City Council Resolution 2001-35CITY OF MONTICELLO
RESOLUTION NO. 2001-35
RESOLUTION ORDERING IMPROVEMENT AND PREPARATION OF PLANS
CEDAR STREET IMPROVEMENTS
PROJECT NO. 2000-18C
WHEREAS, a resolution of the Monticello City Council adopted 23rd day of April, 2001, fixed a date
for a council hearing on the proposed improvement of Cedar Street between Dundas Road and
Oakwood Drive by the redesign and installation of street improvements, sidewalk, pathway,
realigning of existing water main, storm sewer and other appurtenant work, and
WHEREAS, ten days mailed notice and two weeks published notice of the hearing was given and the
hearing was held thereon on the 14" day of May, 2001 at which all persons desiring to be heard were
given an opportunity to be heard thereon.
NOW THEREFORE, BE IT HEREBY RESOL VED BY THE COUNCIL OF THE CITY OF
MONTICELLO, MINNESOTA.-
Such
INNESOTA:
Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility
report.
2. Such improvement is hereby ordered with the scope of the project being reduced to improve
Cedar Street from Chelsea Road to Oakwood Drive.
3. WSB & Associates, Inc. is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such improvement.
4. The City Council declares its official intent to reimburse itself for the costs of the
improvement from the proceeds of the tax exempt bond.
Adopted by the Monticello City Council this 14th day of May, 2001.
5
•, .elsaas,Mayor
ATTEST:
Rick Wolfsteller, CVy Administrator