Loading...
City Council Resolution 2003-7ACITY OF MONTICELLO RESOLUTION NO. 2003-7A RESOLUTION ORDERING FEASIBILITY REPORT PROJECT NO. 2002-14C CORE STREET RECONSTRUCTION PHASE I WHEREAS, it is proposed to implement a program to reconstruct streets within the City of Monticello and to designate an area encompassing Phase I of the improvement program which would include the area south of Broadway (CSAR 75) to 7" Street between Chestnut Street and Pine Street (TH 25) by the reconstruction of existing street surface, installation of curb and gutter where necessary, utility replacement where necessary and all other appurtenant work, and to assess the benefitted property for all or a portion of the cost of the improvement, pursuant to Minnesota Statutes, Chapter 429 NOW THEREFORE, BE IT RESOL VED BY THE CITY COUNCIL OF THE CITY OF MONTICELLO, MINNESOTA: That the proposed improvement be referred to WSB & Associates for study and that they are instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvement is necessary, cost-effective, and feasible and as to whether it should best be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Adopted by the Monticello City Council this 10`" day of February, 2003. ATTEST: Z4 (jj/P7 - Rick Wolfsteller, City &ministrator Bruce Thielen, Mayor