Loading...
City Council Ordinance 571ORDINANCE NO. 571 CITY OF MONTICELLO WRIGHT COUNTY, MINNESOTA AN ORDINANCE ADOPTING THE 2013 FEE SCHEDULE TITLE 20 OF THE MONTICELLO CITY ORDINANCE THE CITY COUNCIL OF THE CITY OF MONTICELLO HEREBY ORDAINS: Section 1. Title 20 — Fee Schedule shall be amended as shown in the 2013 Fee Schedule in Attachment "A." Section 2. This Ordinance shall take effect and be in full force from and after its passage and publication. A printed copy of the whole ordinance is available for inspection by any person during the City's regular office hours. The complete ordinance will be posted on the City's website following summary publication. ADOPTED BY the Monticello City Council this 10th day of December, 2012. CITY OF MONTICELLO �/ �= Clint Herbst, Mayor ATTEST: Jeff WK4 ity Administrator VOTING IN FAVOR: Herbst, Hilgart, Perrault, Posusta, Stumpf VOTING IN OPPOSITION: None ORDINANCE NO. 571 ATTACHMENT "A" 2013 CITY OF MONTICELLO FEE SCHEDULE Boarding Fee: Dog License: Altered Pet Unaltered Pet Altered Pet Unaltered Pet Late Fee Replacement Tag Euthanizalion/Disposal Fee TITLE 20 - CHAPTER 1 2013 FEE SCHEDULE - CITY OF MONTICELLO Fee Schedule Rates supercede amounts shown in city ordinances or policies. $14 /per day +tax $10 - 2 years $15 - 2 years $5.00 - 1 year $7.50 - 1 year $5 $1 +tax $37 per animal +tax Grave Purchasing Fee: Full Grave (4'x 12') Flush Marker Area Full Grave (4'x12') Raised Marker Area Infant Grave (2'x6') Cremation Grave (4'x4') Grave Stalling Fee (monument or excavation): Grave Transfer Fee: Memorial Plaque (Bronze) Stone: Opening and closing of Niche: Perpetual Care Fee: New Grave Sales Grave Sold Pre -1960 Resident Licensed Unlicensed Fine: Running at Large: First offense $25 $35 Second offense $35 $45 Third offense $50 $60 If impounded Add boarding fee (plus tax) Permit for Keeping Fowl on Premises $50 Annual renewal for current permit $25 CEMETERY Administrative Fee: $50 Flat Marker setting with 4" concrete border $150 Frost Charge: (excavations December through February) $100 Grave Excavation Fee: Weekday $400 Weekend $450 Infant Grave Excavation - Weekday $100 Infant Grave Excavation - Weekend $125 Cremation Grave Excavation - Weekday $80 Cremation Grave Excavation - Weekend $105 Grave Purchasing Fee: Full Grave (4'x 12') Flush Marker Area Full Grave (4'x12') Raised Marker Area Infant Grave (2'x6') Cremation Grave (4'x4') Grave Stalling Fee (monument or excavation): Grave Transfer Fee: Memorial Plaque (Bronze) Stone: Opening and closing of Niche: Perpetual Care Fee: New Grave Sales Grave Sold Pre -1960 Resident Non - Resident $800 $1,000 $900 $1,100 $200 $200 $400 $500 $50 $25 Cost plus tax $50 Included in grave price (Maint. not taxable - Plant Care taxable) $100 Monticello Fee Schedule - 2013 - 1 COMMUNITY CENTER Membership Fees: Resident Regular Daily Pass Regular Rate Resident Rate Junior /Senior $6 $5 Adult $7 $6 Family $26 $20 *Climbing wall is not included with Daily Pass. River Room $11 Group Rates $9 Warehouse Room - Weekday Adult $4.50 $5 Junior /Senior $3.50 $4 3 Month Membership Mississippi Room: Private Resident Junior /Senior $88 $72 Adult $121 $99 Dual Senir $143 $116 Family $176 $154 Annual Membership (Paid in full Options) Organization (2 hour minimum - reserve within 3 months of event) Junior /Senior $264 $198 Adult $341 $264 Dual Senior $425 $319 Family $468 $385 Continuous Membership (Monthly * *Paytnent Option) Junior/Senior $25 $19 Adult $33 $28 Dual Senior $40 $31 Family $44 $39 * *Automatic Withdrawal. Cancellation fee applies within 12 months, Childcare - option with Membership $5/month for each child Unlimited Fitness Classes, option with Membership $10 /month per person Special passes are available for Splash Park, Climbing Wall, Gym, Indoor Play, Childcare, and Ice Arena - contact Community Center for rates Contact Community Center for rates on Birthday Parties, Swim Lessons, and Corporate Memberships Hourly Room Rental Rates (2 hour minimum required): Resident Regular Non -Profit Boom Island Room $14 $16 $13 Bridge Room (full) $22 $26 $19 N. or S. Bridge Room $13 $15 $11 River Room $11 $14 $9 Warehouse Room - Weekday $25 $30 $19 Warehouse Room - Weekend $30 $36 $25 Mississippi Room: Private Resident Private Regular Business Resident Business Regular Half Room Rental $47 $57 $36 $52 Full Room Rental $66 $80 $55 $73 Rental event with alcohol (not weddings): Resident Regular Organization (2 hour minimum - reserve within 3 months of event) $138 pot hour $151 per hour $127 per hour Gymnasium Rental Rates Gym - prime time $53/hour Gym - non prime time $36 /hour Full Kitchen $83 flat fee Energy Fee $75 flat fee Damage Deposit 1/2 of rental fees Early set up fee $52 /hour Hostess Fee: $22 /hour Locker fees: $5 /month per locker Park Rental Rates: Resident Non- Resident Ellison Gazebo $100 $125 Ellison Log Shelter $100 for 6 has $125 for 61trs West Bridge Park Shelter /Warming House $100 for 6 brs $125 for 61us West Bridge Picnic Shelter $100 for 6Ins $125 for 6 ]its Pioneer Park $100 for 6lus $125 for 61us Groveland Park Picnic Shelter $100 for 6 his $125 for 6 tus Otter Creek $50 for 6 ]us $75 for 6 his East Bridge Wedding Gazebo $100 for 6 bra $125 for 6 tons Monticello Fee Schedule - 2013 COMMUNITY DEVELOPMENT - BUILDING County Assessor Fees: Building Valuation $499,999 or less Building Valuation $500,000 or more Building Inspection (non - permit related): Building Permit Fees: Building Permit Surcharge: Contractor License Check Fee: Building Pennit/Records - Duplicate Blight Processing Fee Demolition Permit: $25 $100 $50 /hour 106% of 1997 State recotmnended schedule use state - mandated fee $25 $50 /hour $50 (per parcel) 106% of 1997 State recommended schedule Pennit is issued under a building permit (follow same procedures as issuing a building permit). Prior to demolition pennit issuance verify with Public Works. Contractor must arrange disconnection: 1) Sanitaty sewer; 2) City water & retrieve water mater and 3) approve routing for trucks and heavy equipment, (if applicable). Excavation permit may also be required. Fire Alarm/Fire Sprinkler System Mechanical Permits: Residential Commercial Mechanical Surcharge Mobile Home Permit Moving Buildings: Plan Review: Plumbing Permits: Residential Commercial Plumbing Surcharge: Rental Housing License Fee: Rental Housing License Applicution/Lam Fee: Rental Housing License Transfer Fee: Sign Permits: Permanent Sign Permits: Temporary State Surcharge on Building Permits: Valuation of Structure $1,000,000 or less $1,000,000 to $2,000,000 $2,000,000 to $3,000,000 $3,000,000 to $4,000,000 $4,000,000 to $5,000,000 Greater than $5,000,000 Utility Locate Fee: Residential CommerciaFlndustrial COMMUNITY DEVELOPMENT - PLANNING /ZONING Administrative Zoning Permits Conditional Use Permit Monticello Fee Schedule - 2013 106% of 1997 State Recommended Schedule $45 base + $9/fixture 1,25% of valuation+ state surcharge, minimum $100 + state surcharge .0005 X valuation; minimum $5 (state mandated) $95 $150 + expense + demolition permit 65% of building permit fee $45 base +$9 /fixturet'Fl,m�e ^m6W.uen@mge. traps, okt,, M., d, u., 6n, A.o ) 1.25% of valuation + state surcharge, miminum $100 + state surcharge .0005 X valuation; minimum $5 (state mandated) $45 /per building + $15 for each dwelling unit within the building Double the standard license fee $35 $50 for first $1,000 of value (inimmun fee $50) $10 each additional $1,000 of value $35 Addition or Alteration Surcharge Cmnnutation .0005 x valuation; minimum $5 (state mandated) $500 +.0004 x (Value - $1,000,000) $900 +.0003 x (Value- $2,000,000) $1200 +.0002 x (Value - $3,000,000) $1400 +.0001 x (Value - $4,000,000) $1500 +.00005 x (Value - $5,000,000) $40 $55 $50 $200 + Escrow (per chart) Escrow Chart - Land Use Application Plan Review Special Home Occupation Pennits: Interim Use Penit: Labor (for Community Development/Projects): Plainer Engineer Construction Inspector Park Dedication (residential) Parking Fund (CCD District) Plat Subdivisions: Planned Unit Developments (PUDs): Rezoning Request: Temporary Use Permit Simple Subdivision Site Plan Review Special Planning Commission Meeting Street Vacation: Variance: Single Family - Aplication Fee - Deposit All Other Applications - Application Fee - Deposit Commeremt $50 + escrow (per chart) $200 + escrow (per chart) 0 -3 acres 1$2,000 _ _ 1 unit $500 (single family) 4 -10 acres $6,000 2 +units $1000 base $100 per unit 111+ acres $70,000 $200 + Escrow (per chart) $200 +Escrow (per chart) $142/hour $142/hour(maximum) $102/hour (maximum) An amount of land equal to eleven percent (I 1 %) of the total gross land area of the plat shall be presumptively defined as "reasonably conmrensurate." In the event that the subdivider objects to the eleven percent (11 %) standard, the City shall, at the developer's request and expense, conduct a specific dedication study of the park system and the demand placed on the system by the proposed plat. Cash -in -Lieu: $1,704 of cash payment per gross acre of development area $4,500 per stall $200 +Escrow (per chart) $200 + Escrow (per chart) $50 $200 + Escrow (per chart) $200 + Escrow (per chat) $350 $200 + Escrow (per chart) $200 $500 $200 $1,000 NOTE: when multiple land use applications are run concurrently, only one application fee and escrow deposit shall be required per meeting cycle. ENGINEERING Driveway Permit $25 Monticello Fee Schedule - 2013 4 $50 + escrow (per chart) $200 + escrow (per chart) g d$50 $200+ escrow(per chart) + escrow (per chart) $200 + Escrow (per chart) $50 $200 + Escrow (per chart) $200 + Escrow (per chat) $350 $200 + Escrow (per chart) $200 $500 $200 $1,000 NOTE: when multiple land use applications are run concurrently, only one application fee and escrow deposit shall be required per meeting cycle. ENGINEERING Driveway Permit $25 Monticello Fee Schedule - 2013 4 Grading Permit: Existing Single - Family Residential New Single - Family Residential Development, Multi- Dwelling, Commercial & Industrial Properties Land Reclamation/Mining Permit (requires subdivision development agreement or CUP) Right -of -Way Permits Drops - no drawing required unless origination occurs more than 10 feet from property to be served: Fee w /out drawings Fee with drawings Permit Extension Fee: Pavement Hole Fee: Trunk Line Fee: Base Fee (first 100 feet) Trenching (over 100 feet) Boring (over 100 feet) Obstruction Fee: FIBERNET $75 per permit+ $1,500 /acre restoration surety bond. No drainage calculation review required: $150 per permit plus restoration surety bond of $3000 /first acre; $1500 each additional acre. Drainage calculation review required: $350 per permit plus restoration surety bond of $3000 /first acre; $1500 each additional acre. Fee determined by City Council resolution + 100% of land restoration costs as determined by City Engineer $25/25 addresses (maximum) $25/5 addresses with drawings (maximum) $17.50 $50 $40 $.10 /lineal foot $.05 /lineal foot $40 Emergency Response: Fiber cuts; customer - initiated emergency service $70/hour plus expenses (supplies, equipment rental, outside contractors, etc.) *minimum of 30 minutes, charged in 30 minute increments NOTE: Contact FiberNet Business Office or website for current rates for internet, phone and cable TV. FIRE DEPARTMENT Controlled/Prescribed Bums: Building Prairie or Wildland, less than 20 acres Prairie or Wildland, 20 acres or more Emergency Response - Car Accident FalseAlann Policy* - First Time Second Time Third Time or More * Per calendar year Fire Lock Box Fee: LICENSES /PERMITS Burning Permit: (to cover expenses, if PW/Fire Dept are called to burn site) Cigarette License: Utility Excavation Permit Fee (water, wastewater, stor awater) (Bonding and Insurance required) Gambling License: Liquor Administrative Fines: First violation Second violation, within 2 years Third violation, within 2 years Monticello Fee Schedule - 2013 $2,500 $7504rour $1,000 /hour $500 No charge $250 $350 Cost +sales tax (current cost = $171) $250 deposit Tobacco licenses are issued by Wright County $50 Licensed through State of Minnesota; Requires Council approval $750 $1,000 Maximum monetary fine allowed by state statute Liquor Licenses: I -Day Consumption & Display Temporary On -Sale (Beer) Wine, On -Sale Wine/Strong Beer Comb, On -Sale Wine/3.2 Beer Coin. On -Sale 3.2 Beer, On -Sale 3.2 Beer, Off -Sale Liquor, On -Sale Liquor, Sunday Sales Liquor, Setups Liquor,Club (Veteran's Org). Membership 200 or less 201 -500 501 -1000 1001 -2000 2001 -4000 Over 4000 Pawn Shop: Annual license, initial Annual renewal of current license Transaction fee Peddler /Solicitor Permit: Transient Merchant: Annual permit, private premise Daily Fees, operating under annual permit Daily fees, independent merchant Daily fees, farm/garden fruits & vegetables Fireworks Sale Traveling Shows MISCELLANEOUS ITEMS Assessment/Propetty Search - full Property Bill Search - limited Business List Brochures: City resident list(Ufility Billing List) 0 -10 pages City Labels Comprehensive Guide Plan -Entire Downtown Revitalization Plan Transportation Plan Copies: copy machine engineering copier emailed electronic media Delinquent Certification Processing Fee: Minimum Account Balance of $50 Processed once a year Delinquent List Deposits on City Repair Projects Monticello Fee Schedule - 2013 $25 $10 /day $275 /per year $1,200 /per year $500 /per year $275 /year $100 /per year $3,750 /per year $200 (Statutory limit) $250 /year $300 (Statutory limit) $500 (Statutory limit) $650 (Statutory limit) $800 (Statutory ]limit) $1,000 (Statutory limit) $2,000 (Statutory limit) $50 $25 $1.00 per transaction No charge - City resident/business (must register) $10 /person - Non - resident $75/year + $3.50 application fee $10 /day $50/day + $3.50 application fee No fee from 6/15 to 9/15 (state mandated) $350 /year $100 /first day; $50 /day for each day thereafter $25 Free Free Free $0.25/page + sales tax $.50 /sheet +sales tax $32 plus tax $15 plus tax $50 plus tax $.25 per copy + sales tax $.50 /square foot+ sales tax ($2 minimum) $35.00 /hour + sales tax (ntinimum 1/4 hour) $10.00 + cost of media + sales tax $75 per parcel $10 + tax (each) $100 4300 (depending on est. value of work) Maps: City map (24" X 36 ") City map (11" X 17') Zoning map (24" X 36 ") State maps Wright County maps Memorials: Bench Tree Notary: Signs: $3 + sales tax $1 +sales tax $3 + sales tax $.55 + sales tax $3 + sales tax $1,500 /Bench (tax included) $300 /Tree (tax included) $2 Current listed price + 10% handling charge+ tax THE FOLLOWING ITEMS CAN ALSO BE DOWNLOADED FROM CITY WEB SITE: www.6monticello.mn.us City Ordinances: Entire set of ordinances Zoning Ordinance Subdivision Ordinance City Code Sanitary Sewer Assessment Policy City Maps Meeting Agendas/Minutes To obtain paper copies, contact City Hall. Charges based on prices listed under "Copies." Boulevard Disease Tree Removal If City is contracted for tree removal, the City will pay 1/2 the cost of removal up to $225 per tree, with resident responsible for the balance. Boulevard Replacement Tree at 1/2 cost $30 maximum credit each Chipping: $40 + tax per 1/2 hour or part thereof for the first 2 hours $70 + tax per 1/2 hour or part thereof for the next hour No more than 3 hours per year per property Cone Replacement: Cost +sales tax Construction Inspection (City or Engineer) $80 /hour Labor (no equipment): $35.00 /hour - regular business hours Rate will be increased if response required outside of regular hours Redding: $230 /hour for one operator & machine $115 /hour or part thereof for 2 operators, machine and pickup Sidewalk Snow & Ice Control $35.00 per lot- 1st Offence $50.00 per lot - 2nd Offence $75.00 per lot maximum after 2nd Offence $75.00 Mobilization Charge per Offence at Staff Discretion Sweeping: $125 /hour - includes operator Vac /Sewer Jet: $287.50/hour for one operator & machine $345 /hour for two operators & machine Other Equipment (including operator): Large Front End Loaders $125 /hour Mid Size Loaders $75 /hour Backhoe Loader $125 /hour Motor Grader $ l25 /hour Skid Steere $75/hour Dump Truck $75 /hour Pickup or 1 -ton Truck $35/bour Monticello Fee Schedule - 2013 Sewer Rates: 1 at 3740 gallons Over 3740 gallons Sewer Rates: Special Cases (Snowbirds /Others - unoccupied tat quarter) Industrial Sewer Rates: All Usage BODS: TSS: Testing Sewer Discharge Envicomnental Pee: All Sewer Customers Sewer Connection Permit: Sewer and Water Combination Permit: Sewer Access Charge: Residential - Single Family All others per unit equivalent Trunk Sanitary Sewer: Residential Unit Non - Residential Waste Water Discharge Permit: 10,000 to 15,OOO GPD 15,001 to 25,000 GPD 25,001 to 50,000 GPD 50,001 to 100,000 GPD over 100,000 GPD 61t1[/1ti& Trunk Storm Sewer Fees: Alternate Pending Area - Residential Alternate Pending Area - Co rmaereial Alternate Pending Area - Industrial Garbage Service Fees - Apts: w/o dumpsters Pickup Disposal Disposal Surcharge $20.65 minimum $3.7000/748 gallons $24.65 X number of people in household Winter Consumption Rate will be based on 10,472 gallons per quarter $2.2200/748 gallons +sales tax 0.320/lb. +sales tax 0.440 /lb. +sales tax Actual costs+ 10% 2% of sewer bill $75 (residential or commercial) $127 (residential) $127 plus tax (commercial) $4,030 /Unit $4,030/Ilnit $1,223 /unit $3,065 /per acre $50 annually $100 annually $150 annually $250 annually $300 annually $3,245 (net acre) $3,490 per acre $6,997 per acre $8,176 per acre $18.90 x # units + 9.75% tax/per quarter $3.48 x # units (non - taxable) per quarter Garbage Service Fees - Commercial Residential & Non - Commercial Residential 60 gallon: Pickup Disposal $15.93 x # units+ 9.75% tax per quarter Disposal Surcharge $2.31 x # units (non- taxable) per quarter Garbage Cart $3.29 x # units (met. 9.75% tax) per quarter 90 gallon: Pickup Disposal $18.90 x # units + 9.75% tax per quarter Disposal Surcharge $3.48 x # units (non - taxable) per quarter Garbage Cart $4.12 x # units (met. 9.75% tax) per quarter Cart Transfer Fee $30 Garbage Cart Replacement (if lost) 38 gallon $59.06 + 9.75% tax 60 gallon $65.31 + 9.75% tax 90 gallon $70.75 + 9.75% tax Recycle Cart Replacement (if lost); 35 gallon $60 64 gallon $65 Monticello Fee Schedule - 2013 Qo be nddresserl !rslm9 (!a beaddresredWe,) Storage Bins (red, yellow, blue) WATER $10 includes sales tax (until sold out) Hydrant Rates for Contractors: $17.00 minimum ( #1, #2 and #3 ARE ALL TAXABLE IF COMMERCIAL) 3741- 29,920 gallons I. All contractors must obtain a permit from the Water Superintendent. The permit fee is $500. This permit will define the hydrant to be used and provides a tally sheet for water usage. 2. The Following rates shall apply: $1.31/748 gallons Up to 500 cu. ft. or 3,750 gallons $28.00 minimum 500 cu. ft, or more $2.75 per cubic foot 3,750 gallons or more $3.63 per 1,000 gallons 3. The following deposits shall be taken for use of City equipment (no exceptions): Hydrant Wrench $30.00 2 -1/2" fill hose $100.00 1 -1 /2" fill hose with 2 -1/2" adapter $100.00 2 -1/2" hydrant meter $1,000.00 3/4" and small meter $100.00 Nozzle $50.00 *If equipment is returned within 10 days of permit expiration in good condition, the full amount for water use and equipment, less 10% per month on portion thereof for rent, shall be refunded. Trunk Water Charge: $907 per residential unit $2,267 per acre non - residential Res /Comm Water: 0 -3740 gallons $17.00 minimum 3741 - 29,920 gallons $1.13/748 gallons 29,921 - 100,000 gallons $1.31/748 gallons over 100,000 gallons $1.43/748 gallons Minimum Bill for Malfunctioning Meter $150 after 4th contact attempt. Industrial Water Rate, Mtr 1 All usage $1.35/748 gallons +sales tax Irrigation Water Rate - Resid, Twnlmns & Comm first 3740 gallons $17.00 minimum + sales tax 3741- 29,920 gallons $1.13/748 gallons + sales tax 29,921- 100,000 gallons $1.31/748 gallons + sales tax over 100,000 gallons $1.43/748 gallons +sales tax (if metered separately on commercial properties, no mirnimum base rate is applied) Water Shut Off, then Turned On: Water Connection Pernik Water Access Charge: 1 " line I -1/4" line 1 -1/2" line 2" line 3" line 4" line 6" line 8" line Water Main Tapping - New Services (1" only) Water Meters: 5/8" meter 3/4" meter 1" meter 1 1 /2" meter 2" meter + up 1 "x3/4" meter valves 1 "xl" meter valves Monticello Fee Schedule - 2013 $50.00 ($25 on/$25off) +delinquency (taxable if non -res.) $65 (residential) $65 plus tax (commercial) $801 +materials $1,217 +materials $1,460 + materials $1,920 + materials $2,402 + materials $3,164 + materials $3,984 + materials $5,231 +materials $250 each + materials $325 + sales tax $360 + sales tax $430 + sales tax $705 + sales tax Cost+ $50 + sales tax $45 + sales tax $50 + sales tax Water Availability Charge: (For those who have city water available but choose not to hook up) Water Violations (sprinkling): 1st Violation 2nd Violation Each Subsequent Violation $38.25 (billed in July) No Fee $50 $100 /per violation Monticello Fee Schedule - 2013 10