2025-01786CITY OF MONTICELLO
505 WALNUT STREET
MONTICELLO, MN 55362-
763) VAX: (763) 29s-44U4
ADDRESS 9320 CEDAR ST S
PIN 155207001010
LEGAL DESC MONTICELLO BUSINESS CTR 3RD ADDN
LOT 001 BLOCK 001
PERMIT TYPE BUILDING
PROPERTY TYPE : COMMERCIAL
CONSTRUCTION TYPE : ALTERATION
VALUATION : $ 750,000.00
Z 0 Z S- 0 1 7 8 6*
DATE ISSUED: 11/21/2025
Permit #: 2025-01786
NOTE: INTERIOR REMODEL WITH MINOR EXTERIOR WORK.
SALES FLOOR: MOVE LOCATION OF DRESSING ROOMS,
SALES FLOOR: MOVE LOCATION OF ELECTRONICS DESK AND ADD DIGITAL DISPLAY BOARDS
SALES FLOOR: CLEAN, PREPARE AND PAINT WALLS.
REPAIR AND REPLACE FLOOR FINISHES
INTERIOR WALLS: CLEAN, PREP AND PAINT
FLOOR TILE: REPAIR/REPLACE
EXTERIOR SURFACES: CLEAN, PREP AND PAINT
DEMOLISH AND REPLACE EXTERIOR SIDEWALKS AND PAVEMENT
SIGNAGE: DEMO EXISTING SIGNAGE AND PLACE NEW SIGNAGE AS SHOWN.
REPLACE AND INSTALL EXTERIOR SIGNAGE
RESTROOMS: REMODEL/ REFURBISH, REPLACE LAVATORIES, PLUMBING FIXTURES, FINISHES AND ACCESSORIES AS NOTED.
MOTHER'S ROOM: REMODEL AS NOTED
CUSTOMER CHECK OUT AREA: REVISE LOCATION OF CASH REGISTERS AND OTHER EQUIPMENT
CUSTOMER CHECK OUT AREA: ADD SELF CONTAINED REFRIGERATED CASES
APPLICANT
HOWARD IMMEL INC
2601 DEVELOPMENT DRIVE
GREEN BAY, WI 54313-
OWNER
WAL-MART REAL EST BUSINESS TR
1301 1OTH ST SE
PROP TAX DEPT #8013
AR 72716-0555
BUILDING PERMIT FEE 4,687.78
PLAN REVIEW 3,047.06
STATE SURCHARGE, BLDG VAL 375.00
TOTAL 8,109.84
Payment(s)
CHECK 178524
AGREEMENT AND SWORN STATEMENT
I agree that the work will be conducted in conformance with
the ordinances of the City of Monticello and with the
Minnesota State Building Code. I understand that the work
will be in accordance with the plan that has been approved by
the Building Official. I agree that any damage caused to
public property including but not limited to curb, sidewalk,
public utilities and signs will be repaired at my expense.
Applicant 1-40
Date '(1,111125
Bldg Official Date
8,109.84
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
CITY OF Permit No.
MontiCe o [E0LEDV -> T
BUILDING SAFETY Di Date 42 / I
COMMERCIAL / IND RI WL BUILDING RMIT APPLICATION
u
505 Walnut Street, Suit #1 Monticello, MN 55362 h: 763-295-3060 p
buildi
SITE ADDRESS
9320 Cedar Street
LEGAL DESCRIPTION
LOT OQ l BLOCK _ n _ P1D. NUMBER ` , 5 2,,0 700 10 10
PLAT Mori -ri cc- Pa C l i 0 AV1 40NED
OWNER (Name) (Address)
Walmart Stores Inc. 2001 SE 10th Street, Bentonville AR 727
OWNER'S E-MAIL ADDRESS: (Tel. No.)
cathy.yockey@wdpartners.com (380) 232-0017
CONTRACTOR (Name) (Address)
Howard Immel Inc
2601 Development Dr
QrPen Ray- WI 1;41n2
CONTRACTOR'S LICENSE NUMBER (IF APPLICABLE)
IR681856
CONTRACTOR'S E-MAIL ADDRESS: Tel. No.)
Project Manager: John Vanden Avond; Phone: 920-203-4356;
I
Email: johnvan@immelconstruction.com I
ARCHITECT (Name) Address)
Christopher K Doerschlag 7007 Discovery Blvd Dublin OH 43017
ARCHITECT'S E-MAIL ADDRESS Tel. No.)
cathy.yockey@wdpartners.com 380-232-0017
ENGINEER (Name) Address)
Christopher Thibodeaux 7007 Discovery Blvd D1
ENGINEER'S E-MAIL ADDRESS: Tel. No.)
cathy.yockey@wdpartners.com 380) 232-0017
DESCRIPTION OF
WORK:
Interior Remodel with minor exterior work
TYPE OF WORK (Please Circle One) TYPE OF CONSTRUCTION (Please Circle One)
New ommercia
Addition Industrial
j Iteratio Institutional
Repair Multi -Family
Move Other
Other
i
ADDITIONAL INFORMATION MISC. NOTES:
Valuation: Est $750,000.00
Construction Type: V B
Occupancy Group: Mercantile
Square Footage: 30816 Remodeled
of Stories: 1
Maximum Occupancy: 5178
Fire Suppression: Yes ® No
ESTIMATED VALUE OF CONSTRUCTION
750,000.00
1 hereby apply for a permit for construction as described and acknowledge that the information I have
provided above is complete and accurate. I agree that the work will be conducted in conformance with
the ordinances of the City of Monticello and with the Laws of the State of Minnesota; and that 1 under-
stand that this application is not a permit and that the work is not to start without a permit. I further un-
derstand that the work will be in accordance with the plan that has been approved by the Building Offi- cial. 1 agree that any damage caused to public property including but not limited to curb, sidewalk, pub- lic utilities and signs will be repaired at my expense.
Applicant Signature Cathy Yockey ..
Print Name /Title Cathy Yockey, Permitting Manager
Date 4.8.25
Approved by Building Official:
Approved by Fire Marshal AIA
Date Approved: S Total Permit Fee:$•
CITY OF
Permit No.
onticeflo c c 0VrEi 7
BUILDING SAFETY ( Date , / I / 2QZ 7IDn
COMMERCIAL / INDUSTRIAL BUILDING PERMIT APPLICATION
L
505 Walnut Street, Suite #1 Monticello, MN 55362 Ph: 763-295-3060
buildingdepartmeut4!moaticello.mn.us
SITE ADDRESS
9320 Cedar Street
LEGAL DESCRIPTION
LOT') BLOCK 1
PLAT p n e 6 O !.< S +o,S',S 1 i 3
PID. NUMBER Q Q
0 t) 40NED
OWNER (Name)
Walmart Stores Inc.
Address)
2001 SE 10th Street, Bentonville AR 7277
OWNER'S E-MAIL ADDRESS:
cathy.yockey@wdpartners.com
Tel. No.)
380) 232-0017
CONTRACTOR (Name) Address)
CONTRACTOR'S LICENSE NUMBER (IF APPLICABLE)
i
CONTRACTOR'S E-MAIL ADDRESS: Tel. No.)
ARCHITECT (Name)
Christopher K Doerschlag
Address)
7007 Discovery Blvd Dublin OH 43017
ARCHITECT'S E-MAIL ADDRESS
cathy.yockey@wdpartners.com
Tel. No.)
380-232-0017
ENGINEER (Name)
Christopher Thibodeaux
Address)
7007 Discovery Blvd D6
ENGINEER'S E-MAIL ADDRESS:
I
cathy.yockey@wdpartners.com
Tel. No.)
380) 232-0017
DESCRIPTION OF
WORK:
Interior Remodel with minor exterior work
TYPE OF WORK (Please Circle One) TYPE OF CONSTRUCTION (Please Circle One)
New Commerciab
Addition Industrial
lteratio Institutional
i
Repair Multi -Family
Move Other
Other
ADDITIONAL INFORMATION MISC. NOTES:
Valuation: Est $7501000.00
Construction Type:
U B
Occupancy Group:
Mercantile
Square Footage: 30816 Remodeled
of Stories: 1 —
Maximum Occupancy:
5178
Fire Suppression: Yes ® No
ESTIMATED VALUE OF CONSTRUCTION
750,000.00
I hereby apply for a permit for construction as described and acknowledge that the information I have
provided above is complete and accurate. I agree that the work will be conducted in conformance with
the ordinances of the City of Monticello and with the Laws of the State of Minnesota; and that I under-
stand that this application is not a permit and that the work is not to start without a permit. I further un-
derstand that the work will be in accordance with the plan that has been approved by the Building Offi-
cial. I agree that any damage caused to public property including but not limited to curb, sidewalk, pub-
lic utilities and signs will be repaired at my expense.
n ma woe 17MseamApplicantSignatureCathyYockey. __ -^"`° """`°""° °
E `° "
Print Name /Title
Cathy Yockey, Permitting Manager
Date 4.8.25
Approved by Building Official: wom---
Approved by Fire Marshal
J
Date Approved: Total Permit Fee:$
IY "' MonticeRoCOMMERCIAL &
INDUSTRIAL PLAN 13
U I L D I N G SAFETY SUBMISSION MATRIX Review
will not be started until submission materials are complete. Additional
Information: a.
Basic plumbing fixture plans may be required with some building permit applications for calculating fixture counts and
SAC charges. b.
Civil Plans must include: A Certificate of Survey showing proposed location of the building/s, setbacks, and all easements;
site plan; soil boring locations; utility plan; exterior lighting plan (with photometric); landscape plan; SWPPP;
and grading, drainage c erosion control plan. c.
All fire suppression plans valued at more than $2,500 must apply to the State Fire Marshal's office for review, permit issuance,
and inspections. d.
All electrical plans must be submitted to the State of Minnesota for review, permit issuance, and inspections. Visit dli.
mn.us for electrical permits. e.
Materials being submitted must include building, HVAC, plumbing, and electrical plans as related to the project and
type of application, including any State -stamped plans. Project
Title: Plan Type Project
Address: 93 edav- S Y `f — Building Permit
Plan Civil
Plan
Electronic
plan
Sets Allplanssubmittedforreviewmustbe24" x 36" size Arch
D) or smaller. Larger plans will not be accepted. Sets Sets Check
PROJECT
TYPE uired QuantityRequiredBuilding
Addition 2 1 1 Building
Construction, New (at time of application) 1 1 1 Building
Demolition 2 0 Exterior
Signage, New (wall, monument, pylon, etc.) Free-
standing signage requires a certificate of survey with 2 1 location
and setbacks clearly marked. Fire
Sprinkler or Alarm permit (20 or more heads must
be sent to the state Fire Marshal for review) o
Interior
Remodel/Interior Tenant Build -out No
ext i - work. 2
1 1 Cnterior
Remo el/I eriorTenant Build -out i Exterior
site work included: parking lot improvements or 2 I 1
l expansion,
utility changes, etc. Mechanical (
HVAC) permit 2 0 1 Plumbing
permit Projects
with more than five (5)fixtures must be reviewed 2 0 1 by
the State of Minnesota. SAC
square footage based on Met Council's most current
guidelines 1 0 1 Applicants
shall identify all use categories and square footage
as applicable on worksheet provided. Site
work (parking lot expansion, grading/drainage, landscaping,
photometric plans and cut sheets, etc.) 0
1 1 For
Office Use Only Date submitted: -1 Distributed by: o
TY OF
Monti"ceflo
505Walnut Street, Suite 1
MONTICELLO, MN 55362
Date: October 20, 2025
COMMERCIAL ALTERATION
PLANS EXAMINING REPORT
City Hall (763) 295-2711
Building Inspections (763) 295-3060
Buildingdepartment@MonticelloMN.gov
9320 Cedar Street
Walmart Remodel
Building Permit #: Planning Case File:
Description of work: See Attached Scope of Work on pages 2 and 3
ARCHITECT OF RECORD:
ENGINEER OF RECORD:
Christopher K Doerschlag
WD Partners
7007 Discovery Boulevard
Dublin, OH 43017
Telephone: 3 80-232-0017
Email: cathy.yockey@wdpartners.com
Christopher Thibodeaux
WD Partners
7007 Discovery Boulevard
Dublin, OH 43017
Telephone: 3 80-232-0017
Email: cathy.yockey@wdpartners.com
CONTRACTOR: Howard Immel Inc.
John Vanden (Project Manager)
2601 Development Drive
Green Bay WI 54302
Telephone: 902-203-4356
Email: Johnvan@immelconstruction.com
BUILDING STORE MANAGER: Andy Pepin
Walmart Store #03624
9320 Cedar Street
Monticello, MN 55362
Telephone: 763-295-9800
The Architect of Record named above must read this report and respond in writing to each item herein
and appearing on the Approved Job Copy of the plan released for permit with this report.
Plan Review Letter & Scope of Work, GC Added 11-13-25 BF. 1 of 7
Walmart Remodel
GENERAL SCOPE OF WORK
SALES FLOOR: MOVE LOCATION OF DRESSING ROOMS
SALES FLOOR: MOVE LOCATION OF ELECTRONICS DESK AND ADD DIGITAL DISPLAY BOARDS
SALES FLOOR: CLEAN, PREPARE AND PAINT WALLS.
REPAIR AND REPLACE FLOOR FINISHES
INTERIOR WALLS: CLEAN, PREP AND PAINT
FLOOR TILE: REPAIR/REPLACE
EXTERIOR SURFACES: CLEAN, PREP AND PAINT
DEMOLISH AND REPLACE EXTERIOR SIDEWALKS AND PAVEMENT
SIGNAGE: DEMO EXISTING SIGNAGE AND PLACE NEW SIGNAGE AS SHOWN.
REPLACE AND INSTALL EXTERIOR SIGNAGE
RESTROOMS: REMODEL/ REFURBISH, REPLACE LAVATORIES, PLUMBING FIXTURES, FINISHES AND
ACCESSORIES AS NOTED.
MOTHER'S ROOM: REMODEL AS NOTED
CUSTOMER CHECK OUT AREA: REVISE LOCATION OF CASH REGISTERS AND OTHER EQUIPMENT
CUSTOMER CHECK OUT AREA: ADD SELF CONTAINED REFRIGERATED CASES
CUSTOMER SERVICE: REFURBISH AS NOTED. ADD DIGITAL DISPLAY BOARDS AS NOTED
PHARMACY: ADD DIGITAL DISPLAY BOARDS AS NOTED
PHARMACY: PAINT, FIX AND CLEAN AS NOTED
PHOTO LAB: RELOCATE/ INSTALL NEW PHOTOPLAY AS SHOWN
REMODEL ALCOVE TO ACCOMMODATE STORAGE
VISION CENTER: REFURBISH AS NOTED
ENTRY VESTIBULE: CLEAN AND REFURBISH AS NOTED
BREAKROOM: REMODEL AS NOTED
GROCERY: REFURBISH AS NOTED/ REMOVE
REFRIGERATED CASES AND EQUIPMENT. ADD
REFRIGERATED CASES, EQUIPMENT, DIGITAL DISPLAYS AND NEW FINISHES
AUTO CENTER: REFURBISH AS NOTED AND ADD DIGITAL DISPLAYS
AUTO CENTER: ADD ENVIRONMENTAL CAGE
ONLINE PICKUP: IMPLEMENT PICKUP 2.0 AND REMODEL
EXISTING PICKUP RELOCATE OPERATIONS TO GM SALES
WHITE BOX VACANT TENANT'S AS NOTED
ACADEMY CLASS ROOMS: REFURBISH AS NOTED
NEW EXTERIOR EXIT DOORS AT WHITE BOX, RETURN
STORAGE AND ONLINE PICKUP GROCERY
PICKUP EXTERIOR: REPAINT PARKING AND ACCESS
GENERAL NOTES
1. BUILDING IS FULLY SPRINKLERED AS REQUIRED BY CONTRACT DOCUMENTS
SUBMIT FIRE SPRINKLER SYSTEM DRAWINGS AND CALCULATIONS TO AUTHORITIES HAVING
JURISDICTION (FIRE DEPARTMENT AND FIRE MARSHAL)
OBTAIN ALL APPROVALS PRIOR TO FABRICATION OR INSTALLATION
2. OWNER WILL PROVIDE, OR HAS ALREADY PROVIDED, FIRE EXTINGUISHERS IN ACCORDANCE WITH
NFPA 10
AUTHORITY HAVING JURISDICTION WILL APPROVE FINAL FIRE EXTINGUISHER LOCATIONS.
3. WALMART'S ALARM CENTRAL'S ENGINEERING TEAM HAS CONTACTED THE AUTHORITY HAVING
JURISDICTION FOR PRE -PLAN DATA ABOUT STATE AND LOCAL REQUIREMENTS THAT DIFFER FROM
THE NATIONALLY PUBLISHED CODES AND STANDARDS
A COMPLETE SITE SPECIFIC SUBMITTAL IS BEING MADE DIRECTLY TO THE AUTHORITY HAVING
JURISDICTION
QUESTIONS SHALL BE DIRECTED TO 1-800-530-9924, OPTION 3
Plan Review Letter & Scope of Work, GC Added 11-13-25 BF 2 of 7
W
0
m=
Zm 0) cri
Om mnoommOr
c-10 rn *U)mpm m=
rmm0 z>mcz -im mm
2rm=m /Tlv -i--mmm <D
G)D Omi: /v cnm -> oC/)
ZDCn rn O,OG)r
TCD OC Dw>>LnODc
Z rn=m c zx Tm a 0 mmmzrD m
0 mmDD G)mO-O moo
C znrmm=DO m
D(-) mmz D DO
0 p x 0 M0 m
m0z=0-m m
r Z- Z O r D= m < ;
a OOc=mm mDcM0DrG) ncm
v cn m<-= m > -
i cn
D M— XmpDoU) 0c
co-0 U) U)> C)
r U)m m 0 Dmn mDC)
ZO
Z
cn m0T I ;a m-
z > pC/)r<
cn pm
iD =
gym m O Dcn
rT
m m 0D Om
OC) c Z r
D O T-a 0o OZ 0* ,
0 Z z r-
m cn 0 Z
m0 pz m
U) _ M ;ap cn
0 n rn -
D K X
Om m i z -Un
m n xzz -:jm
0 U) DO z Dcn
ZZN
m Om < M pmmm () nz TM
0 = A 000 > z
u 0 D
m 0 U) m
z o
M 0
o
mm
0 = U)
0
Z
Bldg Building, Mechanical & Plumbing Bob Ferguson — Chief Building Officialgg 763) 271-3214
Bob. Fer u, son(a,MonticelloMN
Wayne Kalla — Inspector/ Plan Reviewer 763) 314-0908
Wayne.Kalla(a MonticelloMN.gov
Mark Gerber — Inspector / Plan Reviewer
Mark.Gerber(a,MonticelloMN.,,ov 763) 271-3222
Steve Kowalczyk — Inspector / Plan Reviewer
Steve.Kowalczyk(ci,MonticelloMN.
763) 271-3225
Amy L Biren — Building Permit Technician
Am .Byiren(a;MonticelloMN.ov 763) 295-3060
review Electrical Bill Husom — Electrical Inspector 612) 490-0488
outside
of city
910 — 18th St SE, Buffalo, MN 55313 Office Hrs: 7-8:30am
https://dli.mn.gov/business/electrical-
contractors/electrical-permits-contractors
CDD Land Use/Site Design/Landscaping Angela Schumann — Community Development Director 763) 271-3224
Angela. Schumann(cLMonticelloMN.gov
Bob Ferguson — Chief Building Official 763) 271-3214
Bob.Fer uson(a MonticelloMN.gov
Engr/ Grading, Paving, Drainage & Matt Leonard- City Engineer
PW Utilities Matt. Leonard(c)MonticelloMN.gov 763) 271-3271
Ryan Melhouse — Project Engineer
763) 271-3227
Ryan.Melhouse(&,MonticelloMN.gov
Mario Frucci — Engineering Technician 763) 271-3213
Mario.Frucci(aMonticelloMN.gov
Mat Stang- Water & Sewer Superintendent
Mat. Stang(a),MonticelloMN.gov 763) 271-3274
Please address all responses to this report to:
The Architect of Record is responsible for reviewing and coordinating all the documents submitted in
application for a permit, including those prepared by others. The Architect of Record must receive,
review and coordinate all responses to the items identified in this report.
Responses to this report shall be considered deferred submittals. The deferred submittal items must not be installed until their
design and submittal documents have been approved by the Building Official.
All deferred submittals must be certified by the Architect of Record as having been "reviewed and found to be in general
conformance with the design of the building".
Plan Review Letter & Scope of Work, GC Added 11-13-25 BF 4 of 7
Comprehensive Land Use
Designation
Zoning Classification:
Is this application part of a Planned
Unit Development?
Other Information
Project Zoning Summary
Is this application consistent with desi,
Commercial
Yes
Is this application consistent with desi,
Yes
B-4 Regional Commercial
Existing
Project General Design Summary
Construction Type: V-B
Building Occupancy Groups and M Sl A2 B
Finished Area:
Square Footage 2059445
Fire Suppression System: 13
Building Height: EXISTING, 1-ONE
Maximum Allowable Area: NA
Minimum Property Line Separation: NA
The following notations refer to design submittal documents as presented in application for a building permit. This report is
not to be considered conclusive with respect to review of plans and specifications to assure compliance with Minnesota
Building Codes and Minnesota Fire Codes. Please retain a copy of this report on -site, attached to the Approved Job Copy of
the Building Plans and Specifications.
This review is for Buildinz Construction Permit review only. All other reviews will be conducted with
their respective permit applications. See note #1 below.
Plan Review Letter & Scope of Work, GC Added 11-13-25 BF 5 of 7
PLAN
NO. DEPT
SHEET/
SPEC.
CODE
REFERENCE
COMMENTS
SECTION
SEPARATE PERMIT APPLICATIONS AND SEPARATE PERMITS ARE
REOUIRED:
Mechanical/HVAC (submit to the City of Monticello)
1 Review MSBC Admin Plumbing (more than 5 fixtures must be reviewed by the State)
Note
Chapter 1300 Electrical Work (State Board of Electricity)
Fire Suppression (submit to the State Fire Marshal)
Fire Alarm (submit to the City of Monticello)
Signs submit to the City of Monticello
Building Official review and authorization required prior to changes,
N/A: modifications, or alterations. All changes to the approved building plans must
2 Review MSBC Chpt 1300 be reviewed by the Architect of Record and found to be in general
Note conformance with the overall design of the building then submitted to the
Building Official for review prior to implementing changes.
N/A: Shop Drawings Must Be Approved — Structural shop drawings prepared by
3 Review IBC fabricators must be reviewed and approved by the Structural Engineer of Record.
Note No unapproved structural shop drawings are to be on the job site at any time.
4
N/A:
Review City Ordinances
Debris & Trash Containment Required: All job site debris must be contained in
Note covered dumpster/s or covered fenced area.
Fire Dept Lock Box: Purchase and install a Key Box for Fire Department Access
N/A: if one is not present in the existing building. Please purchase a box from City Hall.
6 Review IFC 506 The price is $233.20 + sales tax. Mount box centered 6-0" above grade
Note immediately adjacent to the front entrance. All necessary keys shall be installed at
time of occupancy
N/A:
Special Inspection & Material Test Reports: Special inspection and material test
8 Review IBC 1704 reports must be submitted to the Building Official during construction per IBC. A
Note final report must be submitted to the Building Official prior to the issuance of the
Certificate of Occupancy.
PHOTOMETRIC PLAN — MANUFACTURER'S FIXTURE CUT SHEETS —
Be aware that all exterior lighting, must utilize recessed fixtures, casting lightMSBC
9 downward only. Parking lot and building exterior lighting must be shielded to
City Code control glare. Submit manufacturers' cut sheets/specifications to building official
for approval of each type of exterior lighting fixture.
10 1 BC 1008.1.9 Door Hardware: All door hardware must unlock and unlatch with a single action.
No deadbolts, manual flush bolts, throw bolts or edge bolts allowed.
Post sign on interior of doors stating, "THIS DOOR TO REMAIN UNLOCKED
11 IBC 1008.1.9 WHEN BUILDING IS OCCUPIED." Letters shall be one (1) inch tall on
contrasting background
12 BLDG AC1 Sign required on riser room door stating "Sprinkler Riser Room- in 4" letters
Plan Review Letter & Scope of Work, GC Added 11-13-25 BF 6 of 7
wdpartners.com
7007 Discovery Blvd. T +1614.634.7000
Dublin. 0H 43017 F +1614.634.7777
May 6, 2025
City of Monticello
505 Walnut Street, Suite 1
Monticello, MN 55362
TEL 763-295-3060
Re:
WALMART #3624
9320 Cedar Street
Monticello, MN 55362
WD Project #WALNE0220
Permit Number: TBD
Attn: To Whom it May Concern:
The following responses pertain to the comments made by your office on the Commercial
Plans Examining Report dated May 6, 2025. Our comment numbers correspond to your
comment numbers, so numbers 7 and 8 were missing.
MSBC Admin Chapter 1300
SEPARATE PERMIT APPLICATIONS AND SEPARATE PERMITS ARE
REQUIRED:
Mechanical/HVAC (submit to the City of Monticello)
Plumbing (more than 5 fixtures must be reviewed by the State)
Electrical Work (State Board of Electricity)
Fire Suppression (submit to the State Fire Marshal)
Fire Alarm (submit to the City of Monticello)
Signs (submit to the City of Monticello)
Response: Noted and will comply.
2. MSBC Chpt 1300
Building Official review and authorization required prior to changes,
modifications, or alterations. All changes to the approved building plans must
be reviewed by the Architect of Record and found to be in general
conformance with the overall design of the building then submitted to the
Building Official for review prior to implementing changes.
Response: Noted and will comply.
3. IBC
Shop Drawings Must Be Approved — Structural shop drawings prepared by
fabricators must be reviewed and approved by the Structural Engineer of Record.
No unapproved structural shop drawings are to be on the job site at any time.
Response: Noted and will comply.
4. City Ordinances
Debris & Trash Containment Required: All job site debris must be contained in
covered dumpster/s or covered fenced area.
Response: Noted and will comply.
5. IFC 506
Fire Dept Lock Box: Purchase and install a Key Box for Fire Department Access
if one is not present on existing building. Please purchase a box from City Hall.
Price is $211.20 + sales tax. Mount box centered 6-0" above grade immediately
adjacent to front entrance. All necessary keys shall be installed at time of
occupancy
Response: Noted and will comply.
8. IBC 1704
Special Inspection & Material Test Reports: Special inspection and material test
reports must be submitted to the Building Official during construction per IBC. A
final report must be submitted to Building Official prior to issuance of Certificate
of Occupancy.
Response: Noted and will comply.
9. MSBC & City Code
PHOTOMETRIC PLAN — MANUFACTURER'S FIXTURE CUT SHEETS —
Be aware that all exterior lighting, must utilize recessed fixtures, casting light
downward only. Parking lot and building exterior lighting must be shielded to
control glare. Submit manufacturers' cut sheets/specifications to building official
for approval of each type of exterior lighting fixture.
Response: Noted and will comply.
10. IBC 1008.1.9
Door Hardware: All door hardware must unlock and unlatch with a single action.
No deadbolts. manual flush bolts, throw bolts or edge bolts allowed.
Response: Noted and will comply.
11. IBC 1008.1.9
Post sign on interior of doors stating "THIS DOOR TO REMAIN UNLOCKED
WHEN BUILDING IS OCCUPIED." Letters shall be one (1) inch tall on
contrasting background
Response: Noted and will comply.
12. AC1
Sign required on riser room door stating "Sprinkler Riser Room" in 4" letters
Response: Noted and will comply.
END OF REVIEW COMMENTS
Please do not hesitate to contact me directly 612-604-6836 or
scott.crosby@wdpartners.com) if you have any questions.
Sincerely,
WD Partners,
Scott W. Crosby
Project Lead
Architecture & Engineering
cc: File, Owner
2018 INTERNATIONAL
BUILDING CODE®
PLAN JU"AMEW RECORD
JURISDICTION:
City, County, Township, etc.)
BUILDING LOCATION:
Stt>l3et address)
EllILDING DESCRIPTION:
REVIEWED BY:
Plan Review #
Date:
Valuation:
Fee:
Numerals indicated in parenthesis are applicable cods sections of the 20181ntemabo-nal Building Code (IBC). The plan review accomplished as Indicated In
this record is limited to those code sections specdfcally identified herein. This record references commonly applicable code sections. It does not reference
all code provisions which may be applicable to spectfic buildings. This record Is designed to be used only by those who are knowledgeable and capable of
exercising competent judgment In evaluating constnuction documents for cone compliance.
CORRECTIONS LIST
Code
1 14Section9 "no, 0414 6MI,
i
1
KMM' fr
1
MM
ICC Copyright, 2018 International Code Council, Inc. Reproduction by any moans is prohibited. ICC
is the trademark of International Code Council, Inc., and is regis'ered in tie U.S. Patent and
Trademark Office. For additional forms, contact: L. INTERNATIONAL CODE COUNCIL, INC.
PHONE 1-888-ICC-SAFE * WWW.ICCSAFE.ORG Item No. 0002PR18
To223r2
61!
CORRECTION LIST (cont'd.)
No. DESCRIPTION Code
Section
2-
NOTES: N.R. — Not required
N.A. — Not applicable
ADMINISTRATION (Chapter 1)
Complete construction documents Signed/sealed construction documents
107.1, 107.2) (107.1, State laws vary)
BUILDING PLANNING (Chapters 3, 49 516) OCCUPANCY
CLASSIFICATION (302 - 312, 508, 509) Single
Occupancy (302.1) Incidental uses (509, Table 509) Mixed
Occupancy (508.1) Accessory occupancies (508.2) GENERAL
BUILDING LIMITATIONS (Chapters 5 & 6) Apply
Case 1 to determine the allowable height and area and permitted types of construction for a building containing a single
occupancy or nonseparated mixed occupancies. Apply Case 2 to determine the allowable height and area and permitted
types of construction for a building containing separated mixed occupancies. FRONTAGE
INCREASE Frontage
506.
3) North
East South West Total
Frontage (
F) ft. Width
of open space (W) _ Area
Increase Factor due
to frontage, 1, _ 506.
3.3) Perimeter (
P) ft. if _ [.
EIff P-
025130 CASE
1 — SINGLE OCCUPANCY OR NONSEPARATED MIXED OCCUPANCIES (508.3) Using
Tables 504.3, 504.4 and 506.2, identify the allowable height and area of the single occupancy or the most restric- tive
of the nonseparated mixed occupancies. Construction types that provide an allowable building area and height equal to
or greater than the actual building area and height are permitted. DETERMINE
CONSTRUCTION TYPE Actual
building area ft2 Tabular
allowance area (A) ft2 Tabular
allowance area for nonsprinklered buildings (
MS) ft2 Allowable
building area ft2 Aa=
A,+(NSX If) Actual
building height feet stories Allowable
building height feet stories Permitted
types of construction Type
of construction assumed for
review (602.1) CHECK
MAXIMUM ALLOWABLE AREA (506.2.3) Total
floor area (all stories) Maximum
allowable floor area (all stories) Allowable
building area Aj
Compliance
verified ft2
x =
ft2 number
of stories above grade
plane (maximum 3) SJ
3-
CASE 2—SEPARATED MIXED OCCUPANCIES (508.4)
Using Tables 504.3, 504.4 and 506.2, identify the allowable height and area of each of the separated occupancies within the building. Construction types that pro-
vide, for each story of the building, areas from Table 506.2 (as modified by Section 506.3.3) which result in a sum of the ratios of 1.00 or less and allowable
heights (per Tables 504.3 and 504.4) equal to or greater than the actual heights of the occupancies are permitted.
Actual Tabular Tabular allowance Allowable Actual Allowable
Story Group floor area allowance area for nonsprinklered floor area* height height
area (A) buildings (NS)
ft2 ft2 ft2 ft2 ft stories ft stories
ft2 ft2 ft2 ft2 ft stories ft stories
ftft2 ft2 ft2 ft stories ft stories
ft2 ft2 ft2 ft2 ft stories ft stories
ft2 ft2 ft2 ft2 ft stories ft stories
ft2 ft2 ft2 ft2 ft stories ft stories
ft2 ft2 ft2 ft2 ft stories ft stories
ft2 ft2 ft2 ft2 ft stories ft stories
Area ratio (single floor) _ Actual floor area 1.00
Allow. floor area*
Allowable floor area = At + (NS x If)
CHECK MAXIMUM ALLOWABLE AREA (506.2.4)
Three stories or less buildings Permitted types of construction
Four or more story buildings Type of construction assumed
Total area ratio <_ 3) for review (602.1)
Compliance verified
MEZZANINES AND EQUIPMENT PLATFORMS (505)
Area limitation (505.2.1) Openness (505.2.3)
Egress (505.2.2) Equipment platforms (505.3)
UNLIMITED AREA BUILDINGS (507)
Open space (507.2)
Nonsprinklered, one story (507.3)
Sprinklered, one story (507.4)
Two story (507.5)
Group A-3 buildings (507.6, 507.7)
Group H-2, H-3 and H-4 occupancies (507.8)
Group H-5 occupancy (507.9)
Aircraft paint hangar (507.10)
Group E buildings (507.11)
Motion picture theaters (507.12)
Covered and open mall buildings/anchor
stores (507.13)
SPECIAL PROVISIONS (510)
Special condition applicable (510.1) Compliance verified
SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY (Chapter 4)
COVERED MALL AND OPEN MALL BUILDINGS (402)
Open space (402.1.1, 402.1.2)
Lease plan (402.3)
Areattype of construction (402.4.1)
Fire separations (402.4.2 - 402.4.2.3)
Open mall construction (402.4.3)
Automatic sprinkler system (402.5)
Interior finish (402.6.1)
Kiosks (402.6.2)
Children's play structures (402.6.3)
Plastic signs (402.6.4)
Standpipe system (402.7.1)
Smoke control (402.7.2)
Emergency power and emergency voice/
alarm (402.7.3, 402.7.4)
Fire department access (402.7.5)
Mall width (402.8.1)
Occupant load (402.8.2 - 402.8.2.4)
Egress (402.8.3 - 402.8.7)
Security grilles and doors (402.8.8)
0
HIGH-RISE BUILDINGS (403)
Construction (403.2)
Automatic sprinkler system (403.3)
Smoke detection (403.4.1)
Fire alarm system (403.4.2)
Standpipes (403.4.3)
Emergency voice/alarm systems (403.4.4)
Emergency responder radio coverage
403.4.5)
Fire command center (403.4.6)
Smoke removal (403.4.7)
Standby/emergency power (403.4.8)
Stair remoteness (403.5.1)
Additional stairway (403.5.2)
Stairway doors (403.5.3)
Smokeproof exit (403.5.4)
Luminous egress path (403.5.5)
Elevators (403.6)
ATRIUMS (404)
Use (404.2)
Automatic sprinkler system (404.3)
Fire alarm system (404.4)
Smoke control (404.5)
Enclosure (404.6)
Standby power (404.7)
Interior finish (404.8)
Travel distance (404.9)
Interior exit stairways (404.10)
OTHER SPECIAL USE AND OCCUPANCY
Underground structures (405)
Motor -vehicle -related occupancies
406, 510)
Group 1-2 (407)
Group 1-3 (408)
Motion picture projection rooms (409)
Stages, platforms and technical produc-
tion areas (410)
Special amusement buildings (411)
Aircraft -related occupancies (412)
Combustible storage (413)
Hazardous materials (307.1, 414)
Groups H-1, H-2, H-3, H-4 and H-5 (415)
Spray application of flammable finishes (416)
Drying rooms (417)
Organic coatings (418)
Live/work units (419)
Groups 1-1, R-1, R-2, R-3 and R-4 (420)
Hydrogen fuel gas rooms (421)
Ambulatory care facilities (422)
Storm shelters (423)
Children's play structures (424)
Hyperbaric facilities (425)
Combustible dusts, grain processing and
storage (426)
Medical gas systems (427)
Higher education laboratories (428)
FIRE PROTECTION (Chapters 6, 7, 89 9)
FIRE -RESISTANCE -RATED CONSTRUCTION (Tables 601 & 602 and Chapter 7)
Note: Entry in 11-1 indicates required rating in hours. NC FIRE -RESISTANCE RATINGS AND FIRE TESTS (703)
indicates noncombustible construction required.
Ratings /Combustibility
Construction classification (602) (703.2, 703.4, 703.5)
COMBUSTIBILITY (602.2, 602.3, 602.4, 602.5, 603) Alternative methods
703.3, 719, 721, 722)
Exterior walls
Rated glazing (703.6)
Interior elements
Marking and identification (703.7)
Roof
0
BUILDING ELEMENTS (Table 601)
1-1 Structural frame (704)
Interior bearing walls
Interior nonbearing walls
Floor construction (711)
Roof construction (711)
EXTERIOR WALLS (507, Table 602, 705, 707.4)
North East South West
Fire
separation
distance
Bearing FL
Nonbearing F1_ F]- FL
Projections (705.2)
Materials/stability (705.4, 705.6)
Opening protection (705.8.1 - 705.8.4)
Vertical fire spread rotection
705.8.5, 705.8.61Y
Parapets (705.11)
FIRE BARRIERS (707)
Shaft enclosures (707.3.1)
Interior exit stairway/ramp (7073.2)
Exit access stairway/ramp (707.3.3)
Exit passageway (707.3.4)
n Horizontal exits (707.3.5)
Atriums (7073.6)
Incidental uses (7073.7)
Control areas (707.3.8)
Mixed occupancy and fire area separa-
tions (707.3.9, 707.3.10, 901.7)
Construction (707.2, 707.5 - 707.10)
VERTICAL OPENINGS (712)
Compliance (712.1.1 - 712.1.16)
SHAFTS (713)
1:1 Construction (713.2 - 713.12, 713.14)
Waste and linen chutes (713.13)
OTHER FIRE-RESISTANT CONSTRUCTION
1:1 Fire walls (706)
Fire partitions (708)
Smoke barriers (709)
Smoke partitions (710)
Penetrations (714)
Fire-resistant joint systems (715)
Opening protectives (716)
Dampers (717)
Concealed spaces (718)
Thermal- and sound -insulating materials
720, 807)
7-
INTERIOR FINISHES (Chapter 8)
Smoke development
803.1.1, 803.1.2, 803.13,
Table 803.13)
Flame spread
803.1.1, 803.1.2, 803.13,
Table 803.13)
Textile/expanded vinyl coverings
803.5 - 803.8)
HDPE/PP/site-fabricated stretch systems/
laminated products/wood facings
803.9 - 803.12)
Floor finish (804)
Combustible materials (805)
Decorative materials and trim (806)
Acoustical ceiling systems (808)
FIRE PROTECTION AND LIFE SAFETY SYSTEMS (Chapter 9)
AUTOMATIC SPRINKLER SYSTEMS (903)
Where required)
Assembly (A-1, A-2, A-3, A-4, A-5)
903.2.1)
Ambulatory care facilities (B) (903.2.2)
Educational (E) (903.2.3)
Factory/Industrial (F-1) (903.2.4)
High -hazard (H-1, H-2, H-3, H-4, H-5)
903.2.5)
Institutional (1-1, 1-2, 1-3, 1-4) (903.2.6)
Mercantile (M) (903.2.7)
Residential (R) (903.2.8)
Storage/Repair garage (S-1) (903.2.9)
Parking garages (903.2.10)
Windowless story (903.2.11.1)
Rubbish and linen chutes (903.2.11.2)
Buildings at least 55 ft. high (903.2.11.3)
Incidental uses (Table 509)
Additional required systems
Table 903.2.11.6)
International Fire Code (1FC 903.2.11.6)
AUTOMATIC SPRINKLER SYSTEMS* (903)
Design)
Shop drawings (107.2.2)
NFPA 13 system (903.3.1.1)
NFPA 13R system (903.3.1.2)
NFPA 13D system (903.3.1.3)
Quick -response and residential heads
903.3.2)
Actuation (903.3.4)
Water supplies (903.3.5)
Hose threads (903.3.6)
Fire department connections (903.3.7)
Limited area sprinkler system (903.3.8)
Sprinkler monitoring and alarms (903.4)
Also see Fire Code Sprinkler Plan Review Record
ALTERNATIVE AUTOMATIC FIRE -EXTINGUISHING
SYSTEMS (904)
Installation (904.3)
Wet -chemical systems (904.5)
Dry -chemical systems (904.6)
Foam systems (904.7)
Carbon dioxide systems (904.8)
Halon systems (904.9)
Clean -agent systems (904.10)
Automatic water mist system (904.11)
Commercial cooking systems
903.2.11.5, 904.2.2, 904.12)
Domestic cooking systems (904.13)
Aerosol fire -extinguishing systems (904.14)
8-
FIRE PROTECTION AND LIFE SAFETY SYSTEMS (continued)
STANDPIPE SYSTEMS (905)
Installation standard (905.2)
Building height (905.3.1)
Group A (905.3.2)
Covered and open malls (905.3.3)
Stages (905.3.4)
Underground buildings (905.3.5)
Helistops/heliports (905.3.6)
Marinas/boatyards (905.3.7)
Rooftop gardens/landscaped roofs
905.3.8)
Hose connections and locations
905.1, 905.4, 905.5, 905.6)
Cabinets (905.7)
Dry standpipes (905.8)
Valve supervision (905.9)
Outlet caps (905.11)
PORTABLE FIRE EXTINGUISHERS (906)
Required locations (906.1, 906.5, 906.6)
Installation standard (906.2)
Size and distribution (906.3)
Cabinets (906.8)
Installation (906.9)
FIRE ALARM AND DETECTION SYSTEMS (907)
Where required)
Construction documents/shop drawings
907.1.1, 907.1.2)
Assembly (A-1, A-2, A-3, A-4, A-5)
907.2.1)
Business (B) (907.2.2)
Educational (E) (907.2.3)
Factory (F-1, F-2) (907.2.4)
High -hazard (H-5/organic coatings/highly
toxic gases/organic peroxides/
oxidizers) (907.2.5)
Institutional (1-1, 1-2, 1-3, 1-4) (907.2.6)
Mercantile (M) (9072.7)
Residential (R-1, R-2)
907.2.8, 907.2.9)
Single/multiple station smoke alarms
907.2.10)
High-rise buildings (907.2.12)
Atriums (907.2.13)
Other buildings/areas
907.2.11, 907.2.14 - 907.2.23)
FIRE ALARM AND DETECTION SYSTEMS (907)
Design)
Residential smoke alarm interconnection
9072.10.5)
Residential smoke alarm power source
907.2.10.6)
Smoke detection system (907.2.10.7)
Fire safety functions (907.3)
Initiating devices (907.4)
Occupant notification (907.5)
Installation (907.6, 907.7)
EMERGENCY ALARM SYSTEMS (908)
Group H occupancy (908.1)
Group H-5 occupancy (908.2)
SMOKE CONTROL SYSTEMS (909)
Where required (402.7.2, 404.5, 405.5,
408.9, 410.2.7.2, 1023.11, 1029.6.2.1)
Design requirements (909.1 - 909.4)
Smoke barriers (909.5)
Pressurization method (909.6)
Airflow design method (909.7)
Exhaust method (909.8)
Design fire (909.9)
Equipment/Power (909.10, 909.11)
Detection and control (909.12 - 909.18)
Smokeproof enclosures (909.20)
Elevator hoistway pressurization (909.21)
SMOKE AND HEAT REMOVAL (910)
Where required (910.2)
Smoke and heat vents (910.3)
Mechanical attemative (910.4)
FIRE COMMAND CENTER (911)
Requirements (911.1.1 - 911.1.6)
FIRE DEPARTMENT CONNECTIONS (912)
Installation (912.1 - 912.6)
FIRE PUMPS (913)
Requirements (913.1 - 913.5)
EMERGENCY RESPONDER SAFETY FEATURES/
RADIO COVERAGE (914, 918)
Requirements (914.1, 914.2, 918.1)
CARBON MONOXIDE DETECTORS (915)
Requirements (915.1 - 915.6)
GAS DETECTION SYSTEMS (916)
Requirements (916.1 - 916.11)
MASS NOTIFICATION SYSTEMS (917)
Risk analysis (917.1)
OCCUPANT NEEDS (Chapters 10, 119 12)
MEANS OF EGRESS (Chapter 10)
OCCUPANT LOAD (1004.3,1004.5 and Table 1004.5,1004.6) CAPACITY OF EGRESS COMPONENTS
1005.3.1, 1005.3.2)
Location Floor + Sq. ft./ - Occt. Other
TotalAreapersonloadocct. Egress width (inch/occupant)
loads
Stairways
Other egress components
Location Stairways Other egress
components
NUMBER OF EXITS/EXIT ACCESS (1006)
Location Required Shown
10-
DESIGN LOADS (continued)
Wind loads (1603.1.4, 1609, Chapters 26 - 31 of ASCE 7)
Design procedure (1609.1.1; Chapters 26
31 of ASCE 7)
Wind speed
1609.3; Figs. 26.5.1, 26.5.2 of ASCE 7)
Risk category
Table 1604.5, Table 1.5-1 of ASCE 7)
Surface roughness/Exposure categories
1609.4; 26.7 of ASCE 7)
Internal pressure coefficient
26.13, Table 26.13-1 of ASCE 7)
Component and cladding pressures
Chapter 30 of ASCE 7)
Main wind -force resisting system
1609.5, 27.3 - 27.5, 28.3 -
28.5 of ASCE 7)
Earthquake design data
1603.1.5, 1613, Chapters 11 - 13 and 15 - 23 of ASCE 7)
Risk category
Table 1604.5, Table 1.5-1 of ASCE 7)
Seismic importance factor, IB
11.5.1, Table 1.5-2 of ASCE 7)
Mapped spectral response acceleration
parameters, SS and S, (1613.2.1;
11.4.2 of ASCE 7)
Design spectral response parameters, Sos
and So, (1613.2.4; 11.4.5 of ASCE 7)
Site class (1613.2.2, 11.4.3, Chapter20 of
ASCE 7)
Seismic design category
1613.2.5; 11.6 of ASCE 7)
Basic seismic -force -resisting system
Table 12.2-1 of ASCE 7)
Response modification coefficient, R
Table 12.2-1 of ASCE 7)
Seismic response coefficient,
CS (12.8.1.1 of ASCE 7)
Analysis procedure (12.6 of ASCE 7)
Design base shear (12.8.1 of ASCE 7)
Flood loads (1603.1.7, 1612)
Flood hazard area (1612.3)
Documentation (1612.4)
Ice loads (1614; Chapter 10 of ASCE 7)
Compliance
Tsunami loads (1615, Chapter 6 of ASCE 7)
Compliance
Other loads
Concentrated live loads (16074)
Partition loads (16075)
Impact loads (1607.10)
Misc. loads (1607.6, 1607.7, 1607.8, 1607.9,
1607.14, 1607.15, 1610, 1611, 2404)
Structural integrity (1616)
Design requirements (1616.1 - 1616.3)
SPECIAL INSPECTIONS AND TESTS (Chapter 17)
Approvals/Research report(s)
1703, 1703.4.2) Report No.
Statement of special inspections (1704.3)
Report requirement/submittal to building
official (1704.2.4, 1704.5)
Prefabricated items (1704.2.5, 1705.10)
Steel construction (1705.2)
Concrete construction (1705.3, 1901.6)
Masonry construction (1705.4, 2101.3)
Wood construction (1705.5)
Prepared fill and foundations
1705.6 - 1705.9)
Sprayed fire-resistant materials and
coatings (1705.14, 1705.15)
EIFS (1705.16)
Fire-resistant penetrations and joints
1705.17)
Smoke control (1705.18)
Wind requirements (1704.3.3, 1705.11)
Seismic resistance
1704.3.2, 1705.12, 1705.13)
Contractor responsibility (1704.4)
Structural observations (1704.6)
Testing (other) (1706 - 1709)
13-
SOILS AND FOUNDATIONS (Chapter 18)
Soils investigations/Reports
1803.1, 1803.2, 1803.3, 1803.6)
Soil classification (1803.5)
Excavation, grading and fill (1804)
Dampproofing and waterproofing (1805)
Load -bearing values (1603.1.6, 1806)
Foundation walls, retaining walls and
embedded posts and poles (1807)
Foundations (1808)
Shallow foundations (1809)
Deep foundations (1810)
STRUCTURAL MATERIALS (Chapters 19, 21, 22,23)
CONCRETE (Chapter 19)
Plain, reinforced and structural plain Construction documents (1901.5)
concrete design/construction standard
Slab provisions (1907) specified (1901.2, 1905, 1906)
Shotcrete (1908)
MASONRY (Chapter 21)
Design method, construction standard
specified (2101.2, 2104)
Masonry units (2103.1)
Mortar type/grout (2103.2, 2103.3)
Metal reinforcement (2103.4)
STEEL (Chapter 22)
Structural steel design/construction
standard specified (2205)
Composite structural steel and concrete
1901.4, 2206)
Open -web steel joist design/construction
standard specified (2207)
WOOD (Chapter 23)
Design method option used (2302.1)
MATERIAL STANDARDS / CONSTRUCTION REQUIRE-
MENTS (2303 - 2306)
Lumber (2303.1.1)
Wood I -joists (2303.1.2)
Glue -laminated timbers
2303.1.3, 2303.1.4)
Wood structural panels
2303.1.5, 2304.6, 2304.7, 2304.8)
Fiber-, hard-, & particle-, boards
2303.1.6 - 2303.1.8)
Decay and termite protection
2303.1.9, 2304.12)
Structural composite lumber (2303.1.10)
Seismic design (2106)
Glass unit masonry (2110)
Fireplaces/Heaters/Chimneys
2111, 2112, 2113)
Dry -stack masonry (2114)
Steel cable structures (2208)
Steel storage racks (2209)
Cold -formed steel design/construction
standard specified (2210)
Cold -formed steel light -framed design/
construction standard specified (2211)
Structural log members (2303.1.11)
Round timber poles and piles (2303.1.12)
Engineered wood rim board (2303.1.13)
Fire -retardant -treated wood (2303.2)
Hardwood and plywood (2303.3)
Trusses (2303.4)
Joist hangers (2303.5)
Fasteners and fastening
2303.6, 2304.10, Table 2304.10.1)
Heavy timber construction (2304.11)
Long-term loading (2304.13)
Shear walls and diaphragms (2305, 2306)
14-
WOOD (continued)
CONVENTIONAL LIGHT -FRAME CONSTRUCTION Wall construction (2308.5)
2308)
Wall bracing (2308.6)
Limitations satisfied (2308.2)
Roof and ceiling framing (2308.7)
Foundations and footings (2308.3)
Design of elements (2308.8)
Floor framing (2308.4)
NONSTRUCTURAL MATERIALS (Chapters 24, 259 26)
GLASS AND GLAZING (Chapter 24)
Sloped glazing and skylights (2405) Safety glazing (2406, 2407, 2408, 2409)
GYPSUM BOARD AND PLASTER (Chapter 25)
Gypsum board materials Plaster (2507, 2508, 2510 - 2513)
2506, Table 2506.2, Table 2508.1)
Reinforced gypsum concrete (2514)
PLASTIC (Chapter 26)
FOAM PLASTIC INSULATION (2603) Wind resistance (2603.10)
Labeling (2603.2, 2603.5.6) Cladding attachment (2603.11 - 2603.13)
Surface -burning characteristics MISCELLANEOUS PLASTICS
2603.3, 2603.5.4)
Interior finish and trim (2604)
Thermal barrier (2603.4)
Plastic veneer (2605)
Exterior walls/Roofs (2603.5, 2603.6)
Light -transmitting plastics (2606 - 2611)
Interior finish/trim in plenums (2603.7)
Protection against termites (2603.8)
Special approval (2603.9)
Plastic composites (2612)
Fiber -reinforced polymer (2613)
Reflective plastic core insulation (2614)
BUILDING SERVICES* (Chapters 27, 289 299 30)
ELEVATORS AND CONVEYING SYSTEMS (Chapter 30)
Construction standard specified (3001.3, Conveying systems (3004)
Table 3001.3)
Machine rooms (3005)
Communication system (3001.2)
Elevator lobbies/hoistway opening protec-
Hoistway enclosures (3002) tion (3006)
Opening protectives (3002.1.1) Fire service access elevator (3007)
Emergency operations (3003) Occupant evacuation elevator (3008)
Also see Electrical (Ch. 27), Mechanical (Ch. 28) and Plumbing (Ch. 29) Plan Review Records
15-
SPECIAL DEVICES AND CONDITIONS (Chapters 31, 32)
SPECIAL CONSTRUCTION (Chapter 31)
Membrane structures (3102) Solar energy systems (3111)
Temporary structures (3103) Greenhouses (3112)
Awnings and canopies/Marquees
3105, 3106)
Signs (3107)
Telecommunication and broadcast towers
3108)
Swimming pools, spas and hot tubs (3109)
Automatic vehicular gates (3110)
Relocatable buildings (3113)
PEDESTRIAN WALKWAYS AND TUNNELS (3104)
Construction and use (3104.3, 3104.4)
Separation (3104.5, 3104.10)
Public way (3104.6)
Egress (3104.7 - 3104.9)
ENCROACHMENTS INTO THE PUBLIC RIGHT-OF-WAY (Chapter 32)
Below grade (3202.1)
Above grade (3202.2, 3202.3)
Appendices adopted (101.2.1)
00
G
APPENDICES A - N
NOTES
Temporary (3202.4)
Compliance verified
16-
INTERIOR ENVIRONMENT (Chapter 12)
Ventilation (1202, 1503.4)* Sound transmission (1206)
Temperature control (1203) Interior space dimensions (1207)
Lighting (1204) Access to unoccupied spaces (1208)
Yards or courts (1205) Toilet and bathroom requirements
1209, 2509)
Also see Mechanical Code Plan Review Record
BUILDING ENVELOPE (Chapters 13*, 14,15)
See Energy Conservation Code Plan Review Record
EXTERIOR WALLS (Chapter 14)
Performance requirements (1402) Combustible material restrictions (1405)
Materials (1403) EIFS (1407)
Exterior wall coverings/MCM's HPL (1408)
1404, 1406)
Plastic composite decking (1409)
ROOF ASSEMBLIES AND ROOFTOP STRUCTURES (Chapter 15)
Roof drainage (1502)
Weather protection (1503)
Flashing (1503.2, 1507.2.8, 1507.3.9,
1507.5.7, 1507.7.7, 1507.8.8, 1507.9.9)
Performance requirements (1504)
Fire classification (1505)
Materials (1506)
Roof coverings (1507)
Roof insulation (1508)
Radiant barriers (1509)
Rooftop structures (1510)
Reroofing (1511)
Photovoltaic panels/modules (1512)
STRUCTURAL SYSTEMS (Chapters 16, 17, 18)
STRUCTURAL DESIGN (Chapter 16)
STRUCTURAL DESIGN CALCULATIONS Roof snow loads (1603.1.3, 1608; Chapter 7 of ASCE 7)
Submitted for all structural members Ground snow load,
106, 107.1, 107.2.1, 1604, 1605) pg (1608.2, 7.2 of ASCE 7)
DESIGN LOADS ON CONSTRUCTION DOCUMENTS If pg > 10 psf, flat -roof snow load,
1603) p, (7.3 of ASCE 7)
Uniformly distributed floor live loads If pg > 10 psf, snow exposure factor,
1603.1.1, Table 1607.1) CB (Table 7.3.1 of ASCE 7)
Floor Area Use Loads Shown If pg > 10 psf, snow load importance factor,
1S (7.3.3, Table 1.5-2 of ASCE 7)
If pg > 10 psf, roof thermal factor,
C, (Table 7.3.2 of ASCE 7)
If pg > 10 psf, slope factor(s), CS (7.4 of ASCE 7)
If pg > 10 psf, drift surcharge loads, Pd (7.7,
Live load reduction 7.8 of ASCE 7)
1603.1.1, 1607.11, 1607.12) If pg > 10 psf, width of snow drift, w (7.7, 7.8 of
Roof live loads (1603.1.2, 1607.13) ASCE 7)
Rain intensity, i (1603.1.9) Ponding instability (1608.3, 7.11, 8.4 of ASCE 7)
12-
MEANS OF EGRESS (continued)
GENERAL MEANS OF EGRESS
Design requirements (1003.2 - 1003.7) Door landings/Thresholds/Arrangement
Encroachment (1005.7)
1010. i.5 - 1010.1.8)
Means of egress illumination (1008)
Door hardware (1010.1.9, 1010.1.10)
Exit signs (1013)
Stairways (1011)
Accessible means of egress (1009)
Roof access (1011.12)
Door size/swing/opening force
Ramps (1012)
1010.1 - 1010.1.3) Handrails (1014)
Special doors/Gates/Turnstiles Guards (1015)
1010.1.4. 1010.2. 1010.3)
EXIT ACCESS
Exit access configuration
1007.1.1 - 1007.1.3)
Common path of egress travel
Table 1006.2.1)
Intervening spaces (1016.2, 1016.2.1)
Exit access travel distance (1017)
Luminous egress path markings (1025)
Aisles (1018)
Exit access stairways/ramps (1019)
Corridors (1020)
Air movement in corridors (1020.5)
Egress balconies (1021)
EXITS / EXIT DISCHARGE
Exits/Exit doors (1006, 1022)
Exit configuration (1007.1.1, 1007.1.2)
Interior exit stairways/ramps (1023)
Exit passageways (1024)
Horizontal exits (1026)
Exterior exit stairways/ramps (1027)
Exit discharge (1028)
OTHER MEANS OF EGRESS
Miscellaneous egress requirements Assembly aisles & features
1006.2.2.1 - 1006.2.2.6) (1029.6 - 1029.17)
Bleachers (1029.1.1) Emergency escape and rescue (1030)
Assembly exits & egress (1029.2 - 1029.5)
ACCESSIBILITY* (Chapter 11)
Scoping requirements (1103)
Accessible route (1104)
Accessible entrances (1105)
Parking and passenger loading (1106)
Also see Accessibility Plan Review Record
Dwelling units and sleeping units (1107)
Special occupancies (1108)
Features and facilities (1109)
Recreational facilities (1110)
Signage (1111)
11-