Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2026-00215
ADDRESS PIN LEGAL DESC PERMIT TYPE PROPERTY TYPE CONSTRUCTION TYPE CITY OF MONTICELLO 505 WALNUT STREET MONTICELLO, MN 55362- 763) 295-3060 YAX: (763) 295-4404 8595 FARMSTEAD AVE NE 155281001260 HAVEN RIDGE 2ND ADDN LOT 026 BLOCK 001 BUILDING SINGLE FAMILY -DETACHED NEW CONSTRUCTION VALUATION : $ 326,442.85 NOTE: NEW CONSTRUCTION SINGLE FAMILY HOME: 0 SQ FT FINISHED BASEMENT 1108 SQ FT UNFINISHED BASEMENT 1115 SQ FT FINISHED MAIN FLOOR 1156 SQ FT SECOND FLOOR 108 SQ FT OPEN PORCH 673 SQ FT GARAGE FIREPLACE: NO A/C: YES MECHANICAL: 11 PLUMBING: 19 WATER METER I (MAIN) 1.00 WAC UNITS 1.00 APPLICANT LENNAR 16305 36TH AVENUE NORTH SUITE 100 PLYMOUTH, MN 55447- 952) 249-3055 OWNER TAMARACK LAND HAVEN RIDGE AGREEMENT AND SWORN STATEMENT I agree that the work will be conducted in conformance with the ordinances of the City of Monticello and with the Minnesota State Building Code. I understand that the work will be in accordance with the plan that has been approved by the Building Official. I agree that any damage caused to public property including but not limited to curb, sidewalk. public utilities and signs will be repaired at my expense. Applicant Date Bldg Official Date SAC UNITS 2 0 2 6— 0 0 2 1 5 DATE ISSUED: 06/26/2026 Permit #: 2026-00215 BUILDING PERMIT FEE PLAN REVIEW STATE SURCHARGE, BLDG VAL SAC FEE 30% SAC FEE 70% WATER ACCESS CHARGE, RESI COMB CONNECTION FEE / RESI SEWER / WATER EXCAVATION PERMIT CONTRACTOR LICENSE VERIFICATION FEE ASSESSMENT SEARCH FEE UTILITY LOCATE FEE, RESI WATER METER 1 (MAIN) MN STATE SALES TAX (MTR 1) TOTAL Payment(s) CHECK 2718332 1.00 2,401.76 1,561.14 163.22 1,507.80 3,518.20 2,732.00 130.00 130.00 5.00 60.00 50.00 520.00 40.95 12,820.07 12.820.07 SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. Ill M Monticeflo BUILDING SAFETY 505 WALNUT STREET, SUITE 1 City Hall (763) 295-2711 MAR 9 2026 ICELLO. MN 55362 PERMIT # ' O 5 95-3060 Fax (763) 295-4404 BUILDING PERMIT APPLICATION Please Print - INCOMPLETE APPLICATIONS WILL NOT BE ACCEPTED. SITE ADDRESS: 8595 Farmstead Ave NE ZONED LEGAL: Lot 26 Block 1 Plat 2nd Addition Property Owner Name: Lennar Homes Phone: 952-249-3055 Address: 16355 36th Ave N #100 City: Plymouth State: MN Zip: 55446 Contractor Name: Lennar Homes Phone: 952-249-3055 State License #: BC001413 E-Mail: mnpermits@lennar.com Address: 16355 36th Ave N #100 City: Plymouth State: MN Zip: 55446 Eng./Architect Name: Lennar Homes Phone: 952-249-3055 Address: 16355 36th Ave N #100 City: Plymouth Stater_ Zip: 55446 Plumber Name: Huikko Phone: 612-919-3097 Matt Huikko Address: 1001 Ridgehaven Circle City: Buffalo State: MN Zip: 55313 Mechanical Name: Varner Phone: 612-685-0737 Address: 776 35th St NW City: Buffalo State: MN Zip: 55313 Type of Work Type of Construction Buildiny, Information New 91 Single Family Use of building Residential Addition Duplex of stories iw4K,, Alteration 0 Multi -Family Floor area sq. ft. 2.) Z ? /,- ; .;k, Repair Commercial Estimated value Move ElIndustrial of construction 3Z6+5 Other Other Description of work: Single family with unfinished basement I hereby apply for a permit for construction as described and acknowledge that the information I have provided above is complete and accurate. I agree that the work will be conducted in conformance with the ordinances of the City of Monticello and with the Laws of the State of Minnesota. - and that I understand that this application is not a permit and that the work is not to start without a permit. I further understand that the work will be in accordance with the plan that has been approved by the Building Official. I agree that any damage caused to public pro cluding but not limited to curb, sidewalk. public utilities and signs will be repaired at my expense. .`', SEE BAC LUMBING 3/3/2026 AND MECHANICAL INFO. Applicant Signature Application r L APPLI (;ASV 1: Please show fixtures that are licable. Other i : (if applicable) Plumbing: (if applicable) No. Fixture Type Heads ri Water Closet (toilet) ecial FS Device Bathtub 5' Lavatory (wash basin) Shower Kitchen Sink 1 Dishwasher Laundry Tub Clothes Washer Pine Alarm: (if applicable) 1 5 Water Heater Urinal No. fixture Type Drinking Fountain 1 Floor Drain of evices Slop Sink Other 2 Z Outside Faucet 19 TOTAL Future Owner Information: Name: Address: City: State: Zip: Phone #: Mechanical: (if applicable) No. Fixture Type Furnace Gas Meter 1 Range Hood 1 Gas Range Water Heater Air Conditioning Mech. Fireplacekol if Bathroom(s) Exhaust Fan Air Exchanger Dryer Gas Opening w/o Fixture 11 TOTAL FOR CITY USE ONLY Tree Ordinance Handout Yes No Other Handouts Yes No DDITIONAL INFORMATION: aluation:-` y'S onstruction Type: ccupancy Group: ivision: quare Footage: Aw, of Stories: ^u -7 of Residential Units: n laximum Occupancy: iV /- ire Sprinklers: O Yes J% No ff-Street Parking Covered: 3 ff-Street Parking Uncovered: uilding Official q jK N C y\--j S 15) 1 PT: / / ITY OF Monticello 2025 Residential Building Permit Calculator Address: 8595 Farmstead Ave NE Legal: Lot 26 Block 1 Haven Ridge 2nd Addition 1 = Yes 0 = No Vanderbilt New Residence: 1 House Type: 3 level split 1 = Yes 0 = No 1 = Yes 0 No Permit Applicant: Contractor: I Plan Review: I Lennar Owner: 0 Master Plan: 0 Master Plan Review = 25% ofBuilding Permit Fee) Crawl Space 0 $ 15.27 Unfinished Basement Area 1,108 $ 16.50 18,282.00 Finished Basement Area 0 $ 44.05 Main/First Floor Area 1,115 $ 125.00 139,375.00 Second Floor Area 1,156 $ 115.00 132,940.00 Detached Garage 0 $ 60.00 Attached Garage 673 $ 47.33 31,853.09 Garage Conversion to Living Space 0 $ 47.44 CarpordGazebo 0 $ 30.90 Pole Barn 0 $ 19.03 Shed - greater than 200 SF 0 $ 40.00 Lean -to -Shed 0 $ 13.25 Basement Finish Only 0 $ 16.00 Remodeled Area 0 $ 17.39 Porch (open) 108 $ 36.97 3,992.76 Porch (3-Season) 0 $ 60.00 Porch (3-Season on Existing Deck) 0 $ 55.00 Porch (Screen Porch/Breezeway) 0 $ 58.48 Solarium 0 $ 94.90 Deck 0 $ 20.00 Deck (Screen In & Roof Over Existing) 0 $ 29.80 In -Ground Pool 0 $ 23.18 Above -Ground Pool 0 $ 11.31 Fireplace - Mechanical/Gas 0 $ 4,892.50 Fireplace - Masonry 0 $ 22, 660.00 Elevator/Lift/Other 0 CALCULATED BUILDING VALUATION $ 326,442.85 1 = Yes 0 = No Water Hook-up 1 Sani Sewer Hook t 1 FEES: BUILDING PERMIT - 1997 UBC FEE SCHEDULE PLUS 6% 2,400.85 PLAN CHECK 1,560.55 CONTRACTOR LICENSE VERIFICATION 5.00 STATE SURCHARGE 163.22 SUBTOTAL 4,129. SEWER FEE [SAC] 4,833.00 WATER FEE ]WAC] 2,153.00 WATER / SEWER CONNECTION FEE 130.00 SEWER/WATER EXCAVATION PERMIT FEE 130.00 ASSESSMENT SEARCH 60.00 UTILITY LOCATES 50.00 5/8" WATER METER & SALES TAX 510.03 SUBTOTAL 7,866.03 TOTAL FEES CALCULATED 11,995.65 Escrow Amount - (Winter Only) TOTAL AMOUNT TO BE PAID TO CITY 11,995.65 Address: 916 f.rVIS4eAJ Aw., Builder: "ty. K V Two sets Building Plans 3-q-; o Two sets Survevs 1 Survey sent to Engineering for review: Energy Calcs Digital Plans: Plan Review letter generated Review completed by Building Department Permit fees calculated Plan Review Checklist Plan Review Letter: yt--,'f Survey approved by Engineering: HVAC Loads Correct percentage of Brick & Stone —/ 210 2- a Received by Building Department: ' Applicant contacted: 'f lv ll(, (AAvt ILA) # Date Address House size and finishing details ECC verified V HVAC Loss Calcs verified Ll Footings and pads highlighted Point loads Any balloon framed walls and stud spacing? Special stairway framing Details on braced walls Blocking on floor framing Bearing wall blocking and bracing Verify any tempered glass Valuation report completed Contact applicant for revisions or questions: What: Who: Date Contacted: Due Date for Revisions: Please provide the necessary information by this date: If not received by that date, the application will be removed from the review process and will be treated as a new permit when the information is provided. The review timeframe will start over at that time. v Valuation and size entered on front page of application Note finished or unfinished basement on front of application Second page of application: Verify fixtures match plan: plumbing, mechanical, alarms Compete "Additional Information" section Approved COS survey received from Engineering Plan Reviewer's Initials: 6— CITY OF Monticello BUILDING SAFETY RESIDENTIAL PLANS EXAMINING REPORT 505 Walnut Street, Suite 1 MONTICELLO, MN 55362 Date: 4/ 1 /2026 Contractor: City Hall (763) 295-2711 Building Inspections (763) 295-3060 Lennar Homes 8595 Farmstead Ave NE Monticello, MN 55362 Lennar 16305 36t' Ave N Plymouth, MN 55446 Telephone: 952-249-3 05 5 BASIC PROJECT DESCRIPTION: 2 Story, Walkout Unfinished Basement 2271 Sq ft Finished. 1 1 Pa g e Bldg Building, Mechanical & Plumbing Bob Ferguson— Chief Building Official 763) 271-3214 Bob.Fer ugson(a,.MonticelloMN.gov Wayne Kalla — Inspector/ Plan Reviewer 763) 314 -0908 Wayne.Kalla(q,MonticelloMN.g( , Mark Gerber — Inspector / Plan Reviewer Mark. Gerber(aMonticelloMN.gvv 763) 271-3222 Steve Kowalczyk — Inspector / Plan Reviewer 763) 271-3253 Steve.Kowalczyk(a,MonticelloMN.gov Amy Biren — Building Permit Technician 763) 295-3060 buildingdepartment a,MonticelloMN.g_ov review Electrical Dennis Shafer — Electrical Inspector 763) 402-5732 outside of city 443 Lafayette Road North, St. Paul, MN 55155 Office Hrs: 7-8:30am http://www.dl1.mn.gov/business/get-licenses-and- ermits/permits CDD Land Use/Site Design/Landscaping Angela Schumann — Community Development Director 763) 271-3224 Angela.Schuniann(a MonticelloMN.go\ Bob Ferguson — Zoning Administrator 763) 271-3214 J1ab.l-_er1Luson to e11oMN. Joy Engr/ Grading, Paving, Drainage & Matt Leonard- City Engineer 763)-271-3271 PW Utilities Matt. Leonard(d MonticelloMN.gov Ryan Melhouse — Project Engineer 763) 271-3227 Ryan.Melhouse(a MonticelloMN.gov Mario Frucci — Engineering Technician Mario.Frucci(&MonticelloMN.gov 763) 271-3213 Mat Stang - Water & Sewer Superintendent 763) 271-3274 Mat. Staniz(&MonticelloMN.gov The plan review accomplished as indicated in this record is limited to those code sections specifically identified herein. This record references commonly applicable code sections. It does not reference all code provisions which may be applicable to specific buildings. This record is designed to be used only by those who are knowledgeable and capable of exercising competent judgment in evaluating construction documents for code compliance. The following notations refer to design submittal documents as presented in application for a building permit. This report is not to be considered conclusive with respect to review of plans and specifications to ensure compliance with Minnesota Building Codes and Minnesota Fire Codes. Please retain a copy of this report on -site, attached to the Approved Job Copy of Page the Building Plans and Specifications. This review is for Buildink Construction Permit review only. All other reviews will be conducted with their respective permit applications. See note #1 below. PLAN NO. DEPT SHEET/ CODE SECTION COMMENTS SPEC. SECTION 1 b/f /", n/a general All job debris must be contained on -site and, in a dumpster, or covered, fenced area note 2 bldg n/a general Building Official review and authorization required prior to changes, modifications, note or alterations. 3 bldg n/a general 1300.0220 NOTICE: This building must not be occupied until a Certificate of Occupancy has note been issued. 4 bldg n/a general Final Building, Plumbing, and Heating inspections must be completed prior to note occupancy. The owner or contractor must be present for the final building inspection. 5 bldg n/a general IFGC 406 Gas piping pressure test required: 25 # for 10 minutes on residential construction. note 6 Bldg n/a general Separate applications and permits Required for Sewer / Water Connection, Heating note A/C Systems, Plumbing, Fire Alarm Systems. bldg n/a general MR 1322.1101 A building certificate, showing energy code compliance information, must be posted 7 note Subp 15 in a permanently visible location prior to final inspection 1101.8 Bldg MN Statute Carbon monoxide detectors must be installed in accordance with MN Statute §299F 8 299F .50 50 R315 Bldg Buildings must be constructed per current building codes. 2020 MN State Building Code including: n/a general 2020 MN Residential Code 9 note MR 1300 2023 National Electrical Code 2020 MN Plumbing Code 2024 MN Mechanical Code 2020 MN Fire Code All bottom wall plates in contact with concrete or masonry shall be decay resistive. 10 R317 All metallic fasteners and mechanical connections in contact with ACQ pressure treated lumber must be approved for such use. I 1 IRC 602.10 Walls shall be braced in accordance with IRC 602.10 or Engineered Plans 12 n/a general Post Address Card Visible from the street, maintain until the house numbers are note installed. 13 bldg n/a general Engineered Roof Trusses: Provide a Copy of the Approved Certified Truss Plans two note weeks prior to the framing inspection. 14 bldg n/a general State Board of Electricity: Separate Permit and Inspections Required for Electrical note work. 15 bldg Maintain 6" Earth to wood separation Eng Erosion Control Required: Install erosion control per proposed survey prior to 16 foundation inspection. Rock construction entrance and site perimeter controls such as silt fences are required. Maintain erosion controls until landscaping is completed. 3 1 Page PLAN NO. DEPT SHEET/ SPEC. CODE SECTION COMMENTS SECTION Vent Pipes: The vent pipe shall be primed and glued at all fittings and shall extend up from the radon control system's collection point to a point terminating a minimum of 12" above the roof. The vent pipe shall be located at least 10' away 17 from any window or other opening into the conditioned spaces of the building. Vent pipes routed through unconditioned spaces shall be insulated with a minimum of R4 insulation. Vent pipes within the conditioned envelope of the building shall not be insulated. bldg Window Fall Protection Required for all windows 6' above grade with sill height of18R312.2 less than 24", maximum opening must be less than 4". 19 bldg WARNING: Call Before You Dig! Gopher State one 651454-0002 bldg. Blower Door Test Required: Prior to final Inspection — Air Leakage Rate Must Not 20 Exceed 3 Air Exchanges Per Hour. 21 h I d Flash between House and Stoop. 22 b R319.1 Install House Numbers: 4" minimum, & visible from street. Fireplaces: Must be inspected prior to wall enclosure or when smoke chamber / 23 damper areas are exposed. 24 b d, Solid Block Between Wall Studs at Vaulted Truss Bottom Chord. bldg Fire blocking Required: Cut off concealed draft openings between stories and attic. 25 R302.11 Close horizontal to vertical penetrations. bldg Carry Concentrated loads to foundation — Concentrated loads must be solidly 26 R301.1 blocked and carried continuously to foundation. bldg Slope garage floor to Overhead door or to floor drain. (no trap / dry pan drains to 27 daylight; schedule 40 pipe required). 28 b/`1' R402.4.1.1 Hardboard Backer Required behind tub / shower. 29 bldg Seal and Secure Sump Pump Basket Cover. 30 bldg R506.2.3 Vapor Retarder: Required Under Floor Slab (Exception unheated spaces). bldg Fain Tile to Sump Basket: Install pump with rigid piping to house exterior. Install31R405.2.3 flexible hose connection extending to drainage area away from the foundation wall. R1303.2402 Provide power receptacle & switched light in attic or other unconditioned space for 32 Subpart 6 future active radon ventilation system. bldg Radon gas vent pipes shall be provided with space around the vent pipe for future fan installation. The space required for the future fan installation shall be a minimum of 33 R 1303.2402 24" in diameter, centered on the axis of the vent pipe, and shall extend a minimum distance of 3 vertical feet. 34 bldg R 402.1.1.3 Poly Slip Sheet Required over non -draining insulation. bldg Install truss clips at each truss and girder end unless otherwise specified by the truss35R802.11 manufacturer. bldg R402.2.3 For air permeable insulations in vented attics, a baffle shall be installed adjacent to 36 MN Res.Energy soffit and eave vents. The baffle shall extend over the top of the attic insulation. code hlrl Install weather barrier / House Wrap: Cover all exterior wall sheathing (exception: 37 R703.2 Detached Accessory Buildings) 4 1 P a g t PLAN NO. DEPT SHEET/ CODE SECTION COMMENTS SPEC. SECTION bldg 2" Anchor Bolts or Manufactured Foundation Straps Must: Engage 2na course of 38 R403.1.6 concrete block masonry. Be located at each core fill / be spaced 6' on center, two anchors per plate, I anchor bolt within V of each end. Exterior non -draining foundation insulation requirements: have a rigid, opaque, and weather -resistant covering to prevent degradation of the insulation's thermal 39 bldg R 4021.1.3 performance. The protective covering shall cover the exposed exterior insulation and extend a minimum of 6" below grade. The insulation and protective covering system shall be flashed in accordance with IRC section R703.8. DRIVEWAY REQUIREMENTS: 40 zoning R-1 zoning code The Maximum Width at the Property line Shall Not Exceed 30 Ft. and Shall Taper to a width Not to Exceed 28 Ft. and the Public Street. 5 1 Page New Construction Energy Code Compliance Certificate Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. Date Certificate Posted COPY OF THIS DOCCUMENT WILL BE POSTED ON THE PLENTUM OF FURNACE 3/3/2026 Mailing Address of the Dwelling or Dwelling Unit: City: 8595 Farmstead Ave NE Monticello Name of Residential Contractor: MN License Number Lennar BC001413 C TVQ R OMont aao APPROVED FILE COPY REVIEWED FOR CODE COMPLIANCE ttBJECT TO FIELD INSPECTION THERMAL ENVELOPE RADON CONTROL SYSTEM Insulation Location o Q o m Type: Check All That Apply X Passive (No Fan) W Z a Q z o z c o C° a) LL M o' U U E c O E u o a N 21 a_ a w a a, U) a Active (With fan and monometer or other system monitoring device) Location (or future location) of Fan: IF fan is required; Attic Other Please Describe Here Below Entire Slab X Foundation Wall R-10 X X Perimeter of Slab on Grade R-10 X Rim Joist (1st Floor) R-20 X Rim Joist (2nd Floor+) R-20 X Wall R-20 X Ceiling, flat R-49 X Ceiling. vaulted R-49 X Bay Windows or cantilevered areas R-30 X Floors over unconditioned area R-30 X Describe other insulated areas Building envelope air tightness: Duct system air tightness: Windows & Doors Heating or Cooling Ducts Outside Conditioned Spaces Average U-Factor (excludes skylights and one door) U: 27-.31 X Not applicable, all ducts located in conditioned spaceIR-valueSolarHeatGainCoefficient (SHGC): 1.25-.29 MECHANICAL SYSTEMS I Make-up Air Select a Type Appliances Heating System Domestic Water Heater Cooling System X Not required per mech. code Fuel Type Natural Gas Natural Gas Electric Passive Manufacturer Bryant Rinnai Bryant Powered Model 912SE4206OM17 RX160i GA4SAN53600N Interlocked with exhaust device. Describe: Rating or Size Input in BTUS: 60,000 Capacity in Gallons: Tankless Output in Tons: 2 Other, describe: EfficiencyIHI;PF% AFUE or 93% SEER 14 Location of duct or system: Mechanical RoomResidentialLoad Calculation Heating Loss Heating Gain Cooling Load 51,270 17,838 22,428 Cfm's round duct OR MECHANICAL VENTILATION SYSTEM metal duct Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): Combustion Air Select a Type X Not required per mech. code Select Type Passive X Heat Recover Ventilator (HRV) Capacity in cfms: Low: 75 High: 134 Other, describe: Energy Recover Ventilator (ERV) Capacity in cfms: Low: High: Location of duct or system: Mechanical RoomBalancedVentilationcapacityincfms: Location of fan(s), describe: I Cfm's Capacity continuous ventilation rate in cfms: 75 round duct OR Total ventilation (intermittent + continuous) rate in cfms: 1134 metal duct Builders Association of Minnesota version 101014 EK02 Vanderbilt HVAC Load Calculations for Varner Heating 8595 Farmstead Ave NE Prepared By: Friday, June 27, 2025 Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2.50, and ACCA Manual D. Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Allied Supply LLC EK02 Vanderbilt Roseville. MN 55113 Page 2 Project Report General Project Information- - Project Title.- EK02 Vanderbilt Project Date: Monday, June 23, 2025 Client Name: Varner Heating Design Data Reference City: Minneapolis, Minnesota Building Orientation: Front door faces East Daily Temperature Range: Medium Latitude: 44 Degrees Elevation: 834 ft. Altitude Factor: 0.970 Outdoor Outdoor Outdoor Indoor Indoor Dry Bulb Grains DifferenceDryBulb Winter: -15 Wet Bulb 15.33 Rel.Hum n/a Rel.Hum n/a 72 n/a Summer: 95 73 36% 50% 72 30 Check Figures Total Building Supply CFM: 836 CFM Per Square ft.-. 0.284 Square ft. of Room Area: 2,944 Square ft. Per Ton: 1,575 Volume (ft'): 23,551 Building Loads Total Heating Required Including Ventilation Air: 51,270 Btuh 51.270 MBH Total Sensible Gain: 17,838 Btuh 80 Total Latent Gain: 4,590 Btuh 20 Total Cooling Required Including Ventilation Air: 22,428 Btuh 1.87 Tons (Based On Sensible + Latent) Notes -_ Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2.50, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C-\ ...\Varner Lennar EK02 Vanderbilt 2025-06-23.00 Friday. June 27. 2025. 9-39 AM Rhvac - Residential S Light Commercial HVAC Loads Elite Software Development, Inc. Allied Supply LLC EK02 Vanderbilt Roseville MN 55113 P Load Preview Report Net ft.z Sen Lat Net, Sen Sys Htg Sys Clg Sys Act Scope Ton Ton Area Gain Gain Gainli Loss CFM CFM CFM Buildinq 1.87 1,575 2,944 17,838 4,590 22,428 51,270 686 836 836 System 1 1.87 1.575 2,944 17,838 4,590 22,428 51,270 686 836 836 16x1 Zone 1 2.944 17.838 4,590 22,428 51,270 686 836 836 16x1 1-Unfinished Basement 1,005 580 161 741 8,410 113 27 27 1-- 2-Great Room 264 1,825 304 2,129 5.607 75 85 85 1-- 3-Flex Room 146 2,220 627 2,847 4,124 55 104 104 1-- 4-Fover 81 562 56 618 1,506 20 26 26 1-- 5-Kitchen/Nook 280 2.951 322 3.273 6.141 82 138 138 2-- 6-Mud Room 60 738 126 864 2,356 32 35 35 1-- 7-Powder Room 25 14 0 14 53 1 1 1 1-- 8-Closet (Mudroom) 25 132 47 179 693 9 6 6 1-- 9-Pantry 20 118 42 160 620 8 6 6 1-- 10-Owner's Suite 203 1,817 666 2,483 4,536 61 85 85 1-- 11-Owner's Bath 69 673 156 829 2,388 32 32 32 1-- 12-Owner's Closet 47 203 51 254 786 11 10 10 1-- 13-Bedroom 2 143 1,243 531 1,774 2,376 32 58 58 1-- 14-Bedroom 3 149 1,559 652 2,211 4,050 54 73 73 1-- 15-Bedroom 4 149 2,094 718 2,812 5,079 68 98 98 1-- 16-2nd Floor Bath 55 204 47 251 736 10 10 10 1-- 17-Laundry Room 36 56 0 56 62 1 3 3 1-- 18-2nd Floor Landinq 189 849 84 933 1.747 23 40 40 1-- C:\ ...\Varner Lennar EK02 Vanderbilt 2025-06-23.00 Fridav, June 27, 2025, 9.39 AM Rhvac - Residential & Light Commercial HVAC Loads Allied Supply LLC Roseville, MN 55113 System 1 Summary Loads Component Description MN Code: Glazing -New Minnesota Code, U-value 0.32, SHGC 0.5 11 P: Door -Metal - Polyurethane Core, U-value 0.29 15A-1 Osffc-8: Wall -Basement, concrete block wall, R-10 foam board to floor, no framing, no interior finish, filled core, 8' floor depth, U-value 0.042, above grade U-value 0.075 13A-1 Ofcs: Wall -Block, board insulation only, R-10 board insulation, filled core, siding finish, U-value 0.069 12F-Osw: Wall -Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs, U-value 0.065 R-49: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Custom, R-49 Minnesota Code, U-value 0.02 21A-20: Floor -Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 20' wide, U-value 0.027 19C-Osp: Floor -Over enclosed crawl space, R-11 insulation on exposed walls, sealed crawl space, passive, no floor insulation, carpet or hardwood, U- value 0.368 Subtotals for structure: People: Equipment: Lighting: Ductwork: Infiltration: Winter CFM: 247, Summer CFM: 130 Ventilation: Winter CFM: 0, Summer CFM: 0 System 1 Load Totals: Check Figures Elite Software Development, Inc. EK02 Vanderbilt Area Sen Lat Sen Total Quart Loss Gain Gain Gain 239 6,655 0 5,697 5,697 42 1,060 0 414 414 966 3,530 0 0 0 126 756 0 180 180 1810.3 10,237 0 2,744 2,744 1038.9 1,807 0 1,621 1,621 1005 2,361 0 0 0 900 1,903 0 502 502 28,309 0 11,158 11,158 10 2,000 2,300 4,300 0 1,200 1,200 0 0 0 0 0 0 0 22,961 2,590 3,180 5,770 0 0 0 0 51,270 4,590 17,838 22,428 Supply CFM: 836 CFM Per Square ft.: 0.284 Square ft. of Room Area: 2,944 Square ft. Per Ton: 1,575 Volume (ft'): 23,551 System Loads Total Heating Required Including Ventilation Air: 51,270 Btuh 51.270 MBH Total Sensible Gain: 17,838 Btuh 80 % Total Latent Gain: 4,590 Btuh 20 % Total Cooling Required Including Ventilation Air: 22,428 Btuh 1.87 Tons (Based On Sensible + Latent) Notes - --- - - - Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2.50, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. C-.\ ...\Varner Lennar EK02 Vanderbilt 2025-06-23_00 Friday. June 27. 2025. 9-39 AM Rhvac - Residential & Light Commercial HVAC Loads Allied Supply LLC Roseville, MN 55113 System 1 Room Load Summary Htg Min Run Room Area Sens Htg Duct No Name SF Btuh CFM Size Zone 1--- 1 Unfinished 1,005 8,410 113 1-6 Basement 2 Great Room 264 5,607 75 1-6 3 Flex Room 146 4,124 55 1-6 4 Foyer 81 1,506 20 1-6 5 Kitchen/Nook 280 6,141 82 2-6 6 Mud Room 60 2,356 32 1-6 7 Powder Room 25 53 1 1-6 8 Closet (Mudroom) 25 693 9 1-6 9 Pantry 20 620 8 1-6 10 Owner's Suite 203 4,536 61 1-6 11 Owner's Bath 69 2,388 32 1-6 12 Owner's Closet 47 786 11 1-6 13 Bedroom 2 143 2,376 32 1-6 14 Bedroom 3 149 4,050 54 1-6 15 Bedroom 4 149 5,079 68 1-6 16 2nd Floor Bath 55 736 10 1-6 17 Laundry Room 36 62 1 1-6 18 2nd Floor Landing 189 1,747 23 1-6 System 1 total 2,944 51,270 686 System 1 Main Trunk Size: Velocity: Loss per 100 ft.: 16x10 in. 752 ft./min 0.095 in.wg Cooling System Summary Cooling Tons Net Required: 1.87 Equipment Data Type: Model: Indoor Model: Brand: Efficiency: Sound: Capacity: Sensible Capacity: Latent Capacity: Sensible/Latent Split 80% / 20% Heating System Natural Gas Furnace 0 AFUE 0 0 Btu h n/a n/a Elite Software Development, Inc. EK02 Vanderbilt Pa e 5 Run Clg Cig Min Act Duct Sens Lat Clg Sys Vel Btuh Btuh CFM CFM 138 580 161 27 27 435 1,825 304 85 85 530 2,220 627 104 104 134 562 56 26 26 352 2,951 322 138 138 176 738 126 35 35 3 14 0 1 1 31 132 47 6 6 28 118 42 6 6 434 1,817 666 85 85 161 673 156 32 32 48 203 51 10 10 297 1,243 531 58 58 372 1,559 652 73 73 500 2,094 718 98 98 49 204 47 10 10 13 56 0 3 3 203 849 84 40 40 1 17,838 4,590 836 836 Sensible Latent Total Btuh Btuh Btuh 17,838 4,590 22,428 Cooling System Standard Air Conditioner 0 SEER 0 0 Btuh 0 Btuh 0 Btuh C:\ ...\Varner Lennar EK02 Vanderbilt 2025-06-23.00 Friday. June 27. 2025. 9.39 AM 8595 Farmstead Ave NE 1346.6012 IFGC APPENDIX E, WORKSHEET E-1. IF C A ppendix E , Worksheet E -1 Residential Combustion Air Calculation Method for Furnace, Boiler, and/or Water Heater in the Same Space) Step 1: Complete vented combution appliace information: Furnace/Boiler: Draft Hood Fan Assisted x Direct Vent Input: 60,000 Btu/hr Not fan Assisted) & Power Vent Water Heater: Draft Hood Fan Assisted X Direct Vent Input: 160,000 Btu/hr Not fan Assisted & Power Vent Step 2 Calculate the volume of the Combustion Appliance Space (CAS) containing combustion appliances. The CAS includes all spaces connected to one another by code compliant openings. CAS volume: 1768 ft3 Step :1 Determine air Changes per Hour (ACH)' Default ACH values have been incorporated into Table E-1 for use with Method 4b (KAIR Method). If the year of construction or ACH is not known, use method 4a Standard Method). Step 4. Determine Required Volume for Combustion Air. 4a. Standard Method Total Btu/hr input of all combustion appliances (DO NOT COUNT DIRECT VENT APPLIANCES) Input: Btu/hr Use Standard Method column in Table E-1 to find Total Required Volume (TRV) TRV: ft3 If CAS Volume (from Step 2) is greater tf7anTRV then no outdoor openings are needed. If CAS Volume (from Step 2) is less than TRV then go to STE P 5. 4b. Known Air Infiltration Rate (KAIR) Method Total Btu/hr input of all fan -assisted and power vent appliances DO NOT COUNT DIRECT VENT APPLIANCES) Input: Btu/hr Use Fan -Assisted Appliances column in Table E-1 to find Required Volume Fan Assisted (RVFA) RVFA: ft3 Total Btu/hr input of all non -fan -assisted appliances Input: Btu/hr Use Non -Fan -Assisted Appliances column in Table E-1 to find Required Volume Non -Fan -Assisted (RVNFA) RVNFA: ft3 Total Required Volume (TRV) = RVFA + RVNFA TRV = + = ft3 If CAS Volume (from Step 2) is greater thanTRV then no outdoor openings are needed. If CAS Volume from Ste 2 is less thanTRV then go to STE P 5. Step 5: Calculate the ratio of available interior volume to the total required volume. Ratio = CAS Volume from Ste 2 divided b TRV from Step 4a or Ste 4b Ratio = 161 Step 6i Calculate Reduction Factor (RF). RF = 1 r4nus Ratio RF = 1 - _ Step 7: Calculate single outdoor opening as if all combustion air is from outside. Total Btu/hr input of all Combustion Appliances in the same CAS (EXCEPT DIRECT VENT) Input: Btu/hr Combustion Air Opening Area (CAOA): Total Btu/hr dividedby 3000 Btu/hr per in2 CAOA = /3000 Btu/hr per in2 = in2 Step El Calculate Minimum CAOA. Minimum CAOA = CAOA multi lied b RF Minimum CAOA = x = in2 Step 9t Calculate Combustion Air Opening Diameter (CAOD) CAOD = 1.13 mould liedb thes uarerootofMinimum CAOA CAOD = 1.13 x -Minimum CAOA = in If desired, ACH can be determined using ASHRAE calculation or blower door test. Follow procedures in Section 304. 58 1346.6014 IFGC APPENDIX E, TABLE E-1. IF GC Appendix E, Table E-1 Residential Combustion Air Re uired Volume (Required Interior Volume Based on Input Rating of Appliances) Input Rating Btu/hr Standard Method ft3 Known Air Infiltration Rate (KAIR) Method (ft3) Fan Assisted Non -Fan -Assisted 1994' to Present Pre 19942 1994' to Present Pre 19942 5,000 250 375 188 525 263 10,000 500 750 375 1,050 525 15,000 750 1,125 563 1,575 788 20,000 1,000 1,500 750 2,100 1,050 25,000 1,250 1,875 938 2,625 1,313 30,000 1,500 2,250 1,125 3,150 1,575 35,000 1,750 2,625 1,313 3,675 1,838 40,000 2,000 3,000 1,500 4,200 2,100 45,000 2,250 3,375 1,688 4,725 2,363 50,000 2,500 3,750 1,875 5,250 2,625 55,000 2,750 4,125 2,063 5,775 2,888 60,000 3,000 4,500 2,250 6,300 3,150 65,000 3,250 4,875 2,438 6,825 3,413 70,000 3,500 5,250 2,625 7,350 3,675 75,000 3,750 5,625 2,813 7,875 3,938 80,000 4,000 6,000 3,000 8,400 4,200 85,000 4,250 6,375 3,188 8,925 4,463 90,000 4,500 6,750 3,375 9,450 4,725 95,000 4,750 7,125 3,563 9,975 4,988 100,000 5,000 7,500 3,750 10,500 5,250 105,000 5,250 7,875 3,938 11,025 5,513 110,000 5,500 8,250 4,125 11,550 5,775 115,000 5,750 8,625 4,313 12,075 6,038 120,000 6,000 9,000 4,500 12,600 6,300 125,000 6,250 9,375 4,688 13,125 6,563 130,000 6,500 9,750 4,875 13,650 6,825 135,000 6,750 10,125 5,063 14,175 7,088 140,000 7,000 10,500 5,250 14,700 7,350 145,000 7,250 10,875 5,438 15,225 7,613 150,000 7,500 11,250 5,625 15,750 7,875 155,000 7,750 11,625 5,813 16,275 8,138 160,000 8,000 12,000 6,000 16,800 8,400 165,000 8,250 12,375 6,188 17,325 8,663 170,000 8,500 12,750 6,375 17,850 8,925 175,000 8,750 13,125 6,563 18,375 9,188 180,000 9,000 13,500 6,750 18,900 9,450 185,000 9,250 13,875 6,938 19,425 9,713 190,000 9,500 14,250 7,125 19,950 9,975 195,000 9,750 14,625 7,313 20,475 10,238 200,000 10,000 15,000 7,500 21,000 10,500 205,000 10,250 15,375 7,688 21,525 10,763 210,000 10,500 15,750 7,875 22,050 11,025 215,000 10,750 16,125 8,063 22,575 11,288 220,000 11,000 16,500 8,250 23,100 11,550 225,000 11,250 16,857 8,438 23,625 11,813 230,000 1 11,500 17,250 8,625 24,150 1 12,075 The 1994 date refers to dwellings constructed under the 1994 Minnesota Energy Code. The default KAIR used in this section of the table is 0.20 ACH. 2This section of the table is to be used for dwellings constructed prior to 1994. The default KAIR used in this section of the table is 0.40 ACH. 59 Table 501.31 Procedure to Determine Nbkeup Air Quantity for Exhaust Equipment in Dwellings Use the Appro riate Column to Estimate House Infiltration One or multiple power vent One or multiple fan- One atmospherically Multiple atmospherically or direct vent appliances or assisted appliances and vented gas or oil vented gas or oil no combustion appliancesA power vent or direct vent appliance or one solid appliances or solid fuel applianceSB fuel appliancec applianceSD 1apressure factor cfm/s 0.15 0.09 0.06 0.03 b) conditioned floor area sf) (including 3126 unfinished basements Estimated House Infiltration (cfm): 469 1a x 1b 2. Exhaust Capacity a) continuous exhaust - only ventilation systems n/acfm): (not applicable to balanced ventilation systems such as HRV b clothes dryer 135 135 135 135 c) 80% of largest exhaust rating (cfm): (not applicable if recirculating system or 32 if powered makeup air is electrically interlocked and matched to exhaust d) 80% of next largest exhaust rating (cfm): not applicable if recirculating system or if powered makeup air is electrically interlocked and matched to exhaust) not applicable Total Exhaust Capacity 455cfm): 2a+2b+2c+2d 3. Makeup Air Requirement 455a) Total Exhaust Capacity from above b) Estimated House 469Infiltrationfromabove Makeup Air Quantity cfm): [3a - 3b] 14ifvalueisnegative, no makeup air is needed 4. For Makeup Air Opening Sizing, refer to n/r Table 501.3.2 AMUse this column if there are other than fan -assisted or atmospherically vented gas or oil appliances or if there are no combustion appliances. BF-JUse this column if there is one fan -assisted appliance per venting system. Other than atmospherically vented appliances may also be included. cRUse this column if there is one atmospherically vented (other than fan -assisted) gas or oil appliance per venting system or one solid fuel appliance. Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically vented gas or oil appliances and solid fuel appliances. 13 Table 501.32 kbkeup Air Op enin Sizing Table for New and Existin Dwellin s One or multiple power vent or direct vent appliances or no combustion applianceSA One or multiple fan- assisted appliances and power vent or direct vent applianceSB One atmospherically vented gas or oil appliance or one solid fuel appliancec Multiple atmospherically vented gas or oil appliances or solid fuel applianceSD Passive makeup air opening duct diameterE,F,c Type of opening ors stem cfm) cfm) cfm) cfm) inches Passive Opening 1-36 1-22 1-15 1-9 3 Passive Opening 37-66 23-41 16-28 10-17 4 Passive Opening 67-109 42-66 29-46 18-28 5 Passive Opening 110-163 67-100 47-69 29-42 6 Passive Opening 164-232 101-143 70-99 43-61 7 Passive Opening 233-317 144-195 100-135 62-83 8 Passive Opening with Motorized Damper 318-419 196-258 136-179 84-110 9 Passive Opening with Motorized Damper 420-539 259-332 180-230 111-142 10 Passive Opening with Motorized Damper 540-679 333-419 231-290 143-179 11 Powered Makeup Air" 679 419 290 179 not applicable A Use this column if there are other than fan -assisted or atmospherically vented gas or oil appliances or if there are no combustion appliances. B Use this column if there is one fan -assisted appliance per venting system. Other than atmospherically vented appliances may also be included. c Use this column if there is one atmospherically vented (other than fan -assisted) gas or oil appliance per venting system or one solid fuel appliance. Use this column if there are multiple atmospherically vented gas or oil appliances using a common vent or if there are atmospherically vented gas or oil appliances and solid fuel appliance(s). E An equivalent length of 100 feet of round smooth metal duct is assumed. Subtract 40 feet for the exterior hood and ten feet for each 90- degree elbow to determine the remaining length of straight duct allowable. F If flexible duct is used, increase the duct diameter by one inch. Flexible duct shall be stretched with minimal sags. c Barometric dampers are prohibited in passive makeup air openings when any atmospherically vented appliance is installed. Powered makeup air shall be electrically interlocked with the largest exhaust system. 14 33 Total ventilation rate (cfm) RESIDENTIAL ENERGY CODE 1322.1104 Equation 11-1: 0.02 x square feet of conditioned space) + 15 x (number of bedrooms + 1)] 138 N1104.2.1 Continuous ventilation. A minimum of 50 percent of the total ventilation rate, but not less than 40 cfm, shall be provided, on a continuous rate average for each one -hour period according to Table N 1104.2 or Equation 11-2. The portion of the mechanical ventilation system that is intended to be continuous may have automatic cycling controls providing the average flow rate for each hour meeting the requirements of Section N 1104.2.1. Equation 11-2: Continuous ventilation (cfm) = total ventilation rate/2 1 69 N1104.2.1.1 Ventilation rate. The continuous ventilation system shall be balanced in accordance with Section N 1104.4.2. Exception: If the local ventilation requirements according to IRC Section R303.3 are being met by the continuous ventilation system, it shall be capable of operating at a rate not more than 100 percent greater than required by Section N l l 04.2.1. N1104.2.2 Intermittent ventilation. The difference between the total ventilation rate and the continuous ventilation rate shall be based on flow rates as designed or as installed. Table N 1104.2 Total and Continuous Ventilation Rates (in cfm) Number of Bedrooms 1 2 3 4 5 62 Conditioned space' (in sq. ft.) Total/ Continuous Total/ Continuous Total/ Continuous Total/ Continuous Total/ Continuous Total/ Continuous 1000-1500 60/40 75/40 90/451100150 105/53 120/60 135/68 1501-2000 70/40 85/43 115/58 130/65 145/73 2001-2500 80/40 95/48 110155 125/63 140/70 155/78 2501-3000 90/45 105/53 120/60 135/68 150/75 165/83 3001-3500 100150 115/58 130/65 145/73 160/80 175/88 3501-4000 110155 125/63 140/70 155/78 170/85 185/93 4001-4500 120/60 135/68 150/75 165/83 180/90 195/98 Copyright ©2009 by the Revisor of Statutes, State of Minnesota. All Rights Reserved. 1322.1104 RESIDENTIAL ENERGY CODE 34 4501-5000 130/65 145/73 160/80 175/88 190/95 205/103 5001-5500 140/70 155/78 170/85 185/93 200/100 215/108 5501-60002 150/75 165/83 180/90 195/98 210/105 225/113 Conditioned space includes the basement. If conditioned space exceeds 6000 sq. ft. or there are more than 6 bedrooms, use Equation 11-1 from Section NJ 104.2 to calculate total ventilation rate. N1104.3 Ventilation system requirements. The mechanical ventilation system shall be one of three types: exhaust according to Section N 1104.3.1; balanced, and HRV/ERV according to Section N 1104.3.2; or other method according to Section N 1104.3.3. N1104.3.1 Exhaust systems. Fans used to comply with the continuous ventilation part of the mechanical ventilation system shall: 1. meet the minimum continuous ventilation rate in Section N 1104.2.1 at the point of discharge; 2. be designed and certified by the equipment manufacturer as capable of continuous operation at the rated cfm; 3. have a maximum 1.0 sone per HVI Standard 915 for surface mounted fans; 4. be permitted to use a required overcurrent protection device as a disconnect per the National Electric Code, incorporated by reference in Minnesota Rules, chapter 1315; and 5. comply with the Minnesota Mechanical Code, chapter 1346, which may require additional make-up air. Fans used to comply with the intermittent ventilation part of the mechanical ventilation system shall have a maximum 2.5 sone per HVI Standard 915. N1104.3.2 Balanced, and HRV/ERV systems. A heat recovery ventilator (HRV) or energy recovery ventilator (ERV) shall meet either: 1. the requirements of HVI Standard 920, 72 hours minus 13 degrees Fahrenheit cold weather test; or 2. certified by a registered professional engineer and installed per manufacturer's installation instructions. An HRV or ERV intended to comply with both the continuous and total ventilation rate requirements shall meet the rated design capacity of the continuous ventilation rate in Section N 1104.2.1 under low capacity and meet the total ventilation rate in Section N1104.2.2 under high capacity. Exception: The balanced, and HRV/ERV system may include exhaust fans to meet the intennittent ventilation rate. Surface mounted fans shall have a maximum 2.5 sones per HVI Standard 915. N1104.3.3 Other methods. Any mechanical ventilation system consisting of exhaust fans, supply fans, or a combination of both, complying with Section N 1104, shall be allowed. A mechanical ventilation system specifically identified in Section N1104.3.1 or Nl 104.3.2 shall not conflict with Sections N1104.3.1 and NI 104.3.2. For the purposes of this section, the delivered Copyright ©2009 by the Revisor of Statutes, State of Minnesota. All Rights Reserved. ID l21'I I I INSTRUCTIONS ON WRAPPING THE WINDOWS. DDRESS NUMBERS TO BE 4" HIGH MIN. & CONTRAST TO BACKGROUND. ROOF VENT INSTALLATION NOTES: 1. ALL ROOF VENTS TO BE INSTALLED OVER 8" WIDE x 9" HIGH OPENINGS INTO THE ROOF SHEATHING. 2. STANDARD LOCATION OF ROOF VENTS ON GABLE ROOFS TO BE 12" DOWN FROM THE ROOF RIDGE TO THE TOP OF THE 8"x9" OPENING. 3. HIP ROOFS MAY REQUIRE THE OPNG'S. TO BE CUT FURTHER DOWN FROM ROOF RIDGE TO ALIGN W/ REQUIRED SIDE ROOF VENTS. SEE ROOF PLAN. 4. ROOF SHEATHING TO BE REMOVED FROM UNDERNEATH OVER -FRAMED OR PERPENDICULAR ROOF SYSTEMS FOR PROPER AIR MOVEMENT. 5. NO ROOF VENT OPENINGS WITHIN 36" OF ANY VALLEY'S. ROOF VENT CALCULATIONS: 1,842 TOTAL S.F. (HOUSE + 3 CAR GARAGE) 1,842 / 300 (IRC) = 6.14 S.F. VENT REQ. 6.14 X 50% (% ROOF VENT) = 3.07 3.07 / .4167 (PER VENT) = 7.37 = 8 GAF #RT65 - 16X20 VENTS W/ 60 SQ. IN. VENTED AREA. (60/144 = .4167 S.F.) Haven Ridge 8595 Farmstead Ave NE Walkout Foundation 8595 Farmstead Ave CITYYtcePoO F Lot 26 Block 1 - Haven Ridge 2nd M n 1 R 9 13IILWvCSAFETYBuilder: Lennar 505 Walnut Street, Suite #1 Monticello, MN 55362 Phone: 763-295-3060 Fax: 763-295-4404 CITY OF MONTICELLO PROPOSED BUILDING SURVEY REQUIREMENTS CHECKLIST Prior to excavation and construction, the permittee shall submit to the City of Monticello through certificate of survey that the proposed construction is in compliance with all land use, zoning, conditional use, or planned use as part of the building permit application. The certificate of survey shall be signed by a registered Minnesota land surveyor. The signed certificate of survey shall contain at a minimum the following information: Indicate permanent iron monuments at each lot corner. Dimension from house to lot lines and from O.H.W. & Bluff Line of rivers, creeks, lakes, and Type 4 and 5 wetlands. Proposed building elevations of lot corners. Proposed elevations at building corners. Proposed elevations on the side yard swales at the extension of building corners and high points. Proposed and as -built elevations of garage slab and lowest floor on walkouts. Top of curb elevation at the extension of property lines and center of driveway. Proposed elevations and location of any critical drainage ways located on the site natural or man-made indicated with drainage arrows and percentage of slope. Label all adjacent street and railroad right-of-way. Erosion control * Must be installed prior to starting construction and maintained to be compliant with City requirements and project SWPPP. Follow City Standard Detail Plate 6006. Proposed driveway location, width at lot line, % of slope. Show proposed porches, cantilevers, bay windows, and decks (if being constructed). N/A Show individual significant trees 36" DBH (Diameter Breast Height)or larger N/A Existing or proposed retaining wall(s) top and bottom elevations. Show adjacent property topo related to drainage with arrows. Proposed sump pump outlet location on building footprint (natural drainage or piped to curb). Show any Drain Tile installed in the yard.---* *Show sump pump location on final as -built City will accept only originals or quality hard copies of the as -built survey and certification of grading. qyN '° ° wFr SNNO Certificate of Survey for: g Revisions: Denotes Grade Footin s to be 1 dropped as needed 2 D YR YR y wMF T #7p d HYD 4 9, 953 LENNAR Denotes Existing Hydrantgy 7 s' 3 II \ \ 0 5 Denotes Existing Electric Box House Address: oo Denotes Existing Television Box OfO e r 8595 Farmstead Avenue NE., Monticello, MN O Denotes Existing Telephone Box 0" H A4 d 1 • SRv Denotes Existing Light Pole En (1) N W) a U : o U o : m o W U o o IDm o Q) o Q Q Q p oLn v 3 O -o i 1° 1.12) O 0 OUSIC, O e p Denotes Existing Service 949.5 w FM do e°° eS Denotes Existing Curb StopVanderbilt (W) o g p x 949.4 dp°+/ x 950.6 t/o,, a S > 4; 2so?3\ \ x 000.o Denotes Existing Elevation 49 5 9e ?,o S 9 rn 6V ° 1 3 \ x D t P d EI t9Aerto951.9 7 / \ 900.0 eno es ropose eva ion 950.5 x 950.5 r/ v? p (z 952.3 x / \ /\ 22 47'F // J / \ \ - Denotes Direction of Drainage 9 Denotes Drainage & Utility Easement x 955.5ox951.9 , (per recorded plot) o 0) x 953.1 / i 1 BENCHMARK ,/ _ Denotes Iron Monument 9 1 TOP OF SPIKE Z g51'0 c5 x 954.4 / x 955.8 ' 5,;' wi \ s? o,) X EL = 963.79 PROPERTY DESCRIPTION: J x 9 '` I N 9s" Lot 26, Block 1 HAVEN RIDGE 2NDa' / 10 8 29 , o oc ya h 951.7 0` ,x / I / ' ADDITION, Hennepin County, Minnesota x 956.2 957.4 32.21 I . 74 . 74 ' n' 2 co 12% s O 1 • 957.5o ,,,. 4 I I , Minimum Lowest Floor Elevation. C 953.3 x 954.3 / / 2g m1n' o W w 962.1 , ' PROPOSED BUILDING ELEVATIONS 26 D o oN r---- 1 12TC 954.4 / D 9s, o ; o -- 11.79 , U) Lowest Floor Elevation: 957.5 IQ x a o 0 o x; N I 962 8 89, 0 961.9 156 h / x 955.0 0D oc '0' 963.E - 30.0 -- I Top of Foundation Elevation: 965.5 x approximate 95 r. rn o, 0 V 11 M 9ss, grade transition--\ _ d iM > 2.0 v o µI p 961.8 1 > Garage Slab Elevation (at door): 965.2 CJ1 o lojh I 93 29 m ° 23.5 °' Pn P i. * 0 O I ' D NOTES: No /- 12 1" a x 66x O Ig58.5x 63.Q x o 9s o C$8.4 1. Proposed building site grading is in accordance with the 955.4 P 955.5 x 955.9 95rO' ,\ 951 7 x o,6 1 - 9 962 6 0 22.5 1> - TV 12 I _1 > grading plans prepared by Carlson McCain, Inc., last Rim=955.2 105.1 o,`o^ 957.4 x 957.9= - - - w I - revised 9/15/23. e _ 961.4 x - - - IiA c 962 7 rn 962 6 30.09SS212 - - - - 958.8 62 24 .o _ y N ° 2. Contractor must verify sewer depth. 57.9 3. Driveways shown are for graphic purposes only. Final driveway g 60 g56,1_- rn 9 0 min. 2% min. N . Y 9 P P P Y Y 2% min. 1 80.,06„ s ` O rn °' i _ design and location to be determined by owner/builder. a SS ,`Dn `' S87°10 56 W ° I - 4. All building foundation dimensions shown on this survey 3• ` rn I include exterior foundation insulation widths, if applicable. IRefer to final building plans for foundation details. I L-Proposed House / l /IV,PCARLSON(staked) I hereby certify to Lennar that this survey, plan or report was prepared by me or ENGINEERING BENCHMARK Bearings shown are assumed TOP OF SPIKE under my direct supervision and that I am a duly licensed land surveyor under the EL = 962.64 laws of the State of Minnesota. ENGINEERING \ SURVEYING \ PLANNING GRAPHIC SCALE 0 15 30 60 Dated this 9th day of February, 2026. 3890 PHEASANT RIDGE DRIVE NE, SUITE 100, BLAINE, MN 55449 PROPOSED DING SURVEY Signed: rls n En ri g, LLC J 3 TEL 763.489.7900 \ FAX 763.489.7959 \ CARLSON-ENGINEERING.COM IN FEET) Approved Date 4/3/2026 BY: o homas R. Bolluff, L.S. eg. No. 40361 2669 7056-52.026 mdb Lennar Job No. 22193542126 (8.5x14 sheet) Peter J. B omquist, L.S. Reg. No. 51676 0