City Council Minutes 09-24-2012 SpecialMINUTES SPECIAL MEETING— MONTICELLO CITY COUNCIL Monday, September 24, 2012 — 5:30 p.m. Mississippi Room, Monticello Community Center Council Present: Clint Herbst, Lloyd Hilgart, Tom Perrault, Glen Posusta Council Absent: Brian Stumpf Staff Present: Bruce Westby, Bob Paschke, Jeff O'Neill, Wayne Oberg, Angela Schumann Others: WSB: Bret Weiss, Tom Roushar; Cargill: Don Roberts, Terry Profitt, Kurt Zweifel, Carrie Heitz, Peter Nystrom; Veolia staff: Chuck Keyes, Margaret Becker, Larry Koch, and others 1. Call to Order 2. 3. Mayor Herbst called the Special Meeting to order at 5:33 p.m. Purpose of Meetin¢ The purpose of this workshop is to review the executive summary of the Feasibility Report for Wastewater Treatment Facility Biosolids Dewatering, Energy Efficiency, Headworks and Site Improvements, City Project No. 12CO01 prior to finalizing the report for presentation during the Public Hearing so that the City Council would clearly understand the purpose and timing of the proposed improvements. Workshop — Review Feasibility Study Bruce Westby reviewed the outline from staff's meeting with Cargill Kitchen Solutions. He noted that the objectives of the W WTF project are to address pending biosolids management issues, improve operating efficiencies and reduce operating costs, address existing operational deficiencies, improve the safety of the overall system, and extend the useful life of equipment. Westby indicated that the sludge dewatering improvements are of the highest priority as they address pending biosolids management issues. Energy efficiency improvements are necessary to better control the operation of the SBR units now and to assist with future phosphorus removal and would pay for themselves over time. The headworks relocation, influent wet -well, and miscellaneous site improvements are important, but less critical, and are included in the City's 5 -year CIP. There could be cost savings associated with completing these improvements at the same time as the others. Westby outlined the proposed improvements and current estimated costs. Sludge dewatering, which includes a screw press process, is estimated to cost $1,800,000. This improved technology would increase the biosolids solids content to allow for landfilling or disposal in a regional Class A dryer. Special Council Meeting Minutes — September 24, 2012 Page 1 • Energy Efficiency improvements are estimated to cost $700,000. These improvements take advantage of rebates from Xcel Energy and generate energy savings. • Relocating the headworks to front end of the W WTF is estimated to cost $2,000,000. The current location is causing pump plugging and wear. • Increasing the wet -well size is estimated to cost $1,600,000. This would increase detention time and safeguard against sewage backups. • Miscellaneous site improvements such as reconstructing deteriorated roads and removing the GBT and pasteurization unit are estimated to cost $85,000. Bret Weiss summarized that seven years ago the City had considered, but decided not to move forward with, a plan to convert from a land applied process to a dewatered/heat dried process which would produce class A sludge. He suggested that the timing may now be right to move forward with modifying the land applied process for a number of reasons. There is a now purchase agreement in place to sell the land, the land and storage are close to capacity, the spreading equipment must soon be replaced, and nitrogen levels in the fields will be at limit in the near future. Bob Paschke pointed out that the City would not be subject to reduced phosphorous levels as soon as expected. Tom Perrault said that he thought phosphorous was a bigger concern than nitrogen. Staff indicated that increased phospherous can be monitored but noted that increased nitrogen would be a dealbreaker. Don Roberts asked if the City would apply sludge to the land next year. Jeff O'Neill said that it would depend upon how much land the MYSA requires for soccer fields. Twelve fields could be ready for use by next fall. Weiss indicated that operations and maintenance costs would not change from the current cost of $60,000 if the biosolids dewatering and energy efficiency improvements were to be constructed. Clint Herbst stated that the City had decided not to transport biosolids to Big Lake's or Buffalo's drying facility as the costs would be 4 -6 times higher than landfilling the biosolids. Weiss outlined that financing options for the improvements may come from a variety of sources including SAC funds, sewer rates, land sale, general taxes, special assessments to Cargill Kitchen Solutions, and from the sale of equipment. • He indicated that SAC funding had dropped significantly as a result of a lack of development since the economy had worsened. Special Council Meeting Minutes — September 24, 2012 Page 2 The bond for the total project would be an estimated $6 million which would cost around $500,000 per year for 15 years. • The City plans to use the $325,000 inland sale revenue for the project. General taxes in the amount of $500,000 per year will continue to be contributed to the existing plant through 2018. A portion of these funds could be back - loaded. The existing agreement with Cargill is to contribute $464,000 toward the construction of a new storage tank. Cargill currently accounts for approximately 26% of the total biosolids produced at the plant, which on a $1.8M project would amount to $468,000. Don Roberts pointed out that Cargill is interested in reviewing its 2001 agreement with the City as much has changed since that time. • Existing equipment that will no longer be used would likely generate $100K to go toward the improvement project. • City staff will work to calculate revised rates based on actual costs and plans to adopt the revised rates as part of the 2013 fee schedule. Weiss noted that Cargill is considering pretreatment requirements for BOD and TSS but may be more interested in working with the City to keep flows and loadings reasonable. Glen Posusta asked about how Kjellberg's mobile home park is handled. Staff noted that the City monitors the Kjellberg sewage through a flow meter. The proposed screw press/landfill option is a step toward utilizing a Class A process, either at a regional Class A facility or in the future at the Monticello plant. This step allows the City to maintain similar overhead expense to process and dispose of the material, while increasing the ability to process increasing amounts of biosolids. The system will be adaptable to future processes should the City desire to expand to a Class A product. Lloyd Hilgart asked how long before Class A would be required. Clint Herbst said that it is more a question of when it would make sense to move in that direction. Staff will provide a recommendation regarding a financing scenario for these improvements at an upcoming City Council meeting. 4. Adiournment TOM PERRAULT MOVED TO ADJOURN THE SPECIAL MEETING AT 6:22 P.M. GLEN POSUSTA SECONDED THE MOTION. MOTION CARRIED 4 -0. Recorder: Kerry T. Burri Jqb Approved: October 8, 2012 Attest: Ci mmistrator Special Council Meeting Minutes — September 24, 2012 Page 3