City Council Resolution 2005-21BCITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2005-2110
SETTING PUBLIC HEARING DATE
2005 CORE STREET RECONSTRUCTION
PROJECT NO. 2005 -IC
WHEREAS, a report has been prepared by WSB and Associates, Inc. with reference to the Core
Street Reconstruction Project calling for the improvement of the following streets: Hillcrest
Circle, Matthew Circle, Oak View Circle, Craig Lane, Kenneth Lane, Riverside Circle, Chestnut
Avenue from CSAH 75 to River Street, River Street from CSAH 75 to Chestnut Avenue,
Hillcrest Road, Hilltop Drive, Sandy Lane from CSAH 75 to Willow Street, Otter Creek Road
and Willow Street by the reconstruction of the existing roadway surface, curb and gutter repair as
needed, new curb and gutter in area without curb and gutter, storm sewer improvements and
other appurtenant work, and this report was received by the City Council on December 13, 2004;
WHEREAS, the Council directed that the engineer make revisions to the scope of the project and
NO W THEREFORE, BE IT RESOL VED B Y THE CITY CO UNCIL OF MONTICELL O,
MINNESOTA:
1. The Council will consider the improvement of such streets in accordance with the report
and the assessment of abutting property for all or a portion of the cost of the improvement
pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost of the
improvement of $1,207,754.
2. A public hearing shall be held on such proposed improvement on the 28th day of March,
2005 in the Council Chambers of City Hall at 7 p.m. and the City Clerk shall give mailed
and published notice of such hearing and improvement as required by law.
Adopted by the Monticello City Council this 28th day of February, 2005.
ATTEST:
fs.c:-tel
Rick Wolfsteller, Ci Administrator
Clint Herbst, Mayor