
Mar-23
Feb-23
Jan-23
Dec-22
Nov-22
Oct-22
Sep-22
East (Bill95853)
$6,199.33
$6,736.13
$6, 045.00
$7, 695.66
$7,890.25
$18, 398.11
$7, 776.18
$8,037.87
$6, 357.51
$6,578.85
$6, 754.62
$6,617.91
$9, 540.90
$8,297.49
$5,276.85
$7,275.42
$6,862.04
$6,593.50
$7,138.71
$7, 542.33
$7,318.19
$5,755.09
$6,259.11
$5,225.55
West (Bit[ 95852)
$8,815.56
$63,656.39
$36, 246.04
$8,668.07
$8,171.40
$9,271.84
$15, 679.89
$8,963.18
$8, 256.25
$8, 470.69
$8,099.62
$12,103.27
$6, 869.23
$6, 708.48
$7,116.81
$7,806.67
$7, 363.99
$8,958.94
$27,948.61
$13,392.25
$9,578.91
$7,639.39
$8,456.03
$7, 569.21
Total Bill
$15,014.89
$70, 392.52
$42, 291.04
$16, 363.73
$16, 061.65
$27, 669.95
$23,456.07
$17,001.05
$14,613.76
$15, 049.54
$14, 854.24
$18,721.18
$16, 410.13
$15,005.97
$12, 393.66
$15, 082.09
$14,226.03
$15, 552.44
$35,087.32
$20, 934.58
$16,897.10
$13,394.48
$14, 715.14
$12, 794.76
4B (9)
Total Sewer Fees Paid (Past 24 months)
S80,000.00
$70,000.00
$60,000.00
S50,000.00
S40,000.00
$30.000.00
S20.000.00
S10.000.00
S0.00
`f, 111 `p tip 1�1 `L� `p, `L tip 'La tip `La
C�eQ � lay le 40 "°, re 011611 4` 40 1`11
Water/Sewer Usage for the Past 12 months:
1
Month
East (Bill 95853)
West (Bill95852)
Total Gallons Billed Occupied Units
Gal Usage Per Unit Per Month
Flow Rate Per Min
Aug-24
533,000
681,000
1,214,000
314
3,866
27.20
Jul-24
613,000
8,854,000
9,467,000
315
30,054
212.07
Jun-24
510,000
4,769,000
5,279,000
315
16,759
122-20
May-24
756,000
662,000
1,418,000
314
4,516
31.77
Apr-24
785,000
585,000
1,370,000
314
4,363
31.71
Mar-24
2.351,000
749,000
3,100,000
314
9,873
69.44
Feb-24
765,000
1,704,000
2,469,000
314
7,863
61.24
Jan-24
807,000
703,000
1,510,000
314
4,809
33.83
Dec-23
591,000
579,000
1,170,000
315
3,714
26.21
Nov23
625,000
677,000
1,302,000
311
4,186
30.14
Oct-23
652,000
620.000
1,272,000
311
4,090
28.49
Sep-23
631,000
1,235,000
1,866,000
311
6,000
41.80
4B (10)
Usage Per Unit Per Month
35,000
30,000
25,000
20,000
15,000
10,000
5,000
�aQ O�
■ Usage Per Unit Per Month
March 2024 Bill East
4B (11)
A(163)29S-2711
CITY OF j1
llo
THE MEADOWS -EAST
B8 00-v0003894-140mdw
PO BOX 1261
HICKSVILLE, NY 11802-1261
Please road the enclosed risen for detaAs on MontcelWs
April announcem8ntsl Hydrant Push ng oeglns on-April-15—"^
Sprang leaf pick L�p 1s on April 27.
Account
Statement
ACCOUNT:
016141-M
SERVICE ADDRESS
9127 ST HWY 25
SERVICE PERIOD
3/112024 to 3/31n024
BILLING DATE
4112024
DUE DATE: SI112024
Previous Reading Current Reading
Swl.i 40 Cote Re" data Resdrg
Can.
956S2 11,9024 176383349 4/1R024 '60734349
2351000
SEWER - MULTIPLE UNIT
15.779 42
--GARBAGE TXBL — - — - -- -:-
1.25593
RECYCLING FEE - NON TAXABLE
66550
GARBAGE TAX RES - 9 759E
12246
STORMWATER 1 RESIDENTIAL
574 75
TOTAL CURRENT CHARGES
18,396.11
�. USAGE H15TORv — _ _ i ALL St, tsalaav
r
w. u+ u rq Aar ac- rw Rt rri 4! ar +.
® t:vrraet usnl�
-Payment— - - -
Coupon
PLEASE. RETURN THIS PORTION ALONI, K1IH YOUR I'A1 MLN7
PLEASE MAKE CHECK PAYABLE TO:
CITY OF MONTICELLO
ACCOUNT 0161414M
SERVICE ADDRESS 9127 ST HWY 25
SERVICE PERIOD 3J12024 to 3131r2024
BILLING DATE 4J32024
DUE DATE; 5/1/2024
p.r,r„b R.c«v.d 777616
.dddW.1 11i2-V 000
Cv fl Cnrgr 16.39611
TOTAL AMOUNT DUE 18,398.11
TOTAL AMOUNT DUE BY 511/2024 18,398.11
AmoGWT—ENCLOSED
REMIT PAYMENT TO
City of Monticeko
505 Walnut St, Ste 91
Monticello. MN 55362
March 2024 Bill West
413 (12)
(763) 295.2711
Account
CITY Of
Sta p,
1l11
M
�i'�(1
110
ACCOUNT:
U
t7W.
SERVICE ADDRESS
STHW 25
9127 ST hiWY 25
SERVICE PERIOD
N12024 to 3r312024
BILLING DATE
41WO24
DUE DATE 6112024
THE MEADOWS -WEST Pre.wiuReaenq CwnntRs.4Mq
88 00-v0003694-t40mdw
PO Box 1201
RtiOfa °a° A•."
C—
HICKSVIILE, NY 11802-1261
.-.-- e�4 t5i53 J274 A':C74 ia1 bF229
r43=
Please road the encosed insert for b6tals on MonPoebo's
SEWER - MULTIPLE UNIT
5.030 00
Apnl Rnn Jnceneenis' Hydrant ft gn :lg hpg fan ApM-15GARBAGE FEE -TXBL --- ` -' -
2 034 48
SVvV leaf tick up a on Apr' 27
RECYCLING FEE - NON TAXABLE
107800
GARBAGE TAX RES - 9 75%
19836
STORMWATER t RESIDENTIAL
931 00
mom - - -
��- _ � i ri re � ni � ■ rih
Payment - - — -
Coupon
I'LLASE RF TL7ty THIS PORTION ALOtx iJTH YU[:R PAYNF V
)LEASE. MAKF CNECIL PAYARLF. 10
CITY OF MONTICELLO
ACCOUNT
SERVICE ADDRESS
SERVICE PERIOD
BILLING DATE
DUE DATE'
0161424000
9127STM.YY25
3112024 to 3/312024
A3=4
9112024
TOTAL CURRENT CHARGES 9.271.64
1'-- 8fti i b 6rb IS
P"n Rrt>•ree 0 co
r`.0t M so
A7V—i Itdmg 000
TOTAL AMOUNT DUE 25.735.72
TOTAL AMOUNT DUE BY 5/172024 25,735.72
RE-M PA:: EN7'G
Gty of Monpcei!o
505 Waknuf St Sie v
Mon5ce6o. MN 55362
4B (13)
1
j(763)2SS-2711
CITY Of
I
THE MEADOWS-WFST
BB 00-v0003a94-140rrdw
PO BOX 1261
HICKSVILLE. NY 11802-1281
April 2024 Bill West
MonUc66o has a yearly ood/even watering schedule 1n affect
from J✓llrle 1 - Septemtwr 30. A P160"btty adoress ondd.g in
an even nurnbor can water on oven c ;Cndar days, WNW
addroases end, g in an odd number, cin walef on odd
calendar days for eddmonal Information, please wit the ctty
�011IIW4 IN
http*JAW4vw u mOrtt+Collo ttvl ur1394/Wnterin0 Wolonnq -Reflr
® carnet rw.�s� j..
Account
- Sta�je�ert
-•,-I.-,.••
,nuna9I91111�I11
LI. II 11111111wil1wIIION11111d
ACCOUNT:
016/42-000
SERVICE ADDRESS
9127 ST HWY 25
SERVICE PERIOD
4f1/2024 to 413CW2024
BILLING DATE
5l312024
DUE DATE.
6n r2024
P—.. Readi.9 C1.nor11 Re4d.ng
... v. n..t. R44etng r).. Re..1+.9
c.—
osnsl u1rJo�4 rsaleeam s.. rlo74 1s�1ar1�2a
i
M�oa
SEWER MULTIPLE UNIT_ -
3,929 56.
- �'--CAR"C—,E
_ _ _ _
aE - 1XRL
2.034 48
RECYCLING FEE - NON TAXARLF
1.07800
C.AR9AGL LAX NES - 9 /SSG
19836
STORMWATFR F RESIDENTIAI
931 00
TOTAL CURRENT CHARGES
l.171.40
n. h..1. .
J4."9 13
Y—
v.y�wva ne:I�4d
24..Yj 1 n
na..aay Re.rwN1
- 1,01, a0
Add.-- 04.rw
0 00
Cw•H Cry.g.•
A 171 40
TOTAL AMOUNT DUE 8.171.40
Coupon
TOTAL. AMOUNT DUE BY 6/1/2024 8.171.40
1-1 t 4 M- e I I I I M ti I I — POR 1 IrIN AI 0W 0.7T11 Y0(1R PAYWNI
REMIT PAYMENT TO
F-I I —IF M 1Kf C1IrCK rAVABLE TV
C 1TY OF MONTICELLO
ACC LINT016/424)W
SER ADDRESS 9127 S 1 t1WY 25
ICE
VI SERCE PERIOD 4/1,2024 to 413012024
City of Montceflo
Rik LI C G DAl F 5/32024
505 wow MA St.. Ste a 1
I
MormceYo. MN 55362
ATE- 6r1/2024 DUE G
THE MEADOWS -WEST
RB 00. v0003894-140mdw
PO B6X 1261
HICK�VILLE. NY 11802 1261
4B (14)
April 2024 Bill East
(163) 295-2711
Account
CITY OF
Statement
•
INFORMATION
y�
1 1
Do�ACCOUNT
ACCOUNT:
31t -
9
SERVICE ADDRESS
ST HW 25
9127 ST HWY 25
SERVICE PERIOD
4/172024 to 450!2024
BILLING DATE
5/3i2024
THE MEADOWS -EAST
88 00-v0003894- t A0mdw
PO BOX 1261
HICKSVILLE NY 11802-1261
Mon! cel o nas a yearly oddleven watering schecule r effect
from June ' September 30 A property address ending r
an even number can water on even calerdar days. while
addresses ermng ;n an odd number, can water on odd
calendar days For additional informabon. please vis4 the city
websrte at
hope /Avww o monbeello mn usf39l1Watenng-Watering -Rest/
-Coons I
RUIT
i:rerwwnYaW I
DUE DATE: 611r2024
Pravima Reading Current Reading
Serial No Cate ReaOng Date R""
Cone
95452 C1,'2024 18C734349 Srtr2024 181519349
'85=
CHARGES
SEWER - MULTIPLE UNIT_
5.27156
_ _
GARBAGE FEE TXBI
1.255 98
RECYCLING FEE - NON TAXABLE
66550
GARBAGE TAX RES - 9 75%
12246
STORMWATER r RESIDENTIAL
57475
TOTAL CURRENT CHARGES
7.890.26
Ptanmr Balarre
hytaM Reorvea .10 390 11
Ala WW Wag 000
Curter CJtrsa 789025
TOTAL AMOUNT DUE 7,890.25
Payment --• -- --- —
- - _
Coupon
TOTAL AMOUNT DUE BY 6/1/2024 7.890.25
PLEASE RETURN THIS PORI ION ALONG WITH YOUR PAYME-1
r
REMIT PAYMENT TC
PLFASF SAKE CHECK PAYABLE TO
CITY OF MONTICELLO
ACCOUNT 016141-000
SERVICE ADDRESS 9127 ST HWY 25
SERVICE PERIOD 411/2024 to 4=12024
Cty of Monticello
BILLING DATE 513/2024
505 Walnut St. Ste •1
Mont cello. MN 55362
DUE DATE: 0f172024
4B (15)
May 2024 Bill West
(763) 295.2711
Account
CITY OF
Statement
�nt 1•
�O
-
ACCOUNT:
u 3 85tn-d3Cp
�
i
SERVICE ADDRESS
ST HWY 25
9127 ST HWY 25
SERVICE PERIOD
5/12024 to 5/312024
BILLING DATE
6152024
THE MEADOWS -WEST
BB 00 v0003894.140nidw
PO BOX 1261
HICKSVILLE, NY 11802-1261
Res,dents may go online to new Montrceeo's 2023 Wate,
Consumer Confidence Repon at
"ps lfinyurl comJ44br2m6h Please contact the Monticello
Water Department at (763) 295-3170 to reg,iesl a pacer
copy or the report o• d you have any additional puesLorts
1
HISTORY - -
Payment
Coupon
ACCOUNT &NFORWA770-N—*
Ot. EASE RI. tl;R\ tI1K Fti?R110V ALUt.II9I; LH YUCK PA5'MF.t.
PI.FASE MAKE CHECK PAYABLE TO:
CITY OF MONTICELLO
ACCOUNT 018/42-000
SERVICE ADDRESS 9127 ST HWY 25
SERVICE PERIOD 5112024 to 5131/2024
BILLING DATE 615f2024
DUE DATE: 7/1/2024
DUE DATE. 7/172024
Pnxvwus Reeding Current Reading
S" No Dab Readng Dax Rew.V C ms
VA53 511r2024 183971229 512W4 184637229 662000
Dill lii �� Spa 1 II1������1
SEWER MULTIPLE UNIT , _
4,44623
GARBAGE FEE - TXBL
2.034 48 '
RECYCLING FEE - NON TAXABLE
1 078 00
GARBAGE TAX RES - 9 75%
19636
STORMWATER i RESIDENTIAL
93100
TOTAL CURRENT CHARGES
8,688.07
Prvoo % Baanta
a ! r 1 40
Payment Reoerwd
-a 171 40
Ad3Slcnal B-N
000
C. " Cha-gas
a bee 07
TOTAL AMOUNT DUE 8,688.07
TOTAL AMOUNT DUE BY 711=24 8.688.07
AMOUNT ENCLOSE
REMIT PAYMENT TO
City of Montrceilo
505 Walnut St, Ste tee
MonocHlo. MN 55362
4B (16)
May 2024 Bill East
Account
Y Of
1p L(763)711
RC.ACCOUNT:
_ _Statement
SERVICE ADDRESS.
ST HW 25
9127 ST HWY 25
SERVICE PERIOD
511l2024 to 5131r2024
BILLING DATE
615f2024
THE MEADOWS -EAST
BB 00-v0003894-140n-dw
PO BOX 1261
HICKSVILLE, NY 11802.1261
Residents may go onEne to hew Morbcel:o's 2023 Water
Consumer Confidence Report at -
hMnJ/ myurl conv44b2m6h Please contact the Mon4cello
Water Department at (763) 295.3170 to request a paper
copy o' the report or if you have any additional questions
A,fiV1JJL1111tM__ffi1
�� Gan.M �e4se� j
DUE DATE: 7/1/2024
Pmvious R so I Cunwd Ibe0in9
Se1b1 NO Date Rea lir g Deb ROMN Cons
96M 9142024 181519349 &1=4 /82275J49 756M
SEWER - MULTIPLE UNIT
5.07697
GARBAGE FEE - TXBL
1.255 98
RECYCLING FEE - NON TAXABLE
66550
GARBAGE TAX RES - 9 75%
12246
STORMWATER 1 RESIDENTIAL
574 75
TOTAL CURRENT CHARGES 7,695.66
pre , (1" 789025
Payments Rai ew j -7 69i 25
AWrepn.l BMg c ai
G.rrern Cn4,9es 7.69566
TOTAL AMOUNT DUE 7,695.66
Payment
Coupon TOTAL AMOUNT DUE BY 7/112024 7,695.66
ACCOUNT INFO�iil;�fI64 I AMOUNT ENCLOSED
P� F A M R 1 it R% T HIS PORTION ALONG WITH YOUR PAYMENT REMIT PAYMENT T p
PLEASE MAKE CHECK PAYABLE TO:
Cm of MONTICELLO
ACCOUNT 016141-M
SERVICE ADDRESS 9127 ST HWY 25
SERVICE PERIOD 5/1/2024 to 5131/2024 City of MonbcePo
BILLING DATE 61S12024 505 Walnut Sl . Ste at
DUE DATE: 7/1/2024 Monticello, MN 55362
4B (17)
June 2024 Bill West
(763) 296.2711
Account
CITY OF
Statement
n •
O
ACCOUNT:
016142-000
urgHan,
_
P
SERVICE ADDRESS.
9127 ST HWY 25
SERVICE PERIOD
&112024 to 613072024
BILLING DATE
71512024
THE MEADOWS -WEST
88 00-v0003894-140mdw
PO BOX 1261
HICKSVILLE. NY 11802-1261
You can now view the 2023 Popular Annual F-rnargal Report
on the city wetmte at
M" Ihvmw cinrort9CeGo non us/164rF1nance The July bill
includes an arewal water availability charge for ONLY those
custorners that have a well and also have access to city
water. but have Chosen not to connect
Payment
Coupon
PLLASL Rt TI.'RN T1f:C PORTION At ONC, WITH YOUR PAYME-YT
PLEASE MAKE CHECK PAYABLE TO.
CITY OF MONMELLO
ACCOUNT.
SERVICE ADDRESS
SERVICE PERIOD
BILLING DATE:
DIE DATE:
THE MEADOWS -WEST
88 00-Y00038W I4prndw
PO BOX 1261
016142-M
9127 ST HWY 25
611 QW4 to 6rM2024
715=4
11101112024
DUE DATE: AtIf2024
Previous Re.din• Curran Ro&Mng
Sr, • vc D� N.=nq C.-A Re.drp Cc l
95G.53 f, 1.2C.-4 184633229 7,11C24 1894C2229 4169=
D
SEIA'ER - MULTIPLE UNIT
32 004 20
GARBAGE FEE - TXBL
2 034 48
RECYCLING FEE - NON TAXABLE
1 07800
GARBAGE TAX RES - 9 75%
19336
STORMWATER 1 RESIDENTIAL
93' 00
TOTAL CURRENT CHARGES 36,246.04
Prewar B.W+rs 6 Gas 07
P.trr'r4. Rbx d 46980,
AJ4 Wt d 911.19 000
Cu+em C+.ron 35 240 C-
TOTAL AMOUNT DUE 36,246.04
TOTAL AMOUNT DUE BY 8/1/2024 36.246.04
REN11- PAYMENT -C
City of Monta:e:-o
505 Walnut St. Ste $1
Monbcelo, MN 55362
4B (18)
June 2024 Bill East
(763) "S-2T11 Account
CITY IOF Statement
ACCOUNT: 016141-000
, SERVICE ADDRESS 9'i' ST HWY 25
SERVICE PERIOD: 6 T 20_ 4 to 6 304024
BILL NG DATE
THE MEADOWS -EAST
88 DD-Y=3894.140mow
PO BOX 1261
HICKSVILLE. KY 11802-1261
t au can 'iOw rr_ r Me 2023 Popular Annual F.rrarx.aRewrl -
ci the city websoe at
hUs lhww c morticew mvn u f1641Finrroe T'1e JUy b0l
ir,-ai des an ann a: wa:er avarfabsty ctw9a for ONLY Bose
customers the, nave a •vil " tiro have accaaa to oty
water. W. have Chose" not to Conned
Payment
Coupon
t [ C N � I R.E Tl i;M iHU Pc1StTf0N ALntiQ I,TTH Vo! R Pat mt
PI. FA-4 MAKL CIIECK PAYABLE T"
CRY OF MONTICELLO
ACCOUNT 016141400
SERVICE ADDRESS 9127 ST HWY 25
SERVICE PEWW 6m=4 to &30=4
BILLING DATE 715=24
DUE DATE: SMI'M4
THE I1tEADOWS-EAST
BB Mv0003894-140n4w
PO Box 1761
WCKSVILLE, NY 11802-1261
DUE DATE: V14024
A No
Pr"*u% Raadkv Currant Raeding
S—ui W 02M Readrq Ceh Readre C4
s31152 a -=4 42275349 711=4 192"Mue 51cm
SE1'.'ER - MULTIP,E UNIT
3 426 3•
GARBAGE FEE • TXBL
1 255 98
RECYCLING FEE • NON TAXABLE
665 50
GARBAGE TAX RES - 9 75%
122.46
STORMWATER i RESIDENTIAL
574 15
TOTAL CURRENT CHARGES 6,04500
P "Celnd
A"l, a Fk hV
Curtertl C-WVM
TOTAL AMOUNT DUE 6,04500
TOTAL AMOUNT DUE BY 8/112024 6,045-00
' REMIT PAYMENT TO
Coy of Monbawo
505 Wain,it St. Ste Ill
Mox+:reto MN 55,X2
4B (19)
July 2024 Bill West
(763) 295.2711
Account
CITY OF
Statement
•
flo
ACCOUNT:
SERVICE ADDRESS
ST HWVl25
9127 ST I1Y 25
SERVICE PERIOD
7,'V2024 to 713112024
BILLING DATE
&WD24
THE MEADOWS -WEST
B3 00-v0003894.140m0w
PO BOX 1261
HICKSVILLE. NY 11802-1261
Monticello has a permamm od2,'even wa`c^ 1g &;hedule n
effect from June 1 - September 30 each year Hone -
add^esses ensng in an even numbe,. water cc) even
caaericar days. w Nle home addresses eni,ng in an oeld
number water on odd ralerdar days I1 you aR Cj:ting in a
new lawn or plartvg trees, a ore-d-ne 3C-day pemvt is
avalLa�.a fro-n PLv.ileriorks which allows fL1r daly wate rig
i
L�.7� LSJ arih_i� r1a� aQ _ a
Payment
Coupon
M EASE. �. Ir It `I 7H!% P(WrK)4 AUMI MIN YOIIR PAYMENT
PLEAS.- XUKE. CHECK PAYABLE TO
CRY OF 0ONTK*A.L0
DUE DATE:
SMIM24
Prov.ous Reading CvTent Raadrng
Cate Rem" Da>e ar..ar.2
Cr
7,1.=4 1SUM29 E'1-2=4 •W2511222
W-54003
SEWER - MULTIPLE UNIT
59.414 55
GARBAGE FEE - TXBL- - - -
-'2 D34 48
RECYCLING FEE - NON TAXABLE
1 oreGo
GARBAGE TAX RES - 9 75%
19836
STORMWATER f RESIDENTIAL
93100
TOTAL CURRENT CHARGES $3,E96.39
Pia~ swe"M 3824834
►sr W Rsane! Ja 246 c4
Ad"" C W
Civvvd cnarar- 63 E5e 3a
TOTAL AMOUNT DUE 63.656.39
TOTAL AMOUNT DUE BY 9/112024 63.6W.39
REMIT PAYMENT TO
ACCOUNT
016142-M
SERVICE ADDRESS
9127 ST HWY 25
SERVICE PERIOD
7n,2024 to 701/2024 City of Montmilo
BILLING DATE
M/2024 505 Yialrul Sl Ste at
Yort,ze:o 11N 55362
DUE DATE:
WirM24
THE MEADOWS -WEST
B8 00-v0003894.14 —n1W
PO BOX 1261
HICKSVlLLE. NY IIW2.1261
July 2024 Bill East
4B (20)
(763) 29S-2711
Account
CITY OF
Statement
_
� •
�0
ACCOUNT '
010141-M
�m =p
SERVICE ADDRESS.
9127 ST HWY 25
SERVICE PERIOD
711=4 to 7r3tr2024
BILLING DATE
Mi'2024
THE MEADOIS'S EAST
BB 00-v0DD3894-140rrwdw
PO BOX 1261
HICKSVILLE NY 11802-1261
1.1onttcello has a permarcnt old rvcn watvnng scheci e m
eBeG f-cm June 1 - Sep.ef;bc* 3D each year Home
&1dresses a^1ng to or even number water cn evert
Cak^dar days tahtle hone ald•esses endng n an odd
%,TT_'cr. water on old cak�dar days If you are pL'ting in a
r&,v Ism,. of ptantng trees, a cne-tore 30-4ey permit s
ava,able f,onr Puo6CWo*ks whr:h allows for d3 y watering
Payment
Coupon
P' 1--%5F REM AN l tf iS FORrION ALOW WITH Y0 9_'R PAtTRti
A EAST MAKE CHFCK PAYABLE TO
CITY OF YOMMELLO
ACCOUNT: 0161414M
SERVICE ADDRESS 9127 ST H'*VY 25
SERVICE PERIOD 7714024 to 73112024
BILLIN3 DATE &5,=4
DUE DATE: 9nf2024
THE MEADOVIS-EAST
88 00-v=3894 140rn:w
PO BOX 126 t
HICKSV,LLE. NY 116Z�'2-12,51
DUE DATE: 9,1112024
Pf itas Res"o Currant P"ding
Swim No Dat• Readq Date RaMna Cem
91,. 2 7n.I.24 ra27PS3H &t.7c24 ta3M"S at=
SEWER - M LTIPLE UN T
4 11744
-GARBAGE FEE • TXBL
1.255 C9
RECYCLING FEE -NON TAXABLE
66550
GARBAGE TAX RES - 9 75%
12246
STORIAWATER I RESIDENTIAL
57475
TOTAL CURRENT CHARGES
6,736.13
P e.10 Lrace a MS 00
Parnrrb Ft --f d 046 W
AbtC , 0-IN C 07
C'"W4 Chrpes a 77e 13
TOTAL AMOUNT DUE 6,736.13
TOTAL AMOUNT DUE BY 9/172024 6,736.13
REMIT PAYMENT TO
City olAAooGce o
SM Ydalm l St, Ste 01
Montwelto MN 55362
August 2024 Bill West
4B (21)
(763)295-2711
Account
Of
Statement
iCITY
N4n•TO
ACC.OUNT INFORMATION
ACCOUNT:
016111-000
QUr4 i m
SERVICE ADDRESS
9127 ST HWY 25
„pl1•
SERVICE PERIOD
8f12024 to 81312024
BILLING DATE
9162024
THE MEADOWS -WEST
BB 00-v0003894-140n-dw
PO BOX 1261
HICKSVILLE. NY 11802-1261
Mcrbcelio's oddfeven watering schedule ends on September
30th Repair arty minor water leaks as soon a5 they occur
On your December bill (November usage). sewage w61 no
longer be limited by your winter average consumpt on. It will
be calculated based on yourerbre water usage
I USAGE HISTORY
eaa�
i
-_aB a110
LurreM Lsene 1
DUE DATE: 1011f2024
METER READING
Prevtot Reading Current Reeding
flora Raod+g Date Ro" Conn
-,n13 5,1W24 1962%229 WI=4 19N37229 661000
CURRENT CHARGES..
SEWER - MULTIPLE UNIT 4.573 72
GARBAGE FEE - TXBL - 2034 48
RECYCLING FEE NON TAXABLE 1 078 00
GARBAGE TAX RES - 9 75% 19836
STORMWATER f RESIDENTIAL 93' 00
TOTAL CURRENT CHARGES 8,815,56
Prevroue Balance 63 C56 39
Peyrre Recewed 6365639
6"Ad,—I- a .2 911313
AddliorW Bdlr9 000
Curren) Cxargn 861556
TOTAL AMOUNT DUE 5,832.43
Payment - — — -- - -- -- --
Con TOTAL AMOUNT DUE BY 101112024 5,832.43
upo
rc t Apt RI TURN THIS PORTION ALONG 9r1TIi YOUR PAYMENT
PLEASE MAKE CHECK PAYAHLE TO.
CITY OF MONTICE LLO
ACCOUNT:
SERVICE ADDRESS
SERVICE PERIOD.
BILLING DATE.
DUE DATE:
016142-000
9127 ST HWY 25
811 f2024 to 8/312024
9WO24
I W112024
City of Monttce'lo
505 Walnut St , Ste #I
Mont.celto, MN 55362
August 2024 Bill East
REMIT PAYldENT TO
4B (22)
(763) 295.2711
Account
CITY OF
Statement
�/ �O
99�iGII1W
ACCOUNT:
vrP
�i �•+
SERVICE ADDRESS
ST HW. 25
9127 ST HWY 25
SERVICE PERIOD
8/1/2024 to 801t2024
BILL ING DATE
9W024
DUE DATE:
10/tt2024
THE MEADOWS -EAST
Previous Reading Current Reading
BB 00-4003894-140milvio
5cv,ai v� Dam Re+e.V Dam Read V
Cons
PO BOX 1261
s•,ss, V=4 16339a349 Wlr2024 183931349
533000
HICKSVILLE, NY 1IB02.1261
kRENT
SEWER - MULTIPLE UNIT
3.58064
SPECIAL MESSAGE
Monticego's oddleven watering sc"dule ends on September
30tn Repair any mina water seats as soon as tney occ jr.
GARBAGE FEE - TXBL —" "
1.25598
On your December bill (November usage), sewage will no
RECYCLING FEE - NON TAXABLE
665.50
longer be limited by your winter average consumption It will
GARBAGE TAX RES - 9 75%
12246
be caladaled based on your entire water usage
STORMWATER 1 RESIDENTIAL
574,75
USAGE roSTORY i
Payment
Coupon
H I RI:TLRNI HIS PORIION ALONG WITH YOUR PAYMEIT
PLEASE MAKE aIECK PAYABLE 70:
CITY OF MONTKZUO
ACCOUNT 016141-000
SERVICE ADDRESS 9127 ST HWY 25
SERVICE PERIOD &12024 to 8/31IW24
BILLING DATE 962024
DUE DATE: 101i/2024
TOTAL CURRENT CHARGES 6,199.33
Prev e�• Balar� 6 736 13
Pairlert• Roow d 6.736 13
Addbo,w U n9 000
Cunem Cnarges 6 19933
TOTAL AMOUNT DUE 6,199.33
TOTAL AMOUNT DUE BY 10/12024 6,199.33
ENCLOSEDI AMOUNT
RF.MIT PAYMENT TO
City of Monbcelto
505 walnut St. Ste 01
Mont7ce*o, MN 55362
NEW EMPLOYEES
Name
Title
Department
Hire Date
Class
Shawn Gellert
Supervised Play Attendant
MCC
11/1/2024
PT
Caleb Myhrer
Slide
MCC
11/5/2024
PT
Janet Baumgarten
Guest Service
MCC
11/6/2024
PT
Jeremy Jensen*
Streets Foreman
Streets
11/16/2024
FT
Bob Ferguson*
Chief Building Official
Building
11/30/2024
FT
* Promotion
TERMINATING EMPLOYEES
Name
Reason
Department
Effective Date
Class
Sophia Lange
Voluntary
Parks
6/7/2024
Seasonal
Christine Simonson
Voluntary
MCC
6/29/2024
PT
Jesse Roebuck
Involuntary
Liquor Store
11/8/2024
FT
New Hire and Terms City Council 2024: 11/12/2024
7th Street Retaining
Wall, RRFB, Sidewalk
Improvements Project
Final Assessment Hearing
November 1212024
�. V 29w7;
ed
Project Details
71" Street Retaining Wall Replacement
• Construct new wall approximately
1' higher than existing wall and
install a stormwater overflow
directing water around the wall.
Legend
Wall Construction
-� 7TH-ST W
JR&RIt, LLC
J �
CO
v
88F
Fropefts, Inc
CO
_k/
Q�
Project Details Legend
Sidewalk Construction
Sidewalk Installation
• Install a sidewalk section on the
North side of 7' Street between
Locust and Walnut Street.
RRFB Installation
• Replace RRFB system at 7t" Street
and Walnut Street.
Area 1
I
Project Details
Sidewalk Installation
• Install a sidewalk section on the
South side of 71" Street connecting
between Washington Street and
Cedar Street
Legend
Sidewalk Construction
C12'2 Area 2
q-
o�
v�
A,
�Ty S r �1— —��
pry_
us SrF
Postal Bravera Monticello
Service Bank Training
Center
,NrERsrArE 94 N
E
Project Detail
Sidewalk Installation
• Install a sidewalk section on the
South side of 71" Street connecting
between Washington Street and
Cedar Street
Legend
Sidewalk CnnStrUctinn
co
441
co
`sT F Area 3
S�
Bluffs in
Alonticello. LLC
i
i
Assessment Method
Current Assessment Policy
New Sidewalks
• 100% along existing undeveloped properties
• 50% front foot basis for non-residential commercially zoned properties
• 25% for abutting non-residential industrial zoned properties
Retaining Wall
• 50% of the project cost based on the front footage on each property.
Proposed Assessment
New Sidewalks
• $50 per adjusted linear front foot
Retaining Wall
• $250 per linear foot of wall
Assessments
Property List and Final Assessment Summary- Updated
FRONT ASSESSMENT TOTAL PRELIMINAR% ASSESSMENT AMOUNT PER TOTAL FINAL OWNER
PID PROPERTY ADDRESS ON'NFR?AXPAY'IiR ON'VER ADpREC[ ZONING FOOTAGE PERCENTAGE (PER OWNER ASSESSMENT LF (1'R(71'OSE) 4PpATE) AS'tiES.SMENI'
CURRENT POLICY) POLICI)
Reeeiliq Wall Coustnetlea
155-068-001020
300 7TH ST W
JR&R II, LLC
901 HIGHWAY 59
CCD: Central Community District
110
50%
543,912
$250
$27,500
MARSHALL, MN 56258
155-068-000030
UNASSIGNED
JRBR II, LLC
901 HIGHWAY 59
CCD Central Community District
92
50%
$36,726
$250
$23,OD0
MARSHALL, MN 56258
155-076-000010
206 7TH ST W
BBF PROPERTIES. INC
PO BOX 990
CCD: Central Community District
48
50%
$19.162
$250
$12,000
MINNEAPOLIS, MN 55440
155-076-001010
206 7TH ST W
BBF PROPERTIES, INC
PO BOX 990
CCD: Central Community District
118
50%
$47,105
$250
$29,500
MINNEAPOLIS, MN 55"0
Sidewalk Ara 1
155-010-006040
611 WALNUT ST
SPO LLC
201 W 7TH ST MONTICELLO, MN
CCD: Central Community District
133
50%
$30,962
$50
$6.650
55362
155-011.1-0U603U
UNASSIGNED
SVULLC
201W/1HSTMONTICELLU,MIN
CCU Central CommunityUistnct
33
50%
$702
$511
$1.650
55362
155-010-006031
UNASSIGNED
DAVID W BRINKMAN
6400 46TH AVE SE SAINT
CCD: Central Community District
33
50%
$7,682
$50
$1.650
CLOUD, MN 56304
155-010-006010
221 7TH ST W
DAVID W BRINKMAN
6400 46TH AVE SE SAINT
CCD. Central Community District
133
50%
$30,962
$50
$6.650
CLOUD, MN 56304
S", k Area 2
155-029-002040
UNASSIGNED
UNITED STATES POSTAL SERVICE
6800 64TH ST W OVERLAND PARK,
IBC', Industrial and Business Campus District
165
100%
$24,726
$50
$9250
KS 66202
155-029-002050
UNASSIGNED
BRAVERA BANK
2201STAVE W DICKINSON, ND
IBC: Industrial and Business Campus District
190
100%
$25,394
S50
89.500
58601
155-029-002070
406 7TH ST E
MONTICELLO TRAINING CENTER LLC
15440 45TH ST NE SAINT MICHAEL
IBC: Industrial and Business Campus District
560
25%
$18,711
S50
$18,711
MN 55376
Sidewalk Arco 3
155-050-000020
UNASSIGNED
BLUFFS IN MONTICELLO LLC
3339 CRYSTAL BAY RD
IBC Industrial and Business Campus District
279
100%
544,906
$50
$13,950
WAYZATA, MN 55391
TOTAL ASSESSMENT $337,930 00
$160 011 00
Assessment Payment Methods
Payment Option 1:
• Pre -pay full assessment amount without interest to the City by the end of the day
December 12, 2024.
• Payment Option 2:
• Pay assessment with 2026 property taxes over 10 years with 10% interest beginning
in on November 121 2024.
Payment Option 3:
• Pay remaining assessment off at a later date (must be before Nov 15), interest is
added through December of year final payment is made. No partial payments
allowed.
Questions?
�� III III III IIIIj III
Wall
Construction
�jl 'II;► IjI�� �I �� ��Ii''�1
N TF.
RSTq+f .
'T1 4 NF
Area 3
k \\
• Motion to adopt Resolution 2024-110 approving assessments for the Th Street Retaining
Wall, Rectangular Rapid Flashing Beacon (RRFB), and Sidewalk Improvement Project,
City Project No. 23C0o5.
9
CITY OF
Mi
ontceflo
Halcanson
Anderson
Project Summary
• Roundabout at School Blvd and Cedar Street
• Roundabout at School Blvd and Edmonson Avenue
• New pavement surface on School Blvd from Highway 25 to Country Lane
• Replace center medians with two-way left turn lane (TWLTL)
• New trail from Edmonson Avenue to Country Lane (South Side)
• Improve all pedestrian ramps to current ADA standards
Cedar Street Roundabout
Replace current all -way stop
1
Center island landscaped and
irrigated
• Roundabout and crosswalks
include new lighting
- y s
/1\• Reconstruct pedestrian ramps
to current ADA standards
• c� �� ♦1, • �` goy
-
i
Edmonson Avenue Roundabout
O
7
C
WLEVARD
• Replace current all -way stop
• Center island landscaped and
irrigated
• Roundabout and crosswalks
include new lighting
• Reconstruct pedestrian ramps
to current ADA standards
Replace Center Median with TWLTL
------------------------------------- --------
0G`LLO LLC RIGHT-OF-WAY DRAINAGE AND AIUT1 EASEMENT
OCCLLO LLC
SIDEWAD EASEMENT
AWOCO EASEMENT
1+00 Rernove Media
0
SCHOOL BOULEVARD
DRAINAGE AND LMLITY EASEMENT AY
WALHAIR REAL MT BUSINESS Tk SIDEWAU EASEMENT
OCLLLO LLC
14400
r —Stripe TWLTL J 1
SCHOOL BOULEVARD
0 Remove existing median
0 New pavement surface
0 New striping includes a TWLTL
WAL-MART REAL CST BUSINESS JR
2320 CEDAR STREET
NewTrail Segment
0 Construct new 10-foot trail
Yo.
�. � i �u ,. �-•\ate =_— — — - — — .,'� Z — --
_ y1
+ao so+oD — —
r
Project Costs
Total Estimated Project Cost
• Right -of -Way and Easements
• Overhead and Construction Contingency
• Construction Cost
$3,5701369
$69,255
$456,667
$3,044,447
Project Funding
Total Estimated Cost $3.15701369
• Total Assessed to Property Owners $490,561
• Electric Utility Fund $384,608
• Federal Grant Funds $1,485,000
• City Funds $1,210,200
Assessment Summary
• Roundabout Medians, Lighting, landscaping, irrigation and new trail construction not assessed
• Total amount assessed $ 490,561
• No residential properties have direct access
• Commercial properties assessed 50% on adjusted front foot basis
• Front footage adjustments for commercial properties
• Rear yard with access — 50%
• Front Yard or short side with access — 100%
• Side Yard no access — 25%
Assessment Payment Methods
Anticipated Assessment Hearing: October 27, 2025
Payment Option 1:
• Pre -pay full assessment amount without interest to the City within 30-days of adoption of assessment
(i.e. November 2025)
Payment Option 2:
• Pay assessment with 2026 property taxes over 10 years with interest beginning in 2025
Payment Option 3:
• Pay remaining assessment off at a later date (must be before Nov 15), interest is added through
December of year final payment is made. No partial payments allowed.
Proposed Project Schedule & Next Steps
• City Council Receives Feasibility Report
• Conduct Improvement Hearing
• Approve Plans / Authorize Bids
• Bid Opening
• Begin Construction
• Substantial Completion
• Conduct Assessment Hearing
• Assessment Payment Due with out interest accrual
• First Assessment Payment Due (with Taxes)
October 14, 2024
November 121 2024
November 251 2024
December 1712024
April 2025
August 2025
October 27, 2025
November 2025
May 2026
Quest*ionc?-
Recommended Action: - Motion to adopt Resolution 2024-111 ordering the improvements
for the School Boulevard Intersection Improvements Project.
�'r�'r�e�RTt�.� ,�;++��`I`y .k'a �-i6:' •;r a.. _.
Rii�k
�'��,_
to
♦�Y L �.
,�j. i.2 .�,.✓` y Ire L
,' J At' �.i. `�,� � � f
PROPERTY INFORMATION & HISTORY
Located on the south end of the city with parcels on both sides of Hwy 25
Neighborhood is served by private water wells
rrT,
Neighborhood discharges wastewater to city's sewer system
6 Privately -owned equipment measures flow
There is a 2002 agreement which limits adjustments to one day per month and states the property
owner is responsible for equipment cleaning and maintenance
Agreement was with the previous owner and was assumed by The Meadows upon purchase
Lakeshore Management (representing The Meadows) requested an adjustment to the sewer charges
a�r
for usage in June and July 2024.
CITY OF
Monticello
• Adjustments should be considered on individual accounts.
• Adjustments should be based on consumption rather than billing
amounts because rates change annually.
• Adjustments should be based on prior readings of the same month to
avoid seasonal fluctuations.
• Adjustments should be considered only if the readings are clearly
inaccurate and aren't a reasonable fluctuation in usage.
MI 0111ill I MA I a 0 1 ELVA I a I MIS] 01161 Its,
East Side
• No adjustment
West Side
• Adjustment of $35,452.57
STAFF
RECOMMENDED
ADJUSTMENT
CALCULATION - EAST SIDE
Month
July
June
2024
Consumption
6131000
510,000
2021-2023
Average
Consumption
8851000
434,000
Variance
(272,000)
76,000
CITY OF
�, Monticello
CALCULATION - WEST SIDE
Adjusted
2021-2023
2024
One -Day
2024
Average
Month Consumption
Adjustment
Consumption
Consumption
July 8/854/000
(285,613)
8,568,387
7651000
June 41769,000
(158,967)
4,610,033
1,846,333
2024 Rate
Variance per 1,000gal
7/803/387 $ 6.71
21763,700 $ 6.71
Total
Half
Adjustment
Amount
$52,360.73
$18,544.42
$70,905.15
$35,452.57
CITY OF
�, Monticello
Motion to approve the request for an
adjustment of sewer charges by The Meadows
Manufactured Home Park in the amount of
$351452.57.
'0I1/1 RA la 0 I970 BIWA�NI[!
11