Loading...
2016-00730PROTECTION CRITERIA BASED ON 2007 NFPA 13 NOMINAL OUTSIDE INSIDE PIPE SIZE DIAMETER DIAMETER EDDY BLK THREADABLE PIPE DIMENSIONS 1' 1.315' 1.060 SCHEDULE 40 BLK PIPE DIMENSIONS 1' 1.315" 1.049 1 typ branch steel deck all 1" drDblackelev18'0" +- deck 19'0"+- thread l ON IIVr VIII IIAI OVERALL FIRE 2- /2" 1 existing;;` br nch r,,,,,,,,',,,,,,,,,, , 3 2-1/2" existing branch SPRINKLI-R PLAN 0 2 4 8 11012440:00 WWI illi CONTACT GENERAL PIPING SPRINKLER SYMBOL LEGIEND GENERAL NOTES INFORMATION AND DEMOLITION NOTES MAKE S.I.N. FINISH STYLE TEMP K -FACTOR SYMBOLDESCRIPTION7 DOCUMENTS INCLUDE JURISDICTIONAL REQUIREMENTS 1. CONTRACTOR MUST VISIT THE BUILDING TO 1. THE DESIGN SHOWN ON THESE CONTRACT RECESSEDHYDRAULIC REFERENCE NODE POINT PROVIDED BY THE FOLLOWING CONTACTS. DETERMINE THE FULL EXTENT OF THE EXISTING FIRE DOCUMENTS HAS BEEN PREPARED FOR APPROVAL BY TY -FRB TY3231 WHITE STYLE 10 155 596 PROTECTION WORK AND THE EXISTING CONDITIONS, THE AUTHORITY HAVING JURISDICTION AND TO FIRE SPRINKLER REVIEWING AUTHORITY: BECOME TOTALLY FAMILIAR WITH DISCONNECTIONS, PROVIDE GUIDANCE FOR BIDDING. THE CONTRACTOR UTE SPRINKLERS OF SAME SIZE, K -FACTOR AND CAP DARYL GILLES, FIRE CHIEF REMOVALS, RELOCATIONS AND/OR RECONNECTIONS SHALL SUBMIT COMPLETE FIRE SPRINKLER SHOP ION UNLESS PROHIBITED BY THE SPECIFICATIONS. (763) 295--4111 OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED, DRAWINGS AS REQUIRED BY SPECIFICATION SECTION RISER NIPPLE/DROP NIPPLE AND CONDITIONS IN THE PROPOSAL FOR THIS 01330. CONTRACTOR SHALL BASE SHOP DRAWING 112 RA7326 BRASS UP 155 11.2K PROJECT. NO EXTRA COMPENSATION WILL BE PAID DESIGN ON THE FIRE PROTECTION DRAWINGS AND FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION, SPECIFICATIONS. SPRINKLER SHOP DRAWINGS SHALL SPRINKLER RISERAPPLICABLE CODES AND/OR ALLOWANCE. INCLUDE ALL NECESSARY ELEVATIONS, HANGER LOCATIONS, PIPE LENGTHS, DIMENSIONS, FABRICATION c>I- INSPECTOR'S TEST/AUXILIARY DRAIN 2. UNLESS NOTED OTHERWISE, DISCONNECT AND REMOVE METHODS/NOTES, MATERIAL DATA, AND ANY OTHER NFPA STANDARDS EDITION ALL EXISTING FIRE PROTECTION COMPONENTS NOT INFORMATION NECESSARY TO CLARIFY THE INTENT OF HANGER NFPA 13 2007 INTENDED TO BE REUSED. INSTALLATION. CONTRACTOR SHALL PROVIDE PIPE SIZES, SPRINKLER SPACING, AND ALL SYSTEM 3. REMOVE ALL DEMOLITION MATERIALS AND DEBRIS TO CONFIGURATIONS AS SHOWN. ANY ALTERNATES IN TRAPEZE HANGER PERPENDICULAR TO JOIST REFER TO SHEET C1 FOR APPLICABLE BUILDING CODES AN APPROVED DUMPING SITE AND CLEAN ALL FIRE DESIGN OF THE SYSTEM OR IN MATERIALS OR PROTECTION WORK PRIOR TO PROJECT COMPLETION, EQUIPMENT USED MUST BE APPROVED IN WRITING VIA TRAPEZE HANGER PARALLEL TO JOIST THE REQUEST FOR INFORMATION PROCESS BY THE 4, PERFORM ALL WORK ACCORDING TO THE PROJECT FIRE PROTECTION ENGINEER OF RECORD PRIOR TO PHASING SCHEDULE INFORMATION FOR THIS PROJECT. ANY BIDDING, FABRICATION, OR INSTALLATION. NEW CONNECTION PROVIDE ALL NECESSARY FIRE PROTECTION WORK, TEMPORARY AND/OR OTHERWISE, AND USE WHATEVER 2. CONTRACTOR SHALL COORDINATE LOCATIONS OF FIRE NEW SPRINKLER PIPE MEANS NECESSARY, TO CONFORM TO THE REQUIRED PROTECTION COMPONENTS INCLUDING PIPING, ALARMS, CONSTRUCTION PHASING OF THE PROJECT. DRAINS, TEST POINTS, ETC., WITH ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND u,. —,--7-EXISTING SPRINKLER PIPE 5. CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR ELECTRICAL COMPONENTS. OBSTRUCTIONS TO REPLACING ITEMS DAMAGED DURING DEMOLITION AND SPRINKLER DISCHARGE MUST BE CONSIDERED DURING DEMO SPRINKLER PIPE CONSTRUCTION. SHOP DRAWING PRODUCTION AND INSTALLATION. EXTRA SPRINKLERS MAY BE REQUIRED AT NO PROVIDE ADDITIONAL SPRINKLERS AS 6. CONTRACTOR SHALL PATCH ALL HOLES TO MATCH ADDITIONAL COST TO WAL-MART, REFER TO REQUIRED PER NFPA 13 IN EXISTING ADJACENT SURFACES LEFT UNUSED AFTER EXISTING SPECIFICATION FOR ADDITIONAL REQUIREMENTS. SPRINKLER CABINET FOR ANY NEW SPRINKLER PIPING OR EQUIPMENT IS REMOVED AND SPRINKLERS INSTALLED. VACATED FROM THESE HOLES, 3. SUBMIT A REQUEST FOR INFORMATION (RFI), FOR QUESTIONS RELATED TO THE FIRE PROTECTION 7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND DOCUMENTS. MAINTAINING FIRE DEPARTMENT ACCESS ROADS THROUGHOUT THE PROJECT. 4, ROUTE ALL SPRINKLER MAINS ABOVE THE BOTTOM CHORD OF THE BAR JOISTS. 8. SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE DEMOLITION SHALL BE LEFT IN SERVICE. 5. PROVIDE FIRE PROTECTION AS REQUIRED BY CODE FOR ANY TEMPORARY STRUCTURES BUILT DURING 9. ALL WORK SHALL BE PERFORMED SO AS TO NOT CONSTRUCTION. INTERRUPT SERVICE. THE CONTRACTOR SHALL TOP BEAM CLAMP PROPERLY NOTIFY THE LANDLORD, THE LESSOR AND 6. SPRINKLER SYSTEMS ARE MONITORED BY AN ADJACENT TENANTS A MINIMUM OF 48 HOURS IN OFF-SITE CENTRAL STATION INCLUDING TAMPER ADVANCE BEFORE PROCEEDING WITH THIS WORK. SWITCHES ON ALL CONTROL VALVES AND FLOW ALL THREAD ROD ALL WORK SHALL BE SCHEDULED IN ADVANCE. SWITCHES. SWIVEL RING HANGER 10. ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO THE 7. IF APPLICABLE, THE CONTRACTOR SHALL ASSUME END OF EACH WORKDAY. THAT ANY CURTAIN BOARDS OR DRAFT CURTAINS WILL BE INSTALLED PRIOR TO THE SPRINKLER PIPING. 11. ONLY THE PORTIONS OF THE BUILDING AFFECTED BY CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER THE SCOPE OF THE PROJECT HAVE BEEN SHOWN. PENETRATIONS OF THE CURTAIN BOARDS OR DRAFT INFORMATION SHOWN AS EXISTING TO REMAIN IS NOT CURTAINS AND SEALING WITH APPROVED FIRE BEING MODIFIED AS A PART OF THIS PROJECT. CAULKING, SPRINKLER PIPE 12, SPRINKLER CONTRACTOR TO SUBMIT AND RECEIVE 8, PENETRATIONS OF RATED WALLS OR ASSEMBLIES APPROVAL OF FULL SHOP DRAWINGS TO HENDERSON SHALL BE "FIRE CAULKED" WITH APPROVED CAULKING BAR JOIST ENGINEERS PRIOR TO FABRICATION AND PER METHODS REQUIRED BY THE AUTHORITY HAVING INSTALLATION. JURSDICTION, AND PROJECT SPECIFICATIONS. 9. THE FIRE PROTECTION ENGINEER OF RECORD WILL ETAIL' NOT BE RESPONSIBLE FOR THE CONTRACTOR'S HANGER DKEYNOTES FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, NOR4SHALLTHEYBEREQUIREDTOSUPERVISETHE CONDUCT OF THE WORK, THE CONSTRUCTION 13.901 COORDINATE SPRINKLER PROTECTION PER PROCEDURES AS SET F=ORTH BY '3HE GENERAL REMOVAL, RELOCATION AND/OR ADDITION CONTRACTOR, SUB -CONTRACTORS, THEIR RESPECTIVE OF WALLS AND/OR CEILINGS, WHERE EMPLOYEES, OR ANY OTHER PERSON AT THE JOBSITE NECESSARY, REMOVE EXISTING OTHER THAN THE ENGINEERING FIRM'S OWN SPRINKLERS) AND ASSOCIATED PIPING. EMPLOYEES. y " lb's CAP OUTLETS NOT INTENDED FOR REUSE. WHERE NEW SPRINKLERS) ARE REQUIRED 10, SPRINKLER PROTECTION IS REQUIRED ABOVE THE WITHIN THE SAME COMPARTMENT AS ELECTRICAL ROOMS. NO MAIN PIPING SHALL EXISTING TO REMAIN SPRINKLERS, NEW PENETRATE OR PASS ABOVE THE ELECTRICAL ROOMS. SPRINKLER SHALL MATCH EXISTING SPRINKLER TYPE K -FACTOR, 11. THE CONTRACTOR MUST REVIEW ALL CONSTRUCTION TEMPERATURE RATING AND FINISH. DOCUMENTS PRIOR TO BID. SHOULD MODIFICATION TO WHERE APPLICABLE, ALIGN NEW THESE PLANS BECOME NECESSARY TO PROPERLY SPRINKLERS WITH EXISTING TO REMAIN COORDINATE THE SYSTEM WITH, OTHER TRADES, IT Nire&wss SPRINKLERS, AND COORDINATE WITH NEW WILL BE THE CONTRACTOR'S RESPONSIBILITY TO ria, o n W I r e I es ,;: AND EXISTING EQUIPMENT AND WALLS TO OBTAIN APPROVAL OF THESE CHANGES BY THE AHJ, MEET NFPA 13 SPACING REQUIREMENTS. AND THE FIRE PROTECTION ENGINEER OF RECORD. IN NOT MORE THAN ONE SPRINKLER ADDITION TO OBTAINING THE NECESSARY APPROVALS, SHALL BE SUPPLIED BY A 1" PIPE OR THE CONTRACTOR MUST MAKE NOTE OF ALL FIELD r CONNECTION. OR COORDINATION CHANGES ON THE INSTALLATION brk Ch DRAWINGS. ONCE COMPLETE, THE CONTRACTOR SHALL Ir N G 13.956 REROUTE EXISTING BRANCHLINES AS SUPPLY ONE COPY OF AS -BUILT DRAWINGS TO THE NECESSARY TO AVOID CONFLICT WITH FIRE PROTECTION ENGINEER OF RECORD FOR THEIR ROOF PENETRATIONS FOR NEW HVAC USE. EQUIPMENT. FIELD VERIFY EXACT LOCATION. ADD AND/OR RELOCATE 12. THE CONTRACTOR SHALL DIVERT ALL DRAIN AND H 0,E AWAYSPRINKLERSASREQUIREDTOMEET FROMCIONSHEDRS SURFFACES AND PIPEHTOGAPPROVEDNFPA13SPACINGANDOBSTRUCTION DRAIN LOCATIONS. THE CONTRACTOR WILL BEREQUIREMENTS. PROVIDE SPRINKLERS BACKCHARGED FOR ANY REPAIR, REPLACEMENT, OR r ,BELOW OBSTRUCTIONS OVER 4FT WIDE S ys , e,,. Pet ,,. , .., CLEANING OF RUST STAINS ON PAVEMENT/CONCRETE G 13.970 PROVIDE NEW PENDENT SPRINKLERS INyEa y DUE TO WATER DISCHARGE FROM SPRINKLER SYSTEM THIS AREA. CONNECT TO EXISTING DRAIN DOWNS. IF SPRINKLER PIPING, NOT MORE THAN ONE 13. ALL HANGER CONNECTIONS SHALL BE MADE TO THESPRINKLERSHALLBESUPPLIEDBYA TOP CHORD OF STRUCTURAL JOIST UNLESS NOTEDAh/ ,- 1" PIPE OR CONNECTION OTHERWISE. USE OF SAMMY SCREWS INTO ROOF DECKF OR STRUCTURE IS PROHIBITED UNLESS OTHERIS NOTED. 0=014 :4 E1,2110PA F -Pi OVERALL •SPRINKLER I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am NICET Certified at Level III Date: a 9 ' I Cert. No. 9519174 C O U 3) C O U L O a) a a) Q L Y d U) U_ a) U U a LU o c IZ o U) U M 4— p E T_ a) QO c O 0 0 E n En U Z ch Z Q o a) M 112- Q U Q m (n U_ LL W 4- 4- w o (D Co wod 0HOL)a-. 6 co U Co t>3 0 C m U) Q :3( _ W O O o a 5 d a' Z U_ o _a c U! C/) Q 0) o Q X -J • U m Lu a u 0 W _' w o a' Ey Q z : N O W cn Q IQ w LIJ O Q 70trLLCUaca LU co 0Cq0 m CQy ce ow Cq COV 0 I" d, ov d o r P. o 0 m o w z Mmm Z OaW1-4, wZa., ZN0 9 RoR: _Ei.d FILE REVIEWED FOR CODE C Ise. ANCE SII WLCT `its FIELD IN5PECT10K I m 0 C? N W U M aiLn 8 M _ N M W ^O O d N It tesMC t! mIEi+ o D to NQ0M p o OZ pp WLLj o o z 00 N HOSE MAXIMUM SPRINKLER OCCUPANCY DENSITY ALLOWANCE SPACING DESIGN BASIS CLASSIFICATION GPM) SQ FT) LEARNING CENTER 0.20/1500 SQ FT 250 130 CLASS I-IV TO 10'-0", 13: TABLE MISCELLANEOUS STORAGE) 13.2.1 AND FIGURE 13.2.1 STOCKROOM EXISTING EXISTING 100 EXISTING PROTECTION CRITERIA NOMINAL OUTSIDE INSIDE PIPE SIZE DIAMETER DIAMETER EDDY BLK THREADABLE PIPE DIMENSIONS 1' 1.315' 1.060 SCHEDULE 40 BLK PIPE DIMENSIONS 1' 1.315" 1.049 1 typ branch steel deck all 1" drDblackelev18'0" +- deck 19'0"+- thread l ON IIVr VIII IIAI OVERALL FIRE 2- /2" 1 existing;;` br nch r,,,,,,,,',,,,,,,,,, , 3 2-1/2" existing branch SPRINKLI-R PLAN 0 2 4 8 11012440:00 WWI illi CONTACT GENERAL PIPING SPRINKLER SYMBOL LEGIEND GENERAL NOTES INFORMATION AND DEMOLITION NOTES MAKE S.I.N. FINISH STYLE TEMP K -FACTOR SYMBOLDESCRIPTION7 DOCUMENTS INCLUDE JURISDICTIONAL REQUIREMENTS 1. CONTRACTOR MUST VISIT THE BUILDING TO 1. THE DESIGN SHOWN ON THESE CONTRACT RECESSEDHYDRAULIC REFERENCE NODE POINT PROVIDED BY THE FOLLOWING CONTACTS. DETERMINE THE FULL EXTENT OF THE EXISTING FIRE DOCUMENTS HAS BEEN PREPARED FOR APPROVAL BY TY -FRB TY3231 WHITE STYLE 10 155 596 PROTECTION WORK AND THE EXISTING CONDITIONS, THE AUTHORITY HAVING JURISDICTION AND TO FIRE SPRINKLER REVIEWING AUTHORITY: BECOME TOTALLY FAMILIAR WITH DISCONNECTIONS, PROVIDE GUIDANCE FOR BIDDING. THE CONTRACTOR UTE SPRINKLERS OF SAME SIZE, K -FACTOR AND CAP DARYL GILLES, FIRE CHIEF REMOVALS, RELOCATIONS AND/OR RECONNECTIONS SHALL SUBMIT COMPLETE FIRE SPRINKLER SHOP ION UNLESS PROHIBITED BY THE SPECIFICATIONS. (763) 295--4111 OF EXISTING FIRE PROTECTION EQUIPMENT REQUIRED, DRAWINGS AS REQUIRED BY SPECIFICATION SECTION RISER NIPPLE/DROP NIPPLE AND CONDITIONS IN THE PROPOSAL FOR THIS 01330. CONTRACTOR SHALL BASE SHOP DRAWING 112 RA7326 BRASS UP 155 11.2K PROJECT. NO EXTRA COMPENSATION WILL BE PAID DESIGN ON THE FIRE PROTECTION DRAWINGS AND FOR LACK OF SUCH DETERMINATION, FAMILIARIZATION, SPECIFICATIONS. SPRINKLER SHOP DRAWINGS SHALL SPRINKLER RISERAPPLICABLE CODES AND/OR ALLOWANCE. INCLUDE ALL NECESSARY ELEVATIONS, HANGER LOCATIONS, PIPE LENGTHS, DIMENSIONS, FABRICATION c>I- INSPECTOR'S TEST/AUXILIARY DRAIN 2. UNLESS NOTED OTHERWISE, DISCONNECT AND REMOVE METHODS/NOTES, MATERIAL DATA, AND ANY OTHER NFPA STANDARDS EDITION ALL EXISTING FIRE PROTECTION COMPONENTS NOT INFORMATION NECESSARY TO CLARIFY THE INTENT OF HANGER NFPA 13 2007 INTENDED TO BE REUSED. INSTALLATION. CONTRACTOR SHALL PROVIDE PIPE SIZES, SPRINKLER SPACING, AND ALL SYSTEM 3. REMOVE ALL DEMOLITION MATERIALS AND DEBRIS TO CONFIGURATIONS AS SHOWN. ANY ALTERNATES IN TRAPEZE HANGER PERPENDICULAR TO JOIST REFER TO SHEET C1 FOR APPLICABLE BUILDING CODES AN APPROVED DUMPING SITE AND CLEAN ALL FIRE DESIGN OF THE SYSTEM OR IN MATERIALS OR PROTECTION WORK PRIOR TO PROJECT COMPLETION, EQUIPMENT USED MUST BE APPROVED IN WRITING VIA TRAPEZE HANGER PARALLEL TO JOIST THE REQUEST FOR INFORMATION PROCESS BY THE 4, PERFORM ALL WORK ACCORDING TO THE PROJECT FIRE PROTECTION ENGINEER OF RECORD PRIOR TO PHASING SCHEDULE INFORMATION FOR THIS PROJECT. ANY BIDDING, FABRICATION, OR INSTALLATION. NEW CONNECTION PROVIDE ALL NECESSARY FIRE PROTECTION WORK, TEMPORARY AND/OR OTHERWISE, AND USE WHATEVER 2. CONTRACTOR SHALL COORDINATE LOCATIONS OF FIRE NEW SPRINKLER PIPE MEANS NECESSARY, TO CONFORM TO THE REQUIRED PROTECTION COMPONENTS INCLUDING PIPING, ALARMS, CONSTRUCTION PHASING OF THE PROJECT. DRAINS, TEST POINTS, ETC., WITH ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND u,. —,--7-EXISTING SPRINKLER PIPE 5. CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR ELECTRICAL COMPONENTS. OBSTRUCTIONS TO REPLACING ITEMS DAMAGED DURING DEMOLITION AND SPRINKLER DISCHARGE MUST BE CONSIDERED DURING DEMO SPRINKLER PIPE CONSTRUCTION. SHOP DRAWING PRODUCTION AND INSTALLATION. EXTRA SPRINKLERS MAY BE REQUIRED AT NO PROVIDE ADDITIONAL SPRINKLERS AS 6. CONTRACTOR SHALL PATCH ALL HOLES TO MATCH ADDITIONAL COST TO WAL-MART, REFER TO REQUIRED PER NFPA 13 IN EXISTING ADJACENT SURFACES LEFT UNUSED AFTER EXISTING SPECIFICATION FOR ADDITIONAL REQUIREMENTS. SPRINKLER CABINET FOR ANY NEW SPRINKLER PIPING OR EQUIPMENT IS REMOVED AND SPRINKLERS INSTALLED. VACATED FROM THESE HOLES, 3. SUBMIT A REQUEST FOR INFORMATION (RFI), FOR QUESTIONS RELATED TO THE FIRE PROTECTION 7. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND DOCUMENTS. MAINTAINING FIRE DEPARTMENT ACCESS ROADS THROUGHOUT THE PROJECT. 4, ROUTE ALL SPRINKLER MAINS ABOVE THE BOTTOM CHORD OF THE BAR JOISTS. 8. SPRINKLER SYSTEMS NOT ASSOCIATED WITH THE DEMOLITION SHALL BE LEFT IN SERVICE. 5. PROVIDE FIRE PROTECTION AS REQUIRED BY CODE FOR ANY TEMPORARY STRUCTURES BUILT DURING 9. ALL WORK SHALL BE PERFORMED SO AS TO NOT CONSTRUCTION. INTERRUPT SERVICE. THE CONTRACTOR SHALL TOP BEAM CLAMP PROPERLY NOTIFY THE LANDLORD, THE LESSOR AND 6. SPRINKLER SYSTEMS ARE MONITORED BY AN ADJACENT TENANTS A MINIMUM OF 48 HOURS IN OFF-SITE CENTRAL STATION INCLUDING TAMPER ADVANCE BEFORE PROCEEDING WITH THIS WORK. SWITCHES ON ALL CONTROL VALVES AND FLOW ALL THREAD ROD ALL WORK SHALL BE SCHEDULED IN ADVANCE. SWITCHES. SWIVEL RING HANGER 10. ALL SYSTEMS TO BE LEFT IN SERVICE PRIOR TO THE 7. IF APPLICABLE, THE CONTRACTOR SHALL ASSUME END OF EACH WORKDAY. THAT ANY CURTAIN BOARDS OR DRAFT CURTAINS WILL BE INSTALLED PRIOR TO THE SPRINKLER PIPING. 11. ONLY THE PORTIONS OF THE BUILDING AFFECTED BY CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER THE SCOPE OF THE PROJECT HAVE BEEN SHOWN. PENETRATIONS OF THE CURTAIN BOARDS OR DRAFT INFORMATION SHOWN AS EXISTING TO REMAIN IS NOT CURTAINS AND SEALING WITH APPROVED FIRE BEING MODIFIED AS A PART OF THIS PROJECT. CAULKING, SPRINKLER PIPE 12, SPRINKLER CONTRACTOR TO SUBMIT AND RECEIVE 8, PENETRATIONS OF RATED WALLS OR ASSEMBLIES APPROVAL OF FULL SHOP DRAWINGS TO HENDERSON SHALL BE "FIRE CAULKED" WITH APPROVED CAULKING BAR JOIST ENGINEERS PRIOR TO FABRICATION AND PER METHODS REQUIRED BY THE AUTHORITY HAVING INSTALLATION. JURSDICTION, AND PROJECT SPECIFICATIONS. 9. THE FIRE PROTECTION ENGINEER OF RECORD WILL ETAIL' NOT BE RESPONSIBLE FOR THE CONTRACTOR'S HANGER DKEYNOTES FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, NOR4SHALLTHEYBEREQUIREDTOSUPERVISETHE CONDUCT OF THE WORK, THE CONSTRUCTION 13.901 COORDINATE SPRINKLER PROTECTION PER PROCEDURES AS SET F=ORTH BY '3HE GENERAL REMOVAL, RELOCATION AND/OR ADDITION CONTRACTOR, SUB -CONTRACTORS, THEIR RESPECTIVE OF WALLS AND/OR CEILINGS, WHERE EMPLOYEES, OR ANY OTHER PERSON AT THE JOBSITE NECESSARY, REMOVE EXISTING OTHER THAN THE ENGINEERING FIRM'S OWN SPRINKLERS) AND ASSOCIATED PIPING. EMPLOYEES. y " lb's CAP OUTLETS NOT INTENDED FOR REUSE. WHERE NEW SPRINKLERS) ARE REQUIRED 10, SPRINKLER PROTECTION IS REQUIRED ABOVE THE WITHIN THE SAME COMPARTMENT AS ELECTRICAL ROOMS. NO MAIN PIPING SHALL EXISTING TO REMAIN SPRINKLERS, NEW PENETRATE OR PASS ABOVE THE ELECTRICAL ROOMS. SPRINKLER SHALL MATCH EXISTING SPRINKLER TYPE K -FACTOR, 11. THE CONTRACTOR MUST REVIEW ALL CONSTRUCTION TEMPERATURE RATING AND FINISH. DOCUMENTS PRIOR TO BID. SHOULD MODIFICATION TO WHERE APPLICABLE, ALIGN NEW THESE PLANS BECOME NECESSARY TO PROPERLY SPRINKLERS WITH EXISTING TO REMAIN COORDINATE THE SYSTEM WITH, OTHER TRADES, IT Nire&wss SPRINKLERS, AND COORDINATE WITH NEW WILL BE THE CONTRACTOR'S RESPONSIBILITY TO ria, o n W I r e I es ,;: AND EXISTING EQUIPMENT AND WALLS TO OBTAIN APPROVAL OF THESE CHANGES BY THE AHJ, MEET NFPA 13 SPACING REQUIREMENTS. AND THE FIRE PROTECTION ENGINEER OF RECORD. IN NOT MORE THAN ONE SPRINKLER ADDITION TO OBTAINING THE NECESSARY APPROVALS, SHALL BE SUPPLIED BY A 1" PIPE OR THE CONTRACTOR MUST MAKE NOTE OF ALL FIELD r CONNECTION. OR COORDINATION CHANGES ON THE INSTALLATION brk Ch DRAWINGS. ONCE COMPLETE, THE CONTRACTOR SHALL Ir N G 13.956 REROUTE EXISTING BRANCHLINES AS SUPPLY ONE COPY OF AS -BUILT DRAWINGS TO THE NECESSARY TO AVOID CONFLICT WITH FIRE PROTECTION ENGINEER OF RECORD FOR THEIR ROOF PENETRATIONS FOR NEW HVAC USE. EQUIPMENT. FIELD VERIFY EXACT LOCATION. ADD AND/OR RELOCATE 12. THE CONTRACTOR SHALL DIVERT ALL DRAIN AND H 0,E AWAYSPRINKLERSASREQUIREDTOMEET FROMCIONSHEDRS SURFFACES AND PIPEHTOGAPPROVEDNFPA13SPACINGANDOBSTRUCTION DRAIN LOCATIONS. THE CONTRACTOR WILL BEREQUIREMENTS. PROVIDE SPRINKLERS BACKCHARGED FOR ANY REPAIR, REPLACEMENT, OR r ,BELOW OBSTRUCTIONS OVER 4FT WIDE S ys , e,,. Pet ,,. , .., CLEANING OF RUST STAINS ON PAVEMENT/CONCRETE G 13.970 PROVIDE NEW PENDENT SPRINKLERS INyEa y DUE TO WATER DISCHARGE FROM SPRINKLER SYSTEM THIS AREA. CONNECT TO EXISTING DRAIN DOWNS. IF SPRINKLER PIPING, NOT MORE THAN ONE 13. ALL HANGER CONNECTIONS SHALL BE MADE TO THESPRINKLERSHALLBESUPPLIEDBYA TOP CHORD OF STRUCTURAL JOIST UNLESS NOTEDAh/ ,- 1" PIPE OR CONNECTION OTHERWISE. USE OF SAMMY SCREWS INTO ROOF DECKF OR STRUCTURE IS PROHIBITED UNLESS OTHERIS NOTED. 0=014 :4 E1,2110PA F -Pi OVERALL •SPRINKLER I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am NICET Certified at Level III Date: a 9 ' I Cert. No. 9519174 C O U 3) C O U L O a) a a) Q L Y d U) U_ a) U U a LU o c IZ o U) U M 4— p E T_ a) QO c O 0 0 E n En U Z ch Z Q o a) M 112- Q U Q m (n U_ LL W 4- 4- w o (D Co wod0HOL)a-. 6 co U Co t>3 0 C m U) Q :3( _ W O O o a 5 d a' Z U_ o _a c U! C/) Q 0) o Q X -J • U m Lu a u 0 W _' w o a' Ey Q z : N O W cn Q IQ w LIJ O Q 70trLLCUaca LU co 0Cq0 m CQy ce owCq COV 0 I" d, ov d o r P. o 0 m o w z Mmm Z OaW1-4, wZa., ZN0 9 RoR: _Ei.d FILE REVIEWED FOR CODE C Ise. ANCE SII WLCT `its FIELD IN5PECT10K I m 0 C? N W U M aiLn 8 M _ N M W ^O O d N It tesMC t! mIEi+ o D to NQ0M p o OZ pp WLLj o o z 00 N