Loading...
Transportation Advisory Commission Minutes - 12-22-2004 (2)WSB & Associates, Inc. WSB & Associates, Inc. 701 Xenia Avenue South, Ste. #300 Minneapolis, MN 55416 (763) 541-4800 (763) 541-1700 (fax) Meeting Minutes Subject: School District Meeting Meeting Date: December 22, 2004 Meeting Location: Monticello, MN Meeting Time: 1:30 PM Meeting Minute Issue Date: December 23, 2004 Revised Meeting Minute Issue Date: January 6, 2005 To: Attendees cc: John Simola, Rick Wolfsteller, Chad Hausmann, Bob Miller, Tom Highum, Steve Ische, Don Sterna, Derek Schmidt Re: CSAH 18-I 94 Interchange Monticello, MN - Wright County SP 8680-138 WSB No. 1546-09 Attendees: Nancy Hanzlik WSB 763 287 8303 NHanzhk a)wsben .corn Dan Wilson Dan Wilson Dev. 952 448 4630 Wilsondev510 a ll.com Bill Holingren Monticello Schools 763 271 0300 Bill. holm ren monticello.kl2.mn.us Chrysann Carriveau Monticello Schools 763 271 0507 ChUsann.calriveati@monticello.kl2.mn.us Mike Benedetto Monticello Schools 763 271 0300 Mlke.benedetto@monticello.kl2.mn.us Virgil Hawkins Wright Co. Hwy. 763 682 7387 Virgil.hawkilis@,co.wrijzht.iiill.us Bret Weiss WSB/Monticello 763 287 7190 Bweiss wsben .com Jim Johnson Monticello Schools 763 271 0300 Jim. 'ohnson ,monticello.kl2.nui.us Discussion Items: 1. All Monticello school buses go from the middle school on CSAH 75 across the CSAH 18 Bridge over I-94 to the high school on School Boulevard. There are an estimated 30 school buses (including handicapped) for the City. School buses run at 7: 30 a. m. and 2:30 p.m. 2. Eastview School will not serve as an elementary school in 2005 or 2006. The school is open for early childhood and Headstart programs. Approximately 50 cars use the lot on CSAH 18. 3. When the school does open for K-5 grades, all students will be bussed to school since School Boulevard is so busy. 4. At the an earlier meeting with the School District staff, the intersection of CSAH 18 and School Boulevard was discussed. At the time, the intersection was to be signalized and raised medians were going to be installed. The median on School C: IwindowslTEMPIMM 122204 School District.doc CSAH 181194 Interchange Monticello, MN Page 2 Boulevard would have extended beyond the entrance adjacent to the intersection. Closing the access and allowing access from the current bus access to the front lot was considered. A conceptual sketch of the private drive appears on the layout. Analysis of traffic at CSAH 18 and School Boulevard indicates that no signal is warranted at this intersection for this project. This information was not available at the time of the previous meeting with School District staff. The construction limits for this project will not extend beyond the intersection of School Boulevard and CSAH 18. Therefore, closing the drive adjacent to CSAH 18 on School Boulevard and constructing the private drive will not be included in this project. The School District staff will evaluate alternative access and internal traffic patterns to resolve the access location at a future date. 5. Required takings for the CSAH 18 interchange project include two small corner takes of permanent right-of-way and a temporary construction easement between the County right-of-way and the existing trail. The electric power poles on CSAH 18 were relocated when the right turn lanes were installed on CSAH 18. The intent was to relocate the poles on County right-of-way. However, the poles were placed on school property. During construction of the trail, the trail was relocated on school property based on negotiations between the District and Elmer Onstad. The School District, County and City staff agree to revise the County right-of-way line location to include the existing trail into the road/utility easement for the County on the plat being prepared by WSB. The recording of the plat will not cost the school district at this time. 6. Assessments are being considered for both Chelsea Road and CSAH 18 road improvement projects. Currently, WSB is determining assessment values for the CSAH 18 project. The public hearing is scheduled for the first council meeting in February 2005. The City Council will determine if assessments will be made to existing developments for the CSAH 18 project at the public hearing. Chelsea Road will be assessed to affected property owners in accordance with the City's assessment policy since it is a City street. 7. WSB will send two 200-scale plots of the October 15 layout to Mike Benedetto and Virgil Hawkins. 8. Mike Benedetto will be the contact for the School District. Nancy Hanzlik will be the CSAH 18 project contact. These minutes were prepared and revised by Nancy Hanzlik. C.•IwindowslTEMPIMM 122204 School District.doc