Loading...
City Council Resolution 1995-37RESOLUTION 95-37 RESOLUTION ORDERING PREPARATION OF REPORT ON REALIGNMENT OF AND IMPROVEMENTS TO ROADWAY ALONG THE HIGHWAY 25 CORRIDOR BETWEEN I-94 AND SCHOOL BOULEVARD WHEREAS, the existing road system serving the Highway 25 corridor between School Boulevard and I-94 may be insufficient to adequately support existing and future traffic demands; and WHEREAS, a need exists to acquire land associated with roadway realignments on a timely and efficient basis; and WHEREAS, land acquisition cannot occur until realignment locations are identified; and WHEREAS, the City of Monticello proposes to realign and improve road systems along and near the Highway 25 corridor between I-94 and School Boulevard and to assess the benefited property for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Chapter 429. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF MONTICELLO, MINNESOTA: That the proposed improvement be referred to Bret Weiss of Orr-Schelen-Mayeron & Associates for study and that he is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvement is feasible and as to whether it should best be made as proposed or in connection with some other improvement, and the estimated cost of the improvement as recommended. Adopted by the City Council this 22nd day of May, 1995. City Administrato