City Council Resolution 2010-08CITY OF MONTICELLO
RESOLUTION NO. 2010-08
ORDERING IMPROVEMENTS AND AUTHORIZING PREPARATION
OF PLANS AND SPECIFICATIONS
2010 STREET RECONSTRUCTION — AREA 4A AND PRAIRIE ROAD
CITY PROJECT NO. 100001
WHEREAS, a resolution was adopted by the City Council on February 8, 2010, accepting the
Feasibility Reports for the 2010 Street Reconstruction of Area 4A and Prairie Road, and calling for a
Public Hearing on February 22, 2010 on said proposed improvements; and
WHEREAS, after due Notice of Public Hearing was provided on the construction of said proposed
improvements for the 2010 Street Construction Project: Area 4A — West River Street between Chestnut
Street and Pine Street/State Highway 25 and adjoining streets between West Broadway and West River
Street or Front Street; and Prairie Road between Nicholas Circle and Wright County Highway 75.
Improvements include reconstruction of urban and rural section roadways, curb and gutter
replacement, sidewalk and storm sewer construction, utility improvements and other appurtenant work.
Optional improvements include Chestnut Street Lift Station wet well improvements, West Bridge Park
pathway lighting, Highway 25 pedestrian underpass improvements, Walnut Street parking lot
reconstruction, sidewalk extensions from Locust Street to Highway 25, Third Street parking lot
improvements, and Par West Park parking lot reconstruction. A hearing was duly held on February 22,
2010 on said improvements and the City Council heard all persons desiring to be heard on the matter
and fully considered the same; and
WHEREAS, at said hearing there was available a reasonable estimate of the amount to be assessed and
a description of the methodology was presented;
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Monticello, Minnesota
as follows:
1. Said improvements are necessary, cost-effective, and feasible as detailed in the Feasibility
Reports.
2. It is advisable, expedient and necessary that said improvements as described in the Notice of
Hearing thereon be constructed, and the same are hereby ordered made.
3. The improvements described in said Notice of Hearing are hereby designated and shall be
known as the 2010 Street Reconstruction, City Project No. 100001.
4. The City Engineer along with consulting engineers, WSB & Associates, Inc. is hereby directed
to prepare final plans and specifications for said improvements.
5. The City Council shall let the contract for all or part of the work for said improvements or order
all or part of the work done by day labor or otherwise as authorized by Minnesota Statutes,
Section 429.041, Subdivision 2 within one year of the date of this resolution ordering said
improvements.
Adopted by the Monticello City Council this 22nd day of February, 2010.
ATTEST: Clint Herbst, Mayor
Jeff VW
City Administrator