City Council Resolution 1995-53'telRESOLUTION 96-58 ��
RESOLUTION ACCEPTING WASTEWATER FACILITIES �
PLANNING REPORT
WHEREAS, the City of Monticello has determined the need for an expansion of its
wastewater treatment facilities because of increasing growth being experienced in
the community, and
WHEREAS, a Wastewater Facilities Planning Report and associated amendments
thereto have been prepared outlining treatment process alternatives for future
expansion, and
WHEREAS, the City of Monticello has conducted a public hearing on acceptance of
the planning report and amendments on September 11, 1995, and continued onto
September 25, 1995, following publication of the required notice, and
WHEREAS, the Facilities Plan and amendments recommended the construction of
a new facility capable of treating 2.04 million gallons per day by either an oxidation
ditch process at an estimated cost of $10,293,000 or a sequencing batch reactor
(SBR) process at an estimated cost of $9,770,000.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF MONTICELLO, MINNESOTA:
1. That because of the lower estimated construction cost and the smaller space
requirements of building an SBR treatment process, the Facilities Plan and
associated amendments are hereby accepted as presented with the SBR
treatment alternative selected as the process method.
2. The Facilities Plan Report and amendments with the SBR recommendation
are hereby authorized to be submitted to the Minnesota Pollution Control
Agency for review and certification.
3. The City staff and consulting engineer are hereby authorized to begin
preparation of an application for obtaining loan proceeds through the Public
Facilities Authority for financing of the treatment facility expansion.
Passed by the City Council this 25th day o
/ ,,