City Council Ordinance 279ORDINANCE AMENDMENT NO. 279
THE CITY COUNCIL OF MONTICELLO, MINNESOTA, HEREBY ORDAINS
THAT TITLE 10, CHAPTER 3, SECTION 2[E] OF THE MONTICELLO CITY
CODE, KNOWN AS THE ZONING ORDINANCE, PERTAINING TO
DRAINAGE PLAN REQUIREMENTS, BE AMENDED TO READ AS
FOLLOWS:
[E] DRAINAGE PLANS: In the case of all apartment, business, and industrial
developments, a minimum of 3 sets of drainage plans shall be submitted to
the City Engineer for review, and the final drainage plans shall be subject to
written approval.
Except as otherwise approved by the City Engineer and/or Building Official
and upon demonstration of positive drainage, all dwellings and commercial
and industrial buildings shall be constructed such that the ground elevation
at the building site will be a minimum of twelve (12) inches above finished
street elevation at the building access point. The exact elevation will be
determined by the Building Official.
All garages and parking facilities shall be situated such that there will be
direct and positive drainage to the street access at finished grade elevation.
All elevations shall be established prior to issuance of a building permit.
Occupancy shall not be granted until the builder certifies conformance with
the grading plan for the lot.
The developer shall have a registered land surveyor or engineer certify that
the development has been rough graded to within tolerance limits according
to the grading plan.
r
Adopted by the City Council this 10th day of June, 1
City Administrab
Published in the Times on 6/20/96.