City Council Resolution 1994-07RESOLUTION 94-7
RESOLUTION ORDERING PREPARATION OF
FEASIBILITY STUDY AND ORDERING PREPARATION
OF PLANS AND SPECIFICATIONS
WHEREAS, it is proposed to improve Phase IV of the Cardinal Hills residential
subdivision and to assess the benefited property for all or a portion of the cost of
the improvement, pursuant to Minnesota Statutes, Chapter 429; and
WHEREAS, the developer is willing to provide the cost to prepare plans and
specifications prior to Council acceptance of the feasibility study.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
MONTICELLO, MINNESOTA:
1. That the proposed improvement be referred to Bret Weiss, City Engineer,
for study and that he is instructed to report to the Council with all
convenient speed advising the Council in a preliminary way as to whether
the proposed improvement is feasible and as to whether it should best be
made as proposed or in connection with some other improvement, and the
estimated cost of the improvement as recommended; and
2. Bret Weiss, City Engineer, is hereby designated as the engineer for this
improvement. He shall prepare plans and specifications for the making of
such improvement subject to the developer providing a $25,000 deposit
covering the cost of preparation of plans and specifications.
Adopted by the Council this 28th day of February, 1994.
C�
City Administrat