Loading...
2025-01217CITY OF MONTICELLO 505 WALNUT STREET MONTICELLO, MN.55362- 763) 295-3060 FAX: (763) 295-4404 ADDRESS 4383 86TH ST NE PIN 155264004190 LEGAL DESC EDMONSON RIDGE LOT 019 BLOCK 004 PERMIT TYPE BUILDING PROPERTY TYPE SINGLE FAMILY -DETACHED CONSTRUCTION TYPE NEW CONSTRUCTION VALUATION : $ 266,164.02 NOTE: NEW CONSTRUCTION SINGLE FAMILY HOME: 698 SQ FT FINISHED BASEMENT 86 SQ FT UNFINISHED BASEMENT 800 SQ FT CRAWL SPACE 800 SQ FT FINISHED MAIN FLOOR 784 SQ FT SECOND FLOOR 36 SQ FT OPEN PORCH 640 SQ FT GARAGE FIREPLACE: NO A/C: YES MECHANICAL: 12 PLUMBING: 19 WATER METER I (MAIN) WAC UNITS APPLICANT JP BROOKS HOMES 13700 REIMER DRIVE SUITE 100 MAPLE GROVE, MN 55311- 763) 999-7153 OWNER LSW INVESTMENTS LLC 4065 CHELSEA RD W MONTICELLO, MN 55362- AGREEMENT AND SWORN STATEMENT 1.00 SAC UNITS 1.00 I agree that the work will be conducted in conformance with the ordinances of the City of Monticello and with the Minnesota State Building Code. I understand that the work will be in accordance with the plan that has been approved by the Building Official. I agree that any damage caused to public property including but not limited to curb, sidewalk, public utilities and signs will be repaired at my expense. Applicant l Date A A-r, Bldg Official Date 2 0 2 S- 0 1 2 1 7 DATE ISSUED: 08/19/2025 Permit #: 2025-01217 BUILDING PERMIT FEE PLAN REVIEW STATE SURCHARGE, BLDG VAL SAC FEE 30% SAC FEE 70% WATER ACCESS CHARGE, RESI COMB CONNECTION FEE / RESI SEWER / WATER EXCAVATION PERMIT CONTRACTOR LICENSE VERIFICATION FEE ASSESSMENT SEARCH FEE UTILITY LOCATE FEE, RESI WATER METER I (MAIN) MN STATE SALES TAX (MTR 1) TOTAL Payment(s) CHECK 23728 1.00 2,045.36 1,329.48 133.08 1,449.90 3,383.10 2,153.00 130.00 130.00 5.00 60.00 50.00 475.00 37.41 11,381.33 11,381.33 SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. CITY OF l Monticeflo BUILDING SAFETY 505 WALNUT STREET, SUITE 1 M( City Hall (763) 295-2711 1 J U L_ 2 ` 2025 L: i NTICELLO, MN 55362 3uilding1ns-pZettM%'—M3j I" PERMIT It QJ 04 3060 Fax (763) 295-4404 BUILDING PERMIT APPLICATION Please Print - INCOMPLETE APPLICATIONS WILL NOT BE ACCEPTED. SITE ADDRESS: /V F ZONED LEGAL: Lot 19 Block Plat_ aAe wvi on (L 1 A5c Property Owner Name: JP Brooks Builders Address: 13700 Reimer Drive Contractor Name: JP Brooks Builders State License #: 656554 Address: 13700 Reimer Drive Eng./Architect Name: Address: Plumber Name: Northwoods Plumbing Address: 30799 73rd Street Mechanical Name: Recher HVAC Address: 1125 Mississippi Drive North Tvpe of Work EQ New Addition Alteration Repair Move Other Description of work: Phone: 763-285-4790 City: Monticello State: MN Zip: 55311 Phone: 763-285-4790 E-Mail: shelly@jpbrooks.com City: Maple Grove State: MN Zip: 55311 City: City: Pierz City: Champlin Twe of Construction N3 Single Family O Duplex Q Multi -Family Commercial Industrial Other Phone: State: Zip: Phone: 763-717-8757 State: MN Zip: 56364 Phone: 612-802-6525 State: MN Zip: 55316 Building Information Use of building al t e of stories k 1 &a / uu T Floor area sq. ft. I j_ 5 g-.;.;.r.r.P /f Vex, Estimated value of construction I hereby apply for a permit for construction as described and acknowledge that the information I have provided above is complete and accurate. I agree that the work will be conducted in conformance with the ordinances of the City of Monticello and with the Laws of the State of Minnesota; and that I understand that this application is not a permit and that the work is not to start without a permit. I further understand that the work will be in accordance with the plan that has been approved by the Building Official. I agree that any damage caused to public property including but not limited to curb, sidewalk, public utilities and signs will be repaired at my expense. --, 1-7 r OR PLUMBING V-Wtv..4 n ' / AND MECHANICAL INFO. Applicant Signature Application Date APPLICANT: Please show• fixtures that are applicable. Fire Suppression : (if applicable) Plumbing: (if applicable) Mechanical: (if applicable) No. Fixture Tvve Sprinkler Heads Other /Special FS Device Fire Alarm: (if applicable) No. Fixture Tvve of Devices Other Name: Address: No. Fixture Tvve I TOTAL Water Closet (toilet) Bathtub J ivatory (wash basin) TZ. Shower Kitchen Sink Dishwasher b Laundry Tub Clothes Washer Water Heater T f ; Urinal Drinking Fountain Floor Drain Slop Sink Outside Faucet Future Owner Information: No. Fixture Tvve Furnace Gas Meter Range Hood Gas Range Water Heater Air Conditioning Mech. Fireplace — E k-c ,j ; c- T Bathroom(s) Exhaust Fan i Air Exchanger Dryer Gas Opening w/o Fixture II TOTAL FOR CITY USE ONLY Tree Ordinance Handout Yes No Other Handouts Yes No City: ADDITIONAL INFORMATION: IValuation: 16 6) i &t - 0 2 State: Zip: Construction Type: V iS Occupancy Group: Phone #: Division: --kU+»lh ,-, R,,d.i L Square Footage: _!, of Stories: :,Pt,'-r J Lo ekav - of Residential Units: - o ti e— Maximum Occupancy: IV /4- Fire Sprinklers: Yes wNo Off - Street Parking Covered: Off - Street Parking Uncovered: Building Official / 7 BPT: / / Address: rn 1 Builder: JF Two sets Building Plans XTwo sets Surveys Survey sent to Engineering for review: Energy Calcs Digital Plans: 1 Plan Review letter generated V Review completed by Building Department t/ Permit fees calculated Plan R iew Checklist Plan Review Letter: Date Address Survey approved by Engineering: HVAC Loads V Correct percentage of Brick & Stone Received by Building Department: w Applicant contacted: 'l`"5 t ir_ House size and finishing details ECC verified Contact applicant for revisions or questions: V HVAC Loss Calcs verified What: V ootings and pads highlighted Who: P int loads Date Contacted: Any balloon framed walls and stud spacing? Due Date for Revisions: Special stairway framing V Details on braced walls Please provide the necessary information by this date: Blocking on floor framing If not received by that date, the Bearing wall blocking and bracing application will be removed from the review process and will be treated as a new permit when the v//",- ,,Verify any tempered glass information is provided. The review timeframe will V V cation report completed start over at that time. Valuation and size entered on front page of application V Note finished or unfinished basement on front of application Second page of application: Verify fixtures match plan: plumbing, mechanical, alarms Compete "Additional Information" section Approved COS survey received from Engineering Plan Reviewer's Initials: Monticello 2025 Residential Building Permit Calculator Address: 4383 86th Street NE Monticello, MN 55362 Legal: Lot 19 Block 4 Edmonson Ridge Monticello, MN 55362 1 = Yes 0 = No Ne-*i, Residence: I House Type: 4 Level split, Lookout, Crawlspace 1 = Yes 0 = No 1 = Yes 0 = No Permit Applicant: Contractor: 1 Plan Review: I Owner: 0 Master Plan: 0 Master Plan Review = 25% ofBuildinQ Permit Fee) Crawl Space 800 15.27 12,216.00 Unfinished Basement Area 86 16.50 1,419.00 Finished Basement Area 698 44.05 30,746.90 Main/First Floor Area 800 125.00 100,000.00 Second Floor Area 784 115.00 90,160.00 Detached Garage 0 60.00 Attached Garage 640 47.33 30,291.20 Garage Conversion to Living Space 0 47.44 Carport/Gazebo 0 30.90 Pole Barn 0 19.03 Shed - greater than 200 SF 0 40.00 Lean -to -Shed 0 13.25 Basement Finish Only 0 16.00 Remodeled Area 0 17.39 Porch (open) 36 36.97 1,330.92 Porch (3-Season) 0 60.00 Porch (3-Season on Existing Deck) 0 55.00 Porch (Screen Porch/Breezeway) 0 58.48 Solarium 0 94.90 Deck 0 20.00 Deck (Screen In & Roof Over Existing) 0 29.80 In -Ground Pool 0 23.18 Above -Ground Pool 0 11.31 Fireplace - Mechanical/Gas 0 4,892.50 Fireplace - Masonry 0 22,660.00 Elevator/Lift/Other 0 CALCULATED BUILDING VALUATION $ 266,164.02 1 =Yes O=No Water Hook-up 1 Sanitary Sewer Hook-up I FEES: BUILDING PERMIT - 1997 UBC FEE SCHEDULE PLUS 6% $ PLAN CHECK $ CONTRACTOR LICENSE VERIFICATION $ STATE SURCHARGE $ SUBTOTAL $ SEWER FEE [SAC] $ WATER FEE ]WAC] $ WATER / SEWER CONNECTION FEE $ SEWER/WATER EXCAVATION PERMIT FEE $ ASSESSMENT SEARCH $ UTILITY LOCATES $ 5/8" WATER METER & SALES TAX $ SUBTOTAL $ TOTAL FEES CALCULATED $ Escrow Amount - (Winter Only) 2,044.69 1,329.05 5.00 133.08 3,511.82 4,833.00 2,153.00 130.00 130.00 60.00 50.00 510.03 7,866.03 11,377.85 TOTAL AMOUNT TO BE PAID TO CITY $ 115377.85 CITY OF 1 A&, iceflo BUILDING SAFETY RESIDENTIAL PLANS EXAMINING REPORT 505 Walnut Street, Suite 1 MONTICELLO, MN 55362 Date: 8/15/25 Contractor: City Hall (763) 295-2711 Building Inspections (763) 295-3060 JP Brooks 4383 86th Street NE JP Brooks 13700 Reimer Drive Maple Grove, MN 55311 Telephone: 763-285-4790 BASIC PROJECT DESCRIPTION. 41eve1 Split, Lookout Finished lower level 2,282 Sq ft Finished 1 1 Page Bldg Building, Mechanical &Plumbing Bob Ferguson — Chief Building Official 763) 271-3214 Bob. Ferg u Lc;MonticelloMN.to\ Wayne Kalla — Inspector/ Plan Reviewer 763) 314 -0908 Wayne. Kai la(tc,MonticelloMN.gov Mark Gerber — Inspector / Plan Reviewer Mark.Gerber(ca.MonticelloMN.goN 763) 271-3222 Steve Kowalczyk — Inspector / Plan Reviewer 763) 271-3253 Steve. KowalczykLa MonticelloMN.gov Amy Biren — Building Permit Technician 763) 295-3060 buiiditigdepartment( n,MonticelloMN.g review Electrical Bill Husom — Electrical Inspector (612) 528-2362 outside Office Hrs: 7-8:30am of city 443 Lafayette Road North, St. Paul, MN 55155 Permits I Minnesota Department of Labor and Industry nm. uov ) CDD Land Use/Site Design/Landscaping Angela Schumann — Community Development Director 763) 271-3224 1i cla.Schumann cc MonticelloMN.goti Bob Ferguson — Zoning Administrator 763) 271-3214 Bob, Fery uson a ov Engr/ Grading, Paving, Drainage & Matt Leonard- City Engineer (763)-271-3271 PW Utilities Matt. Leonard(c—u,,MonticelloMN.P-ov Ryan Melhouse — Project Engineer (763) 271-3227 Rvan. Melhouse(LMonticelloMN.Rov Mario Frucci — Engineering Technician Mario. Frucci(a—,MonticelloMN.jzov (763) 271-3213 Mat Stang - Water & Sewer Superintendent (763) 271-3274 Mat. Stanv,(&,MonticelloMN. 2ov The plan review accomplished as indicated in this record is limited to those code sections specifically identified herein. This record references commonly applicable code sections. It does not reference all code provisions which may be applicable to specific buildings. This record is designed to be used only by those who are knowledgeable and capable of exercising competent judgment in evaluating construction documents for code compliance. The following notations refer to design submittal documents as presented in application for a building permit. This report is not to be considered conclusive with respect to review of plans and specifications to assure compliance with Minnesota Building Codes and Minnesota Fire Codes. Please retain a copy of this report on -site, attached to the Approved Job Copy of 2 1 Page the Building Plans and Specifications. This review is for Buildine Construction Permit review onlv. All other reviews will be conducted with their respective permit applications. See note #1 below. PLAN NO. DEPT SHEET/ SPEC. CODE SECTION COMMENTS SECTION 1 bldg n/a general All job debris must be contained on -site and, in a dumpster, or covered, fenced area note 2 bldg n/a general Building Official review and authorization required prior to changes, modifications, note or alterations. 3 bldg n/a general 1300.0220 NOTICE: This building must not be occupied until a Certificate of Occupancy has note been issued. 4 bldg n/a general Final Building, Plumbing, and Heating inspections must be completed prior to note occupancy. The owner or contractor must be present for final building inspection. 5 bldg n/a general IFGC 406 Gas piping pressure test required: 25# for 10 minutes on residential construction. note 6 bldg n/a general Separate applications and permits Required for Sewer / Water Connection, Heating note A/C Systems, Plumbing, Fire Alarm Systems. bldg n/a general MR 1322.1101 A building certificate, showing energy code compliance information, must be posted 7 note Subp 15 in a permanently visible location prior to final inspection N 1101.8) bldg MN Statute Carbon monoxide detectors must be installed in accordance with MN Statute §299F 8 299F .50 50 R315 bldg Buildings must be constructed per current building codes. 2020 MN State Building Code including: n/a general 2020 MN Residential Code 9 note MR 1300 2023 National Electrical Code 0 2020 MN Plumbing Code 2020 MN Mechanical Code 2020 MN Fire Code Bldg All bottom wall plates in contact with concrete or masonry shall be decay resistive. 10 R317 All metallic fasteners and mechanical connections in contact with ACQ pressure treated lumber must be approved for such use. I 11 bldg IRC 602.10 Walls shall be braced in accordance with IRC 602.10 or Engineered Plans 12 bldg n/a general Post Address Card Visible from the street, maintain until the house numbers are note installed. 13 bldg n/a general Engineered Roof Trusses: Provide a Copy of the Approved, Certified Truss Plans for note framing inspection. 14 bldg n/a general State Board of Electricity: Separate Permit and Inspections Required for Electrical note work. 15 bldg Maintain 6" Earth to wood separation Eng Erosion Control Required: Install erosion control per proposed survey prior to 16 foundation inspection. Rock construction entrance and site perimeter controls such as silt fences are required. Maintain erosion controls until landscaping is completed. 3 1 Page PLAN NO. DEPT SHEET/ SPEC. SECTION 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 CODE COMMENTS SECTION bldg Vent Pipes: The vent pipe shall be primed and glued at all fittings and shall extend up from the radon control system's collection point to a point terminating a minimum of 12" above the roof. The vent pipe shall be located at least 10' away from any window or other opening into the conditioned spaces of the building. Vent pipes routed through unconditioned spaces shall be insulated with a minimum of R-4 insulation. Vent pipes within the conditioned envelope of the building shall not be insulated. bldg R312 2 Window Fall Protection Required for all windows 6' above grade with sill height of less than 24", maximum opening must be less than 4". bldg WARNING: Call Before You Dig! Gopher State One Call 651-454-0002 bldg. Blower Door Test Required: Prior to final Inspection —Air Leakage Rate Must Not Exceed 3 Air Exchanges Per Hour. bldg Flash between House and Stoop. bldg R319.1 Install House Numbers: 4" minimum, visible from street. bldg Fireplaces: Must be inspected prior to wall enclosure or when smoke chamber / damper areas are exposed. bldg Solid Block Between Wall Studs at Vaulted Truss Bottom Chord. bldg R302.11 Fire blocking Required: Cut off concealed draft openings between stories and attic. Close horizontal to vertical penetrations. bldg R301.1 Carry Concentrated loads to foundation — Concentrated loads must be solidly blocked and carried continuously to foundation. bldg Slope garage floor to Overhead door or to floor drain. (no trap / dry pan drains to daylight; schedule 40 pipe required). bl fT R402.4.1.1 Hardboard Backer Required behind tub / shower. bl h Seal and Secure Sump Pump Basket Cover. bl`fr R506.2.3 Vapor Retarder: Required Under Floor Slab (Exception unheated spaces). hl l R405.2.3 Drain Tile to Sump Basket: Install pump with rigid piping to house exterior. Install flexible hose connection extending to drainage area away from the foundation wall. bldg R1303.2402 Provide power receptacle & switched light in attic or other unconditioned space for Subpart 6 future active radon ventilation system. bldg Radon gas vent pipes shall be provided with space around the vent pipe for future fan R 1303.2402 installation. The space required for the future fan installation shall be a minimum of 24" in diameter, centered on the axis of the vent pipe, and shall extend a minimum distance of 3 vertical feet. bldg R 402.1.1.3 Poly Slip Sheet Required over non -draining insulation. bldg R802.11 Install truss clips at each truss and girder end unless otherwise specified by the truss manufacturer. R402.2.3 For air permeable insulations in vented attics, a baffle shall be installed adjacent to MN Res -Energy soffit and eave vents. The baffle shall extend over the top of the attic insulation. code bldg R703.2 Install weather barrier / House Wrap: Cover all exterior wall sheathing (exception: Detached Accessory Buildings) 4 1 Page PLAN NO. DEPT SHEET/ CODE COMMENTS SPEC. SECTION SECTION Bldg '/2" Anchor Bolts or Manufactured Foundation Straps Must: Engage 2°d course of 38 R403.1.6 concrete block masonry. Be located at each core fill / be spaced 6' on center, 2 anchors per plate, 1 anchor within 1' of each end. Exterior non -draining foundation insulation requirements: Shall have a rigid, opaque, and weather -resistant covering to prevent degradation of the insulation's thermal 39 bldg R 4021.1.3 performance. The protective covering shall cover the exposed exterior insulation and extend a minimum of 6" below grade. The insulation and protective covering system shall be flashed in accordance with IRC section R703.8. DRIVEWAY REQUIREMENTS: 40 zoning R-1 zoning code The Maximum Width at the Property line Shall Not Exceed 30 Ft. and Shall Taper to a width Not to Exceed 28 Ft. and the Public Street. 5 1 Page New Construction Energy Code Compliance Certificate Per R401.3 Certificate_ A building certificate shall be posted on or in the electrical dlstribut on Date Certificate Post panel- PIaee your Mailing Address of the D elfin or Dwelling Unit 0 ;trQ'e- N,141 (el 10 Toga here U 3 l1 Name of Residential Contractor Brooks' MN License NumberMN BC 686554 THERMAL ENVELOPE RADON CONTROL SYSTEM Type: Check All That Apply FV] Passive (No Fan) Active (Wirth fan and monometer o co or other system monitoring device) a vocation (or future location) of Fan: tT m Attic72 _0 ca U C CL o a 9 ` o U o -o E a) CLM -2 m cr) C 2 U Insulation Location CU j 2 z U Qt1u` x m o a, u, 0 a m o n o co 'a rn 1 c z 11- u LL u. it it Other Please Descn-be Here Below Entire Slab NA Poly Barrier Foundation Wall R-15 Exterior and interior as dictated by code Perimeter of Slab on Grade R-15 interior of Foundation watt Rim Joist (1st Floor) R-30 Rim Joist (2nd Floor-) R-30 I Wall R21 Ceiling, flat R-48 Ceiling, vaulted R-48 Bay Windows or cantilevered areas R-30 Floors over unconditioned area NA Describe other insulated areas Building envelope airtightness: I IDuct system airtightness: NA windows & Doors Heating or Cooling Ducts outside Conditioned Spaces Average U-Factor (excludes skylights and one door) U: 128 ] Not applicable, all ducts located in conditioned space Solar Heat Gain Coefficient (SHGG): 128 LL~Qil1J R value 3 -: MECHANICAL SYST5-MS i Make-up Air Select Type Appliances Heating System ff Domestic Water ' Goofing System Heater Not required per mech. code Gas Nat_ Gas Elect. F-1passiveFuelTypeNat. Bryant Richmond Bryant powered ManufacturerInterlocked with exhaust device. 9 I5SB042060E17 I BA013NR030BNG I Describe - ModelInput in BTUs: 60,000 Capacity Output linGallons-150 in Tons: 2.5 Other, describe: Rating or Size AFUE or l IHSPF% 96190 SEER f.213Location of duct orsystem: Efficiency EER Heating Loss Heating Gain Coaling Load Residential Load CaleuIath 3 rNc3 1,4 Cfmis round duct OR MECHANICAL VENTILATION SYSTEM metal duct Describe any additional or combined heating or cooling systems if installed: (e.g. two fumaces or air I Combustion Air Selecta Type Not required per mech. code sourceheatpumpwithgasback-up furnace): itselect Ty.PeHeat Recover Ventilator (HRV) Capacity in dims: Low: High: Passive Other, describe_ gI Energy Recover Ventilator (ERV) Capacity in efms: ILow: ISO IHigh: 130 Location of duct or system: I ( Balanced Ventilation capacity in cfms: 1 I Mechanical Room Location offan (s), describe: I Bathrooms and Laundry Capacity continuous ventilation rate in cfms: 90-130 I s " round duct OR Total ventilation ( intermittent+ continuous) rate in cfms: 1270 metal duct Builders Associaton of Minnesota version 101014 Recher HVAC HVAC Load Calculations for 4383 86th St NE Prepared By: Friday, July 18, 2025 Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. thvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc suer Steel (Plymouth) Recher HVA( Ivmouth, MN 55441 - Page,' Project Report General Project Information Project Title: Recher HVAC Project Date: Friday, July 18, 2025 Client Name: 4383 86th St NE Design Data Reference City: Minneapolis/St. Paul AP, Minnesota Building Orientation: Front door faces East Daily Temperature Range: Medium Latitude: 44 Degrees Elevation: 834 ft. Altitude Factor: 0.970 Outdoor Outdoor Outdoor Indoor Indoor Grains Winter: -15 -15 n/a n/a 72 n/a Summer: 88 71 44% 50% 75 24 Check Fi urges Total Building Supply CFM: 784 CFM Per Square ft.: 0.329 Square ft. of Room Area: 2,383 Square ft. Per Ton: 1,321 Volume (ft3): 14,948 Building Loads Total Heating Required Including Ventilation Air: 36,403 Btuh 36.403 MBH Total Sensible Gain: 18,476 Btuh 85 % Total Latent Gain: 3,171 Btuh 15 % Total Cooling Required Including Ventilation Air: 21,647 Btuh 1.80 Tons (Based On Sensible + Latent) Notes - Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:\...\Recher HVAC - 4383 86th St NE.rh9 Friday, July 18, 2025, 11:04 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Auer Steel (Plymouth) Recher HVAC Plymouth. MN 55441 Page 3 Miscellaneous Report System 1 House Outdoor Outdoor Outdoor Indoor Indoor Grains Input Data Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter: -15 15 100% n/a 72 n/a Summer: 88 71 44% 50% 75 23.51 Duct Sizinq Inputs Main Trunk Calculate: Yes Runouts Yes Use Schedule: Yes Yes Roughness Factor: 0.00300 0.01000 Pressure Drop: 0.1000 in.wg./100 ft. 0.1000 in.wg./100 ft. Minimum Velocity: 0 ft./min 0 ft./min Maximum Velocity: 900 ft./min 750 ft./min Minimum Height: 0 in. 0 in. Maximum Height: 0 in. 0 in. Outside Air Data Winter Infiltration Specified: 0.110 AC/hr Summer 0.060 AC/hr 27 CFM 15 CFM Infiltration Actual: 0.110 AC/hr 0.060 AC/hr Above Grade Volume: X 14.948 Cu.ft. X 14.948 Cu.ft. 1,644 Cu.ft./hr 0.0167 897 Cu.ft./hr X Total Building Infiltration: 27 CFM X 0.0167 15 CFM Total Building Ventilation: 125 CFM 125 CFM System 1--- Infiltration & Ventilation Sensible Gain Multiplier: 13.87 1.10 X 0.970 X 13.00 Summer Temp. Difference) Infiltration & Ventilation Latent Gain Multiplier: 15.51 0.68 X 0.970 X 23.51 Grains Difference) Infiltration & Ventilation Sensible Loss Multiplier: 92.85 1.10 X 0.970 X 87.00 Winter Temp. Difference) Winter Infiltration Specified: 0.110 AC/hr (27 CFM), Construction: Tight Summer Infiltration Specified: 0.060 AC/hr (15 CFM), Construction: Tight C:\ ...\Recher HVAC - 4383 86th St NE.rh9 Friday, July 18, 2025, 11:04 AM Rhvac - Residential & Light Commercial HVAC Loads Auer Steel (Plymouth) Plymouth, MN 55441 Elite Software Development, Inc. Recher HVAC Page 44 Load Preview Report Netj ft) j Sen Laq Ne Sen Ht g CI g Ac Duc Scope Tory Tors Area Gain Gain Gai Loss' 1 CFMj CFM Sid CFMI Buildinq 1.80 1,321 2,383 18,476 3,171 21,647 36,403 332 784 784 System 1 1.80 1,321 2,383 18,476 3,171 21,647 36,403 332 784 784 10x1 E Ventilation 1,734 1,939 3,673 11,606 Zone 1 2,383 16,742 1,232 17,974 24,797 332 784 784 10x1; 1-Lower Level 798 3,469 233 3,702 7,611 102 162 162 2-- 2-Main Level 801 7,456 109 7,565 9,931 133 349 349 4-- 3-Upper Level 784 5,817 890 6,707 7,255 97 273 273 3-- C:\ ...\Recher HVAC - 4383 86th St NE.rh9 Friday, July 18, 2025, 11:04 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Auer Steel (Plymouth) Recher HVAC Plvmouth. MN 55441 lk Page 5 Duct Size Preview Room or Minimu Maximu Rough Desig S Duc Duc Ht CI Act. I Duct Duct Name Source VelocittF Velocit Facto U10 Lo Velocit Lengt g g IowFloiA Flow Size Svstem 1 Supply Runouts Zone 1 1-Lower Level 2-Main Level 3-Upper Level Other Ducts in System 1 Supply Main Trunk Svstem 1 Heating Flow: 332 Coolina Flow: 784 Built -In 0 750 0.01 0.1 413.8 102V162 162 2-- Built-In 0 750 0.01 0.1 444.8 1330 349 349 4-- Built-In 0 750 0.01 0.1 462.6 970 273 273 3-- Built-In 0 900 0.003 0.1 753 332M 784 10x1 Summary C:\ ...\Recher HVAC - 4383 86th St NE.rh9 Friday, July 18, 2025, 11:04 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Auer Steel (Plymouth) Recher HVAC Plvmouth. MN 55441 Paqe 6 Total Building_ Summary_ Loads Component Area Sen Lat Sen Total Description Quan Loss Gain Gain Gain . Vector: Glazing -Vector Window, U-value 0.29, SHGC 234 5,903 0 6,376 6,376 0.31 11 P: Door -Metal - Polyurethane Core, U-value 0.29 42 1,060 0 292 292 15BO-10sf-8: Wall -Basement, , R-10 board insulation to 240 1,044 0 0 0 floor, no interior finish, 8' floor depth, U-value 0.05 15BO-10sf-4: Wall -Basement, , R-10 board insulation to 536 2,518 0 0 0 floor, no interior finish, 4' floor depth, U-value 0.054 12F-Osw: Wall -Frame, R-21 insulation in 2 x 6 stud 1353 7,652 0 1,169 1,169 cavity, no board insulation, siding finish, wood studs, U-value 0.065 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic 1584.8 2,757 0 1,522 1,522 Floor (also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal, Tar and Gravel or Membrane, R-50 insulation, U-value 0.02 21 B-20: Floor -Basement, Concrete slab, any thickness, 2 798 1,319 0 0 0 or more feet below grade, R-3 or higher insulation installed below floor, any floor cover, shortest side of floor slab is 20' wide, U-value_0.019 Subtotals for structure: 22,253 0 9,359 9,359 People: 5 1,000 1,150 2,150 Equipment: 0 3,600 3,600 Lighting: 0 0 0 Ductwork: 0 0 0 0 Infiltration: Winter CFM: 27, Summer CFM: 15 2,544 232 207 439 Ventilation: Winter CFM: 125, Summer CFM: 125 11,606 1,939 1,734 3,673 Exhaust: Winter CFM: 125, Summer CFM: 125 AED Excursion: 0 0 2,426_ 2,426 Total Building Load Totals: 36,403 3,171 18,476 21,647 Check Figures Total Building Supply CFM: 784 CFM Per Square ft.: 0.329 Square ft. of Room Area: 2,383 Square ft. Per Ton: 1,321 Volume (ft'): 14,948 Building Loads Total Heating Required Including Ventilation Air: 36,403 Btuh 36.403 MBH Total Sensible Gain: 18,476 Btuh 85 Total Latent Gain: 3,171 Btuh 15 Total Cooling Required Including Ventilation Air: 21,647 Btuh 1.80 Tons (Based On Sensible + Latent) rNOtes - -._ Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C:\ ...\Recher HVAC - 4383 86th St NE.rh9 Friday, July 18, 2025, 11:04 AM Rhvac - Residential & Light Commercial HVAC Loads Auer Steel (Plymouth) Plvmouth. MN 55441 Buildin_q Pie Chart Floor 4% Roof 8% Wall 31% Glass 29% Roof 7% Wall 5% Door 1 % People 10% Elite Software Development, Inc. Recher HVAC Page 7 Ventilation 32% Infiltration 7% Door 3% Glass 16% AED Excursion 11 % Ventilation 17% Infiltration 2% Equipment 1 I% C:\ ...\Recher HVAC - 4383 86th St NE.rh9 Friday, July 18, 2025, 11:04 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Auer Steel (Plymouth) Recher HVAC Plymouth. MN 55441 Paae 8 Detailed Room Loads - Room 1 - Lower Level (Average Load Procedure) fteneral Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 28.5 ft. System Number: 1 Room Width: 28.0 ft. Zone Number: 1 Area: 798.0 sq.ft. Supply Air: 162 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 1.5 AC/hr Volume: 6,384 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 2 Actual Winter Vent.: 38 CFM Runout Air: 81 CFM Percent of Supply.: 24 % Runout Duct Size: 6 in. Actual Summer Vent.: 26 CFM Runout Air Velocity: 414 ft./min. Percent of Supply: 16 % Runout Air Velocity: 414 ft./min. Actual Winter Infil.: 4 CFM Actual Loss: 0.107 in.wg./100 ft. Actual Summer Infil.: 2 CFM Item Area U- Htg Sen Clg Lat Sen I Description Quantitv Value HTM Loss HTM Gain Gai E -Wall-15BO-1 Osf--8 30 X 8 240 0.050 4.4 1,044 0.0 0 0 E -Wall-15BO-1 Osf-4 18 X 4 72 0.054 4.7 338 0.0 0 0 S -Wall-15BO-1 Osf-4 34 X 4 136 0.054 4.7 639 0.0 0 0 W -Wall-15B0-1 Osf-4 24 X 4 96 0.054 4.7 451 0.0 0 0 W -Wall-15BO-10sf-4 24 X 4 96 0.054 4.7 451 0.0 0 0 W -Wall-12F-Osw 24 X 4 60 0.065 5.7 339 0.9 0 52 N -Wall-1 5BO-1 Osf-4 34 X 4 136 0.054 4.7 639 0.0 0 0 N-WaIl-12F-Osw 34 X 4 118 0.065 5.7 667 0.9 0 102 W -GIs-Vector shgc-0.31 0%S (2) 36 0.290 25.2 908 32.7 0 1,178 N -GIs-Vector shgc-0.31 100%S 18 0.290 25.2 454 9.7 0 174 Floor-21 B-20 28 X 28.5 798 0.019 1.7 1,319 0.0______. 0 0 Subtotals for Structure: 7,249 0 1,506 Infil.: Win.: 3.9, Sum.: 2.1 232 1.560 362 0.129 33 30 AED Excursion: 503 People: 200 lat/per, 230 sen/per: 1 200 230 Equipment_ _ 0 1.200_ Room Totals: 7,611 233 3,469 C:\ ...\Recher HVAC - 4383 86th St NE.rh9 Friday, July 18, 2025, 11:04 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Auer Steel (Plymouth) Recher HVAC Plvmouth. MN 55441 Page 9 Detailed Room Loads - Room 2 - Main Level (Average Load Procedure) General Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 28.6 ft. System Number: 1 Room Width: 28.0 ft. Zone Number: 1 Area: 800.8 sq.ft. Supply Air: 349 CFM Ceiling Height: 9.0 ft. Supply Air Changes: 2.9 AC/hr Volume: 7,207 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 4 Actual Winter Vent.: 50 CFM Runout Air: 87 CFM Percent of Supply.: 14 Runout Duct Size: 6 in. Actual Summer Vent.: 56 CFM Runout Air Velocity: 445 ft./min. Percent of Supply: 16 Runout Air Velocity: 445 ft./min. Actual Winter Infil.: 13 CFM Actual Loss: 0.124 in.wg./100 ft. Actual Summer Infil.: 7 CFM e Area U- Htg Sen Clg Lat Sen Description . - Quantity Value HTM Loss HTM Gain Gain E -Wall-12F-Osw 27 X 9 189 0.065 5.7 1,069 0.9 0 163 S -Wall-12F-Osw 34 X 9 294 0.065 5.7 1,663 0.9 0 254 W -Wall-12F-Osw 24 X 9 128 0.065 5.7 724 0.9 0 111 E-Door-11 P 3 X 7 21 0.290 25.2 530 7.0 0 146 E-Door-11 P 3 X 7 21 0.290 25.2 530 7.0 0 146 E -GIs-Vector shgc-0.31 0%S 12 0.290 25.2 303 32.8 0 393 S -GIs-Vector shgc-0.31 0%S 12 0.290 25.2 303 17.9 0 215 W -GIs-Vector shgc-0.31 0%S 42 0.290 25.2 1,060 32.7 0 1,375 W -GIs-Vector shgc-0.31 0%S (2) 26 0.290 25.2 656 32.8 0 852 W -GIs-Vector shgc-0.31 0%S 20 0.290 25.2 505 32.8 0 655 UP-Ceil-1613-50 28.6 X 28 800.8 0.020 1.7 1,393 1.0 0 769 Subtotals for Structure: 8,736 0 5,079 Infil.: Win.: 12.9, Sum.: 7.0 765 1.562 1,195 0.127 109 97 AED Excursion: 1,080 Equipment: 0 1,200 Room Totals: 9,931 109 7,456 C:\ ...\Recher HVAC - 4383 86th St NE.rh9 Friday, July 18, 2025, 11:04 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Auer Steel (Plymouth) Recher HVAC Plvmouth. MN 55441 Page 10 Detailed Room Loads - Room 3 - Upper Level (Average Load Procedure) I General Calculation Mode: Htg. & clg. Occurrences: 1 Room Length: 28.0 ft. System Number: 1 Room Width: 28.0 ft. Zone Number: 1 Area: 784.0 sq.ft. Supply Air: 273 CFM Ceiling Height: 8.0 ft. Supply Air Changes: 2.6 AC/hr Volume: 6,272 cu.ft. Req. Vent. Clg: 0 CFM Number of Registers: 3 Actual Winter Vent.: 37 CFM Runout Air: 91 CFM Percent of Supply.: 13 % Runout Duct Size: 6 in. Actual Summer Vent.: 43 CFM Runout Air Velocity: 463 ft./min. Percent of Supply: 16 % Runout Air Velocity: 463 ft./min. Actual Winter Infil.: 11 CFM Actual Loss: 0.134 in.wg./100 ft. Actual Summer Infil.: 6 CFM j Item Area U- Htg Sen Clg Lat Sen Description Quantitv Value HTM Loss HTM Gain Gain E -Wall-12F-Osw 21 X 8 168 0.065 5.7 950 0.9 0 145 W -Wall-12F-Osw 24 X 8 154 0.065 5.7 871 0.9 0 133 N -Wall-12F-Osw 34 X 8 242 0.065 5.7 1,369 0.9 0 209 W -GIs-Vector shgc-0.31 0%S (2) 30 0.290 25.2 756 32.7 0 982 W -GIs-Vector shgc-0.31 0%S 8 0.290 25.2 202 32.8 0 262 N -GIs-Vector shgc-0.31 100%S (2) 30 0.290 25.2 756 9.7 0 290 U_P-Ceil-16B750 28 X_28 784 _ 0.020 1.7 1,364 1.0 0 753 Subtotals for Structure: 6,268 0 2,774 Infil.: Win.: 10.6, Sum.: 5.8 632 1.562 987 0.127 90 80 AED Excursion: 843 People: 200 lat/per, 230 sen/per: 4 800 920 Equipment:_ 0 1,200 Room Totals: 7,255 890 5,817 C:\ ...\Recher HVAC - 4383 86th St NE.rh9 Friday, July 18, 2025, 11:04 AM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Auer Steel (Plymouth) Recher HVAC Plymouth, MN 55441 _ Page 11 System 1 Room Load Summary Htg Min Run Run Clg Clg Min Act f3Qot___ Area Sens Htg Duct Duct- Sens - L-at-------Gtg Sys - No Name SF- Btuh _ _--_CFM Size Vel Btuh Btuh- CFM CFM Zone 1--- 1 Lower Level 798 7,611 102 2-6 414 3,469 233 162 162 2 Main Level 801 9,931 133 4-6 445 7,456 109 349 349 3 Upper Level 784 7,255 97 3-6 463 5,817 890 273 273 Ventilation 11,606 1,734 1,939 Svstem 1 total 2,383 36,403 332 18,476 3,171 784 784 System 1 Main Trunk Size: 10x15 in. Velocity: 753 ft./min Loss per 100 ft.: 0.09 in.wg Cooling— Svstem Summary Cooling Sensible/Latent Sensible Latent Total Tons Split Btuh Btuh Btuh Net Required: 1.80 85% / 15% 18,476 3,171 21,647 Equipment Data Type: Heating System Natural Gas Furnace Cooling System Standard Air Conditioner Model: Indoor Model: Brand: Efficiency: 0 AFUE 0 SEER Sound: 0 0 Capacity: 0 Btuh 0 Btuh Sensible Capacity: n/a 0 Btuh Latent Capacity: n/a 0 Btuh C:\ ...\Recher HVAC - 4383 86th St NE.rh9 Friday, July 18, 2025, 11:04 AM C rn U3 uj rtln Cl Cl rrt z - tt • 1 r 7U m 0 On n x 0 W n 4 - Oz Z , z r- rn m z U3 zD. z m 0Oc SIGNo-:o D rnD < D orn ZZ Cn rn rn rr-• D Q T r r N Zm r O°0 0 C rn cn QMI Hi ram- ° rn 0 ;0 ;0 ' I D 4383 xp°0 Q D z Z rn Z C rn o T 1 < n > 9- B r. 1..1 '_ rn VO 0 m EDMONSO 0 1N O O JO N X Oro O N N J / T / - VIV 1 O 0 Q 7'7 w ma v O CL w C) clii m a CO2 zo N W03 m 147 10C C C su M mv T NE K4 DGE NESOTA Z COPYRIGHT NOTICE THIS ARCHITECTURAL PLAN SET AND THE DESIGN ELEMENTS REPRESENTED ON rn EACH INDIVIDUAL PAGE INCLUDING BUT NOT LIMITED TO; FLOOR PLAN AND v0 ELEVATIONDESIGN, DETAILS, INFORMATION, AND CONCEPTS IS PROPRIETARY AND DEVELOPED FOR THE EXCLUSIVE USE OF JP BROOKS INC. rn ( D C rn to C) USE AND/OR REPRODUCTION OF ANY PORTION OF THIS PLAN SET IN ANY per, 70 E: FORM IS STRICTLY PROHIBITED WITHOUT EXPRESSED WRITTEN PERMISSION OF JP W rn I'° n BROOKS. VIOLATION WILL BE SUBJECT TO ALL APPLICABLE COPYRIGHT LAWS. 0 Z r ft m cri- - Z< n CA rn Q BUILDING CODE AND DESIGN DISCLAIMER 000 oZ rn CDcrn" rn w m O THE HOME PLAN REPRESENTED IN THIS PLAN SET HAS BEEN DESIGN TO COMPLY WITH WITHTHE 2018 INTERNATIONAL RESIDENTIAL CODE (IRC) AND THE 2020 p ON a 0 DOENERGYCONSERVATIONCODE (IECC). THE DESIGN OF THIScln rn HOME PLAN IS DRAWN AS ACCURATELY AS POSSIBLE, HOWEVER, FINAL w flr4 CONSTRUCTIONMAYDIFFERSLIGHTLYFROMPLANSDUETOSTRUCTURALpGmADJUSTMENTS, FIELD CONDITIONS, OR OTHER DESIGN CONSIDERATIONS. 4383 86th St NE CI T Monticdo Y0 F Lot 19 Block 4 - Edmonson Ridge BUILDING SAFETY Builder: JP Brooks Builders 505 Walnut Street, Suite #1 Monticello, MN 55362 Phone: 763-295-3060 Fax: 763-295-4404 CITY OF MONTICELLO PROPOSED BUILDING SURVEY REQUIREMENTS CHECKLIST Prior to excavation and construction, the permittee shall submit to the City of Monticello through certificate of survey that the proposed construction is in compliance with all land use, zoning, conditional use, or planned use as part of the building permit application. The certificate of survey shall be signed by a registered Minnesota land surveyor. The signed certificate of survey shall contain at a minimum the following information: Indicate permanent iron monuments at each lot corner. Dimension from house to lot lines and from O.H.W. & Bluff Line of rivers, creeks, V lakes, and Type 4 and 5 wetlands. Proposed building elevations of lot corners. Proposed elevations at building corners. Proposed elevations on the side yard swales at the extension of building corners and v high points. Proposed and as -built elevations of garage slab and lowest floor on walkouts. Top of curb elevation at the extension of property lines and center of driveway. Proposed elevations and location of any critical drainage ways located on the site natural or man-made) indicated with drainage arrows and percentage of slope. Label all adjacent street and railroad right-of-way. Erosion control *Must be installed prior to starting construction and maintained to be compliant with City requirements and project SWPPP. Follow City Standard Detail Plate 6006. Proposed driveway location, width at lot line, % of slope. Show proposed porches, cantilevers, bay windows, and decks (if being constructed). Ali 4 Show individual significant trees 36" DBH (Diameter Breast Height)or larger Existing or proposed retaining wall(s) top and bottom elevations. Show adjacent property topo related to drainage with arrows. Proposed sump pump outlet location on building footprint (natural drainage or piped to curb). Show any Drain Tile installed in the yard.---* *Show sump pump location on final as -built City will accept only originals or quality hard copies of the as -built survey and certification of grading. I-P Drainage and Utility Easements ore shown thus: I L-6 12 6 12 1 N.T.S. I Being 6 feet in width and adjoining lot lines and 12 feet In width and adjoining street lines and rear lot lines as shown on this plot, unless otherwise shown. SHEET NO. 963.0 --_" pp4010 991 v v N 5W77R0 155 960.6lP S'_ - - - - --IP 92 i 1 44110 g62 • 44110 N a, I Mow line I 6 d9 6 964 - r ¢ s0 I S. 96 Y ry? 961. 42 2s OD = r°ario I h / A SBl 9\ SBL I I k /4% O X962' S %'% 00 7 - J I-, q 9638 7S4 OW Proposed I / 964.I1 119 House O 960. 9 P/D. 155-264-004190 I Area: 11, 487% S. F. I 0.26% Ac.) 962. S /2, 00 I 963'i Aso, $ $ ij n 1 962- 7 oop 64-6 Se< I V IW / Proposed ambct aw ' tiGarage / P ev. 962/9 I `V 9 h I N PID: 155-264-004180 41 s 3000 SS ? 0p L 96 - 966 11/ i i nil / O. 00 9 / 963.4 0S/41 0 964. 7 0 00 960' eCi 5 t' \ " k Y C r- 96 c .,. 3. 4 10 964. F r 1 1 1 1- V 4A//y 4' \ 963. 1 c _ i Certificate of Survey BOGART, PEDERSON JP Brooks Builders & ASSOCIATES, INC. 1-19j B4 EDMONSON RIDGE LAND SURVEYING CIVIL ENGINEERING MAPPNG Wright County, Minnesota 3071 6FIRST STREET, BECKER. MN 55308-9322 TEL: 763-262-8822 FAX: 763-262-8844 Certificate of Survey PAOPOSEL _.ADIh for AaproveK oa 8/ 15/2025 JP Brooks Builders X 0 20' SCALE: 1" = 20' PROXCT BENCHMARK Top of hub w/ tack of SW`1y building comer offset Elevation = 962.19 feet ( Plot Datum) SETBACKS HOUSE TYPE 25' Front 3- level Split Lookout 7' Side (The Maplewood) 30' Rear ZQVNG 20' Side Street P,LID. DRIVEWAY AREA TO STREET, 960e S. F. (Excluding Sidewalk) SDD AREA Fud Yard - 10,616% S.F. PROPOSED IMPERVIOUS SLRFACES Total lot Area - 11,487Y- SF. House Area = 2,260 4 SF. Driwwov1ydk/Po6o Area - 1,061 SF. Total Impendous Area = 3321% S.F. ( 27.9 ELEV PER GRADING PLAN Pons by Alliont. Garage Floor Elev - 965.2 Lowest Floor Elevation = 958.2 Rear Elevation = 965.2 RAM - Rambler REFERENCE BENCHMARK Rim of sanitary manhole on 86th St. NE near West plot boundary. Elevation - 957.15 feet (Plot Datum) PROPOSED HOUSE ELEVATIONS Top of House Foundation Elev = 966.0 Top of Garage Foundation Elev = 965.5 Garage Floor Elev = 965.2 Lowest Floor Elev = 962.3 Lot 19, Block 4, EDMONSON RIDGE City of Monticello, Wright County, Minnesota Addrem 4383 867H STREET ME Mmdoe%iq MN 66362 NO EXCAVATION OR CONSTRUCTION CAN BEGIN UNTIL THIS PLAN IS APPROVED BY THE LOCAL BUILDING INSPECTOR LOWEST FLOOR ELEVATION IS SUBJECT TO SOIL AND WATER TABLE CONDITIONS. BEARING AND DISTANCE INFORMATION IS PER THE RECORDED PLAT. EASEMENTS ARE SHOWN PER RECORDED PLAT UNLESS OTHER DOCUMENTATION WAS PROVIDED TO US. CONTRACTOR TO DETERMINE EXACT LOCATION AND ELEVATION OF SEWER SERVICE. THE LOWEST FLOOR ELEVATION IS SUBJECT TO THE ACTUAL DEPTH AND ELEVATION OF THE SEWER SERVICE PRIOR TO ANY EXCAVATION, EXCAVATOR MUST COMPARE SURVEY WITH HOUSE PLAN AND BUILDER TO VERIFY TYPE OF HOUSE, DIMENSIONS AND FINAL ELEVATION(S). STREET AND UTILITY IMPROVEMENTS SHOWN PER PLAN. UTILITIES SHOWN HEREON WERE DIGITIZED PER THE EDMONSON RIDGE DEVELOPMENT PLANS DATED 7/29/2021, PAGES 22-24, BY ALLIANT ENGINEERING. LEGEND: OFFSETS Denotes found iron monument OS1' 1 962.19 (BM) ® Denotes set hub 0512 = 96L42 OS/3 = 96411 ® Denotes set lath OSj4 = 964.37 x 976.4 Denotes existing ground elevation 942-fl Denotes proposed elevation Denotes proposed drainage flow T Denotes telephone pedestal Denotes cable television box Denotes electric service Denotes water service Denotes sanitary service Denotes sanitary manhole Denotes catch basin H Denotes watervoive LS 44110 Denotes hydrant Denotes Peter D. Goers, LS Denotes concrete surface (per plan) Denotes bituminous surface (per plan) Denotes easement 960 Denotes contour per grading plan Denotes sanitary sewer (per plan) Denotes waterline ( per plan) SBL - Denotes building setback line Denotes existing adjoiners I hereby certify that this survey, plan, or report was prepared by me or under my REV DATE: 7/15/25 NO DATE my direct supervision, and that I am a duly Licensed Land Surveyor under the DESIGN BY: laws of the State of Minnesota. DRAWN BY: CK CHECKED BY:CAW DWG FILE: L19 B4 HS Signed. Craig A. Wensmann FILE NO.: 22- 0259, 18 Date: 7/16/25 Reg. No.47466 DESCRIPTION