Transportation Advisory Commission Minutes - 12-15-2004A WSB & Associates, Inc. WSB & Associates, Inc. 710 Xenia Avenue South, Ste. 9300 Minneapolis, MN 55416 (763) 541-4800 (763) 541-1700 (fax) Subject: TAC Meeting Meeting Date: December 15, 2004 Meeting Location: Monticello, MN Meeting Time: 3: 3 0 PM Meeting Minute Issue Date: Revised Meeting Minute Issue Date: Meeting Minutes December 20, 2004 January 3, 2005 (revised text is in italic type) To: Attendees Cc: Jeff O'Neill, John Simola, Steve Grittman, David Graeber, Terry Humbert, Bob Miller, Tom Highum, Dan Prather, Dave Hall, Steve Ische, Don Sterna, Doug Weiszhaar Re: CSAH 18-I 94 Interchange Monticello, MN - Wright County SP 8680-138 WSB No. 1546-09 Attendees: Rick Wolfsteller Monticello 763 271 3211 Rick.Wolfsteller ci.rnonticello.mn.us 011ie Koropchak Monticello 763 271 3211 011ie. K.oro chuk ci.monticello.mn.us Dan Wilson Monticello 952 448 4630 Wilsondev5lO@aol.com Bret Weiss Monticello/WSB 763 287 7190 BWeiss ,wsben .com Chad Hausmann Mn/DOT 320 654 5446 Chad.Hausmann dot. state. mn.us Wayne Fingalson Wright County 763 682 7288 Wa e.Fin alson co.wriht.mmus Virgil Hawkins Wright County 763 682 7387 Virgil. Hawkinsco.wri ght.inn.us Brandi Popenhagen WSB 763 287 7178 BPo enha en wsben .corn Derek Schmidt WSB 763 287 8308 DSchmida wsben .com Nancy Hanzlik WSB 763 287 8303 NHanzlik@wsbeng.com Purpose: The purpose of this meeting was to kickoff the final design for the CSAH 18- I 94 Interchange Project with TAC members. Discussion Items: 1. 30% Plan submittal content will contain critical items including the alignments, soil letter, construction staging concepts, bridge geometry, and foundation recommendations. 2. The distribution for the 30% submittal is: Agency Person Number of Copies Monticello John Simola 1 Wright County Virgil Hawkins 3 Mn/DOT Chad Hausmann 2 Mn/DOT Bob Miller 4 C:\windows\TEMP\MM 041215 TAC.doc CSAH 181194 Interchange Monticello, MN Page 2 3. Nancy will email updated parcel sketches to Dan Wilson. The sketch for the school should be updated to not show the closing of the access on School Boulevard or the private drive. Nancy will arrange a meeting with the school district for December 22 in the afternoon to discuss project impacts on school property with district staff. 4. The County Board authorized Wayne to have the surveyor review and sign the right- of-way plat at the last County Board meeting. 5. Chad, Wayne and Virgil approved the delineation of Mn/DOT access control on the plat. Mn/DOT right-of-way limit on Chelsea Road should terminate at the corners just beyond the intersection since Mn/DOT is not letting the construction project. 6. Bridge and corridor aesthetics were discussed. WSB is working with Mn/DOT bridge staff to develop preliminary bridge aesthetics for consideration. The bridge will be designed for aesthetic level B. • Mn/DOT now requires additional protection for piers located within the clear zone. The pier for the new bridge will be designed to accommodate the required collision force. The protection of the pier is under discussion. Currently the pier of the road and adjacent pedestrian bridge is a single bull nose guardrail. Once the third lane is constructed on I-94, a center median will be constructed and the guardrail will not be required. WSB and Mn/DOT bridge office staff are developing concepts for the pier. A conceptual sketch was distributed and discussed at the meeting. Chad will discuss the pier protection (guardrail versus concrete barrier) with Mn/DOT District 3 maintenance staff. WSB will confirm cost participation for the barrier and attenuators with Mn/DOT and City staff. • Mn/DOT has proposed a modified f-barrier bridge railing for the new bridge. Photos of the railing were distributed at the meeting. Bret has asked Nancy to pursue other options with Mn/DOT for consideration including adding railing on top of the barrier and additional rustication options. • Lighting will be installed on top of the signal poles at the signalized intersections. City, County and Mn/DOT staff do not anticipate the installation of decorative lights on the CSAH 18 corridor or bridge. • Paint color on signals with lights will be discussed with John Simola. Mn/DOT and Wright County do not have a color preference. 7. The 30% plans may be submitted before the upcoming Holidays. Mn/DOT will determine if the 60% plan submittal will be required at a future date. 8. Two draft cost participation exhibits were distributed at the meeting — one for right- of-way and the other for construction costs. The county participation for the signals should be revised to reflect the Wright County cost participation policy. The cost split should be: Mn/DOT — 25%, Wright County — 37.5%, Monticello — 37.5%. The exhibits will be reviewed by TAC committee members prior to distribution at the PAC meeting. TAC members should provide comments for the exhibits to Nancy Hanzlik. 9. Ap-reement status is delineated below: Agreement Discussion Anticipated Schedule Design Mn/DOT has agreed to participate in the design Presentation of the partnership Services services cost for the project on a lump sum basis. agreement and project work order Chad will email drafts of the partnership at the January 10 City Council agreement to Nancy and meet with WSB staff to meeting for City acceptance. negotiate the percentage of construction cost for City consideration. Rick will execute the agreement for the City. CAwindows\TEMP\MM 041215 TAC.doc CSAH 181194 Interchange Monticello, MN Page 3 Agreement Discussion Anticipated Schedule Construction The Cooperative Agreement will be drafted by Construction letting is scheduled Services Mn/DOT between Mn/DOT, Wright County, for July 2005. The cooperative and Monticello. Chad confirmed that Monticello agreement will be drafted prior to will be letting and providing construction letting and executed following the observation services for the project. Since award of contract. Mn/DOT Mn/DOT is not letting the project, the schedule Central Office construction for the ROW #1 Certificate will be revised. document approval must occur prior to advertising for bids. Chad will notify Nancy regarding the impact of the City letting on the document preparation schedule. Signal Chad will consider combining the signal Not discussed at meeting. Maintenance agreement with the cooperative agreement for construction services. The agreements for the signals at the intersections of Chelsea Road, 7tn Street and CSAH 75 with CSAH 18 will be between Mn/DOT, Wright County and Monticello. Turn -back of Separate agreements will be developed for the To be determined. right-of-way affected parcels. Mn/DOT may consider using the CSAH 75 ramps during the redecking of the I-94 bridges over CSAH 75 in 2007. Billboards The billboards impacted by the project are being Disposition of billboards must be relocated outside of Mn/DOT right-of-way, not determined prior to final plan bought out. Dan Wilson will follow-up with approval. City staff regarding the billboard status since the disposition of the billboards impacts the assessment value. Railroad WSB has been in contact with BNSF Railroad Railroad crossing permit must be regarding the permit for the crossing at CSAH in place prior to final plan 18. approval. 10. Nancy will email cost participation sketches to Chad for distribution at Mn/DOT. 11. Nancy will schedule a joint PAC/TAC meeting for January 23, at 3:30 in Monticello. 12. Nancy will email the staging concept information to John Simola, Chad, Virgil, Bob Miller, and Tom Highum for discussion early next week. 13. Since the design speed for CSAH 18 is 40 mph and the posted speed is 45 mph, Wright County will request a speed study for CSAH 18 after construction. These minutes were prepared and revised by Nancy Hanzlik. C:\windows\TEMP\MM 041215 TAC.doc