Loading...
Library Board Minutes 07-22-1981 . . . MINUTES MONTICELLO LIBRARY BOARD Wednesday, July 22, 1981 - 6:30 P.M. Members Present: Loren Klein, Donald Maus, Pat Schwarz, Irwin Kallin, Joel Erickson, Marge Bauer Members Absent: None Also Present: Mona carmack, Tedine Roas, Luther Rotto, all from the Great River Library System and Merrill Birch. 1. Luther Ratto, Media Services Coordinator, Great River Regional Library, reviewed the audio-visual considerations for the new library. The build- ing should be designed to accomodate audio-visual materials and services offered now or projected in the years ahead. Flexibility will be needed to accomodate new materials and equipment. The building should be such that electrical sockets are readily available throughout, including some floor sockets which will be capped until needed. Conduit for closed circuit or cable television should be installed or easily installed later. Merrill Birch assured the board after a review of each specific area that the building is equipped as per Luther's letter of January 28, 1981 ex- cept for one floor outlet not originally planned for. Merrill will get a price on this. Also in question is the location of the congregation of cabling and the connection panel. At present, this area is located in the mechanical room. Luther feels that this should be changed to an area near the main desk so that the TV signal can be easily routed within the building by the staff. He will look into this further and advise us as to what is needed to accomplish this. 2. originally, the Library Project Committee was informed (1-26-81) that the existing shelving may have to be refinished but could be used in the new building. The original estimate for interior furnishings was $30,000. Merrill Birch now feels that shelving will not work and standard inter- changeable modules would be better. The cost would be approximately $36,000 for all wood shelving, $30,000 for combination wood-metal shelv- ing and $27,000 for metal shelving. It was decided to purchase the com- bination wood-metal shelving. It was also decided to purchase 75% of the presently recommended shelving now and the remaining 25% at a later date. Mona, Tedine and Marge will meet to decide which shelving can be ommitted at this time.* 3. It was suggested by Merrill Birch that work begin on selecting materials for the interior. Two members of the board should be appointed to work with Merrill to make a selection and an alternate. This should be accomplished within the month for presentation to the board at the next meeting.** . Library Board Minutes - 7/22/81 * Meeting of Thursday, July 27, 1981, we were able to reduce of shelving to be purchased initially by approximately Some wall shelving will be eliminated until a later date. three of the four existing larger units will be refinished used in one area. The existing smaller units will be used in the work room. the amount 45%. Also, and **Marge Bauer and Pat Schwarz were appointed and met with Merrill Birch on Wednesday, July 26, 1981. This meeting was very unpro- ductive because of the lack of adequate samples to chose from. Meeting adjourned. A lM~/ di?/./.RAJ Marge Bau r, Secretary . .