City Council Resolution 2015-62CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2015-062
APPROVING A FINAL STAGE PLANNED UNIT DEVELOPMENT ADJUSTMENT
FOR SWAN RIVER AND AMENDMENT TO DEVELOPMENT CONTRACT FOR
SWAN RIVER CHARTER SCHOOL PLANNED UNIT DEVELOPMENT
WHEREAS, the City of Monticello has adopted a zoning ordinance providing for the
regulation of planned unit development; and
WHEREAS, the applicant has requested an adjustment to planned unit development to allow for
a modification to the approved site plan to allow a mid -block crossing at Maple Street between
5th and 5 %2 Streets; and
WHEREAS, the City Council of the City of Monticello finds that the adjustment to PUD is
consistent with the City's goals for planned unit development goals for the Swan River
Charter School; and
WHEREAS, the City Council finds that the mid -block crossing is appropriate in this location and
circumstance given the low traffic volume present during school day; that there is a private and
common use of property on both sides of crossing, that the PUD will provide for the utilization of
crossing guards and other physical and operational protections, and a public crossing is
maintained,
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of
Monticello, Minnesota hereby approves the adjustment to Planned Unit Development for
Swan River Charter School, subject to the following conditions:
a) The developer shall remove existing bump out on east side of Maple Street.
Designate bus loading and un- loading along 5 1/2 Street or in the back of the
school to separate the buses from vehicle drop offs and pick -ups. This would
provide a safer crossing condition than leaving the bump -out in place.
b) The developer and Swan River Charter School shall provide and utilize an in-
street portable pedestrian crossing marker, similar to Walnut Street/5 %2 Street
crosswalk.
c) The developer and Swan River Charter School shall Drovide for school
crossing guards between 9am to 3:20 pm at all times when students cross.
d) The developer and Swan River Charter School shall provide a flagger at the
intersection of 5 %2 and Maple to warn northbound vehicles of mid -block
crossing.
e) The developer shall provide a colored thermoplastic crosswalk similar to the
Walnut Street/5 %2 Street crosswalk.
f) The developer shall mark the crosswalk with a blinking push -button sign
visible to both directions of Maple Street traffic and advanced crosswalk
signage is placed that meets the requirements of the City Engineer.
g) The developer provide a revised Final Stage PUD plan reflecting site plan
modifications for the mid -block crossing.
ADOPTED BY the Monticello City Council this 10th day of August, 2015.
CITY OF MONTICELLO
Jr: ian Stump , yor
ATTEST:
csvt�
Jeff O' e' ity Administrator