2017-00486BUILDING CODE SUMMARY
USE: EXISTING RETAIL
CODES:
BUILDING CODE: 2015 MINNESOTA BUILDING CODE
ENERGY CODE: 2015 MINNESOTA ENERGY CODE
MECHANICAL CODE: 2015 MINNESOTA MECHANICAL CODE
PLUMBING CODE: 2015 MINNESOTA PLUMBING CODE
ELECTRICAL CODE: 2015 MINNESOTA ELECTRICAL CODE
FIRE CODE: 2015 MINNESOTA FIRE CODE
FUEL GAS CODE: 2015 MINNESOTA FUEL GAS CODE
ACCESSIBILITY CODE: 2015 MINNESOTA ACCESSABILITY CODE
OCCUPANCY: M -MERCANTILE; WHOLESALE OR RETAIL STORE (MAIN USE) - SECT. 309.1
S1 -STORAGE AREA; MOTOR VEHICLE SERVICE STATION
AND RECEIVING AND STOCK ROOMS (MIXED USE) - SECT. 311.2
A2 -ASSEMBLY USE; BREAK ROOM AND
FOOD TENANT (ACCESSORY TO MAIN USE) - SECT. 303.1
B -BUSINESS; NON FOOD TENANT (ACCESSORY TO MAIN USE) - SECT. 304.1
TYPE OF CONSTRUCTION: 5B UNPROTECTED (SPRINKLERED) PER SECT. 602.5 AND TABLES 601 AND 602
ALLOWABLE AREA: UNLIMITED SECTION 507.3
FIRE PROTECTION: BUILDING IS EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM AND
IS SURROUNDED ON ALL SIDES BY 60 FEET MINIMUM OF PERMANENT OPEN SPACE
AND COMPLIES WITH SECTION 507.3. UNLIMITED AREA CRITERIA IS APPLICABLE.
MECHANICAL: BUILDING OMCIAL
CTA ARCHITECTS ENGINEERS CITY OF MONTICELLO, MN
JIM ARMER, PE
WALMART
800 W. MAIN STREET #800 505 WALNUT STREET, SUITE 1
BOISE, ID 83702 MONTICELLO, MN 55362
208 336-4900 763 295-3060
CAPX SUS -NT
USMV=0 024
MONTICELLO, MN
STORE # 3624-602
PROJECT ADDRESS
9320 CEDAR ST.
MONTICELLO, MN. 55362
SQUARE FOOTAGE:
195,000 S.F.
AHU-2
REFRIGERATION
RACK D
AHU-1
GENERAL
INFORMATION
REFER TO SPECIFICATION SECTION 01640 - OWNER
FURNISHED EQUIPMENT. THESE SECTIONS INCLUDE
SPECIFIC INFORMATION REGARDING ITEMS AND SERVICES
TO BE FURNISHED AND INSTALLED BY INDIVIDUALS OTHER
THAN THE GENERAL CONTRACTOR.
REFER TO GENERAL CONTRACTOR PERMIT, REGISTRATION,
NOTIFICATION INSPECTION & INSTALLER
CERTIFICATION(GCPRN) REPORT LOCATED IN GC PERMIT
INFORMATION FOLDER ON OWNER'S DOCUMENT DELIVERY
WEBSITE.
SCOPE
OF WORK
INSTALL NEW HEAT RECLAIM SKID
INSTALL NEW HEAT RECLAIM AIR COILS AND ASSOC.
DUCTWORK
INSTALL NEW HYDRONIC PIPING
DRAWING INDEX
GENERAL
C1 COVER SHEET AND CODE SUMMARY
MECHANICAL
HR1 OVERVIEW PLAN
HR2 DETAILED PLAN
HR3 REFRIGERATION DETAILS
HR4 MECHANICAL SCHEDULES
VENDOR CONTACT LIST
CONTRACTOR IS RESPONSIBLE, UPON AWARD, TO CONTACT AND VERIFY ALL DATES/TIMES WITH
EVERY VENDOR LISTED BELOW, OR TO CHANGE ANY DATES OR DELIVERIES. CONTRACTOR MUST
CONTACT WALMART CONSTRUCTION MANAGER LISTED BELOW. THIS IS UNIQUE TO CAPITAL
EXPENDITURES PROJECTS.
VENDOR PHONE CONTACT
RAE CORPORATION (918) 825-7222 EXT. 144 CHRIS HARRISON
918) 825-7222 EXT. 111 JEREMY COLVARD
CONTRACTOR IS RESPONSIBLE, UPON AWARD, TO CONTACT AND VERIFY ALL DELIVERY DATES/
TIMES FOR CONTRACTOR WITH EVERY VENDOR LISTED ABOVE. THIS IS UNIQUE TO CAPITAL
EXPENDITURE PROJECTS. TO CHANGE ANY DATES OR DELIVERIES, THEY MUST CONTACT THE
WALMART CONSTRUCTION MANAGER LISTED.
24 HOURS PRIOR TO SHUTTING DOWN ANY REFRIGERATION SYSTEMS, H.V.A.C. SYSTEMS, OR
ENERGY MANAGEMENT CONTROLS SYSTEMS, SEND E-MAIL TO NSRM®WALMART.COM. THE
E-MAIL SHALL STATE WHAT, WHY, AND WHEN IT IS BEING SHUT DOWN AND HOW LONG IS IT
ANTICIPATED TO BE DOWN. THEN SEND FOLLOW UP E-MAIL TO MSRMQWALMART.COM AFTER
THE WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND RUNNING.
SR. PROJECT MANAGER MECHANICAL CONSTRUCTION MANAGER INSPECTOR STORE MANAGER
WALMART WALMART WALMART
JIM MCCLENDON LOUWAUNA OBERT OMAR EL GHANDOUR
WAL—MART STORES, INC_ WAL—MART STORES, INC. WALMART SUPERCENTER #3624
9320 CEDAR ST.
ames.McClendon@walmart.com ouwauno.Obert@walmart.com ONTICELLO, MN
479 204-0181 479 277-1612 763 295-9813
building Official Review and
Authorization Required Prior To
Chanpsg ModiftaWns,
or Alterations
APPROVi[;'C FILE COPY
REVIEWED FOR CODE
SUbjLCT 10 FIELD INSPECTION
Date:,
W
Z W O N
W m m
n Q rL N
c'- =
Psa
FW..
J v
v y o is
W asoma"
W < m
Z U m
ZW
y j40
W ,
vni zw-j -nFozo
W1 J
z< -o 16t-6 rrirr Ww *< <w ww6o
OW aN 'moi-omx<?wiEo
N= NNW <3XU1W
pO
QY
OO OO JW WOK
F- ZN <wot AOWJw o ZZQSOOoaVwxW vj4_o
J Xo Y o
oFW<wo1wwZ-wmD_ NW ZZ rFOw 00c940>
r=-oo a.iraawoa< Cn
ISSUE BLOCK
CHECKED BY. MC
DRAWN BY. JRL
DOCUMENT DATE: 06/08/17
This Job Cerny baii Be
Available On i"he Job
Site For ALL i -%7,p etions
TATE BOARD OF ELECT
BeparatpFerinir 6h inspections
Required For Electrical Work
I hereby certify that this plan,
specification, or report was
prepared by me or under my
direct supervision and that I am
a duly Licensed Professional
Engineer under the laws of the
State of Minnesota.
James C 4 ozmy
Signature
Date 10/13/11 License
48300
COVER
SHEET
SHEET:
C1
0
REF 5/HR1
REF 5/HA2
TO (E) AHU 1 AND
E) AHU-2. SEE
1/HR2 AND 2/HR2
FOR CONTINUATION -:\X
ROUTE NEW LINES /
DOWN TO ROOF
ROUTE NEW LINES UP
AND OVER PARAPET WALL,
SEE DETAIL 5/HR1 FOR
VERTICAL PIPING SUPPORT'
N) LIQUID LINE. ROUTE THROUGH RACK
HOUSE. DO NOT OBSTRUCT ACCESS TO
EXISTING EQUIPMENT. DRAWING IS
SCHEMATIC IN NATURE AND DOES NOT
DICTATE ACTUAL ROUTING. KEEP PIPING
LEVEL AS MUCH AS POSSIBLE.
LIQUID LINE TIE-IN. SEE
DETAIL 4/HR1 FOR
TIE-IN LOCATION
EXISTING
EXTERIOR WALL
SCALE: 1/4"=l' -O"
PIPING TO OFFSET AND
ROUTE PIPING TOGETHER
AT 6' AFF TO WALL
SUPPLY
ry
O N
U)
mwwmC
ao
0 = O
v
107
I-1
DISCHARGE LINE TIE-IN. REF
4/HR1 FOR TIE-IN LOCATION
N) DISCHARGE LINES TO AND
FROM HR SKID TO BE PIPED ON
EXTERIOR OF RACK HOUSE.
RECLAIM PACKAGE MOUNTED AND
SECURED TO GROUND WITH
CONCRETE LAG BOLTS NEXT TO
E) REFRIGERATION HOUSE.
DO NOT OBSTRUCT ACCESS
TO EXISTING EQUIPMENT
SEE DETAIL 2/HR1 FOR
CONNECTION SIZES
I,milli: go I,
O
E) SPLIT CONDENSER
SOLENOID VALVES
E) PRESSURE TRANSDUCER
0F COMPRESSOR
REFRIGERATION RECLAIM
PACKAGE ISOMETRIC
NTS
CONDENSER
50% SIDE)
CONDENSER
100% SIDE)
SUPPLY WATER CONNECTION
2 1/2" MPT
DISCHARGE OUTLET CONNECTION
2 1/8" ODS
RETURN WATER CONNECTION
2 1/2" MPT
DISCHARGE INTLET CONNECTION
2 1/8- ODS
LIQUID DRAIN CONNECTION
1 3/8" ODS
PROVIDE AND INSTALL
N) PRESSURE TRANSDUCER.
INSTALL NEW CABLING FROM
TRANSDUCER TO CONDENSER
FANFWD-.
N) MANUAL ISOLATION VALVES.
INSTALL ISOLATION VALVES
PRIOR TO HEAT RECLAIM SKID
TIE-IN TO MINIMIZE DOWNTIME. -
RECLAIM
3 -WAY
f VALVE
N) MANUAL BYPASS VALVE. BYPASS
INSTALL BYPASS VALVE VALVE Lr"I ---- C I_ -.
PRIOR TO HEAT RECLAIM CONDENSER
SKID TIE-IN TO MINIMIZE
DOWNTIME. 7N)MANUAL ISOLATION VALVES.
INSTALL ISOLATION VALVES HEAT RECLAIM UNIT
PRIOR TO HEAT RECLAIM SKID BY OTHERS
TIE-IN TO MINIMIZE DOWNTIME.
E) RECEIVER PRESSURIZATION
VALVE
PROVIDE IN0DEANDINSTALLLL
N) PRESSURE TRANSDUCER FOR
A8 DRAIN REGULATOR CONTROL
E) A8 DRAIN REGULATOR.
PROVIDE AND INSTALL SPORLAN
ELECTRONIC RETROFIT KIT.
REF 6/HR3
RECEIVER
REFRIGERATION PIPING SCHEMATIC
E) RECEIVER BYPASS
SOLENOID VALVE
SUPPORT PIPING
AS SHOWN
UNISTRUT P-1000
3E
2 CUSH-A-CLAMP FIRMLY
MPED TO PIPE
PROVIDE SUPPORT @ 10'-0"
O.C.
HORZONTAL PIPING SUPPORT
ELEVATION
REFRIGERATION LINES
EXTERIOR TO BUILDING (TYP)
CUSH-A-CLAMP FIRMLY
CLAMPED TO PIPE
TYP
WALL OR BUILDING STRUCTURE J \-1 5/8"x1 5/8" GALVANIZED
UNISTRUT P-1000, 10'-0"
PLAN MAXIMUM ON CENTERS
VERTICAL PIPING SUPPORT
2g
W —
z W O N
U) N
W
U) Q ^ n
WO
goii
U o mwMQ2oL"
2 "
w a
Z U ci
O
ZW
W orw ioz
Z W r N¢_
zwF=
f¢
3
O O Q K c, W~
O
Q N W
24w¢3¢rnw N¢Y
z 3c352Eomz3
O owfzp a 7 wzoa z
F'- Zfn ¢,00FN WJ O Z
Q Q¢000wvi€
cwiarOLLAo
o z'E o mUwwc~iwWzc~imOFEWw¢wOw'wz'w
wzzr'owwoo¢o>
NOO¢7'
0I
RZa¢
oEU otna aawoa:2
0
CD C:
0 O
CD
Q d z
CD
v`J
CO
M M cn
wo
LLI
O
ISSUE BLOCK
CHECKED BY: MBC
DRAWN BY: JRL
DOCUMENT DATE: 06/08/17
I hereby certify that this plan,
specification, or report was
prepared by me or under my
direct supervision and that I am
a duly Licensed Professional
Engineer under the laws of the
State of Minnesota.
James czrjw.s G
Signature
Date 10/13/11 License
48300
FRIGERATION
PLAN
AND
DETAILS
SHEET:
HR1
18"X18" PSE 2-2 OR BAS
PORTABLE PIPE HANGERS, I
SUPPORT TO BE ADHERED
INTERABOND DOUBLE STICK
FOR TPO ROOFS, OR FLEXC
DOUBLE STICK ADHESIVE F(
ROOFS.
KEEP ALL HYDRONIC PIPING AT
CONSTANT ELEVATION AS MUCH AS
POSSIBLE AND MINIMIZE PIPING
CROSSOVER. BULL HEAD TEE
ARRANGEMENTS ARE UNACCEPTABLE.
ALL HYDRONIC PIPING HIGH POINTS
OR TRAP LOCATIONS WILL REQUIRE
MANUAL AIR VENTS. MANUAL AIR
VENTS SHALL BE 1/4" BALL VALVE
WITH CAP.
2" MPT INLET
2" MPT OUTLET
AUTO BALANCING VALVE /r
ON HYDRONIC SUPPLY,
SHIPPED WITH UNIT -
REF 5/HR2
PIPING ABOVE ROOF.
SEE DETAIL 4/HR2
FOR SUPPORT DETAIL
HRC -1
NTS
E)AHU-1
CONTRACTOR TO MAKE
NECESSARY DUCT
ADAPTATIONS TO ENSURE
N)HRC-1 AIR TIGHT SEAL
RETURN TO RECLAIM PACKAGE. SEE
SUPPLY 1 /HR1 FOR CONTINUATION
N) RECLAIM PREHEAT AIR COIL
ASSEMBLY PROVIDED BY OTHERS, SEE
SCHEDULE FOR SIZE INFORMATION, SEE
DETAILS 3/HR2 AND 7/HR2 FOR MORE
INFORMATION
HYDRONIC DETAILED PLAN
ELEVATION
FIT
3RANE AROUND
ULL LAP AT TOP
3RANE
ATION
1-1/2" ZINC COATED LAG
1/2"MIN SCREWS (TYP)
TYP I
TREATED WOOD BLOCKING: 6"X6"X12"
FOR HYDRONIC PIPING AT 10'-0" ON
o I
CENTER MAXIMUM ABOVE 1-1/4" PIPE
SIZE.
w
w I 60 MIL MEMBRANE EXTEND MIN. 1/2"
BEYOND END OF WOOD BLOCKING.
ROOF
NTS
TOP PIPE BLOCKING
I ILLV VLI\II I I ILI VII I
FOR PROPER COIL
SUPPORT
7 AIR COIL SUPPORT
PORT BY
ANGERS, INC.
IBRANE
KEEP ALL HYDRONIC PIPING AT
CONSTANT ELEVATION AS MUCH AS
POSSIBLE AND MINIMIZE PIPING
CROSSOVER. BULL HEAD TEE
ARRANGEMENTS ARE UNACCEPTABLE.
ALL HYDRONIC PIPING HIGH POINTS
OR TRAP LOCATIONS WILL REQUIRE
MANUAL AIR VENTS. MANUAL AIR
VENTS SHALL BE 1/4" BALL VALVE
WITH CAP.
2" MPT INLET
2" MPT OUTLET
AUTO BALANCING VALVE
ON HYDRONIC SUPPLY,
SHIPPED WITH UNIT --/
REF 5/HR2
PIPING ABOVE ROOF.
SEE DETAIL 4/HR2
FOR SUPPORT DETAIL
E)AHU-2
CONTRACTOR TO MAKE
NECESSARY DUCT
ADAPTATIONS TO ENSURE
N)HRC-2 AIR TIGHT SEAL
KL I UKN TO RECLAIM PACKAGE. SEE
SUPPLY 1/HR1 FOR CONTINUATION
N) RECLAIM PREHEAT AIR COIL
ASSEMBLY PROVIDED BY OTHERS, SEE
SCHEDULE FOR SIZE INFORMATION, SEE
DETAILS 3/HR2 AND 7/HR2 FOR MORE
INFORMATION
HRC -2 HYDRONIC DETAILED PLAN
NTS
UNION
PROVIDE PLUMBING GRADE -
ISOLATION VALVES
2" SUPPLY AND RETURN
PROVIDED BY CONTRACTOR,
PROVIDE MANUAL AIR VENT
AT HIGHEST POINT AND DRAIN
AT LOWEST POINT OF PIPING. -
UNION
PROVIDE PLUMBING GRADE -
ISOLATION VALVES
2-1/2" SUPPLY AND RETURN
PROVIDED BY CONTRACTOR,
PROVIDE MANUAL AIR VENT
AT HIGHEST POINT AND DRAIN
AT LOWEST POINT OF PIPING. '
PROVIDE PLUMBING GRADE
ISOLATION VALVE
PROVIDE PLUMBING GRADE
ISOLATION VALVE
PROVIDE WYE STRAINER
PROVIDE DRAIN VALVE
2" SUPPLY AND RETURN
PROVIDED BY CONTRACTOR,
PROVIDE MANUAL AIR VENT
AT HIGHEST POINT AND DRAIN
AT LOWEST POINT OF PIPING.
UNION F- —
IEXPANSION
TANK
I
UNION
1 1: A
HEAT RECOVERY COIL FURNISHED
BY OWNER INSTALLED BY CONTRACTOR.
HRC -1 SEE HEAT RECLAIM COIL SCHEDULE
FOR MORE INFORMATION.
INSTALL AUTOMATIC BALANCE VALVE
TO SUPPLY SIDE OF HRC COIL.
BALANCE VALVE SUPPLIED BY OWNER,
INSTALLED BY CONTRACTOR. WORKING FLUID: 35% PROPYLENE GLYCOL
EXTERIOR PIPING INSULATION: 1". INSULATION
NOT REQUIRED ON INTERIOR PIPING, SEE
SPECIFICATONS FOR MORE INFORMATION
HEAT RECOVERY COIL FURNISHED
BY OWNER INSTALLED BY CONTRACTOR.
HRC -2 SEE HEAT RECLAIM COIL SCHEDULE
FOR MORE INFORMATION.
INSTALL AUTOMATIC BALANCE VALVE ALL HYDRONIC PIPING HIGH POINTS
TO SUPPLY SIDE OF HRC COIL. OR TRAP LOCATIONS WILL REQUIRE
BALANCE VALVE SUPPLIED BY OWNER, AIR BLEED VALVES. ALL AIR BLEED
INSTALLED BY CONTRACTOR. VALVES SHALL BE 1/4" BALL VALVE
WITH CAP.
KEEP ALL HYDRONIC PIPING AT
CONSTANT ELEVATION AS MUCH AS
POSSIBLE AND MINIMIZE PIPING
CROSSOVER. BULLHEAD TEE
ARRANGEMENTS ARE UNACCEPTABLE.
HEAT RECLAIM
CONDENSER COIL
IDASHED LINE INDICATES HEAT
RECLAIM CONDENSER UNIT, FURNISHED
BY OWNER, INSTALLED BY CONTRACTOR
SEE DETAIL 3/HR3 FOR MORE
I INFORMATION
I
NOTE: REFER TO SPECIFICATIONS
FOR CHARGING PROCEDURES AND
PIPING INFORMATION
HYDRONIC PIPING SCHEMATIC -
041 11
CHEMATIC
NTS
E) AIR HANDLING UNIT
AIR INTAKE LOUVER--\,,,,
NOTE: CONTRACTOR TO FIELD VERIFY
EXISTING CONDITIONS AND DIMENSIONS
PRIOR TO STARTING WORK. VERIFY COIL
TRANSITION HEIGHT REQUIREMENTS
BASED ON ROOF SLOPE.
AIR FLOW
CONTRACTOR TO PROVIDE
SUPPORT FOR COIL FROM
ROOF. FIELD VERIFY HEIGHT
REQUIRED. SEE DETAIL 7/HR2
FOR MORE INFORMATION
I- - - - - - - - - - - - - - - - - - - - - - - - -
I- - - - - - - - - - - - - - - - - - - - - - - -
E) ROOF
HEAT RECOVERY COIL INSTALLATION DETAIL
NTS
EXTERIOR WALL
E) RACK HOUSE
PROVIDE NEW CONTROL CIRCUIT FOR
HEAT RECLAIM UNIT. PROVIDE CIRCUIT
FROM NORMALLY OPEN CONTACT POINT
ON 4 -POLE ICE CUBE RELAY, LOCATED
IN CONDENSER CONTROL PANEL TO
DIGITAL INPUT IN HEAT RECLAIM.
ROIITF THRnilrH FXI¢Ttnlr_ RAr1V wnllcC
W POWER CIRCUIT FOR NEW
AIM UNIT. PROVIDE NEW
EAKER IN (E) RACK HOUSE,
0 UNIT WITH 3/4"C (3)#12,
IRCUIT TO BE RUN IN 3/4"
EE ELECTRICAL PANEL
FOR CIRCUIT LOCATION
JNTROL WIRES FROM DRY
CONTACTS IN NEW HEAT RECLAIM
@)—E LECTRICAL PLAN
W g
ZIw-oNr
z5° wN
W W'& m
rA Q F16
r
W ZOS OJ
Of U T o Q
w a
zw
w xoz" moonoNNwFZw €
rz3
w O FI-iwi l.K Zyo-c'¢J
zW
a¢
Z¢¢oowc00Ei-cZJON
Of w 3¢ ¢w wa 60
LO 'T zo, 1z' ¢jwF2
00 NryW¢ ¢fnW Otndr
z35zWWDOWoW%zaal-a
sZ
o
w o o w o
i-- ZV) ¢NOfWN
woJmOz
Z
Q Q¢000wNF rNw no
waz,
h--
oNzoHoomoomwowzwl-wJWw zotw- roPW ¢owz<
wzz-,'o00o'r
I-o ofna aaawoa
O O
D C::) .•
1 O
o Z
I
O a
Cn
z
Ld
o
ISSUE BLOCK
CHECKED BY: MBC
DRAWN BY: JRL
DOCUMENT DATE: 06/08/17
I hereby certify that this plan,
specification, or report was
prepared by me or under my
direct supervision and that I am
a duly Licensed Professional
Engineer under the laws of the
State of Minnesota.
James
Signature
Date 10/13/11 License
48300
MECHANICAL
PLAN
AND
DETAILS
SHEET:
HR2
HEAT RECOVERY COIL SCHEDULE (OWNER FURNISHED, CONTRACTOR INSTALLED)
COIL ASSEMBLY MANUFACTURER MODEL NUMBER EQUIPMENT SERVED OPERATING WEIGHT
HRC -1 RAE COIL B -BOX AHU-1 1003 LBS
HRC -2 RAE COIL B -BOX AHU-2 1003 LBS
D-ML-KKaULLE
E) Refrigeration System Information
E) RACK
SYSTEM TYPE
MTD
RACK HOUSE
LOCATION GROUND MOUNTED
REFRIGERANT R404A
REQ'D CAPACITY (MBH) 488.8
AVAILABLE CAPACITY (MBH) 546.3
DESIGN THR (MBH) 785.5
E) CONTROLLER DANFOSS
REFRIGERATION SCHEDULE
Heat Reclaim Package PPD -75
Owner Furnished, Contractor Installed)
z
SIZE LOCATION
O PHYSICAL DIMENSIONS (L x W x H) S'0" x 2'21' x 5'011
Q—
N) 20A -3P 26, 28, 30
CC
PARKER/SPORLAN 0-500 PSIG TRANSDUCER
AHU-1 MUNTERS
ZSNIPPING WEIGHT 862
w O
HCUw603O4 10,000 0.5 CONTINUOUS 5,000
O
953100
L,
ELECTRICAL REQUIREMENTS 208V/3PH/60Hz 15A
o DISCHARGE CONNECTION 2) 2 1/8" ODS
0 a
NOTES: 1. PROVIDE 50 VA 120V/24VAC CLASS 11 TRANSFORMER WITH INTEGRAL TRIP FOR PRESSURE
W DRAIN CONNECTION 13/8" ODS
cc
3. SEE PARKER/SPORLAN ENGINEERING BULLETINS 100-40-2 AND 100-50-5.5 FOR FURTHER
z REFRIGERANT R404A
z FLUID TYPE 35% PG
ov
O QDESIGN FLOW RATE 75 GPM
s
p ESTIMATED GLYCOL CHARGE 190 GALU-
9
HYDRONIC CONNECTIONS 2) 2-1/2" MPT
RECLAIM PACKAGE SCHEDULE
E) 208/60/3 DISTRIBUTION PANEL, RACK SERVICE
LOCATED IN EXISTING RACK HOUSE PANEL
DESCRIPTION SIZE LOCATION
CFM SP OPERATION1:
HEAT RECLAIM UNIT N) 20A -3P 26, 28, 30
ELECTRICAL PANEL SCHEDULE
E) AIR HANDLING UNIT SCHEDULE
MARK MANUFACTURER MODEL
SUPPLY FAN
OUTSIDE
CFM SP OPERATION1: AIR CFM
183905
1 PARKER/SPORLAN 0-500 PSIG TRANSDUCER
AHU-1 MUNTERS HCUw603O4 10,000 0 5 CONTINUOUS 5,000
AHU-2 MUNTERS HCUw603O4 10,000 0.5 CONTINUOUS 5,000
AIR HANDLING UNIT SCHEDULE
N,) ELECTRONIC HOLDBACK SYSTEM
ALARM CIRCUIT SCHEDULE
N) ELECTRONIC HOLDBACK PARTS LIST
QNTY MANUFACTURER DESCRIPTION ITEM NUMBER
1 PARKER/SPORLAN A82 TO CDS-17 CONVERSION KIT
1/2"C, (2) #18
183905
1 PARKER/SPORLAN 0-500 PSIG TRANSDUCER
NOTES: 1. FINAL TERMINATION BY START UP CONTRACTOR. LEAVE WIRE COILED IN CABINET
FOR FINAL TERMINATION BY START UP CONTRACTOR.
952576
1 PARKER/SPORLAN 5 METER PRESSURE TRANSDUCER CABLE Yh O
953100
1 PARKER/SPORLAN PRESSURE CONTROLLER
O953474
z
NOTES: 1. PROVIDE 50 VA 120V/24VAC CLASS 11 TRANSFORMER WITH INTEGRAL TRIP FOR PRESSURECONTROLLERPOWER.
2. POWERED FROM 120V TERMINAL IN DEFROST PANEL.
3. SEE PARKER/SPORLAN ENGINEERING BULLETINS 100-40-2 AND 100-50-5.5 FOR FURTHER EQUIPMENTANDINSTALLATIONINSTRUCTION.
N,) ELECTRONIC HOLDBACK SYSTEM
ALARM CIRCUIT SCHEDULE
LOCATION BOARD TYPE BOARD ADDRESS, POINT CIRCUIT INFO
COMPRESSOR RACK D N) AK2-XM 101A 1/2"C, (2) #18
NOTES: 1. FINAL TERMINATION BY START UP CONTRACTOR. LEAVE WIRE COILED IN CABINET
FOR FINAL TERMINATION BY START UP CONTRACTOR.
ALARM CIRCUIT SCHEDULE
W
N
Lu
rq Q r
coM< W
0)om0'
w s
is
z U<
co
0Z
LA
W4
Lil ¢ wzZw x0,z
n O V)fn¢WF rrcoo2nwZ
Ww- rook-' z w.. ozW
f -z o viiz<ivw
wF g<<<wwwm8o?o0aN }hZ URx QxO
1•-O Zft- wF-1-
aV
Z 3vz,wDot xza F-aOc
nw.
zk om5ww OF5
Q o o+-rn=
WSJ>
w< V
z Wi Oz.Uli zt- wo
mol-
w z
LLLL11< wo
ow U
wwz-wm
NWZZI-'OW O(,9Q O}
n z)Eo o,a,¢aawo a<
0
CD C
O
00
z
Yh O
O
z
i W
O
It
spe
Pre,
dire
a
Eng
Sto
Jarr
Sigr
Dot
48
CHECKED BY: MBC
DRAWN BY: JRL
DOCUMENT DATE: 06/08/17
ereby certify that this plan,
ification, or report was
ored by me or under my
ct supervision and that I am
duly Licensed Professional
neer under the laws of the
e of Minnesota.
es
ature
10/13/11 License
300
MECHANICAL
SCHEDULES
SHEET:
HR3
LOUVER
HINGED LEFT)
17 7/8"
2" LIFTING LUG
LIFT AND TURN
LATCH
INTAKE LOUVER —
AIR FLOW)
1
3/4" FLOOR I DRAIN
3 PLACES
FILTER/COIL
Ar'rGCC nnno
2 11/16" 24
19 1/8
43 7/8"
5/8" MOUNTING HOLES
EST SHIPPING WEIGHT 870
EST OPERATING WEIGHT 1003
ALL DIMENSIONS +/- 1/4"
47 3/16"
1
1 1/2" PERIMETEF
FLANGE
TOP AND SIDES
AVERSE HOLES
82 .
PETE'S PLUG
1/4" MPT VENT,
BALL VALVE
MPT FLUID
ITLET
PETE'S PLUG
2" MPT FLUID
INLET
4" MPT DRAIN,
ALL VALVE
SPREADER BAR
VERTICAL
FORCE
NOTE:
HAYS AUTOMATIC BALANCE VALVE,
MODEL 2530, WILL SHIP LOOSE FOR
FIELD INSTALLATION.
COIL REMOVAL FROM EITHER SIDE.
HEAT RE
P
HEAT
RECLAIM UNIT
REF. INLET
2 1/8" ODS
RECLAIM
HEAT EXHANGER
REF. OUTLET
1 3/8' ODS
47
RECLAIM HEAT EXHANGER LIFTING LUGS
FLUID OUTLET
9/16"0 MOUNTING HOLES
EST SHIPPING WT. 862
EST OPERATING WT. 680
RECLAIM HEAT EXHANGER
FLUID INLET
2 1/2" MPT
3 3/16"
02'
1
3 15/16"
60 9/16"
1 118' —If 1 118"
17 1/4" -,- 25 112' 171/4"
6 3/16" t 60"
SPREADER BAR
VERTI1
FORT
SPREADER BAR
itS
W
z F o N r
z (1) ai
Lu m
AQ N
W J Q O
F J :D
V o m
Lit Q gdLL
Ld Q p
z U mC7
ZW
W H W W n
Wn O F W = O Z NmOZZ,
OW w w
zWF'2a3
LiJ o I-la. Q>Oo
D_ Kt- u= Z tiZw
Q Q S zj 0 O W= Z Q N wlaQOW
Q W Q O OOaNyroZaa? Fo
V3V VINWQ XVI WOj Q}
z 3Uz m o w za¢ra
zv°z o voa zza
Q 3 OJO O4. fnSWKJ vj NOQJFU > U
oz U OmUWw V Wic~iw
O F -r QwO wwZ-wmaNwZZFw-OW 00(9Q0>
Hz a
In ' Dmoaw a Dwaawoa
0
C:--:) C:
O O--
O
I CO
CD
O a
Z d
LLJ
co
ISSUE BLOCK
CHECKED BY: MBC
DRAWN BY: JRL
DOCUMENT DATE: 06/08/17
EQUIPMENT
SUBMITTALS
SHEET:
H R4