Loading...
Transportation Advisory Commission Minutes 02/22/2005A& WSB —111` & Associates, Inc. WSB & Associates, Inc. 701 Xenia Avenue South, Ste. #300 Minneapolis, MN 55416 (763) 541-4800 (763) 541-1700 (fax) Meeting in utes Subject: Meeting Date: Meeting Location: Meeting Time: Meeting Minute Issue Date: To: Attendees Cost Split Meeting February 22, 2005 Mn/DOT Office — St Cloud 8:30 AM February 28, 2005 Cc: Jeff O'Neill, Rick Wotfsteller - Monticello Bret Weiss, Doug Weiszhaar, Brandi Popenhagen - WSB Virgil Hawkins, Wayne Fingalson — Wright County Bob Miller — Mn/DOT Re: CSAH 18-I 94 Interchange Monticello, MN - Wright County City Project 2004-01 C SP 8680-138 WSB No. 1546-09 Attendees: Name Representing Phone E-mail Chad Hausmann Mn/DOT 320 654 5446 Chad.hausmann dot. state. mn.us Terry Humbert Mn/DOT 320 654 5520 Terry. humbertdot. state. inn.us Jamie Hukriede Mn/DOT 218 8282549 Jamie.hukriede dot. state. mn.us Nancy Hanzlik WSB 763 287 8303 nhanzlik wsben .com Derek Schmidt WSB 763 287 8303 dschmidt wsben .com Purpose: The purpose of this meeting was to discuss status of the Cost Split for Cooperative Construction Agreement Memo distributed February 2, 2005. Discussion Items: 1. Mn/DOT concurred with the cost split calculation for the bridge pay items. 2. Mn/DOT concurred with the project limits for cost participation as described in the calculations. 3. Mn/DOT would prefer to have a lump sum cost participation in the cooperative agreement to simplify the tracking of pay items during construction. This will be discussed at a future meeting with Doug Weiszhaar since the previous meeting on December 23, 2004 did not include a lump sum payment for construction costs from Mn/DOT. 4. Percentages for Prorata Items, (mobilization, field office, field lab, traffic control, freeway and other signing not directly tied to an alignment, portable changeable message sign) should be based on the percentage of agency participation on the total project. WSB will revise the split on these items accordingly. F:\AngelaS\Planning Files\2004\Interchange\MM 050222 Cost Split.doc C`SAH 181194 Interchange Monticello, MN Page 2 5. The relocation of the billboards is negotiated during the right-of-way process. Mn/DOT prefers to offer a $25,000 lump sum for the relocation of the billboard in the ramp area. There will not be a pay item for the access road since it is intended that the access would be along the grass pond maintenance bench. The removal of the foundations will remain in the cost estimate and Mn/DOT will pay for the billboard foundations in the ramp area. This item will also be discussed with Doug Weiszhaar at a future meeting since the cost may be on a lump sum basis. 6. Jamie is expediting the right-of-way agreement at the request of Tom Scott. The right-of-way agreement may be used in the condemnation proceedings for the AVR facility. The right-of-way cost participation is based on the ramp and pond participation percentages. 7. WSB will contact Bob Nibbe to determine if the hydraulic cost participation should be based on flow rate or volume. References in the calculations and associated map should be made to generic parcel/area callouts rather than to actual parcel owners. 8. Chad will notify Nancy if the existing permanent changeable message sign located just west of the pedestrian bridge has to be relocated. 9. The calculation and basic assumptions for the determination of earthwork percentages was discussed as follows: • Mn/DOT would like to have some type of guarantee that the excavated material will be suitable for use as backfill material. WSB and Braun have reviewed the soil borings and believe that the excess material will be suitable for backfill material. The material excavated in the concrete wash -out area may have to be processed on site. No guarantees can be made since soil is always an unknown on a constriction project. This will be handled with a special provision in the plans stating the requirements of the excavated material for use as backfill. • The previously agreed to method to generate the cost participation percentage for earthwork was to use the area outside of the CSAH 18 alignments. Mn/DOT no longer believes that this method represents accurate values for percent participation calculation. They agreed to this method to simplify the calculations only during preliminary design, not to be used in the final design calculations. This was not stated at the earlier cost participation meeting on December 23, 2004. Reasons for Mn/DOT's concern include: the 6 foot berm behind the curb that would not be required for the 2-lane rural section and the fact that the roadway is widened to the east side. Mn/DOT would prefer to have WSB design a 2 lane rural section and compare the earthwork volumes. This item will be discussed at the future meeting with Doug Weiszhaar since the level of effort required to redesign the roadway as a two lane rural section is not a minor one. • WSB does not intend to include any excess topsoil pay item in the construction document. Excess topsoil will be wasted in the inslopes. • Excavated material volume is based on excavated volume and borrow is based on compacted volume in the construction documents. 10. Terry would like to confirm the county cost participation percentage. Terry believes that half of the 36.5% (Mn/DOT's participation) should go directly to the County. Nancy will provide the information from the County stating that the County FAAngelaSTIanning Fi1es\2004\Interchange\MM 050222 Cost Split.doc i'SAH 181194 Interchange Monticello, MN Page 3 participation is based on their current policy (up to 80% of the construction cost), with a cap of $2,000,000. 11. In general, Mn/DOT would prefer to see a detailed Schedule I included in the Cooperative Agreement with individual pay times cost participation percentages broken down by roadway alignment. The percentage determined using the bid price will be used as the lump sum payment from Mn/DOT on the project. WSB would like to maintain the original agreement that included Mn/DOT's participation in over -runs and under -runs that occur during construction. This will be discussed at a future meeting with Doug Weiszhaar. 12. Handouts for the February 23 PAC/TAC meeting were discussed: WSB will not distribute the Cost Participation Spreadsheet, Construction Cost Participation Layout Exhibit or the Right -of -Way Cost Participation Exhibit at the meeting. WSB will revise the Easement/Right-of-way/Ownership Transfer Exhibit to indicate "Potential" rather than "Future" jurisdictional transfer. WSB will distribute the Selected Construction Projects 2005-2006 and revised Easement/Right-of- way/Ownership Transfer Exhibit only. 13. Dan Prather and Dave Hall will be in attendance at the PAC/TAC meeting to discuss the bridge aesthetics. 14. District 3 staff is OK with installing the bullpen in the median of I-94 to protect the traffic from the pedestrian and roadway bridge piers. 15. Chad will contact Marilyn Remer of Mn/DOT to discuss the installation of private utilities on the bridge. These minutes were prepared by Nancy Hanzlik. Please provide your corrections to her on or before March 14, 2005. FAAngelaS\Planning Fi1es\2004\Interchange\MM 050222 Cost Split.doc