2026-00024ADDRESS
PIN
LEGAL DESC
PERMIT TYPE
PROPERTY TYPE
CONSTRUCTION TYPE
CITY OF MONTI-CELLO
505 WALNUT STREET
MONTICELLO, MN 55362-
3) 295-3060 FAX: (763) 295-4404
4417 86TH ST NE
155264004160
EDMONSON RIDGE
LOT 016 BLOCK 004
BUILDING
SINGLE FAMILY -DETACHED
NEW CONSTRUCTION
VALUATION : S 322,674.37
NOTE: NEW CONSTRUCTION SINGLE FAMILY HOME:
0 SQ FT FINISHED BASEMENT
1024 SQ FT UNFINISHED BASEMENT
1024 SQ FT FINISHED MAIN FLOOR
1277 SQ FT SECOND FLOOR
96 SQ FT OPEN PORCH
475 SQ FT GARAGE
FIREPLACE: YES
A/C: YES
MECHANICAL: 10
PLUMBING: 21
WATER METER 1 (MAIN) 1.00
WAC UNITS 1.00
APPLICANT
JP BROOKS HOMES
13700 REIMER DRIVE
SUITE 100
MAPLE GROVE, MN 55311-
763) 999-7153
OWNER
LSW INVESTMENTS LLC
4065 CHELSEA RD W
MONTICELLO, MN 55362-
AGREEMENT AND SWORN STATEMENT
I agree that the work will be conducted in conformance with
the ordinances of the City of Monticello and with the
Minnesota State Building Code. I understand that the work
will be in accordance with the plan that has been approved
by the Building Official. I agree that any damage caused to
public property including but not limited to curb, sidewalk,
public utilities and signs will be repaired at my expense.
Applicant /''J
Date 5
Bldg Official Date
2 0 2 6— Q 0 0 2 4*
DATE ISSUED: 01/15/2026
Permit #: 2026-00024
SAC UNITS 1.00
BUILDING PERMIT FEE 2,378.00
PLAN REVIEW 1,545.70
STATE SURCHARGE, BLDG VAL 161.34
SAC FEE 30% 1,449.90
SAC FEE 70% 3,383.10
WATER ACCESS CHARGE, RESI 2,153.00
COMB CONNECTION FEE / RESI 130.00
SEWER / WATER EXCAVATION PERMIT 130.00
CONTRACTOR LICENSE VERIFICATION FEE 5.00
ASSESSMENT SEARCH FEE 60.00
UTILITY LOCATE FEE, RESI 50.00
WATER METER 1 (MAIN) 475.00
MN STATE SALES TAX (MTR1) 37.41
TOTAL 119958.45
Payment(s)
CHECK 24646 11,958.45
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
CITY OF
mofiticeRo
13UILDING SAFETY
505 WALNUT STREET, SUITE 1
City Hail (763) 295-2711
NTI , MN 55362
PERMIT #
3060 Fax (763) 295-4404
BiTILDING PERMIT APPLICATION
Please Print - INCOMPLETE APPLICATIONS WILL NOT BE ACCEPTED.
SITE ADDRESS: e AS I% ZONED
LEGAL: Lot Rio Block y Plat Moe, oe).
Property Owner Name: JP Brooks Builders Phone: 763-285-4790
Address: 13700 Reimer Drive city: Monticello State: MN Zip: 55311
Contractor Name: JP Brooks Builders Phone: 763-285-4790
State License #: 656554 E-Mail: shelly@jpbrooks.com
Address: 13700 Reimer Drive City: Maple Grove State: MN Zip: 55311
Eng./Architect Name: Phone:
Address: City: State: Zip:
Plumber Name: Northwoods Plumbing Phone: 763-717-8757
Address: 30799 73rd Street City: Pierz State: MN Zip: 56364
Mechanical Name: Recher HVAC Phone: 612-802-6525
Address: 1125 Mississippi Drive North City: Champlin State: MN Zip: 55316
Type of Work Type of Construction Building Information
R New Single Family Use of building 0 est`J e h«'-
Addition Duplex of stories VV'..- :,1rV
Alteration Multi -Family Floor area sq. ft. 2aO ,L;' 'I.4
Repair Commercial Estimated value - _ . „_ „_
ElMove Industrial of construction $.Z/ 4741..tZ
Other Other
Description of work:
r u Z ( wS 4'O i `( Viome, In1 , - !, v tti N r h S C C b' L S e w C h i- G r 1L tk
5 cLS; ri, P 16t C L I
hereby apply for a permit for construction as described and acknowledge that the information I have provided above is complete and accurate. I agree
that the work will be conducted in conformance with the ordinances of the City of Monticello and with the Laws of the State of Minnesota; and
that I understand that this application is not a permit and that the work is not to start without a permit. I further understand that the work will be
in accordance with the plan that has been approved by the Building Official. I agree that any damage caused to public proper ' luding but not
limited to curb, sidewalk, public utilities and signs will be repaired at my expense. Applicant
Signature SEE
BACK FOR P MBING I
AND MECHANICAL INFO. Application
Date N
APPLIC,AN]'.9 Please show fixtures that are cable.
Fire Suppression : (if applicable) I Plumbing: (if applicable)
No. Fixture Type No. Fixture Type
Sprinkler Heads Water Closet (toilet)
Other/Special FSDevice Bathtub
Lavatory (wash basin)
Shower
L Kitchen Sink
1 Dishwasher
Laundry Tub
1
Clothes Washer
Water HeaterFireAlarm: (if applicable)
O Urinal
No. Fixture Type 4 Drinking Fountain
t Floor Drain
Slop SinkofDevices
Other Z Outside Faucet
2,1 TOTAL
Future Owner Information:
Name:
Address:
City:
State: Zip:
Phone #:
Mechanical. (if applicable)
No. Fixture Tvoe
Furnace
Gas Meter
0 Range Hood
Gas Range
Water Heater
Air Conditioning
I _ Mech. Fireplace
Bathroom(s) Exhaust Fan
Air Exchanger
Dryer
Gas Opening w/o Fixture
l u TOTAL
FOR CITY USE ONLY
Tree Ordinance Handout Yes No
Other Handouts Yes No
DDITIONAL INFORMATION:
aluation:
onstruction Type:
ccupancy Group: '^
ivision: 4 12-1 De j
quare Footage: Zf OVAS. M
of Stories:s'g ,
of Residential Units:
laximum Occupancy:
ire Sprinklers: Yes Wo
ff-Street Parking Covered:
ff-Street Parking Uncovered: Z
Zoning:
Building Official:
Total Due
CITY OF
Monticello 2025 Residential Building Permit Calculator
Address: 4417 86th ST NE, Monticello, MN 55362
Legal: Lot 16 Block 4 Edmonson Ridge, Monticello
1=Yes 0=No
Ne,vv Residence: I House Type: Two story, Lookout
1=Yes 0=No 1=Yes 0=No
Permit Applicant: Contractor: I Plan Review: 1
Owner: 0 Master Plan: 0
Master Plan Review = 25% qfBuilding Permit Fee)
Crawl Space 0 $ 15.27
Unfinished Basement Area 1,024 $ 16.50 16,896.00
Finished Basement Area 0 S 44.05
Main/First Floor Area 1,024 $ 125.00 128,000.00
Second Floor Area 1,277 $ 115.00 146,855.00
Detached Garage 0 $ 60.00
Attached Garage 475 $ 47.33 22,481.75
Garage Conversion to Living Space 0 $ 47.44
Carport/Gazebo 0 $ 30.90
Pole Barn 0 $ 19.03
Shed - greater than 200 SF 0 $ 40.00
Lean -to -Shed 0 $ 13.25
Basement Finish Only 0 $ 16.00
Remodeled Area 0 $ 17.39
Porch (open) 96 $ 36.97 3,549.12
Porch (3-Season) 0 $ 60.00
Porch (3-Season on Existing Deck) 0 $ 55.00
Porch (Screen Porch/Breezeway) 0 $ 58.48
Solarium 0 $ 94.90
Deck 0 $ 20.00
Deck (Screen In & Roof Over Existing) 0 $ 29.80
In -Ground Pool 0 $ 23.18
Above -Ground Pool 0 $ 11.31
Fireplace - Mechanical/Gas 1 $ 4,892.50 4,892.50
Fireplace - Masonry 0 $ 22, 660.00
Elevator/Lift/Other 0
CALCULATED BUILDING VALUATION $ 322,674.37
1 = Yes 0 = No
Water Hook-up 1
Sanitary Sewer Hook-up 1
FEES:
BUILDING PERMIT - 1997 UBC FEE SCHEDULE PLUS 6% 2,377.10
PLAN CHECK 1,545.12
CONTRACTOR LICENSE VERIFICATION 5.00
STATE SURCHARGE 161.34
SUBTOTAL 4,088.56
SEWER FEE [SAC] 4,833.00
WATER FEE ]WAC] 2,153.00
WATER / SEWER CONNECTION FEE 130.00
SEWER/WATER EXCAVATION PERMIT FEE 130.00
ASSESSMENT SEARCH 60.00
UTILITY LOCATES 50.00
5/8" WATER METER & SALES TAX 510.03
SUBTOTAL
TOTAL FEES CALCULATED 11,954.59
Escrow Amount - (Winter Only)
TOTAL AMOUNT TO BE PAID TO CITY 119954.59
Description
Building Permit Fee
State Surcharge, Building Value
Assessment Search Fee
Plan Review
SAC Fee 30%
SAC Fee 70%
Water Access Charge, Residential
Comb Connection Fee, Residential
Sewer/Water Excavation Permit
Contractor License Verification Fee
Utility Locate Fee, Residential
Water Meter 1(Main)
MN State Sales Tax (Meter 1)
Total
4417 86th Street NE
Permit 2026-00024
City of Monticello
Permit Quote
Quote Date: 1/14/2026
Fee
2,378.00
161.34
60.00
1,545.70
1,449.90
3,383.10
2,153.00
130.00
130.00
5.00
50.00
475.00
37.41
11,958.45
IDLV ZG /M &I V
I
Address: q417- %1h st 96 Builder: ip Bm&S
Two sets Building Plans it ftalz
Two sets Surveys
Survey sent to Engineering for review: Survey approved by Engineering:
Energy Calcs
J Digital Plans:
Plan Review letter generated
Review completed by Building Department
Permit fees calculated
7i Z
Plan Review Checklist
Plan Review Letter:
V HVAC Loads
Correct percentage of Brick & Stone % — 11l-Z L
Received by Building Department: i
Applicant contacted: Date
Address House size and finishing details E
C verified HVAC
Loss Calcs verified Footings
and pads highlighted Point
loads Any
balloon framed walls and stud spacing? Special
stairway framing Details
on braced walls Blocking
on floor framing earing
wall blocking and bracing 1
Verify any tempered glass Valuation
report completed Contact
applicant for revisions or questions: I
What: Who:
Date
Contacted: I
Due Date for Revisions: Please
provide the necessary information by this date: If
not received by that date, the application
will be removed from the review process and
will be treated as a new permit when the information
is provided. The review timeframe will start
over at that time. Valuation
and size entered on front page of application Note
finished or unfinished basement on front of application Second
page of application: Verify
fixtures match plan: plumbing, mechanical, alarms Compete "
Additional Information" section Approved
COS survey received from Engineering Plan
Reviewer's Initials:
Monticello
BUILDING SAFETY
RESIDENTIAL PLANS EXAMINING REPORT
505 Walnut Street, Suite 1
MONTICELLO, MN 55362
Date: 1/14/26
City Hall (763) 295-2711
Building Inspections (763) 295-3060
JP Brooks
M"
4417 89th Ave NE
Monticello, MN 55362
Contractor: JP Brooks
13700 Reimer Drive
Maple Grove, MN 55311
Telephone: 763-285-4790
BASIC PROJECT DESCRIPTION:
Single family 2 story
Unfinished, Lookout basement
4 Bedroom plus office
2,301 Sq ft Finished
1 1 Pa e
Bldg Building, Mechanical & Plumbing Bob Ferguson — Chief Building Official 763) 271-3214
Bob. Fer uson aMonticelloMN.gov
Wayne Kalla — Inspector/ Plan Reviewer 763) 314 -0908
Wayne.Kalla(cLMonticelloMN.gov
Mark Gerber — Inspector / Plan Reviewer
Mark. Gerber(dMonticelloMN.gov 763) 271-3222
Steve Kowalczyk — Inspector / Plan Reviewer 763) 271-3253
Steve.Kowalczyk(a ,MonticelloMN.gox
Amy Biren — Building Permit Technician 763) 295-3060
buildingdepartnient a;MonticelloMN ;g`ov
review Electrical Dennis Shafer — Electrical Inspector 763) 402-5732
outside
of city
443 Lafayette Road North, St. Paul, MN 55155 Office Hrs: 7-8:30am
http://www.dli.mn.gov/business/get-licenses-and-
ermits/ ermits
CDD Land Use/Site Design/Landscaping Angela Schumann — Community Development Director 763) 271-3224
Angela. Schumann(aM onticelloMN.gov
AM.
Bob Ferguson — Zoning Administrator 763) 271-3214
ALi _'__ 9 - - . - - .. -
o.
Engr/ Grading, Paving, Drainage & Matt Leonard- City Engineer 763)-271-3271
PW Utilities Matt.LeonardCctMonticelloMN.gov
Ryan Melhouse — Project Engineer 763) 271-3227
Ryan. MelhouseAMonticelloMN.gov
Mario Frucci — Engineering Technician
Mario. Frucci(oDMonticelloMN.gov 763) 271-3213
Mat Stang - Water & Sewer Superintendent 763) 271-3274
Mat. Stang(a)MonticelloMN.
goA mm_.
The plan review accomplished as indicated in this record is limited to those code sections specifically
identified herein. This record references commonly applicable code sections. It does not reference all code
provisions which may be applicable to specific buildings. This record is designed to be used only by those
who are knowledgeable and capable of exercising competent judgment in evaluating construction
documents for code compliance.
The following notations refer to design submittal documents as presented in application for a building permit. This report is
not to be considered conclusive with respect to review of plans and specifications to assure compliance with Minnesota
Building Codes and Minnesota Fire Codes. Please retain a copy of this report on -site, attached to the Approved Job Copy of
Page
the Building Plans and Specifications.
This review is for Building Construction Permit review only. All other reviews will be conducted with
their respective permit applications. See note #1 below.
PLAN
NO. DEPT SHEET/ CODE
SECTION
COMMENTS
SPEC.
SECTION
1 bldg n/a general All job debris must be contained on -site and, in a dumpster, or covered, fenced area
note
Bldg n/a general Building Official review and authorization required prior to changes, modifications, 2 note or alterations.
hhl"' n/a general NOTICE: This building must not be occupied until a Certificate of Occupancy has3
note 1300.0220
been issued.
bldg n/a general Final Building, Plumbing, and Heating inspections must be completed prior to4noteoccupancy. The owner or contractor must be present for final building inspection.
s bldg n/a general IFGC 406 Gas piping pressure test required: 25# for 10 minutes on residential construction.
note
bldg n/a general Separate applications and permits Required for Sewer / Water Connection, Heating6noteA/C Systems, Plumbing, Fire Alarm Systems.
Bldg n/a general MR 1322.1101 A building certificate, showing energy code compliance information, must be posted
7 note Subp 15 in a permanently visible location prior to final inspection
1101.8
Bldg MN Statute Carbon monoxide detectors must be installed in accordance with MN Statute §299F
8 299F .50 50
R315
bldg Buildings must be constructed per current building codes. 2020 MN State Building
Code including:
n/a general
2020 MN Residential Code
9 MR 1300 2023 National Electrical Code
note
2020 MN Plumbing Code
2020 MN Mechanical Code
2020 MN Fire Code
bhl"' All bottom wall plates in contact with concrete or masonry shall be decay resistive.
10 R317 All metallic fasteners and mechanical connections in contact with ACQ pressure
treated lumber must be approved for such use.
11 ll `l'r IRC 602.10 Walls shall be braced in accordance with IRC 602.10 or Engineered Plans
bldg n/a general Post Address Card Visible from the street, maintain until the house numbers are
12
note installed.
bldg n/a general Engineered Roof Trusses: Provide a Copy of the Approved, Certified Truss Plans for13
note framing inspection.
bldg n/a general State Board of Electricity: Separate Permit and Inspections Required for Electrical14
note work.
15 bldg Maintain 6" Earth to wood separation
Eng Erosion Control Required: Install erosion control per proposed survey prior to
16 foundation inspection. Rock construction entrance and site perimeter controls such
as silt fences are required. Maintain erosion controls until landscaping is completed.
3 1 Page
PLAN
NO. DEPT SHEET/ CODE
SECTION
COMMENTS
SPEC.
SECTION
bldg Vent Pipes: The vent pipe shall be primed and glued at all fittings and shall extend
up from the radon control system's collection point to a point terminating a
minimum of 12" above the roof. The vent pipe shall be located at least 10' away
17 from any window or other opening into the conditioned spaces of the building. Vent
pipes routed through unconditioned spaces shall be insulated with a minimum of R-4
insulation. Vent pipes within the conditioned envelope of the building shall not be
insulated.
18
t(
R312.2 Window Fall Protection Required for all windows 6' above grade with sill height of
less than 24", maximum opening must be less than 4".
19 bldg WARNING: Call Before You Dig! Gopher State One Call 651-454-0002
20
bldg. Blower Door Test Required: Prior to final Inspection — Air Leakage Rate Must Not
Exceed 3 Air Exchanges Per Hour.
21 bldg Flash between House and Stoop.
22 bldg R319.1 Install House Numbers: 4" minimum, visible from street.
23
bldg Fireplaces: Must be inspected prior to wall enclosure or when smoke chamber /
damper areas are exposed.
24
N, Solid Block Between Wall Studs at Vaulted Truss Bottom Chord.
25
d",
R302.11 Fire blocking Required: Cut off concealed draft openings between stories and attic.
Close horizontal to vertical penetrations.
26 R301.1 Carry Concentrated loads to foundation — Concentrated loads must be solidly
blocked and carried continuously to foundation.
27
f'f Slope garage floor to Overhead door or to floor drain. (no trap / dry pan drains to
daylight; schedule 40 pipe required).
28
b/`/'
R402.4.1.1 Hardboard Backer Required behind tub / shower.
29 h/`I' Seal and Secure Sump Pump Basket Cover.
30 bldg R506.2.3 Vapor Retarder: Required Under Floor Slab (Exception unheated spaces).
31 R405.2.3 Drain Tile to Sump Basket: Install pump with rigid piping to house exterior. Install
flexible hose connection extending to drainage area away from the foundation wall.
32
R1303.2402 Provide power receptacle & switched light in attic or other unconditioned space for
Subpart 6 future active radon ventilation system.
Radon gas vent pipes shall be provided with space around the vent pipe for future fan
33 R 1303.2402
installation. The space required for the future fan installation shall be a minimum of
24" in diameter, centered on the axis of the vent pipe, and shall extend a minimum
distance of 3 vertical feet.
34 R 402.1.1.3 Poly Slip Sheet Required over non -draining insulation.
35 R802.11 Install truss clips at each truss and girder end unless otherwise specified by the truss
manufacturer.
R402.2.3 For air permeable insulations in vented attics, a baffle shall be installed adjacent to
36 MN Res.Energy soffit and eave vents. The baffle shall extend over the top of the attic insulation.
code
37
bld>
R703.2 Install weather barrier / House Wrap: Cover all exterior wall sheathing (exception:
Detached Accessory Buildings)
Page
PLAN
NO. DEPT SHEET/ CODE
SECTION
COMMENTS
SPEC.
SECTION
Bldg Anchor Bolts or Manufactured Foundation Straps Must: Engage 2nd course of
38 R403.1.6 concrete block masonry. Be located at each core fill / be spaced 6' on center, 2
anchors per plate, 1 anchor within V of each end.
Exterior non -draining foundation insulation requirements: Shall have a rigid, opaque,
and weather -resistant covering to prevent degradation of the insulation's thermal
39 bldg R 4021.1.3 performance. The protective covering shall cover the exposed exterior insulation
and extend a minimum of 6" below grade. The insulation and protective covering
system shall be flashed in accordance with IRC section R703.8.
DRIVEWAY REQUIREMENTS:
zoning Meadobrook The Establish maximum driveway widths of 20' for the two -car garage lots
40
Zoning Ordinance overall, and 20' at the curb line/curb cut line for three -car garage lots as part
of the PUD.
bldg Floor joists and blocking shall be connected to the sill plate at the top of the wall
41 R404.1 1-4 with an approved connector with listed capacity meeting top of wall reaction in table
R404.1(1). Spacing of blocking shall be in accordance with table R404.1(1).
42
bldg
R314.3 If the office is to be used as a sleeping room. A smoke alarm is required in
accordance to section R314.3
5 1 Page
New COristruGfion Energy code Compliance Certificate
Per R401.3 Certificate_ A building certificate shall be posted on or in the eechical dlstribut1on Date Cepanel_ lriTfrcafe Pos MaiIingAddress
of the Dwelling or Dwelling VD-1:t PlaGe your Name
of Residential Go niractor Iogo here - J1 C1 V JP
gr°GkS MN License Number BG
686554 ERMAL
ENVELOPE RADON
CONTROL SYSTEM ClteckAAThatApply
passive (No Fan) o
Active ve ( fan and monometer co
CDLorothersystem monitoring device) aLocation (
or future Tocati°n) of Fan cam _
ri m Attic R
O CD O 0 0
QMLn _U 'iQ G Insulation
Location > o O
u m
T
aip2oZ >z u o arasUm
C
Ix
oEazICUcnC
m al m Below
Entire Slab IS
0 ill z
LL iz u tr Other Please Describe Here NAFoundation
Wall R15
PolyBarrr6r
Perimeter
of Slab on Grade ExterforandInterlorasdtctatedbycode R-
15 Rim
Joist (1st Floor) interforofFoundation Wag R-
30 Rim
Joist (2nd Floor-f-) R-
30 Wall
f CeTR
21ng,
flatt% R-
48
CeTng, vaulted
R-4e
Bay Windows
or cantilevered areas s/ R-
30
Floors overunconditionecl
area NA Describe other
insulated areas Building envelope
airtightness_ Duct system air tighfriess: NA Windows & DoorsAverageU-
Factor (excTudasskylightsand one door U: Heating or C°orng Ducts Outside Condfi oned Spaces Solar Heat
Gain Coeffrcieat(SHGC): Not applicable, al ducts Iocated in conditioned space - MECHAIIIICAL SYSTEMS
R--value 33 Make-up
Air Selecta Type Appliances Heating
System 'Domestic Water Heater Cooling
System Notre quired
permech_ code r FuelType
1 at. Gas 1 Iat_ Gas .Elect_ EJ Passive Manufacturer Bryant
R1Ghmond Bryant ant PoweredModel
915SB0.
42060E17 BA013NRD30BNG Interlocked with exhaust device_ Input in
Capaciiy Rating or
Size BTUS 60, 0 in Gallons_ Describe: output
j-
I Other, describe_ in Tons: 2, AFUE or
Efficiency HSPF%
9 6j 2 go 11- JI
SEER SEER
13
Location of duct orsystem: Pleating Loss
Heating Gain Residential LoadGalcr_riaii Cooling Load Su, _l
Cfcnrs MECHANICAL
VENTIi
ATTON S'fSTE I round duct OR metal duct
Describe any
additional or combined heating or cooling systems if installed: (e.g_ two furnaces or air source heatpumpwithgasback-up fumace): Combustion Air Selecta Type Select Type
Notrequired per meth- code: Neat Recover
Ventilator (HRXO Capacity in r ins: Low Passive Energy
Recover
Ventilator (ERl/) Capacifyin cams= Low= gp High_ Other,
describe: Balanced Yentilaiion
ca a p ciiyintins= High= 13o Location of duct orsystem_ Location offan(
S), describe: Bathrooms and Laundry IVIecl7anicaI Room Capacitycontinuousventilation rate
in cfms: 130 Cfm's
Total ventilation (
intermittent -f- continuous) rate in cfms: 270 6 "round
duct OR metal duct
Builders Associaton
of Minnesota version 101014
Recher HVAC
HVAC Load Calculations
for
4417 86th Street NE
Prepared By:
Tuesday, October 14, 2025
Rhvac is an ACCA approved Manual J, D and S computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Auer Steel (Plymouth) Recher HVAC
Plymouth, MN 55441 Page 2
Project ---
General Project Information
Project Title: Recher HVAC
Project Date: Tuesday, October 14, 2025
Client Name: 4417 86th Street NE
Design Data
Reference City: Minneapolis/St. Paul AP, Minnesota
Building Orientation: Front door faces East
Daily Temperature Range: Medium
Latitude: 44 Degrees
Elevation: 834 ft.
Altitude Factor: 0.970
Outdoor
Dry Bulb
Outdoor Outdoor Indoor Indoor Grains
Winter: -15
Wet But
15
Rel.Hum
n/a
Rel.Hum
n/a
Dry Bulb
72
Difference
n/a
Summer: 88 71 44% 50% 75 24
Check Fiaures
Total Building Supply CFM: 965
Square ft. of Room Area: 3,326
Volume (ft'): 21,304
Building Loads _
Total Heating Required Including Ventilation Air
Total Sensible Gain:
Total Latent Gain:
Total Cooling Required Including Ventilation Air:
CFM Per Square ft.:
Square ft. Per Ton:
50,404 Btuh
22,817 Btuh
4,068 Btuh
26,885 Btuh
0.290
1,484
50.404 MBH
85 %
15 %
2.24 Tons (Based On Sensible + Latent)
Notes -
Rhvac is an ACCA approved Manual J, D and S computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:\ ...\Recher HVAC - 4417 86th Street NE.rh9 Tuesday, October 14, 2025, 12.19 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Auer Steel (Plymouth) Recher HVAC
PI mouth MN 55441 Page 3
Miscellaneous Report
System 1 House Outdoor Outdoor Outdoor Indoor Indoor Grains
Input -Data Dry Bulb Wet Bulb Rel.HumRel.Hum Dry Bulb Difference
Winter: 15 15 100% n/a 72 n/a
Summer.- 88 71 44% 50% 75 23.51
Duct Sizing Inputs
Main Trunk
Calculate: Yes
Runouts
Yes
Use Schedule: Yes Yes
Roughness Factor.- 0.00300 0.01000
Pressure Drop: 0.1000 in.wg./100 ft. 0.1000 in.wg./100 ft.
Minimum Velocity: 0 ft./min 0 ft./min
Maximum Velocity: 900 ft./min 750 ft./min
Minimum Height: 0 in. 0 in.
Maximum Height: 0 in. 0 in.
Outside Air Data
Winter - Summer
Infiltration Specified: 0.130 AC/hr 0.070 AC/hr
46 CFM 25 CFM
Infiltration Actual: 0.130 AC/hr 0.070 AC/hr
Above Grade Volume: X 21,304 Cu.ft. X 21,304 Cu.ft.
2,770
X 0.0167
Cu.ft./hr 1,491
X 0.0167
Cu.ft./hr
Total Building Infiltration: 46 CFM 25 CFM
Total Building Ventilation: 160 CFM 160 CFM
System 1---
Infiltration & Ventilation Sensible Gain Multiplier: 13.87 = (1.10 X 0.970 X 13.00 Summer Temp. Difference)
Infiltration & Ventilation Latent Gain Multiplier: 15.51 = (0.68 X 0.970 X 23.51 Grains Difference)
Infiltration & Ventilation Sensible Loss Multiplier: 92.85 = (1.10 X 0.970 X 87.00 Winter Temp. Difference)
Winter Infiltration Specified: 0.130 AC/hr (46 CFM), Construction: Tight
Summer Infiltration Specified: 0.070 AC/hr (25 CFM), Construction: Tight
C:\ ...\Recher HVAC - 4417 86th Street NE.rh9 Tuesday, October 14, 2025, 12:19 PM
Rhvac - Residential & Light Commercial HVAC Loads
Auer Steel (Plymouth)
Plymouth, MN 55441
Load Preview Report
Elite Software Development, Inc.
Recher HVAC
Pa e 4
JTNoe Se Lat Nei Sen
Sys;
Htg
Sysa
Clg
Sys
Act DucScopelTorjreAaGaiGainGaiLoss, CMCFM CFM Siz
Building 2.24 1,484 3,326 22,817 4,068 26,885 50,404 476 965 965
Svstem 1 2.24 1,484 3,326 22,817 4,068 26,885 50,404 476 965 965 12x1
Ventilation 2,220 2,482 4,702 14,856
Zone 1 3,326 20,597 1,586 22,183 35,548 476 965 965 12x1
1-Lower Level 1,024 3,723 237 3,960 8,542 114 174 174 2--
2-Main Level 1,024 7,584 182 7,766 12,672 170 355 355 4--
3-Upper Level 1,278 9,291 1,167 10,458 14,334 192 435 435 4--
CA ...\Recher HVAC - 4417 86th Street NE.rh9 Tuesday, October 14, 2025, 12:19 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Auer Steel (Plymouth) Recher HVAC
PI mouth MN_ 55441 _ Page 5
Duct Size Preview
Room or
i
Source Minimum I
Maximurri Roughl Design' SPI Duct Duc Htg Clg Act Duct
Duct Name Veloci Velitoc? Factor U100 Loss Veloci t?+ Length9 . Floaet_ j.__Flow ._ _ Flow_. L Size_
Svstem 1
Supply Runouts
Zone 1
1-Lower Level Built -In 0 750 0.01 0.1 444.1 114® 174 2--
2-Main Level Built-in 0 750 0.01 0.1 452.4 170= 355 4--
3-Upper Level Built -In 0 750 0.01 0.1 407.2 192® 435 4--
Other Ducts in System 1
Supply Main Trunk Built -In 0 900 0.003 0.1 827.1 476 965 12x1
Summary
Svstem 1
Heating Flow: 476
Cooling Flow: 965
CA ...\Recher HVAC - 4417 86th Street NE.rh9 Tuesday, October 14, 2025, 12:19 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Auer Steel (Plymouth) Recher HVAC
Plymouth MN 55441 Page E
Total Building Summary Loads
Component Area Sen Lat Sen Total
Vector: Glazing -Vector Window, U-value 0.29, SHGC 344 8,675 0 9,935 9,935
0.31
11 P: Door -Metal - Polyurethane Core, U-value 0.29 42 1,060 0 292 292
15BO-10sf-8: Wall -Basement, , R-10 board insulation to 608 2,645 0 0 0
floor, no interior finish, 8' floor depth, U-value 0.05
15BO-10sf-4: Wall -Basement, , R-10 board insulation to 312 1,606 0 44 44
floor, no interior finish, 4' floor depth, U-value 0.054
12F-Osw: Wall -Frame, R-21 insulation in 2 x 6 stud 2226 12,588 0 1,925 1,925
cavity, no board insulation, siding finish, wood studs,
U-value 0.065
1613-50: Roof/Ceiling-Under Attic with Insulation on Attic 1277.5 2,223 0 1,226 1,226
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation, U-value 0.02
21 B-20: Floor -Basement, Concrete slab, any thickness, 2 1024 1,693 0 0 0
or more feet below grade, R-3 or higher insulation
installed below floor, any floor cover, shortest side of
floor slab is 20' wide, U-value 0.019
20P-30: Floor -Over open crawl space or garage, Passive, 253.5 772 0 71 71
R-30 blanket insulation, any cover, U-value_0.035____
Subtotals for structure: 31,262 0 13,493 13,493
People: 6 1,200 1,380 2,580
Equipment: 0 3,600 3,600
Lighting: 0 0 0
Ductwork: 0 0 0 0
Infiltration: Winter CFM: 46, Summer CFM: 25 4,286 386 345 731
Ventilation: Winter CFM: 160, Summer CFM: 160 14,856 2,482 2,220 4,702
Exhaust: Winter CFM: 160, Summer CFM: 160
AED Excursion: 0 0 1,779 1,779
Total Building Load Totals: 50,404 4,068 22,817 26,885
Check Figures
Total Building Supply CFM: 965 CFM Per Square ft.: 0.290
Square ft. of Room Area: 3,326 Square ft. Per Ton: 1,484
Volume (ft3): 21,304
Building Loads
Total Heating Required Including Ventilation Air: 50,404 Btuh 50.404 MBH
Total Sensible Gain: 22,817 Btuh 85
Total Latent Gain: 4,068 Btuh 15
Total Cooling Required Including Ventilation Air: 26,885 Btuh 2.24 Tons (Based On Sensible Latent)
Notes
Rhvac is an ACCA approved Manual J, D and S computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
C:\...\Recher HVAC - 4417 86th Street NE.rh9 Tuesday, October 14, 2025, 12:19 PM
Rhvac - Residential & Light Commercial HVAC Loads
Auer Steel (Plymouth)
Plymouth, MN 55441
Building Pie Chart
Floor 5%
Roof 4%
Wall 33%
Glass 37%
Floor 0%
Roof 5%
Wall 7%
Elite Software Development, Inc.
Recher HVAC
Pa e 7
Ventilation 29%
Infiltration 9%
Door 2%
Glass 17%
AED Excursion 7%
Ventilation 17%
Door 1 % People 10%
Infiltration 3%
Equipment 13%
CA ...\Recher HVAC - 4417 86th Street NE.rh9 Tuesday, October 14, 2025, 12:19 PM
Rhvac - Residential & Light Commercial HVAC Loads
Auer Steel (Plymouth)
Elite Software Development, Inc.
Recher HVAC
PI mouth MN 55441 Pa e 8
Detailed Room Loads - Room 1 - Lower Level (Average Load Procedure)
General
Calculation Mode: Htg. & clg. Occurrences: 1
Room Length: 32.0 ft. System Number: 1
Room Width: 32.0 ft. Zone Number: 1
Area: 1,024.0 sq.ft. Supply Air: 174 CFM
Ceiling Height: 8.0 ft. Supply Air Changes: 1.3 AC/hr
Volume: 8,192 cu.ft. Req. Vent. Clg: 0 CFM
Number of Registers: 2 Actual Winter Vent.: 38 CFM
Runout Air: 87 CFM Percent of Supply.- 22
Runout Duct Size: 6 in. Actual Summer Vent.: 29 CFM
Runout Air Velocity: 444 ft./min. Percent of Supply: 17
Runout Air Velocity: 444 ft./min. Actual Winter Infil.: 4 CFM
Actual Loss: 0.123 in.wg./100 ft. Actual Summer Infil.: 2 CFM
Item Area U- Htg Sen Clg Lat Sen
Description Quantity Value HTM Loss HTM Gain Gain
E -Wall-15BO-10sf-8 36 X 8 288 0.050 4.4 1,253 0.0 0 0
S -Wall-15BO-10sf-8 18 X 8 144 0.050 4.4 626 0.0 0 0
S -Wall-15BO-1 Osf-4 16 X 6 96 0.054 5.5 531 0.3 0 25
S -Wall-12F-Osw 16 X 2 32 0.065 5.7 181 0.9 0 28
W -Wall-15BO-1 Osf-4 36 X 4 144 0.054 4.7 677 0.0 0 0
W -Wall-12F-Osw 36 X 4 90 0.065 5.7 509 0.9 0 78
N -Wall-15BO-10sf-4 12 X 6 72 0.054 5.5 398 0.3 0 19
N -Wall-12F-Osw 12 X 2 24 0.065 5.7 136 0.9 0 21
N -Wall-15BO-10sf-8 22 X 8 176 0.050 4.4 766 0.0 0 0
W -GIs-Vector shgc-0.31 0%S (3) 54 0.290 25.2 1,362 32.7 0 1,767
Floor-21 B-20 32_X 32 1024 0.019 1.7 1,693 0.0 0 0
Subtotals for Structure:
Infil.: Win.: 4.4, Sum.: 2.4 255
AED Excursion:
People: 200 lat/per, 230 sen/per: 1
Equipment:_
Room Totals:
8,132
1.605 410
8,542
0.129
0 1,938
37 33
322
200 230
0 1,200
237 3,723
C:\ ...\Recher HVAC - 4417 86th Street NE.rh9 Tuesday, October 14, 2025, 12.19 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Auer Steel (Plymouth) Recher HVAC
Plymouth, MN 55441 Page 9
Detailed Room Loads - Room 2 - Main Level (Average Load Procedure)
General
Calculation Mode: Htg. & clg. Occurrences: 1
Room Length: 32.0 ft. System Number: 1
Room Width: 32.0 ft. Zone Number: 1
Area: 1,024.0 sq.ft. Supply Air: 355 CFM
Ceiling Height: 9.0 ft. Supply Air Changes: 2.3 AC/hr
Volume: 9,216 cu.ft. Req. Vent. Clg: 0 CFM
Number of Registers: 4 Actual Winter Vent.: 57 CFM
Runout Air: 89 CFM Percent of Supply.: 16
Runout Duct Size: 6 in. Actual Summer Vent.: 59 CFM
Runout Air Velocity: 452 ft./min. Percent of Supply: 17
Runout Air Velocity: 452 ft./min. Actual Winter Infil.: 22 CFM
Actual Loss: 0.128 in.wg./100 ft. Actual Summer Infil.: 12 CFM
Item Area U- Htg Sen Clg Lat Sen
Description _ - Quantity_ _ _- Value HTM - _ Loss-__ HTM Gain _ Gain
E -Wall-12F-Osw 36 X 9 252 0.065 5.7 1,425 0.9 0 218
S -Wall-12F-Osw 34 X 9 294 0.065 5.7 1,663 0.9 0 254
W -Wall-12F-Osw 36 X 9 228 0.065 5.7 1,289 0.9 0 197
N -Wall-12F-Osw 34 X 9 306 0.065 5.7 1,730 0.9 0 265
E-Door-11 P 3 X 7 21 0.290 25.2 530 7.0 0 146
E-Door-11 P 3 X 7 21 0.290 25.2 530 7.0 0 146
E -GIs-Vector shgc-0.31 0%S (2) 30 0.290 25.2 756 32.7 0 982
S -GIs-Vector shgc-0.31 0%S 12 0.290 25.2 303 17.9 0 215
W -GIs-Vector shgc-0.31 0%S (3) 45 0.290 25.2 1,134 32.7 0 1,473
W -GIs-Vector shgc-0.31 0%S 42 0.290 25.2 1,060 32.7 0 1,375
W -GIs-Vector shgc 0.31 0%S 9 0.290 25.2 227 32.8.---- 0 ._ 295
Subtotals for Structure:
Infil.: Win.: 21.8, Sum.: 11.7 1,260
AED Excursion:
Equipment:
Room Totals:
10,647 0 5,566
1.607 2,025 0.129 182 163
655
0 1,200
12,672 182 7,584
C:\ ...\Recher HVAC - 4417 86th Street NE.rh9 Tuesday, October 14, 2025, 12:19 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Auer Steel (Plymouth) Recher HVAC
Plymouth, MN 55441 _ Page 10
Detailed Room Loads - Room 3 - Upper Level (Average Load Procedure)
General_ -
Calculation Mode: Htg. & clg. Occurrences: 1
Room Length: 36.5 ft. System Number: 1
Room Width: 35.0 ft. Zone Number: 1
Area: 1,277.5 sq.ft. Supply Air: 435 CFM
Ceiling Height: 8.0 ft. Supply Air Changes: 2.6 AC/hr
Volume: 10,220 cu.ft. Req. Vent. Clg- 0 CFM
Number of Registers: 4 Actual Winter Vent.: 65 CFM
Runout Air: 109 CFM Percent of Supply.: 15
Runout Duct Size: 7 in. Actual Summer Vent.: 72 CFM
Runout Air Velocity: 407 ft./min. Percent of Supply: 17
Runout Air Velocity: 407 ft./min. Actual Winter Infil.: 20 CFM
Actual Loss: 0.084 in.wg./100 ft. Actual Summer Infil.: 11 CFM
Item Area U- Htg Sen Cig Lat Sen
Descriotion _- _ -_ -- --_ - Quantity Value HTM _ Loss HTM Gain_
E -Wall-12F-Osw 36 X 8 242 0.065 5.7 1,369 0.9 0 209
S -Wall-12F-Osw 36 X 8 273 0.065 5.7 1,544 0.9 0 236
W -Wall-12F-Osw 36 X 8 237 0.065 5.7 1,340 0.9 0 205
N -Wall-12F-Osw 36 X 8 248 0.065 5.7 1,402 0.9 0 214
E -GIs-Vector shgc-0.31 0%S 5.2 0.290 25.2 131 32.7 0 170
E -GIs-Vector shgc-0.31 0%S 7.8 0.290 25.2 197 32.7 0 255
E -GIs-Vector shgc-0.31 0%S (2) 33 0.290 25.2 832 32.7 0 1,080
S -GIs-Vector shgc-0.31 0%S 15 0.290 25.2 378 17.9 0 268
W -GIs-Vector shgc-0.31 0%S (3) 45 0.290 25.2 1,134 32.7 0 1,473
W -GIs-Vector shgc-0.31 0%S 6 0.290 25.2 151 32.7 0 196
N -GIs-Vector shgc-0.31 100%S (2) 40 0.290 25.2 1,010 9.7 0 386
UP-Ceil-1613-50 36.5 X 35 1277.5 0.020 1.7 2,223 1.0 0 1,226
Floor-20P-30 15 X 16.9 253.5 0.035 3.0 772 0.3 0 71
Subtotals for Structure: 12,483 0 5,989
Infil.: Win.: 19.9, Sum.: 10.7 1,152 1.607 1,851 0.129 167 149
AED Excursion: 803
People: 200 lat/per, 230 sen/per: 5 1,000 1,150
Equipment: 0 1,200
Room Totals: 14,334 1,167 9,291
C:\ ...\Recher HVAC - 4417 86th Street NE.rh9 Tuesday, October 14, 2025, 12:19 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Auer Steel (Plymouth) Recher HVAC
Plymouth, MN 55441 Page 11
System 1 Room Load Summary
Htg Min Run Run Clg Clg Min Act
Room Area Sens Htg Duct Duct Sens Lat Clg Sys
No Name SF Btuh CFM Size Vel Btuh Btuh CFM CFM
Zone 1---
1 Lower Level 1,024 8,542 114 2-6 444 3,723 237 174 174
2 Main Level 1,024 12,672 170 4-6 452 7,584 182 355 355
3 Upper Level 1,278 14,334 192 4-7 407 9,291 1,167 435 435
Ventilation 14,856 2,220 2,482
System 1 total 3,326 50,404_-_- 476 22,817 -41068 965 965
System 1 Main Trunk Size: 12x14 in.
Velocity: 827 ft./min
Loss per 100 ft.: 0.107 in.wg
Cooling System Summary
Cooling Sensible/Latent Sensible Latent Total
Tons Split Btuh_ _ Btuh Btuh
Net Required: 2.24 85% / 15% 22,817 4,068 26,885
Equipment Data
Type:
Heating System
Natural Gas Furnace
Cooling _ System
Standard Air Conditioner
Model:
Indoor Model:
Brand:
Efficiency: 0 AFUE 0 SEER
Sound: 0 0
Capacity: 0 Btuh 0 Btuh
Sensible Capacity: n/a 0 Btuh
Latent Capacity: n/a 0 Btuh
C:\ ...\Recher HVAC - 4417 86th Street NE.rh9 Tuesday, October 14, 2025, 12:19 PM
rn
n
V , W
V
z
rn
0)
000r- c:
rn
Tlr-
O
m zO=OO°°
m ;v M
m T ,
z z rn
rn 0 z
a
O N ON rOOC
iN C.rl SIGN
RES/
DENCI BARKE
4417
86TH ST LOT
16 - BLC EDMONSON
MONT/CELLO, AA1
4417 86th St NE
CITY Of Lot 16 Block 4 - Edmonson Ridge
Montf effo
BUILDING SAFETY Builder: JP Brooks Builders
505 Walnut Street, Suite #1 Monticello, MN 55362 Phone: 763-295-3060 Fax: 763-295-4404
CITY OF MONTICELLO
PROPOSED BUILDING SURVEY REQUIREMENTS CHECKLIST
Prior to excavation and construction, the permittee shall submit to the City of Monticello
through certificate of survey that the proposed construction is in compliance with all land use,
zoning, conditional use, or planned use as part of the building permit application. The
certificate of survey shall be signed by a registered Minnesota land surveyor.
The signed certificate of survey shall contain at a minimum the following information:
Indicate permanent iron monuments at each lot corner.
Dimension from house to lot lines and from O.H.W. & Bluff Line of rivers, creeks,
lakes, and Type 4 and 5 wetlands.
Proposed building elevations of lot corners.
VProposed elevations at building corners.
Proposed elevations on the side yard swales at the extension of building corners and
high points.
Proposed and as -built elevations of garage slab and lowest floor on walkouts.
Top of curb elevation at the extension of property lines and center of driveway.
Proposed elevations and location of any critical drainage ways located on the site
natural or man-made indicated with drainage arrows and percentage of slope.
Label all adjacent street and railroad right-of-way.
Erosion control *Must be installed prior to starting construction and maintained to be compliant with
City requirements and project SWPPP. Follow City Standard Detail Plate 6006.
Proposed driveway location, width at lot line, % of slope.
Show proposed porches, cantilevers, bay windows, and decks (if being constructed).
N/A Show individual significant trees 36" DBH (Diameter Breast Height)or larger
N/A Existing or proposed retaining wall(s) top and bottom elevations.
Show adjacent property topo related to drainage with arrows.
Proposed sump pump outlet location on buildinq footprint (natural drainage or piped to
curb). Show any Drain Tile installed in the yard-'- *'Show surnp pump location on final as -built
City will accept only originals or quality hard copies of the as -built survey and
certification of grading.
USUMICIM
C-
c0 C -
0 n•
O rn Cl) CD
c
Ka00
Za(n
5.0-1
Z
v(
D
CD
N
0 ^v
cl V/
M
rho >2
F2
v
zmu
wN c'
N
NV Z< mrl wI^
A N
zc N. (
7) rn;
UZINU01 (P NUUI00aIA /O AUN
O
30
G) Cl)
a VJ
O-
4 n-
a-
0 rn
ym
n0
ZQ
a
3, Vc<$
o o
C_.P n
n0 nTo
InO
p A
N U y 0 0-
0 AA /e Z szo
O
O 0.- N
oms
Zo0.3 aO
N A Z
70 c
c
o o 2 a--,°
o rn
3 rn
30 l
0 0 0 O O N
OMO
Z
I 7C Z Z O
F M m
0 00 CO N
Co75 N
j I
rn n n Oco
Ln
CA n O
uMoys
eslnueylo ssetun 'fold slyl uo UM046
6D Seidl 101 J09J PuD Saull laeJ;s 6wulo(
pD puD 41PIM UI 1ee1 ZI puD seuD 301
6ululo(PD PuD ylplM ul lap! 9 6wo S'
1'N ZI
I
ZI
9
snyl
uMoys aJD
sluouJOSD3 Allllll PuD a6DUI1)JO sJeuofpo
6ulslxe solouso cull >
IoDglss 6ulp11nq caloua0 — IBS eLl
P91OM Sajouso JaMas
wJols salouoo James
AJDIIUDS Below(] UDld
6ulpDJ6 Jod Jnoluoo saloueo 996
99S \ / -
S
9
996 - - 9.
Sg j 0'9/ - r 596 i
7I,
a I • g6. ; v 09600'
3 .6F, 90, 6B N S luawasDO
sa4oua0
a7D/Jnc
snoulwnllq salouo0 I aoolJns
alaJouoo
salouQU I SI '
sJ900 •
0 Jalad 601ou00 01I1b S-1 oolAJas AJDlIUDs
solouo0 8011V96 AIDM
6alOUa(] InDA opd0
Joql) Soloua() xoq aolAJos
ogdo Jagy colouo() Od xoq UOlslnelsl
elgoo seloueO IDlsapad suoydolal
solouao Q MOy a6DUIDJp
pasodoJd saloueo U011onep punoJ6
6ullclxo saloueo 9L6 X 4101 lac
saloua0 qny las
solouoo 92 uoIlDAolo pasodoJd
solouo0 E'Zb61 luownuow uoJl
punol solouoo ONJO3 7
wna00 70/
d) )aal LL'S96 - uogonaL3 losjjo JouJoo
6ulpdnq (/,MS
7o J/oo//M qn4 p dol MIS f57UP9
ro.996 =
WSo 99 '596 =
FlYSO 09'996 -
aso Oya) LL '
S'96 = /#'So Z'796 =
AaI3 .J0073 SaM07 6'L96 =
na13 -J0013 a6o.J0,q I?'896 =
na13 uo*gopuno3 a6o./oq jo dol Z'696 =
A013 uoi opuno3 asnoH jo do1 SN011 VA37-
7 3Sno14 a3Sodo(Vd 100 )o/
d) laal 91-Z96 = uo/)--'PG X(Jopunoq )
old goM Joau 3N S 4)
99 uo e/oquo- '00nuos jo wl'y 004007 - 7
9*96 =
u0/1an0/3 J0a2/ 9'096 =
uo!)oAel3 Joo/3 46SAl07 9'L96 =
na/3 Joo/3 060JO0 ugiq y
Xq suo/d Y6'rd)
3'S 4590 L = 'aJV snowadwl lolo1 3'S -:
0091 = oaJy doo)SlasnoH 3'S
y Sr9 9 = -jv ;0/ /0)01 tIDSr - esnol./
pulws ,or 3 S %
Zqg 9 - pJoA /ln3 F-n7v-
dm3's
Y.9rS on'd "
Jls ap!S '00 z JOetl ,
Or 1A0'M
00JG B41) aP!S ,L no1/o07
Nowosog //n3 1--il ,SZ JdAl 337TOR
3T-7 ' cn m
loz -
III :31dos N Cn
lm
oz o
a a
0
aG 0
0
0
NO
0
0
v 0
7 ,. .,
1
1 1 t.996 0/lft I 4
L
11 , 1 J-4 J \/ J
I J N j g96
N Cl.
o -rU
SS I ss O
ValI 4 I S
tQ1i/ s6
L9 OZ& 00'
6
I 00ve
5g6
L6_ 00'90
y09'996 U 060Jo0Q
doo)
S
10,
v NpasodoJdI
I
9.
Fr'1
6 0.6 96 9 gg6
9
y
gg6
I 9,996 oV
y0d'D)
6 va p7'
S Sr9'
9 :oay 0/d m
rl o
09/roo-t90-991 996 y Zlf
asr)0H Ald
Q I
PasodaJd g-t- ,I
I gg6
rZ'/96J I 1 99-996
N
00'6- 00'9f' r oo 051' r
F9J
11 0.996 9zoz/
L/ L
atEQ Panaddb i A3Atuns nwa a3SOdOdd
gg6 b96 - 6.
V96
6 £
9 6x
f d7-- 996
9'996 G9
6 LL'
S96 ARG
1 j.yg6
O
yg6 I
00 6 j 65 1 N
00 '996Z NS0 L J
6 *
I V,
II "96
I cI I
co I
I
6.,
96
11
I
L I V96
t I
4
to
14
I
Lg-
CC -
7c w Ias
9
Zg5
I
1 I e,96 9
i I
I l 9 w I 0
4, 6
0 c'
giIF1"
96 ro
a I
rn ti i X S (g6 1- J '/-
0//**
1
9
6 d/ 9rLr
00f00-f90-S91
O/d 9 j9 9.096 /0 ued0 M .f(
i,
9f.68 N :01d 0ll>ri I
j9° u,f dl
Cf dl ololpo0
l of AI / I A / / \ I I / l 7 f I v \
I v \/ r v \ J - J NVId aid %9'
996=
183ANl 8f1IS kHYiINVS '9N1a33N1`JN3 1NVITW A8 'SZ 39Vd 'IZOZ/6Z/L 031V0 SNVId LN3HdO'l3A3(
l 30018 NOSNONIO3 3Hl aid 03ZI11010 383M N0383H NMOHS S3LLIIIln NVId 83d NMOHS
S1N3W3AO8dHl Allllln ONV 13381S S)NO11YA3I3 IVNU (
INV SNOISN31410 '3snOH 30 3dA1 UW3A Ol 830-IV18 ONV NVId 3Sr)
OH HIM A3A8f1S 38VdMOO ISM 801VAYOX3 'NOIIVAVOX3 ANY 01 8018d 301Aa3S a3MM 3HI
JO NOIIVA3I3
ONY H1d30 Ivn-I0V 3Hl Ol lO3f a-S SI NOLLVA3I3 80013 1S3MOI 3H1 3OIAa3S 83M3S 30
N0I1YA313 ONV NOIIVOOI I3VX3 3NIW83130 01 801OV81NOO Sn 01 (1301A08d
SVM N011V1N3Mn300 83H10
SS3INf1 IVId 03080038 aid NMOHS 38V SIN3MI3SV3 lVld 03080038 3Hl
aid SI N011YA80JNI 30NVISIO 0NV ON18Y38 SNOIIIONOO 3I8VI 831VM
ONV IIOS 01 103rwis SI N011YA313 800-U LS3MOI W103dSNI ONI01U18 Td001
3H1
A8 a3AOdddd SI Nbld SIHl 1IlNn N1038 NVO
NOIl0n8iSN00 80 NOIIVAb0X3 ON Z8M NW WSOPUM
3N J"4S WOO IJ" V"JPPV ejosauuipV Wjunoo IgAu
H `o//aoi;uon jo A&q 3J0/d NOSNOW03 "
P, Y00/8 '91 J07 snap/in8 s3/
00a8 d/* ioj Aco?Ajns
jo
al eoy a