City Council Agenda Packet 10-24-2011AGENDA
REGULAR MEETING – MONTICELLO CITY COUNCIL
Monday, October 24, 2011 – 7 p.m.
Mayor: Clint Herbst
Council Members: Lloyd Hilgart, Tom Perrault, Glen Posusta, Brian Stumpf
1. Call to Order and Pledge of Allegiance
2A. Approval of Minutes – October 10, 2011 Regular Meeting
3. Consideration of adding items to the agenda
4. Citizen comments, public service announcements, and staff updates
a. Citizen Comments:
b. Public Service Announcements:
1) Veolia donation presentation
c. Staff Updates:
1) Building Department
5. Consent Agenda:
A. Consideration of approving payment of bills for October 24th
B. Consideration of approving new hires and departures for City departments
C. Consideration of adopting Resolution #2011-98 approving contribution from Tom
Perrault for the General Fund
D. Consideration of accepting 3rd Quarter Financial Reports
E. Consideration of adopting a City Purchasing Card Policy and Procedures
F. Consideration of approving a request for extension of Conditional Use Permit for
Planned Unit Development for a multi-tenant commercial development in a B-3
(Highway Business) District; Applicant: Cornerstone/DOJO LLC
G. Consideration of adopting Resolutions #2011-99A & B accepting improvements
and approving final payments to Straightline Concrete, Inc. and Decorative
Pavement Markings for the Walnut Street Boulevard Improvements, City Project
No. 11C003
SPECIAL MEETING
5:30 p.m. – Embrace Downtown Open House
Memorial for Sheila Lawrence
H. Consideration of approving the Wetland Replacement Plan Application for
wetland mitigation/violation in Lot 1, Block 1, Otter Creek Crossing 4th Addition;
Applicant: City of Monticello
I. Consideration of approving a waiver of the Plan Review Fee for Jacobson
Properties (Monticello Big Lake Pet Hospital) in accordance with the Business
Expansion Incentive Pilot Program
6. Consideration of items removed from the consent agenda for discussion
7. Public Hearing – Consideration of adopting Resolution #2011-100 approving assessment
roll for delinquent utilities to be certified for 2012 payable tax year
8. Public Hearing – Consideration of adopting Resolution #2011-101 approving assessment
roll for delinquent miscellaneous accounts to be certified for 2012 payable tax year
9. Public Hearing - Consideration of adopting Resolution #2011-102 approving assessment
roll for 2011 Street Reconstruction, City Project No. 11C001 to be certified for 2012
payable tax year
10. Consideration of approving Snow Plowing/Removal Policy for 2011-2012 season
11. Added items
12. Adjournment
CityCouncilAgenda:10/24/11
1
5A.ConsiderationofapprovingpaymentofbillregistersforOctober24th (TK)
A.REFERENCEANDBACKGROUND:
TheattachedbillregisterscontainallinvoicesprocessedsincethelastCouncilmeeting.
SubjecttoMNStatutes,mostinvoicesrequireCouncilapprovalpriortoreleasingchecks
forpayment.ThedayfollowingCouncilapproval,paymentswillbereleasedunless
directedotherwise.
IfCouncilhasnoquestionsorcommentsonthebillregisters,thesecanbeapprovedwith
theconsentagenda.Ifrequested,thisitemcanberemovedfromconsentanddiscussed
priortomakingamotionforapproval.
A1.BudgetImpact:None
A2.StaffWorkloadImpact:Noadditionalworkrequired
B.ALTERNATIVEACTIONS:
1.Motiontoapprovethebillregistersforatotalamountof$1,028,883.81.
2.MotiontoapprovethebillregisterswithchangesdirectedbyCouncil.
C.STAFFRECOMMENDATION:
CitystaffrecommendsAlternative#1or#2,perdirectionofCouncil.
D.SUPPORTINGDATA:
Billregisters
CityCouncilAgenda:10/24/11
1
5B.ConsiderationofapprovingnewhiresanddeparturesforCitydepartments (TE)
A.REFERENCEANDBACKGROUND:
TheCouncilisaskedtoratifythehiringanddeparturesofemployeesthathaveoccurred
recentlyinthedepartmentslisted.ItisrecommendedthattheCouncilofficiallyratifythe
hiring/departureofalllistedemployeesincludingpart-timeandseasonalworkers.
A1.BudgetImpact:(positionsaregenerallyincludedinbudget)
A2.StaffWorkLoadImpact:Ifnewpositions,theremaybesometraining
involved.Ifterminatedpositions,existingstaffwouldpickupthosehours,as
needed,untilreplaced.
B.ALTERNATIVEACTIONS:
1.Motiontoratifythehire/departuresoftheemployeesasidentifiedontheattached
list.
2.Motiontodenytherecommendedhiresanddepartures.
C.RECOMMENDATION:
BystatutetheCityCouncilhastheauthoritytoapproveallhires/departures.Citystaff
recommendsAlternative#1,fortheCounciltoapprovethehiresand/ordeparturesas
listed.
D.SUPPORTINGDATA:
Listofnew/terminatedemployees
Name Title Department Hire Date Class
Sally Neil Deputy Registrar Clerk DMV 10/13 PT
Shannon Florek Deputy Registrar Clerk DMV 10/18 PT
Name Reason Department Last Day Class
Brian Vetsch Voluntary MCC 9/29 PT
Dorothy Schmidt-Wyatt Voluntary MCC 4/13 PT
Harry Lantto Voluntary MCC 8/31 PT
David Mitchell Voluntary MCC 1/7 PT
Brian Rousselow Voluntary Parks 10/14 Seasonal
Jon Hirschey Voluntary Streets 10/28 Seasonal
NEW EMPLOYEES
TERMINATING EMPLOYEES
Book1: 10/19/2011
CityCouncilAgenda:10/24/11
1
5C.ConsiderationofadoptingResolution#2011-98toacceptcontributionfromTom
PerraultfortheGeneralFund (CS)
A.REFERENCEANDBACKGROUND:
TomPerraultiscontributing$250forOctobertogointotheGeneralFund.Asrequired
bystatestatute,iftheCityacceptsthedonationoffunds,theCityCouncilneedstoadopt
aresolutionspecifyingtheamountofthedonationanditsuse.
A1.BudgetImpact:None
A2.StaffWorkloadImpact:Staffaccountsforandreconcilesdonationscontributed
throughtheCity.
B.ALTERNATIVEACTIONS:
1.Approvethecontributionsandauthorizeuseoffundsasspecified.
2.Donotapprovethecontributionsandreturnthefundstothedonors.
C.STAFFRECOMMENDATION:
Staffrecommendationistoadopttheresolutionacceptingthecontributions.
D.SUPPORTINGDATA:
Resolution#2011-98
CityofMonticello
RESOLUTIONNO.2011-98
APPROVINGCONTRIBUTIONS
WHEREAS,theCityofMonticelloisgenerallyauthorizedtoaccept
contributionsofrealandpersonalpropertypursuanttoMinnesotaStatutesSections
465.03and465.04forthebenefitofitscitizensandisspecificallyauthorizedtomaintain
suchpropertyforthebenefitofitscitizensinaccordancewiththetermsprescribedbythe
donor.SaidgiftsmaybelimitedunderprovisionsofMNStatutesSection471.895.
WHEREAS,thefollowingpersonsandorentitieshaveofferedtocontribute
contributionsorgiftstotheCityaslisted:
DONOR/ENTITYDESCRIPTIONVALUE
TomPerraultCash$250
WHEREAS,allsaidcontributionsareintendedtoaidtheCityinestablishing
facilities,operationsorprogramswithinthecity’sjurisdictioneitheraloneorin
cooperationwithothers,asallowedbylaw;and
WHEREAS,theCityCouncilherebyfindsthatitisappropriatetoacceptthe
contributionsoffered.
NOWTHEREFOREBEITRESOLVED bytheCityCouncilofMonticelloas
follows:
1.ThecontributionsdescribedaboveareherebyacceptedbytheCityof
Monticello.
2.Thecontributionsdescribedabovewillbeusedasdesignatedbythe
donor.Thismayentailreimbursingorallocatingthemoneytoanother
entitythatwillutilizethefundsforthefollowingstatedpurpose:
DONOR/ENTITYRECIPIENTPURPOSE
TomPerraultCityofMonticelloGeneralfund(Oct)
AdoptedbytheCityCouncilofMonticellothis24thdayofOctober,2011.
CITYOFMONTICELLO
______________________________
ClintHerbst,Mayor
ATTEST:
______________________________________
JeffO’Neill,CityAdministrator
CityCouncilAgenda:10/24/11
1
5D.Considerationofaccepting3rd QuarterFinancialReport (TK)
A.REFERENCEANDBACKGROUND:
Attachedisthe20113rd quarterfinancialstatusreport.Thereporthasseenactivitypick
up,asmoreactivityoccursduringthe2nd and3rd quartersoftheyearthaninthefirst
quarter.ThroughthethirdquartertheCityisingoodshapecomparedtobudgetandis
verysimilartolastyear’srevenueandexpenditureactivity.
Theconcernsthroughthethirdquarteroftheyearisstillbuildingpermitrevenue
comparedtobudgetappearstobefallingshort,buttherearesomecommercialpermits
thatstillneedtobeissued.Alsointerestratesarebelowbudgetandremainverylowas
someoftheCity’sgovernmentsecuritieswithinterestratesat3%orabovecontinuetobe
called,whichforcesustoreinvestatlowerratesorextendthelengthofmaturitiesto
achievesimilarrates.
Ontheexpendituresideoftheledger,lineitemsforiceandsnowactivityarealittlehigh,
butshouldbeoffsetbyotheractivitiesbeingunderbudget.
ThegoodnewsisrevenuesfortheDMVandLiquorFundsshouldexceedexpenditures
byalargeamount(seereport)fortheyear.FiberNetrevenuesarebelowexpensesas
expectedandwillrequirethefinancialsupportofotherCityfunds.
Allotherrevenueandexpendituresappeartobein-linewithbudgetamounts.
A1.BudgetImpact:Thequarterlyreportshaveverylittlebudgetimpactotherthan
stafftimetopreparethereport.
A2.StaffWorkloadImpact:Thereporttakesstaffacoupleofhourstoprepare,but
thehopeisthenewsoftwaresystemwillreducethistimeinthefuture.
B.ALTERNATIVEACTIONS:
1.Motiontoacceptthe20113rd quarterfinancialstatusreport.
2.Motiontonotacceptthe20113rd quarterfinancialstatusreport.
C.STAFFRECOMMENDATION:
TheCitystaffsupportsAlternative#1.
D.SUPPORTINGDATA:
20113rd QuarterFinancialStatusReport
SeptemberInvestmentSchedule
1
20113rd QuarterFinancialStatusReport
Welltheyearis3quartersoveralready,asistheCity’sfiscalyear.Throughthree
quartersoftheyear,itwouldappearthattotalrevenuesfortheCitywillfinishtheyear
belowbudgetaswillexpendituresandexpenses.Expendituresshouldalsofinishtheyear
exceedingrevenues,butalargepartofthatisduetorevenuesandexpendituresinthe
DebtServiceandCapitalImprovementFunds.
Overall
In2010,thefinancestaffcleanedupandproperlyaccountforsomeofitsrevenuesand
expendituresaccounts,whichresultedintherecordingofsomeextra(unusuallyhigh)
revenuesandexpenditures.AlsotheCityissuedthe2010improvementbondswhich
increasedrevenuesin2010comparedto2011.Thisiswhyrevenuesin2010arehigher
comparedto2011.Thechartbelowshowseachfundtypecomparedtobudgetforyears
2009and2010throughtheendofthe3rd quarter(September,30th).
Revenues:2010 2010 %2011 2011 %
Budget 3rdQTRYTD Received Budget 3rdQTRYTD Received
GeneralFund6,329,450 6,033,125 95.32%6,393,620 3,347,147 52.35%
SpecialRevenueFunds 6,110,647 3,705,254 60.64%6,421,694 3,038,184 47.31%
DebtServiceFunds6,064,497 5,014,176 82.68%6,322,683 4,520,875 71.50%
CapitalImprovementFunds5,602,320 2,731,710 48.76%4,752,002 661,127 13.91%
EnterpriseFunds8,620,167 4,745,976 55.06%12,138,168 7,584,285 62.48%
TotalRevenues32,727,081 22,230,241 67.93%36,028,167 19,151,618 53.16%
Expenditures:2010 2010 %2011 2011 %
Budget 3rdQTRYTD Spent Budget 3rdQTRYTD Spent
GeneralFund6,329,450 4,594,887 72.60%6,393,620 4,725,945 73.92%
SpecialRevenueFunds7,521,339 5,377,884 71.50%9,042,560 4,969,785 54.96%
DebtServiceFunds 6,845,275 7,394,918 108.03%6,904,275 6,286,968 91.06%
CapitalImprovementFunds4,289,220 1,681,842 39.21%4,744,500 1,732,915 36.52%
EnterpriseFunds9,909,830 9,434,993 95.21%15,880,783 8,280,914 52.14%
TotalExpenditures34,895,114 28,484,524 81.63%42,965,738 25,996,527 60.51%
2011expendituresaresimilarto2010expendituresatthistime.Assummerandfall
winddown,sodomanyoftheoutdoorconstructionprojectsandthestartupofwinter
expenditureactivity;sobeing60%spentatthispointisapositive.
GeneralFund
TheCityhasrecorded49%ofitspropertytaxrevenuesofarin2011,whichisgoodif
youconsiderthatifeveryonepaidtheirfirsthalftaxestheCityshouldhavecollected
50%ofitspropertytaxbudget.Consideringtheeconomytoonlyhaveabouta1%
delinquencyrateisreallygood.Permitrevenuesarebelowbudgetbuttherearestilla
2
fewcommercialpermitstobeissued,whichshouldbringpermitrevenuesin-linewith
theirbudget.HoweverIdofeelrevenueswillfinishtheyearbelowbudgetamounts.The
tablebelowcompares2011and2010budgetsand3rd quarterrevenuesfortheGeneral
Fund.
2010 2010 %2011 2011 %
Budget 3rdQTRYTD Received Budget 3rdQTRYTD Received
PropertyTaxes5,297,065 5,274,662 99.58%5,362,622 2,632,939 49.10%
Licenses&Permits296,650 160,978 54.27%296,250 186,601 62.99%
IntergovernmentalRevenues114,801 203,177 176.98%139,740 196,157 140.37%
ChargesforServices306,023 187,253 61.19%330,096 176,718 53.54%
Fines&Forfeits300 165 55.00%200 1,085 542.50%
Miscellaneous269,611 206,890 76.74%264,712 153,647 58.04%
TransfersfromOtherFunds45,000 0 0.00%0 0 0.00%
TotalGeneralFundRevenues6,329,450 6,033,125 95.32%6,393,620 3,347,147 52.35%
OntheexpendituresidetheCityhasspent74%ofitsbudgetthroughSeptember.The
tablebelowcompares2011and2010budgettoactualexpendituresbydepartment.
2010 2010 %2011 2011 %
Budget 3rdQTRYTD Spent Budget 3rdQTRYTD Spent
GeneralGovernment1,372,973 1,106,547 80.59%1,403,829 1,028,887 73.29%
PublicSafety1,697,794 1,270,012 74.80%1,710,383 1,216,879 71.15%
PublicWorks2,275,156 1,518,551 66.74%2,299,770 1,579,002 68.66%
Miscellaneous165,593 205,584 124.15%94,063 373,429 397.00%
Parks744,590 448,823 60.28%732,500 477,713 65.22%
EconomicDevelopment 73,344 45,370 61.86%153,075 50,035 32.69%
TotalGeneralFdExpenditures 6,329,450 4,594,887 72.60%6,393,620 4,725,945 73.92%
GeneralFundhasspent73.9%oftheirbudget,whichisslightlyhigherthan2010for
spendingthroughthe3rd quarter.Havingspentonly73.9%ofthebudgetwhenweare
75%ofthewaythroughtheyearisgoodconsideringthatmostoftheone-time
expenditureswerealreadymadeearlierthisyearandsincewehavenotyetallocatedthe
variousinsurancecoststothevariousdepartmentandfundsyet,whichiswhy
miscellaneousexpendituresare397%spent.TheCityshouldbeabletoendtheyear
belowtheGeneralFundbudget,howeverexpendituresmayexceedrevenuesdepending
onearlywintersnowandsecondhalfpropertytaxcollections.
The generalgovernmentdepartment iscurrentlyabovebudgetamounts,butshouldend
theyearbelowbudget.ThemainreasonistheCityspentjustover73%ofitsbudgetis
theCityhaspaidforcomputerequipmentandvariousmaintenanceagreements,which
areonetimeexpendituresandthusthegeneralgovernmentdepartmentshouldendthe
yearunderbudget.
3
The publicsafetydepartment isonly71%spentandallactivitiesarenearorslightly
belowbudgetsofar.Allactivitieswithinthepublicsafetydepartmentarebelowbudget
andshouldfinishtheyearbelowbudget.Theoneexceptioncouldbethefireactivity
whichwilldependonthenumberoffiredepartmentcallsinthe4th quarteroftheyear.
SofartheCityhaspaidout72%ofbudgetedfirewages,butahighnumberofcallsinthe
fourthquartercouldpushthefireactivityoverbudget.Evenifthishappens,thepublic
safetybudgetshouldfinishtheyearunderbudget.
The publicworksdepartment hasspent68.7%oftheirbudgetsofarandshouldendthe
yearunderbudget.Oneofthereasonsthisdepartmentisunderbudgetisthetime
chargedtothe2011streetreconstructionprojectfortheconstructioninspectors,ofwhich
100%oftheirtimewasbudgetedinthisdepartment.Finally,thesnowandiceactivity
willbepurchasingsaltandsandfortheearlysnowseasonshortlyanddependingonsnow
couldhaveexpenses,whichcouldpushthisactivityoverbudget.Howevergenerallyif
snowandiceisoverbudget,theStreetsandParksbudgetsareunderbudgetduetotime
spent(salaryandbenefit)allocations.
Thebudgetforthe miscellaneousdepartment appearstobeoverbudget(124%spent)
butitshouldbeontargettofinishtheyearalittleabovebudget.TheCityhaspaidits
2011insurancepoliciesoutoftheunallocatedinsuranceactivityandwillbeallocating
thecoststothevariousdepartmentsandfundsinthe4th quarteroftheyear.Oncethat
allocationiscompletedthemiscellaneousdepartmentwillbeontracktofinishtheyeara
littleabovebudget.
The parksdepartment isbelowbudgetduetopathwaymaintenanceandchemical
expenditureswhichare58%and41%spentrespectively.Wagesandcorresponding
benefitsarealsounderbudgetduetotimebeingallocatedtootherareasorprojects.So
thedepartmentshouldendtheyearbelowbudget.Finally,the economicdevelopment
department isalsobelowbudgetsofarthisyearandshouldcompletetheyearbelow
budgetbyyear-end.
Insummary,IbelievetheGeneralFundrevenueswillfinishtheyearbelowbudget,as
willexpenditures.Lookingatthingsrightnowmyexpectationwouldbethat
expenditureswillfinishtheyearslightlyaboverevenuesdependingonthenumberoffire
callsandthenumberofsnoweventsovertherestoftheyear,unlesspermitrevenues
increase,alongwithdevelopmentrelatedfees.
SpecialRevenueFunds
SpecialRevenueFundsarefundswhichtheusesoftheirrevenuesarerestrictedfor
specificpurposesbyagoverningbody.TheCitycurrentlyoperates17specialrevenue
funds,eachwiththeirownbudgets.FundssuchastheLibrary,ShadeTree,and
CommunityCenteralldependonapropertytaxlevytosupporttheiractivities.Belowis
thechartcomparingeachSpecialRevenueFund’sbudgettoactualthroughSeptember
30th.
4
ThetotalrevenuebudgetforallSpecialRevenueFundsis$3,038,184andtheCityhas
collected47.3%ofthesesofar.Thosefundswhichcollectpropertytaxesortax
incrementshaveonlyreceivedtheirfirsthalftaxsettlement,withthebalancetobe
receivedinDecember.
TheCity’sthreeaccessfundsandparkandpathwaydedicationfund,whichdependon
newdevelopmentsandpermitfees,arestrugglingwiththeeconomy.TheSanitarySewer
AccessFundhascollectedonly19.2%oftheirbudget.TheStormWaterAccessFund
hasonly14.8%collectedmainlyfrominterestearnings.TheWaterAccessFundhas
onlycollected9.5%oftheirbudgetedrevenues,whiletheparkandpathwaydedication
fundhascollected0.98%.Thesefourfundsrevenueswillfallshortofbudgetamounts.
Ontheexpenditureside,thefundsasagrouphavespent55.0%oftheirbudgeted
expenditures.ThemajorityoftheSpecialRevenueFundsexpendituresaretransfersto
otherfundsfordebtserviceorcapitalprojects.ExpendituresfortheEDAFundarefor
thefirsthalfpay-as-you-goobligations(thesecondhalfwillbepaidinDecember).The
CommunityCenterFundhasspent79%ofitsbudgetduetosummerprogramsand
designcostsrelatedtothenatatoriumimprovements,whichwasnotbudgeted.Thechart
onthefollowingpageshowstheSpecialRevenueFundsbudgettoexpenditures.
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
BudgettoActuals-Revenues
Budget 3rdQTRYTD
5
OneofthemorepositiveitemstoreportistheDMVrevenueshaveexceeded
expendituresby$57,695throughthreequartersoftheyear,withrevenuesontrackto
exceedtheirbudgetamountsandwithexpendituresbelowbudgetamounts.Barring
anythingmajor,theDMVshouldhaverevenuesexceedsexpendituresbyasubstantial
amountfor2011.
DebtServiceFunds
TheCityhasmadeitsdebtpaymentfortheyear,soexpendituresshouldbecompletedfor
theyearastheyare91%spent.OntherevenuesidemostofthetransfersofCityfunds
fortheCityshareofdebtpaymenthavebeenmadeandthefirsthalfspecialassessments
havebeencollected.SecondhalfspecialassessmentswillbereceivedinDecemberand
thesefundsstillhavetheir3rd and4th quarterinterestearningstobereceived.
OveralltheCityhasoutstandingdebtof$60,011,000asof9/30/11,ofwhich$26,445,000
isfortheFiberNetbondissue.TheamountofdebtoutstandingisveryhighforaCityof
oursize,butithasalottoduewiththefinancingoftheinterchangeproject,whichstill
hasbondsoutstandingof$15,660,000asof12/31/11(currentlybeingrefinance)andthe
FiberNetbond.IsaythisbecausethecommontoolforcomparingdebtfromoneCityto
anotherisdebtpercapitaandIoftenseetheserangingfrom$700to$2,500,andthe
averageofcitieswithabondratingofAa3(thisiswhatMonticello’sbondratingis
currently)inMinnesotais$1,744.Ifweusethecurrentpopulationof12,759for
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
BudgettoActuals-Expenditures
Budget 3rdQTRYTD
6
Monticello,ourdebtpercapitais$4,703.43,whichis$710.24lowerthanlastyearatthis
time.Againyoucanpointtothefiberproject,interchangeproject,wastewatertreatment
plantandcommunitycenterprojectsasgoodreasonstobehighanddoesnotmeanthe
Cityisinbadfinancialhealth.
CapitalProjectFunds
MostoftheCapitalProjectFundactivitiestakeplaceinthesummermonthsdueto
Minnesotaweather.Projectsizesaffectbothcostsandrevenuesfromoneyeartothe
nextsocomparingthemtopastrevenueandexpendituresalsoisnotagoodgage.The
2011budgetdidincludebudgetamountsof$4,744,500fortheCapitalProjectFunds.So
fartheCapitalProjectFundshaveexpendituresof$1,732,915mostlyforthe2011street
reconstructionprojectandrevenuesof$661,127,whichismostlyStateAidStreet
Maintenancefundsrelatedtothe2010and2011streetreconstructionprojects.
EnterpriseFunds
TheCityhasfiveEnterpriseFundsthatitoperates.TheseareoperationsthattheCity
runslikeabusiness.TheWaterandSewerFundsthroughSeptemberhavebilledand
recordedrevenuesforthefirsttwoquartersoftheyearandwillbillforthethirdquarter
inOctober.TheLiquorandCemeteryFundsreceivetheirrevenuesonaprettyconsistent
basisthroughouttheyear,withDecemberfortheLiquorFundbeingitsbusiestperiod.
FinallytheFiberNetMonticelloFundrevenuecontinuestogrowasnewcustomersare
signedupforservice.BelowisthetableofbudgettoactualfortheEnterpriseFund
revenuesforthepasttwoyears:
20102010%2011 2011 %
Budget 3rdQTRYTD Received Budget 3rdQTRYTD Received
WaterFund989,977429,04743.34%990,434 524,299 52.94%
SewerFund1,536,625780,19950.77%1,558,180 898,989 57.69%
LiquorFund4,121,5703,293,49379.91%4,492,098 3,444,403 76.68%
CemeteryFund24,2216,44126.59%35,265 17,609 49.93%
FiberNetMonticelloFund1,947,774236,79612.16%5,062,191 2,698,985 53.32%
Total8,620,1674,745,97655.06%12,138,168 7,584,285 62.48%
Asyoucanseetherevenuestotalfor2011comparedtobudgetaresimilarto2010figures
asfarapercentageandamountreceivedtodatewiththeexceptionofFiberNet.
RevenuesforFiberNetwerebasedontheoriginalbusinessplanandwearebehindthat
planduetolawsuit.AlsofromthechartaboveyoucanseeLiquorFundrevenuesfor
2011exceed2010revenuesthrough9/30by$150,910.
Ontheexpendituresidetherearenobigsurpriseseither.Justliketherevenuesthe
expendituresfortheWaterandSewerFundsarewellbelowbudget.AsistheFiberNet
MonticelloFund,whosebudgetwasbasedonthebusinessplanplussomeconstruction
costs.TheLiquorFundexpensebudgetisclosetobeing75%spentthroughthethird
quarterbutthatisduetoincreasedsalesresultinginincreasedordersofsupplies.
7
2010 2010 %2011 2011 %
Budget 3rdQTRYTD Spent Budget 3rdQTRYTD Spent
WaterFund1,307,876 324,797 24.83%1,393,330 382,150 27.43%
SewerFund2,477,121 871,893 35.20%2,579,030 960,519 37.24%
LiquorFund4,107,434 2,883,359 70.20%4,397,199 3,197,807 72.72%
CemeteryFund39,169 14,325 36.57%34,950 13,211 37.80%
FiberNetMonticelloFund1,978,230 5,340,619 269.97%7,476,274 3,727,227 49.85%
Total9,909,830 9,434,993 95.21%15,880,783 8,280,914 52.14%
AllfundsexcepttheFiberNetMonticelloFundandpossiblytheSewerFundappearto
beonpacetotakeinmorerevenuethantheyspendastherevenuecollectionisonlyfor
halftheyearcomparedtoexpendituresfor3quartersoftheyearintheWaterandSewer
Funds.Oncealltherevenuesarerecordedfortheyearthesefundsshouldhaverevenues
exceedingtheiroperatingexpenses,howeverrevenueswillnotfullyoffsetexpensesfor
assetdepreciation.
TherevenueandexpenditurebudgetsfortheFiberNetMonticelloFundassumedtheCity
wouldhavethesystemfullyconstructedandrunningandthecostwouldbeforoperations
andsomecostsforcompletinginfrastructure;howevertheexpensesin2011areforboth
someconstructionandoperationsofthesystem.However,evenasrevenuescontinueto
growasnewcustomerssignupforservices,theCitywillhavetoprovidecashsupport
fromotherCityFundstokeepFiberNetoperatingin2011andinto2012.
Investments
Finally,theCity’sinvestmentactivityhasbeenrelativelyminor.AsofSeptember30th
theCityhad$23,946,400investedatanaverageinterestrateof3.12%andanaverage
yieldof2.97%.Thiscomparesto$23,009,989atanaverageinterestrateof3.59%and
averageyieldof3.49%ayearago.Theeconomyandlowinterestratescontinuetohurt
theCity’sreturnoninvestments.ForthefirsttimetheCity’sinvestmentshaveayield
below3%.Investmentearningaslowas3%arebeingcalledandreplacementinterest
ratesarebetween1%and2%forinvestmentmaturingoverthesameperiod.Rightnow
theCityisreceivingthebestinterestratesonCD’sandothergovernmentalbondissues.
Thebreakdownoftheinvestmentsisonthefollowingpage:
8
FHL=FederalHomeLoan;MoneyMarkets=GovernmentSecurityMoneyMarketFunds;CD’s=
CertificateofDeposits;FNMA=FederalNationalMortgageAssociation;FFCB=FederalFarmCredit
Bank;FHLMC=FederalHomeLoanMortgageCorporation.
Belowistheinvestmentbreakdownbetweenthirdquarter2010and2011:
Investments:2010 2011
CD's 4,274,000 5,578,000
FNMA5,092,988 5,285,000
FFCB1,928,000 3,228,000
FHLMC7,969,000 5,329,000
FHL 2,365,000 1,880,000
OtherGovmt.Bonds0 1,100,000
MoneyMarkets1,381,001 1,546,400
Total23,009,989 23,946,400
AttachedwithsupportingdataaretheinvestmentholdingsoftheCityasofSeptember
30th.
Conclusion
Overallrevenuesshouldendtheyearnearbudgetamounts,whileexpendituresshould
finishtheyearbelowbudget.Buildingpermitsandrelatedfeesandchargesarestill
fallingbelowbudgetedrevenues.Taxcollectionsappeartobestrongthroughthefirst
halfoftheyear.TheDMVandLiquorFundshouldmakeaprofitfor2011andexceed
2010profits.HowevertheFiberNetFundstillhasexpensesexceedingrevenuesbya
largemarginandwillneedtobesupportedbyotherCityfundsforoperationsin2011and
into2012.
CD's
FNMA
FFCB
FHLMC
FHL Money
Markets
OtherGovmt.
Bonds
InvestmentsbyType
CityCouncilAgenda:10/24/11
1
5E.ConsiderationofadoptingCityPurchasingCardPolicyandProcedures (TK)
A.REFERENCEANDBACKGROUND:
TheCityisworkingwithUSBankonaprogramtoprovideCitystaffapurchasingcard
programforvariouscitypurchases.Theadvantagesarelistedintheintroductionofthe
attacheddraftPurchasingCardPolicyandProceduresdocument.Inadditiontothe
benefitslisted,theprogramwillprovidecashcreditsonthecards,whichwillresultin
minorsavingstotheCity.HoweverwiththisprogramandwithanyCitypurchases,the
Cityneedstofollowcertainprocedurestoavoidmisuseofthecardsandmaintainproper
auditcontrols.
TheattacheddraftPurchasingCardPolicyandProceduresallowstheCitytomaintainthe
controlsnecessaryforsuchacardprogram.Staffisstilldevelopingthelistofemployees
whowouldreceivepurchasingcards,spendinglimits,andanyotherrestrictionstoplace
onpurchasingcapabilities(ScheduleA).
AttachedforreviewistheCardUserAgreementthatemployeeswouldberequiredto
readandsignbeforeacardisissuedtothatemployee(AppendixA).Staffisworkingon
arequestformforsupervisorstousetorequestcardsfortheiremployees(AppendixB).
AlsoattachedisasampleCardTransactionFormthatwouldbeusedtoreportpurchase
cardtransactions(AppendixC).
A1.BudgetImpact:TheprogramshouldreducecoststotheCitybyreducingcheck
costs,timespentonbankreconciliations,andthroughcashbackcreditstheCity
willreceive.
A2.StaffWorkloadImpact:Therewouldbelittlestaffworkloadimpactforthis
program.
B.ALTERNATIVEACTIONS:
1.MotiontoapprovethePurchaseCardPolicyandProceduresandthePurchase
CardUserAgreement.
2.MotiontoapprovethePurchaseCardPolicyandProceduresandthePurchase
CardUserAgreement,withadjustmentsbyCouncil.
3.MotiontodenythePurchaseCardPolicyandProceduresandthePurchaseCard
UserAgreement.
C.STAFFRECOMMENDATION:
CitystaffrecommendsAlternative#1fortheapprovalofthePurchaseCardPolicyand
ProceduresandthePurchaseCardUserAgreement.
CityCouncilAgenda:10/24/11
2
D.SUPPORTINGDATA:
PurchasingCardPolicyandProcedures
AppendixA-PurchasingCardUserAgreement
AppendixB–RequestforPurchaseCard(future)
AppendixC–CardTransactionForm(sample)
ScheduleA–employeelistforpurchasecards(template)
CITY OF MONTICELLO, MINNESOTA
PURCHASING CARD POLICY AND PROCEDURES
Introduction
Efficiencies in the City’s purchasing process are gained through the of use purchase
cards. The following are situations where the use of purchase cards will allow for better
productivity and savings:
Local vendors are paid on a timelier basis.
May increase the speed in obtaining materials.
Fewer checks are written. This allows for fewer lost checks and reduced
time for bank reconciliation.
Eliminates the need for employees to use their personal credit card and
seek reimbursement when making on-line purchases and registering for
conferences.
Reduces the need to complete credit applications for vendors where few or
low dollar purchases are made.
Allows swift cancellation of employee’s ability to charge after
employment termination.
Reduces costs by eliminating invoicing fees.
Reduces cost through cash rewards program.
Purchases can be directly traced to the cardholder.
Overview
This policy is intended to be consistent with the City’s Purchasing Policy and Minnesota
State Statutes. The Finance Director may use his judgment and discretion while
delegating and implementing this policy. The City’s purchasing cards are not credit
cards. The outstanding balance must be paid in full each month. No cash access (ATM)
is allowed.
Purpose
The purpose of these procedures is to establish regulations for the use of city purchase
cards in order to maintain a clear accounting for purchases made with these cards. These
guidelines will reduce the potential loss and misuse of cards. It will also provide
employees with a flexible and convenient method to make purchases for the City of
Monticello.
Eligible Employees
The Finance Director in consultation with Department heads will determine which
personnel will be assigned cards and any restrictions that will pertain to individuals’
cards. Refer to Schedule A for current list of employees and restrictions to issued cards.
A purchasing card will be issued to a specific employee in that employee’s name and can
be used by ONLY that employee. Before taking possession of the purchasing card, the
employee must read and sign the credit card user agreement (Appendix A)
A supervisor may request a credit card for an employee by completing a “Request for
Purchase Card” form (Appendix B). The Finance Director may use his discretion in
approving requests.
Procedures
1. Employees will be required to read and sign a City Purchase Card User
Agreement prior to receiving a purchasing card.
2. A city purchase card may be used at any merchant that accepts Visa except as the
City my otherwise restrict or direct.
3. All purchases must be made subject to applicable State and Federal laws and the
City’s purchasing policy.
4. It is the responsibility of the cardholder to insure that the card is used only for
legitimate City business expenditures in accordance with the cardholder’s job
duties and also that no one but the cardholder uses the card.
5. Upon making a purchase, the cardholder shall complete the “Card Transaction”
form (Appendix C), and attach the required documentation. Supervisors must
forward these forms and documentation to the accounts payable clerks on a
weekly basis or sooner if possible. Documentation must follow City purchasing
policy and include detailed receipt when merchandise or food is purchased. No
summarized card receipts will be accepted.
6. If a card is lost or stolen, it is the responsibility of the employee to contact the
card issuer bank and the Finance Director as outlined in the Card User
Agreement.
7. Improper use of the card will result in disciplinary action up to and including
termination of employment as outlined in the city’s personnel manual.
8. When the cardholder’s employment with the city terminates, the employee will
return the card to his supervisor. The supervisor will immediately notify the
Finance Director who will direct his staff to cancel the card.
9. On-line reporting tools will be utilized by the finance department to monitor
purchases and the expenses charged on the card will be compiled in a separate
report and presented to the city council for approval.
10. All rewards (cash back credits) belong to the City.
11. The Finance Department should be notified as soon as possible of any problems,
issues, or discrepancies an employee has with use of the purchasing card.
***********************************************************************
ADOPTED BY the City Council of Monticello this 24th day of October, 2011.
CITY OF MONTICELLO
_____________________________
Clint Herbst, Mayor
ATTEST:
____________________________
Jeff O’Neill, City Administrator
APPENDIXA
PURCHASINGCARDPOLICY
“UserAgreement”
TheuseoftheCityU.S.BankOneCardisaliabilitytotheCityofMonticelloandnotapersonalliability
tothecardholder.Itwillnothaveanyimpactonthecardholder’spersonalcreditrating.Yoursignature
belowisverificationthatyouhavereadtheCity’sPurchaseCardPolicyandagreetocomplywithitaswell
asthefollowing:
1.IagreethecardisforCity-approvedpurchasesonlyandwillneverbeusedforpersonalcharges.
2.IagreetofollowtheCity’spurchasingpolicyforallcarduse.
3.Thecardisissuedinmyname.Iwillnotallowanyotherpersontousethecard.
4.ImproperuseofthiscardcanbeconsideredmisappropriationofCityfunds.Thiswillresultin
disciplinaryactionuptoandincludingterminationofemployment.
5.AllchargeswillbebilleddirectlytoandpaiddirectlybytheCity.Thebankcannotacceptany
moniesfrommedirectly;thereforeanypersonalchargesbilledtothecitywillbemisappropriationof
Cityfunds.
6.Ifthecardislostorstolen,IwillimmediatelynotifyUSBankCorporateCustomerServicebycalling
the24hourtelephonenumber1-800-344-5696andtheFinanceDirectorat763-271-3211.Iwillalso
follow-upwithawrittenlettertomysupervisorandcopytheFinanceDirector.
7.Iagreetosurrenderthecardimmediatelytomysupervisoruponterminationofemployment,whether
forretirement,voluntaryorinvoluntaryreasons.
8.WithintwodaysofmakingapurchasewithmycardIwillcompleteandsubmittomysupervisora
CardTransactionForm.Iwillattachtheoriginalreceiptandanyothersupportingdocumentationfor
thepurchasetotheCardTransactionForm.
9.Iwillworkwiththefinancedepartmenttoresolveanydiscrepancieswithregardtoactivityonmy
card.
10.Iunderstandapurchasercardisnotnecessarilyprovidedtoallemployees.Assignmentisbasedon
myneedtopurchasematerialsfortheCityand/ortoprovideforCitytravel.Mycardmayberevoked
basedonchangeofassignmentorlocation.Iunderstandthecardisnotanentitlementnorreflective
oftitleorposition.
________________________________________________________
EmployeeSignature SupervisorSignature
_________________________________________________________
EmployeePrintedName SupervisorPrintedName
Date ____________________Department __________________
APPENDIXB
PURCHASINGCARDPOLICY
“RequestforPurchaseCard”
Thisformisintheprocessofbeingdrafted.ItwillbeusedbyaDepartmentSupervisorto
requestacreditpurchasingcardforanemployee.
APPENDIXC
PURCHASINGCARDPOLICY
“ParksDeptCardTransactionForm”
Tobecompletedbypurchaser:
Pleaseattachtheinvoice/receiptandanyotheravailabledocumentationtothisform.
TransactionType:___In-store___Phoneorder___Internet___Other
Amount $_______________
Transactionfor:
___Supplies____Repairparts___Rental___Parking
___SeminarsorHotelReservations:Attendee(s)___________________________
Date/Location____________________________________________
Pleasecircleyourname:
TomPawelk
_____________________________TomGrossnickle
EmployeeSignature LeoSchroden
JoshBerthiaume
DerekWipper
Tobecompletedbysupervisor:
_____________________________________________________________________
SupervisorSignatureCodeDateapproved
FinanceDepartmentUse:
J/Edate:___________
Initials:______
ScheduleA ProposedCardholderList
Enabled/Restricted
Department EmployeeName JobTitle EmployeeNumber Purchases
101Admin O'NeillJeffreyR CityAdministrator 1988802
101Admin ShumanCatherineM DeputyClerk/ProjectCoord 1989903
101Admin BurriKerryT AdministrativeAssistant 2009021
101CH SchumannAngelaMarie CommDevelDirector 2003059
101Admin LeerhoffVickiJan Receptionist 2009014
101CH BarnettLivgardMeganE EconomicDevDirector 2008044
101CH ErgenTracyLeann HumanResourceManag 2008043
101Fire JoergSteven FireChief 1994032
101Fire SimpsonMarc FireInspector 1987011
101Fire AckermanTim Firefighter 2000039
101Fire DahlheimerLuke Firefighter 1996034
101Bldg HackenmuellerRonaldGeorge ChiefBuildingOfficial 2006019
101Bldg HennesseyDanielJames BldgInspector/Code 2005036
101Bldg WardDebraA BldgPermitTechnician 1999012
101Eng WestbyBruceRaymond CityEngineer 2005037
101Eng BoseThomasG EngineeringTechnician 1990004
101Eng LudvigsonKarenAnn EngineeringTechnician 2005025
101Fin KellyThomasRichard FinanceDirector 2007028
101Fin McIntireAngelaJoy Asst.FinanceDirector 2011001
101PW PaschkeRobertDonald PublicWorksDirector 2008069
101PW GreenElizabethE AdminAssistant-PW 1994016
101PW HoglundJulieK OfficeSpecialist-PW 2004028
101Streets MooresThomasJ StreetsSuperintendent 1983305
101Streets GapinskiAllenR ShopMechanic/Operator 1988801
101Streets HaalandMichaelElwood StreetsMaintenForeman 2006005
101Streets EiseleJamesM StreetsMaintenanceOper 1990007
101Streets RogersMichaelJ StreetsMaintenanceOper 1999010
101Streets BarnesToddM StreetsMaintenanceOper 1999018
101Streets HoglundRogerAllen StreetsMaintenanceOper 2006031
101Parks PawelkThomasK ParksSuperintendent 1999003
101Parks GrossnickleThomasP ParksMaintOperator 1997018
101Parks SchrodenLeoA ParksMaintOperator 2000124
101Parks BerthiaumeJoshuaBacklund ParksMaintOperator 2008026
101Parks WipperDerekEdward ParksMaintenanceForema 2007056
217 JohnsonAnnaM DeputyRegistrarMan 2000084
217 JacobsonDianeL DepRegistrarClerk/FT 1980001
226 BaltosKathleenM CommCenterDirector 1999011
226 MenthPatriciaM EventCoordinator 2000021
226 CahillSaraRenee Program/OperationsCoord 2006020
226 WeldonBrianP BuildingMaintSuper 2000079
226 MitchellCorinneM AquaticDirector 2000022
226 GresserMichaelW LeadBldgMaint/Custod 2000107
226 HabermanRandallE LeadBuildingMaint/Cust 2000123
601/602 TheisenMattJ W&SCollectionSup 1979902
601/602 RuotsalainenJerodLee W&SCollectForeman 2002028
601/602 JonesDanielLee W&SCollectionOpe 2002021
601/602 WeisSeanBrian W&SCollectionOpe 2003007
609 JohnsenRandallJackie LiquorStoreManager 2008059
AllbutselectMCC
employeesrestricted
frompurchasingalcohol
andthenonly3.2beer
forBallfieldsduring
summermonths.
ScheduleA ProposedCardholderList
Enabled/Restricted
Department EmployeeName JobTitle EmployeeNumber Purchases
609 FischbachMichaelR AsstLiquorStoreManage 1996001
609 PhillipsRyanLouis LiquorStoreClerkFT 2009017
609 BassKathleenL LiquorStoreClerk/FT 2001036
609 WilkeCherylD LiquorStoreClerk/FT 2002054
655 RanftBen FNMManager HBCemployee
655 HenningMatthewWard TechnicalServicesSuper 2009019
655 DeMaraisBrettDouglass AccountManager 2010003
655 Tobedetermined FiberPlantManager 2010016
655 BakerKimberlyAnn CustomerServiceRep 2004038
Generalpertransacionlimit Generalcreditlimit
DeptHeads $1,000 $50,000
Otheremployees $500 $5,000
CityCouncilAgenda:10/24/2011
1
5F.Considerationofapprovingarequestforone-yearextensionofConditionalUse
PermitforPlannedUnitDevelopmentforamulti-tenantcommercialdevelopment
inaB-3(HighwayBusiness)District;Applicant:DOJO/CornerstoneProperties
(AS)
A.REFERENCEANDBACKGROUND:
ThePlanningCommissionreviewedthisitemduringitsSeptemberregularmeetingand
tabledactionontherequestedextension.TheCommissionnotedthatsincethetimeof
theoriginalapproval,thebasezoningordinancefortheB-3Districthadchanged
significantly,andtheCity’sstandardsforthereviewandapprovalofthePUDhadalso
beenamended.TheCommissionwasinterestedinadiscussionwiththeapplicant
regardingmodificationstothesiteandbuildingplanstobetterconformtothose
standards.TheCommissionersthereforerequestedanopportunitytospeakwiththe
applicantregardingtheplannedunitdevelopment.
Subsequently,duringtheOctoberPlanningCommissionmeeting,applicant
representative,WayneElamofCommercialRealtySolutions,waspresenttoaddressthe
PlanningCommissionregardingthesematters.Mr.Elamstatedthathehadspokenwith
thepropertyowners,whohaveindicatedthatitistheirintenttoreconfigurethebuildings
tobettermarketthepropertiestoHighway25,andtorevisethesiteplanaccordingly.
Mr.Elamstatedthatwiththoseintendedrevisions,theownership/applicantwouldalso
incorporatedesignelementstobettermeettheamendedstandards,aswellasapossible
requestforrezoningtoB-4.DuringtheOctobermeeting,itwasclarifiedforthe
applicantthatthesepotentialchangeswouldthenrequireanamendmenttoPUDwithin
theone-yeartimeframe.
Withthatunderstanding,theapplicantrequestedthatthePlanningCommissionmove
forwardtheextensionoftheexistingCUPforoneyear.Duringthattime,theapplicant
intendstoworkonthestatedmodificationstothesiteplanandsubmitanapplicationfor
amendmenttoPUD.
Theoriginallyproposeddevelopmentincludedtheconstructionoftworetailcommercial
buildingslocatedona1.7acresitelocatedsouthofDundasRoadandeastofState
Highway25.TheoriginalPUDwasreviewedbythePlanningCommissiononAugust
5th,2008andapprovedbythe CityCouncilonAugust11th,2008.Duetonon-use,the
conditionalusepermitfortheCUPwassettoexpireonAugust5th,2011.The
MonticelloZoningOrdinancerequiresthatconditionalusepermitsexpireduetonon-use
afteroneyear.
FollowingthetestimonyattheOctobermeeting,thePlanningCommissionrecommended
thattheCityCouncilapprovetheoneyearextensionoftheCUPforPUD,contingenton
submissionofanapplicationforamendmenttothedevelopmentstagePUDconsistent
withthecurrentB-4zoningstandards.ThePUDextensionisalsoconditionedonthe
requirementthatallpreviouslyapprovedconditionsapplytoanyextensionofthepermit.
CityCouncilAgenda:10/24/2011
2
A1.BudgetImpact:None.
A2.StaffWorkloadImpact:None.
B.ALTERNATIVEACTIONS:
ThePlanningCommissionunanimouslyrecommendsalternative1below.
1.Motiontoapproveaone-yearextensionofConditionalUsePermitforPlanned
UnitDevelopmentforamulti-tenantcommercialdevelopmentinaB-3(Highway
Business)DistrictforDOJO/CornerstonePropertiescontingentonsubmissionof
anapplicationforamendmenttothedevelopmentstagePUDconsistentwiththe
currentB-4zoningstandardsandconformancewithallpreviouslyapproved
conditions.
2.Motiontodenytheone-yearrequestforextensionofConditionalUsePermitfor
PlannedUnitDevelopmentforamulti-tenantcommercialdevelopmentinaB-3
(HighwayBusiness)DistrictforDOJO/CornerstonePropertiesbasedonafinding
tobemadebytheCityCouncil.
C.STAFFRECOMMENDATION:
CitystaffrecommendsAlternative#1.
D.SUPPORTINGDATA:
ExhibitA:ApplicantRequest
ExhibitB:PlanningCommissionReport,August5th,2008
ExhibitC:PlanningCommissionMinutes,August5th,2008
ExhibitD:CityCouncilMinutes,August11th,2008
ExhibitE:ConditionalUsePermitPlandocuments
DOJOREQUEST
From:CaryHourscht[chourscht@lampertyards.com]
Sent:Tuesday,August30,20119:22AM
To:AngelaSchumann
Angela,
CanyoupleaseputCornerstone/DojoontheSept.6th.planningcommissionagenda.Forconsiderationof
extendingTheCup/Pudusepermitforantheryear.Duetothecommercial/economicslowdown.
Hopefullywithantheryear.Theconditionswillchange.Werewecangetstartedwiththeproject.
Thankyouforyourtime
CaryHourscht
763-807-8664Cell
Planning Commission Agenda – 08/05/08
8. Public Hearing – Consideration of a request for Conditional Use Permit for
Planned Unit Development for a multi-tenant commercial development in a B-3
(Highway Business) District. Applicant: Cornerstone/DOJO LLC. (NAC)
BACKGROUND
Cornertsone/DOJO Properties, LLC is seeking a Planned Unit Development
Conditional Use Permit (PUD/CUP) to allow the construction of two retail
commercial buildings upon a 1.7 acre site located south of Dundas Road and east
of State Highway 25. The processing of a PUD is specifically necessary to
accommodate the location of two principal buildings upon a single lot of record.
The underlying zoning of the subject property is B-3, Highway Business.
ANALYSIS
Planned Unit Development. As shown on the submitted site plan, the applicant
wishes to locate two principal buildings upon a single lot. To accommodate this
condition, the processing of a PUD/CUP is necessary.
A Planned Unit Development allows for flexibility in performance standards with
the understanding that the development will be held to higher standards of site
and building design than would ordinarily be required. It is the responsibility of
the applicant to design the development with significant benefits and
communicate those benefits to the City as a basis for allowing a CUP/PUD.
Comprehensive Plan. The City’s Comprehensive Plan directs commercial use of
the subject property. Thus, the proposed use of the property is consistent with the
land use directives of the Plan.
Zoning. The subject site is zoned B-3, Highway Business. The purpose of the B-
3, Highway Business District is to provide for and limit the establishment of
motor vehicle oriented or dependent commercial and service activities. The B-3
District allows a wide array of commercial activities. As a condition of PUD
approval, uses within the two commercial buildings will be limited to those
allowed in the B-3 District.
Access. Access to the site is provided from two points long Cedar Street.
Considering there are no access points along the east side of Cedar Street, there
are no alignment issues that need to be considered. However, the south access
location may raise concerns as it relates to the future commercial development of
the adjoining parcel. Along Cedar Street, the City has required commercial
projects to minimize access locations for traffic safety. This southern access point
should be designed in such a way as to permit cross access with the adjoining
future development. This may include either an agreement to provide access to
the proposed location, or (preferably) a joint location straddling the property line.
Planning Commission Agenda – 08/05/08
2
Parking. The parking requirement for retail and service establishments is one
off-street parking stall for each 200 square feet of net floor area. Using this “net
area” calculation, 10 percent of the total building area is presumed to be reserved
for hallways, restrooms, utilities and the like. As a result, the parking requirement
for the proposed commercial use is as follows:
Square Feet Ratio Required
Spaces
North Building 9,504 gsf (8,553 nsf) 1 space per 200 nsf 43 spaces
South Building 5,472 gsf (4,925 nsf) 1 space per 200 nsf 24 spaces
Total 14,976 gsf (13,478 nsf) 67 spaces
Note: Parking ratio applies to retail and service establishments
As calculated above, a total of 67 off-street parking spaces are required of the
proposed commercial use. In satisfaction of this requirement, a total of 69 stalls
have been proposed on the amended plan. In accordance with ADA requirements,
three of the proposed stalls have been designated as handicapped stalls, although
it would appear that these may be better located near building entrances to meet
the intent of the handicapped parking regulations.
It should be noted that the required off-street parking supply assumes retail use of
the two buildings. If, at some future point, a restaurant use (which has a greater
parking supply requirement) is proposed, it will likely be necessary to increase the
site’s existing off-street parking supply. This could only occur via a PUD
amendment. As part of the processing of such amendment, the applicant would
need to demonstrate compliance with applicable off-street parking requirements.
All proposed parking stalls and drive aisles have been found to meet the minimum
dimensional requirements of the ordinance.
With one exception, the parking lot design is considered well conceived. To
better accommodate vehicular backing maneuvers, it is recommended that the
parking stall in the extreme southwest corner of the site (along the site’s southern
boundary line) be eliminated.
Building Design. As shown on the submitted building elevations, the proposed
commercial buildings are to be finished in horizontal cement board siding with
manufactured stone provided on the front elevations. Building colors have not
been noted. As a condition of PUD/CUP approval, building colors should be
specified and subject to City approval.
The proposed buildings measure 27 feet in height and satisfy the maximum two
story height requirement imposed in the B-3 zoning district.
With the exception of the front entrance canopies, a hip roof design is proposed.
All roof areas are to be finished in asphalt shingles.
Planning Commission Agenda – 08/05/08
3
While the proposed buildings meet applicable building height and material
requirements of the ordinance, staff has some concern in regard to the “back of
the building” appearance provided along Highway 25, Dundas Road and Cedar
Street. These areas will be highly visible to passersby. With previous retail
projects along Cedar Street, the City has required “four-sided architecture” to
enhance the views of the projects from all sides, particularly given the high
visibility of these buildings. Upgraded materials on exposed walls have been
required of the Monticello Travel Center project, the Warnert retail project, and
the retail buildings along Cedar Street west of Wal-Mart.
Staff has recommended that the walls exposed to the public streets on this project
be improved with additional stone detailing, particularly around the door areas,
including some of the same column architecture which is proposed for the
entrance side of the buildings.
Setbacks. As shown below, all applicable setback requirements of the B-3 zoning
district have been satisfied:
Front Yard Side Yard Rear Yard
Required Setbacks 30 feet 20 feet 30 feet
Proposed Setbacks 32 feet feet 71 feet
Note: 30 foot setback applied to side yards which abut public rights-of-way
Landscaping. A landscape plan was submitted as a part of a recent addition to
the application packet. The landscape plan shows a total of 23 trees, meeting the
minimum requirement for a commercial site with a site perimeter of
approximately 1,100 linear feet. The landscaped parking islands meet the
minimum area for such islands. Staff would comment that while the landscape
plan meets the minimum, it could be enhanced through additional plantings along
the perimeter of the site, particular along Highway 25 and the south boundary.
Lighting. To date, a lighting plan has not been submitted. Prior to the City
taking official action on the application, it is recommended that a photometric
lighting plan be submitted in accordance with ordinance requirements.
Signage. The applicants have proposed a freestanding sign as a recent
submission, reducing the parking supply in the front of the building to
accommodate the sign location. The proposed sign is 20 feet in height and a total
sign exposure of approximately 128 square feet in sign area. The sign is mounted
on two poles with a stone base, presumably matching the stone on the building.
This sign is the only freestanding sign on the project, and appears to meet the
City’s sign requirements within a PUD.
The submitted front building elevations identify wall sign panels for the
individual building tenants. The total maximum allowable sign area for any wall
Planning Commission Agenda – 08/05/08
4
is determined by taking 10 percent of the gross silhouette area of the front of the
building up to 100 square feet, whichever is less. The subject site has legal
frontage on Highway 25, Dundas Road and Cedar Street making the north
building eligible for wall signage on its north, east and west sides. The south
building is eligible for wall signage on its east and west facades.
As a condition of PUD/CUP approval, all site signs must meet applicable location
and dimensional requirements of the ordinance.
Trash. As shown on the submitted site plan, trash enclosures are proposed on the
east side of the site near the two Cedar Street access points. To be specifically
noted is that both enclosures are located in front of the building line, making them
highly visible to business patrons. While the location of such enclosures (near
site entrances) is understood from a functional standpoint, the locations are
considered less than ideal from a visual perspective.
To address this concern, consideration should be given to attaching such
enclosures to the principal buildings. Considering the proximity of the enclosures
to the adjacent principal buildings (approximately 7 feet), attached enclosures
would reduce site clutter and minimize the visual presence of the trash handling
areas. Such enclosures or “wing walls” should be finished in materials similar to
those used on the principal buildings, including the stone elements.
Loading. It assumed that loading and deliveries will occur through front
entrances to the various commercial tenants. While service or fire doors are
provided on the “back” side of the two buildings, such doors are not accessible
either by driveway or sidewalk. As a condition of PUD/CUP approval, the
handling of loading activities should be addressed by the applicant (to the
satisfaction of the City).
Engineering Issues
There are several details identified by the City’s Engineering staff relating to
utilities, grading and drainage, and related items. The staff met with the
applicants as a part of the project review and have agreed to address those issues
pursuant to the discussions at that meeting. A copy of the engineers report is
included with this packet, and its recommendations are included here by
reference. The comment letter does not incorporate the results of the staff
discussion.
Grading and Drainage. Issues related to grading and drainage should be subject
to comment and recommendation by the City Engineer.
Easement. As shown on the submitted site plan a United Power Association
(UPA) easement is proposed in the southwest corner of the subject site. The
easement area is overlaid by off-street parking. The acceptability of this
Planning Commission Agenda – 08/05/08
5
condition should be subject to comment and recommendation by the City
Engineer.
Utilities. Issues related to utilities should be subject to comment and
recommendation by the City Engineer.
Right-of-Way Dedication. Consistent with the recommendation of City staff, the
northeast corner of the subject property should be dedicated as public right-of-
way. Such dedication (as depicted upon the submitted site plan) will better
accommodate necessary street turning radii and provide additional area within
which utilities may be installed. It is recommended that such dedication occur
prior to building permit issuance.
This issue should be subject to additional comment by the City Engineer.
Dundas Road Vacation. As a condition of PUD/CUP approval, it is
recommended that a narrow strip of the Dundas Road right-of way (as depicted on
the submitted site plan) be vacated and combined with the subject property. To
be noted is that such strip of right-of way was originally owned by the property
owner east of the subject site.
Upon its vacation, such right-of-way would thus be conveyed to such property
owner. Thus, the adjacent property owner will need to convey the vacated strip to
the subject site. Such vacation/conveyance should occur prior to building permit
issuance.
ALTERNATIVE ACTIONS
Regarding the request for a for Planned Unit Development Conditional Use
Permit (PUD/CUP) approval, the City has the following options:
1. Motion to recommend approval of the PUD/CUP, based on a finding that
the proposed use is consistent with the intent of the B-3 District,
subject to the conditions outlined in Exhibit Z.
2. Motion to recommend denial of the PUD/CUP, based on a finding that the
proposed use does not satisfy the intention of planned unit
development by providing higher development standards than would
normally be required.
RECOMMENDATION
The proposed use, a Planned Unit Development Conditional Use Permit
(PUD/CUP) for two retail commercial buildings, appears to be consistent with the
intent of the B-3 District and compatible with existing and anticipated future
Planning Commission Agenda – 08/05/08
6
surrounding uses. To qualify for PUD consideration, a project must demonstrate
that it exceeds the minimum standards of the zoning ordinance. Staff has made a
series of suggestions in this regard related to access, landscaping, and building
materials. With these improvements, staff would recommend approval of the
PUD.
SUPPORTING DATA
Exhibit A: Location Map
Exhibit B: Application Package, including:
Title Sheet
Site Plan
Grading Plan
SWPPP
SWPPP Details
Utility Plan
Water & Sanitary Details
Storm, Sidewalk & Street
Building Plan – North
Elevations
Landscape Plan
Landscape Detail
Monument Sign Detail
Exhibit C: City Engineer’s Comments
Exhibit Z: Conditions of Approval
Planning Commission Agenda – 08/05/08
7
EXHIBIT Z
Conditions of Approval
1. The proposed site access point locations be revised subject to review and approval by
the City Engineer.
2. Any future proposal to accommodate uses which generate a greater off-street parking
demand (i.e. restaurants), the processing of a PUD amendment and additional parking
shall be required.
3. To better accommodate vehicular backing maneuvers, the parking stall in the extreme
southwest corner of the site (along the site’s southern boundary line) be eliminated.
4. Building colors be specified and subject to City approval.
5. The applicant revises the building materials as discussed in this report, particularly as
related to the building facades facing the surrounding streets.
6. The landscape plan be amended to increase planting on the site, particularly along the
south and west boundary areas.
7. A photometric lighting plan be submitted, in accordance with ordinance requirements,
subject to City approval.
8. Consideration be given to attaching the two trash enclosures to the adjacent principal
buildings. Such enclosures or “wing walls” should be finished in materials similar to
those used on the principal buildings.
9. Requirements of the City Engineering staff are complied with, as agreed to at the
staff-applicant meeting on July 29, 2008
10. Right of way dedications and vacations are finalized prior to final building permit
approval.
CityCouncilAgenda:10/24/11
1
5G.ConsiderationofadoptingResolutions#2011-99A&Bacceptingimprovementsand
approvingfinalpaymenttoStraightLineConcrete,Inc.andDecorativePavement
MarkingsfortheWalnutStreetBoulevardImprovements,CityProjectNo.11C003
(BW)
A.REFERENCEANDBACKGROUND:
CityProjectNo.11C003,WalnutStreetBoulevardImprovements,consistedofremoving
existingbrickpaversfromvariousboulevardareasalongWalnutStreetbetween7th Street
WestandBroadwayandinstallingstamped,coloredconcretecloselymatchingthecolor
andpatternoftheexistingbrickpaversinthesamelocations,aswellaswithintheislands
oftheBlock35municipalparkinglot.Improvementsalsoincludedremovingand
replacingnumerousplainconcretesidewalkpanelsalongWalnutStreetinfrontofCargill
KitchenSolutions,theCommunityCenter,andHi-WayLiquors,aswellasreplacingthe
twobrickpaverpedestriancrosswalksattheintersectionofWalnutand5½th Streetwith
aggregatereinforcedthermoplasticcrosswalkmarkings.
OnJuly11,2011,CouncilacceptedtheFeasibilityReportforCityProjectNo.11C003
andawardedacontracttoStraightLineConcrete,Inc.tocompletealloftheconcrete
workforthisprojectatanestimatedcostof$80,000.TheexecutedcontractwithStraight
LineConcreteincludedatotalof10,743squarefeetofstamped,coloredconcrete,4,303
linealfeetofcobblestoneborderstamping,and950squarefeetofplainconcretesidewalk
installations,whichwereprimarilylocatedinfrontofCargillKitchenSolutionsandon
thesouthsideofHi-WayLiquors.TheworknexttoHi-WayLiquors,whichwasnot
identifiedintheFeasibilityReport,wasaddedtotheprojectforthepurposeofreplacing
theexistingpearocklandscapingwithconcretewalkforeaseofmaintenanceandto
preventpearockfromwashingintotheCity’sstormsewersystem,whichwasanon-
goingissue.ThetotalexecutedcontractamountforStraightLineConcreteendedup
being$81,806.55.
Councilshouldalsobeawarethatstaffreceived,athalf-price,onefullseteachofthe
herringboneandcobblestoneborderstampsthatwereusedontheprojectincaseanyof
thestamped,coloredconcreteinstallationsneedtoberepairedorreplacedinthefuture.
Staffbelievessuchrepairworkcanpotentiallybedonein-house.
OnJuly25th CouncilawardedacontracttoDecorativePavementMarkingstoreplacethe
twobrickpaverpedestriancrosswalksattheintersectionofWalnutStreetand5½th Street
withnew TrafficPatternsXD applications,whichareaggregatereinforcedthermoplastic
markingsmeltedontostampedbituminouspavementthatcloselyresemblethecolorand
designoftheexistingbrickpavercrosswalks.Theestimatedcostforthisworkwas
identifiedat$8,750.Theactualinvoicedcostendedupbeing$7,870.50.
Thewarrantyperiodforthethermoplasticpavementmarkingsisone-yearfromthedate
ofinstallation,whichwasSeptember19,2011.DuringthiswarrantyperiodDecorative
PavementMarkingswillreplaceanylossofproductaslongasthelossisnotthedirect
resultofanyworn,damaged,oroilstainedpavement.
CityCouncilAgenda:10/24/11
2
StraightLineConcreteoffersnowarrantyperiodfortheirconcretework.However,it
shouldbenotedthatthecontractorappliedtwocoatsofsealanttoallstamped,colored
concretesurfacesfollowinginstallation,andthatCitystaffwillapplysealantonanon-
goingbasistoensuremaximumlife.Thiswasnotdonewiththepreviousbrickpavers
causingprematuredeteriorationofthebricksduetodirectexposuretode-icing
chemicals.Nextspring,PublicWorksstaffwillalsocleanandsealthecontroljointsthat
weresaw-cutintothestamped,coloredconcreteusingcoloredcaulk.
TheCityCouncilisherebyrequestedtoaccepttheprojectascompleteandapprovefinal
paymenttoStraightLineConcrete,Inc.intheamountof$29,579.90andtoDecorative
PavementMarkingsintheamountof$7,870.50.Thefollowingpaperworkwasrequested
fromthecontractorsandsomeitemshavealreadybeenreceived.
1.Satisfactoryshowingthatthecontractorhascompliedwiththeprovisionsof
MinnesotaStatutes290.92requiringwithholdingstateincometax(IC134form).
2.Evidenceintheformofanaffidavitthatallclaimsagainstthecontractorby
reasonsofthecontracthavebeenfullypaidorsatisfactorilysecured(lien
waivers).
3.ConsentofSuretytoFinalPaymentcertificationfromthecontractor’ssurety
(StraightLineConcreteonly)–thishasbeenreceived.
Staffisindicatingtheprojectiscompleteandreadyforacceptanceandfinalpaymentin
accordancewiththecontractsandCityofMonticelloEngineeringandConstruction
Standards.Followingreceiptofallpaperwork,anduponCouncilapproval,final
paymentwillbereleased.
A1.BudgetImpact:PerpreviousCouncilmotion,paymentfortheseimprovements,
whichtotal$89,677.05,willbetakenfromtheStreetReconstructionFundwhich
hasacurrentbalanceofabout$2,700,000.Inaddition,Citystaffspentabout
$2,500toremovetheexistingpaverbricksandconcreteedgestripsfromthe
pedestriancrosswalks,torepavethecrosswalks,andtobackfilltheedgesofthe
newconcreteinstallations.
A2.StaffWorkloadImpact:StreetsDepartmentstaffremovedtheexistingbrick
pavercrosswalks,compactedthesubgrade,pavedthecrosswalks,andback-filled
theedgesalongallnewconcreteinstallations,withtheexceptionofthe“Swan
Walk”whichwasback-filledbyCommunityCenterstaff.Variousstafffrom
PublicWorksandEngineeringadministeredandinspectedtheproject.
B.ALTERNATIVEACTIONS:
1.MotiontoadoptResolutions#2011-99A&Bacceptingtheimprovementsand
approvingfinalpaymentof$29,579.90toStraightLineConcrete,Inc.,and
$7,870.50toDecorativePavementMarkings,subjecttoreceiptoffinal
paperwork.
CityCouncilAgenda:10/24/11
3
2.Donotaccepttheimprovementsandapprovefinalpayment.
C.STAFFRECOMMENDATION:
StaffrecommendsselectingAlternative#1.
D.SUPPORTINGDATA:
Resolutions#2011-99A&B
CopyofinvoicefromStraightLineConcrete,Inc.(Final-corrected)
CopyofinvoicefromDecorativePavementMarkings(Final)
WarrantyLetterfromDecorativePavementMarkings
CITYOFMONTICELLO
WRIGHTCOUNTY,MINNESOTA
RESOLUTIONNO.2011-99A
ACCEPTINGIMPROVEMENTSANDAPPROVINGFINALPAYMENT
FORSTRAIGHTLINECONCRETE,INC.
WALNUTSTREETBOULEVARDIMPROVEMENTS,
CITYPROJECTNO.11C003
WHEREAS,pursuanttoawrittencontractwhichtheCityofMonticelloawardedtoStraightLine
Concrete,Inc.ofMapleLake,Minnesota,thecontractorhassatisfactorilycompletedtheworkforthe
concretewalkimprovementsinaccordancewiththecontract;
NOWTHEREFORE,BEITRESOLVEDBYTHECITYOFMONTICELLO,MINNESOTA that
theworkcompletedundersaidcontractisherebyacceptedandapprovedandthattheMayorandCity
Clerkareherebydirectedtoissueaproperorderforthefinalpaymentonsuchcontractsubjectto
receiptofthefollowing:
1)SatisfactoryshowingthatthecontractorhascompliedwiththeprovisionsofMinnesotaStatutes
290.92requiringwithholdingstateincometax(IC134);
2)Evidenceintheformofanaffidavitthatallclaimsagainstthecontractorbyreasonsofthe
contracthavebeenfullypaidorsatisfactorilysecured(lienwaivers);and
3)ConsentofSuretytoFinalPaymentcertificationfromthecontractor’ssurety.
ADOPTEDBY theMonticelloCityCouncilthis24thdayofOctober,2011.
CITYOFMONTICELLO
___________________________
ClintHerbst,Mayor
ATTEST:
___________________________
JeffO’Neill,CityAdministrator
CITYOFMONTICELLO
WRIGHTCOUNTY,MINNESOTA
RESOLUTIONNO.2011-99B
ACCEPTINGIMPROVEMENTSANDAPPROVINGFINALPAYMENT
FORDECORATIVEPAVEMENTMARKINGS
WALNUTSTREETBOULEVARDIMPROVEMENTS,
CITYPROJECTNO.11C003
WHEREAS,pursuanttoawrittencontractwhichtheCityofMonticelloawardedtoDecorative
PavementMarkingsofPlymouth,Minnesota,thecontractorhassatisfactorilycompletedtheworkfor
pedestriancrosswalkimprovementsattheintersectionofWalnutStreetand5½th Streetinaccordance
withthecontract;
NOWTHEREFORE,BEITRESOLVEDBYTHECITYOFMONTICELLO,MINNESOTA that
theworkcompletedundersaidcontractisherebyacceptedandapprovedandthattheMayorandCity
Clerkareherebydirectedtoissueaproperorderforthefinalpaymentonsuchcontractsubjectto
receiptofthefollowing:
1)SatisfactoryshowingthatthecontractorhascompliedwiththeprovisionsofMinnesotaStatutes
290.92requiringwithholdingstateincometax(IC134);and
2)Evidenceintheformofanaffidavitthatallclaimsagainstthecontractorbyreasonsofthe
contracthavebeenfullypaidorsatisfactorilysecured(lienwaivers).
ADOPTEDBY theMonticelloCityCouncilthis24thdayofOctober,2011.
CITYOFMONTICELLO
___________________________
ClintHerbst,Mayor
ATTEST:
___________________________
JeffO’Neill,CityAdministrator
CityCouncilAgenda:10/24/11
1
5H.ConsiderationofapprovingtheWetlandReplacementPlanApplicationforwetland
mitigation/violationinLot1,Block1,OtterCreekCrossing4th Addition;Applicant:
CityofMonticello (JO/BW)
A.REFERENCEANDBACKGROUND:
TheCityCouncilisaskedtoconsiderapprovalofawetlandreplacementplanfound
necessaryinconjunctionwiththeSuburbanManufacturingexpansionprojectatthenet
costof$15,016fortheCity.TheCityistheLocalGovernmentUnit(LGU)forthe
WetlandConservationAct(WCA)and,initscapacity,theCityreviewsandissues
permitsforprojectsthatimpactwetlands,addressesviolationissues,andgenerally
overseesthatwetlandsareregulatedintheCityinconformancewithStatewetlandrules.
AspartofaroutinewetlanddelineationbyWSB&AssociatesforOutlotCoftheOtter
CreekCrossing2nd AdditioncompletedinJuly2011,theWrightCountySoilandWater
ConservationDistrict(SWCD)conductedanaerialphotoreviewofthesiteandfound
whatappearedtobeanadditionalwetlandthatpreviouslyexistedonthesitebutno
longerexistedinthecurrentsiteconditions.OutlotCislocatedinthesouthwestcorner
ofChelseaRoadandDaltonAvenueandhasnowbeenreplattedintoOtterCreek
Crossing4th Addition.ThewetlandareawasbroughttotheattentionoftheCity.The
CityandWSBreviewedhistoricaerialphotosthatshowedawetlandintheareajustwest
ofwhereDaltonAvenueiscurrentlylocated.Fromthephotos,itappearsthiswetland
wasfilledafter2003.Fromvarioustopographyfiles,itappearsthewetlandwasfilled
sometimebetween2004and2006.CityStaffandWSBreviewedpastfilesforthe
MonticelloBusinessCenter,ChelseaRoadandDaltonAvenueextension,andtheland
transactionfromChadwicktotheCitytodetermineiftheCityhadeverdelineatedthat
wetland,ifapermitapplicationwasprepared,orifthewetlandwasaddressedwiththe
Chadwickproject.CurrentandpastWSBstaffandCitystaffwerealsocontactedto
determineifanyoneknewanythingaboutthewetlandinthisarea.Basedonthisreview,
nooneknowsexactlywhathappenedtothatwetlandandwerenotawareofitaspartof
anyoftheCity’sprojectsinthearea.Thoughinadvertent,thefillofthiswetlandis
consideredaviolationoftheWetlandConservationAct.
Toaddressthisinadvertentviolation,awetlandreplacementplanapplicationwas
prepared.Thisafter-the-factwetlandreplacementplanapplicationinvolvestwoaspects:
firstwasinadvertentwetlandfillingin2005aspartofsitegradingandroadconstruction
(pastproject),andsecondisacurrentdevelopmentplanforSuburbanManufacturing
Company(currentproject).ThisapplicationhasbeensubmittedtotheCitybytheCity
asanafter-the-factapplicationforwetlandfillduetoa1)awetlandonthesitebeing
inadvertentlyfilledinthepastand2)toshowjustificationforthewetlandfillwiththe
currentlyproposedproject.
IntheWetlandConservationAct,wetlandviolationsmustshowthattheimpactis
justifiedundertherules(i.e.thefillcannotbeavoidedorminimized)andmustprovide
wetlandreplacementata4:1ratio.Theattachedpermitapplicationhasbeenreviewedby
theTechnicalEvaluationPanel(TEP).TheTEPincludesarepresentativefromtheBoard
CityCouncilAgenda:10/24/11
2
ofWaterandSoilResources(BWSR)andtheWrightCountySoilandWater
ConservationDistrict;theTEPactsasatechnicaladvisortotheLGU.TheTEP
concurredthatthewetlandfillcouldnotbeavoided,thatimpactscannotbeminimized,
andthatthewetlandcreditscouldbepurchasedfromawetlandbank.Thewetlandbank
chosenmeetstherequirementsoftheWCAandisoneofthelessexpensivebanks
researchedaspartoffindingwetlandcredits.
Thewetlandthatwasfilledwasdeterminedtobe0.23acres.A4:1mitigationratio
meansthat0.92acresofwetlandcreditneedtobepurchased.Thewetlandbankis
ownedbyMr.PhilipMillerinStearnsCountyandiswithinthesameBankServiceArea
asthewetlandfill.Thecosttopurchasethewetlandcreditswillbe$18,033.84(about
$0.45persquarefoot)toMr.Millerwithanadditional$1,172.20transactionfeeto
BWSRforatotalof$19,206.04.Otherwetlandbanksthatwereinvestigatedwerenearly
doublethiscost.Hadthewetlandbeenidentifiedandpermittedpriortofillinginthepast,
themitigationratiowouldhavebeenata2:1ratio.Wetlandcreditsatthattimewere
sellingfor$1persquarefootduetothehighlandvalues;evenwiththeincreased
mitigationforthisviolation,thecosttotheCityissimilar.Itisunfortunatethatthisissue
wasnotaddressedpriortothewetlandbeingfilled;howeverwecannotbesureasto
whenthewetlandwasfilledorbywhom.Fortunately,theTEPrecognizedtheunusual
circumstancesandworkedwiththeCityandWSBtocorrectthesituation.WSBtakes
theirroleasthewetlandLGUfortheCityofMonticelloseriouslyandhassteppedupto
assisttheCitywiththeresolutionofthisissue.WSBwilltakeresponsibilityforhalfof
thecostofthewetlandcreditsandpaytheBWSRtransactionfeeforatotalof
$10,189.12.TheCitywillpaythecostofthe2:1replacementof$9,016.92andtheLGU
engineeringcostsof$6000.Underthisscenario,theCitycosttodevelopandimplement
themitigationiswhatitwouldhavebeenhadthewetlandnotbeeninadvertentlyfilled.
WeappreciateWSBassistingtheCitywiththesecostseventhoughtheywerenot
involvedwiththewetlandfilling.WealsoappreciatetheeffortmadebyWSBtoexpedite
asolutiontoaproblemthusenablingSuburbanManufacturingtoproceedwiththeir
projectinatimelyfashion.
A1.BudgetImpact:Fundingforpurchaseofthewetlandcreditwillcomefromthe
TrunkStormSewerfundthathasacurrentbalanceofabout$1.8million.
A2.StaffWorkloadImpact:WSBandStaffhavealreadyworkedwiththeTEPto
resolvethismatterinordertoexpeditedevelopmentthatissettooccuronOutlot
C.Thereisnoadditionalworktobecompletedatthistime.
B.ALTERNATIVEACTIONS:
1.MotiontoapprovetheWetlandReplacementPlanapplicationtoaddressthe
wetlandviolationandprovidepaymentof$18,033.84toMr.PhilipMillerand
$1,172.20toBWSR,utilizingthecostsplitsbetweentheCityandWSBasnoted
above.Thiswilladdressthepastwetlandviolationonthissite.
CityCouncilAgenda:10/24/11
3
2.MotiontonotapprovetheWetlandReplacementPlanapplication.Thiswillleave
theCityinviolationoftheWetlandConservationAct.
C.STAFFRECOMMENDATION:
StaffrecommendsAlternative#1.StaffandWSBhaveresearchedthismatterand
workedwiththeTEPtoresolvethisissueinaccordancewiththeWetlandConservation
Act.
D.SUPPORTINGDATA:
After-the-FactWetlandReplacementPlanapplicationdatedSeptember29,2011
PlatdrawingofOtterCreekCrossing4th Addition
CityCouncilAgenda:10/24/11
1
5I.ConsiderationofapprovingawaiverofthePlanningReviewFeeforJacobson
Properties(MonticelloBigLakeHospital)inaccordancewiththeBusiness
ExpansionIncentivePilotProgram (MBL)
A.REFERENCEANDBACKGROUND:
TheCouncilauthorizedaBusinessExpansionIncentiveprograminJanuaryof2011.
Theapprovedprogramstructureallowedforapplicantstoreceiveupto$5,000in
buildingorplanningfeereductions.Theassistancewouldbeappliedonlytotheplan
reviewcomponentofthebuildingpermitcost,planningapplication,ordemolition
permits.
Toqualifyfortheprogram,applicantsneedtobeanexistingbusinessseekingtoexpand
attheircurrentlocationorexpandatanewlocationinMonticello.Theapplicantalso
needstodemonstrateanabilitytomeetatleasttwoofthefollowingcriteria:
1.Createorretainjobs.
2.Redevelopment,expansion,orrenewalofexistingvacantunderutilized
existingcommercialorindustrialproperties/buildings,includingoneofthe
following:
a)Increasebuildingsquarefootage
b)Increasebuildingvaluation
c)Increasedvisualappearanceorfunctionoffacility
d)Productorserviceexpansion
e)OccurswithintheCentralCommunityDistrict
CityStaffreceivedanapplicationfromJacobsonProperties,MonticelloPetHospital,
requestingtoutilizethebusinessexpansionincentiveprogramtoreceiveawaiverofthe
buildingpermitplanreviewfeeandplanningreviewfee.TheCityCouncilapproved
waivingthebuildingplanreviewfeeonJuly25,2011.Again,theprogramallowsa
maximumof$5,000intotalreviewfeestobewaived.Therefore,aftersubtractingthe
buildingpermitplanreviewcost,thetheapplicantisrequestingthattheremaining
amount,$1,707.24,bewaivedinplanningreviewfees.TheirselectedlocationatQuad
DevelopmentrequiredanamendmenttoPUD,whichwasapprovedbytheCityCouncil.
TheMonticelloBigLakePetHospitalwillbreakgroundattheendofOctoberand
anticipatesmovingintotheirnewfacilitybyMayof2012.
A1.BudgetImpact:ThecurrentcashbalanceoftheBusinessExpansionaccountin
theLiquorStoreFundis$13,964.39.UponapprovaloftheJacobsonProperties
application,thefundbalancewillbe$12,257.15.
CityCouncilAgenda:10/24/11
2
A2.StaffWorkloadImpact:Staffworkloadrequirementsconsistedofwritingthe
Councilstaffreport.
B.ALTERNATIVEACTIONS:
1.Motiontoapprovewaiving$1,707.24inplanningreviewfeesforJacobson
Properties(MonticelloBigLakePetHospital)aspartoftheBusinessExpansion
IncentivePilotProgram.
2.Motiontodenywaivingtheplanningreviewfee.
C.STAFFRECOMMENDATION:
StaffrecommendsAlternative#1.Theproposedprojectmeetstheobjectivesofthe
approvedBusinessExpansionIncentivePilotprogrambyaddingsquarefootage,creating
additionaljobs,andincreasingbuildingvaluationinMonticello.Furthermore,theCity
Councilhasapprovedpreviouswaiverrequests(Belde,Aroplax,DLLK,Monticello-Big
LakePetHospital,LandmarkCenter,NAPA,SuburbanManufacturing).
D.SUPPORTINGDATA:
None
CouncilAgenda:10/24/11
1
7.PublicHearing-ConsiderationofadoptingResolution#2011-100approving
assessmentrollfordelinquentutilitiestobecertifiedfor2012payabletaxyear (TK)
A.REFERENCEANDBACKGROUND:
TheCityCouncilisagainaskedtoadoptanassessmentrollforutilitybillingaccounts
whicharedelinquentmorethan60daysandtocertifytheassessmentrolltotheCounty
Auditorforcollectiononnextyear'srealestatetaxes.
Thedelinquentutilityaccountsthatareincludedwiththeagendaareaccountsthatareat
least60dayspastdueandincludeallnewdelinquentsfromthelasttimewecertified
them.TheCouncilpreviouslyapprovedtheestablishmentofanadministrativefeeof$50
peraccountthatisaddedtoeachdelinquentassessment.Itshouldbenotedthatthe
amountsshownontheencloseddelinquentutilitieslistdonotincludetheadditional$50
administrationfeeforthepreparationoftheassessmentroll.Thisfeewillbeaddedafter
theassessmentrollisapprovedbyCouncil.
Thedelinquentutilityamountsbeingcertifiednowtotalabout$4000morethanthe
amountcertifiedlastyearforthesametimeperiod,andthereareabout45additional
accountsbeingcertifiedcomparedtolastyearatthistime.
Itisrecommendedthatthedelinquentaccountsbeputonanassessmentrollfor
certificationataninterestrateof6%asallowedbystatestatute.Asinthepast,ifany
accountsarepaidwithin30daysaftertheadoptionoftheassessmentroll,theycanbe
paidthroughNovember23rd withouttheadditionalinterestbutwouldincludethe$50
processingfee.
A.1BudgetImpact:Certificationofdelinquentutilityaccountsiscollectionofrevenuethe
Cityshouldhavereceivedin2011but,becauseofthenon-payment,thesemonieswillnot
becollecteduntil2012whentheassessmentwillappearonthetaxrolls.
A.2StaffWorkload-Theprocessforcollectingdelinquentutilityamountsistime
consumingwithpreparingandmailingdelinquentnotices;preparingandmailingnotices
ofthepublicassessmenthearingaswellasotherclericalworkinpreparingtheamounts
forcertification.Themosttime-consumingstepoftheprocessisverifyingthedelinquent
accountdataagainstWrightCountypropertytaxrecords.The$50feethatisaddedtothe
delinquentaccountshelpsdefraythecostofstafftimeandpublicationexpenses.
B.ALTERNATIVEACTIONS:
1.MotiontoadoptResolution#2011-100approvingtheassessmentrollforthe
delinquentutilitiesaspresented.
2.MotiontoadoptResolution#2011-100withadjustmentstotheassessmentrollas
directedbyCouncilandbaseduponinputduringthepublichearing.
CouncilAgenda:10/24/11
2
C.STAFFRECOMMENDATION:
StaffrecommendsAlternative#1thattheCounciladopttheassessmentrollaspresented.
Alloftheaccountsareatleast60dayspastdueandhavebeengivenpropernoticeofthis
assessmenthearingandampleopportunitytopaytheaccountsinfull.Allutility
accountswerenotifiedthattherewouldbeanadditional$50administrativefeeattached
toeachoutstandingbalance.
D.SUPPORTINGDATA:
Resolution#2011-100
Listingofdelinquentutilityaccountstobecertified
CITYOFMONTICELLO
WRIGHTCOUNTY,MINNESOTA
RESOLUTIONNO.2011-100
ADOPTINGASSESSMENTROLLCERTIFYING
DELINQUENTUTILITIESFOR2012PAYABLETAXYEAR
WHEREAS,pursuanttopropernoticedulygivenasrequiredbylaw,theCouncilhasmetand
heardandpasseduponallobjectionstotheproposedassessmentfordelinquentutilityaccount
charges;
NOW,THEREFORE,BEITRESOLVEDBYTHECITYCOUNCILOFMONTICELLO,
MINNESOTA:
1.Suchproposedassessments,acopyofwhichisattachedheretoandmadeaparthereof,is
herebyaccepted,fortheamountshownplusanadditional$50certificationfee,andshall
constitutethespecialassessmentsagainsttheparcelsnamedherein,andeachtractofland
thereinincludedisherebyfoundtobebenefittedbytheassessmentleviedagainstit.
2.Suchassessmentsshallbepayableinone(1)annualinstallmentpayableinthetaxyearof
thefirstMondayinJanuary2012,andshallbearinterestattherateof6percentper
annumfromthedateoftheadoptionofthisassessmentresolution.Tothefirst
installmentshallbeaddedinterestontheentireassessmentfromthedateofthis
resolutionuntilDecember31,2012.
3.Theownerofthepropertysoassessedmay,atanytimeuptoNovember23,2011,pay
thewholeoftheassessmentonsuchpropertytotheCityTreasurer,andthatnoadditional
interestshallbechargediftheentireassessmentispaidwithinthistimeframefromthe
adoptionofthisresolution.
4.Theclerkshallforthwithtransmitacertificationofthisassessmenttothecountyauditor
tobeextendedonthepropertytaxlistofthecounty.Suchassessmentshallbecollected
andpaidoverinthesamemannerasothermunicipaltaxes.
ADOPTEDBY theMonticelloCityCouncilthis24thdayofOctober,2011.
CITYOFMONTICELLO
________________________________
ClintHerbst,Mayor
ATTEST:
_________________________________
JeffO’Neill,CityAdministrator
CityCouncilAgenda:10/24/11
1
8.PublicHearing–ConsiderationofadoptingResolution#2011-101approvingthe
assessmentrollfordelinquentmiscellaneousaccountstobecertifiedfor2012
payabletaxyear (TK)
A.REFERENCEANDBACKGROUND:
TheCityCouncilisaskedtoadoptanassessmentrollforaccountsreceivablebillswhich
aredelinquentmorethan60daysandtocertifytheassessmentrolltotheCountyAuditor
forcollectiononthe2012realestatetaxesifnotpaidwithin30daysofthispublic
hearing.
Thetotalamountfordelinquentaccountsreceivabledroppedabout$5,000fromlastyear
withsignificantlyfewerparcelsinvolved.
Itisrecommendedthatthedelinquentaccountsbeputonanassessmentrollfor
certificationataninterestrateof6%asallowedbystatestatute.Asinthepast,ifany
accountsarepaidwithin30daysaftertheadoptionoftheassessmentroll,theycanbe
paidwithoutanyadditionalinterest.AfterCouncilapproval,anadditional$50
processingfeewouldbeaddedtotheamountdueshownontheattachedlisttocover
coststhattheCityhasincurredinthedelinquentnoticesprocess.
A1.BudgetImpact:ThisactionwouldreimbursetheCityforcostsithasincurred
includingCountyfeeschargedforaddingthesetothetaxes.Therewouldbeno
furtherimpactontheCitybudget.
A2.StaffImpact:ThereisnostaffimpactontheCityforthisitem.
B.ALTERNATIVEACTIONS:
1.MotiontoadoptResolution#2011-101approvingtheassessmentrollfor
delinquentmiscellaneousaccountsaslistedwiththeadditionofa$50processing
fee.
2.MotiontoadoptResolution#2011-101approvingtheassessmentrollfor
delinquentmiscellaneousaccountsasadjustedbyCouncil,basedonpublic
hearinginput.
C.STAFFRECOMMENDATION:
CityStaffrecommendsAlternative#1thattheCounciladopttheassessmentrollas
presented.Alloftheaccountsareatleast60dayspastdueandhavebeengivenproper
noticeofthisassessmenthearingandampleopportunitytopaytheaccountinfull.
D.SUPPORTINGDATA:
Resolution#2011-101
Listofdelinquentaccountsreceivable
CITYOFMONTICELLO
WRIGHTCOUNTY,MINNESOTA
RESOLUTIONNO.2011-101
ADOPTINGASSESSMENTROLLFOR
DELINQUENTMISCELLANEOUSACCOUNTSRECEIVABLE
FOR2012PAYABLETAXYEAR
WHEREAS,pursuanttopropernoticedulygivenasrequiredbylaw,theCouncilhasmetand
heardandpasseduponallobjectionstotheproposedassessmentfordelinquentmiscellaneous
accountcharges;
NOW,THEREFORE,BEITRESOLVEDBYTHECITYCOUNCILOFMONTICELLO,
MINNESOTA:
1.Suchproposedassessments,acopyofwhichisattachedheretoandmadeaparthereof,is
herebyaccepted,fortheamountshownplusanadditional$50processingfee,andshall
constitutethespecialassessmentsagainsttheparcelsnamedherein,andeachtractofland
thereinincludedisherebyfoundtobebenefittedbytheassessmentleviedagainstit.
2.Suchassessmentsshallbepayableinone(1)annualinstallmentpayableinthetaxyearof
thefirstMondayinJanuary2012,andshallbearinterestattherateof6percentper
annumfromthedateoftheadoptionofthisassessmentresolution.Tothefirst
installmentshallbeaddedinterestontheentireassessmentfromthedateofthis
resolutionuntilDecember31,2012.
3.Theownerofthepropertysoassessedmay,atanytimeuptoNovember23,2011,pay
thewholeoftheassessmentonsuchpropertytotheCityTreasurer,andthatnointerest
shallbechargediftheentireassessmentispaidwithin30daysfromtheadoptionofthis
resolution.
4.Theclerkshallforthwithtransmitacertificationofthisassessmenttothecountyauditor
tobeextendedonthepropertytaxlistofthecounty.Suchassessmentshallbecollected
andpaidoverinthesamemannerasothermunicipaltaxes.
ADOPTEDBY theMonticelloCityCouncilthis24thdayofOctober,2011.
CITYOFMONTICELLO
_____________________________________
ClintHerbst,Mayor
ATTEST:
_________________________________
JeffO’Neill,CityAdministrator
DELINQUENT MISCELLANEOUS ACCOUNTS - 2011
Name Property Address PID Description Balance
Finders Keepers/J&C Enterprise Inc 108 Cedar St 155010067152 water meter replacement 107.93
Jemel & Danielle Johnson 2533 Briar Oakes Blvd 155070002160 blight/mowing 246.86
Mark Suojanen & Sara Warner 4871 Stoneridge Dr 155090003010 blight/mowing 130.86
Earnest Harris & Ardell Morris 9341 Golden Pond Ln 155173002090 blight/mowing 136.88
Paula Holker 155 East Broadway 155010053100 water meter replacement 106.86
729.39$
CityCouncilAgenda:10/24/11
1
9.PublicHearing-ConsiderationofadoptingResolution#2011-102approving
assessmentrollsfor2011StreetReconstruction,CityProjectNo.11C001,tobe
certifiedfor2012payabletaxyear (BW)
A.REFERENCEANDBACKGROUND:
TheCityCouncilisbeingrequestedtoadoptResolution#2011-102approvingthefinal
assessmentrollsforArea4BandWestRiverStreetbetweenCSAH75andtheballfields,
whichwerereconstructedwiththe2011StreetReconstructionproject,CityProject
#11C001.
ThepreliminaryassessmentrollsforArea4BandWestRiverStreetbetweenCSAH75
andtheballfieldshavebeenupdatedtoreflectpreviousCouncilactionsregardingcosts
tobeassessed,includingaconsiderationforreducingapplicableassessmentratesto
reflectactualconstructioncostsifwarranted.Costsforimprovementsmadeto7th Street
WestbetweenTH25andLocustStreetwiththisprojectarenotbeingassessed.
InaccordancewithMinnesotaStatute429,inordertobondforthisprojecttheCity
Councilmustholdapublichearingpriortoawardingacontractforconstructionofthe
improvements.AhearingwasconductedonFebruary28,2011forArea4BandWest
RiverStreet.TheCityCouncilisalsorequiredtoconductanassessmenthearingatthe
completionoftheproject.
WrightCountyrequiresthatassessmentsbecertifiedtotheCountyAuditorbytheendof
Novemberforcollectiononnextyear’staxes.Thisdeadlinewillbemetbyconducting
theassessmenthearingthisevening,whichallowedadequatetimeforthepublicationand
mailingofnoticestosatisfytherequirementsforpublicimprovementprojectsin
accordancewithMinnesotaStateStatutesChapter429.
Whileconstructionoftheprojectisstillnotcomplete,thevastmajorityoftheprojecthas
beencompleted.Staffhasthereforecalculatedtheactualconstructioncostsknownto
date,andhasestimatedcostsforthefewremainingconstructionitemsnotyetcomplete
inordertomeettheassessmenthearingdeadlinesperStateStatute.Staffisconfidentthat
theestimatedcostswillbeextremelyclosetoactualconstructioncostsuponcompletion
oftheproject.
Thetablebelowidentifiesthecostsforreconstructingthestreetsinthoseareasidentified
asbasebiditems,aswellasthecostsforthetwoalternatebiditemsasapprovedbythe
CityCouncil.Thecostsbelowincludecostsasestimatedbytheengineer,asbidbythe
contractorthattheprojectwasawardedto,andbasedontheestimatedfinalconstruction
cost.Indirectcosts,whichincludeengineering,materialtesting,administration,legal,
andfinancingcosts,areestimatedat22%oftheestimatedfinalconstructioncost.
CityCouncilAgenda:10/24/11
2
Engineer’s
Estimate
Redstone’s
Bid
Estimated
Final
Construction
Cost
BaseBid
Area4B $1,586,031.25$1,412,272.14 $997,260(1)
WestRiverStreet $242,404.75$241,942.28$164,760
7th Street$69,095$86,269.96$83,280
Alternate#1
EllisonParkSanitaryService $14,587$11,846.99$7,350
Alternate#2
EastBridgeParkParkingLot $12,611.25$18,004.12$8,445
Alternate#3
EllisonParkParkingLot $74,825.75$79,677.89$48,450
TOTALCOSTS
BaseBid+Approved
Alternates
$1,930,460$1,763,743.42 $1,309,545
(1)Includes$1,877.94forworkonprivateproperty
Residentialassessments-
Benefitingresidentialpropertiesarebeingassessedforstreetimprovementsusingflat
ratesforeachproperty,regardlessofthesizeorlocationofthepropertyorthenumberof
accesses.TheresidentialassessmentratethatwaspreliminarilyapprovedbyCouncil
was$4,000perproperty.Thisrepresentsanincreaseof5%overthe2010Street
Reconstructionresidentialassessmentratewhichwas$3,800perproperty.A5%annual
increaseisconsistentwiththelastseveralstreetreconstructionprojectscompleted.
Uponapprovingthepreliminaryassessmentratesforthisyear’sproject,Councilasked
stafftoreviewtherateagainsttheactualconstructioncoststoensurethattheCityisnot
over-assessingpeople.Basedontheactualconstructioncostsitisapparentthatthe
constructioncostsarelessthanbidprices,butiftheCityweretoreduceassessmentrates
wewouldnotbeabletomeettheminimum20%assessmentthresholdrequiredbyState
Statute.
Inaddition,staffwouldnotrecommendreducingtheresidentialstreetassessmentrate
sincethepreliminaryrateapprovedbyCouncilisalreadysignificantlylessthanwhat
othercomparablecitiesareassessingtheirresidentsforsuchprojects.Andduetothe
increasingbudgetdeficitsfacinglocalgovernments,staffwouldrecommendincreasing
residentialstreetreconstructionassessmentratesonfutureprojects,whichcanbe
exploredinmoredetailwhenthenextstreetreconstructionprojectisproposed.
CityCouncilAgenda:10/24/11
3
Non-residentialassessments-
Benefitingnon-residentialpropertiesarebeingassessedforstreetimprovementsona
front-footbasis.Thenon-residentialratepreliminarilyapprovedbyCouncilis$80per
frontfootforstreetimprovements,whichisthecurrentstandardnon-residentialrate.
Thisratewasusedonotherrecentstreetreconstructionprojects,andwasinitially
establishedusingtheConstructionCostIndex.Staffthereforebelievesthisrateis
reasonable,evenwhenconsideringactualconstructioncostsversusbidpricesreceived.
Perpreviousassessmentpractices,non-residentialratesareappliedto100%ofthefront
footageand50%ofthesidefootageofnon-residentialproperties,aslongastheproperty
hasdirectaccesstothereconstructedstreet,or25%ofthesidefootageiftheproperty
doesnothavedirectaccess.However,ifdirectaccessisaddedatalaterdatetheproperty
ownerwillthenberequiredpaytheadditional25%atthattime.Previousassessments
forpropertiesassessedduringtheCSAH75improvementprojectweretakeninto
considerationwiththepreliminaryprojectassessmentsbasedontheabovemethodology.
Severalnon-residentialpropertiesrequirespecialconsiderationasfollows.
MNGPTrainingFacilityProperty(2100WestRiverStreet)–Forthepurposeofthis
assessmentrole,theinitialassessmentforthispropertyhasbeennoticedat$42,240($80
X528frontfeet).However,thisamountshouldbeconsideredpreliminaryasitisbased
onslightlylessthanhalfthelinealfrontfootageofthepropertyalongthelengthofthe
TrainingCenterFacility.Inordertoaddressthissituation,itisproposedthatthe
assessmentrollbeadoptedasiswiththenotationinthemeetingminutesthata
supplementalassessmenthearingwillbeconductedinthefuturethataccountsforthe
portionofcost/valuenotincludedintheoriginalnotice.Aspartofthisprocess,staffwill
meetwithXcelofficialstodiscussuniquecircumstancesaffectingthebenefitofthe
improvementtothebalanceoftheproperty.OneimportantfactortodiscusswithXcelin
establishingbenefitoftheroadwayisthefuturepresenceofacitystormwaterpond
coveringaportionoftheproperty.Logically,itwouldnotbefairtochargefullamount
foraroadimprovementadjacenttopropertythatwillbeunusableduetothepresenceofa
futurestormpond.WemaywishtotakethisopportunitytotalktoXcelaboutwaiving
theassessmentforthefuturepondareafrontfootageareainconjunctionwithcity
purchaseofthelandoreasementsutilizingtrunkstormsewerfunds.
ElectroIndustries(2150WestRiverStreet)-BillSeefeldt,ownerofElectroIndustries,
submittedalettertotheCityonJanuary31,2011inwhichhequestionedthepreliminary
assessmentrateandaskedthatitbere-evaluated,amongotherthings.Thisletteris
attachedassupportingdata.Uponreviewingthisrequestfurther,stafffeelsthatthenon-
residentialassessmentrateof$80perfrontfootisafairandjustrateforthispropertyand
doesnotrecommendreducingit.
MichaelisProperty(2156WestRiverStreet)-TheMichaelisproperty,locatedbehind
ElectroIndustries,isbeingassessedfortheWestRiverStreetimprovementssincethey
accesstheirsitefromWestRiverStreetviaElectroIndustriesaccess.Assuch,thefront
footageoftheElectroIndustriesparcelhasbeenproportionatelysplitbetweenthetwo
CityCouncilAgenda:10/24/11
4
propertiesbyapplyingaratiooftheareasofthetwopropertiestothetotalfrontfootage
todetermineeachpropertiesassessment.
MonticelloAlanoSociety(2025WestRiverStreet)–TheBoardofDirectorssubmitteda
lettertotheCitydatedFebruary14,2011requestingthattheCityCouncilwaivetheir
assessmentinitsentirety,therebyallowingthemtomaintaintheirpresentobligationsand
tonotjeopardizetheirfuturebydepletingthefundstheyhavemanagedtosaveand
earmarkforamuchneededexpansionproject.TheletternotedthattheMonticelloAlano
Societywasincorporatedin1978andthattheircurrentmembershipisabout30people,
butthattheyserveabout200peopleaweek.Theletteralsostatedthattheyareanon-
profitorganizationthatdoesnotrequirepaymentofduesorfeesfortheirservices,and
thatanassessmentforthisprojectwouldplaceaveryheavyburdenupontheirservice.
DuringthepublichearinginFebruary,Councilreviewedtheirpreliminaryassessmentof
$8,000whichwasbasedonthestandardassessmentratefortworesidentialpropertiesto
beconsistentwiththeassessmentapproachusedforboththeRodandGunClubandthe
RitzeTruckingpropertiesforthe2007StreetReconstructionproject.Councilnotedthat
theywouldbewillingtoconsiderdeferringsomeoralloftheirassessmentduringthe
finalassessmenthearinginthefall.
StaffrespectfullyrecommendsthattheCouncilcarefullyconsidertheCity’sestablished
assessmentpolicypracticesandanyprecedentsthatcouldbesetwhenconsideringthese
specialassessmentrequests.
Assessmentdeferraloption-
ThereisoneundevelopedpropertyonWestRiverStreetabuttingthewestsideofElectro
Industries.Ashasbeendonepreviouslyforundevelopedproperties,theCouncilcould
choosetodefertheassessmentforthispropertyuntilsuchtimethatitisdeveloped.Staff
isnotawareofanyimminentplanstodevelopthisproperty,butinworkingwiththeCity
duringthisprojecttosettheutilityservicestublocationsforthisproperty,Electro
Industriesindicatedthattheyarelookingtodevelopthispropertyinthenottoodistant
future.
IfCouncilapprovesanyassessmentdeferrals,staffwillworkwiththepropertyowner(s)
toexecutethenecessaryassessmentdeferralagreement(s).
Assessmentsforimprovementstoprivateproperty-
ThreepropertyownerswithintheprojectlimitsrequestedthattheCity’scontractor
completeadditionalworkontheirprivateutilityservicesand/ordrivewaysduringthe
projectatthepropertyowner’sexpense.WhencontractorsonCityprojectsareagreeable
tothis,aswasthecasethisyear,theCitytypicallyaccommodatessuchrequests.The
extraworkwasthereforecompletedasrequestedandthosepropertyownersarebeing
assessed100%ofthecosts,whichtotals$1,877.94andisaccountedforintheattached
assessmentrollsandresolution.
CityCouncilAgenda:10/24/11
5
EllisonandEastBridgeParkparkinglotimprovements-
ImprovementscompletedintheEllisonParkandEastBridgeParkparkinglots,which
totaled$78,383,includedindirectcosts,arebeingfundedwithParkfunds.
Projectfundingsplits-
ThisprojectwasinitiallyfundedwithGeneralObligationbonds,whichwillbepaidback
usingacombinationoffundingsourcesincludingstateaidfunds;streetreconstruction
funds;stormsewer,sanitarysewerandwatertrunkfunds;andassessmentstobenefiting
properties.
Utilityoperatingfundsareproposedtobeusedforallsanitarysewerandwatermain
replacementsonstreetswithintheprojectareas,aswellasforgeneralutilityadjustments.
Replacementofindividualsewerand/orwaterservicelinesisassessedtothebenefitting
propertyownerwhentheworkisrequestedbythepropertyowner.IftheCityinitiated
theworkonanindividualservicelinetheCityispayingfortheworkandtheproperty
ownerisnotbeingassessed.Stormsewertrunkutilityfundsarebeingusedtofundall
newstormsewerwork.
TheproposedfundingsplitsforArea4BandWestRiverStreetbetweenCSAH75and
theballfieldsareasfollows:
Assessments...................................................$543,648
StreetReconstructionandStateAidFund.....$364,677
StormSewerTrunkFund...............................$147,284
WatermainTrunkFund..................................$144,718
SanitarySewerTrunkFund...........................$318,937
ParkFund.......................................................$78,383
Total...........................................................$1,597,647*
*Thetotalcostincludes$20,000fortheinstallationoftheBNSFrailroadsurface
crossingmaterialsonWestRiverStreet.Thisworkwascompletedbytherailroad’s
contractorpertheirrequirement,forwhichwethenreimbursedthem.
Therecommendedassessmentinterestrateis4%and,unlessotherwiserequestedin
writing,allassessmentswillbeprocessedwitha10-yearterm.
A1.BudgetImpact:TheCity’sshareoftheprojectfundingwilldependonthefinal
assessmentratesapprovedbyCityCouncil.StaffrecommendspayingtheCity’s
sharefromthebondsusedtoinitiallyfundtheproject.
A2.StaffWorkloadImpact:Impactstostaffworkloadareanticipatedtobeminimal
nomatterwhichactionCounciltakes.
CityCouncilAgenda:10/24/11
6
B.ALTERNATIVEACTIONS:
1.MotiontoadoptResolution#2011-102approvingassessmentrollsfor2011Street
Reconstruction,CityProjectNo.11C001,tobecertifiedfor2012payabletax
year.
2.MotiontodenyadoptionofResolution#2011-102atthistime.
C.STAFFRECOMMENDATION:
CitystaffrecommendsthattheCouncilauthorizeAlternative#1.
D.SUPPORTINGDATA:
Resolution#2011-102
A-LetterfromElectroIndustriesdatedJanuary31,2011
B-LetterfromMonticelloAlanoSocietydatedFebruary14,2011
C-AssessmentAreaMaps:
Area4B(EastRiverStreetarea)
WestRiverStreet–CSAH75toBallFields
WestRiverStreet-undevelopedareaofXcelproperty
D-AssessmentRolls:
Area4B(EastRiverStreetarea)
WestRiverStreet–CSAH75toBallFields
CITYOFMONTICELLO
WRIGHTCOUNTY,MINNESOTA
RESOLUTION2011-102
ADOPTINGASSESSMENTROLLCERTIFYING
2011STREETRECONSTRUCTIONIMPROVEMENTASSESSMENTS
FOR2012PAYABLETAXYEAR,CITYPROJECTNO.11C001
WHEREAS,pursuanttopropernoticedulygivenasrequiredbylaw,theCouncilhasmetand
heardandpasseduponallobjectionstotheproposedassessmentforthe2011Street
ReconstructionprojectconsistingofArea4B,whichincludesEastRiverStreetfromCedar
Streettoapproximately1,100feeteastofWashingtonStreet,aswellasPalm,New,Wright,
Ramsey,Hennepin,andWashingtonStreetsbetweenEastBroadway/CSAH75andEastRiver
Street,andthereconstructionofpavedsurfacesinEllisonParkandEastBridgePark;andWest
RiverStreet,westofWrightCSAH75;and
NOW,THEREFORE,BEITRESOLVEDBYTHECITYCOUNCILOFMONTICELLO,
MINNESOTA:
1.Suchproposedassessment,copiesofwhichareattachedheretoandmadeaparthereof,is
herebyacceptedandshallconstitutethespecialassessmentagainstthelandsnamed
therein,andeachtractoflandthereinincludedisherebyfoundtobebenefittedbythe
proposedimprovementintheamountoftheassessmentleviedagainstit.
2.Suchassessmentshallbepayableinannualinstallmentsextendingoveraperiodoften
years,thefirstoftheinstallmentstobepayableinthetaxyearofthefirstMondayin
January,2012,andshallbearinterestattherateof4%(percent)perannumfromthedate
oftheadoptionofthisassessmentresolution.Tothefirstinstallmentshallbeadded
interestontheentireassessmentfromthedateofthisresolutionuntilDecember31,2012.
Toeachsubsequentinstallmentwhendueshallbeaddedinterestforoneyearonall
unpaidinstallments.
3.Theownerofanypropertysoassessedmay,atanytimeuptoNovember28,2011,pay
thewholeoftheassessmentonsuchpropertytotheCityTreasurer,exceptthatnointerest
shallbechargediftheentireassessmentispaidwithinthestatedtimeframefromthe
adoptionofthisresolution.Inanysubsequentyear,theownermaypaytotheCity
Treasurertheentireprincipalamountoftheassessmentremainingunpaid,withthe
exceptionoftheamountassessedonthecurrenttaxes.Suchpaymentshallbemade
beforeNovember15thorinterestwillbechargedthroughDecember31ofthenext
succeedingyear.
4.TheclerkshallforthwithtransmitacertificationofthisassessmenttotheCountyAuditor
tobeextendedonthepropertytaxlistsofthecounty.Suchassessmentsshallbe
collectedandpaidoverinthesamemannerasothermunicipaltaxes.
ADOPTEDBY theMonticelloCityCouncilthis24thdayofOctober,2011.
CITYOFMONTICELLO
______________________________________
ClintHerbst,Mayor
ATTEST:
___________________________________
JeffO’Neill,CityAdministrator
Fa
l
l
o
n
Av
e
N
e
H
a
r
t
Bl
v
d
River
S
t
W
Territo
r
i
a
l
R
d
E Bro
a
d
w
a
y
S
t
Was
h
i
n
g
t
o
n
S
t
Ce
d
a
r
S
t
Pin
e
S
t
He
n
n
e
p
i
n
S
t
Ra
m
s
e
y
S
t
Wri
g
h
t
S
t
Ne
w
S
t
Pa
l
m
S
t
Riv
e
r
S
t
E
4th
S
t
E
3rd
S
t
E
7th St E
53
80
79
81
54 55 56
83
82
84
57 58 59
858687
7
88
60 61
64
63
62
65
1
67 6869
66 32 33
71
70
23
89
22212019
272625
24
28
3029
31
2 4
3
8
65
109
14131211
18171615
363534
37 38
39
73
51
72 74
40 41 42 43 44
75 76
45 46 47 48
77
78
49 50 52
File: K:\01494-42\GIS\Maps\assessments.mxd, Dec 29, 2010 2:25:46 PM
City of Monticello 2011 Street Reconstruction
¹
0 300Feet
Proposed Assessed Properties(CP 11C001)
Residential
Non-Residential
City Owned
Hospital
!"b$
EÕGH
116TH STRE
E
T
N
E
TOWNSHIP ROAD
RIVER STREET WEST
AL
P
I
N
E
D
R
I
V
E
MA
R
V
I
N
E
L
W
O
O
D
R
O
A
D
CR
O
C
U
S
L
A
N
E
CR
O
C
U
S
CIR
C
L
E
HILL
C
R
E
S
T
CIRC
L
E
CSAH 75
PRAIRIE ROAD
EL
W
O
O
D
R
O
A
D
RIVER ST.
RAI
L
R
O
A
D
2
4
5
3 1
File: K:\01494-42\GIS\Maps\RSW_prop.mxd, Jan 25, 2011 3:08:35 PM
West River Street2011 Street Reconstruction (CP 11C001)Monticello, MN µ0 500FeetProposed Assessed Parcels
FINAL Proposed Assessment Roll - East River Street (Area 4B)
2011 STREET RECONSTRUCTION PROJECT
Map ID PID Owner Name Property Address Assessment Amt
1 155010066010 SANDRA L GOULD 207 RIVER ST E 4,000.00$
3 155040001050 ROBERT J&VALERIE SOMERVILLE 213 RIVER ST E 4,000.00$
4 155040001021 DIANE B BLUE 219 RIVER ST E 4,000.00$
5 155040001020 MICHAEL A PELARSKI 225 RIVER ST E 4,000.00$
6 155040001010 ELIZABETH E BALDRIDGE & DAVID E FIECKE 231 RIVER ST E 4,000.00$
7 155040001011 LEROY E & SHARON K ROBIDEAU 237 RIVER ST E 4,000.00$
8 155015006050 DARYL R & ELLEN E FISCHBACH 303 RIVER ST E 4,000.00$
9 155015006030
FRANK SR & LEANORA LIEBHABER TR
% GREGORY V SMITH, ATTORNEY 313 RIVER ST E 4,000.00$
10 155015006010 DONALD & KATHLEEN NICOLAI 325 RIVER ST E 4,000.00$
11 155015007050 FRED W & BONNIE COX 401 RIVER ST E 4,000.00$
12 155015007040
RUTH M SPARKS
% LYLE W & MARION N OLSON 409 RIVER ST E 4,000.00$
13 155015007020 MARCIA L HEIGL 413 RIVER ST E 4,000.00$
14 155015007010
WELLS FARGO BANK NA
%WACHOVIA MORTGAGE FSB 425 RIVER ST E 4,000.00$
15 155015008050
OLIVER K MALMIN
%CNA FIELD OFFICE 501 RIVER ST E 4,000.00$
16 155015008030 JOHN & DORIS HARELAND 507 RIVER ST E 4,000.00$
17 155015008020 LEANN K ZELLGERT &BROOKS E JOHNSON 519 RIVER ST E 4,000.00$
18 155015008010 JAY A & ANNETTE M SHIERTS 525 RIVER ST E 4,000.00$
19 155015009050 DARWIN G & SHIRLEY M STRAW 601 RIVER ST E 4,000.00$
20 155015009040 THOMAS A & COLLEEN J WEISS 607 RIVER ST E 4,000.00$
21 155015009030 KAREN M & JERRY D WELLS 613 RIVER ST E 4,000.00$
22 155015009020
OLIVER K MALMIN
%CNA FIELD OFFICE 619 RIVER ST E 4,000.00$
23 155015009010 ARVE A & JEAN A GRIMSMO 625 RIVER ST E 4,000.00$
24 155015010060 JAMES A DICKRELL & MARY M MICKE 707 RIVER ST E 4,000.00$
25 155015010040 ARNOLD C &KATHERINE TESSMER 719 RIVER ST E 4,000.00$
26 155015010011 WILLIAM J CUMMINGS & JANICE C PLETSCH 725 RIVER ST E 4,000.00$
27 155015010010 FRED R & MAXINE M TOPEL 721 RIVER ST E 4,000.00$
28 155015017010 CITY OF MONTICELLO (not assessed)913 RIVER ST E 62,928.00$
29 155015019011 E DANIEL & CHRISTY M SECOR 1005 RIVER ST E 4,000.00$
30 155015019010 PAMELA A JONES 1007 RIVER ST E 4,000.00$
32 155218001030
NLD HOLDINGS II LLC
% CAPITAL REAL ESTATE INC 116 RIVER ST E 2,304.00$
33 155010067151 DAVID F STROMBERG 102 CEDAR ST 4,000.00$
34 155010067140 CHANTELLE M MITCHELL 206 RIVER ST E 4,000.00$
35 155010067130 MARK I MICHAELIS 212 RIVER ST E 4,000.00$
36 155010067120 ALEXANDRA C PARR 218 RIVER ST E 4,000.00$
38 155040002030 MICHELLE K HUGHES 230 RIVER ST E 4,000.00$
39 155040002050 JACOB P & SAMANTHA R OLINGER 242 RIVER ST E 4,000.00$
40 155015005110 DAVID M & NHU H RICHARDSON 300 RIVER ST E 4,695.35$
41 155015005120 JOSE FUENTES& LETICIA V GAYTAN 306 RIVER ST E 4,000.00$
42 155015005130 CHASE HOME FINANCE LLC 312 RIVER ST E 4,000.00$
43 155015005140 DONNA R HERBEL 318 RIVER ST E 4,000.00$
44 155015005150 RONALD D & NANCY C H BEGIN 324 RIVER ST E 4,446.05$
45 155015004110 GARY L & BARBARA J HEGARTY 400 RIVER ST E 4,000.00$
Map ID PID Owner Name Property Address Assessment Amt
46 155015004130 GERALD A SR &BEATRICE ANDERSON 406 RIVER ST E 4,000.00$
47 155015004131 JASON S ZACHMAN 416 RIVER ST E 4,000.00$
48 155015004140 MICHAEL R & BARBARA LUNDQUIST 424 RIVER ST E 4,000.00$
49 155015003110 W DAVID & CHERYL M KINNARD 500 RIVER ST E 4,000.00$
50 155015003120 BRADLEY K & MARVEL E HATFIELD 506 RIVER ST E 4,000.00$
51 155015003130 DAVID M WILHELM 512 RIVER ST E 4,000.00$
52 155015003140 DIANA L & MARK J KRUSE 518 RIVER ST E 4,000.00$
53 155015003150 DONALD F NAGEL 524 RIVER ST E 4,000.00$
54 155015002110 GEORGE E & MAUREEN LARSON 606 RIVER ST E 4,000.00$
55 155015002130 EDWARD M REILLY 612 RIVER ST E 4,000.00$
56 155015002150 NORITA M SOLTAU 624 RIVER ST E 4,000.00$
57 155015001080 CORY A BERNING 700 RIVER ST E 4,000.00$
58 155015001031 JEFFREY R & LISA M KOEPPEN 712 RIVER ST E 4,000.00$
59 155015001040 GEORGE POACH 718 RIVER ST E 4,000.00$
60 155015016050 PAUL M & KELLY L BOISCLAIR 806 RIVER ST E 4,000.00$
61 155015016060 A RICHARD & JOANNE BOISCLAIR 812 RIVER ST E 4,000.00$
62 155208001010
MONTI-BIG LAKE COMM HOSPITAL
%FRAUENSHUH PROPERTY ASSET MGT 1013 HART BLVD 35,872.00$
63 155015025060
KLATT FAMILY TRUST
WALTER F & HELEN KLATT TRTEES 924 RIVER ST E 4,000.00$
64 155015024100 NEW RIVER MEDICAL CENTER 1000 RIVER ST E 6,880.00$
65 155208001020
MONTI-BIG LAKE COMM HOSPITAL
%FRAUENSHUH PROPERTY ASSET MGT 1001 HART BLVD 6,880.00$
66 155010053111 DENNIS F & MYRNA R ANDERSON 107 CEDAR ST 4,000.00$
69 155010053100 PAULA H L HOLKER 155 BROADWAY E 13,246.40$
70 155010067152 J & C ENTERPRISE INC 108 CEDAR ST 6,960.00$
71 155010067010 CITY OF MONTICELLO EDA 201 BROADWAY E 13,200.00$
73 155040002100 STEPHEN R & PAULETTE A CONROY 261 BROADWAY E 7,336.54$
74 155015005090 LYLE S TRUNNELL 301 BROADWAY E 4,000.00$
75 155015005010 DONALD E & BONNIE T HICKMAN 355 BROADWAY E 6,600.00$
76 155015004090 ANN M LINDBERG 401 BROADWAY E 4,000.00$
77 155015004010 SARAH L RAMEY&KATHY JO BLOMQUIST 449 BROADWAY E 4,000.00$
78 155015003100 DAVID MCNICHOLS 112 WRIGHT ST 4,000.00$
79 155015003141 4TH & BROADWAY LLC
XXX RAMSEY ST
(VACANT LOT)4,000.00$
80 155015003010 4TH & BROADWAY LLC 549 BROADWAY E 4,000.00$
81 155015002080 JEFFREY A & SUSAN K MCINTOSH 601 BROADWAY E 4,000.00$
82 155015002011 SHAUN E BERRYMAN& ANDI TISCHNER 109 HENNEPIN ST 4,000.00$
83 155015002010 FIRST NATIONAL BANK ELK RIVER 655 BROADWAY E 4,000.00$
85 155015001030 PATRICIA M HOLTHAUS 105 WASHINGTON ST 4,000.00$
86 155015001131 NORAM ENTERPRISES INC
XXX WASHINGTON
ST (VACANT LOT)3,400.00$
87 155015001010 DENNIS J & AMY L ROBERTSON 743 BROADWAY AVE E 3,720.00$
88 155015016030 ROBERT G STROM 106 WASHINGTON ST 4,000.00$
89 155015016010 THOMAS P & LISA P GROSSNICKLE 110 WASHINGTON ST 10,400.00$
Subtotal 456,868.34$
less City (#28)(62,928.00)$
TOTAL 393,940.34$
FINAL Proposed Assessment Roll - West River Street
2011 STREET RECONSTRUCTION PROJECT
Map#(PID)PROPERTY OWNER PROPERTY ADDRESS ASSESSMENT AMOUNT
1 155500041301 MONTICELLO AREA ALANO SOCIETY 2025 RIVER ST W $8,000.00
2 155500041300 MERRLYN L SEEFELDT 2150 RIVER ST W $14,862.40
3 155500042400 PRAISE ACRES LLC xxxx RIVER ST W $10,000.00
4 155500041200 NORTHERN STATES POWER COMPANY 2100 RIVER ST W $42,240.00
5 155500041302 JEFFREY E &JOAN C MICHAELIS 2156 RIVER ST W $11,677.60
$86,780.00
CityCouncilAgenda:10/24/11
1
10.ConsiderationofapprovingtheannualSnowPlowing/RemovalPolicyfor2011-2012
snowseason (TM/BP)
A.REFERENCEANDBACKGROUND:
EachyearthePublicWorksDepartmentreviewsthepreviousyear’sSnowPlowing/
RemovalPolicyandproposesupdatestothedocument.InearlyOctoberafterallofthe
differentdivisionsofPublicWorkshavehadanopportunitytocheckplowroutes,new
constructionandchanges,wemeetasagroupforseveralhourstogooverthepolicyin
depth.Commentsgeneratedfromthisgroupmeetingoftenresultinmodificationsand
changestothepolicy.Thesechangesthenareoutlinedandclearlymarkedinredinthe
draftdocumentandcarriedtotheCityCouncilforreview,possiblechangesand
adoption.Thisdocumentthenbecomestheframeworkforthesnowplowingand
removaloperationsthroughouttheCitybyPublicWorks.Individualdepartmentsthen
developtheirownplansonhowtheyaretoaccomplishthegoalssetoutinthepolicy.
Thepolicylaysoutprioritiesandtimingforallfacetsofsnowplowing/removal
throughoutthecommunity.Theprioritiessetoutinthepolicyaretobeachievedbythe
PublicWorksDepartmentunderreasonableconditionsandbudgetassumingthatatleast
onepieceofmajorequipmentandoneoperatorarenotavailable.Inmostcasesweare
abletomeetthegoalssetoutinthepolicyinlesstimethanstated.
Thefollowingisasummaryofthisyear’sminorchangestoSNOWEMERGENCY
ROUTES:
Primary
RiverStreetEastfromWashingtontotheNursingHome
WashingtonStreetfromBroadwaytoEastRiverStreet
Secondary
RiverStreetEastfromTH25toCedarStreetincludingtheblockofWalgreen’s
RiverStreetWestfromtheXcel/CityBallfieldstoTH25
PublicParkingLots
Plowedby8AM–MonticelloFiberNetHeadEndBuilding
Plowedwithin12hoursfollowingasnowfall–CedarStreettemporarylot
overflowparkingEastBridgeSlidingHill
Plowedwithin12hoursfollowingasnowfall–TerritorialRoad,drivewayinto
theRandMansion
Citymaintainedsidewalks
CedarStreetfromBroadwaytoRiverStreet(EastSide)
SidewalksClearedWithCityAssistance
EliminatelasttwosentencesinParagraph1
CityCouncilAgenda:10/24/11
2
Citymaintainedpathways
FarmsteadAvenuefrom9144FarmsteadAvetoPioneerParkParkingLot
EdmonsonAvenuecombineintoonephrasefromSchoolBlvdto89th Street
SwanParkPathway
PointstoConsider:
TheCityhaschosenthroughitsOrdinance8-1-11toassigntheresponsibilityof
snowremovalandsidewalkmaintenancetopropertyowners,withtheexception
ofareasthatCityCouncilhasinstatedaspartofoursidewalkmaintenanceand
snowplowpoliciesforCitystafftomaintain.
A1.BudgetImpact:Theproposedchangestothepolicythisyearwillhaveminor
impactontheCity’sbudgetwithnochangestoordinance.
A2.StaffWorkloadImpact:Theproposedchangestothepolicywillhaveminor
changestotheworkloadofthePublicWorksduringthewinterseason.Weare
adequatelystaffedtohandlethisworkloadbutthetimerequiredtocompletethe
processmaybeincreased.
B.ALTERNATIVEACTIONS:
1.Motiontoadoptthe2011-2012SnowPlowing/RemovalPolicywithminor
highlightedchanges.
2.Motiontodenyadoptingthe2010-2011SnowPlowing/RemovalPolicy.
C.STAFFRECOMMENDATION:
CitystaffrecommendsAlternative#1fortheCityCounciltoapprovethemodifications
totheSnowPlowing/RemovalPolicyasoutlinedandadoptthepolicy.Keepinmind
PublicWorksisadequatelystaffedtohandlethisworkloadbutthetimerequiredto
completetheprocessmaybeincreased.
D.SUPPORTINGDATA:
SnowPlowingRemovalPolicy(2011-2012proposedchangeshighlightedinred)
SnowPlowRouteMap
Primary/SecondaryPlowRouteMap
SnowmobileRouteMap
Sidewalk/PathwayMaintenanceMap
f:\admin\wordproc\policies\snow plowing policy 2011-2012 - draft.doc - PAGE 1 OF 13 -
CITY OF MONTICELLO
SNOW PLOWING/REMOVAL POLICY
Effective November 10, 1997
Amended by the City Council January 10, 2005
Amended by the City Council December 12, 2005
Amended by the City Council November 27, 2006
Amended by the City Council November 13, 2007
Amended by the City Council December 8, 2008
Amended by the City Council October 26, 2009
Amended by the City Council October 25, 2010
1. INTRODUCTION
The City of Monticello assumes basic responsibility for the control of snow and ice on city streets and
city owned public parking lots. Reasonable snow and ice control is necessary for routine travel and
emergency services. The city will provide such control in a safe and cost effective manner, keeping in
mind safety, budget, personnel and environmental concerns. The city will utilize city employees, city
equipment and/or private contractors when necessary to provide this service.
2. AREAS OF RESPONSIBILITY
Through its adoption, the City Council of Monticello is responsible for the policy established herein.
Implementation of this policy is the responsibility of the Street Superintendent or his designee under the
direction of the Public Works Director and City Administrator. The chain of command is the City
Administrator, Public Works Director and Street Superintendent, in that order. Decisions as to time,
method and materials used on snow plowing/removal operations will be made by the Street
Superintendent under the direction of the Public Works Director and City Administrator, and any
amendments are to be in accordance with amendment section of this policy. The Parks Department will
supplement the efforts of the Street Department with primary responsibilities in parking lots , sidewalks,
pathways and skating rinks. This work will be carried out by the Park Superintendent or his designee
under the direction of the Public Works Director and City Administrator. (Amended by City Council 01/10/2005)
(Amended by City Council 10/26/2009)
3. AMENDMENTS TO POLICY
Any amendments to this policy require council approval. Whenever possible and practical, amendments
should be brought up at council meetings and should be a matter of public record. However, to allow
for emergencies or other extenuating circumstances, when time does not permit council approval or
action, the Public Works Director or Street Superintendent is hereby authorized to amend any portion of
this policy he sees fit. If practical, the City Administrator shall be notified and shall approve of any such
amendment. Any such amendment made due to a particular emergency shall be brought to the attention
of the council if the amendment is to be a permanent one. (Amended by City Council 10/26/2009)
2011-2012 DRAFT
f:\admin\wordproc\policies\snow plowing policy 2011-2012 - draft.doc - PAGE 2 OF 13 -
4. EQUIPMENT
The city shall acquire, maintain, repair and replace equipment on a timely basis as the city’s established
budget shall allow. To provide for utilization of equipment in a cost effective manner, the city may use
regular city trucks, motor graders, front-end loaders, snow blowers and any other regular equipment as
may be useful for control of snow and ice. Equipment that can be used only for snow and ice control
shall be acquired and utilized only if deemed absolutely essential. Whenever existing snow removal
heavy equipment is believed to be broken down for an excess of eight hours during a declared snow
event and that piece of equipment is essential to snow plowing/ removal operations, the Street
Superintendent or his designee may rent equipment. The Public Works Director shall be notified of this
decision immediately. A written report to include equipment down, reason for renting, estimated rental
period, rental company, rental machine identification, rental rate, and estimate of total cost shall be
submitted within 48 hours. (Amended by City Council 10/26/2009)
When the Street Superintendent determines that the policy levels of service cannot be provided by city
forces, he shall report to the Public Works Director the following information:
A. Additional time required to provide desired levels of service using just city forces.
B. Additional equipment and/or personnel support required to achieve desired levels of service.
C. Estimated number of hours equipment and/or personnel will be required.
The Public Works Director will then take the following action:
A. Determine availability of contractor equipment.
B. Estimate cost of contracted service required.
C. Determine availability of funds to meet estimated costs.
D. Based on information supplied, the Public Works Director shall determine whether to contract
for additional service or equipment, or accept reduced levels of service.
If contracted service or equipment is secured, the Public Works Director shall provide the City
Administrator with a report containing the following information :
A. Purpose of contracting snow plowing/removal.
B. Estimated time and cost of contracted services.
C. Time and date contract began.
In the absence of the Public Works Director, the Street Superintendent shall have full authority under
this section and shall communicate any decisions or actions resulting in extraordinary expenditures to
the City Administrator.
5. WORK SCHEDULE
Scheduling of employees is the responsibility of the Street Superintendent or his designee under the
direction of the Public Works Director. When conditions allow, work schedules shall be arranged to
keep overtime at a minimum, with overtime scheduling being approved by the Public Works Director.
The Public Works Director shall notify the City Administrator of any unusual amount of overtime to be
performed and the reasons.
(Amended by City Council 10/26/2009)
f:\admin\wordproc\policies\snow plowing policy 2011-2012 - draft.doc - PAGE 3 OF 13 -
6. MINIMUM LEVELS OF SERVICE
The following are minimum levels of service that can be expected. The city will strive to achieve better
results if possible.
Snow and/or ice control may be terminated at any time the Street Supt. or his designee determine that
rising or falling temperatures, visibility and/or the rate of accumulation make the control unsafe,
ineffective or unnecessary.
Should a subsequent storm occur within the minimum times for service, then such subsequent storm
shall become the storm referred to in this policy.
A. Snow removal and/or sanding operations shall begin when snow accumulation reaches 2" or
when ice or snow pack occur on designated primary snow emergency streets, and shall
continue periodically throughout the duration of the storm. It is the intention of the City to keep
these routes open to traffic, if possible, during a storm; however, it is not the intent to keep them
snow or ice free.
B. All designated secondary snow emergency streets shall be open to traffic (two lanes) within
eight (8) hours after the snow storm subsides.
C. All remaining non emergency through streets shall be open to 2-lane traffic within 12 hours
after the snowstorm subsides. Parking lot snow may be piled for removal and removed after
snow is hauled from the Broadway median and all streets are widened curb to curb where
possible. The snow plowing operations in the commuter parking lots shall be started by 4 a.m.
whenever weather conditions allow.
D. All public streets such as dead ends and cul-de-sacs shall be open to traffic within sixteen (16)
hours after a snowstorm subsides.
E. Downtown Broadway, from 150 feet east of Linn Street to 150 feet east of Cedar Street shall be
plowed to the center median. The Street Superintendent or his designee may elect to plow
downtown streets during evening or early morning hours to avoid traffic and parked vehicles.
Other downtown streets will be plowed outward. City owned parking lots and alleys in blocks
34, 35 and 52 are plowed by 8 a.m. after a 2" accumulation of snow (see Section 12). (Amended by City Council 01/10/2005)
F. Downtown snow hauling including the half block of Walnut south of Broadway, if necessary,
shall begin by the next morning after all streets have been plowed and the crews are rested.
Hauling shall not be conducted Friday evening or Saturday evening unless abnormal conditions
warrant same. (Amended by City Council 01/10/2005)
G. Salt and sand operations shall provide bare pavement on driving lanes when conditions allow for
all primary snow emergency routes, skid resistance at school crossings, stop signs and isolated
icy areas. General snowpack on residential streets shall not be sanded.
f:\admin\wordproc\policies\snow plowing policy 2011-2012 - draft.doc - PAGE 4 OF 13 -
H. Snow depth at the corners of intersections shall be reduced to 36" or less following other
necessary snow plowing and removal operations. The Street Superintendent or his designee shall
have the authority to determine the scheduling and priority of this function.
I. Certain county highways within the city are maintained by the city and fall under county
maintenance agreements.
7. SNOW EMERGENCY ROUTES *SEE CHANGES*
PRIMARY SNOW EMERGENCY ROUTES
6TH STREET
FROM THE FIRE HALL TO TH 25 : INCLUDING FIRE HALL PARKING LOT AND DRIVEWAYS
7TH STREET
FROM WALNUT STREET TO CSAH 18
BROADWAY
FROM WILLOW STREET TO MEADOW OAK DRIVE
CSAH 39 WEST
FROM THE PUBLIC WORKS BUILDING TO CSAH 75 WEST
FENNING AVENUE
FROM SCHOOL BOULEVARD TO 85TH STREET (DUE TO TOPOGRAPHY)
GILLARD AVENUE
FROM CSAH 39 EAST TO 95TH STREET (DUE TO TOPOGRAPHY)
HART BOULEVARD
FROM MISSISSIPPI SHORES TO WWTP TO CSAH 75 EAST
RIVER STREET EAST
From Washington to the Nursing Home
ROUNDABOUT
AT CSAH 18 & MEADOW OAK AVENUE
SCHOOL BOULEVARD
FROM TH 25 TO CSAH 18
WALNUT STREET
FROM WEST BROADWAY TO 7TH STREET
WASHINGTON STREET
FROM EAST BROADWAY TO 7TH STREET
WASHINGTON STREET
From Broadway to East River Street
(Amended by City Council 11/27/2006)
(Amended by City Council 11/13/2007)
(Amended by City Council 10/26/2009)
f:\admin\wordproc\policies\snow plowing policy 2011-2012 - draft.doc - PAGE 5 OF 13 -
*SEE CHANGES*
SECONDARY SNOW EMERGENCY ROUTES
3RD STREET
FROM CHESTNUT ST TO WASHINGTON ST
6TH STREET WEST
FROM ELM STREET TO THE FIRE HALL
CEDAR STREET
FROM RIVER STREET TO 7TH STREET
CHELSEA ROAD
FROM CSAH 18 TO CR 39 WEST
DEEGAN AVENUE
FROM SCHOOL BLVD TO COMMUTER PARKING LOT
DUNDAS ROAD
FROM TH 25 EAST TO FALLON AVENUE
ELM STREET
FROM CSAH 39 WEST TO 6TH STREET WEST
OAKWOOD DRIVE EAST
FROM T.H. 25 TO INCLUDE THE CUL-DE-SAC
OTTER CREEK ROAD
FROM CSAH 75 TO RIVER STREET WEST
PRAIRIE ROAD
FROM KEVIN LONGLEY DRIVE TO CSAH 75
RIVER STREET EAST
From TH 25 To Cedar Street (including block of Walgreen’s)
RIVER STREET WEST
FROM THE XCEL/CITY BALLFIELDS TO THE NURSING HOME ENTRANCE TH 25
SCHOOL BOULEVARD
FROM TH 25 TO REDFORD LANE
(Amended by City Council 12/12/2005)
(Amended by City Council 11/13/2007)
(Amended by City Council 12/08/2008)
(Amended by City Council 10/26/2009) (Amended by City Council 10/25/2010)
8. METHOD OF PLOWING SNOW
Snow will be plowed in a manner so as to minimize traffic obstructions. With the exception of that
section of Broadway previously mentioned, the snow will be plowed from the center of the street
outward. The City will plow the roundabout at CSAH 18 and Meadow Oak Avenue from the outside to
the center. The County will plow to the outside. The plowing activities are shared. For narrow streets
or other streets when conditions require, the Street Superintendent or his designee may choose to plow
from one side to the other. Snow shall be plowed and pushed from left to right and discharged on the
edge of the street or on adjacent right-of-way without regard for sidewalks and/or drivewa ys. The City
shall not be responsible for plowing snow from any private driveways or sidewalks.
(Amended by City Council 11/27/2006)
f:\admin\wordproc\policies\snow plowing policy 2011-2012 - draft.doc - PAGE 6 OF 13 -
9. HAULING OF SNOW
Where space does not allow for snow to be pushed or piled outside the driving lanes, the city will
remove the snow by hauling. Timing of such hauling shall be at the discretion of the Street
Superintendent or his designee. Snow will be windrowed along the south curb on Chelsea Road
between Highway 25 and Sandberg Road and hauled when the windrow reaches 2 feet in height to
reduce snow pushed on to the sidewalk. (Amended by City Council 12/12/2005)
10. WEATHER CONDITIONS
Snow and ice control operations will be conducted only when weather conditions do not endanger the
safety of employees or equipment, and operations are effective. Factors that may delay snow and ice
control operations include: severe cold, significant winds, limited visibility and rapid accumulation of
snow and/or ice.
11. DISPATCHING OF EQUIPMENT
Dispatching of equipment shall be determined by the Street Superintendent or his designee. The Street
Superintendent or his designee shall monitor weather conditions and forecasts to aid in dispatch
decisions. Plowing and/or sanding operations may occur during the assigned work shift or on a specific
situation call out. If the specific situation is on a primary snow emergency route, the response shall be
as soon as possible if workers and equipment are available and it is more than four hours until a work
shift is to begin. Once a work shift has ended, the Street Superintendent or his designee has the
discretion of responding immediately to other specific situations or waiting, in the case of non -
emergencies, until a new work shift begins.
For emergency vehicles responding to emergency situations (fire, medical, police) within the city,
necessary workers and equipment will be dispatched as soon as possible. The Street Superintendent or
his designee shall keep the Public Works Director informed of start, progress and end of full scale
plowing operations.
12. PUBLIC PARKING LOTS
PLOWING TO BEGIN BY 4 A.M.
COMMUTER PARKING LOT
INCLUDING SCHOOL BLVD FROM TH 25 WEST TO DEEGAN AVE
AND DEEGAN AVENUE FROM SCHOOL BLVD TO COMMUTER PARKING LOT
COMMUNITY CENTER PARKING LOTS
WEST AND SOUTH LOTS
(Amended by City Council 11/27/2006)
F:\ADMIN\WORDPROC\POLICIES\SNOW PLOWING POLICY 2011-2012 - DRAFT.DOC - PAGE 7 OF 13 -
*SEE CHANGES*
PLOWED BY 8 A.M. (ON NORMAL BUSINESS DAYS)
BLOCK 34
BY ZOO AND 216 PINE STREET
BLOCK 35
WALNUT & 3RD STREET PARKING LOT
(Lot is signed for 24-hour parking to aid in timely snow removal and other seasonal maintenance)
BLOCK 52
BY JADE PATRICK SALON AND OLD SCHOOL
CITY HALL PARKING LOT
DEPUTY REGISTRAR/MOTOR VEHICLE PARKING LOT
HI-WAY LIQUOR PARKING LOT
MONTICELLO FIBERNET HEAD END BUILDING PARKING LOT
PRAIRIE WEST BUILDING
MONTICELLO FIBERNET RETAIL SITE - 6TH STREET
(Amended by City Council 11/27/2006)
(Amended by City Council 11/13/2007)
(Amended by City Council 10/26/2009)
PLOWED WITH PRIMARY SNOW EMERGENCY ROUTE
FIRE HALL PARKING LOT
*SEE CHANGES*
PLOWED WITHIN 12 HOURS FOLLOWING SNOW FALL EVENT
4TH STREET PARK PARKING LOT (plowed by Sewer/Water Department)
ANIMAL SHELTER PARKING LOT (plowed by Sewer/Water Department)
CEDAR STREET PARKING LOT (OVERFLOW PARKING – EAST BRIDGE SLIDING HILL)
EAST BRIDGE AND WEST BRIDGE PARK PARKING LOTS
MONTICELLO FIBERNET HEAD END BUILDING PARKING LOT (MOVED TO PLOWED BY 8 A.M.)
PUBLIC LIBRARY PARKING LOT
PUBLIC WORKS MAINTENANCE BUILDING AND OFFICE PARKING LOTS INCLUDING THE AREA
AROUND THE FUEL PUMPS (plowed by the Sewer/Water Department)
TERRITORIAL ROAD
DRIVEWAY INTO THE RAND MANSION
(Amended by City Council 11/27/2006)
(Amended by City Council 10/26/2009)
F:\ADMIN\WORDPROC\POLICIES\SNOW PLOWING POLICY 2011-2012 - DRAFT.DOC - PAGE 8 OF 13 -
13. CITY MAINTAINED SIDEWALKS *SEE CHANGES*
CLEARED WITHIN 24 HOURS OF THE END OF A STORM EVENT AS PER CITY ORDINANCE
*3rd STREET WEST
SOUTH SIDE OF 3RD STREET WEST FROM ELM STREET TO MAPLE STREET
*BROADWAY EAST
SOUTH SIDE BETWEEN THE ZOO AND BOB’S BARBER SHOP
*BROADWAY EAST
SOUTH SIDE FROM PALM STREET TO WASHINGTON STREET
*BROADWAY EAST
ON THE NORTH SIDE FROM 731 E. BROADWAY TO PALM ST TO WASHINGTON ST WITH THE
EXCEPTION OF DENNY’S SERVICE AT 743 E. BROADWAY
*BROADWAY WEST
SOUTH SIDE FROM 906 BROADWAY TO BROADWAY KWIK STOP
*BROADWAY WEST
ON THE NORTH SIDE FROM CHESTNUT STREET TO LINN STREET WITH THE EXCEPTION OF
TRINITY LUTHERAN CHURCH AT 494 WEST BROADWAY
*CARDINAL HILLS PARK
SIDEWALK RUNNING THROUGH PARK FROM MARTIN DRIVE TO SCHOOL BLVD
*OTTER CREEK ROAD AND WEST RIVER STREET
FROM CSAH 75 TO COMPOST SITE
*WASHINGTON STREET
EAST SIDE FROM RR CROSSING TO 7TH STREET
3RD STREET EAST
DEPUTY REGISTRAR/PARKING LOT NORTH SIDE FROM 216 PINE STREET TO CEDAR STREET
3RD STREET WEST
NORTH SIDE FROM 211 PINE ST TO WALNUT STREET
BROADWAY EAST
201 EAST BROADWAY (OLD CEDAR STREET GARDEN CENTER SITE)
BROADWAY WEST
NORTH SIDE AT 111 WEST BROADWAY
CEDAR STREET
EAST SIDE AT RR CROSSING
CEDAR STREET
FROM BROADWAY TO RIVER STREET (EAST SIDE)
*THESE ARE PRIORITY SIDEWALKS TO BE COORDINATED WITH THE SCHOOL DISTRICT EACH YEAR AND THE CITY
WILL MAKE EVERY ATTEMPT TO CLEAR THE SIDEWALKS BY THE START OF THE SCHOOL DAY. IN TURN, THE
SCHOOL DISTRICT WILL NOTIFY THE STREET SUPERINTENDENT IMMEDIATELY OF SCHOOL CLOSINGS.
F:\ADMIN\WORDPROC\POLICIES\SNOW PLOWING POLICY 2011-2012 - DRAFT.DOC - PAGE 9 OF 13 -
CLEARED WITHIN 24 HOURS OF THE END OF A STORM EVENT AS PER CITY ORDINANCE
COMMUNITY CENTER
WEST SIDE OF WALNUT STREET FROM RR CROSSING TO 6TH STREET
AND NORTH SIDE OF 6TH STREET FROM WALNUT STREET TO FIRE HALL
COMMUTER PARKING LOT
BUS SHELTER AND SIDEWALK
EAST BRIDGE PARK
BITUMINOUS PATHWAY FROM THE SLIDING HILL TO WALNUT STREET
ELM STREET
WEST SIDE FROM GOLF COURSE ROAD TO BROADWAY
GROVELAND (CITY OWNED PROPERTY)
A PORTION OF HAYWARD CT 150' WEST OF PARK PLACE DR
A PORTION 220' NORTH OF SUMMIT CT BETWEEN WINDEMERE CT & SUMMIT CT
A PORTION EAST OF 90TH ST ON S SIDE OF PARK PLACE DR
GROVELAND PARK
SAVANNAH & INNSBROOK ALONG PARK
HI-WAY LIQUOR
WEST SIDE T.H. 25 FROM 5TH TO 6TH AND NORTH SIDE 6TH FROM T.H. 25 TO INCLUDE SECOND
DRIVEWAY INTO LIQUOR PARKING LOT, ALSO INCLUDING THE SIDEWALK ON THE NORTH
SIDE OF THE LIQUOR STORE BUILDING
INFORMATION CENTER
SW CORNER ON TH 25 & CSAH 75 TO ALLEY INCLUDING PRIME AMERICA
LIBRARY
SOUTH SIDE 6TH STREET FROM WALNUT TO LOCUST
WEST SIDE WALNUT FROM 6TH TO LIBRARY DRIVEWAY
MEADOW OAK AVENUE
ADJOINING FREEWAY FIELDS
MEADOW OAK AVENUE
SIDEWALK ALONG MEADOW OAK AVENUE (SHAWN WEINAND PROPERTY)
MINNESOTA STREET
EAST SIDE FROM 7TH STREET TO A POINT 125' NORTH
PRAIRIE ROAD
FROM CSAH 75 TO HEDMAN LANE
RIVER STREET WEST
STEPS AT SOUTH SIDE OF RIVER STREET ON WALNUT STREET
T.H. 25
WEST SIDE FROM W. RIVER ST. TO MISSISSIPPI BRIDGE
WALNUT STREET
EAST SIDE PARKING LOT, ALLEY TO 3RD STREET,
FROM WELLS FARGO DRIVEWAY TO RR TRACKS
(Amended by City Council 11/27/2006) (Amended by City Council 11/13/2007) (Amended by City Council 12/08/2008) (Amended by City Council 10/26/2009) (Amended by City Council 10/25/2010)
F:\ADMIN\WORDPROC\POLICIES\SNOW PLOWING POLICY 2011-2012 - DRAFT.DOC - PAGE 10 OF 13 -
Sidewalks Cleared With City Assistance: *SEE CHANGES*
1.) South side of Broadway from the Broadway Kwik Stop to and including the Peterson
Grimsmo Chapel at 250 East Broadway, and the North side of West and East Broadway
from Linn Street to Palm Street including Trinity Lutheran Church at 449 West
Broadway. Also the north side of East Broadway in front of 731 and 743 East Broadway
near Washington Street. The City will make one (1) pass with a snow blower each time
its snow blower is used on the adjacent West and East Broadway sidewalks. The City
will not broom or apply sand/salt to this sidewalk in the commercial area.
2.) Sidewalks on the east and west sides of Highway 25 from River Street to Oakwood
Drive: The city will assist Mn/DOT when they request, by providing one (1) operator or
one (1) driver and a 12-cubic yard dump truck to help remove snow from sidewalks put
there by Mn/DOT plows.
14. CITY MAINTAINED PATHWAYS *SEE CHANGES*
CLEARED WITHIN 36 HOURS TO A WIDTH OF 6'
*1 7TH STREET EAST
NORTH SIDE FROM CEDAR STREET TO WASHINGTON STREET
* FALLON AVENUE
FROM SCHOOL BOULEVARD TO FARMSTEAD AVENUE
*FARMSTEAD AVENUE
FROM 9144 FARMSTEAD AVE TO PIONEER PARK PARKING LOT
*SCHOOL BOULEVARD
FROM EDMONSON AVE TO CR 18 INCLUDING THE PATHWAY THROUGH THE NORTH END OF
PIONEER PK EXCEPT THE S. SIDE OF SCHOOL BLVD FROM FALLON TO CARDINAL HILLS PK
2001 ISETEA PATHWAY SYSTEM INCLUDING I-94 PEDESTRIAN BRIDGE
FROM CSAH 75, SOUTH TO SCHOOL BLVD TO THE EAST THRU MEADOW OAK TO MEADOW OAK DRIVE
7TH STREET EAST
WASHINGTON STREET TO WEST SIDE OF ENTRANCE TO ST. HENRY’S CHURCH
CHELSEA ROAD
SOUTH SIDE FROM SANDBERG TO INNSBROOK
CSAH 18
FROM OAK RIDGE CIRCLE TO OAKVIEW COURT
CSAH 18
SOUTH SIDE FROM SPIRIT HILLS ROAD TO TROY MARQUETTE DRIVE
1
* THESE ARE PRIORITY SIDEWALKS TO BE COORDINATED WITH THE SCHOOL DISTRICT EACH YEAR AND THE CITY WILL MAKE EVERY ATTEMPT TO
CLEAR THE SIDEWALKS BY THE START OF THE SCHOOL DAY. IN TURN, THE SCHOOL DISTRICT WILL NOTIFY THE STREET SUPERINTENDENT
IMMEDIATELY OF SCHOOL CLOSINGS.
F:\ADMIN\WORDPROC\POLICIES\SNOW PLOWING POLICY 2011-2012 - DRAFT.DOC - PAGE 11 OF 13 -
CLEARED WITHIN 36 HOURS TO A WIDTH OF 6'
CSAH 18
SOUTH SIDE FROM WILDWOOD BOULEVARD TO GATEWATER DRIVE
CSAH 75
FROM WEST RIVER STREET TO PINEWOOD ELEMENTARY
CSAH 75
FROM MONTI MIDDLE SCHOOL AT THE HOSPITAL SIGNAL LIGHTS TO MEADOW OAK AVE
EDMONSON AVENUE
WEST SIDE FROM SCHOOL BOULEVARD TO ORCHARD CIRCLE, AND ORCHARD CIRCLE TO
89TH STREET IN SOUTH TO FEATHERSTONE
EDMONSON AVENUE
WEST SIDE FROM ORCHARD CIRCLE TO 89TH STREET (COMBINE THESE 2)
FENNING AVENUE
EAST SIDE FROM MEADOW OAK AVENUE GOING SOUTH TO CSAH 18
GILLARD AVENUE
WEST SIDE FROM RIVER FOREST DRIVE TO 95TH STREET
GILLARD AVENUE
WEST TO RIVER FOREST DRIVE
MEADOW OAK
FROM MEADOW OAK AVENUE TO MEADOW OAK DRIVE (SOUTH OF RAILROAD TRACKS)
MEADOW OAK
FROM MEADOW OAK AVENUE GOING SOUTH TO EASTWOOD CIRCLE
SCHOOL BOULEVARD
NORTH SIDE FROM EDMONSON AVE TO T.H. 25
SCHOOL BOULEVARD
NORTH SIDE FROM TH 25 TO RIVER CITY EXTREME
SLIDING HILL PATHWAY
FROM MILL RUN ROAD TO RIVER FOREST DRIVE
SWAN PARK PATHWAY
TH 25
EAST SIDE FROM KJELLBERG’S TO OAKWOOD DRIVE
(Amended by City Council 11/27/2006)
(Amended by City Council 11/13/2007)
(Amended by City Council 10/26/2009)
The Pathways shall be cleared to a min. width of 6' within 36 hours of the end of any snow event with
snow accumulation of ½" or more on the pathway. Work on the pathways immediately adjacent to
major highways or thorough fairs will not begin until the adjacent roadway is plowed and widened.
Pathways shall be blown clear and/or broomed as necessary to provide a surface deemed safe for
pedestrian traffic. It is expected that the bituminous surface shall be visible in many areas along the
pathway. Pathways designated for snow removal which are used for student pedestrian travel to and
from the schools shall be cleared within 24 hours of the end of a snow event provided any immediate
adjacent major roadway is cleared and widened first. (Amended by City Council 01/10/2005)
F:\ADMIN\WORDPROC\POLICIES\SNOW PLOWING POLICY 2011-2012 - DRAFT.DOC - PAGE 12 OF 13 -
15. CITY MAINTAINED SKATING RINKS
4TH STREET PARK
(2) HOCKEY RINKS
(1) GENERAL SKATING RINK
WEST BRIDGE PARK
(1) GENERAL SKATING RINK (Amended by City Council 11/27/2006)
(Amended by City Council 11/13/2007)
Within 36 hours of the end of any snow event with an accumulation of more than 1" of snow, all three
rinks shall be plowed or blown clear and then broomed. All snow shall be removed from within the
hockey rink area and no accumulations of snow should be left around the inside of the boards. Care
should be used not to throw or pile snow on walkways. For any event between one -tenth of an inch to
an inch of snow, all three rinks shall be broomed within 36 hours after the end of the snow event.
Again, accumulation or ridges of snow around the inside of the hockey boards must be removed. (Amended by City Council 12/12/2005)
16. DAMAGE TO PERSONAL PROPERTIES
Only those mailboxes or other personal properties which are installed properly and allowed by city
ordinance to be on the boulevard and are damaged by actual contact with city equipment, will be
considered for compensation at city expense. Compensation for mailboxes and posts shall be for
materials only with a maximum allowable reimbursement of $150 per single family residential mailbox
and a maximum allowable reimbursement of $200 per cluster mailboxes. Damage to trees, shrubbery
and other landscaping will not be considered for compensation unless located beyond the boulevard or
private property. The city will re-seed plow disturbed areas of the boulevard in the summer months
when staffing and workload permits. (Amended by City Council 10/26/2009)
Damage to personal vehicles will be considered only if they are legally parked and only if physically
contacted by equipment.
17. PLOWING OF PRIVATE PROPERTY
Unless there is direct benefit to city operations or unless emergency vehicles need access, there shall be
no plowing of private property with city equipment.
18. REVIEW OF POLICY
The city will keep on file comments and complaints received regarding this policy. This policy will be
reviewed periodically. Any review will consider comments or complaints received since the last review.
F:\ADMIN\WORDPROC\POLICIES\SNOW PLOWING POLICY 2011-2012 - DRAFT.DOC - PAGE 13 OF 13 -
19. WINTER PARKING REGULATIONS
The Wright County Sheriff’s Department will rigorously enforce portions of the parking ordinances
beginning November 15 through April 15, as follows:
TITLE 9, CHAPTER 1 SECTION 2:
Parking and stopping: Except for the City of Monticello or Wright County on its own right of ways, no
person shall utilize any portion of any local public right of way, including the traveled street, boulevard
or public parking lot for the storage or parking of any object or material which is not a licensed,
operable motor vehicle, passenger vehicle or motorcycle as defined by Minnesota Statutes Chapter
169.01, Subd. 3, 3a and 4, except as may be explicitly permitted on a temporary period of time by the
City Council or its designated representative. Properly licensed, operator motor vehicles, passenger
vehicles and motorcycles may be parked in the public street where permitted but not on the boulevard
portion of the public right of way subject to the further requirements of local parking regulations and
applicable Minnesota Statutes. A trailer of any type properly licensed or not is not considered a motor
vehicle or part thereof when disconnected from its tow vehicle.
It shall be unlawful for the owner and/or driver of a motor vehicle to stop, stand, or park the said vehicle
in any of the following places, except when necessary to avoid conflict with other traffic or in
compliance with the directions of a peace officer or traffic control devices:
On any street or roadway between the hours of two o’clock (2:00) a.m. and six o’clock (6:00) a.m.
from November 15 through April 15, except physicians on emergency calls.
TITLE 9, CHAPTER 1, SECTION 8:
Parking in regard to snow plowing and/or removal: After a snowfall, all streets in the city of
Monticello shall be cleared of all motor vehicles and parts thereof for the purposes of snow plowing
and/or removal until all streets are plowed.
Any motor vehicle or parts thereof left on any street or boulevard in the city of Monticello in such a way
as to impede the performance of the city and/or state snowplow shall be dealt with under the Penalty
Code No. 1-4-1 (a fine of up to $300 and/or imprisonment in a city or county jail for a period not to
exceed 90 days).
20. WINTER SIDEWALK PATHWAY/SNOWMOBILE REGULATIONS
The Wright County Sheriff’s Department will rigorously enforce portions of the city ordinance in
regard to use of the sidewalks/pathways by snowmobiles, ATV’S and other motorized vehicles.
TITLE 6, CHAPTER 5, SECTION 2:
Restrictions: It is unlawful for any person to operate a snowmobile:
On any sidewalks or pathways in the city of Monticello provided for pedestrian and/or
bicycle travel.