City Council Agenda Packet 09-27-2010AGENDA
REGULAR MEETING – MONTICELLO CITY COUNCIL
Monday, September 27, 2010 – 7 p.m.
Mayor: Clint Herbst
Council Members: Tom Perrault, Glen Posusta, Brian Stumpf, Susie Wojchouski
1. Call to Order and Pledge of Allegiance
2A. Approval of Minutes – September 13, 2010 Regular Meeting
2B. Approval of Minutes – September 13, 2010 Special Meeting
3. Consideration of adding items to the agenda
4. Citizen comments, public service announcements and Council updates
a. Citizen Comments:
b. Public Service Announcements:
1) Business Expo (10/3)
2) Candidate Forums (10/6 & 10/18)
3) Leaf Pickup (11/13)
4) Coalition of Utility Cities (CUC) presentation
c. Staff Updates:
1) School Blvd Lighting Project
5. Consent Agenda:
A. Consideration of approving new hires and departures for City departments
B. Consideration of adopting Resolution #2010-59 to accept contribution from Tom
Perrault
C. Consideration of appointing two additional election judges for the 2010 elections
D. Consideration of establishing new monthly meeting date for FiberNet Advisory Board
E. Consideration of a request for a Conditional Use Permit for Open and Outdoor Storage
in an I-2 (Heavy Industrial) District Applicant: All Elements, Inc.
F. Consideration to approve an amendment to the 2010 City of Monticello Zoning Map
Applicant: City of Monticello
G. Consideration of adopting Resolution #2010-60 declaring costs to be assessed,
ordering preparation of assessment roll and calling for a public hearing on October 25
to adopt assessments for the 2010 Street Reconstruction, City Project No 10C001
H. Consideration of authorizing City staff to coordinate safety improvements at the
intersection of Cedar Street and Dundas Road
I. Consideration of accepting quotes and awarding contract for gathering GPS data
points for FiberNet Monticello
J. Consideration of approving an on-call policy for FiberNet Monticello technicians
K. Consideration of accepting quotes and approving contract for a roof replacement at the
control building for the water reservoir located at 207 Chelsea Road East
L. Consideration of approval to draw on Letters of Credit 399 and 400 from MinnWest
Bank securing Quad Development
6. Consideration of items removed from the consent agenda for discussion
7. Consideration of accepting a Live Wright grant award prepared and submitted by City staff
8. Consideration of approving quotes and authorizing caulking repairs to the Monticello
Community Center building
9. Added Items
10. Approve payment of bills for September 27th
11. Adjournment
CityCouncilAgenda:09/27/10
1
5A.ConsiderationofapprovingnewhiresanddeparturesforCitydepartments (TE)
A.REFERENCEANDBACKGROUND:
TheCouncilisaskedtoratifythehiringanddeparturesofemployeesthathaveoccurred
recentlyinthedepartmentslisted.ItisrecommendedthattheCouncilofficiallyratifythe
hiring/departureofalllistedemployeesincludingpart-timeandseasonalworkers.
A1.BudgetImpact:(positionsaregenerallyincludedinbudget)
A2.StaffWorkLoadImpact:Ifnewpositions,theremaybesometraining
involved.Ifterminatedpositions,existingstaffwouldpickupthosehours,as
needed,untilreplaced.
B.ALTERNATIVEACTIONS:
1.Motiontoratifythehire/departuresoftheemployeesasidentifiedontheattached
list.
2.Motiontodenytherecommendedhiresanddepartures.
C.RECOMMENDATION:
BystatutetheCityCouncilhastheauthoritytoapproveallhires/departures.Citystaff
recommendsAlternative#1,fortheCounciltoapprovethehiresand/ordeparturesas
listed.
D.SUPPORTINGDATA:
Listofnew/terminatedemployees
Name Title Department Hire Date Class
Brian Rousselow Fall/Winter Parks Worker Parks 9/20 Seasonal
Name Reason Department Last Day Class
NEW EMPLOYEES
TERMINATING EMPLOYEES
5A Council_employee list 2010 Revised: 9/23/2010
CityCouncilAgenda:09/27/10
1
5B.ConsiderationofadoptingResolution#2010-59toacceptcontributionfromTom
Perrault (CS)
A.REFERENCEANDBACKGROUND:
TomPerraultiscontributing$250forSeptembertogointotheGeneralFund.As
requiredbystatestatute,iftheCityacceptsthedonationoffunds,theCityCouncilneeds
toadoptaresolutionspecifyingtheamountofthedonationanditsuse.
A1.BudgetImpact:None
A2.StaffWorkloadImpact:Staffaccountsforandreconcilesdonationscontributed
throughtheCity.
B.ALTERNATIVEACTIONS:
1.Approvethecontributionsandauthorizeuseoffundsasspecified.
2.Donotapprovethecontributionsandreturnthefundstothedonors.
C.STAFFRECOMMENDATION:
Staffrecommendationistoadopttheresolutionacceptingthecontributions.
D.SUPPORTINGDATA:
ResolutionNo.2010-59
CityofMonticello
RESOLUTIONNO.2010-59
APPROVINGCONTRIBUTIONS
WHEREAS,theCityofMonticelloisgenerallyauthorizedtoaccept
contributionsofrealandpersonalpropertypursuanttoMinnesotaStatutesSections
465.03and465.04forthebenefitofitscitizensandisspecificallyauthorizedtomaintain
suchpropertyforthebenefitofitscitizensinaccordancewiththetermsprescribedbythe
donor.SaidgiftsmaybelimitedunderprovisionsofMNStatutesSection471.895.
WHEREAS,thefollowingpersonsandorentitieshaveofferedtocontribute
contributionsorgiftstotheCityaslisted:
DONOR/ENTITYDESCRIPTIONVALUE
TomPerraultCash$250
WHEREAS,allsaidcontributionsareintendedtoaidtheCityinestablishing
facilities,operationsorprogramswithinthecity’sjurisdictioneitheraloneorin
cooperationwithothers,asallowedbylaw;and
WHEREAS,theCityCouncilherebyfindsthatitisappropriatetoacceptthe
contributionsoffered.
NOWTHEREFOREBEITRESOLVED bytheCityCouncilofMonticelloas
follows:
1.ThecontributionsdescribedaboveareherebyacceptedbytheCityof
Monticello.
2.Thecontributionsdescribedabovewillbeusedasdesignatedbythe
donor.Thismayentailreimbursingorallocatingthemoneytoanother
entitythatwillutilizethefundsforthefollowingstatedpurpose:
DONOR/ENTITYRECIPIENTPURPOSE
TomPerraultCityofMonticelloGeneralfund(Sept)
AdoptedbytheCityCouncilofMonticellothis27thdayofSeptember,2010.
CITYOFMONTICELLO
______________________________
ClintHerbst,Mayor
ATTEST:
______________________________________
JeffO’Neill,CityAdministrator
City Council Agenda: 09/27/10
1
5C. Consideration of appointing two additional election judges for the 2010 elections (CS)
A. REFERENCE AND BACKGROUND:
City Council previously approved the appointment of a number of election judges to
serve at primary and general elections and with absentee voting. We received two more
applications from Monticello residents that are interested in serving as a judge and are
attending election judge training. We may need additional judges for the General
election and it is planned to utilize these two.
Council is asked to approve the following individuals to add to the roster of election
judges:
Diane Peters – 1120 Sandy Lane
Frank Opay – 100 Hillcrest Rd
A1. Budget Impact: Election judge compensation is included in the 2010 budget.
A2. Staff Workload Impact: None.
B. ALTERNATIVE ACTIONS:
1. Motion to appoint additional 2010 election judges as listed.
2. Motion to deny appointment of extra election judges.
C. STAFF RECOMMENDATION:
City staff recommends Alternative #1. These residents are interested in serving and have
already signed up to attend training on October 5th, making them good candidates for
election judges. They will be assigned shifts at the General election.
D. SUPPORTING DATA:
none
City Council Agenda: 09/27/10
1
5D. Consideration of establishing new monthly meeting date for the FiberNet Advisory
Board (DP)
A. REFERENCE AND BACKGROUND:
City Council is asked to approve a change in the regular monthly meeting date for the
FiberNet Advisory Board. Currently, they meet on the first Tuesday of each month. The
suggested change is to switch to the Tuesday immediately following the first Council meeting
of each month. The FiberNet Advisory Board did vote at the September 7th meeting to
recommend this change to the full City Council, with the change going into effect in
November.
A1. Budget Impact: none
A2. Staff Workload Impact: none
B. ALTERNATIVE ACTIONS:
1. Motion to set the regular monthly meeting date of the FiberNet Advisory Board as the
Tuesday immediately following the first Council meeting of each month, effective
November 2010.
2. Motion to deny making a change to the regular meeting date of the FiberNet Advisory
Board.
C. STAFF RECOMMENDATION:
City staff recommends Alternative #1. The proposed date works better with the schedules of
staff and advisory board members. The new meeting date would go into effect with the
October meeting, which would be November 9th at 6 p.m.
D. SUPPORTING DATA:
none
CityCouncilAgenda:09/27/10
1
5E.ConsiderationofarequestforaConditionalUsePermitforOpenandOutdoor
StorageinanI-2(HeavyIndustrial)DistrictApplicant:AllElements,Inc.(AS)
A.REFERENCEANDBACKGROUND:
AllElements,Inc.hasappliedforaConditionalUsePermitforOpenandOutdoor
Storagetoallowforthestorageofvehiclesintherearyardofthe1347DundasCircle
property.Thesubjectsiteisapproximately1.21acresinsizeandiszonedI-2,Heavy
Industrial.
ThePlanningCommissionheldapublichearingonthisrequestonSeptember7th,
2010.ThePlanningCommissiontooknopubliccommentontherequest,butdid
clarifythattheapplicantwouldbewillingtoprovideaproofofparkingplanin
ordertosatisfytheCuprequirements.Theapplicant’srepresentativealsoclarified
thataccesstothestorageareawouldbethroughagateadjacenttothepavedarea
onthenorthsideofthesite.Inacommentreceivedfromanadjacentproperty
ownerpriortotheCouncilmeeting,itwasrecommendedthattheapplicantutilize
thecrushedconcreteoracrushedgranitesurfacingratherthanClass5.(The
applicanthadspecifiedanintenttoutilizeeithercrushedconcreteorClass5.)This
conditionhasbeenaddedtoExhibitZ.
ANALYSIS
TheapplicantisrequestingaCUPforOpenandOutdoorStoragetoallowexterior
storageoftrailersandequipmentrelatedtotheirprimaryuseasaroofingcontracting
company.Theapplicantisproposingtofenceandsurfacetheirrearyardforthis
purpose,encompassingaspaceofapproximately10,400squarefeet.Basedonresearch
ofCityandCountyrecords,thereiscurrentlynoconditionalusepermitinplaceonthe
site.
Inadditiontotheoutdoorstoragearea,thesiteincludesaconcreteparking/loadingarea
onthenorthsideofthepropertyandabuildingapproximately10,503squarefeetinarea.
AccessisprovidedviaDundasCircleandfromDundasRoad.
ThepropertyisborderedinalldirectionsbypropertiescurrentlyzonedI-2.
ConditionalUsePermit.Openandoutdoorstorageispermittedasaconditionalusein
theI-2District,providedthat:
1.Theareaisfencedandscreenedfromviewofneighboringresidentialusesor,if
abuttingaresidentialdistrict,incompliancewithChapter3,Section2[G],ofthis
ordinance.
Comment:Thesitedoesnotabutanyresidentialusesorresidentiallyzoned
property.
CityCouncilAgenda:09/27/10
2
2.Storageisscreenedfromviewfromthepublicright-of-wayincompliancewith
Chapter3,Section2[G],ofthisordinance.
Comment:Thestorageareaisproposedtobesurroundedbyan8’steelfence,The
siteplanillustratesthatthefencelineisproposedtoplaceduptothepropertyline.
However,adrainageswaledoesexistontheproperty,andassuch,theCityEngineer
willneedtoapprovethefinalplacementofthefencerelativetothedrainageand
utilityeasementandthisswale.Additionally,theheightofthefencerequiresa
buildingpermittoverifystructuralintegrity.Theapplicant’snarrativenotesthatthe
fencewillbeconstructedofsteelsimilartotheexistingbuilding,andwillbeofa
similarcolor.
3.Storageareaisgrassedorsurfacedtocontroldust.
Comment:Thestorageareaisproposedtobesurfacedwithcrushedconcreteor
Class5,whichmeetstheintentofthisprovision.Inacommentreceivedfroman
adjacentpropertyownerpriortotheCouncilmeeting,itisrecommendedthatthe
applicantutilizethecrushedconcreteoracrushedgranitesurfacing.Theapplicant
mayneedtospraythesurfacingoccasionallyinthesummermonthstopreventexcess
dustwithfrequentvehiclemovement.
4.Alllightingshallbehoodedandsodirectedthatthelightsourceshallnotbevisible
fromthepublicright-of-wayorfromneighboringresidencesandshallbein
compliancewithChapter3,Section2[H],ofthisordinance.
Comment:Noadditionallightingisproposedforthesiteaspartoftheproject.Ifat
anytimeadditionallightingisproposed,saidlightingshallberequiredtocomply
withChapter3,Section2HoftheZoningOrdinance.
5.TheprovisionsofChapter22ofthisordinanceareconsideredandsatisfactorilymet.
Comment:Chapter22requiresthattheapplicantconformtothestandard
ConditionalUsePermitprocess.
ParkingandLoading.Theexistingbuildingincludesofficeandwarehouseuses.
Currently,thesiteincludes19totalstripedparkingspacesandanapproximately4,000
squarefootsurfacedareaonthenorthernportionofthesite.Thecurrentparking
requirementforofficeusesisthreespacesplusonespaceforeach200squarefeetof
grossfloorarea(minus10percent).Theparkingrequirementfor
manufacturing/warehouseusesisatleasteight(8)spacesplusone(1)spaceforeachtwo
(2)employeesoneachshiftbasedonmaximumplannedemploymentorataminimumat
leasteight(8)spacesplusone(1)spaceforeachfivehundred(500)squarefeetoffloor
area.
Basedoninformationprovidedbytheapplicant,theparkingrequirementforthesiteisas
follows:
CityCouncilAgenda:09/27/10
3
UseFloorAreaSpacesRequired
OfficeSpace2100squarefeet12spaces
Warehouse/Storage8305squarefeet24spaces
TotalRequired 36spaces
Asillustrated,theserawnumberswouldrequire36totalspaces.However,thelarge
surfacedareatothenorthcouldbepavedandstripedforproofofparkingto
accommodatethebalanceoftherequiredparkingstalls(17).Asconditionofapproval,
theapplicantshouldprovideasiteplanillustratingproofofparkingonsitesufficientto
meetparkingrequirements.Thisconditionisadequategiventhattheprimaryuseofthe
facilityinvolvesemployeeswhoworkoff-site,andthatadditionalimpervioussurfacing
giventhistypeofwarehouse(notmanufacturing)useisnotrecommended.
Theapplicanthasindicatedthatitistheirintenttoprovideanaccesstotheenclosed
storageareaatthenorthwestcorner.Theapplicantisaskedtoverifythatthegatewill
opentothepavedarealeadingtotheDundasCircleaccess.
A1.BudgetImpact:None.
A2.StaffWorkloadImpact:None.
B.ALTERNATIVEACTIONS:
ThePlanningCommissionrecommendsAlternative1below.
RegardingtherequestforaConditionalUsePermitforOpenandOutdoorStorage,the
Cityhasthefollowingoptions:
1.MotiontoapprovetherequestforaConditionalUsePermitforOpenandOutdoor
Storagefor1347DundasCircle,basedonafindingthattheproposeduseis
consistentwiththeconditionsofapprovalandtheperformancerequirementsfor
theI-2District,subjecttotheconditionsoutlinedinExhibitZ.
2.MotiontodenytherequestforaConditionalUsePermitforOpenandOutdoor
Storage,basedonafindingthattheproposeduseisnotconsistentwiththe
performancerequirementoftheI-2District.
C.STAFFRECOMMENDATION:
CitystaffrecommendsAlternative#1.Theproposeduseisconsistentwiththeconditions
ofapproval,andtheintentoftheI-2District.Staffrecommendsapproval,subjecttothe
conditionsoutlinedinExhibitZ.
CityCouncilAgenda:09/27/10
4
D.SUPPORTINGDATA:
ExhibitA:ApplicantNarrative
ExhibitB:SiteLocationMap
ExhibitC:SitePlan
ExhibitD:SitePhotos
ExhibitE:ZoningMap(seeitem7)
ExhibitZ:Conditionsofapproval
All Elements Inc.
14400 James Rd Phone: 763.493.5928
Suite B Fax: 763.493.4262
P.O. Box 186 Email: aei@allelementsinc.net
Rogers, MN, 55374 Web Site: allelementsinc.net
License #: 20323540
August 3, 2010
Page 1 of 1
All Elements Inc was established in 2002 in the home of John and Tara Thurber located
in Crystal, MN. All Elements is a roofing contractor who specializes in commercial. In 2003 All
Elements Inc. grew to the point where it needed office and warehouse space. All Elements Inc.
found a great starter space for the office warehouse in Brooklyn Park. In 2006 the need again
arose for more space. This time moving to Rogers was the answer since it was closer to John
and Tara who had moved to Monticello in January of 2006.
All Elements Inc has continued to grow due to our commitment to our customers and our
community. All our employees take great pride in making sure we always fulfill our
commitments to our customers, suppliers, and project partners. With the continued growth we
have decided to purchase a property in Monticello and make it the permanent home to All
Elements Inc.
Upon deciding on the property on Dundas Circle we immediately noticed the need to
have an enclosed area to store trailers and equipment out of sight.
We are proposing a wood framed 8 ft tall fence with steel exterior to look like the
existing building. We are planning to use 6 x 6 posts with 2 x 6 cross members. The steel
exterior will be the same Tan color as the existing building and be fastened using colored screws
to give it a better longevity and looks than nails.
The fence will run along Dundas Road to the West property line then North to the
Northern most property line the East to the edge of the concrete drive. We plan to put a gate
from the Northwest corner of the building to the new fence.
The fenced area will have Class 5 or concrete regrind within its borders allowing it to be
driven on yet be a permeable surface.
nk you,
161:0 MN
John and Tara Thurber.
El
El
Roads
CSA11C1
CTYCL
d MUNiCL
PR AtATLCL
ff Trent.
Ott,
imam-wt.:1
Slate 1 Iwy
Alt
US I Irry
Wright County, MN
ebeacon 7 "
Date Created: 7/29/2010
Map Scale: 1 in = 100 ft
Last Data Upload: 7/29/2010 7:34:01 AM
developed by
The Schneider Corporation
Sc hne ider wNw.SChneidercorp.c.fam
B.M.
30
DENOTES:
• IRON MONUMENT FOUND
1/2 INCH BY 14 INCH .
WITH A PLASTIC CAP k
0 0 0 .01EX IS TING GROUND CONTI
000 Q EXISTING GROUND SPAT
EXISTING
LOT 1, BLOCK 1.
OAKWOOD INDUSTRIA
WRIGHT COUNTY, MI .
% Tir1
171'$ ONLY EASEMENTS ON RECORD PLAT
"?.-4 Ill UNLESS ADDITIONAL DOCUMENTA T.
TA -NA 114. RECORD ARE ,PROVIDED TO US.
CIS -A
tt1.4 I
960
fa - —
4k>.,
' :- ,•,:,..,::-!•,.•••,.
. .
. .
-''''f""e:,..or if-F!r.,•":--"---- -""----",'
•••••-• ' -:---',...' ?:•.=.' • • " • 7.1.77,1,,,
e 'r ,
HYDF1ANT
64TE eit
VALVE
4tut
CENTERLINE A5 TRAVELLED 15 IN. R. C .P. SANITARY SEWER
SANITARY SEWER MH.
TOP CASTING EL 957.9
INVERT ELEV 941 . 4 DUNDAS 12 48, CM P.
•
4 •
10 IN, PPP, KAT:4R4444# 7
v
4;I
SANITARY SEWER MH.
TOP CASTING El- 959,7
INVERT ELEV # 942.5
wow
4/,"c c="-
Ca
C 41 7/4 G/4-f-f:r.14,41n 44./..4./
‘t.f7ke'is
G C
I hereby certify that this survey. p
by me or under my direct supervis
Registered Land Surveyor under t
Minnesota.
'29LVZ/a:4') :-4,4‘1-
BENCH MARK:
TOP NUT OF HYDRANT LOCATED AT THE SW
CORNER OF LOT _I, BLOCK 1.
ELEVATION = 960.94 FEET
!"b$
!"b$
!"b$
!"b$
Sg
?¾A@
?¾A@
SÊ
SÊ
S}
S}
9 0th St S E
Fenning Ave NE
Mississippi River
M is sis s i p p i R i v e r
O tte r C r e e k
FirstLake
MudLake
R1
AO
¹
0 1,200 2,400Feet
Legend
PERIMETER
Lakes
CityBoundary
Parcels
Zoning Districts
Agriculture - Open Space
Single Family Residential
Single Family Residential - A
Single Family and 2 Family Residential
Single Family and 2 Family Residential - A
Medium Density Residential
Mobile Home Park
Residential Planned Unit Development
Performance Zone - Residential
Performance Zone - Mixed
Neighborhood Business
Limited Business
Highway Business
Regional Business
Central Community District
Light Industrial - A
Light Industrial
Heavy Industrial
Public - Semi-Public
PUD
AO
R1
R1-A
R2
R2-A
R3
R4
PZ-R
PZ-M
B1
B2
B3
B4
CCD
I1-A
I1
I2
PS
PUD
ExhibitZ
ConditionsofApproval
1347DundasCircle
1.Theapplicantshallrevisethesiteplantoillustrateproof-of-parkingfor17additional
stallsasnotedinthePlanningCommissionreportdate9/7/10.
Theapplicanthasprovidedtheprooforparkingplanasrequested.Attachedas
exhibit.
2.Applicantistoverifyexactlocationofproposedgateonthesiteplan.
Theapplicanthasverifiedthatthegatewillbelocatedatthenorthernportion
ofthesiteandaccessiblefromtheexistingconcretepavedarea.Attachedas
exhibit.
3.Applicantistoverifythestatusoflineofevergreentreesintherearyardofthesite
relativetotheoutdoorstorage.
4.Allmaterialsstoredoutsideonthesiteshallbestoredwithinthefencedstorageareaatall
times.
5.Theapplicantshallutilizecrushedconcreteoracrushedgranitesurfacingfortheoutdoor
storagearea.
6.TheproposedfencelinewillnotencroachintotheDundasRoadorDundasCirclerightof
way.
7.Theapplicantsshallapplyforabuildingpermitfortheproposedfence.TheCUPis
subjecttoapprovaloftheproposedfence.
8.TheCityEngineerwillapprovethefinalplacementofthefencerelativetothedrainage
andutilityeasementandthedrainageswaleonsite.
CityCouncilAgenda:09/27/10
1
5F.Considerationtoapproveanamendmenttothe2010CityofMonticelloZoning
Map.Applicant:CityofMonticello (AS)
A.REFERENCEANDBACKGROUND:
ThePlanningCommissionisaskedtorecommendadoptionofanamended2010Cityof
MonticelloZoningMap.
SincethePlanningCommission’sinitialreviewofthemapstaffhasfoundthatthereare
locationswherezoningdesignationswereincorrectlyshown.Theseincludethe
designationfor307ChelseaRoad,whichshouldbeshownasI-1A,andtheadjacent
parceltotheeast,whichshouldbeshownasB-4.(LetterA,ExhibitB)Thismis-
classificationwasmadeprimarilyduetothefactthattheunderlyingparcelmapwasnot
currentbasedonCountyrecords.
StaffhasalsomadeacorrectionintheareaofOtterCreek,wherepropertyhasbeen
annexedandneedstoreflectanA-Ozoningclassification.(LetterB,ExhibitB)
Inmakingtheseclarifications,staffhasfoundotherportionsofthemapthatrequire
clean-up.Theseareareaswherethezoningshapedidnotmatchtheparcellines.
ItisnotedthattheZoningMapwillbefurtheramendedaspartoftheZoningCode
revisionproject.However,asMonticello’scodeindicatesthatthemapactuallycontrols
theactualzoningdesignationofaproperty,theCityAttorneyrecommendsadoptingthis
updatedmap.
A1.BudgetImpact:Minorconsultingengineeringcostsforthemaprevisionswere
incurred.
A2.StaffWorkloadImpact:None.
B.ALTERNATIVEACTIONS:
1.Motiontoapproveanamendmenttothe2010CityofMonticelloZoningMap.
2.Motiontodenyanamendmenttothe2010CityofMonticelloZoningMap.
C.STAFFRECOMMENDATION:
CitystaffrecommendsAlternative#1.Theseamendmentsareessentiallyhousekeeping
itemstoclarifypreviousformalCityactionordecisionsonzoningclassifications.
D.SUPPORTINGDATA:
ExhibitA:Current2010ZoningMap
ExhibitB:Proposed2010ZoningMap
R1
I2
R1
B3
R1
I2
R1
AO
R2
CCD
B4
I1
I1-A
R2
R2
PZ-M
R1
R1
B4
B4
R1
R1
B4
R1
R2
R1
R1
R4
B3
B2
PZ-M
R-1A
R1-A
I1-A
I1
R3
R2
R-2A
R3
PZ-M
R2
PS
R2
R2A
AO
R2
R2
AO
B3
I1
R3
R-PUD
PZ-M
R1
PZ-M
PS
PZ-M
PZ-M
R2
R1
PZ-M
B3
B1
B2
B4
R-PUD
PS
PS
R-2
R2
B3
R1
R1 R1
I1-A
I-2
R4
AO
R1
B4
B4
B4
R1
B4
R1A
R4
AO
R1A
I2
B4
AO
90 th S t SE
Fe
nn
i
ng
A
v
e
N
E
M
i
s
s
i
s
s
ip
pi
R
iv
er
M i s s i s s i p p i R i v e r
Otter
C
r
e
e
k
First
Lake
Mud
Lake
R1
AO
01,2002,400600
Feet
Legend
Lakes
CityBoundary
Parcels
Zoning Districts
Agriculture - Open Space
Single Family Residential
Single Family Residential - A
Single Family and 2 Family Residential
Single Family and 2 Family Residential - A
Medium Density Residential
Mobile Home Park
Residential Planned Unit Development
Performance Zone - Residential
Performance Zone - Mixed
Neighborhood Business
Limited Business
Highway Business
Regional Business
Central Community District
Light Industrial - A
Light Industrial
Heavy Industrial
Public - Semi-Public
PUD
AO
R1
R1-A
R2
R2-A
R3
R4
PZ-R
PZ-M
B1
B2
B3
B4
CCD
I1-A
I1
I2
PS
PUD
!"b$
!"b$
!"b$
!"b$
Sg
?¾A@
?¾A@
SÊ
SÊ
S}
S}
9 0th St S E
Fenning Ave NE
Mississippi River
M is sis s i p p i R i v e r
O tte r C r e e k
FirstLake
MudLake
R1
AO
¹
0 1,200 2,400Feet
Legend
PERIMETER
Lakes
CityBoundary
Parcels
Zoning Districts
Agriculture - Open Space
Single Family Residential
Single Family Residential - A
Single Family and 2 Family Residential
Single Family and 2 Family Residential - A
Medium Density Residential
Mobile Home Park
Residential Planned Unit Development
Performance Zone - Residential
Performance Zone - Mixed
Neighborhood Business
Limited Business
Highway Business
Regional Business
Central Community District
Light Industrial - A
Light Industrial
Heavy Industrial
Public - Semi-Public
PUD
AO
R1
R1-A
R2
R2-A
R3
R4
PZ-R
PZ-M
B1
B2
B3
B4
CCD
I1-A
I1
I2
PS
PUD
CityCouncilAgenda:9/27/10
1
5G.ConsiderationofadoptingResolutionNo.2010-60declaringcoststobeassessed,
orderingpreparationofassessmentroll,andcallingforapublichearingtoadopt
assessmentsfor2010StreetReconstruction,CityProjectNo.10C001 (BW/WSB)
A.REFERENCEANDBACKGROUND:
Thepreliminaryassessmentrollsforthe2010StreetReconstructionproject,including
Area4AandPrairieRoad,mustbeupdatedtoreflectCouncil’spreviousmotions
regardingcoststobeassessed,includingtheconsiderationofusingactualconstruction
costsversusestimatedorbidcostsinadoptingfinalassessmentrates.
InaccordancewithMinnesotaStatute429,inordertobondforthisprojecttheCity
Councilmustholdapublichearingpriortoawardingacontractforconstructionofthe
improvements.HearingswereconductedonFebruary22,2010forthebaseprojectplus
alternates#1,#3,#5and#6,onMay24,2010foralternate#4,andonJune14,2010for
alternate#2.Inaddition,Councilmustconductanassessmenthearingatthecompletion
oftheproject.
WrightCountyrequiresthatassessmentsbecertifiedtotheCountyAuditorbyNovember
30,2010forcollectiononnextyear’staxes.Thisdeadlinecanbemetbycallingforthe
assessmenthearingtobeheldattheOctober25,2010Councilmeeting.Byconducting
theassessmenthearingonOctober25,adequatetimeforpublicationandmailingof
noticeswillbeprovidedtosatisfytherequirementsforpublicimprovementprojectsin
accordancewithMinnesotaStateStatutesChapter429.
Althoughconstructionoftheprojectisnotyetcomplete(about50%ofthecontract
amounthasbeenpaid),allactualconstructioncostsknowntodatehavebeencalculated
andanyoutstandingprojectcostswerethenestimatedinordertomeettheassessment
hearingdeadlinesperStateStatute.Thetablebelowidentifiesthecostsofthebasebid
pluseachalternatebiditemasestimatedbytheengineer,asbidbythecontractorthatthe
projectwasawardedto,andasconstructedtodate.Indirectcosts,whichinclude
engineering,materialtesting,administration,legal,andfinancingcosts,arecurrently
estimatedat$519,517,whichtotalsapproximately22%oftheestimatedfinal
constructioncost.
Engineer’s
Estimate
Redstone’s
Bid
Estimated
Final
Construction
Cost
BaseBid
Area4A&PrairieRoad
$2,519,137.75$2,165,392.38
$2,040,850
(includes
$19,000for
workrequested
byprivate
property
owners)
CityCouncilAgenda:9/27/10
2
Alternate#1
WalnutStconnectiontoRiverSt $49,715.80 $38,960.59 Notapproved
Alternate#2
ThirdStPkgLotReconstruction
$74,091.00$62,340.40
$73,540
(includes
$11,200for
workrequested
byprivate
property
owners)
Alternate#3
ChestnutLiftStationWetWell $113,026.30$143,329.99$143,330
Alternate#4
WalnutSt-RiverSttoFrontSt $22,965.00$23,977.40 $16,280
Alternate#5
ParWestPkgLotReconstruction
$18,725.00$22,269.00$22,269
Alternate#6
PrairieRdSidewalk
$54,217.00$45,070.50$46,370
TOTALCOSTS
BaseBid+ApprovedAlternates $2,802,162.05$2,462,379.67$2,342,639
ThisprojectisinitiallybeingfundedthroughGeneralObligationbondswhichwillbe
paidbackthroughacombinationoffundingsourcesincludingstateaidfunds;street
reconstructionfunds;stormsewer,sanitarysewerandwatertrunkfunds;andassessments
toadjacentbenefitingproperties.Benefitingresidentialpropertieswillbeassessedfor
streetimprovementsandsidewalkimprovementsusingflatratesforeach,regardlessof
thesizeorlocationofthepropertyorthenumberofaccesses.Theresidentialrate
preliminarilyapprovedbyCouncilwas$3,800perpropertyforstreetimprovementsand
$153perpropertyforsidewalkimprovementsonPrairieRoad.Benefitingnon-
residentialpropertieswillbeassessedforstreetimprovementsonafront-footbasis.The
non-residentialratepreliminarilyapprovedbyCouncilwas$80perfrontfootforstreet
improvements,and$12perfrontfootforsidewalkimprovements,whicharetheCity’s
currentstandardnon-residentialrates.
Thepreliminaryresidentialstreetassessmentrateapprovedforthisprojectincorporateda
5%peryearincreaseovertheratesassessedforthe2007StreetReconstructionproject.
Thesidewalkassessmentratewassetsothatresidentswouldpayfor25%ofthesidewalk
costsdirectly,withtheCitypickinguptheremaining75%.
Uponapprovingthepreliminaryassessmentratesforthisyear’sproject,Councilnoted
thattheywantedtolookatreducingthepreliminaryratesbasedonactualconstruction
costs,assumingthattheconstructioncostswouldbelowerthantheengineer’sestimate.
Basedonthefinalestimatedconstructioncosts,itappearsthatconstructioncostswill
likelybelessthanoriginallyestimatedsoCouncilmaybeabletoreduceoneofmoreof
theassessmentrateswhilestillmeetingthe20%assessmentthresholdrequiredbyState
Statute.Thatsaid,staffdoesnotrecommendloweringtheresidentialrateforstreet
CityCouncilAgenda:9/27/10
3
assessmentssincethepreliminaryrateapprovedbyCouncilisalreadyabout50%less
thanwhatothercomparablecitiesassesstheirresidentsforsuchprojects.Andinlightof
theever-increasingbudgetdeficitsthatlocalgovernmentsarefacing,staffwould
recommendincreasingresidentialstreetreconstructionassessmentratesonfuture
projects,whichcanbeexploredinmoredetailwhenthenextstreetreconstructionproject
isproposed.
Regardingresidentialsidewalkassessmentrates,staffwouldalsonotrecommend
loweringtheseratesforthesamereasonsstatedabove.Itshouldbenotedthoughthatthe
estimatedsidewalkassessmentsalongPrairieRoad,basedonthebidprices,is$110per
unit.Theestimateinthefeasibilityreportwas$153perunit.Thesidewalkassessment
includespropertiesintheneighborhoodsadjacenttoPrairieRoad(i.e.thesidestreets)
sinceallofthesepropertiescanaccessthesidewalkregardlessifitfrontstheirproperty
andwheretheyhavenoalternativepedestrianaccess.
Regardingnon-residentialrates,thepreliminaryrateof$80perfrontfootwasusedon
severalrecentprojectsandbeforethatthisratewasincreasedannuallybasedonthe
constructioncostindexsostaffbelievesthisratetobereasonable.However,becausethis
projectreceivedfavorablebids,about9%belowtheengineer’sestimateforthe
constructionofstreetimprovements,staffwillreviewthisratebeforetheassessment
hearingtomakesureitremainsreasonable.
Theproposedfundingsplitsusingthepreliminaryapprovedassessmentratesof$3,800
perresidentialunitand$80pernon-residentialfrontfootageforstreetassessments,and
$153perresidentialunitforsidewalkassessments,isasfollows:
Assessments..........................................$563,347
StateAidFunds.....................................$395,397
StreetReconstructionFund...................$372,217
StormSewerTrunkFund......................$344,711
WatermainTrunkFund.........................$305,000
SanitarySewerTrunkFund..................$783,643
Total$2,756,634*
*Thetotalcostincludes$15,501forinstallationoftheBNSFsurfacecrossingmaterial
forthesidewalkalongPrairieRoad.
Thetotalproposedassessmentamountis20.6%ofthetotalprojectcosts,including
indirectcosts,whichjustmeetstherequiredminimumthresholdsetbyStateStatute.
TheabovefundingsplitsdonotincludeassessmentsfortheThirdStreetparkinglot
reconstructionsincetheassessmentratesfortheseimprovementshavenotyetbeen
finalized.AsCouncilmayrecall,staffwasdirectedtoworkwiththepropertyowners
benefitingfromtheseimprovementstodetermineanequitableassessmentprogram,
whichwillbepresentedindetailattheAssessmentHearing.BasedonCouncil’smotion
atthePublicHearingfortheseimprovements,thepropertyownersaretobeassessed
CityCouncilAgenda:9/27/10
4
60%ofthecostsforthiswork.
TheestimatedfundingsplitsfortheThirdStreetparkinglotreconstructionaretherefore
asfollows:
Assessments..........................................$44,124
CityFunds(TBD).................................$29,416
Total$73,540
TheParWestParkingLotimprovementsarenotreflectedinanyoftheabovetablessince
theseimprovementsaretobefundedusingParkfunds.
CouncilshouldnotethatseveralprivatepropertyownersrequestedthattheCity’s
contractorcompleteadditionalworkontheirprivateutilityservicesand/ordriveways
duringtheprojectatthepropertyowner’sexpense.Whencontractorsareagreeableto
this,theCitytypicallyaccommodatessuchrequestswhencompletingstreet
reconstructionprojects,thereforetheextraworkwascompletedasrequestedandthose
propertyownerswillbeassessed100%forthework.Thesecostswillbepresentedin
detailattheAssessmentHearing,butasoftodaythisworktotalsapproximately$19,000
forworkcompletedinArea4AandonPrairieRoad,andanother$11,200forrepaving
privateparkingareasbehindthreeofthebusinessesabuttingtheThirdStreetparkinglot.
Thesecostsarereflectedinthetotalprojectandassessmentscostsshownabove,aswell
asinResolutionNo.2010-60.
A1.BudgetImpact:TheCity’sshareoftheprojectfundingwilldependonthefinal
assessmentratesapprovedbytheCityCouncil.
A2.StaffWorkloadImpact:Impactstostaffworkloadareanticipatedtobe
minimal.
B.ALTERNATIVEACTIONS:
1.MotiontoadoptResolutionNo.2010-60declaringcoststobeassessed,ordering
preparationofassessmentroll,andcallingfortheassessmenthearingforOctober
25,2010.
2.MotiontodenyadoptingResolutionNo.2010-60atthistime.
C.STAFFRECOMMENDATION:
CitystaffrecommendsthattheCouncilauthorizeAlternativeActionNo.1.
D.SUPPORTINGDATA:
ResolutionNo.2010-60
Assessmentmaps:
CityCouncilAgenda:9/27/10
5
Area4A(WestRiverStreetarea)
PrairieRoad
WalnutStreet-WestRiverStreettoFrontStreet
ThirdStreetParkingLot
CITYOFMONTICELLO
WRIGHTCOUNTY,MINNESOTA
RESOLUTIONNO.2010-60
DECLARINGCOSTSTOBEASSESSED,ORDERINGPREPARATIONOF
ASSESSMENTROLLANDCALLINGFORPUBLICHEARING
2010STREETRECONSTRUCTION
PROJECTNO.10C001
WHEREAS,contractshavebeenletforthereconstructionofArea4A,includingWestRiver
StreetbetweenChestnutStreetandStateHighway25andadjoiningsidestreetsbetweenWest
BroadwayandWestRiverStreetorFrontStreet;andforPrairieRoadbetweenNicholasCircle
andWrightCountyHighway75;and
WHEREAS,thetotalcostsoftheimprovementsare$2,830,174;
NOWTHEREFOREBEITHEREBYRESOLVEDBYTHECITYCOUNCILOFTHECITY
OFMONTICELLO,MINNESOTAASFOLLOWS:
1.TheCityCouncilherebydeterminesthat$607,471shallbeassessedagainstbenefitted
propertyownersbaseduponbenefitsreceivedwithoutregardtocashvaluation.
2.TheCityAdministratorshallforthwithcalculatetheproperamounttobespecially
assessedforsuchimprovementagainsteveryassessablelot,pieceorparcelofland
withoutregardtocashvaluationasprovidedbylaw,andheshallfileacopyofsuch
proposedassessmentinhisofficeforpublicinspection.
3.Ahearingshallbeheldonthe25th dayofOctober,2010at7p.m.attheMonticello
CommunityCentertopassuponsuchproposedassessmentandatsuchtimeandplaceall
personsowningpropertyaffectedbysuchimprovementwillbegivenanopportunityto
beheardwithreferencetosuchassessment.
4.TheCityClerkisherebydirectedtocauseanoticeofthehearingontheproposed
assessmenttobepublishedonceintheofficialnewspaperatleasttwoweekspriortothe
hearingandshallstateinthenoticethetotalcostoftheimprovement.TheClerkshall
alsocausemailednoticetobegiventotheownerofeachparceldescribedinthe
assessmentrollnotlessthantwoweekspriortothehearing.
5.Theownerofanypropertysoassessedmay,atanytimepriortocertificationofthe
assessmenttotheCountyAuditor,paythewholeoftheassessmentonsuchproperty,
withinterestaccruedtothedateofpaymenttotheCity,exceptthatnointerestshallbe
chargediftheentireassessmentispaidwithin30daysfromtheadoptionofthe
assessment.SuchpaymentmustbemadebeforeNovember25orinterestwillbecharged
throughDecember31ofthesucceedingyear.Insubsequentyears,thepropertyowner
mayatanytimethereafter,paytotheCitythebalanceoftheassessmentremaining
unpaidafterthecurrentyear,providedsuchpaymentismadepriortoNovember15th.
6.TheCityClerkshallforthwithtransmitacertificationofthisassessmenttothecounty
auditortobeextendedonthepropertytaxlistsofthecounty.Suchassessmentsshallbe
collectedandpaidoverinthesamemannerasothermunicipaltaxes.
ADOPTEDBY theMonticelloCityCouncilthis27th dayofSeptember,2010.
CITYOFMONTICELLO
____________________________________
ClintHerbst,Mayor
ATTEST:
______________________________________
JeffO’Neill,CityAdministrator
?¾A@See Inset
3rd St W
Linn St
6th St W
Pine St River St E
4th St W
Chestnut St
Elm
St
New St
Walnut St S
Oak Ln
Cedar St
Walnut St
River St W
W Broadway St
Locust St
Minnesota St
Vine St
Front St
Palm
St
Golf Course Rd
37
383940
41
42 43
4445
4647
48 50
51
54565859
6061 62
63 64 65
66
6768697071
72
7374
24
76
77
78
79 8081
82 83
84 85 86
8788 8990 91
92 93 94 9596
100 101
144145
52
102
53
1011
121314
15
16
171819
20 7521
22
232526
27
28
29303132
33
34
35
36
Residential - Street & Sidewalk
Residential - Street
Non-Residential
City Properties
±
0 350 700175Feet
Preliminary Assessment Roll2010 Street Reconstruction ProjectCity of Monticello, MN
1 inch = 350 feet
Fi
l
e
:
K
:
\
0
1
4
9
4
-
3
4
\
G
I
S
\
M
a
p
s
\
A
s
s
e
s
s
m
e
n
t
R
o
l
l
2
0
1
0
.
m
x
d
,
F
e
b
0
3
,
2
0
1
0
1
0
:
2
8
:
0
7
A
M
Front
S
t
Loc
u
s
t
S
t
Waln
u
t
S
t
River
S
t
W
62
102
68
60
61
67
66
146
147
148
149
150
152
153
154
155
156
49
55
57
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
==
=
=
=
=
=
=
==
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
==========
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
====
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=====
=
=
=
==
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
==
=
=
=
=
=
=
=
==
=
=
=
=
=
==
=
=
=
=
==
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
==
=
=
=
=
=
=
=
=
=
=
==
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
==========
=
=
==
=
=
==
=
==
=
==
=
=
=
=
=
==
=
=
=
=
=
===
=
=
===
=
=
=
=
==
=========================
=
=
=
=====================
=
=
=
=
=
=
=
=
=
=
=
=
==
========================================================
!(
!(
!(
!(!(
!(
!(
")
")
")
")
")
")")
")
")
")
")
!(
!(
!(
!(
!(
!(
!(
!(
")
")
")
")
")
")
!(
!(
!(
!(
")
")
")")
")
")
")!(
!(
!(!(
!(
")
")")
!(
")")
!(
!(
!(
!(
!(
!(
")
")
")
")
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
")
")
")
")")
")
!(
!(
!(
!(
!(
")")!(!(!(")")!(!(
!(
!(
")!(!(")!(!(")")
")!(
")
!(
")")
")!(")!(!(!(")!(")!(")")!(")!(!(")")!(")!(!(!(!(!(
GÕWX
!"b$
Marvin Elwood Road
Ma
r
v
i
n
E
l
w
o
o
d
R
o
a
d
Prairie
R
o
a
d
Hedman
L
a
n
e
Cr
o
c
u
s
L
a
n
e
Crocus Circle
Ni
c
h
o
l
a
s
C
i
r
c
l
e
A
l
p
i
n
e
D
r
i
v
e
UV124
UV36
UV76
UV2
UV127
UV117
UV43
UV89
UV96
UV103
UV104
UV88
UV97
UV39
UV120
UV98
UV75UV74
UV73
UV106
UV125
UV121
UV84
UV107
UV42
UV99
UV35
UV102
UV126
UV108
UV105
UV100
UV60
UV114
UV101UV40
UV115
UV44
UV41
UV68
UV109
UV95
UV38
UV90
UV118
UV113
UV94
UV48
UV30
UV72 UV77
UV78
UV24
UV52
UV69
UV37
UV110
UV1
UV45
UV122
UV119
UV123
UV29
UV112
UV46
UV64
UV79
UV128
UV93
UV34 UV83
UV111
UV71
UV50
UV47 UV22
UV80
UV27
UV65
UV33
UV61
UV66
UV26
UV25
UV85
UV116UV129
UV31 UV51
UV28
UV67
UV87
UV70
UV86
UV91
UV32
UV92
UV62
UV23
UV3 UV4 UV5 UV6 UV9 UV10 UV11
UV53
UV54
UV55
UV56
UV57 UV81
UV63
UV82
UV49
UV19UV18UV16
UV20
UV17
UV21
UV14UV7UV8UV12UV13UV15
Proposed Assessment MapPrairie Road ReconstructionCity of Monticello, MN
LegendSidewalk & Street Assessed ParcelsSidewalk Assessed Parcels
Fi
l
e
:
F
:
\
W
P
W
I
N
\
1
4
8
8
-
4
7
\
2
0
1
0
F
e
a
s
-
P
r
a
i
r
i
e
R
o
a
d
\
G
I
S
\
M
a
p
s
\
P
r
a
i
r
i
e
R
o
a
d
A
s
s
e
s
s
m
e
n
t
M
a
p
.
m
x
d
,
F
e
b
0
4
,
2
0
1
0
8
:
3
7
:
5
2
A
M
µ0200400100Feet
62
146
147
148
149
150
152
153
154
155
156
102
Loc
u
s
t
S
t
River
S
t
E
Front
S
t
W Bro
a
d
w
a
y
S
t
Pin
e
S
t
Waln
u
t
S
t
Residential - Street
Non-Residential
City Properties
0 125 25062.5 Feet
Preliminary Assessment RollWalnut St Improvements (River St to Front St)City of Monticello, MN
1 inch = 125 feet
Fi
l
e
:
K
:
\
0
1
4
9
4
-
3
4
\
G
I
S
\
M
a
p
s
\
A
s
s
e
s
s
m
e
n
t
R
o
l
l
2
0
1
0
_
W
a
l
n
u
t
L
o
c
u
s
t
.
m
x
d
,
5
/
1
9
/
2
0
1
0
2
:
5
4
:
4
4
P
M
Pin
e
S
t
3rd
S
t
W
Wa
l
n
u
t
S
t
S
3rd
S
t
E
W Br
o
a
d
w
a
y
S
t
E Br
o
a
d
w
a
y
S
t
Ce
d
a
r
S
t
Wa
l
n
u
t
S
t
File: K:\01494-34\GIS\Maps\33rdSt_assessments.mxd, Sep 22, 2010 4:56:02 PM
3rd St Parking Lot
Assessed Parcels
City Property ¹
3rd St Parking Lot ImprovementsCity of Monticello, MN
0 100Feet
CityCouncilAgenda:09/27/10
1
5H.ConsiderationofauthorizingCitystafftomakesafetyimprovementsatthe
intersectionofCedarStreetandDundasRoad (BP/BW/AS/CS)
A.REFERENCEANDBACKGROUND:
CouncilisaskedtoconsiderasafetyimprovementattheintersectionofCedarStreetand
DundasRoad.ThisintersectionisknowntobeoneoftheworstintheCityforsightline
visibility.Theobstructionsintherightofwayare2woodenpowerpoles,3guywires,1
lightpole,1treeandseveralbushes.Inordertobevisibletotraffic,thestopsignmustbe
locatedfarbackonthesoutheastcornerofthisintersectionandpositionedinfrontofthe
firstpolewhichisthestreetlight.ItisverydifficulttoseetotheeastonDundasRoad
afterfirststoppingatthestopsignandinchingupto30feetfurthertoseepastthetwo
otherpolesbeforeproceedingnorthonCedar.
Staffissuggestingremovalofthedecorativelightpoleandfixture,andreplacementwith
amastarmCobraheadstreetlightforwoodenpole#1toilluminatetheintersection,
whichwillallowthestopsigntobemoved20feetclosertotheintersection.(referto
diagraminsupportingdata)
Lt.DanAnselmentfromtheWrightCountySheriff’sDepartmentstates:“Atacontrolled
intersectionthemotorvehicleoperatorisresponsibletoobeythestopsignandproceed
onlywhensafe.”Hewouldprefertoseethisstopsignmovedforwardasmuchas
possibleandthestopbarlocatedatapositionatorforwardpastthestopsign.
XcelEnergyownsthetwowoodenpowerpoleswhichcannotbemovedandthe
decorativestreetlightonCedarStreet.Xcel’srepresentative,DebraCofield,hasbeen
contactedtogaininformationoncostforremovalofthedecorativepoleandfixtureand
replacementofamastarmCobraheadstreetlightforwoodenpole#1.Thecostshe
providedis$1,494,asshowninsupportingdocumentation.
Priortothe2002-06ClightingprojectonCedarStreet,amastarmCobraheadstreetlight
waslocatedonwoodenpole#1.ItwasdiscoveredthatXcelhasbeenbillingthecityfor
thisabsentfixtureafteritsremovaluntilpresent.Xcelwascontactedandwillrefundup
toamaximumof3yearsprecedingtherequestforrefund.Themonthlychargeforthis
unitisfundedfromtheannualstreetlightbudgetintheamountof$9.30/month(Xcel
codeA30-A).Thistotalsapproximately$334.80,whichcanbeusedtooffsettheexpense
tomakerequestedchangesattheintersection.
Thecosttooperatethecurrenttwofixturedecorativelightpole(XcelcodeA30Q)is
$8.45forthe250wattstreetlightand$5.26forthe70wattpedestrianlight,totaling
$13.71permonth.
IfCouncilelectstoremovetheornamentallampasproposed,Staffwillbedetermining
thesourceoffundingfortheornamentallightsandprovidetheCityCouncilwith
alternativesforprovidingcredittopartiesthatwerechargedforthisbenefit,now
removed.
CityCouncilAgenda:09/27/10
2
A1.BudgetImpact:CosttoremovedecorativestreetlightandinstallCobraHead
StreetlightbyXcelenergy$1,494.00minus$334.80refundtotaling$1,159.20.
Monthlyoperatingchargewillbe$9.30fortheCobralight,$4.41lowerthanpast
monthlyoperatingcostswiththecombinationdecorativelight.
A2.StaffWorkloadImpact:Stafftimetolocateutilitiesremoveandreplacethestop
signandcleanupboulevardarea.
B.ALTERNATIVEACTIONS:
1.MotiontoapprovesafetyimprovementsattheintersectionofCedarStreetand
DundasRoad,specificallyremovalofdecorativelightpole/fixtureandinstallation
ofmastarmCobraheadontowoodenpowerpole#1byXcelenergyandtohave
staffrelocatetheintersectionstopsigndirectlyinfrontofwoodenpowerpole#1.
2.MotiontodenymakingsafetyimprovementsattheintersectionofCedarStreet
andDundasRoadatthistime.
C.STAFFRECOMMENDATION:
CitystaffrecommendsAlternative#1approvingremovalofdecorativelightpole/fixture
andinstallationofamastarmcobraheadstreetlightandtohavestaffrelocatetheSE
cornerstopsigndirectlyinfrontofwoodenpowerpole#1attheintersectionofCedar
andDundas.Thisprojectwouldimprovesightlinevisibilityfortheintersectionin
regardstopublicsafety.
D.SUPPORTINGDATA:
AerialviewofCedarandDundasintersection
QuotefromXcelenergy
Xceldataandpricingsheets
LettertoLTAnselment,WrightCountySheriffDept
Crashdata–WrightCountySheriff
CityCouncilAgenda:9/27/10
1
5I.ConsiderationofacceptingquotesandawardingcontractforgatheringGPSdatapoints
forFiberNetMonticello (BW)
A.REFERENCEANDBACKGROUND:
WhenFiberNetMonticellowasfirstconceiveditwasthoughtthattheGPScoordinatesforthe
systemcouldbegatheredbytheprojectinspectorswithoneortwohandheldGPSunitsthat
wouldbepurchaseddirectlythroughtheproject.However,whenTDSfiledtheirlawsuit
againsttheCitytheFiberNetprojectwasdelayedandweweresubsequentlyforcedtocut
projectcosts,includingtheGPSunit(s).
WhentheFiberNetprojectwaspickedupagainitwashopedthattheGPSdatapointscould
begatheredbyCitystaffusingtheexistingGPSunitpreviouslypurchasedbyPublicWorks.
However,bythistimethePublicWorksDepartmentwasutilizingtheirunitheavilyfor
locatingpublicutilitiesthroughouttheCity.StaffthereforerequestedCouncilauthorization
topurchaseasecondGPSunitforgatheringdatapointsforFiberNetMonticello,aswellas
forprivateutilitiesthatwerebeinglocatedduringtheFiberNetprojectsowewouldhavethe
datafordesigningprojectsandmanagingourright-of-way.Councilauthorizedthispurchase
lastyear,andsincethenstaffhasbeenusingtheunittogatherdatapointsforbothpublicand
privateutilities.
DuringtheconstructionofFiberNetMonticelloithasbecomeclearthatstaffisnotableto
devotesufficienttimetocollectallthedatathatisneededtoas-builtthesystemwhilestill
completingtheirprimaryduties.StaffisthereforerequestingCouncilauthorizationtoenter
intoacontractwithaqualifiedfirmthatisabletoemployGPStechnologytocollectthe
coordinatesofallthestructuresthathavenotyetbeencollected,whichtotalsapproximately
3,030structures,allowingthesystemtobeas-builtthisyearyet.Bycollectingthedatathis
year,FiberNetMonticellowillthenhavethecoordinatesofalltheirstructuressothatwhen
thegroundiscoveredwithsnowtheywillbeabletoquicklylocatetheirstructures,manyof
whicharebelow-ground,therebyreducingthetimetheyspendonservicecalls.Thiswill
saveFiberNet,andsubsequentlytheircustomers,bothtimeandmoney.
Quoteswererecentlysolicitedfromfivefirmsthatweredeemedtobecapableofgathering
therequiredGPSdatapointsfortheFiberNetsystemstructures,andthatwereknowledgeable
enoughinthelayoutoftheCitytounderstandthescopeoftheproject.Thesefirmsincluded
Bogart,Pederson&Associates,Meyer-RohlinLandServices,SpectrumEngineering,Taylor
LandSurveyors,andWSB&Associates.ThescopeofworkincludedcollectingtheXandY
(horizontal)coordinatesforapproximately3,030FiberNetstructures,andprovidinguswith
anelectronictextfileofallthecoordinates,aswellasanelectronicshapefilethatcanbe
addedasalayertotheCity’sGISsystembyNovember30,2010.
Responseswerereceivedfromallfivefirms.Atableoftherespectivequotesreceivedis
providedbelow.
CityCouncilAgenda:9/27/10
2
SolicitedFirms PricesQuoted
Bogart,Pederson&Associates,Inc.$15,315.00
Meyer-RohlinLandServices$6,850.00
SpectrumEngineering$22,667.20
TaylorLandSurveyors,Inc.$27,000.00
WSB&Associates,Inc.$16,786.00
Basedonthequotesreceived,thequotefromMeyer-RohlinLandServicesisbyfarthelowest
intheamountof$6,850.ThesecondlowestquotewasreceivedfromBogart,Pederson&
Associatesintheamountof$15,315.Meyer-Rohlinwascontactedafterwereceivedtheir
quotetomakesuretheyfullyunderstoodthescopeoftheproject,aswellastherequired
deliverables,whichtheydid.Staffthereforebelievesthattheywillhonorthequotesubmitted
shouldCouncildirectstafftoenterintoacontractwiththemtocompletethework.
Ofcourse,Councilalsohastheoptionofdirectingstafftocollecttheremainingstructure
coordinates.Thedrawbacktothisoptionisthatthestaffwouldnotlikelybeabletocollect
alltherequiredstructurecoordinatesthisyearyet.Andshouldalargeimprovementproject
beconstructednextyear,suchasanotherstreetreconstructionproject,staffmightnotbeable
tocollectalloftherequireddatauntillatein2011.However,ifnosuchimprovementproject
isconstructedin2011thenstaffmightbeabletocollecttherequireddataearlierintheyear.
Eitherway,thedatawouldlikelynotbecollectedinitsentiretyin2010ifstaffisdirectedto
collectit.
Itshouldbenotedthatover300structureshavealreadybeenlocatedusingourhandheldGPS
unit,andassuchthesestructuresarenotincludedinthenumberofstructuresdefinedinthe
requestforquotes(3,030).Itshouldalsobenotedthatallbutafewofthecoordinatesthat
werecollectedwithourhandheldGPSunitwerewithin18-inchesoftheactuallocationofthe
structure,whichisaccurateenoughforthepurposesofFiberNetandotherCitystaff.
NomatterwhetherCouncilchoosestoenterintoacontractwithMeyer-Rohlintocollectthe
data,orwhethertheydirectstafftocollectthedata,staffwillcontinuetocollectcoordinates
forallremainingstructuresastimeallows.Thiswouldallowstafftofinishdatacollection
fasterinthespringshouldCouncildirectthattheworkbecompletedin-house,oritwill
reducethenumberofstructuresthattheconsultantswillberequiredtogather,thereby
reducingourcontractcost.
Aswaspreviouslynoted,FiberNetwouldbenefitfromknowingwheretheirstructuresare
beforethesnowfiles.However,otherCitydepartmentswouldalsobenefitbyhavingas-
builtsfortheirsystem.Forexample,theEngineeringDepartmentwouldbebetterableto
designfutureprojectsaroundthesystem,therebyreducingthechancesthatelementsofthe
systemwouldbeimpactedorwouldneedtoberelocatedduringconstruction.ThePublic
WorksDepartmentwouldalsobebetterequippedtoundertakemaintenanceoperations
withoutimpactingtheFiberNetsystem.
CityCouncilAgenda:9/27/10
3
A1.BudgetImpact:ThecostforgatheringtheGPSdatapointswillbefundedby
FiberNetMonticello.TheEngineeringDepartmentwillfundtheworkrequiredtoadd
thedataasalayertoourGISsystemusingbudgetedfundsfor2010.
A2.StaffWorkloadImpact:Staffworkloadimpactsareanticipatedtobenegligibleif
CouncildirectsstafftoenterintoacontractwithMeyer-Rohlin.However,ifstaffis
directedtocollectthenecessarydata,therewillbesignificantimpactstostaff.
B.ALTERNATIVEACTIONS:
1.Motiontoacceptthequoteintheamountof$6,850fromMeyer-RohlinLand
Services,andtodirecttheCityAdministratortoenterintoacontractwithMeyer-
RohlintocompletetheworkasoutlinedhereinandintheRequestforQuotes.
2.Motiontodenyacceptinganyquotesatthistimeandtodirectstafftogatherall
remainingstructurecoordinatesrequiredtoas-builttheFiberNetMonticellosystem.
C.STAFFRECOMMENDATION:
CitystaffrecommendsAlternativeActionNo.1sincethecostappearstobeveryreasonable
andsincethisservicewillprovideFiberNetMonticellowiththenecessarydatapointstoas-
builttheirentiresystem,allowingthemtomoreefficientlymaintaintheirsystemandserve
theircustomers.
D.SUPPORTINGDATA:
RequestforQuotes
RFQresponses
CityCouncilAgenda:09/27/10
1
5J.Considerationofapprovinganon-callpolicyforFiberNetMonticellotechnicians
(DP,JO,TE)
A.REFERENCEANDBACKGROUND:
TheCouncilisaskedtoapproveanon-callpolicyforFiberNetMonticellotechnicians.
FiberNettechniciansaretypicallyscheduledtoworkfrom7:15am-4:30pmMonday-Thursday
and7:15am-2pmonFriday.Thepurposeoftheattachedpolicyistoensurecoveragefor
situationsthatoccuroutsideoftheregularestablishedhoursofoperationandtoalsoprovide
guidelinesforresponsetimeandcompensationforcall-backsituations.Theattachedpolicy
willbeimplementedonatrialbasisandwillbereviewedbytheFiberAdvisoryBoardin
AprilwithanupdatebroughtbacktoCouncilinMarch2011.
Attachedistherecommendedpolicythatoutlinesthepurpose,expectationsandcompensation
forcall-backsituations.
A1.BudgetImpact:Impactwouldbeminimal.
A2.StaffWorkloadImpact:Wouldn’timpactstaffworkload.
B.ALTERNATIVEACTIONS:
1.MotiontoapproveadoptionofFiberNetMonticelloon-callpolicyfortechnicians.
2.MotiontodenyadoptionofFiberNetMonticelloon-callpolicyfortechnicians.
C.STAFFRECOMMENDATION:
Citystaff,alongwiththeFiberAdvisoryBoard,recommendsAlternativeAction1.
D.SUPPORTINGDATA:
FiberNetMonticelloOn-CallPoliciesandProcedures
FiberNetMonticelloTechnicianOn-CallPoliciesandProcedures
Purpose:ThepurposeoftheOn-CallPolicyistoensurecoverageforsituationsthatoccuroutsideofthe
regularestablishedhoursofoperationandtoalsoprovideguidelinesforresponsetimeand
compensationforcall-backsituations.
1.Theon-calltechnicianmust respondtotheBSCwithin20minutesofbeingcalledout.
TheBSCwillcontacttheDirectorofTechnicalServicesifthereisnoresponsefromthe
on-calltechnicianwithin20minutesoftheinitialcontactfromtheBSC.
Othertechnicianswillthenbecalledouttoassistand/orcovertheservicecalloroutage.
Shouldtheon-calltechnicianneedtobeunavailableorunreachableformorethan20
minutesduringtheirscheduledshift,arrangementsmustbemadetoprovidecoverage
fromanotheravailabletechnicianandtheBSCthennotified.
2.Theon-calltechnicianmustbeavailabletobeonsiteatthecustomerpremisewith1hourof
theBSCreceivingtheinitialcallfromthecustomer.
Ifthisrulecannotbemet,duetocurrentservicecallcommitmentseveryeffortmustbe
madetoinformtheBSC.
3.Theon-calltechnicianmust reporttotheBSCatthecompletionofeach servicecallor
outage.
TheBSCwillassumetheon-calltechnicianisstillonsiteandworkinguntiltheyreceive
thecallofcompletion.
Shouldtheon-calltechniciandiscovertheserviceissuewilllastmorethan1hour;the
BSCmustbecontactedandupdatedwithanestimatedtimeofcompletion.
LeavingamessageontheBSCphonetoreportcalloroutagecompletionisacceptable.
ShouldatechnicianneedtospeaktoaBSCpersonandtheyarenotavailable,callDan
Debrouxatanytimeonhiscellphone.
4.On-callcompensationforfieldoperationswillbeasfollows:
Theon-calltechnicianwillbepaidfromthetimetheyeitherreachtheshop(ifnecessary)
orreachthecustomer’slocationuntilthecompletionoftheservicecalloroutageor,if
workingonmultipleservicecalls,atthecompletionofthelastcall.
On-calltechnicianswillbecompensatedforanytimeworkedduringtheworkweek
complyingwiththeovertimepolicysetbytheCityofMonticello.
Ifdispatched toacall,theon-calltechnicianwillbecompensatedminimum2hoursof
pay.The2hoursofpayappliesonlytotheinitialdispatch.Thehourscannotbestacked,
meaningifanotherservicerequestcomesinwhilealreadyonlocationorwithin2hours
ofinitialdispatchthetechnicianwillonlybepaidthe2hourminimumplusany
additionalhoursworkedifthe2hoursareexceeded.
Offdutytechniciansassistingwithanoutageconditionwillbepaidthesamehourlyrates
minustheOn-Callpay.
5.Allchangesinthedocumentedon-callrotationschedulemustbeapprovedbytheDirector
ofTechnicalServicesinadvanceofthechange.
TheBSCwillassumethatthetechnicianassignedontheweeklytechscheduleistheone
thatwillbeworkingthatshift.
Thescheduledon-calltechnicianwillberesponsibleforgettingcoverageforany
scheduledshifttheywillbeunabletowork.
6.Additionalrulesandpolicies.
Drinkingalcoholorusinganyotheralteringsubstancesisstrictlyprohibitedwhen
workinganon-callshiftoratanyothertimewhiledrivingaFiberNetvehicleorwhile
workinginanycapacityforFiberNetMonticello.Thisprohibitionincludestheuseofany
prescriptiondrugsthatmayaffectthesafeoperationofvehiclesorequipment,orwhich
couldimpairthesafeandefficientperformanceofanemployee’sduties.
Exemptemployeesshouldbeexcludedfromtheoncallrotationastheyarealwaysinan
emergencycallbackstatusandcannotreceiveoncallcompensation.
Failuretocomplywiththisanyoftheabovestatedrulesandpolicieswillresultin
disciplinaryactionwhichmayincludeverbalorwrittenwarnings,suspensionsor
terminationofemploymentwithFiberNetMonticello.
7.Workvehicleuseduringon-calltime.
Aworkvehiclemaybedriventoandfromanemployee’splaceofresidenceduringthe
timetheyareon-call.
Employeesarenotallowedtousetheworkvehicleforpersonalusewhileon-call.
Workvehicleistobeparkedatresidencewithorangeconetoprotectfrontand/orbackof
vehicleforsafetypurposes.
EmployeemustresidewithinatenmileradiusoftheCityofMonticelloinordertoutilize
thispolicy.
ADOPTEDBY theMonticelloCityCouncilonthe27th dayofSeptember,2010.
CITYOFMONTICELLO
_____________________________________
ClintHerbst,Mayor
ATTEST:
_____________________________________
JeffO’Neill,CityAdministrator
CityCouncilAgenda:09/27/10
1
5K.Considerationofacceptingquotesandawardingcontractforaroofreplacementat
thecontrolbuildingforthewaterreservoirlocatedat207ChelseaRoadEast
(MT/JO)
A.REFERENCEANDBACKGROUND:
CityCouncilisaskedtoconsiderawardingaroofreplacementcontracttoHightech
RoofingoutofBigLake.Thisroofreplacementprojectaffectsthecontrolbuildingfor
thewaterreservoir.Fundsareavailableforthisprojectasitwasanitembudgetedfor
completionthisyear.
TheMonticelloreservoirandcontrolbuildingwasconstructedin1978.Thereservoir
itselfisunderground.Itis90’longx60’wideand20’deep.Itholds760,000gallonsof
water.Thecontrolbuildingsitsrightontopinthesoutheastcornerofthereservoir.Its
dimensionsare51’longx37’wide.Thisbuildinghousesthemaincontrolsandalarm
forthewholewatersystem,whichincludescontrolsforallfivewellsandbothwater
towers.Italsohousesfour40hpboosterpumpsthatpump600gpmeachintothewater
system.
Thecurrentandoriginalroofisatwo4-plyasphaltbuiltuproofonprecastconcrete.For
thelastfewyearswehavebeenchasingleaksontheroof.Theasphalthasstartedto
blisterand,whenwalkedon,itbreakstheblistersandleaks.
Wepreparedspecificationsandrequestedproposalsfortheroofreplacement.Atotalof
threeproposalswerereceivedwiththelowproposalfromHightechRoofing&Sheet
Metalintheamountof$9,500.Pleaseseetheattachedtabulationofallquotesreceived.
A1.BudgetImpact:Thereis$12,000inthe2010WaterOperatingFundforthis
project.
A2.StaffWorkloadImpact:Approximately3hoursforprojectinspection.
B.ALTERNATIVEACTIONS:
1.MotiontoapprovetheproposalsandawardtheroofreplacementattheMonticello
WaterReservoirlocatedat207ChelseaRoadEasttoHightechRoofingofBig
Lake,MNintheamountof$9,500.
2.Motiontodenytheproposalsandnottoawardtheroofreplacementprojectatthis
time.
C.STAFFRECOMMENDATION:
CitystaffrecommendsthattheCityCouncilapprovetheroofreplacementofthewater
reservoirandawardthecontracttoHightechRoofingofBigLakeasoutlinedin
Alternative#1.
CityCouncilAgenda:09/27/10
2
D.SUPPORTINGDATA:
RoofReplacementQuoteSpecifications
RoofReplacementQuoteTabulation
CityCouncilAgenda:09/27/10
1
5L.ConsiderationofapprovaltodrawonLettersofCredit399and400fromMinnWestBank
securingQuadDevelopment (AS/JJ)
A.REFERENCEANDBACKGROUND:
OnSeptember10th,2010,theCityofMonticelloreceivednotificationfromMinnWestBank
thatitdoesnotintendtorenewLettersofCredit399and400,whichprovidesecurityforsite
improvementsatQuadDevelopment.
QuadDevelopmentisafive-buildingmulti-tenantcommercialcomplexlocatedjustsouthof
Wal-MartonSchoolBoulevard.Currently,onlyoneofthefivebuildingshasbeen
constructedandservedwithutilities.
ThetwoLOCsspecifiedareneededtoguaranteecompliancewiththeQuadDevelopment
developmentagreement,whichstipulatestherequiredon-sitepublicandprivate
improvements.
TheCityhasalreadysentcertifiedmailednoticethatitrequiresreplacement/renewalofthese
LOCsoritwilldrawontheexistingLOC.
Inspeakingwiththebankdirectly,staffhaslearnedthatthebankisexperiencingdifficulty
withthecurrentpropertyowner/developer.Atthistime,thebankisintheprocessof
determiningwhethertorenewtheLOCorsupplyacashescrowtotheCity.
TheCityAttorneyhasadvisedthattheCityshouldformallyauthorizeapprovaltodrawonthe
existingLOCsintheeventthatthebankdoesnotsupplyareplacementLOC.Shouldthe
bankrenewtheLOCs,Council’sapprovaltodrawontheLOCwillnotbenecessaryatthis
time.
Again,itisnecessaryforthesesecuritiestobeheldonhandtoguaranteetherequiredsite
improvements.
A1.BudgetImpact:None.
A2.StaffWorkloadImpact:None.
B.ALTERNATIVEACTIONS:
1.Motiontoapprove adrawonLettersofCredit399and400fromMinnWestBanksecuring
QuadDevelopment
2.Motiontodeny adrawonLettersofCredit399and400fromMinnWestBanksecuring
QuadDevelopment
C.STAFFRECOMMENDATION:
CitystaffrecommendsAlternative#1.
CityCouncilAgenda:09/27/10
2
D.SUPPORTINGDATA:
ExhibitA:LetterfromMinnWestBank,dated9/4/10
ExhibitB:LetterfromtheCityofMonticello,dated9/14/10
ExhibitC:CopiesofLOCs
CityCouncilAgenda:9/27/10
1
5M.ConsiderationofadoptingResolution#2010-61approvingaGamblingPremises
PermitapplicationforMonticelloLionsClubtoconductgamblingatBeefO’Bradys
(TK/CS)
A.REFERENCEANDBACKGROUND:
TheMonticelloLionsClubisrequestingapprovaloftheirPremisesPermitApplicationto
conductgamblingatBeefO’BradysstartingOctober1,2010.Thegroupintendsto
conductgamblingonaregularbasisatthatsite.(Pleaseseetheapplicationfordetails.)
MickMaher,LionsClubGamblingManager,hascompletedthenecessaryapplications
andhasbeenworkingwiththeownerofBeefO’BradysandtheStateofMinnesota
AlcoholandGamblingDivisiontoexpeditetheprocessasmuchaspossible.
TheStateGamblingControlBoardrequiresCounciltoadoptaresolutionapprovingthis
typeofgamblingpermitapplications.CitystaffdoesnotfindanyreasonthatCouncil
wouldnotapprovethisapplication.
A1.BudgetImpact:none
A2.StaffWorkloadImpact:none
B.ALTERNATIVEACTIONS:
1.MotiontoadoptResolution#2010-61approvingthePremisesPermitApplication
forMonticelloLionsClubtoconductgamblingatBeefO’Bradys.
2.MotiontodenyResolution#2010-61.
C.STAFFRECOMMENDATION:
CitystaffrecommendsAlternative#1toadopttheresolution.
D.SUPPORTINGDATA:
Resolution#2010-61
PremisesPermitApplication
LeaseforLawfulGamblingActivity
CityCouncilAgenda:09/27/10
1
7.ConsiderationofacceptingaLiveWrightgrantawardaspreparedandsubmitted
byCitystaff (AS,KB,TP)
A.REFERENCEANDBACKGROUND:
TheCityCouncilisaskedtoapproveacceptanceofa$52,500grantawardbyLive
WrightforthecompletionofaMonticelloParks&TrailsPlanandResourcesUpdate.
InpreviousCouncilConnectionissues(GreenSheets),staffhasprovidedCouncilwith
updatesontheLiveWrightinitiative.LiveWrightisaprojectoftheWrightCounty
PublicHealthDepartmentandtheMinnesotaInstituteofPublicHealth(MIPH).Itis
designedtoencouragecommunityresidentsandleadersinthedevelopmentofresources
andimprovementsleadingtobetterhealthandactivelifestyles.
Todate,LiveWrighthasbeenfocusedspecificallyinthecitiesofBuffaloand
Monticello.RepresentativesfromMonticelloCitystaff,Monticelloschools,andthe
HospitalDistricthavebeenactiveparticipantsintheCommunityLeadershipTeamfor
LiveWright.
ThroughStatefundingawardedtoLiveWright,theinitiativehasalreadyhadthe
opportunitytofundanumberofgrantprojectsinBuffaloandMonticelloaimedat
increasingopportunitiesforphysicalactivityandpromotinghealthylifestyles.In
August,LiveWrightofferedasecondgrantcycle,acceptingproposalsforinitiativesthat
supportpolicy,systemandenvironmentalchangestohelpcreatehealthiercommunities.
OnbehalfoftheCityofMonticello,staffpreparedagrantapplicationforthisround,
whichclosedonSeptember3rd.
Monticello’sproposalrequestedLiveWrightgrantfundingtosupportthedevelopmentof
aParks&TrailsPlanandResourceUpdate.Theideawastocompleteatwo-pronged
projectyieldingnotonlyanupdatedplanforMonticello’sparksandtrails,butalsothe
updatingofpromotionalresourceswhichwouldcreatemoreuseofthesefacilities.The
grantidentifiedMonticello’sneedforacohesiveplanwhichbuildsonexistingassets,
incorporatinginfrastructure,providingrecommendationsforfuturedevelopment,and
integratingarea-widefacilitiesandresources.Italsorecognizesthatthecommunity
needstoprovideresidentsmoreuser-friendlyinformationonparkandtrailfacilities.
ThefullgrantapplicationisattachedforCouncil’sreference.Itprovidesdetailed
informationontherationalefortheplanningandresourceupdate,aswellasafullproject
scopeandproposedschedule.
OnSeptember10th,theCityofMonticellowasnotifiedthatLiveWrighthasapproved
full fundingoftheMonticellograntrequest.ItshouldbenotedthatMonticello’sgrant
proposalwastheonlygrantrequestfundedwithoutmodificationstoitsproposal.
Asbudgetscontinuetotighten,theneedtomoreeffectivelyandefficientlyplanfor
CityCouncilAgenda:09/27/10
2
park/trailexpansionsandimprovementshasbecomecritical.Councilwillrecallthe
numberofproposedprojectsincludedinthisyear’sCapitalImprovementPlan.By
updatingtheParks&Trailsplannow,itwillhelptheCityidentifyactualneedsand
improvementsforfutureCIPs.Additionally,theplancallsforclosecoordination
betweentheCityandotherswhoprovideparkandrecreationfacilities,includingthe
schoolandtheCounty.Thiscoordinationwillreducecostsbyeliminatingunneeded
duplicationinparkamenitiesandallowusalltoplanandbudgetmoreefficiently.
AnotherbenefitofthisprojectisthattheupdateofthePark&TrailPlanwillinclude
pedestrianplanningforthedowntownarea.TheEmbracingDowntownPlanwillthen
incorporatethedowntownelementsprovidedinthisupdateofthePark&TrailPlan.As
such,staffwillbeabletoreducethetransportationlineitemcostsforthesespecific
componentsintheEmbracingDowntownMonticelloproject.Thesavingsisanticipated
atabout$2,000.
Perhapsmostimportantly,thisgrantrequiresnocashmatchfromtheCity.Thecash
requirementsforboththeplanandresourcecomponentsarefullyfundedbyLiveWright.
Staffdididentifyin-houseresourceswhichcouldserveasin-kindcontributions.Inthe
grantapplication,consultanttimeontheprojectsisclearlyoutlinedandbudgetedbecause
onlyasmallamountofactualstafftimecanbecommittedtotheproject.
A1.BudgetImpact:None.Thegoalisactuallytohaveanetpositiveeffectonthe
budget,allowingtheCitytomoreeffectivelyplanforparkandtrailcapital
expenditures,therebyreducefutureinfrastructureandmaintenancecosts.
A2.StaffWorkloadImpact:Asnotedabove,in-kindcontributionsaretoproviding
baseinformationonexistingfacilities,supportingcommunityengagementefforts,
andutilizationofCityofficesupplies/postage.
B.ALTERNATIVEACTIONS:
1.MotiontoacceptthegrantawardbyLiveWrightforthecompletionofa
MonticelloParks&TrailsPlanandResourcesUpdate.
2.MotiontodenythegrantawardbyLiveWrightforthecompletionofa
MonticelloParks&TrailsPlanandResourcesUpdate.
C.STAFFRECOMMENDATION:
CitystaffrecommendsAlternative#1above.Asnotedinthegrantapplication,thegoal
ofthisprojectistobridgethegapbetween"parksinplace"and"parksinuse".The
intentistodevelopaplantobuildandconnectexistingandfutureparkandtrail
resourcesandprovideupdatedresourcessupportingtheuseofMonticello’sparksand
trailsbymorepeople,moreoften.
CityCouncilAgenda:09/27/10
3
D.SUPPORTINGDATA:
ExhibitA:LiveWrightGrantApplication
1. Mini-Grant Proposal Summary
a) Provide a detailed description of your initiative, including clear goals.
Monticello is requesting Live Wright grant funding to support the development of a Parks &
Trails Plan and Resource Update. Monticello’s goal is to complete a two-pronged project
yielding both an achievable plan for park and trail expansion and improvement, as well as access
enhancement for park and trail users.
While Monticello already has a strong parks and trails system and continues to physically expand
that system, the community lacks a coordinated vision connecting current/future park resources
and actively promoting their use. Monticello last updated its Park & Trails Plan in 1996. Since
that time, the community has grown by over 40%. Through this growth, the community has
added to its existing inventory of parks and trails by acquiring new open space and paths through
park dedication and easement requirements.
In addition to past growth, the City of Monticello and Monticello Township have agreed to an
Orderly Annexation process allowing the City to plan for future growth within a 10,000 acre
boundary. Additionally, the City of Monticello and Wright County have partnered to develop a
1,200 acre regional park at the Bertram Chain of Lakes, just outside the current city limits. With
these factors in place, Monticello has a tremendous opportunity to foster community access to a
first-class park and trail system.
What is needed now is a cohesive plan which builds on these assets, incorporating infrastructure,
providing recommendations for future development, and integrating area-wide facilities and
resources. These facilities need to be safe and accessible for all. The community must also be
able to provide residents more user-friendly information on park and trail facilities.
With these two needs in mind, Monticello is proposing a project which includes two primary
components. The first piece, the Park & Trail Plan, represents completion of a clear policy
direction for Monticello’s park planning efforts in both the short and long term. The Park &
Trail Plan will allow Monticello to better utilize existing resources and more effectively plan for
future needs. The second segment, the Park Resource Update, provides concrete information
sources for residents, which supports immediate access to parks and trails for the community.
The goal of this project is to bridge the gap between "parks in place" and "parks in use". Taken
together, the two project elements will meet that goal, supporting an active, healthy Monticello
for years to come.
b) Describe how your initiative’s goal(s) align with the proposal areas in the mini-grant
guidelines.
Live Wright's Active Community Goals promote the ability for the community to engage in
physical activity through walking, biking, recreation and more. Monticello's initiative will
support these goals by providing for alternative pedestrian-oriented transportation routes and
planning for active recreational opportunities in the community's existing and future parks. In
addition, the development and implementation of both web and print tools for residents will
further enhance access to parks and trails.
Research supports Monticello and Live Wright's goals for healthier lifestyles. A group of s tudies
reviewed in the American Journal of Preventive Medicine showed that creation of or enhanced
access to places for physical activity combined with informational outreach produced a 48.4
percent increase in the frequency of physical activity. The same studies showed that easy access
to a place to exercise results in a 5.1 percent median increase in aerobic capacity, along with
weight loss, and a reduction in body fat. According to the Centers for Disease Control and
Prevention, only 25 percent of American adults engage in recommended levels of physical
activity. As a result of these findings, the CDC itself has called for more parks and playgrounds.
It is clear that Monticello's parks and trails play a critical role in engaging residents in physical
activity. When people have access to parks, they exercise more. When people are armed with
information on the parks and trails, an active lifestyle becomes even easier! This project's dual
focus aims to provide both access and information leading to a healthier Monticello.
c) Who has been involved in developing this proposal? Who else do you plan to involve if
funding is awarded?
The City of Monticello has taken the lead on developing the proposal, working across internal
departments to create a final scope of work. However, the depth of the project will require
coordination with citizen-led advisory groups, such as the Parks Commission, the Planning
Commission, and the Community Center Advisory Board. The intent to provide regional
connectivity will also require that the project have direct involvement from the Monticello Public
School District, and the Wright County Parks, Engineering, and Information Services
Departments. Finally, and most importantly, the project will involve the input and feedback of
the community at-large, including various park user-groups, local recreational associations and
neighborhood organizations. The plan needs to address an array of user-groups, each with
varying accessibility needs. This project seeks to engage stakeholders at every le vel, ultimately
producing a final product that has community support from the ground up.
2. Policy, Systems & Environmental Change (PSE) Change
a) Describe what PSE changes will occur or that are supported as a result of your initiative
Low-density, automobile-dependent development patterns in Monticello have seemingly
discouraged physical activity. By developing a plan to build and connect existing and future
park and trail resources, this grant will help alter that pattern. Specifically, the planning
component will generate Policy, Systems and Environmental Change by weaving together local
and regional park/trail resources and other community assets. The plan will set out a capital
improvement program that outlines a seamless network of options, connecting community
gardens to soccer complexes and everything in between. The plan will create real opportunities
for the community to walk, bicycle and enjoy parks in new ways through increased and direct
access to parks, schools, community facilities, shops and employment. It will help the City look
at streets and movement in a different way. The plan will also focus on the development of
facilities that are safe and accessible to all. This will support the use of Monticello’s park s and
trails by more people, more often.
The Resource Update will take this vision one step further, supporting Policy, Systems and
Environmental Change by improving the usability of park information. New brochures, helpful
signage, better maps, and enhanced web features will make it easier to find, navigate and utilize
all of the City's park and trail resources. The resources will also reach out to a broad spectrum of
users. For example, the program includes a provision for offering higher-tech downloadable
mobile device applications (such as trail finders and distance calculators), as well as low-tech
City walk/bike brochures.
Supporting this system change is a study in the American Journal of Preventive Medicine
showing that “creation of or enhanced access to places for physical activity combined with
informational outreach” produced a 48.4 percent increase in the frequency of physical activity.
The research illustrates that education and information supports long-lasting, healthy changes.
The Park and Trails Plan and Resource Update addresses each primary goal of Live Wright,
effecting policy, system and environmental change. These changes will lead to a healthier, more
active Monticello.
b) Describe how the PSE changes will be sustainable in your community.
This project is innately sustainable, creating opportunities for on-going Policy, Systems and
Environmental change, specifically because it provides a defined plan for implementation and
action well into the future.
The goal of the Parks & Trail Plans and Resource Update is to create an achievable park and trail
plan for development over the long-term, and to increase and encourage the use of those systems.
To accomplish this level of sustainability, the final Park & Trail Plan will be adopted as an
appendix to the City's Comprehensive Plan. The Comprehensive Plan is the City's guide for
future growth and development to 2020. The City uses the Comprehensive Plan as the base for
making decisions about land use, including how and where the community will grow. By formal
adoption into the Comp Plan, the Parks & Trails plan will become the City's set policy for the
development of both existing and future park and trail planning. The Parks & Trails plan will
also be used to supply information for Capital Improvement Plans (CIP). The City's CIP is a
financial management tool, allowing the City Council to plan for and budget for park and trail
improvements, including those multi-modal improvements made to the streetscape.
The Resource Update enables both an immediate and on-going change in park and trail use. In
addition to the PSE changes noted above, the Resource Update will provide a baseline of
information that can be added to and built as the larger vision is achieved. Developing a baseline
of information for park and trail users today will increase the amount of activity in those systems
well into the future.
3. Need
a) Describe the need in your organization or community for this initiative (identify data
sources) and how your initiative will impact the need.
Monticello's past and future growth make planning for the development and use of parks
imperative. As budgets continue to tighten, the need to more effectively and efficiently park for
park/trail expansions and improvements has become critical. Parks and trails are often the first
places communities cut resources. However, research has shown that these important pieces of
infrastructure have direct impacts on the community's social and physical health. Engaging the
public now in park and trail planning will ensure continued support for parks/trails as an integral
part of Monticello’s long-term social and economic health.
b) Describe the population that will be impacted by your initiative.
The scope of work developed for the project includes the current population of the City of
Monticello, as well as the expected population within the orderly annexation area. This impact
area speaks to the longevity and sustainability of the park planning component. The scope of
work calls for a highly inclusionary process involving served and under-served user groups,
neighborhood groups and local associations. In addition, the inclusion of the Monticello School
District into planning efforts, as well as provision for connection to County and regional park
systems, further broadens the population served by the project.
4. Action Plan
a) Describe the specific action you will take to carry out the initiative.
To accomplish its goal, the City proposes the following action plan. (A full scope is available as
a supplement to this grant narrative.)
1. Assessment & Inventory
2. Analysis
A. Parks
B. Trails
3. Public Involvement
4. Plan Preparation & Adoption
5. Implementation & Resource Update
To complete this workplan, the City proposes to utilize planning and engineering consultants.
The City has developed a relationship with Northwest Associated Consultants and will seek to
utilize their services for completion of this project. NAC has on staff an experienced group of
land use planners, park and recreation planners, research professionals and landscape architects
who can provide a high level of experience in meeting the scope of work defined above. The
City will also utilize its designated engineering consultant, WSB & Associates. WSB currently
administers the City's mapping and GIS functions and can facilitate in the geographic and
technical areas of this project. Lastly, the City's current web provider, GovOffice, will be
involved with assistance related to providing the GIS/Web interface. The project will be directed
by Monticello's Community Development Director, with the assistance of the Parks
Superintendent and Community Center Director.
b) Outline the timeline for the actions you plan to take.
October 1st, 2010: Begin assessment and analysis
October - November, 2010: Continue assessment and analysis, neighborhood meetings
November - December, 2010: Continue assessment and analysis, community workshops
December, 2010 - March, 2011: Finalize analysis, prepare final plan and map data
March - April, 2011: Prepare resource updates (GIS, web, multi-media)
May, 2011: Community Open House and Public Hearings for Adoption,
Comprehensive Plan Amendment
June, 2011 - On-going: Implementation and continuous resource updates
5. Evaluation
a) Describe the specific outcomes you plan to achieve with your initiative.
Adoption of the updated Plan and Resources accomplish the following key outcomes:
o Provides a park/trail development plan that meets current and future community needs
o Provides parks and trail development that functions both as recreational resource and a
system which provides multi-modal access to the entire community.
o Creates and continues partnerships with other entities providing recreation opportunities.
o Identifies valuable environmental resources for protection, preservation, access,
restoration and education as appropriate.
o Provides user-friendly resources which encourage and promote immediate and on-going
access to parks and trails.
o Project includes the following deliverables:
Final Parks & Trails plan provided digitally in Publisher/Word and .pdf version
Parks and Trails User Survey (for on-going use) in Word and .pdf format
GIS base layers for parks, trails, sidewalks, regional facilities
Park & trail guidebook/brochure in Publisher/Word and .pdf formats
Web/GIS interface with route mapping options
Web and mobile device application resources
b) Describe how you will measure your outcomes.
Outcomes will be measured by the following benchmarks:
1. Level of initial community participation in assessments and workshops.
2. Recommendations made for adoption of the plan by stakehodlers and policy groups.
3. Adoption of the plan by the City Council.
4. Online statistics capturing, including IP addresses and page views.
5. On-going budget commitment.
6. On-going park use surveys.
4. Action Plan – Detailed Scope
a) Describe the specific action you will take to carry out the initiative.
To accomplish its goal, the City proposes the following action plan.
1. Assessment & Inventory
Identify stakeholders and user groups.
Update geographic identification of all parks and trails.
Update conditions and amenities inventory for all parks.
Inventory partner facilities and opportunities, including the Monticello Public School
District and Wright County.
Identify special issue areas (i.e. grade crossings for Highway 25 and I-94).
Identify park and trail barriers: physical, economic, competitive.
Develop baseline use and performance data for parks and trails through survey
methods.
Prepare a parks and trails needs assessment for Monticello’s current population,
including information for baseline capital improvement planning.
Prepare a parks and trails needs assessment for Monticello’s projected growth area
population, including clear definition of active and passive areas and infrastructure
needs.
Understand Natural Resource Inventory & Assessment information.
Assess current trail and pathway system conditions and connectivity.
2. Analysis
A. Parks
Recommend current park improvement opportunities.
Recommend future park location, spacing, phasing, and type.
Include short and long term planning for the Monticello Community Center as a
primary recreational and fitness resource.
Incorporate the Bertram Chain of Lakes Regional Park concept plan into both short
and long-term assessment and park plans.
Integrate Monticello School District facilities and other existing community resources
(community gardens, farmer's markets) into planning.
Integrate the Monticello Natural Resource Inventory & Assessment into park/ trail
planning, including identification of greenway corridors and natural area
preservation/restoration education opportunities.
Provide ideas for enhancing public enjoyment of the Mississippi River.
Incorporate park dedication opportunities.
B. Trails
Identify complete street opportunities.
Recommend needed connection points and build in way-finding and Live Wright
signage locations.
Specify expansion opportunities for current and future system.
Provide recommendations that address special issue areas.
Develop a regional connection plan which links Monticello’s parks and paths with
Wright County’s existing and future system, as well as neighboring city resources.
3. Public Involvement
Actively engage the general public, including on-site neighborhood meetings, and use
of interactive media strategies.
Assessment surveys, as noted above.
Coordinate with local stakeholders and user groups, including athletic associations.
Allow for direction and involvement by the Parks Commission, the Monticello
Community Center Advisory Board, Planning Commission and City Council.
Hold workshops and hearings as noted below.
4. Plan Preparation & Adoption
The final plan will include the following documents
a. Policy Statements
b. Park Facilities Plan - Type, Location, Phasing
c. Trail & Pathway Plan
d. Greenways Plan
e. Phasing and Capital Improvement Plan
f. Appendix: Data
The final plan will be reviewed and adopted after a series of public events/hearings as
follows:
a. Workshop – Stakeholders
b. Workshop – Review Plan with General Public
c. Workshop – Public policy-makers (Parks, MCC Advisory)
d. Public Hearing – Consideration of Plan by Planning Commission
e. Adoption - City Council
5. Implementation & Resource Update
Provide a detailed Capital Improvement Plan for Park & Trail Plan as proposed.
Develop a Geographic Information Systems (GIS) layer which includes all parkland
and proposed park areas, trailways, connecting sidewalks and regional connection
points.
Implement a web interface utilizing the GIS layer as a base, further enhanced with
user-friendly features such as distance, amenity and condition information.
Provide internet and mobile device applications for promotion.
Create a complete Monticello Park & Trail guidebook/brochure.
Update current park and trail pages on the City website.
CityCouncilAgenda:9/27/10
1
8.Considerationofapprovingquotesandauthorizingcaulkingrepairstothe
MonticelloCommunityCenterbuilding (RH/KB)
A.REFERENCEANDBACKGROUND:
Onsomeofthewindowsandentrywaysofthecommunitycenterthecaulkingneedsto
bereplaced.Timeandweatherhavecausedittodryout,shrinkorgomissinginsome
spots.Tomaintainthebuilding,ensurenowaterseepage,heatorcoolingloss,weneed
tore-caulktheareasaffected.
Therearewindowsonwhichthecaulkisstillingoodshape.Theyarealongthehallway
fortherentalrooms,theCityoffice’sexcludingtheeastalcove,mostofthewindowsin
theMississippiRoom,theeastandsouthentrances,andthelargewindowsonthenorth
sideofthechildcareandtheWarehouseroomareallfineanddonotrequireany
maintenanceatthistime.
Theareasthatwillneedre-caulkingarealongthemainhallway,thepoolwindows,the
alcoveareainCityHall,oneofthepatiowindowsintheMississippiRoom,thewindows
inthefireplaceroom,thecustomerentranceonthewestendofthebuildingandthepool
maintenanceentryonthewestendaswell.Wewillalsohavesomecaulkingdoneonthe
concreteonthesouthsideofthebuildingwherethereisaslightelevationchangedueto
waterdrippingfromtheoverhang.
Wedidreceivefourquotesforthisproject.WeusedtheownerofRasGlassforreferrals,
theCity’sBuildingDepartmentaswellasthephonebookforcontractor’snames.Our
resourcesdidnotidentifyalocalcontractorwhodoescaulking.
Thereareafewoptionsforproductthatcanbeused.Alloftheareasthatneedtobere-
caulkedhaveorhadurethanecaulking.Siliconecaulkingcangooverthetopofurethane
caulking,however,urethanecannotgooversilicone.RonHackenmuellerandBrian
WeldonarerecommendingusingtheproductSonneborn150Urethane.Thesilicone
doesprovidealongerproductlife,butdiscussionwiththecontractorsidentifiedthe
abilitytopossiblypeelthesiliconeoff,whereastheurethanecreatesastrongerseal.The
productlifeoftheSonneborn150isfivetotenyearsandthecontractorsprovidedeithera
oneortwoyearwarrantyonlabor.
A1.BudgetImpact:Thecommunitycenterhaddesignated$30,000inthe2010
budgetforthisproject.ThequotesreceivedarefromA.J.SpanjersCompanyInc.
fromBrooklynParkintheamountof$20,880,TheCaulkersCo.,Inc.from
Fridleyintheamountof$27,800,DziedzicCaulking,Inc.fromAndoverinthe
amountof$17,880andSunriseSpecialtyContractingoutofBigLakeinthe
amountof$24,300.
Sincethecaulkinthewindowsandentrywaysidentifiedaboveisinbadshape,
weknowthatwearelosingheatingandcoolingthroughthoseopenings.We
CityCouncilAgenda:9/27/10
2
wouldanticipatewithabettersealwe’dseeanimprovementinourgasand
electricneeds.
A2.StaffWorkloadImpact:BrianWeldon,theMaintenanceSupervisor,will
overseetheworkwiththehelpofourBuildingDepartmentasanadditional
resourceifnecessary.
B.ALTERNATIVEACTIONS:
1.MotiontoacceptthequoteforDziedzicCaulkingInc.intheamountof$17,880
andauthorizetheworktobedone.
2.Motiontodenyacceptanceofthequotesanddonotauthorizetheworktobe
done.
C.STAFFRECOMMENDATION:
TheCitystaffrecommendsalternativenumber1.Toensureproperbuilding
maintenance,buildingintegrityandimprovedheatingandcoolingefficiencies,we
recommendtheworkbedoneusingDziedzicCaulkingInc.asourcontractor.
D.SUPPORTINGDATA:
Theprojectquotesfrom:
A.J.SpanjersCompanyInc.
TheCaulkersCo.,Inc.
DziedzicCaulking,Inc.
SunriseSpecialtyContracting