Loading...
Planning Commission Resolution 2015-008CITY OF MONTICELLO WRIGHT COUNTY, MINNNESOTA PLANNING COMMISSION RESOLUTION NO. PC- 2015 -008 RECOMMENDING APPROVAL OF AMENDMENT TO THE OFFICIAL MONTICELLO ZONING MAP TO INCLUDE PROPERTY TO BE ZONED LIGHT INDUSTRIAL (I -1), PRELIMINARY AND FINAL PLAT FOR FIRST LAKE SUBSTATION ADDITION, CONDITIONAL USE PERMIT FOR UTILITIES WITHIN THE LIGHT INDUSTRIAL (I -1) DISTRICT AND APPROVING VARIANCE TO THE ZONING ORDINANCE TO REQUIRED SETBACK FROM THE SOUTH PROPERTY LINE AND APPROVING THE VARIANCE TO CHAPTER 4, SECTION 8(E)(2)(C), SURFACING WHEREAS, the applicant has submitted applications to construct an electrical substation on a parcel of newly annexed land; and WHEREAS, the proposed project requires a rezoning of the property to rezone the property to I -1 Light Industrial, a Preliminary Plat and Final Plat, and a Conditional Use Permit for a Utility; and WHEREAS, the applicants are seeking variances from the applicable zoning standards for a reduced setback from the south property line and a request to waive the paving requirements for driveway; and WHEREAS, the subject property is guided for "Places to Work" in the Monticello Comprehensive Plan; and WHEREAS, the applicants have provided adequate right of way in the plat to accommodate future street and utility extensions; and WHEREAS, the Planning Commission held a combined public hearing on April 7th, 2015 on the applications and the applicant and members of the public were provided the opportunity to present information to the Planning Commission; and WHEREAS, the Planning Commission has considered all of the comments and the staff report, which are incorporated by reference into the resolution; and CITY OF MONTICELLO WRIGHT COUNTY, MINNNESOTA PLANNING COMMISSION RESOLUTION NO. PC- 2015 -008 WHEREAS, the Planning Commission of the City of Monticello makes the following Findings of Fact in relation to the recommendation of rezoning, plat, and Conditional Use Permit approval, incorporating the Conditions of Approval in Exhibit Z of the staff report: 1. The property is guided for industrial uses, consistent with the proposed use and zoning. 2. The proposed plat is consistent with all of the City's subdivision regulations. 3. The use meets the requirements for Utility installations, pending setback and surfacing variance approval. 4. The use will not overburden the City's street or utility services. 5. The use will not create undue levels of traffic or other negative impacts; and WHEREAS, the Planning Commission of the City of Monticello makes the following Findings of Fact in relation to the variance from the _required setback along the south property line: 1. The property adjoining the south boundary is guided for future industrial uses. 2. Such adjoining industrial uses would be required to maintain only a 15 foot setback from the same property line. 3. The property is encumbered by a gas pipeline that restricts the use of the property in ways that are unique to the proposed electrical substation use. 4. Relocation of the substation on the property is not practical due to the gas pipeline location. 5. Additional property to meet the setback would be an unreasonable burden on the property that would not be required of other industrial uses. 6. The conditions on the property create practical difficulties in putting the property to the utility use as proposed, which is otherwise a reasonable use of the property; and WHEREAS, the Planning Commission of the City of Monticello makes the following Findings of Fact in relation to the requested variance from driveway paving standards: 1. The conditions on the property are unique in relation to the paving requirements for Industrial uses due to the extensive driveway area on the property. 2. The applicant will construct a gate approximately 250 west of the access from Dalton Avenue. 3. The applicant will pave the driveway between the public street and the gate. 4. The applicant will surface the remaining area will gravel. 5. The gravel portions will not be visible from the public street. 6. The surfacing as proposed will be consistent with the intent of the surfacing requirements of the zoning ordinance. 0J, CITY OF MONTICELLO WRIGHT COUNTY, MINNNESOTA PLANNING COMMISSION RESOLUTION NO. PC- 2015 -008 NOS', THEREFORE, BE IT RESOLVED, by the Planning Commission of the City of Monticello, Minnesota, that the Planning Commission hereby takes the following actions: 1. Recommends that the City Council approve the rezoning from A -O to I -1, Light Industrial. 2. Recommends that the City Council approve the Preliminary Plat and Final Plat for First Lake Substation Addition. 3. Recommends that the City Council approve the Conditional Use Permit for Utility in A he I -1 zoning district. 4. Hereby approves the variance to the south property line allowing a 60 foot setback, rather than the required 100 foot setback for utility substation. 5. Hereby approves the variance to the paving requirements, requiring that the applicant pave the driveway between the access point to Dalton Avenue and the entrance to the use, as marked by a gate located approximately 250 feet from the public street. These actions are subject to the conditions listed in Exhibit Z, which are as follows: 1. Additional landscape screening along the west boundary to screen the substation enclosure area from the Bertram Park property. 2. Pavement of the required driveway from the connection between Dalton and the entrance to the facility. 3. Compliance with the conditions identified in the City Engineer's comment letter dated March 27, 2015. ADOPTED this r day of April, 2015, by the Planning Commission of the City of Monticello, Minnesota. MONTICELLO PLANNING COMMISSION ATTEST: Angela SchuyAah#, Coi*nunity Development Director