Loading...
EDA Agenda - 09/10/2025 (Workshop)AGENDA WORKSHOP - ECONOMIC DEVELOPMENT AUTHORITY (EDA) Wednesday, September 10, 2025 – 4:45 p.m. Academy Room, Monticello Community Center Commissioners: President Steve Johnson, Vice President Jon Morphew, Treasurer Hali Sittig, Rick Barger, Clinton Berglof, Councilmember Tracy Hinz, Mayor Lloyd Hilgart Staff: Executive Director Jim Thares, Rachel Leonard, Angela Schumann, Tyler Bevier, Anne Mueller, Sarah Rathlisberger 1. Call to order 2. Roll Call 3. Business Subsidy Pre-Application and Application Process - Review Discussion 4. Façade Improvement Forgivable Loan Program Application Review – Krautbauer- Stellar Property – 124 West Broadway 5. Façade Improvement Forgivable Loan Program Application Review – Sperr Properties, LLC – Cornerstone Café 154 West Broadway 6. Marketing Plan IMCP Strategies Update 7. Rustech Brewing – Equipment Status Update 8. Adjournment OFFICE: 763-295-2711 FAX: 763-295-4404 505 Walnut Street Suite 1 Monticello, MN 55362 MEMORANDUM To: City of Monticello Economic Development Authority From: Jim Thares, Economic Development Manager Date: 09/10/2025 Subject: Business Subsidy Applications Introduction: The Economic Development Authority has three applications related to business subsidy programs, the GMEF Loan Program, SCDP Loan Program and the Façade Improvement Forgivable Loan Program. Staff would like EDA feedback on the review steps for these programs. Generally, the Pre-Application (initial vetting) is now occurring in the EDA Workshop meetings. The goal is to be effective in discovery of necessary borrower information in these meetings to allow the EDA to make good decisions and proceed to a formal decision point in a regular meeting and/or to offer feedback or determine a “not interested” status. General EDA feedback will be helpful to format the process going forward. A couple of specific questions are noted below as well. Application Types: The downtown façade loan application walks through a two-step process. An applicant • Downtown Façade Loan Application o Two-step process  Step One: Workshop with EDA on the concept, initial quotes and timelines, if board concurs with the concept, moves to public hearing meeting for Step Two  Step Two: Quotes finalized, loan agreements drafted, televised public hearing review • Preliminary Application o Concept meeting of the applicant. o Should the applicant proceed to the formal application review with in-depth review? • Formal Application o Televised public hearing with the applicant o In-depth financial review with EDA financial consultant Application Review: • Are there any questions you would like to add to the façade, preliminary or formal application review process for applicants to consider and come prepared to ask? Attachments: A. Downtown Façade loan application B. Preliminary Application C. Formal Application 1 CITY OF MONTICELLO ECONOMIC DEVELOPMENT AUTHORITY BUSINESS SUBSIDY APPLICATION BUSINESS ASSISTANCE FINANCING Legal name of applicant: Address: Telephone number: Name of contact person: REQUESTED INFORMATION Addendum shall be attached hereto addressing in detail the following: 1. A map showing the exact boundaries of proposed development. 2.Give a general description of the project including size and location of building(s); business type or use; traffic information including parking, projected vehicle counts and traffic flow; timing of the project; estimated market value following completion. 3.The existing Comprehensive Guide Plan Land Use designation and zoning of the property. Include a statement as to how the proposed development will conform to the land use designation and how the property will be zoned. 4.A statement identifying how the increment assistance will be used and why it is necessary to undertake the project. 5.A statement identifying the public benefits of the proposal including estimated increase in property valuation, new jobs to be created, hourly wages and other community assets. 6. A written description of the developer’s business, principals, history and past projects I understand that the application fee will be used for EDA staff and consultant costs and may be partially refundable if the request for assistance is withdrawn. Refunds will be made at the discretion of the EDA Board and be based on the costs incurred by the EDA prior to withdraw of the request for assistance. If the initial application fee is insufficient, I will be responsible for additional deposits. SIGNATURE Applicant's signature: Date: 2 CITY OF MONTICELLO ECONOMIC DEVELOPMENT AUTHORITY Application for Business Assistance Financing GENERAL INFORMATION: Business Name: Date: Address: Type (Partnership, etc.): Authorized Representative: Phone: Description of Business: Legal Counsel: Address: Phone: FINANCIAL BACKGROUND: 1.Have you ever filed for bankruptcy? 2.Have you ever defaulted on any loan commitment? 3.Have you applied for conventional financing for the project? 4. List financial references: a. b. c. Financial Assistance Seeking GMEF TIF SCDP Downtown Facade Tax Abatement 3 5. Have you ever used Business Assistance Financing before? If yes, what, where and when? PROJECT INFORMATION: 1. Location of Proposed Project: 2. Amount of Business Assistance requested? 3.Need for Business Assistance: 4. Present ownership of site: 5.Number of permanent jobs created as a result of project? 6.Estimated annual sales:Present: Future: 7. Market value of project following completion: 8.Anticipated start date:Completion Date: FINANCIAL INFORMATION: 1.Estimated project related costs: a. Land acquisition $ b. Site development c. Building cost d. Equipment e.Architectural/engineering fee f.Legal fees g. Off-site development costs 4 2. Source of financing: a. Private financing institution $ b. Tax increment funds c. Other public funds d. Developer equity 5 PLEASE INCLUDE: 1. Preliminary financial commitment from bank. 2. Plans and drawing of project. 3. Background material of company. 4. Pro Forma analysis. 5. Financial statements. 6. Statement of property ownership or control. 7. Payment of application fee of $250.00 Date ________________ Signature____________________________________ Please Note: All information provided on this application is made public Contact Information Applicant: _________________________________ Firm Or Trade Name: ______________________________________ City/State: ______________________________________ Telephone: (Bus.) ___________________ E-Mail: __________________________________________ Business Information Type Of Business: ___ Sole Proprietorship ___Corporation ___Partnership Start Up Type Of Project: ___ Manufacturing Commercial Residential Type Of Project: ___ New Business ___ Relocation ____ Expansion Financial Assistance Seeking: ___ GMEF ___ TIF ___ Façade ___ Tax Abatement SCDP History of Your Business _________________________________________________________ _____________________________________________________________________________ Development Plans Total Sq. Ft. of Building _______________ Own Lease Estimated Sq Ft Cost of Construction _____________________ Estimated Land Acreage _____________________ Describe Your Project (Products, Processes, Employment Types, Location(s), Customers, Markets & Any other information to help us understand the nature of your business) ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ Attach Any Images or Plans That May Help Explain Your Project Financial Information Anticipated Lender ____________________________________________________ Anticipated Contractor _________________________________________________ Anticipated Amount of Financial Request from EDA _________________________ Anticipated Schedule__________________________________________________ Job And Wage Level Creation For Monticello Location Only: Created & Filled FTE within Two Years # of Jobs ____________ Average Wages Per Employee_____________________ 1 | P a g e 1.CONTACT INFORMATION Legal Name of Business: _________________________________________________________ Project Site Address: ____________________________________________________________ City / State / Zip: _______________________________________________________________ Contact Person(s): ______________________________________________________________ Business Phone: ____________________________ Email: ____________________________ Home Phone: _____________________________ Check One:  Proprietor  Corporation  Partnership Federal ID # ___________________________State ID # _____________________________ Legal Name of Property Owner: __________________________________________________ Project Site Address: ____________________________________________________________ City / State / Zip: _______________________________________________________________ Contact Person(s): _______________________________________________________________ Business Phone: ____________________________ Email: _____________________________ 2.PROJECT GOALS Please give a brief summary of the project: MONTICELLO EDA DOWNTOWN FACADE IMPROVEMENT FORGIVABLE LOAN PROGRAM APPLICATION 2 | P a g e Please describe how the proposed project will positively impact the city’s downtown/Central Community District:] 3.PROJECT FUNDING A.FORGIVABLE LOAN USE FUNDING REQUEST Maximum grant amount of $50,000 $ ________________ $ ________________ $ ________________ $ _________________ $ _________________ $ _________________ $ _________________ $ _________________ Façade Improvements Frontage Improvements (Signage, awnings, permanent landscaping) Total Loan Request: B. OTHER PROPOSED FUNDING SOURCES Bank Loan Private Fund Commitment (5% required) Applicant Commitment Other Total Other Funding Sources PROJECT TOTAL: $ _________________ 4.PROJECT CONTACTS (Lenders, private funding source, partners, etc...) 3 | P a g e Name ________________________________________________________________________ Address ______________________________________________________________________ Phone/Email: __________________________________________________________________ Name ________________________________________________________________________ Address ______________________________________________________________________ Phone/Email: __________________________________________________________________ 6.ATTACHMENTS CHECK LIST Please attach the following: _ ______ A) Letter of Commitment from the Other Sources of Financing, Stating Terms and Conditions of their Participation in Project (if applicable) _ ______ B) Project Plans (Architectural Rendering and Scope must be included) _______ C) Project Quotes/Estimates _______ D)Property Legal Description 7. AGREEMENT I / We certify that all information provided in this application is true and correct to the best of my/our knowledge. I / We authorize the Monticello EDA to verify financial and other information. I / We agree to provide any additional information as may be requested by the city. The undersigned has received the EDA’s policy regarding the payment of costs of review, understands that the EDA requires reimbursement of costs incurred in reviewing the application, agrees to reimburse the EDA as required in the policy and make payment when billed by the EDA, and agrees that the application may be denied for failure to reimburse the EDA for costs as provided in the policy. APPLICANT SIGNATURE _____________________________________________________ APPLICANT FAME (Print): _____________________________________________________ PROPERTY OWNER NAME (Print): _____________________________________________ PROPERTY OWNER SIGNATURE: ______________________________________________ DATE: ______________________________ The EDA is a governmental entity and as such must provide public access to public data it receives. Data deemed by Applicant to be nonpublic data under State law should be so designated or marked by Applicant. See Minnesota Statutes, Sections 13.591, Subd. 1 and 2. MonticelloMN.gov MEMORANDUM To: City of Monticello Economic Development Authority From: Jim Thares, Economic Development Manager Date: 9/10/2025 Subject: Concept Review for Façade Loan Application | 124 W Broadway St Introduction: The City has received a complete Façade Improvement Forgivable Loan application from Stellar Property Investments, LLC (Liquor Lounge), located at 124 W Broadway St Angie Krautbauer, owner of Liquor Lounge, submitted improvement plans and quotes from contractors related to a proposal consisting of exterior improvements, including: • Stucco replacement • Roof repairs • Framing • Soffit Application Materials: Materials submitted for EDA review of the proposal include the following:  A completed application with a summary of the proposal  Improvement project quotes (two quotes as required by the program policy were submitted; the best desired quote consistent with policy is included in the packet. The applicant has had difficulties securing two concrete bids per the policy. Staff have included the rejection letters from concrete bids to satisfy the two bid requirements. Materials that have not been submitted for EDA review of the proposal include the following:  Affidavit regarding owner financial commitment (equity)  Property and ownership information  Rendering of proposed improvements MonticelloMN.gov STAFF RECOMMENDATION Staff recommend that the EDA move forward with the development of a Downtown Façade Improvement Program Forgivable Loan for Angie Krautbauer in the amount of $50,000 to be presented at the October 8, 2025, meeting. The EDA approved a $50,000 façade grant (before it became a forgivable loan program) to Jill Agosto for improvements to her building’s front and side improvements in 2020. Per the Policies, the EDA may authorize a Façade Loan in amount between $5,000 to $50,000. In addition, funding can be approved for improvements to all of some sides of a building. The EDA has previously approved funding in the amount of $100,000 for two proposals for corner buildings, one of which was the Murray’s Dance Studio located at 155 west Broadway. Project Budget:  Façade Improvements - $145,521 o Stucco Replacement - $108,987.68 (staff recommend this task receive the façade funding) o Demo & Framing - $26,729 o Soffit - $9,803.65  Roof Replacement - $12,567.82  Disposal – $5,500  Engineering - $2,000  Electrical - $3,500  Building Permit - $2,395.38 (Estimate by City staff)  Total Improvement Project Cost: $170,000  Stellar Property Investments, LLC is required to contribute a minimum 5% match which totals $2,500. Stellar Property Investments, LLC has indicated they will meet this requirement in cash payment to the contractor. Stellar Property Investments, LLC will be required to make the initial payment, with proof of such payment to the EDA, prior to release of EDA funds. Budget Impact The Façade Loan sub-fund currently has 21,409.47 available. The EDA should also keep in mind that there is one additional active completed application, and two more anticipated façade funding applications expected to be submitted in the coming weeks. MonticelloMN.gov Comprehensive Plan: The Monticello 2040 Vision + Plan identifies the Downtown as a “development focus” area with the intent of promoting investment and redevelopment of key properties and parcels in the City’s core area. By using its available tools such as the Façade Loan Program to assist in property investment, the EDA is helping to facilitate the effort to realize Comprehensive Plan goal “A vibrant and thriving Downtown that contributes to the City’s economic development and housing objectives” (Chapter 5, 2040 Plan). Attachments: A. Façade Loan Application B. Red Letter Bid C. Vanguard Bid D. Cunnigham Rendering E. Historic Image F. Beacon Report G. Aerial Image H. Downtown Façade Improvement Policy Page 1 / 12 Date Jun 30, 2025 #Item Qty Unit Unit Price Total 1 Building 210,596.10 210,596.10 1.1 Stucco Demo/EIFS Installation The project involves the removal and disposal of existing stucco from the designated areas of the building. The goal is to prepare the substrate for the installation of new stucco or other exterior cladding. All work will be completed in accordance with local codes, safety standards, and manufacturer guidelines. Work Items: . Site Preparation: Safety Setup: Install safety barriers or warning signs around the work area to prevent unauthorized access. Ensure the presence of personal protective equipment (PPE) for all workers (e.g., gloves, goggles, dust masks, hard hats, etc.). Protect Surrounding Areas: Cover or protect adjacent windows, doors, landscaping, or other non-demolition areas to prevent damage from debris. Lay down tarps or plastic sheets to collect debris and dust during demolition. . Stucco Removal: Surface Inspection: Inspect the stucco to identify areas that may be deteriorated or easier to remove. This can inform whether a more delicate approach is necessary. Mechanical Demolition: Use appropriate tools (e.g., hammers, chisels, power tools, etc.) to remove the stucco layer from the underlying structure. Ensure the stucco is removed in manageable sections to minimize the risk of injury and damage to the underlying structure. 1 $134,761.90 $134,761.90 Krautbauer - eifs siding Red Letter Renovation 125 Oak Ave N Suite 100 Annandale, Minnesota, 55302 License Number: BC807385 Tom Zarembski +17635163340 Estimate ES-10056 Bill To Page 2 / 12 #Item Qty Unit Unit Price Total Handling of Lath and Other Materials: If the stucco is applied over a metal or wood lath, remove and dispose of the lath material carefully. If any wire mesh or reinforcing materials are part of the stucco installation, they should be safely removed as well. . Debris Removal and Disposal: Collection of Debris: Gather and bag or containerize all debris as it’s removed. Proper Disposal: Transport and dispose of all demolition debris in compliance with local environmental regulations and waste management protocols. Cleaning the Work Area: Sweep and clean all surfaces to ensure that no residual debris remains on the building or surrounding areas. . Substrate Evaluation: Inspection of the Underlying Surface: After stucco removal, assess the condition of the wall surface (whether it’s concrete, wood, or masonry) for any damage or necessary repairs. Preliminary Repairs: Perform minor repairs to the substrate if needed before re-coating or installing new materials. . Final Cleanup: Site Restoration: Ensure the entire work site is cleaned of all tools, debris, and protective coverings. Final Walkthrough: Conduct a walkthrough with the client or project manager to confirm that the demolition has been completed to specifications. Exclusions: Repairs to Substrate: Any significant structural repairs to the building substrate are not included unless specified separately. Repainting or Resurfacing: Repainting or resurfacing the area after the stucco is removed is not part of the scope unless specified. Asbestos or Hazardous Material Removal: If hazardous materials like asbestos are found behind the stucco, removal will require additional measures and should be handled separately. 1. Pre-Installation Preparations Site Assessment and Inspection: Inspect the surface to which EIFS will be applied (e.g., concrete, masonry, wood framing). Ensure the structure is sound, free from defects, and dry. Verify that the surface is level and properly cleaned to support the EIFS installation. Material Procurement and Delivery: Coordinate the delivery of all necessary materials, including insulation boards, base coat, finish coat, reinforcing mesh, fasteners, sealants, and trims. Ensure materials are stored properly to prevent damage or contamination before use. Submittals and Approvals: Submit shop drawings, samples, and product specifications for approval by the client or architect. Page 3 / 12 #Item Qty Unit Unit Price Total Review installation guidelines from the manufacturer. 2. Installation of Insulation Boards Cutting and Fitting Insulation: Install foam insulation boards (commonly expanded polystyrene or extruded polystyrene) to the exterior surface, ensuring a continuous thermal envelope. Boards should be cut to fit around windows, doors, corners, and other building features. Fastening of Insulation Boards: Secure insulation to the wall substrate using mechanical fasteners (screws or anchors) and/or adhesive. Ensure that fasteners do not penetrate through to the interior. Ensure proper alignment, with no gaps or misalignments between the boards. Sealing Joints: Use joint sealants (e.g., expanding foam or adhesive) to fill the gaps between insulation boards to prevent air infiltration. 3. Reinforcement and Base Coat Application Reinforcing Mesh Application: Apply fiberglass reinforcing mesh over the insulation boards, embedding it into a base coat of EIFS material. Ensure the mesh is applied continuously, with no gaps, overlaps, or wrinkles. Mesh should extend over all seams and corners, providing structural reinforcement. Base Coat Application: Apply a base coat of EIFS material over the mesh to provide a smooth, uniform surface. The base coat should be thick enough to fully embed the mesh and provide a level surface for the finish coat. Allow the base coat to cure as per the manufacturer's guidelines. 4. Finish Coat Installation Surface Preparation: After the base coat has fully cured, prepare the surface by cleaning and ensuring it’s smooth. Any imperfections (e.g., uneven areas) should be corrected before the finish coat is applied. Application of Finish Coat: Apply a finish coat (usually acrylic-based or synthetic) to achieve the desired texture and appearance. The finish coat may be troweled, sprayed, or rolled depending on the desired texture and manufacturer's specifications. Ensure the finish coat is uniformly applied and free of defects. Texturing (if required): Apply a textured finish as per design specifications (smooth, sand, dash, etc.). Ensure proper adhesion and texture to prevent cracking or peeling. 5. Trims, Sealants, and Caulking Install Corner Beads and Trims: Install corner beads, expansion joints, and trims around windows, doors, and at wall intersections. Page 4 / 12 #Item Qty Unit Unit Price Total Ensure these trims are secured tightly and sealed properly to maintain the weatherproofing of the system. Sealant and Caulking: Apply sealants around all windows, doors, joints, and penetrations to prevent water infiltration. Ensure caulking is applied neatly, and that no gaps remain. 6. Quality Control and Inspection Ensure Proper Alignment and Leveling: Throughout the installation process, constantly check that the system remains level and properly aligned. Final Inspection: Perform a final inspection of the installed EIFS to ensure all layers are applied correctly and that there are no defects or omissions. Check that all system components (insulation, base coat, mesh, and finish coat) meet the manufacturer's and project specifications. 7. Post-Installation Cleanup and Site Restoration Cleanup: Remove all debris, excess materials, and equipment from the site. Ensure the surrounding areas are free from construction waste. Protection: If the EIFS is installed during a rainy season or unfavorable weather conditions, ensure protective coverings are in place to protect the new installation until it fully cures. 8. Warranties and Maintenance Warranty Documentation: Provide the client with product warranties and installation guarantees from both the manufacturer and the installer. Maintenance Guidelines: Provide the client with guidelines for maintaining the EIFS, including cleaning, inspection, and re-sealing of joints as needed. 9. Timeline and Deliverables Project Timeline: Allow sufficient curing time between coats and phases. Completion and Handover: Specify the criteria for project completion, including sign-offs from the client or architect. Ensure all documentation, warranties, and maintenance instructions are handed over at the time of completion. 1.2 Installation of Metal Roofing 1. Project Overview The contractor will install metal shingles on the roof The work will include the removal of existing roofing materials (if necessary), preparation of the roof surface, and the installation of new metal shingles according to manufacturer guidelines and best industry practices. 2. Objectives To provide a durable, weather-resistant roofing system that meets aesthetic and functional requirements. 1 $13,000.00 $13,000.00 Page 5 / 12 #Item Qty Unit Unit Price Total Ensure proper insulation, ventilation, and waterproofing. Complete the project on time and within budget. 3. Materials and Equipment Metal Shingles: The contractor will supply [Brand/Type] metal shingles, including all necessary components such as trim, flashing, fasteners, and underlayment. Underlayment: High-quality synthetic or felt underlayment will be used to provide an extra layer of protection. Fasteners: Corrosion-resistant screws/nails (e.g., stainless steel or galvanized) will be used to secure the shingles. Flashing and Ventilation: Proper flashing around chimneys, vents, and edges will be installed. Ventilation systems, if required, will be integrated for adequate airflow. 4. Scope of Work Tasks 4.1. Roof Inspection & Preparation: Inspect the roof structure to ensure it's in good condition and can support the new shingles. Remove any existing roofing materials (old shingles, tar paper, nails, etc.), and dispose of them responsibly. Check for any water damage or areas needing repair (e.g., decking, trusses). Clean the roof deck of debris to ensure a smooth, level surface for installation. 4.2. Install Underlayment: Lay down synthetic underlayment across the entire roof deck, ensuring that all seams are sealed properly to prevent water penetration. Overlap underlayment by [x] inches to provide full coverage. 4.3. Install Metal Shingles: Begin installation at the roof’s eave and work upwards toward the ridge. Ensure that shingles are installed according to the manufacturer’s specifications, including the proper overlap and alignment. Secure each metal shingle with the appropriate fasteners (screws or nails) to prevent wind uplift and ensure long-term stability. Ensure proper flashing around chimneys, skylights, and other roof penetrations. 4.4. Install Flashing & Trim: Install metal flashing around roof edges, valleys, chimneys, vents, and skylights to ensure water is directed away from vulnerable areas. Add trim and ridge caps to seal the roof's edges and create a polished appearance. 4.5. Ventilation & Insulation (if required): Install ridge vents, soffit vents, or other required ventilation systems. Ensure proper insulation is placed under the roof to regulate temperature and prevent moisture build-up. 5. Quality Assurance & Testing Perform a thorough inspection after installation to ensure that the roof is secure, watertight, and aesthetically pleasing. Check that all seams are properly sealed, fasteners are secure, and flashing is correctly installed. 6. Safety Measures All work will be performed in accordance with OSHA and local safety regulations. Page 6 / 12 #Item Qty Unit Unit Price Total The contractor will provide all necessary safety equipment for the crew, including fall protection, hard hats, and harnesses. Scaffoldings, ladders, or safety ropes will be used as needed to ensure safe access to the roof. The worksite will be kept clean and free of debris to prevent accidents. 7. Warranty The contractor will provide a [X]-year warranty on the labor for the installation of the metal shingles. The manufacturer’s warranty for the metal shingles will apply to any material defects. 8. Exclusions The scope does not include the replacement or repair of any structural components (e.g., decking, trusses) unless otherwise noted. Any additional work, such as installing gutters or skylights, will be considered outside the scope and may incur additional charges. 1.3 Demo of Cedar shakes Roofing shovel or shingle remover (for prying up shakes and nails) Crowbar or pry bar Claw hammer Utility knife (to cut underlayment or tar paper) Reciprocating saw (for cutting through nails or tough sections) Trash chute or heavy-duty buckets (to lower debris safely) Start from the top and work your way down to avoid standing on unsupported surfaces. Pry up the shakes by inserting the shovel or pry bar beneath each course and lifting up. Remove nails as you go, either by pulling them out or cutting them off. Pull off old underlayment or felt paper. Check for any damage to the sheathing or framing and document it for repair. Cedar shakes can be heavy and splintery—use contractor bags or bins for transport. Wood shakes are not typically recyclable due to coatings, nails, or embedded tar—dispose of them as construction waste. Sweep the area thoroughly and use a magnet to pick up stray nails. 1 $1,950.00 $1,950.00 1.4 Removal of storefront sign and reinstall Remove existing storefront sign and reinstall when work is complete 1 $3,900.00 $3,900.00 1.5 Exterior Electrical Work Disconnect Electrical as needed Reconnect Electrical as work get completed Install new can lights and photo eye near back entrance of bar and other spaces disconnect store front sign NOTE: There will be multiple trips for the electricians 1 $12,675.00 $12,675.00 Page 7 / 12 #Item Qty Unit Unit Price Total 1.6 Exterior Carpentry 1. Assessment and Planning Structural Assessment: Engage a structural engineer to assess how removing the gable end and eyebrow in the front of the building will affect the building’s integrity. 2. Safety and Site Preparation Asbestos/Lead Inspection: Required in many jurisdictions for older buildings. Utility Disconnections: Water, gas, electricity, and data services may need to be shut off or rerouted. Scaffolding and Shoring: Temporary supports may be necessary to stabilize adjoining structures or roofing. Site Safety Plan: Ensure fall protection, debris containment, noise/dust controls, and signage are in place. 3. Demolition Process Manual or Mechanical: Depending on size and location, demolition will be done manually Structural Sequencing: Remove roof finishes and supports connected to the gable end first. Wall demolition follows. Debris Removal: Materials should be sorted for recycling, hazardous waste, or disposal. 4. Reconstruction or Finishing Rebuild or Restructure: If a new façade is planned, framing and wall construction follow. Waterproofing and Sealing: Ensure the newly exposed area is sealed against the elements. Final Inspections: Local authorities may require inspections before and after work is complete. Important Notes Engineer Involvement: Always involve a qualified structural engineer. Historic Buildings: May need special permission or conservation oversight. Neighboring Structures: In tight urban settings, party wall agreements or adjacent property protections might be necessary. 1 $19,500.00 $19,500.00 1.7 Tyvek Make sure sheathing (e.g., plywood or OSB) is smooth, dry, and free of debris. Cover all sheathing before installing siding. Begin at a lower corner of the wall. Install Tyvek horizontally with the printed logo facing out. Overhang the bottom edge at least 1" over the foundation or sill plate. Fasten every 12"–18" along vertical studs, using cap fasteners or staples with plastic caps. Avoid stretching the wrap too tightly — it should be flat but able to move slightly to prevent tearing. Horizontal overlaps: at least 6" Vertical overlaps: at least 6"–12" 1 $7,499.70 $7,499.70 Page 8 / 12 #Item Qty Unit Unit Price Total Always overlap upper layers over lower ones (shingle-style) to shed water. Use Tyvek Tape or another approved construction tape to seal all vertical and horizontal seams. Tape around window and door openings, particularly corners. Cut an "X" at window/door openings. Fold flaps inside or over framing. Tape or flash as needed (use flashing tape or follow manufacturer instructions for windows and doors). Use proper flashing at window sills and heads. Install sill flashing before inserting the window. Follow the window manufacturer’s flashing instructions for integration with Tyvek. Check all seams are taped and that the wrap is securely fastened. Ensure proper lapping and that water will shed downward and outward. 1.8 Sheathing of building Install any necessary blocking or bracing. Check local building codes for specific sheathing requirements (e.g., thickness, fastening schedule). Begin sheathing at a bottom corner of the wall. Place the first panel vertically or horizontally (check your code or plan). Make sure the bottom edge is flush with the bottom plate or overlaps the rim joist if required. Panels should be installed with a 1/8-inch gap between them (use a nail or spacer). End joints should be staggered whenever possible. Ensure the panel is plumb and square before fastening. Fasten every 6" along panel edges and every 12" in the field (center studs). Use 8d nails or screws per building code. Nail heads should be flush (not overdriven or underdriven). If using a nail gun, adjust depth carefully. Cut around window and door openings before the sheathing is installed. Nail edges around openings as specified in structural plans. 1 $13,799.50 $13,799.50 1.9 James Hardie soffit 1. Framing & Support Prep Support with nominal 2×4 framing spaced no more than 24″ on center, with all panel edges backed by framing (sub‑facia or ledger) Trim rafter tails using a chalk line to ensure a flat plane before installing the sub‑facia 2. Cut & Fit Panels Install panels perpendicular to the rafters or joists jam 1 $3,510.00 $3,510.00 Page 9 / 12 #Item Qty Unit Unit Price Total Panel joints: butt together in moderate contact or leave a 1/8″ gap, sealed with caulk and covered with an H‑molding or batten strip For hip/valley soffits, cut ends at 45° for clean mitered joints 3. Fastening Requirements Fastener type: Wood framing: 4d common nails Steel framing: #8‑18 × 1″ ribbed bugle screws Spacing: Edges & intermediate supports ≤ 24″ OC. Nails 12″ wide or less: at least 1″ from corners, 3/8″ from edges. Wider than 12″: 2″ from corners, 3/8″ from edges Fastener heads should be flush, not over‑driven or protruding Use corrosion-resistant fasteners—galvanized or stainless steel recommended 4. Flashing & Caulking Maintain at least a 1″ gap from gutter end caps to siding/trim for drainage Install kickout flashing where roof meets wall (4″×4″ minimum, angled 100°–110°) Seal siding/soffit joints or gaps with permanently flexible caulk, avoiding inappropriate types (e.g. alkyd/oil‑based) 5. Finish & Touch‑Up Use the Hardie Touch‑Up Pen for nails and small cuts; avoid alkyd/oil paints and stains Ensure cut edges are primed (ColorPlus® panels are pre-finished but cut edges need touch‑up) 2 Management 16,250.00 16,250.00 2.1 Project Management This estimate includes all labor and administrative services required to professionally manage a renovation project under favorable site conditions. Red Letter Renovation will oversee project planning, execution, coordination with authorities, and final delivery—ensuring compliance, efficiency, and quality from start to finish. Administrative and Management Services Project Planning and Scheduling Develop a detailed project plan outlining cost targets, decision timelines, trade schedules, and inspection milestones. Establish a comprehensive workflow to track progress and align resources for timely completion. Permitting and Regulatory Coordination Facilitate the application, submission, and acquisition of required permits. Coordinate with city inspectors and building officials throughout the project, including scheduling inspections, addressing corrections, and ensuring compliance with all applicable building codes and ordinances. Coordination and Oversight Actively expedite and manage all project activities, including subcontractor coordination, vendor communication, and milestone execution. Provide regular oversight to ensure quality standards, code compliance, and adherence to the construction schedule. Budget and Progress Tracking 1 $5,200.00 $5,200.00 Page 10 / 12 #Item Qty Unit Unit Price Total Monitor and track all project milestones and running budget in real time. Approve vendor invoices, material costs, and labor hours while maintaining alignment with client-approved budgets. Labor Services Included Site Preparation and Protection Coordinate area preparation, including protective coverings for floors and surfaces, dust containment, and safe material storage. Ensure jobsite setup is efficient, secure, and compliant with local safety standards. Equipment and Material Acquisition Oversee procurement and delivery of materials, tools, and equipment necessary for each project phase. Verify shipments for accuracy and conformance to specifications. Setup, Daily Oversight, and Cleanup Manage daily operations, ensure jobsite cleanliness, and support smooth transitions between trades. Oversee setup and breakdown for each stage of construction and maintain a clean, organized, and inspection-ready environment. This estimate includes all labor and administrative responsibilities required to deliver a fully managed renovation project, including planning, execution, permitting, inspection coordination, and close-out. Red Letter Renovation ensures disciplined project leadership, responsive communication, and regulatory compliance throughout. 2.2 Drawings Renderings of what the building will look like when completed NOTE: there is a non-refundable deposit for this 1 $8,450.00 $8,450.00 2.3 Waste Management Waste and Debris Management Red Letter Renovation will manage all waste and debris generated throughout the course of the renovation project. This includes the safe and efficient handling, removal, and disposal of all materials in compliance with local regulations and environmental standards. Provision of Dumpster or Bagster We will supply a dumpster or Bagster, as required, to collect and contain all waste materials. The appropriate container will be selected based on the size and scope of the project to ensure that all debris can be removed promptly and without disruption to the site. Facilitation of Removal Red Letter Renovation will coordinate and facilitate the timely removal of the dumpster or Bagster once it has reached capacity. This ensures that the job site remains clean and organized throughout the project, allowing for a safe and efficient work environment. This estimate covers all aspects of waste management, from container supply to removal, ensuring that all debris is handled professionally and the site remains clean throughout the project. Optional: Same-Day Waste Removal with Dump Trailer Dump Trailer Provision (Optional Upgrade) For projects requiring immediate and efficient disposal of materials, 1 $2,600.00 $2,600.00 Page 11 / 12 #Item Qty Unit Unit Price Total Red Letter Renovation offers the option to supply a dump trailer for same-day waste removal. This allows for real-time cleanup, minimizing site clutter and allowing uninterrupted progress on the job. Includes delivery and on-site use of a dump trailer for the duration of the workday. Same-day hauling and disposal of all renovation-related debris. Ideal for compact job sites or locations with strict disposal regulations or HOA restrictions. Pricing available upon request and based on trailer size and load volume. 226,846.10 $0.00 226,846.10 113,423.05 Deposit 113,423.05 Upon completion $226,846.10 $0.00 Subtotal Tax Total Amount Paid Balance Due Payments Upcoming Upcoming Memo Angie This is rough estimate the price could change more depending on what we find when the stucco is removed and if you want to replace doors and windows. It would give the building a cleaner new updated look also. We might need to need to do some structural work It would be something to discuss whenever you have some free time on the extent of the work you want to do. Tom Zarembski Red Letter Renovation Page 12 / 12 Signature Click here to sign Company Signature Client Signature Red Letter Renovation Proposal Vanguard Construction P.O. Box 331 Cambridge, MN 55008 Business License #: BC807170 Date: August 19, 2025 Prepared For: Angie Krautbauer Project Description – Full Scope of Work This project consists of a full renovation of the building exterior including stucco replacement, framing modifications, roofing replacement, soffit installation, electrical as required, and debris removal. The following sections provide itemized scopes of work with pricing included. Stucco Replacement North, South, Front, and Back elevations as described with full stucco removal, prep, lath, mesh, and acrylic finish (color TBD). PRICE: $108,987.68 Demo & Framing (per Drawings & Carpentry) Demolition per engineered drawings, new framing of gables, integration with existing overhang roof, signage detach/reset, bracing and fasteners per code and manufacturer requirements. PRICE: $26,729.00 Roofing Replacement Remove cedar shakes, install premium roofing (EDCO steel, asphalt shake, or cedar). Includes flashing, underlayment, ventilation, per code and manufacturer requirements. PRICE: $12,567.82 Engineer’s Drawings Structural engineer drawings, coordination with client and contractor, permitting compliance. PRICE: $2,000.00 Electrical Work (as needed) Electrical modifications for code compliance under separate permit. Removed if not required. PRICE: $3,500.00 James Hardie Soffit Install Hardie soffit per manufacturer installation guidelines and local codes. Includes fasteners, backing, bracing, and inspections. PRICE: $9,803.65 Debris Removal Provide dumpsters, remove all debris (stucco, roofing, framing, misc). Disposal per regulations, maintain site cleanliness. PRICE: $5,500.00 Bid Alternate – Second Story Windows Frame new openings, install supports, trim, and casings. Interior finishing to match existing as close as possible. *Price subject to change based on window manufacturer and material cost.* PRICE: $13,985.00 Pricing Summary Item Price Stucco Replacement $108,987.68 Demo & Framing $26,729.00 Roofing Replacement $12,567.82 Engineer’s Drawings $2,000.00 Electrical Work $3,500.00 James Hardie Soffit $9,803.65 Debris Removal $5,500.00 Subtotal $169,088.15 Contingency (10%)$16,908.82 TOTAL BID $185,996.97 Bid Alternate – 2nd Story Windows $13,985.00 (subject to change) Site Management & Compliance Site Management - Vanguard Construction will provide full project management to ensure work proceeds in accordance with drawings, specifications, and agreed-upon schedule. - A qualified site supervisor will coordinate daily operations, subcontractor activities, inspections, and communication with the client. - The site will be maintained in a clean and orderly condition at all times, with debris regularly removed and safety measures enforced. OSHA Compliance - All work will be performed in accordance with OSHA safety standards. - Personal protective equipment (PPE) will be worn by all workers as appropriate. - Scaffolding, ladders, and lifts will be erected and maintained per OSHA requirements. - Hazard communication, fall protection, and equipment training will be strictly enforced. General Contractor Responsibilities - Vanguard Construction will manage permitting, inspections, and scheduling in coordination with the client. - Subcontractors will be prequalified for licensing, insurance, and performance standards. - Work will meet or exceed applicable building codes, manufacturer installation requirements, and industry best practices. - Change orders, if required, will be processed promptly with clear written approval from the client. - Liability and workers’ compensation insurance will be maintained throughout the duration of the project. Payment Schedule - One Third (1/3) Due at Signing: $61,998.99 – to secure scheduling and begin permitting. - One Third (1/3) Due Upon Starting Work: $61,998.99 – prior to commencement of demolition and framing activities. - Final One Third (1/3) Due Upon Completion: $61,998.99 – following final walkthrough, cleanup, and closing of permit. Terms & Conditions – Vanguard Construction 1. Proposal valid for 14 days from the date issued. 2. Change orders will be estimated at time & material plus 20% overhead and profit. 3. Payment terms: One third due at signing, one third due upon starting, remaining balance due upon completion. 4. Permits and inspections are the responsibility of: [Specify Vanguard Construction or Customer]. Prepared By: Michael Rudnitski, Owner Vanguard Construction n 763-260-3635 )n mike@vanguardconstmn.com Project Name September 29, 2012 Minneapolis New storefront with transom windows, signage panel new full height windows grind and paint stucco remove gable, install new front with signage panel, cornice (metal) and storefront remove gable, install new front with signage panel, cornice (metal) and storefront Proposed Existing Building # 2 Glitz and Glam Town Travel Town Travel Historic plaqueStrip stucco on base only. Monticello Facade Improvements November 11, 2018 MinnesotaMonoticello Primary Owner STELLAR PROPERTY INVEST LLC 350 102ND ST NE MONTICELLO MN 55362 Seq Land Description Land Code Dim 1 Dim 2 Dim 3 Units UT Unit Price Adj 1 Adj 2 Adj 3 Eff Rate Div %Value 1 DOWNTOWN I 155604 0 0 0 6,585.000 S 18.000 0.00 0.00 0.00 5.885 0.327 38,750 2 DOWNTOWN I 155604 0 0 0 6,585.000 S 18.000 0.00 0.00 0.00 12.111 0.673 79,751 3 BLACKTOP FAIR 008681 0 0 0 3,600.000 U 1.500 0.00 0.00 0.00 0.491 0.327 1,766 4 BLACKTOP FAIR 008681 0 0 0 3,600.000 U 1.500 0.00 0.00 0.00 1.009 0.673 3,634  Total     13,170.000        123,901 Building 1 Year Built 1885 Architecture N/A Above Grade Living Area 0 Finished Basement Sqft 0 Construction Quality 04 Foundation Type N/A Frame Type (C) Concrete Frame Size/Shape Exterior Walls STUCCO Windows N/A Roof Structure N/A Roof Cover N/A Interior Walls N/A Floor Cover N/A Heat WALL HEAT Air Conditioning N/A Bedrooms 0 Bathrooms N/A Gross Building Area 943 Summary Parcel ID 155010035090 Property Address 124 BROADWAY W MONTICELLO MN 55362 Sec/Twp/Rng 11-121-025 Brief Tax Description SECT-11 TWP-121 RANGE-025 ORIGINAL PLAT MONTICELLO LOT-009 BLOCK-035 TH PRT OF LOT 9 BLK35 LY WLY OF LN DRWN 9FT WLY OF&PAR TO COMMON BDRY LN OF LTS 8&9 ALSO TH PRT OF LT 10 LY ELY OF LN DRWN 16FT WLY OF& PAR TO COMMON BDRY LN OF LTS9&10 (Note: Not to be used on legal documents) Class 233 - 3A COMMERCIAL LAND AND BUILDING;209 - 4B1 RES 1- 3 UNITS - PREV SSR District (1101) CITY OF MONTICELLO-0882 School District 0882 (Note: Class refers to Assessor's Classification Used For Property Tax Purposes) Abstract/Torrens ABSTRACT GIS Acres Parcel: 155010035090 Acres: 0.15 Acres USAB: 0.15 Acres ROW: Sq Ft: 6,585.38 Owner Land Buildings Wright County, MN Building 2 Year Built 1885 Architecture N/A Above Grade Living Area 0 Finished Basement Sqft 0 Construction Quality 04 Foundation Type WOOD Frame Type (C) Concrete Frame Size/Shape Exterior Walls STUCCO Windows N/A Roof Structure N/A Roof Cover N/A Interior Walls N/A Floor Cover N/A Heat WALL FURN Air Conditioning N/A Bedrooms 0 Bathrooms N/A Gross Building Area 2386 Multi Parcel Instr Type Qualified Sale Sale Date Book Page Sale Type Buyer Seller Sale Price Adjusted Sale Price eCRV #eCRV Sale Type S.S. Rcmd. S.S. Rjt. Rsn. Transact Num N CD Q 12/28/2007   I- Improved STELLAR PROPERTY INVESTMENTS LLC LARSON PROPERTIES II $280,000 $280,000 107482  I  NA-NOT APPLIC 107482 N WD U 12/28/2007   I- Improved STELLAR PROPERTY INVESTMENTS LLC LARSON PROPERTIES II $280,000 $280,000 110001  I  14- CFD/INT PA 110001 Sale date range: Search Sales by Neighborhood Search Sales by Subdivision Grantor Grantee Recorded Date Doc Type Doc No LARSON PROPERTIES II STELLAR PROPERTY INVESTMENTS LLC 1/9/2009 WAR 1106221 LARSON PROPERTIES II STELLAR PROPERTY INVESTMENTS LLC 1/4/2008 CFD 1076213 Note: Transfer History data is from LandLink beginning 01/01/2003.   2025 Assessment 2024 Assessment 2023 Assessment 2022 Assessment 2021 Assessment +Estimated Land Value $123,900 $123,900 $77,800 $57,900 $56,200 +Estimated Building Value $183,000 $167,900 $167,900 $140,200 $134,200 +Estimated Machinery Value $0 $0 $0 $0 $0 =Total Estimated Market Value $306,900 $291,800 $245,700 $198,100 $190,400 %Change 5.17%18.76%24.03%4.04%0.00% Sales Recent Sales In Area From: 09 /04 /20 To: 09 /04 /20 Distance: 1500 Units: Feet   Search Sales by Distance Transfer History Valuation Click here to view Taxation Information for this parcel   2025 Payable 2024 Payable 2023 Payable 2022 Payable  Estimated Market Value $291,800 $245,700 $198,100 $190,400 -Excluded Value $0 $0 $0 $0 -Homestead Exclusion $0 $0 $0 $0 =Taxable Market Value $291,800 $245,700 $198,100 $190,400         Net Taxes Due $5,004.10 $3,852.00 $2,916.00 $3,274.00 +Special Assessments $617.90 $0.00 $0.00 $0.00 =Total Taxes Due $5,622.00 $3,852.00 $2,916.00 $3,274.00 %Change 45.95%32.10%-10.93%0.06% Click here to view Taxation Information for this parcel Click here to view Taxes Paid for this parcel Taxation (Internal Only) Taxation Taxes Paid Photos Sketches No data available for the following modules: Land GA/RP, Extra Features, OBY, OBY (Working 2026 Assessment). Map Aerial Image : 124 W. Broadway 04/20/2025 City Policy and Procedure SECTION: FINANCE NO: FIN- REFERENCE: Date: Next Review Date: TITLE: FAÇADE IMPROVEMENT PROGRAM 1.0 Purpose The City of Monticello Economic Development Authority (the “EDA”) recognizes the need to encourage investment in commercial and retail buildings in the Downtown area in order to maintain the economic viability of the City and the Downtown/Central Community District. The purpose of this forgivable loan program is to support a visually and financially appealing Downtown and greater Monticello community by providing forgivable loans to improve the façades of existing Downtown commercial and retail buildings. 2.0 Policy ELIGIBLE BUSINESSES Commercial property located within the geographic area illustrated in Exhibit A of these guidelines may be eligible for a Downtown Façade Improvement Forgivable Loan (“ Loan”) as further defined herein. The area illustrated in Exhibit A of these guidelines is amended to include the buildings to remain on Block 52 following redevelopment, as well as those buildings along Walnut Street, between Broadway Street West and River Street. It is the goal of the EDA that 70% of the buildings within the eligible area complete improvements to their properties. The EDA has allocated a maximum of $200,000 for the initial Loan program. This is a pilot program, and additional areas and allocations will be considered at a future date. FORGIVABLE LOAN FUND TERMS & CONDITIONS Loan Amount & Structure Individual loans may be made in an amount ranging from $5,000-$50,000. Loan forgiveness generally takes place over a three-year period with fifty percent (50%) of the award forgiven at the end of the first year, and twenty-five percent (25%) forgiven at the end of years two and three. The EDA may extend or reduce the forgiveness period based on the dollar amount of the Loan. If the benefitting building is sold within the period of the Loan, the Loan must be repaid. The Applicant must provide at least 5% of the project cost in cash. The Applicant percentage shall be used as the project down-payment, as may be required. Eligibility Requirements Tenants and property owners should discuss the loan program to determine responsibilities and commitment for application and its components. The owner of the property must be a cosignatory to the application and Loan agreement. The property owner must carry current property insurance both at the time of application and through completion of approved Loan improvements. Property taxes on the subject site must be current for the duration of the Loan. MN190\101\941811.v1 Applicants are not eligible to receive funding if the property to be rehabilitated is in default under a property mortgage, contract for deed or comparable obligation. An applicant/property owner is ineligible to receive assistance if currently involved in bankruptcy proceedings. Applicants may apply for only one Loan per building. The EDA reserves the right to approve or reject applications on a case-by-case basis, taking into consideration factors considered appropriate by the EDA, in addition to established polices, criteria, and potential benefits. Meeting the criteria does not guarantee an application will be approved. Approval or denial of an application is at the sole discretion of the EDA. Concurrent Loans The concurrent use of different EDA loan programs by any one borrower or for any one project is permitted. Business subsidy agreements may be required. Permitted Loan Uses Exterior renovation of the façades of principal use retail or commercial buildings as further shown on Exhibit B attached hereto. An applicant may apply for façade improvements on all exterior sides of their building. The EDA may approve a Loan for improvements for all or some of the sides of the building at their discretion. An architectural rendering supplied by one of the following is required: an EDA selected architect, applicant contractor or architect, or a qualified architect accepted by the EDA. This item is required for use in determining final scope of work in consultation with the applicant and the applicant’s selected contractor for any project. The cost of the rendering shall not be included in the Loan amount. Architectural renderings will be considered for preparation after initial letter of interest by an applicant. Façade renovation may include, but is not limited to windows, doors, siding, brick, stucco, masonry, painting, steps, cornices, parapets, shutters, dormers, signage, awnings, and structural roof components and such improvements shall be guided by the architectural rendering. Interior side renovation proposals may be considered on a case-by-case basis. The applicant will work with a contractor to define final selected improvements using the architectural rendering as a guide. The architectural rendering with final selected improvements must be reviewed and approved by the EDA and will be included in final Loan documentation. The improvements must be completed in substantial conformity to the approved architectural rendering. The cost of the building permit for the approved Loan project will be included in the final Loan amount. CONSTRUCTION AND IMPROVEMENTS CODE COMPLIANCE As applicable, buildings for which public funds will be used within this program are to be brought into conformity with city ordinances and state building codes in effect for the area in which the building is located. It is the intent of the Downtown Façade Improvement Loan Program to comply with the City’s building standards for the Downtown/Central Community District (CCD). Please refer to the City’s Downtown Small Area Plan and zoning ordinance for complete details as it relates to the standards governing this program’s design guidelines. TIMING OF PROJECT EXPENSES MN190\101\941811.v1 No project may commence until the EDA has approved the Loan application and the Loan agreement. Any costs incurred prior to execution of the Loan agreement are not eligible expenditures. No building construction may commence until the required city permits are secured. Loan disbursements shall be as provided for within the Loan agreement and shall be made directly to the Applicant/owner’s contractor. The Loan agreement shall reference final contracts for improvements. COMMUNICATION Success of the project depends on the completeness of applications and good communication between all parties. Applicants should feel free to reach out to EDA staff with any questions at any time. PROCEDURAL GUIDELINES FOR APPLICATION AND APPROVAL The applicant shall meet with city staff to obtain information about the Loan program, discuss the project, and obtain application forms. Prior to application, it is recommended that the applicant complete and submit a letter of interest to the EDA. The letter of interest should provide a summary of desired façade improvements. As part of the letter of interest review, the EDA may consider authorization of a façade rendering by the EDA’s architectural consultant or may direct the applicant to proceed with a formal application including preparation of rendering by their contractor(s)/architect. Once the applicant has obtained the rendering and estimates, the applicant must submit a formal application to the EDA for review including the project rendering and detailed estimates. Applications will be received and reviewed on a first-come, first-served basis from the time of submission of a complete application. An inspection of the building may be required. The EDA is a governmental entity and as such must provide public access to public data it receives. Data deemed by Applicant to be nonpublic data under State law should be so designated or marked by Applicant. See Minnesota Statutes, Section 13.591, Subd. 1 and 2. The formal Loan application will be reviewed by EDA staff to determine if it conforms to all city policies and ordinances, and will be presented to the EDA for formal approval, as follows: 1. Staff will complete a preliminary application review and may consult with the EDA’s Financial Advisor and/or EDA Attorney in preparing a report for EDA consideration. 2. Staff will evaluate the project application in terms of the following: a. Project Design - Evaluation of project design will include review of proposed activities, project construction and renovation plans including architectural rendering and final building elevations detailing selected improvements, timelines and capacity to implement the project. b. Financial Feasibility - Availability of funds, private investment, financial packaging and cost effectiveness, and bid-quote submissions. c. Evidence of applicant’s ability to meet the 5% cash requirements. d. Letter of Commitment from other financing sources stating terms and conditions of their participation in the project, if applicable. e. All other information as required in the application and/or additional information as may be requested by the EDA staff. MN190\101\941811.v1 f. Project compliance with all applicable city codes and policies. 3. The EDA Commissioners will review each application in terms of: a. Its consistency with the goals of the city’s Comprehensive Plan and Downtown Small Area Study. b. Whether it is desirable and in the best interests of the public to provide funding for the project. c. The project’s overall potential impact on the community’s economy. 4. The EDA Commissioners will approve or deny the application, or request a resubmission with clarifications, at the EDA’s sole discretion. APPROVAL OR DENIAL OF LOAN APPLICATION The EDA, at its sole discretion, may deny any application on a case-by-case basis, taking into consideration factors such as: consistency with the goals of the city’s Comprehensive Plan and Downtown Small Area Study, the project’s overall impact on the community’s economy, and the above criteria. LOAN POLICY REVIEW The above criteria will be reviewed on an annual basis to ensure that the policies reflected in this document are consistent with the economic development goals set forth by the city. COMPLIANCE WITH BUSINESS SUBSIDY LAW All developers/businesses receiving financial assistance from the City of Monticello EDA shall be subject to the City’s Business Subsidy Policy as amended, and the provisions and requirements set forth under Minnesota Statutes, Sections 116J.993 to 116J.995. LOAN AGREEMENT If the application for a Loan is approved, the applicant/property owner will be required to enter into a Loan agreement to proceed. The Loan agreement will specify the terms and conditions of the Loan as identified herein. DISBURSEMENT OF LOAN FUNDS Upon approval of a Loan application, applicants are required to provide executed contracts with qualified, licensed contractors for work per the approved Loan plans. Contracts shall be consistent with the procedures and requirements herein. Loan funds will be disbursed to the contractor based on completion of work as outlined below. The City’s Chief Building Official will verify completion of work. Upon verification of completion, payment will be dispersed per contract amount for the work completed based on submitted invoice. PROJECT CONTRACTOR PROCEDURES AND REQUIREMENTS A. PARTICIPATING CONTRACTORS: All contractors participating in the Downtown Façade Improvement Loan Program must have a contractor’s license on file with the Minnesota Department of Labor and Industry. The contractors will be responsible for securing insurance of the amounts specified on the application form. The application must contain proof of insurance coverage via a Certification of Insurance Coverage, and the contractor's registration and license number and bond. B. BID/QUOTE SOLICITATION: To participate in the Downtown Façade Improvement Loan Program, the applicant must solicit bids or quotes from at least two vendors. An applicant is free to choose any contractor, provided the license requirements are met and the cost differential in the quotes received MN190\101\941811.v1 does not exceed 20%. C. CONTRACTOR CONTRACT: The contract for work is between the property owner (applicant) and the contractor. Each selected contractor will enter into a contract with the property owner. The contract will outline the terms for completion of the rehabilitation on the project and will include the following: 1. Scope of Work 2. Project Start Date; 3. Project Completion Date; 4. General Conditions; 5. Building Elevations and Architectural Drawings; 6. Special Conditions; 7. Project Warranties; 8. Change Order Procedures; 9. Payment Terms; 10. Termination Procedures. D. FAILURE TO START/COMPLETE PROJECT: Upon approval of the Loan agreement, the applicant and selected contractor will have 180 calendar days in which to complete the contracted work. The 180- day time period shall not be exceeded except through the issuance of a change order. Failure to complete any work within 180 days will be grounds to terminate the Loan agreement. E. PAYMENT PROCEDURES: All contractors will agree to the payment schedule, which is as follows: 1. Pre-payments for contracted services may be disbursed from an escrow account established with the EDA’s specified agency. Such escrow account shall be administered per the Loan agreement. 2. Lien waivers are required for all contractors and subcontractors before payment is made. 3. Final payment for work completed, including any retainage amounts, will be made after work by a contractor is completed with verified receipts and costs incurred, the final inspection has been conducted and the Chief Building Official, property owner, and contractor have signed off on the work. F. CHANGE ORDERS: Change orders to the approved Loan project require the approval of the EDA. Change orders will be allowed only for the following reasons: 1. To rectify hidden deficiencies that are discovered once the work has begun. 2. To change a specification due to unforeseen difficulties arising after work has begun. 3. To address a deficiency that was inadvertently dropped from the project during project packaging. 4. To change completion dates. PROJECT COMPLETION The City’s Chief Building Official will complete a final project inspection and issue a Certificate of Completion verifying project completion per the approved Loan plans. 3.0 Scope This policy applies to all projects that apply for and may receive assistance under the Façade Improvement Program. 4.0 MN190\101\941811.v1 HISTORY Approval Date: August 8, 2018 Approved by: EDA Amendment Date: November 9, 2022 Approved by: EDA Amendment Date: January 10, 2024 Approved by: EDA MN190\101\941811.v1 EXHIBIT A Geographic Program Limits Downtown Facade Improvement Grant Program Eligibility Area MN190\101\941811.v1 EXHIBIT B Permitted Fund Uses – Visual Reference For your convenience, we offer payment options via check or Credit Card. Please note that a 4% service fee will be applied to Credit Card transactions. Please send checks to: P.O. Box 333 Becker, MN 55308 This quote is valid for the next 30 days, after which values may be subject to change. 2 of 2 pages Lemperes Building 14175 Bank Street | Becker, Minnesota 55308 763-670-0774 | Joe@LemperesBuilding.com | www.LemperesBuilding.com Heritage Construction Companies, LLC. Office: (763) 633-4080 www.HeritageConstructionMN.com 10908 171st Ave NW Suite C, Elk River, MN 55330 1 Job Name: Date: Plan Date:N/A Division Description Total Cost 1005 Job Site Supervision $8,100.00 1030 AE Design Fees $3,600.00 1040 Field Engineering $0.00 1310 Permits and Fees SAC/WAC NOT INCLUDED IN THIS ESTIMATE $3,133.35 1410 Testing $0.00 1500 Temporary Facilities Equipment $675.00 1710 Clean up $0.00 1750 Trash disposal / Roll-off Boxes $1,000.00 2200 Demolition $0.00 2300 Earthwork $0.00 2550 Site Utilities $0.00 2600 Paving and Surfacing $0.00 2620 Curb, Gutter, Sidewalks $0.00 2830 Fencing $0.00 2900 Landscaping $0.00 3300 Cast In Place Concrete $0.00 3400 Precast Concrete $0.00 4000 Masonry $0.00 5000 Structural Metals $0.00 5700 Misc. Metals $0.00 6100 Rough Carpentry $71,842.32 6200 Finish Carpentry $0.00 7100 Siding / Fascia $20,000.00 7200 Insulation & Waterproofing $0.00 7240 EFIS $0.00 7300 Roofing $0.00 7900 Joint Sealers $0.00 8000 Doors and Frames Material $0.00 8300 Overhead Doors $0.00 8500 Residential Window $0.00 8800 Glass and Glazing $5,948.00 9250 Drywall $0.00 9300 Tile $0.00 9500 Acoustical Ceilings $0.00 9510 Acoustical Treatments $0.00 9650 Flooring $0.00 9900 Painting $14,200.00 9950 Wallcovering $0.00 10150 Toilet Partitions $0.00 10440 Signage $0.00 10520 Fire Extinguishers $0.00 10800 Toilet Accessories $0.00 11000 Equipment $0.00 11100 Loading Dock Equipment $0.00 12400 Cabinets $0.00 12500 Window Treatments $0.00 14200 Elevators $0.00 15300 Fire Protection $0.00 15400 Plumbing $0.00 15800 HVAC $0.00 16000 Electrical $3,390.00 16400 Low Voltage $0.00 20000 Miscellaneous $2,000.00 Sub Total $133,888.67 Overhead and Profit $13,388.87 Total $147,277.54 Exclusions:Winter Conditions, gas and electric utilities, SAC/WAC fees. Cornerstone Café Exterior Remodel 8/28/2025 Summary Sheet Heritage Construction Companies, LLC. Office: (763) 633-4080 www.HeritageConstructionMN.com 10908 171st Ave NW Suite C, Elk River, MN 55330 2 Division Description Notes Quantity Unit Price Sub Total Total Cost 1005 Job Site Supervision $8,100.00 Job Cost 90 $90.00 $8,100.00 1030 AE Design Fees $3,600.00 Architectural Fees $3,600.00 Civil Engineering Fees $0.00 Structural Engineering Fees $0.00 Survey $0.00 1040 Field Engineering $0.00 Surveying $0.00 1310 Permits and Fees $3,133.35 Permits $3,133.35 SAC/WAC NOT INCLUDED IN THIS ESTIMATE $0.00 Realtor Fee $0.00 Builders Risk Insurance $0.00 Bonding $0.00 1410 Testing $0.00 Indepentant Testing Fees $0.00 1500 Temporary Facilities Equipment $675.00 Temporary Toilet 3 $225.00 $675.00 Temporary Office 0 $400.00 $0.00 Security Fence $0.00 Safety Railing $0.00 Poly Dust Control $0.00 1710 Clean up $0.00 Lump Sum $0.00 1750 Trash disposal / Roll-off Boxes $1,000.00 10 yd 0 $275.00 $0.00 20 yd 0 $325.00 $0.00 30 yd 2 $500.00 $1,000.00 Concrete Washout 0 $250.00 $0.00 2200 Demolition $0.00 Lump Sum 2300 Earthwork $0.00 Lump Sum Bid $0.00 Erosion Control $0.00 Clearing and Grubbing $0.00 Earth Retention $0.00 2550 Site Utilities $0.00 Lump Sum $0.00 2600 Paving and Surfacing $0.00 Lump Sum Bid $0.00 Class 5 $0.00 2620 Curb, Gutter, Sidewalks $0.00 Curb, and Gutter $0.00 Entrances $0.00 Sidewalks $0.00 2830 Fencing $0.00 Lump Sum $0.00 Detailed Breakdown Heritage Construction Companies, LLC. Office: (763) 633-4080 www.HeritageConstructionMN.com 10908 171st Ave NW Suite C, Elk River, MN 55330 3 Division Description Notes Quantity Unit Price Sub Total Total Cost 2900 Landscaping $0.00 Landscaping $0.00 Irrigation $0.00 3300 Cast In Place Concrete $0.00 Lump Sum Bid $0.00 Footings $0.00 Poured Foundation $0.00 Floors $0.00 Vapor Barrier $0.00 GypCrete Prep $0.00 GypCrete $0.00 3400 Precast Concrete $0.00 Lump Sum $0.00 4000 Masonry $0.00 Lump Sum Bid $0.00 Stoops $0.00 Brick $0.00 Stucco $0.00 Block Sealer $0.00 5000 Structural Metals $0.00 Material $0.00 Labor $0.00 5700 Misc. Metals $0.00 Lump Sum 6100 Rough Carpentry $71,842.32 Lump Sum $47,930.40 Awning $23,911.92 Labor $0.00 Crane Rental $0.00 6200 Finish Carpentry $0.00 Door Install $0.00 Material $0.00 7100 Siding / Fascia $20,000.00 Lump Sum Repair stucco on all sides of building and where bay windows are made flush with building $20,000.00 7200 Insulation & Waterproofing $0.00 Lump Sum $0.00 Foundation Insulation $0.00 Walls and Ceiling $0.00 Foundation Waterproofing $0.00 Building Wrap $0.00 7240 EFIS $0.00 Lump Sum $0.00 7300 Roofing $0.00 Lump Sum $0.00 Material $0.00 Sheetmetal $0.00 7900 Joint Sealers $0.00 Lump Sum $0.00 Heritage Construction Companies, LLC. Office: (763) 633-4080 www.HeritageConstructionMN.com 10908 171st Ave NW Suite C, Elk River, MN 55330 4 Division Description Notes Quantity Unit Price Sub Total Total Cost 8000 Doors and Frames Material $0.00 Interior doors $0.00 Exterior door $0.00 8300 Overhead Doors $0.00 Lump Sum $0.00 8500 Residential Window $0.00 Labor $0.00 8800 Glass and Glazing $5,948.00 Takeout window $5,948.00 9250 Drywall $0.00 Lump Sum $0.00 9300 Tile $0.00 Lump Sum $0.00 9500 Acoustical Ceilings $0.00 Lump Sum $0.00 9510 Acoustical Treatments $0.00 Lump Sum $0.00 9650 Flooring $0.00 Lump Sum $0.00 Carpet $0.00 LVT $0.00 Vinyl Base $0.00 Epoxy $0.00 9900 Painting $14,200.00 Lump Sum Paint exterior of building $14,200.00 9950 Wallcovering $0.00 FRP $0.00 Wallpaper $0.00 10150 Toilet Partitions $0.00 Lump Sum $0.00 Material $0.00 Labor $0.00 10440 Signage $0.00 Lump Sum $0.00 City Required Signage $0.00 10520 Fire Extinguishers $0.00 Material $0.00 Labor $0.00 Signage $0.00 10800 Toilet Accessories $0.00 Lump Sum $0.00 Material $0.00 Labor $0.00 11000 Equipment $0.00 Lump Sum $0.00 Heritage Construction Companies, LLC. Office: (763) 633-4080 www.HeritageConstructionMN.com 10908 171st Ave NW Suite C, Elk River, MN 55330 5 Division Description Notes Quantity Unit Price Sub Total Total Cost 11100 Loading Dock Equipment $0.00 Lump Sum $0.00 12400 Cabinets $0.00 Lump Sum $0.00 12500 Window Treatments $0.00 Lump Sum $0.00 14200 Elevators $0.00 Lump Sum $0.00 15300 Fire Protection $0.00 Lump Sum $0.00 15400 Plumbing $0.00 Lump Sum $0.00 15800 HVAC $0.00 Lump Sum $0.00 16000 Electrical $3,390.00 Lump sum recessed can lighting in soffit of new awning and new LED sign light $3,390.00 16400 Low Voltage $0.00 Lump Sum $0.00 20000 Miscellaneous $2,000.00 Lump Sum $2,000.00 CLARIFICATIONS: Proposal based on plans dated N/A Heritage construction is a merit shop contractor: we use the low comprehensive bid, union or non-union No SAC or WAC fees included (water and sewer fees) EXCLUDES WINTER CONDITIONS EXCLUDES Low voltage, Communication system, telephone & technology. EXCLUDES work relating to hazardous materials in this value (mold, asbestos, lead, etc…) Appliances by Owner Signage By Owner "(a) Any person or company supplying labor or materials for this improvement to your property may file a lien against your property if that person or company is not paid for the contributions. (b) Under Minnesota law, you have the right to pay persons who supplied labor or materials for this improvement directly and deduct this amount from our contract price, or withhold the amounts due them from us until 120 days after completion of the improvement unless we give you a lien waiver signed by persons who supplied any labor or material for the improvement and who gave you timely notice." Signature_______________________________________ Aerial Image 154 W Broadway 04/20/2025 City Policy and Procedure SECTION: FINANCE NO: FIN- REFERENCE: Date: Next Review Date: TITLE: FAÇADE IMPROVEMENT PROGRAM 1.0 Purpose The City of Monticello Economic Development Authority (the “EDA”) recognizes the need to encourage investment in commercial and retail buildings in the Downtown area in order to maintain the economic viability of the City and the Downtown/Central Community District. The purpose of this forgivable loan program is to support a visually and financially appealing Downtown and greater Monticello community by providing forgivable loans to improve the façades of existing Downtown commercial and retail buildings. 2.0 Policy ELIGIBLE BUSINESSES Commercial property located within the geographic area illustrated in Exhibit A of these guidelines may be eligible for a Downtown Façade Improvement Forgivable Loan (“ Loan”) as further defined herein. The area illustrated in Exhibit A of these guidelines is amended to include the buildings to remain on Block 52 following redevelopment, as well as those buildings along Walnut Street, between Broadway Street West and River Street. It is the goal of the EDA that 70% of the buildings within the eligible area complete improvements to their properties. The EDA has allocated a maximum of $200,000 for the initial Loan program. This is a pilot program, and additional areas and allocations will be considered at a future date. FORGIVABLE LOAN FUND TERMS & CONDITIONS Loan Amount & Structure Individual loans may be made in an amount ranging from $5,000-$50,000. Loan forgiveness generally takes place over a three-year period with fifty percent (50%) of the award forgiven at the end of the first year, and twenty-five percent (25%) forgiven at the end of years two and three. The EDA may extend or reduce the forgiveness period based on the dollar amount of the Loan. If the benefitting building is sold within the period of the Loan, the Loan must be repaid. The Applicant must provide at least 5% of the project cost in cash. The Applicant percentage shall be used as the project down-payment, as may be required. Eligibility Requirements Tenants and property owners should discuss the loan program to determine responsibilities and commitment for application and its components. The owner of the property must be a cosignatory to the application and Loan agreement. The property owner must carry current property insurance both at the time of application and through completion of approved Loan improvements. Property taxes on the subject site must be current for the duration of the Loan. MN190\101\941811.v1 Applicants are not eligible to receive funding if the property to be rehabilitated is in default under a property mortgage, contract for deed or comparable obligation. An applicant/property owner is ineligible to receive assistance if currently involved in bankruptcy proceedings. Applicants may apply for only one Loan per building. The EDA reserves the right to approve or reject applications on a case-by-case basis, taking into consideration factors considered appropriate by the EDA, in addition to established polices, criteria, and potential benefits. Meeting the criteria does not guarantee an application will be approved. Approval or denial of an application is at the sole discretion of the EDA. Concurrent Loans The concurrent use of different EDA loan programs by any one borrower or for any one project is permitted. Business subsidy agreements may be required. Permitted Loan Uses Exterior renovation of the façades of principal use retail or commercial buildings as further shown on Exhibit B attached hereto. An applicant may apply for façade improvements on all exterior sides of their building. The EDA may approve a Loan for improvements for all or some of the sides of the building at their discretion. An architectural rendering supplied by one of the following is required: an EDA selected architect, applicant contractor or architect, or a qualified architect accepted by the EDA. This item is required for use in determining final scope of work in consultation with the applicant and the applicant’s selected contractor for any project. The cost of the rendering shall not be included in the Loan amount. Architectural renderings will be considered for preparation after initial letter of interest by an applicant. Façade renovation may include, but is not limited to windows, doors, siding, brick, stucco, masonry, painting, steps, cornices, parapets, shutters, dormers, signage, awnings, and structural roof components and such improvements shall be guided by the architectural rendering. Interior side renovation proposals may be considered on a case-by-case basis. The applicant will work with a contractor to define final selected improvements using the architectural rendering as a guide. The architectural rendering with final selected improvements must be reviewed and approved by the EDA and will be included in final Loan documentation. The improvements must be completed in substantial conformity to the approved architectural rendering. The cost of the building permit for the approved Loan project will be included in the final Loan amount. CONSTRUCTION AND IMPROVEMENTS CODE COMPLIANCE As applicable, buildings for which public funds will be used within this program are to be brought into conformity with city ordinances and state building codes in effect for the area in which the building is located. It is the intent of the Downtown Façade Improvement Loan Program to comply with the City’s building standards for the Downtown/Central Community District (CCD). Please refer to the City’s Downtown Small Area Plan and zoning ordinance for complete details as it relates to the standards governing this program’s design guidelines. TIMING OF PROJECT EXPENSES MN190\101\941811.v1 No project may commence until the EDA has approved the Loan application and the Loan agreement. Any costs incurred prior to execution of the Loan agreement are not eligible expenditures. No building construction may commence until the required city permits are secured. Loan disbursements shall be as provided for within the Loan agreement and shall be made directly to the Applicant/owner’s contractor. The Loan agreement shall reference final contracts for improvements. COMMUNICATION Success of the project depends on the completeness of applications and good communication between all parties. Applicants should feel free to reach out to EDA staff with any questions at any time. PROCEDURAL GUIDELINES FOR APPLICATION AND APPROVAL The applicant shall meet with city staff to obtain information about the Loan program, discuss the project, and obtain application forms. Prior to application, it is recommended that the applicant complete and submit a letter of interest to the EDA. The letter of interest should provide a summary of desired façade improvements. As part of the letter of interest review, the EDA may consider authorization of a façade rendering by the EDA’s architectural consultant or may direct the applicant to proceed with a formal application including preparation of rendering by their contractor(s)/architect. Once the applicant has obtained the rendering and estimates, the applicant must submit a formal application to the EDA for review including the project rendering and detailed estimates. Applications will be received and reviewed on a first-come, first-served basis from the time of submission of a complete application. An inspection of the building may be required. The EDA is a governmental entity and as such must provide public access to public data it receives. Data deemed by Applicant to be nonpublic data under State law should be so designated or marked by Applicant. See Minnesota Statutes, Section 13.591, Subd. 1 and 2. The formal Loan application will be reviewed by EDA staff to determine if it conforms to all city policies and ordinances, and will be presented to the EDA for formal approval, as follows: 1. Staff will complete a preliminary application review and may consult with the EDA’s Financial Advisor and/or EDA Attorney in preparing a report for EDA consideration. 2. Staff will evaluate the project application in terms of the following: a. Project Design - Evaluation of project design will include review of proposed activities, project construction and renovation plans including architectural rendering and final building elevations detailing selected improvements, timelines and capacity to implement the project. b. Financial Feasibility - Availability of funds, private investment, financial packaging and cost effectiveness, and bid-quote submissions. c. Evidence of applicant’s ability to meet the 5% cash requirements. d. Letter of Commitment from other financing sources stating terms and conditions of their participation in the project, if applicable. e. All other information as required in the application and/or additional information as may be requested by the EDA staff. MN190\101\941811.v1 f. Project compliance with all applicable city codes and policies. 3. The EDA Commissioners will review each application in terms of: a. Its consistency with the goals of the city’s Comprehensive Plan and Downtown Small Area Study. b. Whether it is desirable and in the best interests of the public to provide funding for the project. c. The project’s overall potential impact on the community’s economy. 4. The EDA Commissioners will approve or deny the application, or request a resubmission with clarifications, at the EDA’s sole discretion. APPROVAL OR DENIAL OF LOAN APPLICATION The EDA, at its sole discretion, may deny any application on a case-by-case basis, taking into consideration factors such as: consistency with the goals of the city’s Comprehensive Plan and Downtown Small Area Study, the project’s overall impact on the community’s economy, and the above criteria. LOAN POLICY REVIEW The above criteria will be reviewed on an annual basis to ensure that the policies reflected in this document are consistent with the economic development goals set forth by the city. COMPLIANCE WITH BUSINESS SUBSIDY LAW All developers/businesses receiving financial assistance from the City of Monticello EDA shall be subject to the City’s Business Subsidy Policy as amended, and the provisions and requirements set forth under Minnesota Statutes, Sections 116J.993 to 116J.995. LOAN AGREEMENT If the application for a Loan is approved, the applicant/property owner will be required to enter into a Loan agreement to proceed. The Loan agreement will specify the terms and conditions of the Loan as identified herein. DISBURSEMENT OF LOAN FUNDS Upon approval of a Loan application, applicants are required to provide executed contracts with qualified, licensed contractors for work per the approved Loan plans. Contracts shall be consistent with the procedures and requirements herein. Loan funds will be disbursed to the contractor based on completion of work as outlined below. The City’s Chief Building Official will verify completion of work. Upon verification of completion, payment will be dispersed per contract amount for the work completed based on submitted invoice. PROJECT CONTRACTOR PROCEDURES AND REQUIREMENTS A. PARTICIPATING CONTRACTORS: All contractors participating in the Downtown Façade Improvement Loan Program must have a contractor’s license on file with the Minnesota Department of Labor and Industry. The contractors will be responsible for securing insurance of the amounts specified on the application form. The application must contain proof of insurance coverage via a Certification of Insurance Coverage, and the contractor's registration and license number and bond. B. BID/QUOTE SOLICITATION: To participate in the Downtown Façade Improvement Loan Program, the applicant must solicit bids or quotes from at least two vendors. An applicant is free to choose any contractor, provided the license requirements are met and the cost differential in the quotes received MN190\101\941811.v1 does not exceed 20%. C. CONTRACTOR CONTRACT: The contract for work is between the property owner (applicant) and the contractor. Each selected contractor will enter into a contract with the property owner. The contract will outline the terms for completion of the rehabilitation on the project and will include the following: 1. Scope of Work 2. Project Start Date; 3. Project Completion Date; 4. General Conditions; 5. Building Elevations and Architectural Drawings; 6. Special Conditions; 7. Project Warranties; 8. Change Order Procedures; 9. Payment Terms; 10. Termination Procedures. D. FAILURE TO START/COMPLETE PROJECT: Upon approval of the Loan agreement, the applicant and selected contractor will have 180 calendar days in which to complete the contracted work. The 180- day time period shall not be exceeded except through the issuance of a change order. Failure to complete any work within 180 days will be grounds to terminate the Loan agreement. E. PAYMENT PROCEDURES: All contractors will agree to the payment schedule, which is as follows: 1. Pre-payments for contracted services may be disbursed from an escrow account established with the EDA’s specified agency. Such escrow account shall be administered per the Loan agreement. 2. Lien waivers are required for all contractors and subcontractors before payment is made. 3. Final payment for work completed, including any retainage amounts, will be made after work by a contractor is completed with verified receipts and costs incurred, the final inspection has been conducted and the Chief Building Official, property owner, and contractor have signed off on the work. F. CHANGE ORDERS: Change orders to the approved Loan project require the approval of the EDA. Change orders will be allowed only for the following reasons: 1. To rectify hidden deficiencies that are discovered once the work has begun. 2. To change a specification due to unforeseen difficulties arising after work has begun. 3. To address a deficiency that was inadvertently dropped from the project during project packaging. 4. To change completion dates. PROJECT COMPLETION The City’s Chief Building Official will complete a final project inspection and issue a Certificate of Completion verifying project completion per the approved Loan plans. 3.0 Scope This policy applies to all projects that apply for and may receive assistance under the Façade Improvement Program. 4.0 MN190\101\941811.v1 EXHIBIT A Geographic Program Limits Downtown Facade Improvement Grant Program Eligibility Area MN190\101\941811.v1 EXHIBIT B Permitted Fund Uses – Visual Reference Primary Owner TRICAMBRA HOLDINGS LLC 313 JACKSON AVE NW ELK RIVER MN 55330 Seq Land Description Land Code Dim 1 Dim 2 Dim 3 Units UT Unit Price Adj 1 Adj 2 Adj 3 Eff Rate Div %Value 1 DOWNTOWN I 155604 0 0 0 4,033.000 S 18.000 0.00 0.00 0.00 5.940 0.330 23,958 2 DOWNTOWN I 155604 0 0 0 4,033.000 S 18.000 0.00 0.00 0.00 12.061 0.670 48,642 3 BLACKTOP FAIR 008681 0 0 0 1,045.000 U 1.500 0.00 0.00 0.00 0.505 0.330 528 4 BLACKTOP FAIR 008681 0 0 0 1,045.000 U 1.500 0.00 0.00 0.00 1.026 0.670 1,072  Total     8,066.000        74,200 Building 1 Year Built 1910 Architecture N/A Above Grade Living Area 0 Finished Basement Sqft 0 Construction Quality 04 Foundation Type CONC BLOCK Frame Type (C) Concrete Frame Size/Shape Exterior Walls STUCCO Windows N/A Roof Structure SHED Roof Cover N/A Interior Walls DRYWALL Floor Cover N/A Heat N/A Air Conditioning N/A Bedrooms 0 Bathrooms N/A Gross Building Area 2468 Summary Parcel ID 155010035150 Property Address 154 BROADWAY W MONTICELLO MN 55362 Sec/Twp/Rng 11-121-025 Brief Tax Description SECT-11 TWP-121 RANGE-025 ORIGINAL PLAT MONTICELLO LOT-015 BLOCK-035 W24 1/2FT OF LT 15 BLK 35 (Note: Not to be used on legal documents) Class 233 - 3A COMMERCIAL LAND AND BUILDING;209 - 4B1 RES 1-3 UNITS - PREV SSR District (1101) CITY OF MONTICELLO-0882 School District 0882 (Note: Class refers to Assessor's Classification Used For Property Tax Purposes) Abstract/Torrens ABSTRACT GIS Acres Parcel: 155010035150 Acres: 0.09 Acres USAB: 0.09 Acres ROW: Sq Ft: 4,033.04 Owner Land Buildings Wright County, MN Click here to view Taxation Information for this parcel   2025 Payable 2024 Payable 2023 Payable 2022 Payable  Estimated Market Value $325,300 $279,000 $229,100 $222,100 -Excluded Value $0 $0 $0 $0 -Homestead Exclusion $0 $0 $0 $0 =Taxable Market Value $325,300 $279,000 $229,100 $222,100         Net Taxes Due $5,403.08 $4,156.00 $3,270.54   +Special Assessments $2,856.92 $676.00 $1,775.46   =Total Taxes Due $8,260.00 $4,832.00 $5,046.00   %Change 70.94%-4.24% 0.00% Click here to view Taxation Information for this parcel Click here to view Taxes Paid for this parcel Taxation (Internal Only) Taxation Taxes Paid Photos Sketches EDA Agenda: 08/13/25 4B. Consideration of Review and Discussion of Integrated Marketing and Communications Plan (IMCP) proposed Draft Strategies Goals and Priorities Prepared by: Economic Development Manager Meeting Date: 09/10/25 ☐ Regular Agenda Item X Workshop Item ☐ Consent Agenda Item Reviewed by: Community Development Director, Community & Economic Development Coordinator, Park & Recreation Director Approved by: City Administrator ACTION REQUESTED No Motion – Information only about the Integrated Marketing and Communications Plan (IMCP) Draft Strategies Goals and Priorities. REFERENCE AND BACKGROUND Staff will provide a brief update regarding the proposed Draft IMCP Strategies Goals and Priorities. The IMCP was completed in 2022 by AE2S through funding provided by the Community Energy Transition (CET) Grant. The IMCP is a comprehensive 93-page marketing and communications plan. It was compiled through guidance from the Monticello 2040 + Comprehensive Plan and through community surveys and feedback sessions with the goal of identifying communication gaps and potential tools to better disseminate information about the City’s economic development goals, efforts and accomplishments. It is an acknowledgment that as a growing community with various needs, and efforts and projects in different stages of progress, it is helpful to be transparent about those efforts and to promote the City’s development opportunities and strengths to reach the goals and build on the successes. In recent budget cycles, the EDA has authorized a marketing-advertising line item of between $40,000 to $47,000. The amount in the recently approved 2026 CY EDA General Fund budget is $54,000. This level of funding should allow the EDA to engage in a variety of marketing and communication action strategies to effectively carry the message(s) that the EDA prefers regarding the City’s development opportunities and advantages. Staff plan to provide a very brief update to the EDA about progress in formulating the strategies to implement the IMCP. The goal is to present more information to the EDA in a future workshop and seek feedback to revise the action strategies as desired and then bring it to the EDA in a regular meeting in the future for approval. EDA Agenda: 08/13/25 I. Budget Impact: The cost of discussing and providing feedback on the IMCP action strategies is minimal. If the EDA eventually approves various IMCP action strategies, there will be cost considerations as the strategies are implemented. It is likely that much of that could be incurred in 2026 and possibly in 2027. Each future annual budget cycle the EDA will also be able to establish a marketing-advertising budget line item as needed to implement the IMCP strategies. II. Staff Workload Impact: City staff involved in the effort to present the IMCP Draft implementation strategies goals and priorities for discussion and feedback with the EDA includes the City Administrator, the Community Development Director, the Economic Development Manager and the Marketing and Communications Coordinator. III. Comprehensive Plan Impact: The Vision adopted as part of the Monticello 2040 + Plan includes organized steps and plans to communicate the City’s economic development efforts along with the opportunities and advantages to both an internal and external audience. STAFF RECOMMENDATION No formal action is being sought from the EDA in this meeting. Staff’s purpose is to present the IMCP strategies goals and priorities for discussion and feedback and make adjustments as desired by the EDA. Staff intend to modify the draft strategies goals and priorities based on feedback and re-present to the EDA for approval at a future meeting. SUPPORTING DATA N/A