Transportation Advisory Commission Minutes 08/27/2003I-94/CSAH 18 Interchange Technical Advisory Committee Monticello, MN Wednesday, August 27, 2003 Meeting Minutes ATTENDANCE: David Graeber FHWA Terry Humbert Mn/DOT Dist.3 Kevin Sommers Mn/DOT Metro Virgil Hawkins Wright County Jeff O'Neil Monticello Rick Wolfsteller Monticello John Simola Monticello Bret Weiss Doug Weiszhaar WSB & Assoc. / Monticello City Engineer WSB & Assoc. Nancy Hanzlik WSB & Assoc. Jared Olson Ryan Co. 1•) Approve Meeting Minutes ➢ Attach the attendance sheet with the minutes. ➢ In the second paragraph under item 2-Site History, the sentence reading "The City' storm water plan needs to be considered with this EA." should read "The EA sho s include the City's storm water impacts as they relate to this project." should ➢ The minutes were approved with corrections. ^' � 2.) Property Owner Issues VAJv ' The agenda was amended to include a discussion on property owner issues as requested Jeff O'Neil. Jeff gave the committee a handout which included issues and data that a f by available developable land as they relate to the CSAH 18 interchange. Mr. O'Neil re affect the that the committee consider and provide solutions to the concerns as the project contiquested forward. p J nues An issues map was provided to the committee by WSB that already addressed man concerns raised. WSB will be investigating these issues along with the interchangeproject. the p J ect. 3.) Discuss CORSIM Analysis FHWA Concerns — Mr. Graeber questioned if preliminary analysis h ad been to analyze the configuration of the CSAH 18 interchange before Rfore a full CO S completed is completed. It was stated that the original Interchange Access Request aanalysis FHWA would be a representation of preliminary analysis of the I94 operations. Wby has also completed some SYNCHRO analysis on the current configuration of the SB CSAH 18 interchange at the ramp terminals and other surface street intersections. Mr. Graeber requested to review the SYNCHRO analysis. analysis prior to starting the CORSIM Mr. Graeber also expressed the concern that interchanges that connect into city streets a FHWA has for folded diamond precludes possible improvements to the interchange ramp terminals. This configuration stated that the preliminary and CORSIM operation ange if operations break down. It was give indication if the interchange would e p expect tonal analysis at the interchange should p any operational failures. CORSIM Analysis - The CORSIM .Analysis should include a model conditions on I94. This would include I94 oecalibrated to represent the ex surface street operations should include the exirations at AM & P1VI 3-hour peaks. The existing signal at CSAH 75 & CS t ramp terminal at CSAH 75 and the CSAH 18. The interchange ramps at TH 25 should included in all of the models to analyze weaving terminal intersections at TH 25 would b aving between ramps; however therampbe between TH 25 and CS e excluded because of the 2-mile separation CSAH 18. Speed studies and queue observat completed to calibrate the model. Mr. Sommers ions should be manual of procedures that should be followed for stated Mn/DOT has drafted a CORSIlVI this project. The Analysis will include the followin : g • 2003 Existing • 2026 No Build Alternative O Assume I94 is 6 lanes • 2006 Build Alternative O Assume I94 is 4 lanes • 2026 Build Alternative O Assume I94 is 6 lanes Mr. Humbert will get the latest I94 forecasts from the SRF study. 4.) Discuss Functional Classification of A question was raised if the countclassifies H 18 y responded that CSAH 18 has 75' of right-of-waSAH 18 as a minor arterial. The count City currently has 50' on each side. The roadwaysy on each side for an upgrade to 4-lane updated Monticello transportation plan that iclassification will be influenced and s. The also doing a study that will determine its classification. in the process of completion. The countyer the snfication. is 5.) Discuss Project Construction Staging The project's construction staging will be influencedMn/DOT on whether I94 will o OT is currently looking at the railroad issue. der or over also working with contacts at the railroad to de termine the need for a temporarybridgeMn/D o e ndge over Page 2 of 3 the railroad to railroad Mn/DOypass traffic ring construction if I94 goes T will kee g under. If I94 goes over the -lane each direction open. If I94 goes under to carry 4-lanes because of the time needed to move the necessary dirt. M�DOT will have Mn/DOT has agreed to work out the billboard acqulsltions. 6.) Next Meeting — TAC/PAC Scheduled f was rescheduled to Wednesday, or Sept. 18th, 2003 at 3:00 pm. Note: The meeting y, September 17 , 2003. Page 3 of 3