Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
City Council Resolution 2001-25CITY OF MONTICELLO
RESOLUTION NO. 2001-25
RESOLUTION ORDERING IMPROVEMENT AND
PREPARATION OF PLANS
WALNUT STREET CORRIDOR IMPROVEMENTS
PROJECT NO. 2000-17C
WHEREAS., a resolution of the City Council adopted the 12"' day of March, 2001 fixed a date for a
council hearing on the proposed improvement to a nine block area bounded on the north by 4" Street,
on the south by 7t' Street, on the east by TH 25 and on the west by Walnut Street by the installation of
concrete sidewalks, bituminous pathway, street lighting, boulevard improvements and other
appurtenant work, and
WHEREAS, ten days mailed notice and two weeks published notice of the hearing was given, and the
hearing was held thereon on the 23rd day of April, 2001, at which all persons desiring to be heard
were given an opportunity to be heard thereon,
NOW THEREFORE, BE IT RESOL VED BY THE COUNCIL OF THE CITY OF MONTICELLO,
MINNESOTA
Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility
report.
2. Such improvement is hereby ordered as proposed in the council resolution adopted March 12,
2001.
3. WSB & Associates, Inc. is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such improvement.
4. The city council declares its official intent to reimburse itself for the costs of the improvement
from the proceeds of the tax exempt bond.
Adopted by the Monticello City Council this 23rd day of April, 2001.
ATTEST:
Rick Wolfsteller, City Ad inistrator