Loading...
Planning Commission Agenda - 03/04/2025 (Workshop)AGENDA JOINT MONTICELLO PLANNING COMMISSION/CITY COUNCIL WORKSHOP Tuesday, March 4, 2025 – 4:45 p.m. Mississippi Room, Monticello Community Center Commissioners: Chair Andrew Tapper, Vice-Chair Melissa Robeck, Rick Kothenbeutel, Teri Lehner, Rob Stark City Councilmembers: Mayor Lloyd Hilgart, Kip Christianson, Charlotte Gabler, Tracy Hinz, Lee Martie Staff: Angela Schumann, Steve Grittman, Bob Ferguson, Tyler Bevier 1. Call to Order 2. Concept Stage Submittal for a 106.05 acre development including data center uses, within a Light Industrial Park, Mixed Neighborhood, Commercial and Residential Flex and Estate Residential land use designation areas as identified by the Monticello 2040 Vision + Plan. 3. Adjournment 1 Grittman Consulting llc Steve.GrittmanConsulting@gmail.com Planning, Zoning, Land Use MEMORANDUM TO: Angela Schumann Mayor Hilgart and Monticello City Council Monticello Planning Commission FROM: Stephen Grittman DATE: February 25, 2025 MEETING DATE: March 4, 2025 (Joint Workshop Meeting) RE: Monticello – Scannell Properties – Concept PUD Review GC FILE NO: 120-01 – 24.26 PLANNING CASE NO: 2024 - XXX PROPERTY ID: Introduction The current proposal is for a Concept Plan review, which is not a formal zoning or land use application but is intended to provide an opportunity for City feedback on a potential development proposal prior to more formal zoning review and the extensive supporting materials that such reviews require. The Planning Commission and City Council will have the opportunity to review the project, ask questions of the proposer, and provide comments as to the issues and elements raised by the project. No formal approval or denial is offered for a Concept Review. The neighboring property owners have been notified of the meeting, but it is not a formal public hearing. This memorandum provides an overview of the project and will serve as an outline for the discussion. Site Context and Project Description This memorandum reviews the elements of a proposed concept plan on parcels located between the City’s Otter Creek Crossing industrial park on the north, extending to 90th Street NW on the south, and abutting the Bertram Chain of Lakes Regional Park on the west. The property comprises approximately 106 acres over four parcels. The subject property is currently within the boundaries of 2 Monticello Township, but is within the Monticello Orderly Annexation Area, abutting the City on the north and east. The property is currently used for agricultural purposes and includes an electric transmission line from 90th Street north to the Xcel substation and beyond. The applicants propose to reguide the property to an appropriate land use designation in support of development of a data center project of up to 1.3 million square feet. A conceptual site plan for the proposed data center campus has been provided by the submitter. The City recently amended its 2040 Comprehensive Plan to accommodate the potential for Data Center development in its Light Industrial Park (LIP) land use category. As noted above, approximately 30 acres of the 106-acre proposed site are currently guided in this manner. The other 76 acres are guided by the Monticello 2040 Plan for residential or residential/commercial mixed uses and are otherwise surrounded by both rural residential and parkland. The concept discussion will focus on the proposed land use, which would require reguidance of the land area as identified by the Monticello 2040 Vision + Plan, as well as considerations related to the conceptual site plan. Surrounding Land Uses/Comprehensive Plan Guidance 2040 Land Use Guidance The project area is included in the Monticello 2040 Vison + Plan Future Land Use Map, guided as four separate land use categories. The largest parcel of 41 acres occupies the northwest corner of the site, and is guided Estate Residential. The parcel adjoins the Bertram Chain of Lakes Regional Park on the north and west. The next largest, consisting of approximately 30 acres, is guided Light Industrial Park, abutting the Otter Creek Business Park and the Xcel Energy power substation on the north. In the southwest corner of the site, a parcel of 27 acres is currently guided Mixed Neighborhood, a residential category. Finally, a parcel of approximately 8 acres extends to 90th Street, and is guided Commercial and Residential Flex. Surrounding Land Use To the north, the land uses are guided as Light Industrial Park, with the majority of existing uses consistent with that designation (excepting the Xcel substation and concrete plant). To the east, a mix of Light Industrial and eight rural residential lots (1-acre lots) border the site. To the south and southwest lie approximately twenty rural residential lots of 4-5 acres each. To the west, Estate Residential guidance and Bertram Lakes parkland form the boundary. The rural residential lots and parkland are located within Monticello Township, within the MOAA. Key aspects of the City’s 2040 Plan requirements for data center development relate to ensuring that the project can be adequately served by the required utilities, that it facilitates the extension of the City’s planned development and infrastructure patterns, that it provides for the long-term provision of tax base diversification and stability, and that they can be located in such a way as to avoid conflicts with surrounding land uses – particularly residential land uses. 3 In this case, the applicants have provided a site plan that would re-guide all of the non-industrial portions of the property to Light Industrial Park, removing the various other residential land uses. The concept plan illustrates a series of four buildings, the extension of Dalton Avenue NW through the site from north to 90th Street, and other internal site development in support of the data center use. Of these proposed land use changes, the most significant consideration would be the proposed removal of the Estate Residential category, which was established in the Comprehensive Plan as a high-amenity location for this housing style due to its adjacency to the Bertram Lakes park area. The applicants have suggested that this style of housing would not be compatible with the data center facilities and have developed a site plan that anticipates its removal from the land use planning for the area. As with other such proposals, if the City chooses to reguide this portion of the site from its current Estate Residential designation, the need for the City to find viable alternative locations for this land use category would intensify. This direction is based on a presumption that such development would require significant natural resource amenities to support the higher lot sizes and project costs. Proposed Land Use Data centers themselves are a relatively unique type of industrial land use. Data centers have a high taxable value on a per square foot basis, while generally producing a relatively low number of permanent jobs per square foot as compared to other industrial uses that might locate within Light Industrial Park areas. However, frequent upgrades to internal systems and equipment generate additional employment over time. Depending on the scale of the individual users, the use can consume significant land area and (potentially) utility infrastructure. These facilities act as large data “warehouses”; there is no direct customer interaction, and they typically do not consume large areas of land for parking fields or generate significant traffic impacts. Given the above, the City’s recent amendments to the 2040 Plan indicates that data center uses would be considered only within areas with the Light Industrial Park land use designation. Concept Submittal Review Criteria The first stage of PUD process consists of an informal Concept Plan review, which is separate from the formal zoning application which follows the Concept Review step. Concept Plan review is not a formal zoning application but is intended to provide the applicant an opportunity for City feedback on a potential development proposal prior to more formal zoning review. For this project to proceed, it requires not only the Land Use guidance change but also review under regulations related specifically to data center projects in the Light Industrial zone. As those regulations are still to be created, the current proposal follows a concept review process similar to that included in the Planned Unit Development section of the ordinance, although PUD may not be the final zoning designation. 4 Concept reviews are to proceed as follows: (a) Concept Proposal Prior to submitting formal application, preliminary plat (as applicable) and rezoning applications for the proposed development, the applicant may, at its option, prepare an informal concept plan and present it to the Planning Commission and City Council at a concurrent work session, as scheduled by the Community Development Department. The purpose of the Concept Proposal is to: 1. Provide preliminary feedback on the concept plan in collaboration between the applicant, general public, Planning Commission, and City Council; 2. Provide a forum for public comment on the PUD prior to a requirement for extensive engineering and other plans. 3. Provide a forum to identify potential issues and benefits of the proposal which can be addressed at succeeding stages of PUD design and review. The intent of Concept Proposal review is to consider the general acceptability of the proposed land use, and identify potential issues that may guide the City’s later consideration of a full PUD application. The City Council and Planning Commission meet in joint session to provide feedback to the developer, and may include an opportunity for informal public comment as they deem appropriate. For this specific concept proposal, it is critical that the Planning Commission and City Council members engage in a frank and open discussion of the project benefits and potential issues. The Concept Review process is most valuable when the applicants have the opportunity to understand how the City is likely to look at the project, its development details, and the potential issues it presents. In this way, the subsequent land use and development specifics can be more finely tuned to address City policy elements. Future Review and Land Use Application Process Further land use approvals would include the following: o Environmental Review o Rezoning to Light Industrial, and related zoning approvals o Development Stage and Final Stage PUD and/or other rezoning and site plan review action o Preliminary Plat o Final Plat o Adoption of Zoning Amendments; Planned Unit Development; Development Agreement; o Annexation* *Annexation of the project is only finalized once the various zoning and subdivision approvals are final. The Planning Commission will hold public hearings on the required elements, but 5 pursuant to the City’s Orderly Annexation Agreement with Monticello Township, formal Rezoning actions are taken subject to Annexation approval by the State of Minnesota. Zoning. As noted above, the zoning regulations for data centers have not yet been developed. However, per the guidance of the recent amendment to the 2040 Plan, zoning regulation for data centers is expected to include the following analyses, among others: • Proximity to Residential Land Uses: Data Centers have the potential to create noise, usually through outdoor-located back-up power generation. Any other types of noise would also need to be accounted for prior to any consideration. In contrast, if such issues are controlled or mitigated, data centers generate very low volumes of traffic, and virtually no regular truck traffic, so they can be low-impact neighbors. In some examples, back-up power generation may be limited to short regular testing – similar to other users with back-up power. In this description, only in a major power-supply emergency would the generators be used for longer periods of time. The developer must study and detail noise impacts and present a thorough and adequate mitigation plan, as determined by the City. • Utility Demands: Depending on the type of data center, these facilities can be prodigious users of municipal water and can contribute significant volumes of wastewater for treatment. In some areas, new utility services or design system upgrades may need to be made to accommodate (any) land use and development, and in others, adequate supply may be available. The developer must demonstrate to the City’s satisfaction and adequate capacity and design to serve these users, without creating a shortage of capacity for other development. • Transportation: Transportation impacts and demands will require study. Networks may require extension, capacity and/or design improvements. The developer must study and detail transportation impacts and present a thorough and adequate multi-modal circulation plan, as determined by the City. • Industrial Land Supply: The City will evaluate and determine whether adequate supplies of land to accommodate other light-industrial development are available within its boundary and Orderly Annexation Area if data center development consumes large areas currently guided. • Economic/Fiscal Issues: Like most land development, the data center development process is likely to entail several associated, but separate, entities – land developer, construction manager, owner, user(s). Development contracts to secure financial obligations and to bind future parties will be required for infrastructure development. Moreover, a thorough examination of city expenses will be necessary to ensure that 6 any financial or legal securities are addressed in full. The timing of these agreements will be an important consideration in final overlay rezoning. • Electric Power Usage: Data center development is under scrutiny due to its substantial demand for electric power, and its potential for creating stress on the local or regional electric power infrastructure and supply. Monticello’s location as a nuclear power plant host, and the extensive power line infrastructure, are a significant reason for recent data center interest. Data center coordination with energy service providers and information on their permitting process will be a point of consideration. The information must demonstrate to the satisfaction of the City whether the electric power supply can remain consistent and robust for others in and around the community, without threat of power loss due to the development of data centers in the community. Site Planning. The City will also need to evaluate how it will manage additional review authority for site-specific considerations including noise, light, transportation, utilities and other development details. Staff Preliminary Comments and Issues For this proposal, the primary considerations evident at this point in the process include the following: i. Land Use. As noted in the project description, the site is designated for a variety of land uses, including a portion currently guided as Light Industrial Park, and other (primarily) residential designations. The Commercial/Residential Flex and Mixed Neighborhood categories are somewhat less location dependent than Estate Residential or Light Industrial Park designations. They are included in this area serving as transitional land uses between the Estate Residential and Light Industrial designations along the north side of the site. The Light Industrial Park portion of the site would support the proposed use (subject to other site-specific details), but the Estate Residential area would be at odds with more intensive industrial operations. It is this compatibility issue that appears to have resulted in the applicant’s decision to eliminate the Estate Residential from an earlier concept. While eliminating the Estate Residential from this plan resolves that incompatibility, it would continue to be a potential issue for existing rural residential areas surrounding the subject property. It would also be an issue given the relationship of the area to the Bertram Chain of Lakes Regional Park. Moreover, as discussed above, deleting the Estate Residential designation here raises the issue of where that land use category might be relocated, given limited options and the need for higher amenity locations to support this type of development. The City has discussed a process to identify those locations, but that effort is only at its beginning. Removing the existing inventory would exacerbate this particular issue. In this location, 7 that is of note given the proximity of municipal utilities to serve Estate Residential development as compared to other Estate Residential within the MOAA. ii. Circulation and Utilities. The site is accessed via the extension of Dalton Avenue NW from the north. The City’s 2040 plans for transportation network in that area recommend that Dalton Avenue extend through the site to connect to 90th Street on the south. Municipal utilities would be required to extend though the site as well. The City Engineer’s office has provided a letter regarding other transportation and utility comments regarding the proposal. As a component of any data center consideration, Xcel Energy would need to be able to verify that the available power supply would be sufficient to serve this use, without compromising either existing or future other growth in the region. iii. Building Materials and Architecture. Limited information is provided at this point in the process. The issues for discussion areas primarily about land usage and the City’s interest in modifying the future land use map to accommodate this use and industrial designation. Building phasing will also require detail if applicable. iv. Connectivity and Open Space. Considerations of open space preservation and other non- vehicular connectivity would be dependent on a more detailed site development plan. However, it is presumed that those connections would be included along Dalton Avenue, and options for connection to Bertram Chain of Lakes Regional Park – if appropriate – may be a factor in site design. v. Landscaping and Buffering. As discussed above, buffering from residential uses is a required component on any data center development. Information on any interior or exterior systems which have the potential for noise generation will be required, including evaluation of mitigation measures. Considering the site is bordered by a number of rural residential parcels of various acreages, this aspect of the proposal will require much more detailed information and consideration. Buffering from the existing park uses should also be a consideration in this case. As the abutting Bertram Chain of Lakes Regional Park is a natural amenity for the community, it is important to ensure that uses in this industrial development do not compromise the extensive investments that have been, and are planned to be, made in this regional park. vi. Other Details. Engineering and roadway improvements will be addressed by City Engineering staff. Summary As noted, the Planning Commission and City Council provide comment and feedback to the developer at the Concept Review level. City officials should identify any areas of concern that would require amendment to avoid the potential for conflict, as well as any elements of the concept that the City would find essential for eventual approval. 8 This project concept review is primarily about land use, although other factors will impact the City’s reaction to the request. The proposal reguides nearly three-quarters of the proposed site from primarily residential to Light Industrial Park, eliminating the designated area of Estate Residential currently adjoining the Bertram Chain of Lakes Regional Park. Two primary questions arise from this proposal, assuming that the various engineering and other challenges can be resolved. • First, how with the proposed use impact existing rural residential uses that surround the site, and meet the City’s expectations for buffering of data center (and any) industrial uses from residential lands, as well as the regional park? • Second, how (and where) will the City replace the lost Estate Residential if this site is reguided, given the importance that natural resource amenities typically play in successful large-lot residential development? The notes listed above acknowledge that a significant amount of detail will be added as the project proceeds to a more advanced stage of review. SUPPORTING DATA A. Aerial Site Image B. Applicant Narrative C. Site Plan D. City Engineer’s Comment Letter E. Excerpts, Monticello 2040 Plan Monticello Comprehensive Plan Amendment Scannell Properties / Mary and David Spike Land 2.3.25 A completed City of Monticello Land Use Application form, including full legal description of property. Separate document attached. A listing of contact information including name(s), address(es) and phone number(s) of: the owner of record, authorized agents or representatives, engineer, surveyor, and any other relevant associates Owner: Mary and Dave Spike Developer: Scannell Properties Senior Development Associate: Erik Anderson Phone: 701-238-2649 Email: erik.anderson@scannellproperties.com Address: 294 Grove Lane E Wayzata, MN 55391 A listing of the following site data: Address, current zoning, parcel size in acres and square feet and current legal description(s); Monticello, MN Zoning Map: Note: Subject Parcel have not been zoned/annexed. A narrative explaining the applicant’s proposed objectives for the PUD, and public values that the applicant believes may be achieved by the project Scannell Properties is proposing to build a state-of-the-art data center campus at this site. A data center is a specialized physical facility that houses an organization's critical computing infrastructure, including servers, storage systems, networking equipment, and related hardware used for storing, processing, and distributing digital data and applications. Our proposed data center campus will deliver transformative value to the community through three key strategic objectives: 1. Economic Advancement • Generate significant tax revenue without adding traffic congestion • Create high-quality technical jobs for local workforce • Attract complementary technology ecosystem businesses 2. Infrastructure Optimization • Leverage existing power connectivity and proximity to nuclear generation facilities • Enhance local utility grid stability and technological capabilities 3. Strategic Community Investment • Provide long-term economic stability through a low-impact, high-value development • Position the community of Monticello as a forward-thinking technology hub By executing this vision, our data center campus will deliver substantial economic and technological benefits while maintaining the community's existing quality of life and infrastructure integrity. A listing of general information including the number of proposed residential units, commercial and industrial land uses by category of use, public use areas including a description of proposed use, and any other land use proposed as part of the PUD Scannell’s Proposed Data Center Campus will span across 106.05 acres of Light Industrial Zoned Land. Scannell intends to construct 4 buildings of the following Size: Building 1: 320,000 square feet Building 2: 320,000 square feet Building 3: 320,000 square feet Building 4: 320,000 square feet While building out this data center campus, Scannell will invest in public roadways connecting Dalton Ave NE with 90th Ave NE as requested by the City of Monticello. Additionally, a portion of land has been carved out for the expansion of Monticello’s EDC land. Calculation of the proposed density of the project and the potential density under standard zoning regulations, including both gross density and net density, accounting for developable and undevelopable land. Undevelopable land shall include all wetlands, floodplains, sensitive ecological areas identified in the Natural Resource Inventory, slopes greater than 18%, poor soils and areas of concentrated woodlands This development will result in a building coverage of 27.7%, (+/- 1,280,000 sq ft of building area). This development will result in an impervious coverage of 49.7%, (+/- 2,297,000 sq ft of impervious area). This development will result in an undeveloped area of 50.3%, (+/- 2,322,538 sq ft of undeveloped area). Outline a conceptual development schedule indicating the approximate date when construction of the project, or stages of the same, can be expected to begin and be completed (including the proposed phasing of construction of public improvements and recreational and common space areas) Preliminary Development Schedule 1. Initial Concept Plan Presentation (1-2 months) • Present early concept plan to Monticello City Council and Planning Commission for initial feedback 2. Environmental Assessment Worksheet (EAW) Process (6-8 months) • Prepare and submit EAW document with project details, potential environmental impacts, and mitigation measures 3. Formal Application Submission (1 month) • Submit detailed project plans and required documentation to Monticello Planning Department 4. Planning Commission Review (2-3 months) • Staff review of application • Planning Commission public hearing and recommendation 5. City Council Review and Approval (1-2 months) • City Council public hearing • Final decision on project approval 6. Permitting Process (2-3 months) • Apply for necessary building permits, stormwater management permits, etc. • Address any conditions set by the City Council during approval 7. Pre-Construction Phase (1-2 months) • Finalize construction documents • Secure contractors and suppliers 8. Construction Phase 1 (18-24 months) • Site preparation and infrastructure development • Building construction and equipment installation 9. Construction Phase 2 (18-24 months) • Building construction and equipment installation 10. Construction Phase 3 (18-24 months) • Building construction and equipment installation Total estimated timeline: Approximately 30-40 months (2.5-3.5 years) from initial concept presentation to the completion of the first data center building, depending on the complexity of the project and any unforeseen challenges or additional requirements. Concept Plan o Area calculations for gross land area; o Existing zoning district(s); o Layout of proposed lots and proposed uses. Please show existing & proposed structures on site. Denote outlots planned for public dedication and/or open space (schools, parks, etc.); o Area calculations for each parcel o General location of wetlands and/or watercourses over the property and within 200 feet of the perimeter of the subdivision parcel o Location of existing and proposed streets within and immediately adjacent to the subdivision parcel o Proposed sidewalks and trails o Proposed parking areas o Proposed parks, common areas, and preservation easements (indicate public vs. private if applicable) o General location of wooded areas or significant features (environmental, historical, cultural) of the parcel o Location of utility systems that will serve the property Location of utility systems that will serve the property The utilities for the planned data center campus are anticipated to be extended from Dalton Avenue, which is located in the existing Monticello Economic Development Commission (EDC) industrial park to the Northeast. This approach would leverage the existing utility connections in the industrial park to support the development of the new data center campus, potentially streamlining the construction process and reducing infrastructure costs. A listing of the areas of flexibility from the standard zoning sought through the use of PUD design. It is Scannell Properties understand that the City of Monticello is adopting zoning language of Data Centers into the Light Industrial Zoning Code. M:\028214-000\Admin\Docs\2025-02-10 Submittal (Concept Plan)\_2025-02-24 Scannell Properties Data Center - Concept Plan - WSB Engineering Review Letter.docx 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 5 5 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M February 24, 2025 Matt Leonard City Engineer/Public Works Director City of Monticello 505 Walnut Street, Suite 1 Monticello, MN 55362 Re: Scannell Properties Data Center Site - Concept Stage PUD Plan Review City Project No. 2025-__ WSB Project No. 028214-000 Dear Mr. Leonard: We have reviewed the Scannell Propertied Data Center Site conceptual stage PUD site plans dated January 31, 2025. The applicant proposes to construct four buildings as a part of a new data center complex on multiple parcels over 98 acres on what is being called the “Spike Property”. The documents were reviewed for general conformance with the City of Monticello’s general engineering and stormwater treatment standards. We offer the following comments regarding these matters. General 1. City staff will provide additional comments under separate cover. 2. Provide soil borings and full geotechnical evaluation to verify soil conditions, groundwater elevations within the site, and the proposed pavement section meeting City design requirements. 3. The current concept plan shows improvements within both the overhead power easements and in the pipeline easements. The developer will need to work with the easement holders to verify what improvements will be allowed in order to obtain approved from the easement holders. Site, Street, & Utility Plans 4. Streets, parking lots, and utilities shall be designed in accordance with the applicable City Subdivision Ordinances and the City’s General Specifications and Standard Details Plates for Street and Utility Construction. 5. The Fire Marshall and/or building department will review required fire hydrant location(s) and emergency vehicle access/circulation. Fire truck circulation will need to accommodate the City’s ladder truck. Provide a turning movement exhibit to show that a fire truck can access all building structures, cul-de-sacs, roundabout areas, and parking lots as applicable. Additional comments may be provided under separate cover. 6. The overall City Comprehensive Plan calls for a watermain to be extended through the site along the public roadway connection to 90th Street. Scannell Properties Data Center Site Concept Stage PUD – WSB Engineering Plan Review February 24, 2025 Page 2 7. With future submittals, provide a utility plan showing the existing and proposed sanitary sewer, watermain and storm sewer serving the site. a. Watermain looping may be required through the site to provide adequate fire flow supply. b. Additional consideration should be given to the water demands for cooling of the data centers. Provide calculations pertaining to this use. c. Full depth sanitary sewer may need to be extended through property. d. Additional utility stubs to adjacent properties may also be required to accommodate future looping connections. 8. With future submittals, provide a full civil plan set that includes an existing/removals plan, utility plan, more detailed site/paving plan, grading plan, erosion/sediment control, and standard details plan. Stormwater Management 9. Below are General Stormwater Requirements for the Site: a. The applicant will be required to submit a stormwater management plan for the proposed development in accordance with the requirements in the City’s Design Manual. b. Infiltration is required for new developments. If infiltration is not feasible provide documentation on the rational before moving to additional BMP’s. c. The new site will need to provide onsite volume control for runoff of 1.1” over the new impervious area, Pre-treatment measures are required prior to discharging to the volume control BMPs. d. Water quality requirements will be considered met if volume control is achieved for the site. If volume control cannot be met then the development will need to show a no net increase of TSS and TP. e. Rate control will be required for the new development. i. The majority of the site drains towards Dalton Avenue cul-de-sac. For this portion of the site, rate control must not exceed a 100-year discharge rate of 10 cfs to the existing storm sewer stub on the west side of the Dalton Ave NE cul-de-sac that serves as the outlet. ii. The small portion of the site that drains west must meet existing conditions discharge rates. f. An operation and maintenance plan for all stormwater BMPs is required and should be submitted with the stormwater report for review. g. The eastern portion of the site is located within a low and moderate vulnerability DWSMA and is subject to requirements of the City’s Wellhead Protection Plan. There are no additional requirements for low and moderate vulnerability DWSMAs. 10. Two feet of freeboard is required for the HLW of a basin to the low opening of a structure. Two feet of vertical separation is also required from an area’s EOF elevation to the low opening. 11. Include storm sewer sizing calculations with future plans. Refer to the City design guidelines for Storm sewer requirements. 12. The last structure prior to discharge to a stormwater BMP is required to be a 4’ minimum sump structure. Scannell Properties Data Center Site Concept Stage PUD – WSB Engineering Plan Review February 24, 2025 Page 3 13. The proposed project will disturb more than one acre. Develop and include a SWPPP consistent with the MPCA CSWGP with future plan submittals. Provide calculations showing disturbed area, proposed impervious, and future impervious for the site. 14. An NPDES/SDS Construction Storm Water General Permit (CSWGP) shall be provided with the grading permit or with the building permit application for review, prior to construction commencing. 15. A detailed review of erosion control BMP’s will take place with future submittals. Provide redundant perimeter control around all wetlands onsite. Traffic & Access 16. The applicant is proposing access from a planned future public roadway connection between 90th Street and Dalton Avenue. Street access spacing, grades, and sight lines will be reviewed with future submittals. 17. The site would likely generate over 1,200 daily trips and over 120 trips during peak hours. A traffic study should be completed for the development. 18. Analyze the need for turn lanes at the future roadway connection with 90th Street. 19. Identify any trails or sidewalks proposed with the development. 20. Include parking space calculations in future submittals. Wetlands & Environmental 21. A wetland delineation should be completed and submitted to the Local Government Unit for review and approval. This should include a review of historical aerial imagery for an offsite hydrology determination in cropped areas. 22. Any permanent or temporary impacts proposed to wetlands must be permitted via the Wetland Conservation Act.. A more detailed review of the development plans will be completed when the applicant submits complete civil plans and a stormwater management report. Please have the applicant provide a written response addressing the comments above. Feel free to contact me at 612-419-1549 if you have any questions or comments regarding the engineering review. Sincerely, WSB James L. Stremel, P.E. Senior Project Manager