Loading...
City Council Resolution 2011-13ACITY OF MONTICELLO RESOLUTION NO. 2011-13A ORDERING IMPROVEMENTS AND AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS — WEST RIVER STREET 2011 STREET RECONSTRUCTION PROJECT CITY PROJECT NO. 11CO01 WHEREAS, a resolution was adopted by the City Council on February 14, 2011, accepting the Feasibility Report for the 2011 Street Reconstruction Project, and calling for a Public Hearing on February 28, 2011 on said proposed improvements; and WHEREAS, after due Notice of Public Hearing was provided on the construction of said proposed improvements for the 2011 Street Reconstruction Project: Area 4B — East River Street from Cedar Street to approximately 1,100 feet east of Washington Street, as well as Palm, New, Wright, Ramsey, Hennepin, and Washington Streets between East Broadway/CSAH 75 and East River Street, and the reconstruction of paved surfaces in Ellison Park; and West River Street, west of Wright CSAH 75. Improvements include the reconstruction of urban and rural section roadways, curb and gutter replacement, sidewalk, pathway and storm sewer construction, utility improvements and other appurtenant work. Optional improvements include East Bridge Park parking lot reconstruction. A hearing was duly held on February 28, 2011 on said improvements and the City Council heard all persons desiring to be heard on the matter and fully considered the same; and WHEREAS, at said hearing there was available a reasonable estimate of the amount to be assessed and a description of the methodology was presented; NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Monticello, Minnesota as follows: 1. Said improvements are necessary, cost-effective, and feasible as detailed in the Feasibility Report. 2. It is advisable, expedient and necessary that said improvements for West River Street, west of Wright CSAH 75, as described in the Notice of Hearing thereon be constructed, and the same are hereby ordered made. 3. The improvements described in said Notice of Hearing are hereby designated and shall be known as the 2011 Street Reconstruction Project, City Project No. I ICOO 1. 4. The City Engineer along with consulting engineers, WSB & Associates, Inc. is hereby directed to prepare final plans and specifications for said improvements. The City Engineer is directed to design West River Street as a 35 -foot wide rural section with a 5 - foot wide on -road pathway, and to review alternatives to the right turn lane from West River Street onto CSAH 75 to determine the preferred movement into the southbound traffic, such as an acceleration lane. 5. The City Council shall let the contract for all or part of the work for said improvements or order all or part of the work done by day labor or otherwise as authorized by Minnesota Statutes, Section 429.041, Subdivision 2 within one year of the date of this resolution ordering said improvements. ADOPTED BY the Monticello City Council this 28th day of February, 2011. CITY OF MONTICELLO 1 Clint Herbst, Mayor ATTEST: Jeff 1, City Administrator