Loading...
City Council Resolution 1978-09RESOLUTION RECEIVING FEASIBILITY REPORT AND CALLING HEARING ON 197$-1 IMPROVEMIIVT } ~, BE IT RESOLVED by the City Council of Monticello, Minnesota as follows: 1. It is hereby found and determined that Mr. John Badalich, consulting engineer for the City of Monticello, has reported in a preliminary way that a local improvement hereinafter described is feasible and may best be made as proposed, and not in conjunction with any other improvement, and the estimated cost of said improvement to the G`ity is $1,528,600. 2. Said improvement consists of the following: (A) Extension of .Curb, Gutter and Permanent Street Improvements from the intersection of 6th and Pine Streets to 6th and Cedar Streets. (B) Extension of Sanitary Sewer, Watermain, Storm Sewer, Curb, Gutter, and Permanent Street Improvements along all streets within the following Subdivisions: Sandberg South Plat Riverside Plat Country Club Manor Plat Kampa Estates Plat (C) Extensions of Sanitary Sewer, Storm Sewer, Curb, Gutter and Permanent Street Improvements through Lauring Hillside Addition from the intersection of 7th and Cedar to Washington and 7th Street. (D) Extensions of Sanitary Sewer, Storm Sewer, Watermain, Curb, Gutter, Street Lights and Permanent Street Improvements through all streets within the Holker Subdivision Plat. (E) Extension of Watermain and Bituminous Surfacing on Chelsea Road from Lot 4 Block 2, Oakwood Industrial Park east to Lot 5 Block 2, Oakwood Industrial Park. 3. It is proposed to assess all or part of the cost against abutting property owners of above improvements and additionally those areas included in the feasibility report which is attached. Li.. Said proposed improvement shall be designated as the 197$-1 Improvement. 5. A public hearing will be held by the City Council on Monday, the 22nd day of May, 197$, at the Monticello City Hall on the proposed improvement. 6. The City Administrator is authorized and directed to cause notice of the time, place, and purpose of said meeting to be published twice, a week apart, in the Monticello Times, the official newspaper of the City. The last publication shall be not less than 3 days prior to the date of said meeting and said notice shall also be mailed to the owners of property in the area proposed to be assessed not less than 10 days prior to date of said meeting. Motion by , this $th day of May, 197$• Voting in favor: Opposed: Motion carried. seconded by Gary Wiebe , City Administrator to adopt Resolution RESOLUTION RECEIVING FEASIBILITY REPORT AND CALLING HEARING ON 197$-1 IMPROVENIE~TT BE IT RESOLVED by the City Council of Monticello, Minnesota as follows: 1, It is hereby found and determined that Mr. John Badalich, consulting engineer for the City of Monticello, has reported in a preliminary way that a local improvement hereinafter described is feasible and may best be made as proposed, and not in conjunction with any other improvement,~and the estimated cost ~~f said improvement to the City is $1,528,.600. <. Said improvement consists of the following: (A) Extension of Curb., Otter and Permanent Street Improvements from the intersection of 6th and Pine Streets to 6th and Cedar Streets. (B} Extension of Sanitary Sewer, Watermain, Storm Sewer, Curb, Gutter, and Permanent Street Improvements along all streets within the following Subdivisions: Sandberg South Plat Riverside Plat Country Club Manor Plat Kampa Estates Plat (C) Extensions of Sanitary Sewer, Storm Sewer, Curb, Gutter, and Permanent Street Improvements through Lauring Hillside AdditiorL from the intersection of 7th and Cedar to Washington and 7th Street. (D} Extensions of Sanitary Sewer, Storm. Sewer, Watermain, Curb, t~.tter, Street Lights and Permanent Street Improvements through all. streets within the Holker Subdivision Plat. (E) Extension of Sewer and Water from a point on Golf Course Road (W. County Road 39) approximately 950' west of the intersec+.,ion of Golf Course Road and Elm Street to and along portions of Go:1f Course Rcad to the interstate 91~ overpass. (r} Extension of Watermain and Bituminous Surfacing on Chelsea Road .from Lot 4 Block 2, Oakwood Industrial Park east to Lot Block ~', Oakwood Industrial Park. ~t i s proposed to assess all or part of the cost, against the a~~u~~i.n; r ~.~r?:~~ o:~mers including the following areas: 1 ) Sandberg South Plat 2~ Riverside Plat ? Country Club Manor Plat 1+} Kampa Estates Plat 5~ Lauring Hillside Addition Plat 6 Holker Hillside Addition Plat `,pp~ ~/ y~ i ~sa O /C~.. ~~