Loading...
2017-00486BUILDING CODE SUMMARY USE: EXISTING RETAIL CODES: BUILDING CODE: 2015 MINNESOTA BUILDING CODE ENERGY CODE: 2015 MINNESOTA ENERGY CODE MECHANICAL CODE: 2015 MINNESOTA MECHANICAL CODE PLUMBING CODE: 2015 MINNESOTA PLUMBING CODE ELECTRICAL CODE: 2015 MINNESOTA ELECTRICAL CODE FIRE CODE: 2015 MINNESOTA FIRE CODE FUEL GAS CODE: 2015 MINNESOTA FUEL GAS CODE ACCESSIBILITY CODE: 2015 MINNESOTA ACCESSABILITY CODE OCCUPANCY: M -MERCANTILE; WHOLESALE OR RETAIL STORE (MAIN USE) - SECT. 309.1 S1 -STORAGE AREA; MOTOR VEHICLE SERVICE STATION AND RECEIVING AND STOCK ROOMS (MIXED USE) - SECT. 311.2 A2 -ASSEMBLY USE; BREAK ROOM AND FOOD TENANT (ACCESSORY TO MAIN USE) - SECT. 303.1 B -BUSINESS; NON FOOD TENANT (ACCESSORY TO MAIN USE) - SECT. 304.1 TYPE OF CONSTRUCTION: 5B UNPROTECTED (SPRINKLERED) PER SECT. 602.5 AND TABLES 601 AND 602 ALLOWABLE AREA: UNLIMITED SECTION 507.3 FIRE PROTECTION: BUILDING IS EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM AND IS SURROUNDED ON ALL SIDES BY 60 FEET MINIMUM OF PERMANENT OPEN SPACE AND COMPLIES WITH SECTION 507.3. UNLIMITED AREA CRITERIA IS APPLICABLE. MECHANICAL: BUILDING OMCIAL CTA ARCHITECTS ENGINEERS CITY OF MONTICELLO, MN JIM ARMER, PE WALMART 800 W. MAIN STREET #800 505 WALNUT STREET, SUITE 1 BOISE, ID 83702 MONTICELLO, MN 55362 208 336-4900 763 295-3060 CAPX SUS -NT USMV=0 024 MONTICELLO, MN STORE # 3624-602 PROJECT ADDRESS 9320 CEDAR ST. MONTICELLO, MN. 55362 SQUARE FOOTAGE: 195,000 S.F. AHU-2 REFRIGERATION RACK D AHU-1 GENERAL INFORMATION REFER TO SPECIFICATION SECTION 01640 - OWNER FURNISHED EQUIPMENT. THESE SECTIONS INCLUDE SPECIFIC INFORMATION REGARDING ITEMS AND SERVICES TO BE FURNISHED AND INSTALLED BY INDIVIDUALS OTHER THAN THE GENERAL CONTRACTOR. REFER TO GENERAL CONTRACTOR PERMIT, REGISTRATION, NOTIFICATION INSPECTION & INSTALLER CERTIFICATION(GCPRN) REPORT LOCATED IN GC PERMIT INFORMATION FOLDER ON OWNER'S DOCUMENT DELIVERY WEBSITE. SCOPE OF WORK INSTALL NEW HEAT RECLAIM SKID INSTALL NEW HEAT RECLAIM AIR COILS AND ASSOC. DUCTWORK INSTALL NEW HYDRONIC PIPING DRAWING INDEX GENERAL C1 COVER SHEET AND CODE SUMMARY MECHANICAL HR1 OVERVIEW PLAN HR2 DETAILED PLAN HR3 REFRIGERATION DETAILS HR4 MECHANICAL SCHEDULES VENDOR CONTACT LIST CONTRACTOR IS RESPONSIBLE, UPON AWARD, TO CONTACT AND VERIFY ALL DATES/TIMES WITH EVERY VENDOR LISTED BELOW, OR TO CHANGE ANY DATES OR DELIVERIES. CONTRACTOR MUST CONTACT WALMART CONSTRUCTION MANAGER LISTED BELOW. THIS IS UNIQUE TO CAPITAL EXPENDITURES PROJECTS. VENDOR PHONE CONTACT RAE CORPORATION (918) 825-7222 EXT. 144 CHRIS HARRISON 918) 825-7222 EXT. 111 JEREMY COLVARD CONTRACTOR IS RESPONSIBLE, UPON AWARD, TO CONTACT AND VERIFY ALL DELIVERY DATES/ TIMES FOR CONTRACTOR WITH EVERY VENDOR LISTED ABOVE. THIS IS UNIQUE TO CAPITAL EXPENDITURE PROJECTS. TO CHANGE ANY DATES OR DELIVERIES, THEY MUST CONTACT THE WALMART CONSTRUCTION MANAGER LISTED. 24 HOURS PRIOR TO SHUTTING DOWN ANY REFRIGERATION SYSTEMS, H.V.A.C. SYSTEMS, OR ENERGY MANAGEMENT CONTROLS SYSTEMS, SEND E-MAIL TO NSRM®WALMART.COM. THE E-MAIL SHALL STATE WHAT, WHY, AND WHEN IT IS BEING SHUT DOWN AND HOW LONG IS IT ANTICIPATED TO BE DOWN. THEN SEND FOLLOW UP E-MAIL TO MSRMQWALMART.COM AFTER THE WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND RUNNING. SR. PROJECT MANAGER MECHANICAL CONSTRUCTION MANAGER INSPECTOR STORE MANAGER WALMART WALMART WALMART JIM MCCLENDON LOUWAUNA OBERT OMAR EL GHANDOUR WAL—MART STORES, INC_ WAL—MART STORES, INC. WALMART SUPERCENTER #3624 9320 CEDAR ST. ames.McClendon@walmart.com ouwauno.Obert@walmart.com ONTICELLO, MN 479 204-0181 479 277-1612 763 295-9813 building Official Review and Authorization Required Prior To Chanpsg ModiftaWns, or Alterations APPROVi[;'C FILE COPY REVIEWED FOR CODE SUbjLCT 10 FIELD INSPECTION Date:, W Z W O N W m m n Q rL N c'- = Psa FW.. J v v y o is W asoma" W < m Z U m ZW y j40 W , vni zw-j -nFozo W1 J z< -o 16t-6 rrirr Ww *< <w ww6o OW aN 'moi-omx<?wiEo N= NNW <3XU1W pO QY OO OO JW WOK F- ZN <wot AOWJw o ZZQSOOoaVwxW vj4_o J Xo Y o oFW<wo1wwZ-wmD_ NW ZZ rFOw 00c940> r=-oo a.iraawoa< Cn ISSUE BLOCK CHECKED BY. MC DRAWN BY. JRL DOCUMENT DATE: 06/08/17 This Job Cerny baii Be Available On i"he Job Site For ALL i -%7,p etions TATE BOARD OF ELECT BeparatpFerinir 6h inspections Required For Electrical Work I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. James C 4 ozmy Signature Date 10/13/11 License 48300 COVER SHEET SHEET: C1 0 REF 5/HR1 REF 5/HA2 TO (E) AHU 1 AND E) AHU-2. SEE 1/HR2 AND 2/HR2 FOR CONTINUATION -:\X ROUTE NEW LINES / DOWN TO ROOF ROUTE NEW LINES UP AND OVER PARAPET WALL, SEE DETAIL 5/HR1 FOR VERTICAL PIPING SUPPORT' N) LIQUID LINE. ROUTE THROUGH RACK HOUSE. DO NOT OBSTRUCT ACCESS TO EXISTING EQUIPMENT. DRAWING IS SCHEMATIC IN NATURE AND DOES NOT DICTATE ACTUAL ROUTING. KEEP PIPING LEVEL AS MUCH AS POSSIBLE. LIQUID LINE TIE-IN. SEE DETAIL 4/HR1 FOR TIE-IN LOCATION EXISTING EXTERIOR WALL SCALE: 1/4"=l' -O" PIPING TO OFFSET AND ROUTE PIPING TOGETHER AT 6' AFF TO WALL SUPPLY ry O N U) mwwmC ao 0 = O v 107 I-1 DISCHARGE LINE TIE-IN. REF 4/HR1 FOR TIE-IN LOCATION N) DISCHARGE LINES TO AND FROM HR SKID TO BE PIPED ON EXTERIOR OF RACK HOUSE. RECLAIM PACKAGE MOUNTED AND SECURED TO GROUND WITH CONCRETE LAG BOLTS NEXT TO E) REFRIGERATION HOUSE. DO NOT OBSTRUCT ACCESS TO EXISTING EQUIPMENT SEE DETAIL 2/HR1 FOR CONNECTION SIZES I,milli: go I, O E) SPLIT CONDENSER SOLENOID VALVES E) PRESSURE TRANSDUCER 0F COMPRESSOR REFRIGERATION RECLAIM PACKAGE ISOMETRIC NTS CONDENSER 50% SIDE) CONDENSER 100% SIDE) SUPPLY WATER CONNECTION 2 1/2" MPT DISCHARGE OUTLET CONNECTION 2 1/8" ODS RETURN WATER CONNECTION 2 1/2" MPT DISCHARGE INTLET CONNECTION 2 1/8- ODS LIQUID DRAIN CONNECTION 1 3/8" ODS PROVIDE AND INSTALL N) PRESSURE TRANSDUCER. INSTALL NEW CABLING FROM TRANSDUCER TO CONDENSER FANFWD-. N) MANUAL ISOLATION VALVES. INSTALL ISOLATION VALVES PRIOR TO HEAT RECLAIM SKID TIE-IN TO MINIMIZE DOWNTIME. - RECLAIM 3 -WAY f VALVE N) MANUAL BYPASS VALVE. BYPASS INSTALL BYPASS VALVE VALVE Lr"I ---- C I_ -. PRIOR TO HEAT RECLAIM CONDENSER SKID TIE-IN TO MINIMIZE DOWNTIME. 7N)MANUAL ISOLATION VALVES. INSTALL ISOLATION VALVES HEAT RECLAIM UNIT PRIOR TO HEAT RECLAIM SKID BY OTHERS TIE-IN TO MINIMIZE DOWNTIME. E) RECEIVER PRESSURIZATION VALVE PROVIDE IN0DEANDINSTALLLL N) PRESSURE TRANSDUCER FOR A8 DRAIN REGULATOR CONTROL E) A8 DRAIN REGULATOR. PROVIDE AND INSTALL SPORLAN ELECTRONIC RETROFIT KIT. REF 6/HR3 RECEIVER REFRIGERATION PIPING SCHEMATIC E) RECEIVER BYPASS SOLENOID VALVE SUPPORT PIPING AS SHOWN UNISTRUT P-1000 3E 2 CUSH-A-CLAMP FIRMLY MPED TO PIPE PROVIDE SUPPORT @ 10'-0" O.C. HORZONTAL PIPING SUPPORT ELEVATION REFRIGERATION LINES EXTERIOR TO BUILDING (TYP) CUSH-A-CLAMP FIRMLY CLAMPED TO PIPE TYP WALL OR BUILDING STRUCTURE J \-1 5/8"x1 5/8" GALVANIZED UNISTRUT P-1000, 10'-0" PLAN MAXIMUM ON CENTERS VERTICAL PIPING SUPPORT 2g W — z W O N U) N W U) Q ^ n WO goii U o mwMQ2oL" 2 " w a Z U ci O ZW W orw ioz Z W r N¢_ zwF= f¢ 3 O O Q K c, W~ O Q N W 24w¢3¢rnw N¢Y z 3c352Eomz3 O owfzp a 7 wzoa z F'- Zfn ¢,00FN WJ O Z Q Q¢000wvi€ cwiarOLLAo o z'E o mUwwc~iwWzc~imOFEWw¢wOw'wz'w wzzr'owwoo¢o> NOO¢7' 0I RZa¢ oEU otna aawoa:2 0 CD C: 0 O CD Q d z CD v`J CO M M cn wo LLI O ISSUE BLOCK CHECKED BY: MBC DRAWN BY: JRL DOCUMENT DATE: 06/08/17 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. James czrjw.s G Signature Date 10/13/11 License 48300 FRIGERATION PLAN AND DETAILS SHEET: HR1 18"X18" PSE 2-2 OR BAS PORTABLE PIPE HANGERS, I SUPPORT TO BE ADHERED INTERABOND DOUBLE STICK FOR TPO ROOFS, OR FLEXC DOUBLE STICK ADHESIVE F( ROOFS. KEEP ALL HYDRONIC PIPING AT CONSTANT ELEVATION AS MUCH AS POSSIBLE AND MINIMIZE PIPING CROSSOVER. BULL HEAD TEE ARRANGEMENTS ARE UNACCEPTABLE. ALL HYDRONIC PIPING HIGH POINTS OR TRAP LOCATIONS WILL REQUIRE MANUAL AIR VENTS. MANUAL AIR VENTS SHALL BE 1/4" BALL VALVE WITH CAP. 2" MPT INLET 2" MPT OUTLET AUTO BALANCING VALVE /r ON HYDRONIC SUPPLY, SHIPPED WITH UNIT - REF 5/HR2 PIPING ABOVE ROOF. SEE DETAIL 4/HR2 FOR SUPPORT DETAIL HRC -1 NTS E)AHU-1 CONTRACTOR TO MAKE NECESSARY DUCT ADAPTATIONS TO ENSURE N)HRC-1 AIR TIGHT SEAL RETURN TO RECLAIM PACKAGE. SEE SUPPLY 1 /HR1 FOR CONTINUATION N) RECLAIM PREHEAT AIR COIL ASSEMBLY PROVIDED BY OTHERS, SEE SCHEDULE FOR SIZE INFORMATION, SEE DETAILS 3/HR2 AND 7/HR2 FOR MORE INFORMATION HYDRONIC DETAILED PLAN ELEVATION FIT 3RANE AROUND ULL LAP AT TOP 3RANE ATION 1-1/2" ZINC COATED LAG 1/2"MIN SCREWS (TYP) TYP I TREATED WOOD BLOCKING: 6"X6"X12" FOR HYDRONIC PIPING AT 10'-0" ON o I CENTER MAXIMUM ABOVE 1-1/4" PIPE SIZE. w w I 60 MIL MEMBRANE EXTEND MIN. 1/2" BEYOND END OF WOOD BLOCKING. ROOF NTS TOP PIPE BLOCKING I ILLV VLI\II I I ILI VII I FOR PROPER COIL SUPPORT 7 AIR COIL SUPPORT PORT BY ANGERS, INC. IBRANE KEEP ALL HYDRONIC PIPING AT CONSTANT ELEVATION AS MUCH AS POSSIBLE AND MINIMIZE PIPING CROSSOVER. BULL HEAD TEE ARRANGEMENTS ARE UNACCEPTABLE. ALL HYDRONIC PIPING HIGH POINTS OR TRAP LOCATIONS WILL REQUIRE MANUAL AIR VENTS. MANUAL AIR VENTS SHALL BE 1/4" BALL VALVE WITH CAP. 2" MPT INLET 2" MPT OUTLET AUTO BALANCING VALVE ON HYDRONIC SUPPLY, SHIPPED WITH UNIT --/ REF 5/HR2 PIPING ABOVE ROOF. SEE DETAIL 4/HR2 FOR SUPPORT DETAIL E)AHU-2 CONTRACTOR TO MAKE NECESSARY DUCT ADAPTATIONS TO ENSURE N)HRC-2 AIR TIGHT SEAL KL I UKN TO RECLAIM PACKAGE. SEE SUPPLY 1/HR1 FOR CONTINUATION N) RECLAIM PREHEAT AIR COIL ASSEMBLY PROVIDED BY OTHERS, SEE SCHEDULE FOR SIZE INFORMATION, SEE DETAILS 3/HR2 AND 7/HR2 FOR MORE INFORMATION HRC -2 HYDRONIC DETAILED PLAN NTS UNION PROVIDE PLUMBING GRADE - ISOLATION VALVES 2" SUPPLY AND RETURN PROVIDED BY CONTRACTOR, PROVIDE MANUAL AIR VENT AT HIGHEST POINT AND DRAIN AT LOWEST POINT OF PIPING. - UNION PROVIDE PLUMBING GRADE - ISOLATION VALVES 2-1/2" SUPPLY AND RETURN PROVIDED BY CONTRACTOR, PROVIDE MANUAL AIR VENT AT HIGHEST POINT AND DRAIN AT LOWEST POINT OF PIPING. ' PROVIDE PLUMBING GRADE ISOLATION VALVE PROVIDE PLUMBING GRADE ISOLATION VALVE PROVIDE WYE STRAINER PROVIDE DRAIN VALVE 2" SUPPLY AND RETURN PROVIDED BY CONTRACTOR, PROVIDE MANUAL AIR VENT AT HIGHEST POINT AND DRAIN AT LOWEST POINT OF PIPING. UNION F- — IEXPANSION TANK I UNION 1 1: A HEAT RECOVERY COIL FURNISHED BY OWNER INSTALLED BY CONTRACTOR. HRC -1 SEE HEAT RECLAIM COIL SCHEDULE FOR MORE INFORMATION. INSTALL AUTOMATIC BALANCE VALVE TO SUPPLY SIDE OF HRC COIL. BALANCE VALVE SUPPLIED BY OWNER, INSTALLED BY CONTRACTOR. WORKING FLUID: 35% PROPYLENE GLYCOL EXTERIOR PIPING INSULATION: 1". INSULATION NOT REQUIRED ON INTERIOR PIPING, SEE SPECIFICATONS FOR MORE INFORMATION HEAT RECOVERY COIL FURNISHED BY OWNER INSTALLED BY CONTRACTOR. HRC -2 SEE HEAT RECLAIM COIL SCHEDULE FOR MORE INFORMATION. INSTALL AUTOMATIC BALANCE VALVE ALL HYDRONIC PIPING HIGH POINTS TO SUPPLY SIDE OF HRC COIL. OR TRAP LOCATIONS WILL REQUIRE BALANCE VALVE SUPPLIED BY OWNER, AIR BLEED VALVES. ALL AIR BLEED INSTALLED BY CONTRACTOR. VALVES SHALL BE 1/4" BALL VALVE WITH CAP. KEEP ALL HYDRONIC PIPING AT CONSTANT ELEVATION AS MUCH AS POSSIBLE AND MINIMIZE PIPING CROSSOVER. BULLHEAD TEE ARRANGEMENTS ARE UNACCEPTABLE. HEAT RECLAIM CONDENSER COIL IDASHED LINE INDICATES HEAT RECLAIM CONDENSER UNIT, FURNISHED BY OWNER, INSTALLED BY CONTRACTOR SEE DETAIL 3/HR3 FOR MORE I INFORMATION I NOTE: REFER TO SPECIFICATIONS FOR CHARGING PROCEDURES AND PIPING INFORMATION HYDRONIC PIPING SCHEMATIC - 041 11 CHEMATIC NTS E) AIR HANDLING UNIT AIR INTAKE LOUVER--\,,,, NOTE: CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO STARTING WORK. VERIFY COIL TRANSITION HEIGHT REQUIREMENTS BASED ON ROOF SLOPE. AIR FLOW CONTRACTOR TO PROVIDE SUPPORT FOR COIL FROM ROOF. FIELD VERIFY HEIGHT REQUIRED. SEE DETAIL 7/HR2 FOR MORE INFORMATION I- - - - - - - - - - - - - - - - - - - - - - - - - I- - - - - - - - - - - - - - - - - - - - - - - - E) ROOF HEAT RECOVERY COIL INSTALLATION DETAIL NTS EXTERIOR WALL E) RACK HOUSE PROVIDE NEW CONTROL CIRCUIT FOR HEAT RECLAIM UNIT. PROVIDE CIRCUIT FROM NORMALLY OPEN CONTACT POINT ON 4 -POLE ICE CUBE RELAY, LOCATED IN CONDENSER CONTROL PANEL TO DIGITAL INPUT IN HEAT RECLAIM. ROIITF THRnilrH FXI¢Ttnlr_ RAr1V wnllcC W POWER CIRCUIT FOR NEW AIM UNIT. PROVIDE NEW EAKER IN (E) RACK HOUSE, 0 UNIT WITH 3/4"C (3)#12, IRCUIT TO BE RUN IN 3/4" EE ELECTRICAL PANEL FOR CIRCUIT LOCATION JNTROL WIRES FROM DRY CONTACTS IN NEW HEAT RECLAIM @)—E LECTRICAL PLAN W g ZIw-oNr z5° wN W W'& m rA Q F16 r W ZOS OJ Of U T o Q w a zw w xoz" moonoNNwFZw € rz3 w O FI-iwi l.K Zyo-c'¢J zW a¢ Z¢¢oowc00Ei-cZJON Of w 3¢ ¢w wa 60 LO 'T zo, 1z' ¢jwF2 00 NryW¢ ¢fnW Otndr z35zWWDOWoW%zaal-a sZ o w o o w o i-- ZV) ¢NOfWN woJmOz Z Q Q¢000wNF rNw no waz, h-- oNzoHoomoomwowzwl-wJWw zotw- roPW ¢owz< wzz-,'o00o'r I-o ofna aaawoa O O D C::) .• 1 O o Z I O a Cn z Ld o ISSUE BLOCK CHECKED BY: MBC DRAWN BY: JRL DOCUMENT DATE: 06/08/17 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. James Signature Date 10/13/11 License 48300 MECHANICAL PLAN AND DETAILS SHEET: HR2 HEAT RECOVERY COIL SCHEDULE (OWNER FURNISHED, CONTRACTOR INSTALLED) COIL ASSEMBLY MANUFACTURER MODEL NUMBER EQUIPMENT SERVED OPERATING WEIGHT HRC -1 RAE COIL B -BOX AHU-1 1003 LBS HRC -2 RAE COIL B -BOX AHU-2 1003 LBS D-ML-KKaULLE E) Refrigeration System Information E) RACK SYSTEM TYPE MTD RACK HOUSE LOCATION GROUND MOUNTED REFRIGERANT R404A REQ'D CAPACITY (MBH) 488.8 AVAILABLE CAPACITY (MBH) 546.3 DESIGN THR (MBH) 785.5 E) CONTROLLER DANFOSS REFRIGERATION SCHEDULE Heat Reclaim Package PPD -75 Owner Furnished, Contractor Installed) z SIZE LOCATION O PHYSICAL DIMENSIONS (L x W x H) S'0" x 2'21' x 5'011 Q— N) 20A -3P 26, 28, 30 CC PARKER/SPORLAN 0-500 PSIG TRANSDUCER AHU-1 MUNTERS ZSNIPPING WEIGHT 862 w O HCUw603O4 10,000 0.5 CONTINUOUS 5,000 O 953100 L, ELECTRICAL REQUIREMENTS 208V/3PH/60Hz 15A o DISCHARGE CONNECTION 2) 2 1/8" ODS 0 a NOTES: 1. PROVIDE 50 VA 120V/24VAC CLASS 11 TRANSFORMER WITH INTEGRAL TRIP FOR PRESSURE W DRAIN CONNECTION 13/8" ODS cc 3. SEE PARKER/SPORLAN ENGINEERING BULLETINS 100-40-2 AND 100-50-5.5 FOR FURTHER z REFRIGERANT R404A z FLUID TYPE 35% PG ov O QDESIGN FLOW RATE 75 GPM s p ESTIMATED GLYCOL CHARGE 190 GALU- 9 HYDRONIC CONNECTIONS 2) 2-1/2" MPT RECLAIM PACKAGE SCHEDULE E) 208/60/3 DISTRIBUTION PANEL, RACK SERVICE LOCATED IN EXISTING RACK HOUSE PANEL DESCRIPTION SIZE LOCATION CFM SP OPERATION1: HEAT RECLAIM UNIT N) 20A -3P 26, 28, 30 ELECTRICAL PANEL SCHEDULE E) AIR HANDLING UNIT SCHEDULE MARK MANUFACTURER MODEL SUPPLY FAN OUTSIDE CFM SP OPERATION1: AIR CFM 183905 1 PARKER/SPORLAN 0-500 PSIG TRANSDUCER AHU-1 MUNTERS HCUw603O4 10,000 0 5 CONTINUOUS 5,000 AHU-2 MUNTERS HCUw603O4 10,000 0.5 CONTINUOUS 5,000 AIR HANDLING UNIT SCHEDULE N,) ELECTRONIC HOLDBACK SYSTEM ALARM CIRCUIT SCHEDULE N) ELECTRONIC HOLDBACK PARTS LIST QNTY MANUFACTURER DESCRIPTION ITEM NUMBER 1 PARKER/SPORLAN A82 TO CDS-17 CONVERSION KIT 1/2"C, (2) #18 183905 1 PARKER/SPORLAN 0-500 PSIG TRANSDUCER NOTES: 1. FINAL TERMINATION BY START UP CONTRACTOR. LEAVE WIRE COILED IN CABINET FOR FINAL TERMINATION BY START UP CONTRACTOR. 952576 1 PARKER/SPORLAN 5 METER PRESSURE TRANSDUCER CABLE Yh O 953100 1 PARKER/SPORLAN PRESSURE CONTROLLER O953474 z NOTES: 1. PROVIDE 50 VA 120V/24VAC CLASS 11 TRANSFORMER WITH INTEGRAL TRIP FOR PRESSURECONTROLLERPOWER. 2. POWERED FROM 120V TERMINAL IN DEFROST PANEL. 3. SEE PARKER/SPORLAN ENGINEERING BULLETINS 100-40-2 AND 100-50-5.5 FOR FURTHER EQUIPMENTANDINSTALLATIONINSTRUCTION. N,) ELECTRONIC HOLDBACK SYSTEM ALARM CIRCUIT SCHEDULE LOCATION BOARD TYPE BOARD ADDRESS, POINT CIRCUIT INFO COMPRESSOR RACK D N) AK2-XM 101A 1/2"C, (2) #18 NOTES: 1. FINAL TERMINATION BY START UP CONTRACTOR. LEAVE WIRE COILED IN CABINET FOR FINAL TERMINATION BY START UP CONTRACTOR. ALARM CIRCUIT SCHEDULE W N Lu rq Q r coM< W 0)om0' w s is z U< co 0Z LA W4 Lil ¢ wzZw x0,z n O V)fn¢WF rrcoo2nwZ Ww- rook-' z w.. ozW f -z o viiz<ivw wF g<<<wwwm8o?o0aN }hZ URx QxO 1•-O Zft- wF-1- aV Z 3vz,wDot xza F-aOc nw. zk om5ww OF5 Q o o+-rn= WSJ> w< V z Wi Oz.Uli zt- wo mol- w z LLLL11< wo ow U wwz-wm NWZZI-'OW O(,9Q O} n z)Eo o,a,¢aawo a< 0 CD C O 00 z Yh O O z i W O It spe Pre, dire a Eng Sto Jarr Sigr Dot 48 CHECKED BY: MBC DRAWN BY: JRL DOCUMENT DATE: 06/08/17 ereby certify that this plan, ification, or report was ored by me or under my ct supervision and that I am duly Licensed Professional neer under the laws of the e of Minnesota. es ature 10/13/11 License 300 MECHANICAL SCHEDULES SHEET: HR3 LOUVER HINGED LEFT) 17 7/8" 2" LIFTING LUG LIFT AND TURN LATCH INTAKE LOUVER — AIR FLOW) 1 3/4" FLOOR I DRAIN 3 PLACES FILTER/COIL Ar'rGCC nnno 2 11/16" 24 19 1/8 43 7/8" 5/8" MOUNTING HOLES EST SHIPPING WEIGHT 870 EST OPERATING WEIGHT 1003 ALL DIMENSIONS +/- 1/4" 47 3/16" 1 1 1/2" PERIMETEF FLANGE TOP AND SIDES AVERSE HOLES 82 . PETE'S PLUG 1/4" MPT VENT, BALL VALVE MPT FLUID ITLET PETE'S PLUG 2" MPT FLUID INLET 4" MPT DRAIN, ALL VALVE SPREADER BAR VERTICAL FORCE NOTE: HAYS AUTOMATIC BALANCE VALVE, MODEL 2530, WILL SHIP LOOSE FOR FIELD INSTALLATION. COIL REMOVAL FROM EITHER SIDE. HEAT RE P HEAT RECLAIM UNIT REF. INLET 2 1/8" ODS RECLAIM HEAT EXHANGER REF. OUTLET 1 3/8' ODS 47 RECLAIM HEAT EXHANGER LIFTING LUGS FLUID OUTLET 9/16"0 MOUNTING HOLES EST SHIPPING WT. 862 EST OPERATING WT. 680 RECLAIM HEAT EXHANGER FLUID INLET 2 1/2" MPT 3 3/16" 02' 1 3 15/16" 60 9/16" 1 118' —If 1 118" 17 1/4" -,- 25 112' 171/4" 6 3/16" t 60" SPREADER BAR VERTI1 FORT SPREADER BAR itS W z F o N r z (1) ai Lu m AQ N W J Q O F J :D V o m Lit Q gdLL Ld Q p z U mC7 ZW W H W W n Wn O F W = O Z NmOZZ, OW w w zWF'2a3 LiJ o I-la. Q>Oo D_ Kt- u= Z tiZw Q Q S zj 0 O W= Z Q N wlaQOW Q W Q O OOaNyroZaa? Fo V3V VINWQ XVI WOj Q} z 3Uz m o w za¢ra zv°z o voa zza Q 3 OJO O4. fnSWKJ vj NOQJFU > U oz U OmUWw V Wic~iw O F -r QwO wwZ-wmaNwZZFw-OW 00(9Q0> Hz a In ' Dmoaw a Dwaawoa 0 C:--:) C: O O-- O I CO CD O a Z d LLJ co ISSUE BLOCK CHECKED BY: MBC DRAWN BY: JRL DOCUMENT DATE: 06/08/17 EQUIPMENT SUBMITTALS SHEET: H R4