City Council Agenda Packet 06-08-2015AGENDA
REGULAR MEETING – MONTICELLO CITY COUNCIL
Monday, June 8th, 2015 – 7 p.m.
Mississippi Room, Monticello Community Center
Mayor: Brian Stumpf
Council Members: Charlotte Gabler, Lloyd Hilgart, Tom Perrault and Glen Posusta
1. General Business
A. Call to Order & Pledge of Allegiance
B. Approval of Meeting Minutes
Special Meeting Minutes from May 26th, 2015
Regular Meeting Minutes from May 26th, 2015
C. Consideration of Adding Items to the Agenda
D. Citizen Comments
E. Public Service Announcements/Updates
Walk ‘n Roll (6/13)
Grand Opening Bertram Beach & Playground (6/27)
F. Council Liaison Updates
Brian Stumpf (BCOL, IEDC, FAB)
Charlotte Gabler (FAB, PC)
Lloyd Hilgart (IEDC, EDA, Hwy 25 Corridor Coalition)
Tom Perrault (EDA, Safety)
Glen Posusta (BCOL)
G. Department Updates
Sheriff’s Office (Anselment)
City Administrator (O’Neill)
2. Consent Agenda
A. Consideration of approving the payment of bills for June 8th
B. Consideration of approving new hires/departures
C. Consideration of appointing representatives to the Monticello Planning
Commission to fill vacancies for terms to expire 12/31/15 and 12/31/16
D. Consideration of adopting Resolution #2015-042 accepting a contribution from
Cargill Kitchen Solutions for flower plantings on Broadway West median
E. Consideration of adopting Resolution #2015-043 accepting a contribution from
the Monticello Lions to the Street Department for traffic control devices
F. Consideration of adopting Resolution #2015-047 accepting a contribution from
the Monticello Lions to the Parks Department for kiosk signage
G. Consideration of adopting Resolution #2015-046 approving the Final Plat and
Development Agreement for the Vine Street Place a two-lot subdivision in an R-2
(Single and Two Family Residence) District and approval of encroachment
agreement. Applicant: Benoit, Patrick
H. Consideration of adopting Resolution #2015-045 approving a Final Stage Planned
Unit Development (PUD), Final Plat and Development Agreement for Hoglund
Bus Park, a two lot commercial development in an existing Planned Unit
Development District, and to approve a sidewalk easement associated with the
plat. Applicant: WAG Partners, LLP
I. Consideration of adopting Resolution #2015-036A approving an assessment
agreement with Northern States Power, dba Xcel Energy for First Lake Substation
J. Consideration of adopting Resolution #2015-044 approving a request for an
Amendment to Development Stage Planned Unit Development (PUD) and Final
Stage Planned Unit Development (PUD) for a single lot commercial development
in a B-4 (Regional Business) District. Applicant: MF Monticello, LLC
K. Consideration of adopting Ordinance No. 616 for Amendments to the Monticello
Zoning Ordinance, Chapter 5, Section 3 – Accessory Use Standards and Chapter
8, Section 4 – Definitions, as related to regulations for Accessory Building -
Major and Accessory Building – Minor. Applicant: City of Monticello
L. Consideration of adopting Resolution #2015-048 approving an application for a
Gambling Premises Permit to conduct gambling at the Monticello Country Club.
Applicant: Monticello Youth Hockey Program
M. Consideration of authorizing 50/50 cost share with the City of Windom for
purchasing bandwidth for final implementation of 10 Gig Ring
N. Consideration of authorizing sending a letter of interest to participate in
cooperative cost saving ventures with City of Windom related to telephone
switching equipment
2a. Consideration of items removed from the consent agenda for discussion
3. Public Hearings None
4. Regular Agenda
A. Consideration of adopting Resolution #2015-049 accepting bids and awarding
contract for the School Boulevard/Fallon Avenue and 85th Street Improvements,
City Project No. 14C003
B. Consideration of approving initial purchase and deployment of Calix GigaCenters
for FiberNet Monticello residential customers
C. Consideration of approving concept of FiberNet Monticello contracting with
Yondoo for video hosted services
D. Consideration of approving process and terms of sale for City-owned property
located at 1022 W. River Street
5. Added Items
6. Adjournment
SpecialCityCouncilMinutes–May26,2015 Page1|4
MINUTES
SPECIALMEETING–MONTICELLOCITYCOUNCIL
Tuesday,May26,2015–5p.m.
NorthMississippiRoom,MonticelloCommunityCenter
Present:BrianStumpf,CharlotteGabler,LloydHilgart,TomPerrault,GlenPosusta
Absent:None
Others:JeffO’Neill,AngelaSchumann,ShibaniBisson,ChuckRickart(WSB),Bill
Tapper(EDA/TAC)
1.CalltoOrder
MayorBrianStumpfcalledthespecialmeetingtoorderat5p.m.
2.PurposeofWorkshop:DiscussionofthefollowingitemswasannouncedbyMayor
Stumpf.
A.AlignmentofSchoolBoulevardWestextensiontoCountyRoad39
B.OptionsforalignmentofFallonAvenueOverpass
3.ReviewofpotentialalignmentoptionsforSchoolBoulevardWestextensionto
CountyRoad39
AngelaSchumannintroducedthisitemandindicatedthatthepresentationwillprovidean
explanationtoCouncilabouttheproposedalignmentfortheextensionofSchool
BoulevardWesttoCountyRoad39.Schumannindicatedtherearetwoconceptualroad
alignmentsanddisplayedthoseonamap.SchumanntalkedabouttheBertramChainof
LakesParkandthecoordinationbetweentheCityandCountytodeveloptheparkland.
Thatdesigndoesnotincludearoadthroughthepark.TheCity’sTransportationPlan
showstheSchoolBoulevardextensionasan“AreatobeStudied”anddoesnotspecifya
particularalignmentforSchoolBoulevardtoCR39.Adecisionneedstobemade
whethertoaligntheroadwaythroughtheparkforgrantwritingpurposes.Angela
SchumannturnedthediscussionovertoShibaniBissonandChuckRickart.
ShibaniBissonexplainedthatconceptroadwayalignmentswereconsideredin2006
whenKarlsburgerFoodswasproposingtolocateintheOtterCreekIndustrialPark,the
HeritagedevelopmentwasproposedandtheYMCAwasconsideringsellingtheir
property.TheCouncilapprovedaconceptalignmentofextendingSchoolBlvdthrough
theYMCApropertyatthattime.However,thetransportationplanindicatedthatthearea
wastobestudied.Sinceconditionshavechanged,staffhasreevaluatedthealignementof
SchoolBlvdandtheassociatedimpactstothetransporationsystem.Twoconceptual
alignmentsarebeingpresented,oneforSchoolBoulevardextendedthroughthe
northeasternportionoftheYMCACampManitoupropertyandtheotheralignment
connectingwiththeexistingDaltonAvenue.
SpecialCityCouncilMinutes–May26,2015 Page2|4
ChuckRickartexplainedthatthereisastudybeingdoneforpotentialsitesforafutureI-
94interchangeintheareaofCountyRoad39orOrchardRoad.Thiswouldlikelyimpact
trafficonChelseaRoad,90th Street,andSchoolBoulevard.Chuckexplainedthe
transportationimpactswiththealignmentoptions.
BrianStumpfaskedwhetherAlternative2wouldadverselyimpacttheabilitytodevelop
theSpikepropertythatwouldbeintersectedbytheproposedroadalignment.Shibani
BissonexplainedthattheAlternative2alignmentwillbeguidedbydevelopmentandthe
optionsevaluatedallowforadequatedevelopmentarea.TheXcelsubstationwasalso
consideredwhenevaluatingthealignments.Theroadwayisshownextendingthroughthe
narrowparcelthatintersectionswith90th Street,ownedbySpike.
GlenPosustaaskedwhythisroadextensionisbeingdiscussedatthistime.Angela
SchumannexplainedthattheCountyandCityareapplyingforagrantforanothersection
ofBertramChainofLakesparklandandtheyneedtoknowifthefutureroadextension
mightgothroughtheparkland.Ifaroadwouldbisecttheparkland,thatwouldhavetobe
indicatedinthegrantapplication.GlenPosustaexpressedhisconcernaboutchoosingan
alignmentatthistimewhenfuturedevelopmentisnotlikelytotakeplaceforquitesome
time.JeffO’NeillstatedthattheCityhasbeensuccessfulindefiningcollectorroad
alignmentsinadvanceandusingthoseplanstoguidedeveloperswhentheymake
inquiries.Inthiscase,thefuturealignmentwasidentifiedtogothroughtheparklandand
citystafffeltitwouldbebeneficialtochangethatidentificationnowratherthanlater.
Theactualroadconstructionwouldnottakeplaceuntildrivenbydevelopment.
ChuckRickartmentionedthatthereareavarietyofoptionstoalignSchoolBoulevardif
thedecisionismadetoavoidroutingitthroughBertramparkland.AngelaSchumann
notedthatCouncilcouldelecttonotmakeachoiceforanalternativerealignmentwith
DaltonAvenue,butinsteadjustmakeadecisionnottoextendSchoolBoulevardthrough
theparkanddetermineanewalignmentatalatertime.
BillTapperfromtheEDAcommentedthatLukeDahlheimerofDahlheimerDistributing
expressedconcernaboutanalignmentwithDaltonAveashefelttherewouldbenegative
trafficimpactsforthebusinessesinthatarea.
BrianStumpfindicatedthathewouldliketoseeafinaldecisionforalignmentdeferredto
afuturetime.HewouldliketoseeSchoolBoulevardterminatedattheSpikeproperty
andnotatDaltonAvenue.However,hedoesunderstandthatCouncilshouldprovide
directionforthegrantapplication.
BrianStumpfstatedthatCouncilwillbeaskedtotakeactionattheregularCouncil
meeting.
4.ReviewofpreferredoptionforFallonAvenueOverpassalignment
JeffO’NeillintroducedthisitemandindicatedthattheoptionsfortheFallonAvenue
OverpassalignmenthavebeendiscussedindetailovermanymonthsbytheCity’s
SpecialCityCouncilMinutes–May26,2015 Page3|4
TransportationAdvisoryCommittee.ThemeetingwasturnedovertoChuckRickart
fromWSBwhohasbeenworkingonthisproject.Rickartnotedthatlandacquisitions
needtotakeplaceforrightofwayandeasementsprimarilyfromSt.Henry’sChurch
beforefinaldesigncommences.ChuckRickarttalkedaboutalignmentoption3Awhich
incorporatestworoundaboutsonthenorthsideofthefreeway.Hepointedouttheareas
thatwillneedtobeacquiredforeachoftheroundabouts.Option3Amakesaconnection
atWashingtonStreet,whichwouldbebeneficialiftherewouldeverbeasecondriver
crossingatWashingtonStreet.ThisalternativewasapprovedbytheTransportation
AdvisoryCommitteealthoughnotunanimously.Ifoption3Aisselected,theproject
couldbedoneinphases.
GlenPosustaaskediftherewasawaythattheprojectcouldbedonetokeeptheroadway
opentotrafficduringconstruction.ChuckRickartexplainedthatitwouldhavetobe
closedattimes.GlenPosustasuggestedthattheprojectbephasedoveronetimeframe,
ratherthanpartnowandpartinanotheryear,soastolimitthelengthoftimethattraffic
wouldbeimpactedbystreetclosures.
ChuckRickartreviewedalignmentoption5whichutilizesoneroundaboutonthenorth
sideofthefreeway.ThesmallsectionofFallonAvenueonthenorthsideofthefreeway
wouldlinkWashingtonand7th Streetwitharoundaboutattheconfluenceoffourstreet
segments.TheMalonepropertywouldbeaffectedandwouldneedtobeacquiredwith
thisoption.TheBusch’s(RandMansion)andMalone’sarenotinfavorofthisoption.
ChuckRickartnotedthatthisalternativewouldhaveaslightlyhighercostthanoption
3A.
ChuckRickartcommentedonthetrafficinteractionsandhowtheycouldbeimpactedby
eitherofthesetwoalternatives.Option5wouldhavemoretrafficinteractioncompared
toOption3A,whichseparatestrafficattheintersectionsof7thStreetandWashington
andtheproposedFallonAve.Also,eastboundtrafficfrom7th StreettoWashington
wouldneedtogofurthereasttoenterandexittheroundaboutcomparedtoOption3A.
BillTapper,memberoftheEDAandTransportationAdvisoryCommittee,explainedhis
reasonsforpreferringOption5.Withoption3A,heisconcernedabouttheslopeof7th
StreetasboundtrafficapproachestheroundaboutattheFallonAvenueoverpass.Tapper
statedthathepersonallylikesroundaboutsandwouldprefertoseearoundaboutatthe
intersectionofFallonAvenueandChelseaRoadwhentheoverpassisconstructed.
BrianStumpfaskedChuckRickarttotalkabouttimingontheconstructionofthe
overpassandstreetalignments.ChuckRickartstatedthatthereisnostatefunding
availablesoitwouldneedtobefundedwithlocalfundsandpossiblysomestateaid
money.ChuckRickartnotedthatthereisarequirementforthecitytoconstructthe
FallonAvenueoverpassbeforeanyfurtherinterchangesareaddedwithincitylimits.It
wassuggestedtodosometrafficcountsinthe7th Streetarea.ChuckRickartcommented
thattheprojectcouldbestartedasearlyas2016,providedthatlandacquisitionsand
alignmentdecisionsarecompletednow.
SpecialCityCouncilMinutes–May26,2015 Page4|4
BrianStumpfindicatedthatthistopicwillbeontheregularcouncilagendaforashort
presentationanddecisionbyCouncilonthealignment.
ChuckRickartalsonotedthat,onthesouthsideofthefreeway,theFallonAvenue
overpasswillneedsometypeoftrafficcontrolattheintersectionwithChelseaRoad.
GlenPosustaaskedwhichtypeofintersectionwouldmovetrafficthebest.Chuck
Rickartindicatedthattrafficstudiesshowthatroundaboutswouldservetokeeptraffic
movingateachofthedesignatedsitesinthedesignofbothoptions.
JeffO’Neillcommentedthatthesingleroundaboutoption(#5)wastheoriginal
preferenceoftheTransportationAdvisoryCommittee.However,oncetheyweighedthe
optionsandcommentsfromlandowners,theychoseoption3A.
5.Adjournment
TOMPERRAULTMOVEDTOADJOURNTHESPECIALMEETINGAT6:03P.M.
CHARLOTTEGABLERSECONDEDTHEMOTION.MOTIONCARRIED5-0.
Recorder:CatherineM.Shuman____
Approved:
Attest:____________________________
CityAdminstrator
CityCouncilMinutes–May26,2015 Page1|11
MINUTES
REGULARMEETING–MONTICELLOCITYCOUNCIL
Tuesday,May26th,2015–7p.m.
MississippiRoom,MonticelloCommunityCenter
Present:BrianStumpf,CharlotteGabler,LloydHilgart,TomPerrault,GlenPosusta
Absent:None
1.GeneralBusiness
A.CalltoOrder
ThemeetingwascalledtoorderbyMayorStumpfat7p.m.withaquorum
present.
B.PledgeofAllegiance
Thepledgeofallegiancewasrecited.
C.ApprovalofMeetingMinutes
•SpecialMeetingMinutesfromApril27th,2015
TOMPERRAULTNOTEDAFEWCORRECTIONSHEHAD
REPORTEDANDMOVEDTOAPPROVETHEAPRIL27TH,2015
SPECIALMEETINGMINUTESASPRESENTED.LLOYDHILGART
SECONDEDTHEMOTION.MOTIONCARRIED5-0.
•RegularMeetingMinutesfromMay11th,2015
TOMPERRAULTNOTEDAFEWCORRECTIONSHEHAD
REPORTEDANDMOVEDTOAPPROVETHEMAY11TH,2015
REGULARMEETINGMINUTESASPRESENTED.LLOYD
HILGARTSECONDEDTHEMOTION.MOTIONCARRIED5-0.
•CorrectionstoApril27th RegularMeetingMinutes
LLOYDHILGARTMOVEDTOAPPROVETHECORRECTIONSTO
THEAPRIL27TH,2015REGULARMEETINGMINUTESAS
PRESENTED.CHARLOTTEGABLERSECONDEDTHEMOTION.
MOTIONCARRIED5-0.
D.ConsiderationofAddingItemstotheAgenda
•#2L–SunsetPondsSecondAdditioneasementvacationresolution(staff)
•Illegaldumping;recyclingcarts(CharlotteGabler)
•GoodwilldropboxatEastview(BrianStumpf)
•Wristbands(BrianStumpf)
•FriendshipIsland(BrianStumpf)
E.CitizenComments
None
CityCouncilMinutes–May26,2015 Page2|11
F.PublicServiceAnnouncements/Updates
•Cargillthankyou–RachelLeonardannouncedathankyoutoCargill
KitchenSolutionemployeesforvolunteeringwithclean-upeffortsinthe
City.TheydothisonanannualbasisanditisahugebenefittotheCity.
G.CouncilLiaisonUpdates
•BrianStumpf(MCC,FAB,TransportationAdvisoryCommittee,Personnel)–
MCCAdvisoryBoard:visitsaredown;possiblemoveofFriendshipIsland;
minimumwagereviewforpart-timeemployees;rateincreasesfor
membershipswillberesearched.FAB:discussed10GBringandMetaswitch
sharingwithWindomnet;videocontracts;hiringofBusinessMgrandupdate
ofordinance.TransportationAdvisoryCommittee:allitemsonregular
agendatonight.
•CharlotteGabler(FAB,Personnel)–Personnel:volunteerappreciationdayin
Julytorecognizecommissionmembers;employeeappreciationdayin
August;applicationsreceivedforCityClerkandBuildingOfficialand
interviewstobescheduled.
•LloydHilgart(EDA,TransportationAdvisoryCommittee)–Transportation
AdvisoryCommittee:workingonalignmentoptionsforFallonAvenue
overpass.EDA–levydiscussion,whichisincludedinregularagenda.
•TomPerrault(EDA,PAC)–PAC:meetinginJuly.TomPerraultattended
WrightCountymeetingonsolargardensandSafetyCommitteemeeting.
•GlenPosusta(BCOLRFP)–ParksCommissioncomingupthisweek.
H.DepartmentUpdates
•Workshop/SpecialMeetingReview–MayorStumpfnotedthattheworkshop
actionsareincludedintheregularagenda.
•CityAdministrator–JeffO’Neillreportedonthefollowing:LionsClub40th
anniversaryonFriday,May29attheMCCparkinglotfrom6to11:30pm;
freetothepublic.HelpCenterhasrescindedtheirletterofintenttomoveto
theoldbowlingalley;payingrentonasitewouldimpacttheirabilityto
receivecertaingrantsandassistance.JeffO’Neillmentionedpossibilityof
collaboratingonconstructionofabuildingneartheJeffersonCommonswater
towerthatcouldincludespacefortheHelpCenter.
•MarketMatching–JohnUphoffwasnotabletoattendandwillreportat
anothertime.
2.ConsentAgenda
A.ConsiderationofapprovingthepaymentofbillsforMay26th.THISITEM
WASREMOVEDFROMTHECONSENTAGENDA.
B.Considerationofapprovingnewhires/departures.ActionTaken:Ratifythe
newhiresandterminationsforMCC,CityHall,BuildingDepartment,and
WaterDepartment.
CityCouncilMinutes–May26,2015 Page3|11
C.Considerationofapprovingthreeapplicationsfortemporaryon-saleliquor
licensesfortheMonticelloLionsClubforRiverfestCommunityCelebration
eventsonJuly11th-12th,2015.ActionTaken:Approvethreetemporaryon-
saleliquorlicenseapplicationsfortheMonticelloLionsfortheRiverfest
CommunityCelebrationonJuly11,2015forArtintheParkinEllisonPark,
onJuly11,2015fortheRiverfestStreetDanceattheMonticelloCommunity
Centerparkinglot,andfortheSundayeventsatEllisonParkonJuly12,
2015;contingentonprovidingthenecessaryliquorliabilityinsurance
certificate.
D.ConsiderationofadoptingResolution#2015-039acceptingquotesandawarding
contractforthe2015SealcoatandFogSealProject.ActionTaken:Adopt
Resolution#2015-039acceptingthebidsandawardingacontracttoCaldwell
AsphaltCompany,Inc.ofHawickMN,basedontheirlowbidof
$136,953.36;projecttobecompletedpercontractbyAugust21,2015.
E.ConsiderationofapprovingthepurchaseofNeptuneradioreadingunitsforthe
WaterDepartment.THISITEMWASREMOVEDFROMTHECONSENT
AGENDA.
F.ConsiderationofadoptingResolution#2015-040acceptingimprovementsand
authorizingfinalpaymenttoWHServicesforthe2014StreetLighting
Improvements(West7th betweenElmStreetandCR39),CityProjectNo.
14C001.THISITEMWASREMOVEDFROMTHECONSENTAGENDA.
G.ConsiderationofratifyingthenegotiatedLaborAgreementbetweentheCityof
MonticelloandtheInternationalUnionofOperatingEngineers,Local49for
April1,2015toMarch31,2017.THISITEMWASREMOVEDFROMTHE
CONSENTAGENDA.
H.Considerationofapprovingfinalpaymentof$181,544.53toVeoliaWaterfor
2014wastewatertreatmentplantcontractservices.THISITEMWAS
REMOVEDFROMTHECONSENTAGENDA.
I.ConsiderationofratifyingtheEDAAnnualWorkPlan.THISITEMWAS
REMOVEDFROMTHECONSENTAGENDA.
J.Considerationofapprovinganamendmenttotheencroachmentagreementforthe
CedarStreetAddition(GoodwillIndustriesStore).Applicant:Oppidan/Fourth
StreetParkingPartnership,LLP.ActionTaken:Approveanamendmentto
theencroachmentagreementfortheCedarStreetAdditionfor
Oppidan/FourthStreetParkingPartnership,LLP,statedasfollows:
ENCROACHMENTAUTHORIZATION.TheCityherebyapprovesencroachmentin
itseasementareasfortheconstruction,use,andmaintenanceofdriveaisles,parking
stalls,curbs,streetlighting,andlandscapinginthecross-hatchedareasdepictedon
theattachedExhibit“B.”
CityCouncilMinutes–May26,2015 Page4|11
[PriorSection2andpriorExhibitBwillbedeletedandreplaced]
K.ConsiderationofapprovingalettertotheMinnesotaPublicUtilitiesCommission
andMinnesotaDepartmentofCommerceregardingcommunitysolargardens.
ActionTaken:ApprovesubmissionofalettertotheMinnesotaPublic
UtilitiesCommissionandMinnesotaDepartmentofCommerceregarding
communitysolargardens.
L.ConsiderationofadoptingResolution#2015-023Aapprovingarevisiontoa
conditionintheoriginalresolutionforSunsetPonds2nd Additioneasement
vacation.ActionTaken:AdoptResolution#2015-023Aapprovingthe
vacationofeasementsforSunsetPondsSecondAddition,witharevisionto
theconditionsasfollows:
•ApprovaloftheSunsetPondsThirdAdditionfinalplatbytheCityCouncilofthe
CityofMonticello.
•ThefinalplatofrecordshallincludetheWrightCountyRecorder’sdocument
numbersforthevacationeasementsdescribedherein.
•ACertificateofApprovalforVacationofDrainageandUtilityEasementsbe
recordedattheWrightCountyRecorder’sOffice.
LLOYDHILGARTMOVEDTOAPPROVETHECONSENTAGENDAWITHTHE
REMOVALOFITEMSA,E,F,G,H,ANDI.CHARLOTTEGABLERSECONDED
THEMOTION.MOTIONCARRIED5-0.
2A.Considerationofitemsremovedfromtheconsentagendafordiscussion
2A.ConsiderationofapprovingthepaymentofbillsforMay26th
GlenPosustaaskedaboutthecarpetingintheRomp&Stompandwhetherthatwas
budgeted.JeffO’Neillindicateditwas.GlenPosustaaskedwhylumberwaspurchased
fromBigLakeLumberinsteadofHomeDepot.WayneObergreportedthatstaff
indicatedtheycouldnotgetthesematerialsatHomeDepot.GlenPosustaaskedabout
purchaseofasignforthefuturedogpark.CathyShumanexplainedthesignwas
approvedinoriginalpresentationforadogpark;costtobereimbursedfromdonated
funds.
GLENPOSUSTAMOVEDTOAPPROVETHEPAYMENTOFBILLAND
PURCHASECARDREGISTERSFORATOTALOF$676,371.61.CHARLOTTE
GABLERSECONDEDTHEMOTION.MOTIONCARRIED5-0.
2E.ConsiderationofapprovingthepurchaseofNeptuneradioreadingunitsforthe
WaterDepartment
CharlotteGablerwantedtoverifythatthesewerethesameunitsthatwerebroughtto
CouncilforapprovalbackinNovember.WayneObergconfirmedthat.
CityCouncilMinutes–May26,2015 Page5|11
CHARLOTTEGABLERMOVEDTOAPPROVETHEPURCHASEOF650
NEPTUNERADIOREADUNITSATACOSTOF$69,641TOCOMEOUTOFTHE
2015WATERDEPARTMENTBUDGET.TOMPERRAULTSECONDEDTHE
MOTION.MOTIONCARRIED5-0.
2F.ConsiderationofadoptingResolution#2015-040acceptingimprovementsand
authorizingfinalpaymenttoWHServicesforthe2014StreetLightingImprovements
(West7th betweenElmStreetandCR39),CityProjectNo.14C001
CharlotteGableraskedifthereductionthathadbeendiscussedpreviouslyhadbeen
deductedfromthefinalpayment.JeffO’Neillconfirmedthatwasthecase.
CHARLOTTEGABLERMOVEDTOADOPTRESOLUTION#2015-040
ACCEPTINGIMPROVEMENTSANDAUTHORIZINGFINALPAYMENTOF
$10,579.87TOWHSERVICESANDENTERINTOAMAINTENANCE
AGREEMENTWITHWHSERVICESFORWEST7TH STREETLIGHTING
IMPROVEMENTS,CITYPROJECTNO.14C001.TOMPERRAULTSECONDED
THEMOTION.MOTIONCARRIED5-0.
TomPerraultnotedthattheresolutionclauseaboutthecontractneedstostateMayorand
CityAdministrator,ratherthanCityClerk.
2G.ConsiderationofratifyingthenegotiatedLaborAgreementbetweentheCityof
MonticelloandtheInternationalUnionofOperatingEngineers,Local49forApril1,
2015toMarch31,2017
TomPerraultstatedthathehasanissuewiththelanguageinthelaboragreementfor
Article10.01relatedtoovertimepaybeinggrantedinexcessof8hoursofworkwithina
24-hourperiodoftime.Hefeelsthatovertimepayshouldnotbegrantedonadailybasis,
butwasokaywiththe40hourworkweekovertimeprovisions.GlenPosustaquestioned
whetherCouncilisreallyabletopullindividualitemsoutoftheproposedcontract.Jeff
O’NeillstatedthatCouncilcouldeitherdenyorapprovethecontractwitha
recommendationforachangethatwouldhavetobenegotiatedandbroughtbackto
Councilforapproval.Councilmembersindicatedthatsupervisorsshouldbemakingsure
employeesdonotreceiveovertimepayinexcessof8hourswithina24-hourtimeframe
unlessitisabsolutelynecessaryandapprovedinadvance.
LLOYDHILGARTMOVEDTORATIFYTHE2015-2017LOCAL49UNION
CONTRACTASNEGOTIATED,EFFECTIVEAPRIL1,2015.GLENPOSUSTA
SECONDEDTHEMOTION.MOTIONCARRIED4-1WITHTOMPERRAULT
VOTINGINOPPOSITION.STAFFWASDIRECTEDTOKEEPTRACKOF
OVERTIMEHOURSTOSEEIFTHEREAREANYISSUESWITHOVERTIMEPAY
WITHINTHE24-HOURTIMEFRAME;IFSO,THISWOULDBEADDRESSEDIN
NEXTCONTRACTRENEWALPERIOD.
CityCouncilMinutes–May26,2015 Page6|11
2H.Considerationofapprovingfinalpaymentof$181,544.53toVeoliaWaterfor
2014wastewatertreatmentplantcontractservices
BrianStumpfaskedWayneObergtoaddresstheamountpayableontheVeoliaWater
contract.WayneObergaskedthattherearetwopartstothewastewatertreatmentplant
contract:oneisforreimbursableexpensesandoneisforpersonalservices.The2014
contractbudgetwassubmittedbyChuckKeyeswiththeamountsof$234,504for
reimbursableexpensesand$585,096forpersonalservices.Thereareprovisionsinthe
contractwhichincludesanannualfeeadjustmentformulafordeterminingthebase
compensationifanamountisnotnegotiated.Thiscreatedanincreaseintheamountthat
wasbudgeted.2015isthelastyearofthecontractwithVeolia.TheCitywillneedto
takeintoconsiderationwhatoptionsareavailableforanewcontractortoutilizeinternal
staffing.
LloydHilgartcommentedonthechangesinthebudgetreconciliationandstatedthatit
appearsthatVeolia’sactualexpendituresarenotpaidinregardtowhatisbudgeted.
WayneObergindicatedthatthepaymentsarelinkedtotheformulasinthecontract,
whichterminatesattheendof2015.
LLOYDHILGARTMOVEDTOAPPROVEFINALPAYMENTOF$181,544.53TO
VEOLIAWATERFOR2014WASTEWATERTREATMENTPLANTCONTRACT
SERVICES.BRIANSTUMPFSECONDEDTHEMOTION.MOTIONCARRIED4-1
WITHGLENPOSUSTAVOTINGINOPPOSITION.
2I.ConsiderationofratifyingtheEDAAnnualWorkPlan
TomPerraultnotedthatthestaffreportindicatedthattheWorkPlanwasapproved
unanimouslyattheEDAmeetingonMay13,2015,buthehadactuallyvotedagainstit.
JeffO’Neillapologizedforreportingthatincorrectlyinhisnotes.
LLOYDHILGARTMOVEDTORATIFYTHEEDAANNUALWORKPLAN,
CONSISTENTWITHITSADOPTIONBYTHEMONTICELLOECONOMIC
DEVELOPMENTAUTHORITY.CHARLOTTEGABLERSECONDEDTHE
MOTION.MOTIONCARRIED4-1WITHTOMPERRAULTVOTINGIN
OPPOSITION.
3.PublicHearings -None
4.RegularAgenda
A.ConsiderationofadoptingResolution#2015-041authorizingaletterofsupport
fortheMonarchDevelopmentGroupasrelatedtoanaffordableworkplace
townhomedevelopmentontheformerRuffproperty(PID155-500-101418)
AngelaSchumannpresentedtheproposalfromMonarchDevelopmentGroupfor
developmentofanaffordableworkplacetownhomeproject.Inordertoproceed
withtheirapplicationtotheMNHousingFinanceAgencyfortheaffordable
CityCouncilMinutes–May26,2015 Page7|11
housingtaxcreditprogram,theyneedCouncilapprovalofaletterofsupportfrom
theCity.AngelaSchumanntalkedaboutthesite,whichispartoftheformerRuff
Autosalvageyard.AngelaSchumannnotedthattheCityhasalreadyinvestedin
thepropertywhentheyreceivedstategrantsforcontaminationclean-upofthe
RuffAutosite.Thegoalofthegrantswastoremediatethecontaminationto
facilitatefutureresidentialdevelopment,whichmatchesthegoaloftheMonarch
Groupproposaltodeveloptownhomeunitsforcityresidents.
MikeKearneyofMonarchDevelopmentGroupspokebrieflyabouttheirproposal
andhandedoutplansanddrawingsabouttheprojecttocouncilmembers.Their
firmisproposingadevelopmentcalledCygnetLanding.Mr.Kearneytalked
abouthiscompanyandsomeoftheconsultingfirmsthattheyworkwith.He
emphasizedthehighqualityoftheirproducts.CygnetLandingwouldconsistof
45unitsofaffordableworkplacehousing,withrentsrangingfrom$950fora2-
bedroomunitto$1,100fora3-bedroom.Tenantswouldhavetomeetincome
guidelines.MonarchGroupplanstoinvestabout$10millioninthedevelopment.
TheyarelookingforaletterofsupportfromtheCityaspartoftheirapplication
processfortheaffordablehousingtaxcredits.
BrianStumpfaskedhimtocommentonthetimeline.MikeKearneydiscussed
theprocess,whichisverycompetitive.Theywouldnotanticipateapprovalfrom
MNHousingFinanceAgencyuntilOctoberattheearliest.Followingthat,they
wouldgothroughthecityzoningprocess,withbuildingpermitsissuedand
constructionbeginninginSpringof2016.LloydHilgartaskedwhetherthey
wouldholdtheseunitsorsellthem.Kearneyexplainedtheywouldholdthe
investmentandpartnerwithWellsFargoBankfortheaffordabletaxcredits.
Theywouldalsoutilizeapropertymanagementcompanytomanagethe
townhomecomplex.Thepropertywouldremainunderthisstatusforatleast15
years.LloydHilgartaskedwhetherthetaxcreditsareasubsidy,allowingthemto
rentbelowmarketvalue.Kearneyconfirmedthatthetaxcreditswouldbearent
subsidy.However,therentamountsbeingproposedareactuallyatmarketrent
forthisarea.
GlenPosustaquestionedthevalueoftheinvestmentashefelttheunitsdidn’t
appeartobeofthequalitybasedontheamounttobeexpended.Kearney
explainedthatthereareotherfactorsthatgointotheinvestmentbesidesthebrick
andmortarconstruction.GlenPosustaalsoaskedaboutthetaxvaluationofthe
property.ElizabethNesbittexplainedthatitwouldbecommercialproperty
subjecttothetaxationrulesinMinnesota.
CharlotteGableraskedthemtocommentonwhytheychoseMonticello,being
thattheyarefromtheeastcoast.Kearneynotedreasonsincluding:locationon
thefreeway,streetscapealong7th StreetWest,currentbusinessdevelopment,job
opportunities,andrelativelocationtothemetroarea.CharlotteGableraskedwhy
theybuildatownhomestyleratherthanapartmentbuildings.Kearneyexplained
thattownhomestendtobebettersuitedforfamiliescomparedtoanapartment
building,whichgivesasenseofhome.CharlotteGableraskedabouthowthe
CityCouncilMinutes–May26,2015 Page8|11
unitsaremarketed.ElizabethNesbittexplainedthatthetownhomeswouldbe
advertisedatmarketrents,notasasubsidizedhousing.Kearneyexplainedthat
theseunitsarenotSection8housing;rentsubsidiesarebasedonfamilyincome
andfamilysize.
KimBretheimofLHBtalkedabouttheCygnetprojectthattheyareplanningand
designing.Theywouldplantoextend6½StreetWestintothepropertyandadd
pondingfordrainage.Theunitswouldbearrangedtofaceeachotheralong
interiorroads,wouldhave2-cargarages,andwouldhavebothfrontandback
doors.Therewouldbeacentraloutsideplayareainthecomplex.Thecostofthe
developmentwouldincludefundingofreservestosustainoperatingand
maintenancecosts.Theyplantousematerialsthatexceedbuildingcode
requirements.Hedisplayedpicturesoftwoprojectswhichhavebeenconstructed
inAppleValleyandRosemount;thiswouldbesimilartowhattheyintendforthe
Monticelloproject.Thoseprojectsweredonewiththesametypeoffinancing
plannedforCygnetLanding.Squarefootageofunitsrangefrom1100fora2-
bedroomto1500fora3-bedroom,plusa2-cargarage.
GlenPosustaaskedaboutprojectsinMinnesota,anditwasconfirmedthatLHB
hasmainofficesinDuluth,Minnesotaandisintheprocessofconstructinga
numberofvariousprojectsacrossthestate.CharlotteGableraskedJeffO’Neill
tocheckreferencesfromotherMinnesotaprojects.
TomPerraultaskedif6½Streetiscurrentlyapublicstreet.Staffconfirmedthat
andindicatedthatotherinternalstreetsofthedevelopmentwouldbeprivate.All
streetdevelopmentcostswillbetheresponsibilityofthedeveloper.
CHARLOTTEGABLERFORALTERNATIVE#1TOADOPTRESOLUTION
#2015-041AUTHORIZINGALETTEROFSUPPORTFORTHEMONARCH
DEVELOPMENTGROUPASRELATEDTOANAFFORDABLE
WORKPLACETOWNHOMEDEVELOPMENTONTHEFORMERRUFF
PROPERTY(PID155-500-101418).GLENPOSUSTASECONDEDTHE
MOTION.MOTIONCARRIED4-1WITHTOMPERRAULTVOTINGIN
OPPOSITION.
B.Considerationofsupportinganalignmentoptionforthefutureextensionof
SchoolBoulevardWesttoCountyRoad39
AngelaSchumannnotedthatCouncilisbeingaskedtoconsiderthealignmentof
SchoolBoulevardwestextensionasrelatedtotheBertramChainofLakes
parkland.BrianStumpfcommentedthathewouldliketoseeAlternate#1revised
toendtheSchoolBoulevardextensionattheSpikeproperty.Thisrevisionwould
stillresultindeflectingtheroadsothatitwouldnotberoutedthroughBertram
ChainofLakesparkland.Othercouncilmembersindicatedtheiragreementwith
thatchange.
CityCouncilMinutes–May26,2015 Page9|11
BRIANSTUMPFMOVEDFORALTERNATE#1TOSUPPORTANOPTION
FORFUTUREWESTERNEXTENSIONOFSCHOOLBOULEVARDUPTO
THESPIKEPROPERTYANDAVOIDAROUTETHROUGHTHE
BERTRAMCHAINOFLAKESPARKLAND.GLENPOSUSTASECONDED
THEMOTION.MOTIONCARRIED4-1WITHTOMPERRAULTVOTING
INOPPOSITION.
C.ConsiderationofapprovinganoptionfortheFallonAvenueOverpassalignment
JeffO’Neillsummarizedthisitemfromdiscussionthattookplaceataworkshop
priortotheCouncilmeeting.HeaskedShibaniBissonandChuckRickartto
reviewthealignmentoptionssothatCouncilcanselectapreferredoption.
ChuckRickartreviewedthestudyprocesswhichstartedwitheightpossible
optionsforalignmentoftheFallonAvoverpass.Theoriginaldrawingstarted
withasimpledesignforanoverpassacrossI-94thatmetat7th Streetonthenorth
andChelseaonthesouth.Discussionsovertimenarrowedtheoptionsto
Alternate3AandAlternate5,withAlternate3Arecommendedbythe
TransportationAdvisoryCommittee.Alternate3Aincorporatestworoundabouts
onthenorthsideofthefreewayalong7th Streetattheintersectionoftheoverpass
andattheintersectionofWashingtonStreet.Alternate5utilizesasingle
roundaboutonthenorthsideofthefreeway;thisroundaboutformsa4-leg
intersectionwith7th Streetontheeastandwestlegs,theoverpassonthesouth
leg,andWashington/Fallononthenorthleg.Itisproposedtoincludea
roundaboutonthesouthintersectionwithChelseaRoad,butthatisopento
adjustment.GlenPosustanotedthathefavorsthesingleroundaboutdesign.
BrianStumpfsummarizedafewconcernsthatwerereportedattheworkshop.
TransportationAdvisoryCommitteefavorsAlternate3AratherthanAlternate5,
althoughaconcernwasexpressedabouttrafficbeingdirectedthroughtwo
roundaboutsandthepossibletrafficimpactintheeventthatasecondriver
crossingisconstructedatWashingtonStreet.Therewasaconcernexpressed
aboutthegradeat7th Streetwhereitapproachestheroundaboutlocatednearthe
FallonAvenueoverpass.JeffO’Neillcommentedthatthegradeisactuallyof
valuebecausedriversdonotneedtoseevehiclesapproachingfromtheother
direction;driversattentionshouldbedirectedatvehiclesalreadyinthe
roundabout.
LloydHilgartcommentedthatheprefersAlternate3Afortheroundaboutsat7th
StreetandtheoverpassandonthesouthsideatChelsea.However,heisnot
convincedthataroundaboutisneededatthistimewhere7th Streetintersects
WashingtonStreet.BrianStumpfnotedthattheadvantageofincludingthe
secondroundaboutatWashingtonatthistimeistoreducetheimpactsof
constructionnowandthenagaininthefuturewhenitwouldneedtobe
constructed.CharlotteGableralsonotedthattheroundaboutsaresinglelane
design.
CityCouncilMinutes–May26,2015 Page10|11
CHARLOTTEGABLERMOVEDFORALTERNATIVE#1SELECTING
CONCEPTOPTION3AFORTHEFALLONAVENUEOVERPASS
ALIGNMENT,CITYPROJECTNO.ZRCFOS.BRIANSTUMPFSECONDED
THEMOTION.MOTIONCARRIED3-2WITHTOMPERRAULTAND
GLENPOSUSTAVOTINGINOPPOSITION.
D.ConsiderationofapprovingthesubmissionofaletterofintentforanEDAand/or
HRAlevy
AngelaSchumanndiscussedtheEDAworkshopthatwasheldpriortothe
CouncilmeetingandexplainedthatCouncilisbeingaskedtoauthorize
submissionofaletterofintenttoWrightCountyforanon-bindingEDAand/or
HRAlevy.Thiswouldnotindicateapprovalofanytypeofalevyatthistime;
saidletterwouldsimplyindicateanintenttoproposeanEDAand/orHRAlevyas
partofthe2016budgetprocess.
CHARLOTTEGABLERMOVEDFORALTERNATIVE#1TOAPPROVE
THESUBMISSIONOFALETTEROFINTENTTOWRIGHTCOUNTYFOR
ANEDAAND/ORHRALEVYFOR2016.LLOYDHILGARTSECONDED
THEMOTION.MOTIONCARRIED4-1WITHTOMPERRAULTVOTING
INOPPOSITION.
5.AddedItems
•Donationdrop-offs:CharlotteGablerandBrianStumpfbothcommentedonthe
problemwithpeopledumpingitemsoutsidetheGoodwilldrop-offboxlocatedin
theEastviewparkinglot.Goodwillemptiesthecontainerwhenitisfull,butdoes
notpickupanyitemsthatarenotacceptedintheirprogram.Theschoolis
participatingwithGoodwillthisasafundraiser,andBrianStumpffeelsthatthis
shouldbeaddressedwiththeschooldistrict.WayneObergindicatedthathehad
heardfromtheschoolandtheyarenotgoingtocontinuethisifitcontinuesto
createproblems.
•RecyclingCarts:CharlotteGableraskediflargercartsareavailableforrecycling.
WayneObergexplainedthatlargercartsarenotpartoftheprogramnow;
howeverresidentscanpayanextrafeetohaveanothercart.CharlotteGabler
askedifthecitycouldcheckonpossibilityoflargercarts.
•Peddlers:CharlotteGableraskedifthepeddlerinformationcouldbepostedon
citywebsitewhentheyregisterwiththeCity.CathyShumanexplainedthatis
alreadybeingdone.
•FriendshipIsland:BrianStumpfaskedcitystafftolookattheviabilityofadding
asiteforFriendshipIslandintheformerRiversofHopeofficesuite.Charlotte
Gablertalkedabouttheprogramandhowitfunctions;sheexplainedthatthisis
notadaycarebutratheradaycampforpreteens.BrianStumpfindicatedthathe
hasalreadyaskedcitystafftodoaspaceneedsstudyandwouldliketoinclude
CityCouncilMinutes–May26,2015 Page11|11
FriendshipIslandinthatstudy.ConsensusistoreportbacktoCouncilbythefirst
meetinginJuly.
LloydHilgartaskedwhattheyaredoingrightnowforFriendshipIsland.
CharlotteGablerexplainedthatMCCwasusingtheWarehouseRoombutthatis
alsousedforalotofotherprograms.TheyhaveutilizedspaceattheSwanRiver
School,butarerunningoutofroom.
•MCCwristbandexpenditure:BrianStumpfnotedthatlettersofreprimandrelated
towristbandpurchasingwereplacedinthefilesoftheMCCDirectorandFinance
DirectorandshouldbeconsideredfortheCityAdministrator.
MOTIONBYGLENPOSUSTATOPUTALETTEROFREPRIMANDIN
THECITYADMINISTRATOR’SPERSONNELFILEREGARDINGTHE
PURCHASEOFWRISTBANDSWITHOUTCOUNCILAPPROVALIN
EXCESSOFTHEPURCHASINGPOLICYALLOWANCE.TOMPERRAULT
SECONDEDTHEMOTION.MOTIONCARRIED5-0.
BrianStumpfreportedonthePersonnelCommitteerecommendationtoreview
thecity’spurchasingpolicytomakesurethatitisclearastowhatisallowedand
not.BrianStumpfpointedoutthattheyfoundexpendituresinexcessof$10,000
onregularly-budgeteditems,suchasforsandandsaltpurchases.
6.Adjournment
GLENPOSUSTAMOVEDTOADJOURNTHEMEETINGAT8:41P.M.TOM
PERRAULTSECONDEDTHEMOTION.MOTIONCARRIED5-0.
Recorder:CatherineM.Shuman___
Approved:
Attest:___________________________
CityAdministrator
CityCouncilAgenda:6/08/15
1
2A.ConsiderationofapprovingpaymentofbillregistersforJune8th (WO)
A.REFERENCEANDBACKGROUND:
Citystaffsubmitstheattachedbillregistersandpurchasingcardregistersforapprovalby
Council.Thebillregisterscontainallinvoicesprocessedandthepurchasingcard
registerscontainallcardpurchasesmadesincethelastCouncilmeeting.SubjecttoMN
Statutes,mostinvoicesrequireCouncilapprovalpriortoreleasingchecksforpayment.
ThedayfollowingCouncilapproval,paymentswillbereleasedunlessdirected
otherwise.AcreditpurchasingagreementandpolicywasapprovedbyCouncilinitially
andcardpurchasesmustcomplywiththepolicy.
IfCouncilhasnoquestionsorcommentsonthebillandpurchasecardregisters,thesecan
beapprovedwiththeconsentagenda.Ifrequested,thisitemcanberemovedfrom
consentanddiscussedpriortomakingamotionforapproval.
A1.BudgetImpact:None
A2.StaffWorkloadImpact:Noadditionalworkrequired
B.ALTERNATIVEACTIONS:
1.Motiontoapprovethebillandpurchasecardregistersforatotalamountof
$455,686.95.
2.MotiontoapprovetheregisterswithchangesdirectedbyCouncil.
C.STAFFRECOMMENDATION:
CitystaffrecommendsAlternative#1or#2,perdirectionofCouncil.
D.SUPPORTINGDATA:
Billregisters
PurchaseCardregisters
User:
Printed:06/01/2015 - 10:46AM
Debbie.Davidson
Computer Check Proof List by Vendor
Accounts Payable
Batch:00215.05.2015 - 215.05.2015 Xcel
Invoice No Description Amount Payment Date Acct Number Reference
Vendor:1426 CITY OF MONTICELLO Check Sequence: 1 ACH Enabled: True
10128 Qrt1 2015 Office Facility 118 6th St W 76.06 05/31/2015 101-41941-438200
10250 Qrt1 2015 Head End Garage 3698 1/2 School Blvd 41.20 05/31/2015 656-49870-438200
5250 Qrt1 2015 Bridge Park West 107 River St W Rm 39.97 05/31/2015 101-45201-438200
7224 Qrt1 2015 WWTP 2,264.09 05/31/2015 602-49480-438200
7885 Qrt1 2015 Help Center 45.12 05/31/2015 217-41990-438200
8086 Qrt1 2015 4th Street Warming House 39.97 05/31/2015 101-45201-438200
8114 Qrt1 2015 Hi-Way Liquor 119.78 05/31/2015 609-49754-438200
8117 Qrt1 2015 MCCr 3,353.22 05/31/2015 226-45122-438200
8119 Qrt 1 2015 Fire Station 55.43 05/31/2015 101-42200-438200
8120 Qrt 1 2015 Bldg Inspection Garage 39.97 05/31/2015 101-41940-438200
8177 Qrt 1 2015 Library 268.61 05/31/2015 101-45501-438200
8631 Qrt 1 2015 203 Chelsea Rd- Animal Shelter 39.97 05/31/2015 101-42700-438200
8673 Qrt 1 2015 Head End Building 41.20 05/31/2015 656-49870-438200
8903 Qrt 1 2015 PW Shop/Clerical 163.72 05/31/2015 101-43127-438200
8904 Qrt 1 2015 PW Vehicle Storage 55.93 05/31/2015 101-43127-438200
8905 Qrt 1 2015 PW Office 39.97 05/31/2015 101-43127-438200
6,684.21Check Total:
Vendor:1585 XCEL ENERGY Check Sequence: 2 ACH Enabled: True
04/30/2015 51-6505915-2 1,115.83 04/30/2015 101-45201-438100
04/30/2015 51-6505915-2 92.62 04/30/2015 101-45203-438100
04/30/2015 51-6505915-2 36.89 04/30/2015 226-45203-438100
04/30/2015 51-6505915-2 300.44 04/30/2015 601-49440-438100
04/30/2015 51-6505906-1 1,216.29 04/30/2015 602-49490-438100
04/30/2015 51-6505914-1 1,142.15 04/30/2015 101-43127-438100
05/31/2015 utx - 51-9069641-8 1,878.95 05/31/2015 656-49877-438100
05/31/2015 51-6505910-7 1,495.77 05/31/2015 609-49754-438100
05/31/2015 51-6505905-0 5,301.93 05/31/2015 601-49440-438100
05/31/2015 51-0395766-0 782.95 05/31/2015 601-49440-438100
05/31/2015 ZCULPS - 51-0623082-8 17.09 05/31/2015 213-46522-438100
05/31/2015 51-6505909-4 145.13 05/31/2015 217-41990-438100
AP-Computer Check Proof List by Vendor (06/01/2015 - 10:46 AM)Page 1
Invoice No Description Amount Payment Date Acct Number Reference
05/31/2015 51-6505911-8 - MCC 7,611.41 05/31/2015 226-45122-438100
05/31/2015 51-4271112-2 735.57 05/31/2015 101-45501-438100
05/31/2015 51-0371645-4 18.84 05/31/2015 101-45201-438100
05/31/2015 51-6505911-8 - National Guard 197.70 05/31/2015 101-42800-438100
05/31/2015 51-6505907-2 63.94 05/31/2015 101-43140-438100
05/31/2015 51-6505907-2 46.49 05/31/2015 101-43140-438100
05/31/2015 51-4400193-4 17.09 05/31/2015 101-43160-438100
05/31/2015 51-6505916-3 12,447.32 05/31/2015 101-43160-438100
05/31/2015 51-6505911-8 - Senior Center 395.40 05/31/2015 101-45175-438100
05/31/2015 51-9391437-3 188.10 05/31/2015 101-41941-438100
05/31/2015 51-7780310-4 46.84 05/31/2015 101-41940-438100
05/31/2015 51-6505911-8 - City Hall 1,680.44 05/31/2015 101-41940-438100
05/31/2015 51-6505908-3 17.49 05/31/2015 101-42500-438100
05/31/2015 51-6505912-9 76.79 05/31/2015 101-42700-438100
05/31/2015 51-6505912-9 463.73 05/31/2015 101-42200-438100
37,533.19Check Total:
Total for Check Run:
Total of Number of Checks:
44,217.40
2
AP-Computer Check Proof List by Vendor (06/01/2015 - 10:46 AM)Page 2
The preceding list of bills payable was reviewed and approved for payment.
Date: 6/8/2015 Approved by: ______________________________________
Mayor Brian Stumpf
User:
Printed:06/03/2015 - 11:30AM
Julie.Cheney
Computer Check Proof List by Vendor
Accounts Payable
Batch:00202.06.2015 - 00202.06.2015 AP
Invoice No Description Amount Payment Date Acct Number Reference
Vendor:1020 ALMCO HYDRAULICS INC Check Sequence: 1 ACH Enabled: False
16567 Preventative Mtc inspection/baler 139.00 06/09/2015 609-49754-431990
139.00Check Total:
Vendor:1038 APPERTS FOOD SERVICE Check Sequence: 2 ACH Enabled: False
505290709 Freight 5.00 06/09/2015 226-45122-433300
505290709 Pizzas for parties 62.97 06/09/2015 226-45127-421460
505290709 Concession - hot dogs, cookies, muffins, dessert bars, chips, 451.23 06/09/2015 226-45127-425410
519.20Check Total:
Vendor:3491 ARTISAN BEER COMPANY Check Sequence: 3 ACH Enabled: False
3032091 resale - beer 32.00 06/09/2015 609-49750-425200
3032696 resale - beer 320.00 06/09/2015 609-49750-425200
352.00Check Total:
Vendor:1062 BEAUDRY OIL COMPANY Check Sequence: 4 ACH Enabled: True
223774 Hoses & Fittings 105.59 06/09/2015 101-43120-422100
105.59Check Total:
Vendor:1065 BELLBOY CORPORATION Check Sequence: 5 ACH Enabled: True
48361000 resale - liquor 347.00 06/09/2015 609-49750-425100
48361000 resale - wine 398.00 06/09/2015 609-49750-425300
48361000 freight 17.60 06/09/2015 609-49750-433300
48454900 resale - liquor 451.17 06/09/2015 609-49750-425100
48454900 resale - wine 88.00 06/09/2015 609-49750-425300
48454900 freight 15.41 06/09/2015 609-49750-433300
48497500 resale - liquor credit inv. 44041900; 48050300 -57.36 06/09/2015 609-49750-425100
1,259.82Check Total:
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 1
Invoice No Description Amount Payment Date Acct Number Reference
Vendor:1067 BERNICK'S Check Sequence: 6 ACH Enabled: False
3105 Resale - Coffee 131.04 06/09/2015 226-45127-425410
93310 Resale - soda pop 89.70 06/09/2015 609-49750-425400
93310 Resale - juice 65.60 06/09/2015 609-49750-425500
93311 Resale - beer 1,680.60 06/09/2015 609-49750-425200
94078 Resale - pop, water, tea 343.42 06/09/2015 226-45127-425410
96871 Resale - Milk, Pop, Water 331.40 06/09/2015 226-45127-425410
2,641.76Check Total:
Vendor:4126 PERRY BONDHUS Check Sequence: 7 ACH Enabled: False
5/19/2015 Refund on membership child care 44.91 06/09/2015 226-45122-347900
5/19/2015 Refund on membership child care - sales tax 3.09 06/09/2015 226-00000-208100
48.00Check Total:
Vendor:2535 BORDER STATES ELECTRIC SUPPLY Check Sequence: 8 ACH Enabled: True
909364514 1000 Coax 112.92 06/09/2015 656-49877-421990
909372389 (2) Cybershield 176.06 06/09/2015 656-49877-421990
909379186 (20) SCAPC-SCAPC 161.03 06/09/2015 656-49877-421990
909386316 (3) 810-LL7-030 77.45 06/09/2015 656-49877-421990
909408516 credit- Hi-Density QP Panel -51.17 06/09/2015 656-49877-421990
476.29Check Total:
Vendor:3233 C.J.'S LINEN SERVICE Check Sequence: 9 ACH Enabled: False
31548 Mississippi Room drapes cleaned (4) 90.00 06/09/2015 226-45127-431990
90.00Check Total:
Vendor:1091 CAMPBELL KNUTSON PA Check Sequence: 10 ACH Enabled: True
2348-001G 92 General - Code Enforcement - April 2015 326.70 06/09/2015 101-42400-430400
326.70Check Total:
Vendor:1801 CANNON RIVER WINERY Check Sequence: 11 ACH Enabled: True
7810 resale - wine 115.00 06/09/2015 609-49750-425300
115.00Check Total:
Vendor:1094 CAREFREE LAWN SERVICE INC Check Sequence: 12 ACH Enabled: False
14641 Lawn Maint- (2) Hillside; (2) Riverside;(2) Ltr/Debris- H.Side 1,420.00 06/09/2015 101-45501-431050
1,420.00Check Total:
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 2
Invoice No Description Amount Payment Date Acct Number Reference
Vendor:1095 CARLOS CREEK WINERY INC Check Sequence: 13 ACH Enabled: False
11283 resale - wine 576.00 06/09/2015 609-49750-425300
576.00Check Total:
Vendor:1106 CENTRAL MCGOWAN INC Check Sequence: 14 ACH Enabled: False
00042806 Monthly Tank Rental 45.00 06/09/2015 226-45122-441500
00866360 Bulk Carbon Dioxide (450 lbs) 116.00 06/09/2015 226-45122-421600
161.00Check Total:
Vendor:2654 CENTURYLINK Check Sequence: 15 ACH Enabled: False
r72010610615128 Voice 5/1-8/2015 - monthly access charge- due date changed 140.00 06/09/2015 656-49879-430910
140.00Check Total:
Vendor:2654 CENTURYLINK Check Sequence: 16 ACH Enabled: False
r97006006015128 Voice 5/1-8/2015 - monthly access charge- due date changed 33.66 06/09/2015 656-49879-430910
33.66Check Total:
Vendor:2654 CENTURYLINK Check Sequence: 17 ACH Enabled: False
L04003703715128 Voice 5/1-8/2015 - monthly access charge- due date changed 27.51 06/09/2015 656-49879-430910
27.51Check Total:
Vendor:2476 CSI DIGITAL INC Check Sequence: 18 ACH Enabled: True
103054 1 Gbps monthly fiber feed - June 2015 2,700.00 06/09/2015 656-49879-430930
2,700.00Check Total:
Vendor:1092 CSI SOFTWARE INC Check Sequence: 19 ACH Enabled: True
29174 Monthly Software Fee - July 2015 466.47 06/09/2015 226-45122-430910
466.47Check Total:
Vendor:1129 DAHLHEIMER BEVERAGE LLC Check Sequence: 20 ACH Enabled: True
109161 resale - n/a beer 42.00 06/09/2015 609-49750-425400
109161 resale - beer 19,939.70 06/09/2015 609-49750-425200
109477 resale - beer 28,385.84 06/09/2015 609-49750-425200
109477 resale - n/a beer 124.70 06/09/2015 609-49750-425400
109592 resale - beer credit -102.60 06/09/2015 609-49750-425200
109593 resale - beer 216.00 06/09/2015 609-49750-425200
109843 resale - beer - softball fields 89.00 06/09/2015 226-45203-425200
109856 resale - beer - softball fields 238.00 06/09/2015 226-45203-425200
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 3
Invoice No Description Amount Payment Date Acct Number Reference
1140937 resale - beer 254.60 06/09/2015 609-49750-425200
1156468 resale - beer 403.00 06/09/2015 609-49750-425200
1156495 resale - n/a beer 65.50 06/09/2015 609-49750-425400
1156495 resale - beer 17,572.75 06/09/2015 609-49750-425200
67,228.49Check Total:
Vendor:1134 DAY DISTRIBUTING COMPANY Check Sequence: 21 ACH Enabled: True
802860 resale - beer 4,217.40 06/09/2015 609-49750-425200
802860 resale - beer N/A 49.20 06/09/2015 609-49750-425400
803863 resale - beer 1,206.50 06/09/2015 609-49750-425200
803863 resale - N/A beer 21.50 06/09/2015 609-49750-425400
804779 resale - beer 3,112.65 06/09/2015 609-49750-425200
8,607.25Check Total:
Vendor:1151 EARL F ANDERSEN INC Check Sequence: 22 ACH Enabled: False
0107780 Meeting tables - 30x96 (6) 3,911.92 06/09/2015 226-45122-424600
3,911.92Check Total:
Vendor:1153 ECM PUBLISHERS INC Check Sequence: 23 ACH Enabled: True
221085 PHN - PHN Monti Union Crossing - Ad# 395649 110.76 06/09/2015 101-41910-435100
221086 XSOLAR - PHN Zo Ord Ch 5 & 8 - Ad# 395650 110.76 06/09/2015 101-41910-435100
221087 PHN - Zo Ord Ch 5 & 8 Acc - Ad# 395653 110.76 06/09/2015 101-41910-435100
222244 Farmers Market Ad# 395855 65.00 06/09/2015 226-45127-434990
397.28Check Total:
Vendor:3681 STERLING EGAN Check Sequence: 24 ACH Enabled: False
5/19/2015 Referee Mens Hockey - 1 game - 5/18/15 35.00 06/09/2015 226-45127-430160
5/29/2015 Referee Mens Hockey - 2 games - 5/20/15 70.00 06/09/2015 226-45127-430160
105.00Check Total:
Vendor:4132 GILLES ELANE Check Sequence: 25 ACH Enabled: False
06022015 FNM-001-0502 acct. Refund 27.73 06/09/2015 656-00000-115025
27.73Check Total:
Vendor:1167 EXTREME BEVERAGE LLC Check Sequence: 26 ACH Enabled: False
264-912 resale - rootbeer 104.70 06/09/2015 609-49750-425400
104.70Check Total:
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 4
Invoice No Description Amount Payment Date Acct Number Reference
Vendor:4137 SARAH FRITSCH Check Sequence: 27 ACH Enabled: False
6/2/2015 Friendship Island staff workship on child discipline & behavior 225.00 06/09/2015 226-45122-433200
225.00Check Total:
Vendor:4090 GOLDEN WEST TECHNOLOGIES Check Sequence: 28 ACH Enabled: False
150510451 5/1-5/31/2015 - Video Support Usage- After Hours Tech Support 645.75 06/09/2015 656-49870-431990
645.75Check Total:
Vendor:1206 GRAPE BEGINNINGS INC Check Sequence: 29 ACH Enabled: False
181604 resale - wine 300.00 06/09/2015 609-49750-425300
181604 freight 15.00 06/09/2015 609-49750-433300
315.00Check Total:
Vendor:4140 H2O PRO LLC Check Sequence: 30 ACH Enabled: False
6/3/2015 Refund on permit issued in error 100.00 06/09/2015 101-42400-322110
100.00Check Total:
Vendor:1241 HOISINGTON KOEGLER GROUP INC Check Sequence: 31 ACH Enabled: True
010-032-2 Comp Plan Update w/2014 amendment 249.00 06/09/2015 101-41910-431990
249.00Check Total:
Vendor:1242 HOLIDAY CREDIT OFFICE Check Sequence: 32 ACH Enabled: True
05182015 Fire Dept. Fuel slips 4/24-5/17/2015 396.50 06/09/2015 101-42200-421200
396.50Check Total:
Vendor:1244 HORIZON COMMERCIAL POOL SUPPLY Check Sequence: 33 ACH Enabled: False
150430012 Pool chemicals 139.95 06/09/2015 226-45122-421600
139.95Check Total:
Vendor:3356 INDIAN ISLAND WINERY Check Sequence: 34 ACH Enabled: False
2570 resale - wine 481.92 06/09/2015 609-49750-425300
481.92Check Total:
Vendor:2208 INITIATIVE FOUNDATION Check Sequence: 35 ACH Enabled: False
6/1/2015 VISTA intern for Farmers Market 400.00 06/09/2015 226-45127-421981
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 5
Invoice No Description Amount Payment Date Acct Number Reference
400.00Check Total:
Vendor:3971 INTL UNION OF OPER ENGINEERS LOCAL 49 FRINGE BENE Check Sequence: 36 ACH Enabled: False
July 2015 July Health Insurance 48,000.00 06/09/2015 101-00000-217061
July 2015 July Health Insurance 12,720.00 06/09/2015 101-00000-217061
60,720.00Check Total:
Vendor:1256 J&W INSTRUMENT INC Check Sequence: 37 ACH Enabled: False
3008748 (10) Eurotherm-Chessell Charts 524.01 06/09/2015 601-49440-422700
524.01Check Total:
Vendor:1259 JJ TAYLOR DISTRIBUTING Check Sequence: 38 ACH Enabled: False
2368248 resale - beer 1,075.71 06/09/2015 609-49750-425200
2368248 freight 3.00 06/09/2015 609-49750-433300
1,078.71Check Total:
Vendor:3855 JOANNE C JOHNSON Check Sequence: 39 ACH Enabled: False
May1 BLANDN - Billing period May 2015 3,000.00 06/09/2015 656-00000-220250
3,000.00Check Total:
Vendor:1263 JOHNSON BROS WHOLESALE LIQUOR Check Sequence: 40 ACH Enabled: False
5161246 resale - liquor 148.50 06/09/2015 609-49750-425100
5161246 freight 2.88 06/09/2015 609-49750-433300
5161247 freight 50.39 06/09/2015 609-49750-433300
5161247 resale - wine 2,213.75 06/09/2015 609-49750-425300
5162500 resale - liquor 2,968.17 06/09/2015 609-49750-425100
5162500 freight 31.92 06/09/2015 609-49750-433300
5162501 freight 66.95 06/09/2015 609-49750-433300
5162501 resale - wine 2,138.28 06/09/2015 609-49750-425300
5162501 resale - N/A wine 118.70 06/09/2015 609-49750-425400
5162502 resale - beer 87.96 06/09/2015 609-49750-425200
5164022 freight 38.28 06/09/2015 609-49750-433300
5164022 resale - liquor 3,208.01 06/09/2015 609-49750-425100
5164023 resale - wine 2,143.85 06/09/2015 609-49750-425300
5164023 resale - mix 28.49 06/09/2015 609-49750-425400
5164023 freight 55.20 06/09/2015 609-49750-433300
5164024 resale - beer 78.00 06/09/2015 609-49750-425200
5166859 freight 1.44 06/09/2015 609-49750-433300
5166859 resale - liquor 72.00 06/09/2015 609-49750-425100
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 6
Invoice No Description Amount Payment Date Acct Number Reference
5169875 freight 20.14 06/09/2015 609-49750-433300
5169875 resale - liquor 2,239.40 06/09/2015 609-49750-425100
5169876 resale - mix 28.49 06/09/2015 609-49750-425400
5169876 freight 1.44 06/09/2015 609-49750-433300
5169877 freight 41.75 06/09/2015 609-49750-433300
5169877 resale - liquor 3,074.00 06/09/2015 609-49750-425100
5169878 freight 34.55 06/09/2015 609-49750-433300
5169878 resale - wine 1,822.40 06/09/2015 609-49750-425300
5169879 resale - beer 541.00 06/09/2015 609-49750-425200
526213 freight -1.20 06/09/2015 609-49750-433300
526213 resale - liquor credit -63.75 06/09/2015 609-49750-425100
526214 resale - liquor credit -12.75 06/09/2015 609-49750-425100
526215 resale - wine credit -13.15 06/09/2015 609-49750-425300
526382 resale - liquor credit -2.00 06/09/2015 609-49750-425100
526383 resale - winecredit -9.71 06/09/2015 609-49750-425300
526384 resale - wine credit -26.30 06/09/2015 609-49750-425300
21,127.08Check Total:
Vendor:1270 KENNEDY AND GRAVEN CHARTERED Check Sequence: 41 ACH Enabled: False
MN190-00101 Apr General EDA Matters through 4/30/15 684.50 06/09/2015 213-46301-430400
MN190-00147 Apr BLK034 - TIF District through 4/30/15 280.25 06/09/2015 213-46301-430400
964.75Check Total:
Vendor:4131 RUTH KIVIAHDE Check Sequence: 42 ACH Enabled: False
06022015 FNM-001-0368 acct. Refund 22.55 06/09/2015 656-00000-115025
22.55Check Total:
Vendor:4092 JEROME KLEIS Check Sequence: 43 ACH Enabled: False
5/19/2015 Referee Mens Hockey - 2 games 5/18/15 70.00 06/09/2015 226-45127-430160
70.00Check Total:
Vendor:4076 NICHOLAS KLINKHAMMER Check Sequence: 44 ACH Enabled: False
5/29/2015 Referee Mens Hockey Games - 5/20 (2) & 5/27 (1) 105.00 06/09/2015 226-45127-430160
105.00Check Total:
Vendor:2626 HARRY LANTTO Check Sequence: 45 ACH Enabled: True
5/29/2015 Planning Commission Meeting Recording - 5/5/15 60.00 06/09/2015 101-41910-431990
5/29/2015 EDA Meeting Recording - 5/13/15 60.00 06/09/2015 213-46301-431990
5/29/2015 City Council Meeting Recording - 5/11/15 & 5/26/15 130.00 06/09/2015 101-41110-431990
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 7
Invoice No Description Amount Payment Date Acct Number Reference
250.00Check Total:
Vendor:2304 LEGACY MECHANICAL SERVICES LLC Check Sequence: 46 ACH Enabled: True
4699 Labor install venting & gas piping for spa heaters 1,041.60 06/09/2015 226-45122-440440
4699 Materials for install venting & gas piping for spa heaters 186.00 06/09/2015 226-45122-440440
1,227.60Check Total:
Vendor:1292 LEROY JOB TRUCKING INC Check Sequence: 47 ACH Enabled: True
17361 Animal Charge (7) 81.90 06/09/2015 101-42700-431990
81.90Check Total:
Vendor:4133 SHAWN LUCAS Check Sequence: 48 ACH Enabled: False
06022015 FNM-001-0075 acct Refund 31.10 06/09/2015 656-00000-115025
31.10Check Total:
Vendor:4081 M & P SIGN CO Check Sequence: 49 ACH Enabled: False
8936 Metal signs 30x24 "For Sale for Development" (1/2) 59.00 06/09/2015 213-46301-431990
8936 Metal signs 30x24 "For Sale for Development" (1/2) 59.00 06/09/2015 101-41940-431990
118.00Check Total:
Vendor:1303 M AMUNDSON LLP Check Sequence: 50 ACH Enabled: True
195979 resale - soda pop; cork screws; can coolers; etc 393.36 06/09/2015 609-49750-425400
195979 resale - cigarettes 536.76 06/09/2015 609-49750-425500
930.12Check Total:
Vendor:1308 MARCO INC Check Sequence: 51 ACH Enabled: True
278648191 5/10-6/10-15 Contract 4,923.39 06/09/2015 702-00000-441500
4,923.39Check Total:
Vendor:2852 MIDWEST BUSINESS PROMOTIONS INC Check Sequence: 52 ACH Enabled: True
11472 (1000) Executive Javalina Pens 524.65 06/09/2015 609-49754-421990
524.65Check Total:
Vendor:2179 MINNESOTA 9-1-1 PROGRAM Check Sequence: 53 ACH Enabled: True
May-15 May 2015 - 911 Wright Co. 780.53 06/09/2015 656-00000-208170
780.53Check Total:
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 8
Invoice No Description Amount Payment Date Acct Number Reference
Vendor:1932 MIRACLE RECREATION EQUIPMENT CO Check Sequence: 54 ACH Enabled: False
762216 (6) DNO Spiralok - W. Bridge; Sunset Ponds; Groveland parks 383.63 06/09/2015 101-45201-440800
383.63Check Total:
Vendor:1341 MMKR Check Sequence: 55 ACH Enabled: True
37944 Progress Billing - services through 4/30/15 6,500.00 06/09/2015 101-41540-430100
6,500.00Check Total:
Vendor:4138 MONTICELLO LIONS Check Sequence: 56 ACH Enabled: False
6/2/2015 Return donation - for Fire Relief Association 100.00 06/09/2015 101-42200-362300
100.00Check Total:
Vendor:1375 MONTICELLO PRINTING INC Check Sequence: 57 ACH Enabled: True
5/21/2015 Self Inking Stamp 39.00 06/09/2015 101-42400-421990
39.00Check Total:
Vendor:1390 MTI DISTRIBUTING INC Check Sequence: 58 ACH Enabled: False
1012306 check valve kit 107.12 06/09/2015 101-45201-422100
1012896 check valve kit 110.16 06/09/2015 101-45201-422100
1012897 check valve kit - credit -95.42 06/09/2015 101-45201-422100
121.86Check Total:
Vendor:1419 PAN O GOLD CO ST CLOUD Check Sequence: 59 ACH Enabled: True
010004513610 Resale - buns (9 pkgs) 15.66 06/09/2015 226-45127-425410
010004513610 Resale - buns (9 pkgs) 15.66 06/09/2015 226-45203-425410
31.32Check Total:
Vendor:1273 PAUSTIS & SONS WINE CO Check Sequence: 60 ACH Enabled: False
8498942 resale - wine 494.95 06/09/2015 609-49750-425300
8498942 freight 10.50 06/09/2015 609-49750-433300
8499879 resale - wine 1,414.44 06/09/2015 609-49750-425300
8499879 freight 22.50 06/09/2015 609-49750-433300
1,942.39Check Total:
Vendor:1427 PHILLIPS WINE & SPIRITS CO Check Sequence: 61 ACH Enabled: False
212890 resale - wine credit -5.83 06/09/2015 609-49750-425300
2788078 resale - liquor 445.70 06/09/2015 609-49750-425100
2788078 freight 8.64 06/09/2015 609-49750-433300
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 9
Invoice No Description Amount Payment Date Acct Number Reference
2788079 resale - wine 3,205.05 06/09/2015 609-49750-425300
2788079 freight 71.99 06/09/2015 609-49750-433300
2788859 freight 36.00 06/09/2015 609-49750-433300
2788859 resale - liquor 2,763.35 06/09/2015 609-49750-425100
2788860 resale - wine 4,468.50 06/09/2015 609-49750-425300
2788860 freight 137.51 06/09/2015 609-49750-433300
2789786 freight 38.35 06/09/2015 609-49750-433300
2789786 resale - liquor 3,540.68 06/09/2015 609-49750-425100
2789787 resale - wine 1,084.75 06/09/2015 609-49750-425300
2789787 resale - wine n/a 112.00 06/09/2015 609-49750-425400
2789787 freight 26.64 06/09/2015 609-49750-433300
2791710 freight 80.65 06/09/2015 609-49750-433300
2791710 resale - liquor 3,597.50 06/09/2015 609-49750-425100
2793574 resale - liquor 6,103.74 06/09/2015 609-49750-425100
2793574 freight 79.19 06/09/2015 609-49750-433300
2793575 freight 27.36 06/09/2015 609-49750-433300
2793575 resale - wine 670.25 06/09/2015 609-49750-425300
26,492.02Check Total:
Vendor:1443 QUALITY FLOW SYSTEMS INC Check Sequence: 62 ACH Enabled: False
30470 Chestnut Lift Station - (4) KSB Profile gasket 280.00 06/09/2015 602-49490-422100
280.00Check Total:
Vendor:3721 MICHAEL REASONER Check Sequence: 63 ACH Enabled: False
5/19/2015 Referee Mens Hockey 1 game 5/18/15 35.00 06/09/2015 226-45127-430160
35.00Check Total:
Vendor:4129 MIKE ROGERS Check Sequence: 64 ACH Enabled: True
05/28/2015 Boot Reimbursement - Mike R 90.00 06/09/2015 101-43120-420650
90.00Check Total:
Vendor:1474 PATRICIA A SALZWEDEL Check Sequence: 65 ACH Enabled: True
6/3/2015 Semi Monthly Contract Payment 1,593.75 06/09/2015 101-42700-431200
1,593.75Check Total:
Vendor:4130 MARLIEN SASS Check Sequence: 66 ACH Enabled: False
06022015 FNM-001-08223 acct refund 11.59 06/09/2015 656-00000-115025
11.59Check Total:
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 10
Invoice No Description Amount Payment Date Acct Number Reference
Vendor:4127 SCHILLEWAERT LANDSCAPING & TREE SERVICE, INC Check Sequence: 67 ACH Enabled: False
127727 Planting Maple Tree Hunters Crossing - AMCON BLOCK to pay 825.70 06/09/2015 101-43120-431990
825.70Check Total:
Vendor:2443 SECURITAS SECURITY SERVICES USA INC Check Sequence: 68 ACH Enabled: False
W4796982 Security Officer - 5-1-15 Wine Tasting Event 119.70 06/09/2015 609-49754-425550
119.70Check Total:
Vendor:1485 SENTRY SYSTEMS INC Check Sequence: 69 ACH Enabled: True
05/21/2015 Security system cancellation fee 15.00 06/09/2015 101-43110-431900
15.00Check Total:
Vendor:2497 SHERBURNE WRIGHT CABLE COMMISSION Check Sequence: 70 ACH Enabled: True
6/2/2015 Cable Franchise Fees - FNM Qtr 2 2015 7,081.16 06/09/2015 656-00000-208300
7,081.16Check Total:
Vendor:1490 CYNTHIA R SIMPSON Check Sequence: 71 ACH Enabled: False
894131 May 2015 Cleaning Service 100.00 06/09/2015 101-42200-431990
100.00Check Total:
Vendor:3309 SOUTHERN WINE & SPIRITS OF MINNESOTA Check Sequence: 72 ACH Enabled: False
1284920 resale - wine 4,214.88 06/09/2015 609-49750-425300
1284920 freight 74.26 06/09/2015 609-49750-433300
1287329 resale - liquor 2,947.42 06/09/2015 609-49750-425100
1287329 freight 27.00 06/09/2015 609-49750-433300
1287330 freight 27.00 06/09/2015 609-49750-433300
1287330 resale - wine 1,633.55 06/09/2015 609-49750-425300
1289601 resale - liquor 855.56 06/09/2015 609-49750-425100
1289601 freight 8.10 06/09/2015 609-49750-433300
1289602 freight 31.05 06/09/2015 609-49750-433300
1289602 resale - wine 1,686.00 06/09/2015 609-49750-425300
11,504.82Check Total:
Vendor:1497 SPECTRUM SUPPLY COMPANY Check Sequence: 73 ACH Enabled: True
252604 (6) kitchen towels 12/210ct - PW 152.28 06/09/2015 101-43127-421100
252604 (20) Starlite Grey; (12)32oz spryrr; (12) 9.25" spryr; etc -Prk 174.08 06/09/2015 101-45201-421650
326.36Check Total:
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 11
Invoice No Description Amount Payment Date Acct Number Reference
Vendor:2564 SPORTS PRO LLC Check Sequence: 74 ACH Enabled: True
358 Labor - Qtrly Preventative Maint (13) Treadmills (11) Elliptical 545.00 06/09/2015 226-45122-431900
545.00Check Total:
Vendor:4136 PAUL & MARY STERBUCK Check Sequence: 75 ACH Enabled: False
06022015 FNM-001-0271 acct Refund 113.24 06/09/2015 656-00000-115025
113.24Check Total:
Vendor:3829 STEVE'O'SEPTIC Check Sequence: 76 ACH Enabled: True
May 2015 (12) Porta Toilet Rentals - full month 597.00 06/09/2015 101-45201-431990
597.00Check Total:
Vendor:1516 TASC Check Sequence: 77 ACH Enabled: False
IN547728 7/1/2015-7/31/2015 Admin Fees 66.56 06/09/2015 101-49240-413500
66.56Check Total:
Vendor:3608 TELESPHERE SOFTWARE INC Check Sequence: 78 ACH Enabled: False
4941-DM The balance from May 2015- cust, pd. us rather than Telesphere 129.52 06/09/2015 656-49870-431990
129.52Check Total:
Vendor:1522 THORPE DISTRIBUTING COMPANY Check Sequence: 79 ACH Enabled: True
00756428 resale - beer 20,910.18 06/09/2015 609-49750-425200
893832 resale - beer 13,456.44 06/09/2015 609-49750-425200
895361 resale - wine 25.10 06/09/2015 609-49750-425300
895362 resale - N/A beer 115.65 06/09/2015 609-49750-425400
895363 resale - beer 14,422.35 06/09/2015 609-49750-425200
896436 resale - beer 444.85 06/09/2015 609-49750-425200
896437 resale - beer N/A 62.80 06/09/2015 609-49750-425400
896504 resale - beer 288.05 06/09/2015 609-49750-425200
896504 resale - beer N/A 76.00 06/09/2015 609-49750-425400
896521 resale - beer credit -69.50 06/09/2015 609-49750-425200
49,731.92Check Total:
Vendor:3594 TRIMARK Check Sequence: 80 ACH Enabled: False
2426409 resale 34.74 06/09/2015 609-49750-425400
2426409 (6) asst. bags; coffee filter, etc 201.35 06/09/2015 609-49754-421990
2426409 freight 7.80 06/09/2015 609-49750-433300
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 12
Invoice No Description Amount Payment Date Acct Number Reference
243.89Check Total:
Vendor:1534 TWIN CITIES FLAG SOURCE INC Check Sequence: 81 ACH Enabled: False
28057 (2) 5x8 USA nylon I flag 133.59 06/09/2015 609-49754-421990
133.59Check Total:
Vendor:1537 UHL COMPANY INC Check Sequence: 82 ACH Enabled: True
34929 Issues w/energy mgmt program: java & graphics 1,205.00 06/09/2015 226-45122-440440
1,205.00Check Total:
Vendor:1550 VEOLIA WATER N AM OPERATING SERV LLC VEOLIA WATER N AM OPERATIONS INC Check Sequence: 83 ACH Enabled: False
00048698 July 2015 WWTP Operation & Maintenance 79,823.00 06/09/2015 602-49480-430800
79,823.00Check Total:
Vendor:1552 VIKING COCA COLA BOTTLING CO Check Sequence: 84 ACH Enabled: True
1570644 resale - soda pop 430.00 06/09/2015 609-49750-425400
1570786 resale - soda pop 166.25 06/09/2015 609-49750-425400
596.25Check Total:
Vendor:1684 VINOCOPIA Check Sequence: 85 ACH Enabled: True
0124881 freight 12.50 06/09/2015 609-49750-433300
0124881 resale - wine 436.50 06/09/2015 609-49750-425300
0125337 freight 7.50 06/09/2015 609-49750-433300
0125337 resale - wine 336.00 06/09/2015 609-49750-425300
792.50Check Total:
Vendor:4135 KIM WALLIN Check Sequence: 86 ACH Enabled: False
06022015 FNM-001-0470 acct. Refund 50.02 06/09/2015 656-00000-115025
50.02Check Total:
Vendor:3683 BRADLEY WEBER Check Sequence: 87 ACH Enabled: True
5/29/2015 Referee Mens Hockey - 5/27/15 - 1 game 35.00 06/09/2015 226-45127-430160
35.00Check Total:
Vendor:1567 WES OLSON ELECTRIC LLC Check Sequence: 88 ACH Enabled: False
7195 Materials - Lift rental for light repairs in Mississippi room 75.00 06/09/2015 226-45122-440100
7195 Labor - Light repairs in Mississippi room 300.00 06/09/2015 226-45122-440100
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 13
Invoice No Description Amount Payment Date Acct Number Reference
7199 Materials- Repair on Gazebo Wiring- W. Bridge Park 115.94 06/09/2015 101-45201-443910
7199 Labor - Repair on Gazebo Wiring- W. Bridge Park 227.50 06/09/2015 101-45201-443910
7200 Materials - Freeze stat - special order 165.00 06/09/2015 226-45122-440440
7200 Labor - repair air handler unit; replace freeze stat 162.50 06/09/2015 226-45122-440440
7212 Labor - Instl. Pedestal Pioneer Park. Prep for future lines-West 650.00 06/09/2015 101-45201-431990
7212 Materials- Instl. Pedestal Pioneer Park. Prep for future line 609.20 06/09/2015 101-45201-431990
7212 Inspection- Instl. Pedestal Pioneer Park. Prep for future line 45.00 06/09/2015 101-45201-431990
2,350.14Check Total:
Vendor:1756 WIGEN COMPANIES INC Check Sequence: 89 ACH Enabled: False
18757 Water softner repair and maintenance 1,406.95 06/09/2015 226-45122-440440
1,406.95Check Total:
Vendor:2651 WILSON DEVELOPMENT SERVICES LLC Check Sequence: 90 ACH Enabled: True
23311 Acquistioin & Relocation Consultant Services - Dahlke Property 592.50 06/09/2015 213-46301-431990
592.50Check Total:
Vendor:1572 THE WINE COMPANY Check Sequence: 91 ACH Enabled: True
393147 resale - wine 2,620.00 06/09/2015 609-49750-425300
393147 freight 37.95 06/09/2015 609-49750-433300
2,657.95Check Total:
Vendor:1573 WINE MERCHANTS INC Check Sequence: 92 ACH Enabled: False
7030236 freight 23.04 06/09/2015 609-49750-433300
7030236 resale - wine 1,204.00 06/09/2015 609-49750-425300
7030477 resale - wine 1,200.00 06/09/2015 609-49750-425300
7030477 freight 15.84 06/09/2015 609-49750-433300
7031231 freight 41.76 06/09/2015 609-49750-433300
7031231 resale - wine 1,440.25 06/09/2015 609-49750-425300
7031765 freight 2.88 06/09/2015 609-49750-433300
7031765 resale - wine 138.00 06/09/2015 609-49750-425300
4,065.77Check Total:
Vendor:1209 WIRTZ BEVERAGE MINNESOTA WINE & SPIRITS Check Sequence: 93 ACH Enabled: False
1080323834 reale - liquor 4,189.02 06/09/2015 609-49750-425100
1080323834 reale - wine 1,508.78 06/09/2015 609-49750-425300
1080323834 freight 90.91 06/09/2015 609-49750-433300
1080326499 reale - liquor 4,947.06 06/09/2015 609-49750-425100
1080326499 reale - wine 984.00 06/09/2015 609-49750-425300
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 14
Invoice No Description Amount Payment Date Acct Number Reference
1080326499 freight 74.13 06/09/2015 609-49750-433300
1080329105 reale - liquor 4,631.65 06/09/2015 609-49750-425100
1080329105 reale - wine 1,088.74 06/09/2015 609-49750-425300
1080329105 freight 72.61 06/09/2015 609-49750-433300
2080088437 reale - liquor credit -186.09 06/09/2015 609-49750-425100
2080088438 reale - liquor credit -40.75 06/09/2015 609-49750-425100
2080088439 reale - liquor credit -27.51 06/09/2015 609-49750-425100
2080088440 reale - liquor credit -199.49 06/09/2015 609-49750-425100
17,133.06Check Total:
Vendor:4134 RICK & LONNA WOLFSTELLER Check Sequence: 94 ACH Enabled: False
06022015 FNM-001-0028 acct. Refund 41.51 06/09/2015 656-00000-115025
41.51Check Total:
Vendor:2573 WOODLAND HILL VINEYARDS LLC Check Sequence: 95 ACH Enabled: False
1613 resale - wine 153.00 06/09/2015 609-49750-425300
153.00Check Total:
Total for Check Run:
Total of Number of Checks:
411,469.55
95
AP-Computer Check Proof List by Vendor (06/03/2015 - 11:30 AM)Page 15
The preceding list of bills payables was reviewed and approved for payment.
Date: 6/8/15 Approved by________________________________________
Mayor Brian Stumpf
CityCouncilAgenda:06/08/15
1
2B.ConsiderationofapprovingnewhiresanddeparturesforCitydepartments (TE)
A.REFERENCEANDBACKGROUND:
TheCouncilisaskedtoratifythehiringanddeparturesofemployeesthathaveoccurred
recentlyinthedepartmentslisted.ItisrecommendedthattheCouncilofficiallyratifythe
hiring/departureofalllistedemployeesincludingpart-timeandseasonalworkers.
A1.BudgetImpact:(positionsaregenerallyincludedinbudget)
A2.StaffWorkLoadImpact:Ifnewpositions,theremaybesometraining
involved.Ifterminatedpositions,existingstaffwouldpickupthosehours,as
needed,untilreplaced.
B.ALTERNATIVEACTIONS:
1.Motiontoratifythehire/departuresoftheemployeesasidentifiedontheattached
list.
2.Motiontodenytherecommendedhiresanddepartures.
C.RECOMMENDATION:
BystatutetheCityCouncilhastheauthoritytoapproveallhires/departures.Citystaff
recommendsAlternative#1,fortheCounciltoapprovethehiresand/ordeparturesas
listed.
D.SUPPORTINGDATA:
Listofnew/terminatedemployees
Name Title Department Hire Date Class
Noelle Berg Guest Service 2 MCC 5/23/2015 PT
Natalie Seyko Guest Service 2 MCC 5/24/2015 PT
Sydney Cottrell Guest Service 2 MCC 5/26/2015 PT
Amanda Campbell Slide Attendant MCC 5/26/2015 PT
Aysia Romer Life Guard MCC 5/31/2015 PT
Katie DeVries Slide Attendant MCC 5/31/15 PT
Sarah Renslow Friendship Island MCC 6/1/2015 PT
Joseph Schultz Friendship Island MCC 6/1/15 PT
Name Reason Department Last Day Class
Terae DeMarais Voluntary MCC 3/20/15 PT
Jennifer Jungroth Involuntary MCC 5/7/15 PT
Christian Sipe Voluntary MCC 5/8/15 PT
Melanie Rasmussen Voluntary MCC 5/22/15 PT
Michael Guyse Voluntary MCC 5/24/15 PT
Noah Haaland Voluntary MCC 5/26/15 PT
Anna Davidson Voluntary MCC 5/17/15 PT
Sydney Cottrell Involuntary MCC 5/28/15 PT
NEW EMPLOYEES
TERMINATING EMPLOYEES
New Hire and Terms City Council 2015: 6/3/2015
CityCouncilAgenda:6/08/15
1
2C.ConsiderationofappointingrepresentativestotheMonticelloPlanningCommission
tofillavacanciesfortermstoexpire12/31/15and12/31/16 (AS/TE)
A.REFERENCEANDBACKGROUND:
CityCouncilisaskedtoappointJohnFalenschekandMarcSimpsontopositionsonthe
MonticelloPlanningCommissiontofilltermstoexpire12/31/15and12/31/16
respectively.AlanHeidemannandAmberKramerpreviouslyheldthesepositions.
Thevacantpositionswereadvertisedtothepublicandinterviewswereheldbythe
PlanningCommissiononMay5,2015andonJune2,2015.Otherapplicantsforthe
Commissionwillbenotifiedandtheirapplicationskeptonfileforfutureopeningsonthis
orotherCityboards.
CouncilwillnotethatMr.Falenschekisapart-timeemployeeoftheMonticello
CommunityCenter.Mr.FalenschekteacheskarateclassesattheMCC.
ThePlanningCommissionrecommendedFalenschek’sandSimpson’sappointmentsto
theCommissioninaunanimous3-0vote.
B.ALTERNATIVEACTIONS:
Decision1:
1.MotiontorecommendthattheCityCouncilapprovetheappointmentofJohn
FalenschektotheMonticelloPlanningCommissionwithatermtoexpire
12/31/15.
2.Motiontodenytheappointment.
Decision2:
1.MotiontorecommendthattheCityCouncilapprovetheappointmentofMarc
SimpsontotheMonticelloPlanningCommissionwithatermtoexpire12/31/16.
2.Motiontodenytheappointment.
C.STAFFRECOMMENDATION:
CityStaffandtheMonticelloPlanningCommissionrecommendAlternative#1for
Decisions1and2.
D.SUPPORTINGDATA:
Application–JohnFalenschek(redacted)
Application–MarcSimpson(redacted)
Application–SteveReishus(redacted)
CityCouncilAgenda:6/08/15
2
CityCouncilAgenda:6/08/15
1
2D.ConsiderationofadoptingResolution#2015-042acceptingacontributionfrom
CargillKitchenSolutionsforflowerplantingsonBroadwayWestmedian (TM)
A.REFERENCEANDBACKGROUND:
CargillKitchenSolutionswishestocontribute$500towardtheflowerplantingsonthe
BroadwayWestmedian.TheflowerswereplantedonMay21st,2015.
Themedianhasbeenlookingbeautifulforanumberofyearsthankstothefinancial
contributionfromCargillKitchenSolutions,andtheplantingandmaintenancebyBarb
BrionofMartiesFarmService.Citystaffhavereceivedmanycomplimentsonhow
beautifulthisarealooksinthesummer.
A1.BudgetImpact:None
A2.StaffWorkloadImpact:Staffaccountsforandreconcilesdonationscontributed
throughtheCity.
B.ALTERNATIVEACTIONS:
1.Motiontoapprovethecontributionandauthorizeuseoffundsasspecified.
2.Motiontodenythecontributionandreturnthefundstothedonor.
C.STAFFRECOMMENDATION:
CitystaffrecommendsadoptingResolution#2015-042toacceptthedonationof$500
fromCargillKitchenSolutionsfortheflowerplantingsontheBroadwayWestmedian.
D.SUPPORTINGDATA:
Resolution#2015-042
Contributionform
CITYOFMONTICELLO
WRIGHTCOUNTY,MINNESOTA
RESOLUTIONNO.2015-042
ACCEPTINGCONTRIBUTIONS
WHEREAS,theCityofMonticelloisgenerallyauthorizedtoaccept
contributionsofrealandpersonalpropertypursuanttoMinnesotaStatutesSections
465.03and465.04forthebenefitofitscitizensandisspecificallyauthorizedtomaintain
suchpropertyforthebenefitofitscitizensinaccordancewiththetermsprescribedbythe
donor.SaidgiftsmaybelimitedunderprovisionsofMNStatutesSection471.895.
WHEREAS,thefollowingpersonsandorentitieshaveofferedtocontribute
contributionsorgiftstotheCityaslisted:
DONOR/ENTITY DESCRIPTION VALUE
CargillKitchenSolutions Cash $500
WHEREAS,allsaidcontributionsareintendedtoaidtheCityinestablishing
facilities,operationsorprogramswithinthecity’sjurisdictioneitheraloneorin
cooperationwithothers,asallowedbylaw;and
WHEREAS,theCityCouncilherebyfindsthatitisappropriatetoacceptthe
contributionsoffered.
NOWTHEREFOREBEITRESOLVED bytheCityCouncilofMonticelloas
follows:
1.ThecontributionsdescribedaboveareherebyacceptedbytheCityof
Monticello.
2.Thecontributionsdescribedabovewillbeusedasdesignatedbythe
donor.Thismayentailreimbursingorallocatingthemoneytoanother
entitythatwillutilizethefundsforthefollowingstatedpurpose:
DONOR/ENTITY RECIPIENT PURPOSE
CargillKitchenSolutions CityofMonticello Flowers
AdoptedbytheCityCouncilofMonticellothis8thdayofJune,2015.
CITYOFMONTICELLO
______________________________
BrianStumpf,Mayor
ATTEST:
______________________________
KerryBurri,InterimCityClerk
CityCouncilAgenda:06/08/15
1
2E.ConsiderationofadoptingResolution#2015-043acceptingacontributionfromthe
MonticelloLionstotheStreetDepartmentfortrafficcontroldevices (TM)
A.REFERENCEANDBACKGROUND:
TheMonticelloLionswishtocontribute$490towardsthepurchaseoftrafficcontrol
devices(barricades&cones)fortheMonticelloStreetDepartment.
Throughouttheyearsatvariouscommunityevents,theStreetDepartmenthasassisted
theMonticelloLionswithprovidingtrafficcontrol,barricades,cones,signs,etc.The
LionshaveexpressedtheirgratitudetotheCityandwishtocontributeasawayofsaying
thanksandgivingbacktotheCityfortheirassistance.
A1.BudgetImpact:None
A2.StaffWorkloadImpact:Staffaccountsforandreconcilesdonationscontributed
throughtheCity.
B.ALTERNATIVEACTIONS:
1.Motiontoapprovethecontributionandauthorizeuseoffundsasspecified.
2.Motiontodenythecontributionandreturnthefundstothedonor.
C.STAFFRECOMMENDATION:
CitystaffrecommendsadoptingResolution#2015-043toacceptthedonationof$490
fromtheMonticelloLionsforthepurchaseoftrafficcontroldevicesfortheMonticello
StreetDepartment.
D.SUPPORTINGDATA:
Resolution#2015-043
ContributionForm
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2015-043
ACCEPTING CONTRIBUTIONS
WHEREAS, the City of Monticello is generally authorized to accept
contributions of real and personal property pursuant to Minnesota Statutes Sections
465.03 and 465.04 for the benefit of its citizens and is specifically authorized to maintain
such property for the benefit of its citizens in accordance with the terms prescribed by the
donor. Said gifts may be limited under provisions of MN Statutes Section 471.895.
WHEREAS, the following persons and or entities have offered to contribute
contributions or gifts to the City as listed:
DONOR/ENTITY DESCRIPTION VALUE
Monticello Lions Cash $490
WHEREAS, all said contributions are intended to aid the City in establishing
facilities, operations or programs within the city’s jurisdiction either alone or in
cooperation with others, as allowed by law; and
WHEREAS, the City Council hereby finds that it is appropriate to accept the
contributions offered.
NOW THEREFORE BE IT RESOLVED by the City Council of Monticello as
follows:
1. The contributions described above are hereby accepted by the City of
Monticello.
2. The contributions described above will be used as designated by the
donor. This may entail reimbursing or allocating the money to another
entity that will utilize the funds for the following stated purpose:
DONOR/ENTITY RECIPIENT PURPOSE
Monticello Lions City of Monticello Traffic Control Devices
ADOPTED BY the City Council of Monticello this 8th day of June, 2015.
CITY OF MONTICELLO
______________________________
Brian Stumpf, Mayor
ATTEST:
______________________________
Kerry Burri, Interim City Clerk
CityCouncilAgenda:06/08/15
1
2F.ConsiderationofadoptingResolution#2015-047acceptingacontributionfromthe
MonticelloLionstotheParksDepartmentforkiosksignage (TM)
A.REFERENCEANDBACKGROUND:
TheMonticelloLionswishtocontribute$1,575towardsthepurchaseofthreekiosksigns
tobeinstalledatEllisonPark,WestBridgeParkandPioneerPark.
ThroughouttheyearstheMonticelloLionshaveworkedwiththeMonticelloParks
Departmentonvariousparkprojectsincluding,concessionstands,picnicshelters,etc.
TheLionshostmanyeventsintheparksincludingtheirannualBrewfestinWestBridge
ParkandvariousRiverfesteventsatEllisonPark,PioneerParkandWestBridgePark,
justtonameafew.TheParksDepartmentassiststheLionsattheseeventsandtheLions
wishtocontributeasawayofsayingthanksandgivingbacktotheCityfortheir
assistance.
A1.BudgetImpact:None.
A2.StaffWorkloadImpact:Staffaccountsforandreconcilesdonationscontributed
throughtheCity.
B.ALTERNATIVEACTIONS:
1.Motiontoapprovethecontributionandauthorizeuseoffundsasspecified.
2.Motiontodenythecontributionandreturnthefundstothedonor.
C.STAFFRECOMMENDATION:
CitystaffrecommendsadoptingResolution#2015-047toacceptthedonationof$1,575
fromtheMonticelloLionsforthepurchaseofkiosksignagetobeusedinthreedifferent
parklocations.
D.SUPPORTINGDATA:
Resolution#2015-047
ContributionForm
Kiosksignspecifications
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2015-047
ACCEPTING CONTRIBUTIONS
WHEREAS, the City of Monticello is generally authorized to accept
contributions of real and personal property pursuant to Minnesota Statutes Sections
465.03 and 465.04 for the benefit of its citizens and is specifically authorized to maintain
such property for the benefit of its citizens in accordance with the terms prescribed by the
donor. Said gifts may be limited under provisions of MN Statutes Section 471.895.
WHEREAS, the following persons and or entities have offered to contribute
contributions or gifts to the City as listed:
DONOR/ENTITY DESCRIPTION VALUE
Monticello Lions Cash $1,575
WHEREAS, all said contributions are intended to aid the City in establishing
facilities, operations or programs within the city’s jurisdiction either alone or in
cooperation with others, as allowed by law; and
WHEREAS, the City Council hereby finds that it is appropriate to accept the
contributions offered.
NOW THEREFORE BE IT RESOLVED by the City Council of Monticello as
follows:
1. The contributions described above are hereby accepted by the City of
Monticello.
2. The contributions described above will be used as designated by the
donor. This may entail reimbursing or allocating the money to another
entity that will utilize the funds for the following stated purpose:
DONOR/ENTITY RECIPIENT PURPOSE
Monticello Lions City of Monticello Kiosk Signage for Parks
Adopted by the City Council of Monticello this 8th day of June, 2015.
CITY OF MONTICELLO
______________________________
Brian Stumpf, Mayor
ATTEST:
______________________________
Kerry Burri, Interim City Clerk
CityCouncilAgenda:6/08/2015
1
2G.ConsiderationofadoptingResolution#2015-046approvingtheFinalPlatand
DevelopmentAgreementfortheVineStreetPlaceatwo-lotsubdivisioninanR-2
(SingleandTwoFamilyResidence)Districtandapprovalofencroachmentagreement.
Applicant:Benoit,Patrick(AS)
Property:Legal:Seeplatdocuments
PID:155010022010
Address:VicinityofVineStreet,5th Street
PlanningCaseNumber:2014-031,ZZVINE
A.REFERENCE&BACKGROUND
Request(s):FinalPlatapproval,includingdevelopmentagreement.
Previousfinalplatapprovalvoidduetofailuretorecord
within100days.Relatedencroachmentagreementalso
includedforapproval.
LandUseDesignation:PlacestoLive
ZoningDesignation:R-2SingleandTwoFamilyResidenceDistrict
ThepurposeoftheR-2SingleandTwoFamilyResidence
Districtistoprovideforlowtomoderatedensityoneand
twounitdwellingsanddirectlyrelatedcomplementary
uses.
CurrentSiteUse:Vacant/undeveloped
SurroundingLandUses:
North:SingleFamilyHomes/PlacestoLive(R-2)
East:SingleFamilyHomes/PlacestoLive(R-2)
South:RailroadTracks
West:SingleFamily/TwoFamilyHomes/PlacestoLive(R-2)
ProjectDescription:PatrickBenoitofBenoitProperties,LLCisseeking
approvalofFinalPlat,basedonavariancefrom
subdivisionstandardstocreatealotwithnostreetfrontage
grantedbythePlanningCommissiononJuly1,2014.The
purposeofthesubdivisionistoconstructaback-to-back
duplexutilizingazerolotlinetodividetheproperties.The
parcelontheeast(Lot2)hasnodirectstreetaccessand
willaccesstheVineStreetcul-de-sacviaashareddriveway
withthelotonthewest(Lot1).
CityCouncilAgenda:6/08/2015
2
ANALYSIS
ThefinalplatforVineStreetPlaceispresentedforre-considerationbytheCityCouncil.
Thepreviousfinalplatapprovalisconsideredvoid,asthefinalplatwasnotsubmittedfor
recordingatWrightCountywithintherequired100daysfromthetimeofCouncil’s
approvalofthefinalplat.ThisisarequirementoftheCity’ssubdivisionordinance.The
applicanthadtheoptiontorequestanextensionwithinthe100daysandwasadvisedof
theextensionopportunity,butdidnotchoosetoextendatthattime.Therefore,anew
applicationforfinalplatconsiderationisrequired.Aspartofthatapplication,theCouncil
isaskedtowaivetheapplicationfeeof$50andescrowof$1,200,asthisisa
reconsiderationduetoexpirationofthepriorapproval.
Subdivision.Thefinalplatdocumentcontinuestoillustratetheplattingofapproximately
0.36acres(15,682squarefeet)intotworesidentiallots.ThepropertyiszonedR-2
SingleandTwoFamilyResidenceDistrict.Thesiteiscurrentlyundevelopedandis
adjacenttoexistingsinglefamilyhomestothenorthandeast,theVineStreetcul-de-sac
onthewest,andrailroadtrackstothesouth.Theapprovedpreliminaryplatcreatestwo
lotsforthepurposesofconstructingaback-to-backduplex.Thecombinedlotarea
exceedsthebasedistrictminimumof12,000squarefeetincompliancewithZoning
OrdinanceSection3.4(B)(1)(a).
PublicStreetAccess.Thefinalplatre-dedicatesVineStreetaspublicrightofway.The
portionofVineStreetfrontingLot1,Block1oftheproposedplatwaspreviously
vacatedbytheCity.Theadjoiningneighboringownerstothewest,JamesandKaye
Eisele,willjoinintheplatastheyowntheunderlyingpropertyforthededicationarea.
Lot1willgainaccessdirectlyfromthispublicstreet.Lot2willgainaccesstothepublic
streetperthevariancetozoningandsubdivisionrequirementsforlotfrontage,whichwas
previouslyapprovedforLot2.ThatvarianceisvaliduntilJuly1,2015andwas
contingentontheexecutionandrecordingofarequiredprivateeasementdocumentfor
access.
Easements.Drainageandutilityeasementshavebeenindicatedaroundtheperimeterof
thelots,withtheexceptionofthezerolotlineparcelboundary.A12footdrainageand
utilityeasementwillbededicatedalongthenorth(side)lotlineattherequestofthecity,
asthereisnodrainageandutilityeasementalongtherearlotlinesoftheparcelstothe
north.A6’easementisproposedalongthesouthlineoftheplat.
Twoeasementencroachmentsaredepictedontheproposedsiteplanfortheduplex:a
patioareaforLot2andthesouthernedgeofthecurbeddrivewayapproximately3feet
fromthesouthproperty.Aneasementencroachmentagreementmustbefiledwiththe
propertywhentheplatisrecorded.
TheapplicanthasaddressedtheExhibitZconditionsforpreliminaryandfinalplatas
approvedonAugust11th,2014asfollows:
CityCouncilAgenda:6/08/2015
3
1.Acrossaccesseasementagreementmustbeestablishedandfiledwiththecountyto
provideaccessfromLot2acrossLot1totheVineStreetcul-de-sac.Thecross
accesseasementshouldbewrittentoincludereferencetoutilityprovisioncrossing
theprivatelotlines.Acrosseasementagreementdocumenthasbeenprovidedby
theapplicantforaccess.Atthistime,thedocumentdoesnotincludethecrossing
ofpropertylineswithutilitiesandrequiresrevisiontoinclude.Therevised
documentissubjecttoreviewoftheCityAttorneyandproofofrecordingofthe
easementwillberequiredpriortobuildingpermit.
2.Theapplicantshallspecifyhowlong-termmaintenanceandcapitalimprovements
willbeprovidedforbetweenthetwoparcels.Aseparatedocumentfortheseitems
hasbeendraftedandsubmittedtotheCity.
3.Thesharedwallfacingonthezerolotlinemustbeastructuralwallmeetingbuilding
codeandpropertylinerequirements.Conditionapplicable;reviewedatbuilding
permit.
4.Additionallandscaping,suchasashrubborder,shallbeinstalledalongthenorth
propertylinetoprovideadditionalvisualbufferingforthesideyardoftheduplexand
therearyardsoftheadjoiningresidentialparcels.Arborvitaeandspireaplantings
havebeenaddedalongthenorthsideoftheunitsontherevisedrecordlandscaping
plan.
5.ExteriorfinishmaterialsonthewestsideoftheduplexonLot1musthaveatleast20
percentofthefaçadeconsistingofbrick,stone,orculturedmasonrysimulatingthese
materials.Theapplicanthasprovidedarecordplanillustratingtheadditionof
brickorstoneonthewestsideoftheduplexonLot1.Thisrequirementwillalsobe
verifiedatbuildingpermit.
6.Executionofanencroachmentagreementforimprovementsinthepubliceasements.
AnencroachmentagreementisincludedforCouncilreviewandapproval.
7.Executionofadevelopmentagreementgoverningrequirementsandimprovementsin
theplat.ThedevelopmentagreementisincludedforCouncilreviewandapproval
andisdiscussedinmoredetailbelow.
8.RecommendationsoftheCityEngineerrelatingtograding,drainage,utilities,and
stormwatermanagement.Itshouldbenotedthatinrecordpreliminaryplatplans
submittedtotheCity,theapplicanthasrevisedthesiteandgradingplansto
illustrateareduceddrivewaywidthandgradingplanwhicheliminatescurbing
alongthedrivewayanddirectsdrainageacrossthedrivewaydirectlytotheexisting
stormwatersysteminVineStreet.Theapplicanthasalsosubmittedarevised
utilityplanwhichindicatesthattheywillnotremovetheadditionalthirdwater
service.TheCityEngineerandWater&SewerSuperintendentrecommend
abandoningthewaterservicebyclosingtheconnectionwheretheserviceintersects
themaininthestreetandalsoremovingthestandpipeintheboulevard.TheWater
CityCouncilAgenda:6/08/2015
4
&SewerSuperintendenthasindicatedthathehashadissuesinthepastwhere
unusedwaterservicesleak,creatingasinkholethatcouldimpactthestreet.By
closingofftheconnectionatthemain,thisissuecanbeprevented.Also,ifthe
standpipeintheboulevardishitwithalawnmowerforexample,thatcancreate
leakingissuesaswell.
Thedevelopmentagreementthereforerequiresanassumptionofallliabilityforthe
extraserviceifnotabandonedpertheCityEngineerandWater&Sewer
Superintendent’srecommendation.
Therehasbeensomediscussionwiththeadjoiningpropertyownertothenorth
regardingtheuseoftheextrasetofsewerandwaterservicesfordevelopmentof
theirvacantlot.Iftheapplicantandadjoiningpropertyownercometoaseparate,
privateagreementregardingutiltizingtheextrasetofservices,arevisedutilityplan
illustratingthatconnectionandlineserviceswillberequired.
Atthistime,theCityEngineerhasreviewedtherevisedrecordgradingandutility
planscurrentlyonfileandhasminorcomments.
9.TheapplicantsmustaddasignaturelineontheFinalPlatfortheneighbortothewest
orVineStreet,duetotitleinterestintheplattingoftheVineStreetrightofway.This
signaturelineisincludedonthefinalplatpresentedforconsiderationatthistime.
10.Theapplicantmustprovidedetailsoftreeprotectiononthelandscapingplan,
consistentwiththenotesincludedonthegradingplan.Thisitemhasbeenaddressed
ontherecordpreliminaryplatplansonfilewiththeCity.
DEVELOPMENTCONTRACT&FINANCEPLAN
ThedevelopmentcontractforVineStreetPlaceincludesmanyofthestandardprovisions
forplatdevelopment,includingzoninganddesignprovisions,andgradinganderosion
managementrequirements.However,thecontractdoesreflectthenatureoftheprojectas
asmallresidentialsubdivisiontoaccommodateaduplexdevelopment.
Giventhesites’locationintheOriginalPlatofMonticello,aswellasthefactthatthe
duplexisapresumedallowabledensityforthesite,notrunkchargeshavebeenassigned.
ThisallowanceissubjecttoCouncilconsideration.Asanote,staffbelievesthat
additionalstudyregardingapplicationoftrunkfeesintheOriginalPlatandLower
Monticelloisnecessary-butthatresearchanddiscussioncanoccurwithCounciloutside
ofthisreviewandapproval.Atthistime,Councilisonlyaskedtoconsiderapprovalof
thisplatwithoutapplicationoftrunkfees.Approvalofthedevelopmentcontractas
presentedintheSupportingDatadoesnotrequirepaymentoftrunkfees.
Aspreviouslynoted,theapplicanthassubmittedarevisedutilityplanwhichindicates
thattheywillnotabandontheadditional,unusedwaterservicewithintheplat.TheCity
CityCouncilAgenda:6/08/2015
5
EngineerandWater&SewerSuperintendentrecommendabandoningthewaterservice
byclosingtheconnectionwheretheserviceintersectsthemaininthestreetandalso
removingthestandpipeintheboulevard.Thedevelopmentagreementthereforerequires
anassumptionofallliabilityfortheextraserviceifnotabandonedpertheCityEngineer
andWater&SewerSuperintendent’srecommendation.
Councilwillagainnotethattherehasbeensomediscussionwiththeadjoiningproperty
ownertothenorthregardingtheuseoftheextrasetofsewerandwaterservicesfor
developmentoftheirvacantlot.Iftheapplicantandadjoiningpropertyownercometoa
separate,privateagreementregardingtheextrasetofservices,arevisedutilityplan
illustratingthatconnectionandlineserviceswillberequired.
Parkdedicationhasbeendeterminedtobeapplicableandhasbeenidentifiedinthe
agreement.Theapplicantcanelecttoassessthischargeastheagreementiscurrently
written.Theagreementalsorequiresthepaymentofexpensesof$2,377overtheoriginal
depositassociatedwiththepreliminaryplatreview.Thisoverageisduetothe
complexityassociatedwiththeVineStreetrightofwayandin-fillnatureofthesite.
Theagreementreflectsasmallerthanstandarddepositforlegal,planningand
engineeringadministrationoftheplat.Thisisduetothefactthatallutilitiesandstreet
improvementsareinplace.Gradingandutilityinspectionandreviewwilloccurwithany
necessaryrightofwaypermitsandbuildingpermitinspections.Nodepositfor
mailboxes,streetlights,streetsignsorsweepingwasdeemedtobenecessary,subjectto
Councilreview.Aminimaldepositof$500hasbeenthereforebeenprovidedinthe
agreementandthatamountissubjecttoreconciliation.
Councilisalsoaskedtoconsideraspartofthefinalplatanddevelopmentcontract
approvalthereallocationofexpensesfromthisprojecttoengineeringandlegalbudgets.
Thisreallocationisrequestedtomoreaccuratelyreflectthereviewassociatedwiththe
plat.Reviewexpensesassociatedwiththerevisiontothedrivewaywidth(andresulting
changestothegradingplan),treesizedeterminationandVinePlacerightofwayreview
wouldbemovedfromthisprojecttotheplanningandengineeringbudgets.Thisamount
is$3,361.11.ApprovalofthedevelopmentcontractaspresentedintheSupportingData
willallowforthisre-allocation.
Otherapplicabledepositsassociatedwiththeplatincludethoseforlandscapingand
placementofironmonuments.Thesearereturnedinfulloncetherequireditemsare
complete.
ENCROACHMENTAGREEMENT
Twoeasementencroachmentsaredepictedontheproposedsiteplanfortheduplex:a
patioareaforLot2andthesoutherndriveway,whichliesapproximately3feetfromthe
southproperty.AcopyoftheencroachmentagreementisattachedforCouncil
consideration.
CityCouncilAgenda:6/08/2015
6
Theeasementencroachmentagreementmustbefiledwiththepropertywhentheplatis
recorded.
B.ALTERNATIVEACTIONS
1.MotiontoadoptCityCouncilResolution#2015-046approvingtheFinalPlatand
DevelopmentAgreementfortheVineStreetPlaceatwo-lotsubdivisioninanR-2
(SingleandTwoFamilyResidence)District,andapprovalofencroachment
agreementforVineStreetPlace,subjecttoconditionsoutlinedintheattached
ResolutionNo.2014–046.Theapprovalincludesthewaiverofapplicationfeeand
escrowfortheplatre-application.
2.MotiontodenyadoptionofResolution#2015-046basedonfindingsenumeratedby
theCityCouncil.
3.Motionofother.
C.STAFFRECOMMENDATION
Staffrecommendsalternative#1,withcommentsrelatedtoapplicablechargessubjectto
Councilcomment.
D.SUPPORTINGDATA
A.Resolution2015-046
B.FinalPlat
C.DevelopmentAgreement
D.FinancePlan
E.EncroachmentAgreement
F.ProposedDraftCrossEasement
G.ProposedDraftMaintenanceAgreement
H.RevisedRecordPreliminaryPlatDocuments,including:
a.TitleSheet
b.SitePlan
c.Grading&DrainagePlan
d.UtilityPlan
e.LandscapePlan
f.DetailSheet
g.DetailSheet
h.PreliminaryPlat
I.SubdivisionOrdinance
J.BuildingElevations
Z.ConditionsofApproval
CityCouncilAgenda:6/08/2015
7
EXHIBITZ:CONDITIONSOFAPPROVAL
PlatofVineStreetPlace
1.VineStreetshallbededicatedperthefinalplatapprovedbytheCityCouncilonJune8th,
2015.
2.Theplatandplandocumentsshallcomplywiththerequirementsandrecommendationsof
theCityEngineerandCountySurveyor.
3.TheCityapprovedaVariancetothezoningordinancefortheVineStreetPlace
developmentonJuly1st,2014.Theplansarerequiredtocomplywithallconditionsas
approvedaspartoftheVarianceconsideration.
4.Simultaneouswiththerecordingofthefinalplat,Developershallprovideandrecordan
easementoverLot1infavorofLot2foraccesstoVineStreetthatalsoaddressesuseand
maintenanceofthedriveway,providesutilitiestoLot2andeasementpremises,and
providesforlong-termmaintenanceandcapitalimprovementsbetweenthetwoparcels.
5.Iftheapplicantandadjoiningpropertyownertothenorthcometoanagreement
regardingtheextrasetofwaterandsewerservices,arevisedutilityplanillustratingthe
connectionwillberequiredtobesubmitted.
6.Thesharedwallfacingonthezerolotlinemustbeastructuralwallmeetingbuilding
codeandpropertylinerequirements.
7.Executionofanencroachmentagreementforimprovementsinthepubliceasements.
8.Executionofadevelopmentagreementgoverningrequirementsandimprovementsinthe
plat.
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2015-046
APPROVING A FINAL PLAT AND DEVELOPMENT CONTRACTAND
APPROVING AN ENCROACHMENT AGREEMENT FOR
VINE STREET PLACE ADDDITION
WHEREAS, Patrick Benoit of Benoit Properties, LLC has submitted an application for final
plat approval and an encroachment agreement for the proposed development of Vine Street
Place Addition; and
WHEREAS, the final plat will meet design standards and other provisions outlined in Title
XI, the Monticello Subdivision Ordinance subject to conditions enumerated below; and
WHEREAS, Lot 2 of Vine Street Place Addition has no direct street access, and said Lot
received approval of a variance on July 1st, 2014 from zoning and subdivision standards by
the Board of Adjustments and Appeals; and
WHEREAS, Lot 2 will access the Vine Street cul-de-sac via an access easement across a
shared driveway with Lot 1, both of which encroach into the public drainage and utility
easement; and
WHEREAS, the Planning Commission held a public hearing on July 1st, 2014 on the
application and the applicant and members of the public were provided the opportunity to
present information to the Planning Commission; and
WHEREAS, the Planning Commission of the City of Monticello adopted Resolution #2014-
066 stating the following Findings of Fact in their recommendation of approval:
1. The lot in question has sufficient area to accommodate a two-family home,
2. A duplex is a permitted use in the R-2 District, and the proposed site and building
plan meets all required setbacks established by the district.
3. There are special circumstances affecting this lot which justify the granting of the
variance in order to allow for reasonable use of the property and granting the variance
will not be detrimental to the public health and welfare.
4. The site and building plans meet the performance standards in the ordinance for the
development of a duplex in the R-2 District subject to the conditions outlined below.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Monticello,
Minnesota that the final plat and encroachment agreement are hereby approved subject to the
following conditions:
1. Vine Street shall be dedicated per the final plat approved by the City Council on June
8th, 2015.
2. The plat and plan documents shall comply with the requirements and recommendations
of the City Engineer and County Surveyor.
3. The City approved a Variance to the zoning ordinance for the Vine Street Place
development on July 1st, 2014. The plans are required to comply with all conditions as
approved as part of the Variance consideration.
4. Simultaneous with the recording of the final plat, Developer shall provide and record an
easement over Lot 1 in favor of Lot 2 for access to Vine Street that also addresses use
and maintenance of the driveway, provides utilities to Lot 2 and easement premises,
and provide for long-term maintenance and capital improvements between the two
parcels.
5. If the applicant and adjoining property owner to the north come to an agreement
regarding the extra set of water and sewer services, a revised utility plan illustrating
the connection will be required to be submitted.
6. The shared wall facing on the zero lot line must be a structural wall meeting building
code and property line requirements.
7. Execution of an encroachment agreement for improvements in the public easements.
8. Execution of a development agreement governing requirements and improvements in
the plat.
BE IT FURTHER RESOLVED, by the City Council of the City of Monticello, Minnesota
that the Development Contract for Vine Street Place Addition is hereby approved, subject to
the applicable conditions as stated above.
ADOPTED BY the Monticello City Council this 8th day of June, 2015.
CITY OF MONTICELLO
_______________________________
Brian Stumpf, Mayor
ATTEST:
_______________________________
Jeff O’Neill, City Administrator
1
123633
(reserved for recording information)
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
VINE STREET PLACE
AGREEMENT dated ____________________, 2015, by and between the CITY OF MONTICELLO, a
Minnesota municipal corporation (“City”), and BENOIT PROPERTIES, LLC, a Minnesota Limited Liability
Corporation (the “Developer”).
1. REQUEST FOR PLAT APPROVAL. On June 8th, 2015, the City approved a plat for VINE
STREET PLACE (referred to in this Contract as the “plat” and the “Development”), consisting of two (2) residential lots
to be developed as a duplex. The land is situated in the County of Wright, State of Minnesota, and is legally described
on the attached Exhibit “A”.
2. CONDITIONS OF PLAT APPROVAL. The City approved the plat on condition that the
Developer enter into this Contract, furnish the security required by it, and record the plat with the County Recorder or
Registrar of Titles within 365 days of the date the plat is approved.
The City Council approved the plat subject to the following additional conditions:
a) Vine Street shall be dedicated per the final plat approved by the City Council on June 8th,
2015.
2
123633
b) The plat and plan documents shall comply with the requirements and recommendations of
the City Engineer and County Surveyor.
c) The City approved a Variance to the zoning ordinance for the Vine Street Place development
on July 1st, 2014. The plans are required to comply with all conditions as approved as part of
the Variance consideration.
d) Simultaneous with the recording of the final plat, Developer shall provide and record an
easement over Lot 1 in favor of Lot 2 for access to Vine Street that also addresses use and
maintenance of the driveway, provides utilities to Lot 2 and easement premises, and provides
for long-term maintenance and capital improvements between the two parcels.
e) If the applicant and adjoining property owner to the north come to an agreement regarding
the extra set of water and sewer services, a revised utility plan illustrating the connection
will be required to be submitted.
f) The shared wall facing on the zero lot line must be a structural wall meeting building code
and property line requirements.
g) Execution of an encroachment agreement for improvements in the public easements.
3. RIGHT TO PROCEED. Within the plat or land to be platted, the Developer may not grade or
otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets, utilities, public or private
improvements, or any buildings until all the following conditions have been satisfied: 1) this agreement has been fully
executed by both parties and filed with the City Clerk, 2) the necessary security has been received by the City, 3) the
plat and this contract have been submitted to the Wright County Recorder's Office, and 4) the City has issued a letter
that all conditions have been satisfied and that the Developer may proceed.
4. PHASED DEVELOPMENT. The plat is not a part of a multi-phased preliminary plat.
5. CHANGES IN OFFICIAL CONTROLS. For two (2) years from the date of this Contract, no
amendments to the City's Comprehensive Plan, or official controls shall apply to or affect the use, development
density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in
writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary, to the full
extent permitted by state law, the City may require compliance with any amendments to the City's Comprehensive
Plan, official controls, platting or dedication requirements enacted after the date of this Contract.
3
123633
6. ZONING. Except as otherwise provided herein, the subject property shall be subject to the zoning
regulations of the R-2 (Single and Two Family Residence) District for residential lot design.
7. CONDITION FOR SUBSEQUENT APPROVALS. No final plat for changes or amendments
to this agreement shall be approved, nor shall construction commence for such additional land uses, until an amendment
of the agreement is processed and approved, subject to the requirements of the Monticello Zoning and Subdivision
Ordinances.
8. DEVELOPMENT PLANS. The plat shall be developed in accordance with the following plans.
With the exceptions of Plan A, the plans shall not be attached to this Contract. With the exception of Plans A and B,
the plans may be prepared, subject to City approval, after entering the Contract, but before commencement of any
work in the plat. If the plans vary from the written terms of this Contract, the written terms shall control. The plans
are:
Plan A—Plat, dated
Plan B— Preliminary Plat, dated
Plan C – Site Plan, dated
Plan D - Final Grading, Development, and Erosion Control Plan, dated
Plan E—Utility Plan, dated
Plan F - Landscape Plan, dated
Plan G – Mailbox Location Plan
9. IMPROVEMENTS. Public utilities, including sanitary sewer, watermain and street have been
installed in Vine Street and are accessible to the development. Developer shall pay for, be responsible for, and install
the following according to City requirements:
A. Plat
B. Site Grading and Erosion Control
C. Underground Utilities
D. Setting of Iron Monuments
4
123633
E. Surveying and Staking
F. Landscaping/Trees
G. Mailboxes: All developers must meet with the City of Monticello Street Superintendent and
USPS to determine the type of mail boxes installed and the location of all mail boxes. The City
of Monticello requires that mail boxes be clustered in groups of six (6) or more and a minimum
spacing of 200 feet between cluster locations, unless deemed not practical by the City Street
Superintendent and/or the USPS. Initial costs of the mail boxes and their installation are the
responsibility of the developer. Effective (date of ordinance change), all residential
developments (other than standard single family homes) must install locking cluster mail boxes.
The improvements shall be installed in accordance with the City subdivision ordinance; City standard specifications
for utilities and street construction; and any other ordinances. The Developer shall submit plans and specifications
which have been prepared by a competent registered professional engineer to the City for approval by the City
Engineer. The City may, at the City's discretion and at the Developer's expense, have one or more City inspectors and
a soil engineer inspect the work on a full or part-time basis. The Developer, its contractors and subcontractors, shall
follow all instructions received from the City's inspectors. The Developer's engineer shall provide for on-site project
management. The Developer's engineer is responsible for design changes and contract administration between the
Developer and the Developer's contractor. The Developer or his engineer shall schedule a pre-construction meeting at
a mutually agreeable time at the City Council chambers with all parties concerned, including the City staff, to review
the program for the construction work. Within thirty (30) days after the completion of the improvements and before
the security is released, the Developer shall supply the City with a complete set of reproducible "as constructed" plans,
an electronic file of the "as constructed" plans in an auto CAD.DWG file or a .DXF file, and two complete sets of blue
line "as constructed" plans, all prepared in accordance with City standards.
In accordance with Minnesota Statutes 505.02, the final placement of iron monuments for all lot corners must
be completed before the applicable security is released. The Developer's surveyor shall also submit a written notice to
the City certifying that the monuments have been installed.
10. DESIGN STANDARDS. The applicable Zoning District Regulations are equal to those set forth
in the R-2 (Single and Two Family Residence) Zoning District Regulations.
5
123633
11. PERMITS. The Developer shall obtain or require its contractors and subcontractors to obtain all
necessary permits, including but not limited to:
Wright County for County Road Access and Work in County Rights-of-Way
Minnesota Department of Health for Watermains
NPDES Permit for Stormwater Connections
MPCA for Sanitary Sewer and Hazardous Material Removal and Disposal
DNR for Dewatering
City of Monticello for Building Permits
City of Monticello for Grading Permits
City of Monticello for Right of Way Permit
12. DEWATERING. Due to the variable nature of groundwater levels and stormwater flows, it will
be the Developer’s and the Developer’s contractors and subcontractors responsibility to satisfy themselves with
regard to the elevation of groundwater in the area and the level of effort needed to perform dewa tering and storm
flow routing operations. All dewatering shall be in accordance with all applicable county, state, and federal rules
and regulations. DNR regulations regarding appropriations permits shall also be strictly followed.
13. TIME OF PERFORMANCE. The Developer shall install all required public improvements by
November 1, 2015. The Developer may, however, request an extension of time from the City. If an extension is
granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the
extended completion date.
14. LICENSE. The Developer hereby grants the City, its agents, employees, officers and contractors a
license to enter the platted property (including dedicated easements) to perform all work and inspections deemed
appropriate by the City in conjunction with plat development.
15. EROSION CONTROL, STORM WATER CONTROL AND STREET CLEANUP.
Prior to initiating site grading, the erosion control plan, Plan “D”, shall be implemented by the Developer and
inspected and approved by the City. The City may impose additional erosion control and storm water requirements if
they would be beneficial. All areas disturbed by the excavation and backfilling operations shall be reseeded within 48
hours after the completion of the work or in an area that is inactive for more than seven (7) days unless authorized and
approved by the City Engineer. Seeding shall be in accordance with the City’s current seeding specification, except as
6
123633
otherwise provided in the erosion control plan. Seeding may include certified oat seed to provide a temporary ground
cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed
retention.
The Developer shall clean dirt and debris from streets that has resulted from construction work by the
Developer, home builders, subcontractors, their agents or assigns. The Developer shall pay a penalty of $100.00 a day
for each calendar day that the streets are not cleaned in accordance with this paragraph. The parties recognize that time
is of the essence in controlling erosion. If the Developer does not comply with the erosion control plan and schedule
or supplementary instructions received from the City, or repeatedly fails to clean and sweep streets, the City may take
such action as it deems appropriate, including the performance of the necessary work by City staff or contracting to
have it performed. The City will endeavor to notify the Developer in advance of any proposed action, but failure of
the City to do so will not affect the Developer’s and City’s rights or obligations hereunder. If the Developer does not
reimburse the City for any cost the City incurred for such work within ten (10) days, the City may withdraw money
from the escrow account or draw down the letter of credit to the extent necessary to pay any costs. No development,
utility or street construction will be allowed and no building permits will be issued unless the plat is in full compliance
with the approved erosion control plan and storm water control measures are in place. Upon request by Developer,
the City will every six (6) months release the $500.00 per unit erosion control deposit for finished lots.
16. GRADING PLAN AND CERTIFICATION. The plat shall be graded in accordance with the
approved grading plan, stormwater control measures and erosion control plan as set forth in Plan "D". The plan shall
conform to City of Monticello specifications. Within thirty (30) days after completion of the grading and before the
City approves individual building permits (except model homes as permitted by this agreement), the Developer shall
provide the City with an "as-built" grading plan certified by a registered land surveyor or engineer that all ponds,
swales, and ditches have been constructed on public easements or land owned by the City. Additionally, the "as-built"
grading plan will include a certification that the grading following construction activities has been undisturbed or has
been returned to the state required in the grading plan. The "as-built" plan shall include field verified elevations of the
following: a) cross sections of ponds; b) location and elevations along all swales, wetlands, wetland mitigation areas
7
123633
if any, ditches, locations and dimensions of borrow areas/stockpiles, and installed "conservation area" posts; and c) lot
corner elevations, and building pads. A development plan will be required to be submitted with the "as-built" grading
plan as described in the City’s Plan Requirements and Design Guideline Manual. The City will withhold issuance of
building permits until the approved "as-built" grading plan and development plan is on file with the City, conservation
posts are installed, approved tree preservation plan and all erosion control measures are in place as determined by the
City Engineer. The Developer certifies to the City that all lots with building footings placed on fill have been
monitored and constructed to meet or exceed FHA/HUD 79G specifications.
17. OWNERSHIP OF IMPROVEMENTS. Upon completion of the work and construction
required by this Contract, the improvements lying within public easements shall become City property without further
notice or action.
18. CITY ADMINISTRATIVE OVERHEAD, PLANNING AND LEGAL EXPENSES,
CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION OBSERVATION. An escrow
for City staff administration relating to processing of the pla t and associated administration, planning, engineering
and legal costs shall be required in the amount of $500.00. This is subject to reconciliation based on actual costs at
the completion of the project. This amount covers the following: Street and utility plan review and project
administration, monitoring of construction observation, consultation with Developer and his e ngineer on status or
problems regarding the project, coordination for final inspection and acceptance, project monitoring during the
warranty period, and processing of requests for reduction in security. Also included in the deposit is the cost of
construction observation performed by the City’s in-house engineering staff or consulting engineer. Construction
observation will be billed on hourly rates. Upon completion of the project this amount shall be reconciled against
actual City costs. This amount also covers Grading plan review and project administration, monitoring of
construction observation, consultation with Developer and his engineer on status or problems regarding the project,
coordination for final inspection and acceptance, and processing of requests for reduction in security. Upon
completion of the project this amount shall be reconciled against the actual City costs.
8
123633
19. CLAIMS. In the event that the City receives claims from labor, materialmen, or others that work
required by this Contract has been performed, the sums due them have not been paid, and the laborers, materialmen,
or others are seeking payment from the City, the Developer hereby authorizes the City to commence an Interpleader
action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the District Courts, to draw upon the letters of
credit in an amount up to 125 percent of the claim(s) and deposit the funds in compliance with the Rule, and upon
such deposit, the Developer shall release, discharge, and dismiss the City from any further proceedings as it pertains to
the letters of credit deposited with the District Court, except that the Court shall retain jurisdiction to determine
attorneys' fees pursuant to this Contract.
20. STORM SEWER AREA AND PONDING CHARGE. The Development is not subject to a
storm sewer area charge.
21. SANITARY SEWER AREA CHARGE. The Development is not subject to a sanitary sewer area
charge.
22. WATER MAIN AREA CHARGE. The Development is not subject to a water main area charge.
23. PARK DEDICATION. The Developer shall be assessed or shall pay a cash contribution of
$2,750.00 in satisfaction of the City’s park dedication requirements. The share is calculated as follows:
11% x $25,000 = $2,750.00
The total spark dedication charge for the Development of $2,750.00 shall be assessed against the property
if not paid by the Developer in cash at the time of final plat approval or shall be assessed per the terms of paragraph
27D herein.
24. EXISTING SPECIAL ASSESSMENTS. The property to be platted as Lot 1, Block 1, and
Lot 2, Block 1, Vine Street Place, PID 155-010-022010 is subject to special assessments for Vine Street per the
agreement dated November 24th, 2003 “Assessment Agreement” between the City and the fee owners (“Assessment
Agreement”). These amounts have been levied by Wright County beginning with taxes payable for 2014. In entering
into this Development Agreement, the Developer assumes all responsibility for payment of these special assessments
9
123633
and there is no obligation for payment of any portion of the assessment per the Assessment Agreement for Lot 5,
Block 23, Original Plat of Monticello.
25. SPECIAL PROVISIONS. The following special provisions shall apply to plat
development:
A. The Developer is required to submit the final plat in electronic format in either an
AutoCAD.DWG file or a .DXF file. All construction record drawings (e.g. grading, utilities, and streets) shall be in
electronic format in accordance with standard City specifications. The Developer shall also submit one complete set
of reproducible construction plans on Mylar. No signatures will be placed on the final plat until all conditions of
approval have been met and the terms of this section have been met.
B. The developer shall pay for City expenses over deposit for the review of the preliminary plat
and variance in the amount of $2,377.49.
C. Vine Street shall be dedicated per the final plat, approved by the City Council on June 8th,
2015.
D. The plat and plan documents shall comply with the requirements and recommendations of
the City Engineer and County Surveyor
E. The City approved a Variance to the zoning ordinance for the Vine Street Place development
on July 1st, 2014. The plans are required to comply with all conditions as approved as part of the Variance
consideration.
F. Simultaneous with the recording of the final plat, Developer shall provide and record
an easement over Lot 1 in favor of Lot 2 for access to Vine Street that also addresses use and maintenance
of the driveway, provides utilities to Lot 2 and easement premises, and provides for long-term maintenance
and capital improvements between the two parcels.
G. A third water service exists on the west side of the property, extending from the main at Vine
Street. Should a private agreement for the use of that service not be executed with the adjacent property owner to the
10
123633
north, the developer and all successors, heirs and assigns of this agreement, including property owner of Lot 1, Block
1, Vine Street Place, hereby assumes all liability and cost associated with this service.
26. SUMMARY OF SECURITY REQUIREMENTS. To guarantee compliance with the terms
of this agreement, payment, the Developer shall furnish the City with a letter of credit, in the form attached hereto,
from a bank (“security”) for $1,550.00. The amount of the security was calculated as follows:
CONSTRUCTION COSTS:
Sanitary Sewer $ NA
Watermain $ NA
Storm Sewer/Draintile/Infiltration Basin $ NA
Internal Streets, Roads, Driveways, Sidewalks $ NA
Landscaping $ 800.00
Lot Corners/Iron Monuments ($300.00 x 2 x 125%) $ 750.00
TOTAL SECURITIES: $ 1,550.00
This breakdown is for historical reference; it is not a restriction on the use of the security. The bank shall be
subject to the approval of the City Administrator. The security shall be for an automatically renewing term. Individual
security instruments may be for shorter terms provided they are automatically renewed on an annual basis until
expiration. The City may draw down the security, with fifteen (15) days written notice to Developer, for any violation
of the terms of this Contract or if the security is allowed to lapse prior to the end of the required term. If the required
public improvements are not completed at least thirty (30) days prior to the renewal of the security, the City may also
draw it down. If the security is drawn down, the proceeds shall be used to cure the default. Upon receipt of proof
satisfactory to the City that work has been completed and financial obligations to the City have been satisfied, with
City approval the security may be reduced from time to time by ninety percent (90%) of the financial obligations that
have been satisfied. Ten percent (10%) of the amounts certified by the Developer's engineer shall be retained as
security until all improvements have been completed, all financial obligations to the City satisfied, and the required
"as constructed" plans have been received by the City. The City standard specifications for utilities and street
construction outline procedures for security reductions.
11
123633
27. SUMMARY OF CASH REQUIREMENTS.
A. The following is a summary of the cash requirements under this Contract which must be furnished to
the City prior to the time of final plat approval:
City Legal/Planning/Engineering $ 500.00
City Expenses over deposit (preliminary plat and variance review) $ 2,377.49
Storm Sewer $ NA
Sanitary Sewer $ NA
Water Main Area $ NA
Park $ 2,750.00
TOTAL CASH REQUIREMENTS $5,627.49
B. If Developer chooses to have assessed the park dedication as identified in paragraphs 23 as noted
above, the $2,750.00 shall be apportioned across the 2 units of the plat, with each unit being assigned an assessment of
$1,375.99. This assessment shall be payable over a two (2) year period, in two (2) equal principal installments, plus
interest per annum, paid at the prevailing rate plus 1.5% at the time of certificate of assessment, on the remaining
principal balance each year. Interest will begin to accrue on the principal balance commencing on the date of final
plat approval by the City of Monticello.
C. Developer hereby waives unconditionally all procedural and substantive objections to the
assessment including, but not limited to, any rights to hearing requirements and any claim that the assessment
constitutes a special benefit or that the amount of the assessment exceeds the special benefit to the
Development property. The Developer further waives any appeal rights otherwise available pursuant to
Minnesota Statutes § 429.081 or other laws.
28. RESPONSIBILITY FOR COSTS.
A. The Developer shall pay all actual costs incurred by it or the City in conjunction with the
development of the plat, including but not limited to legal, planning, engineering and inspection expenses incurred in
connection with approval and acceptance of the plat, the preparation of this Contract, review of construction plans and
documents, and all costs and expenses incurred by the City in monitoring and inspecting development of the plat. The
Developer shall deposit with the City the amount set forth in Section 28 to be used for the payment of these fees and
12
123633
enforcement fees. If the amount in the deposit account drops below 15% of the initial amount, the Developer will
make additional deposits in amounts set by the City. At the completion of the project and following payment of all
expenses related to the project, the City shall return the remaining deposit funds to the Developer.
B. The Developer shall hold the City and its officers, employees, and agents harmless from
claims made by it and third parties for damages sustained or costs incurred resulting from plat approval and
development. The Developer shall indemnify the City and its officers, employees, and agents for all costs, damages,
or expenses which the City may pay or incur in consequence of such claims, including attorneys' fees.
C. The Developer shall reimburse the City for costs incurred in the enforcement of this
Contract, including engineering and attorneys' fees.
D. The Developer shall pay, or cause to be paid when due, and in any event before any penalty
is attached, all special assessments referred to in this Contract. This is an obligation of the Developer and shall
continue in full force and effect even if the Developer sells a part or parts of the platted land.
E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred
under this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt plat
development and construction until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest
at the rate of eighteen percent (18%) per year.
F. In addition to the charges and special assessments referred to herein, other charges and
special assessments may be imposed such as but not limited to sewer availability charges ("SAC"), City water
connection charges (“WAC”), City sewer connection charges, and building permit fees.
29. DEVELOPER’S DEFAULT. In the event of default by the Developer as to any of the work to
be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly
reimburse the City for any expense incurred by the City, provided the Developer, except in an emergency as
determined by the City, is first given notice of the work in default, not less than forty-eight (48) hours in advance. This
Contract is a license for the City to act, and it shall not be necessary for the City to seek a Court order for permission
13
123633
to enter the land. When the City does any such work, the City may, in addition to its other remedies, assess the cost in
whole or in part.
30. MISCELLANEOUS.
A. The Developer represents to the City that the plat complies with all city, county,
metropolitan, state, and federal laws and regulations, including but not limited to: subdivision ordinances, zoning
ordinances, and environmental regulations. If the plat ceases to comply with county, metropolitan, state, and federal
laws and regulations, the City may, at its option, refuse to allow construction or development work in the plat until the
Developer does comply. Upon the City's demand, the Developer shall cease work until there is compliance.
B. Third parties shall have no recourse against the City under this Contract.
C. Breach of the terms of this Contract by the Developer shall be grounds for denial of building
permits, including lots sold to third parties.
D. If any portion, section, subsection, sentence, clause, paragraph, or phrase of this Contract is
for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract.
E. Grading, curbing, approved erosion control and one lift of asphalt shall be installed on all
private and public streets prior to issuance of any building permits, except model homes as permitted by this
agreement or the Building Official. Individual lot as-built grading and development plans will be required for any
model home permits.
F. If building permits are issued prior to the acceptance of public improvements, the Developer
assumes all liability and costs resulting in delays in completion of public improvements and damage to public
improvements caused by the City, Developer, its contractors, subcontractors, material men, employees, agents, or
third parties.
G. No sewer and water connection permits may be issued and no one may occupy a building for
which a building permit is issued on either a temporary or permanent basis until the streets needed for access have
been paved with a bituminous surface and the utilities are accepted by the City Engineer.
14
123633
H. The action or inaction of the City shall not constitute a waiver or amendment to the
provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and
approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this
Contract shall not be a waiver or release.
I. This Contract shall run with the land and may be recorded against the title to the property.
The Developer covenants with the City, its successors and assigns, that the Developer is well seized in fee title of the
property being final platted and/or has obtained consents to this Contract, in the form attached hereto, from all parties
who have an interest in the property; that there are no unrecorded interests in the property being final platted; and that
the Developer will indemnify and hold the City harmless for any breach of the foregoing covenants.
J. Developer shall take out and maintain or cause to be taken out and maintained until
six (6) months after the City has accepted the public improvements, public liability and property damage insurance
covering personal injury, including death, and claims for property damage which may arise out of Developer's work or
the work of its subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and
death shall be not less than $500,000 for one person and $1,000,000 for each occurrence; limits for property damage
shall be not less than $200,000 for each occurrence; or a combination single limit policy of $1,000,000 or more. The
City shall be named as an additional insured on the policy, and the Developer shall file with the City a certificate
evidencing coverage prior to the City signing the plat. The certificate shall provide that the City must be given ten (10)
days advance written notice of the cancellation of the insurance. The Developer must provide a Certificate of
Insurance which meets the following requirements:
1. The Description section of the Accord form needs to read “City of Monticello is named as Additional
Insured with respect to the General Liability and Auto Liability policies on a Primary and Non-
Contributory Basis.” Each policy shall provide 30 days notice of cancellation to City of Monticello.
2. Certificate Holder must be City of Monticello.
3. Provide copy of policy endorsement showing City of Monticello named as Additional Insured on a
Primary and Non-Contributory Basis.
15
123633
K. Each contract of a municipality must require the prime contractor to pay any subcontractor
within ten days of the prime contractor's receipt of payment from the municipality for undisputed services provided
by the subcontractor. The contract must require the prime contractor to pay interest of 1-1/2 percent per month or
any part of a month to the subcontractor on any undisputed amount not paid on time to the subcontractor. The
minimum monthly interest penalty payment for an unpaid balance of $100 or more is $10. For an unpaid balance of
less than $100, the prime contractor shall pay the actual penalty due to the subcontractor. A subcontractor who
prevails in a civil action to collect interest penalties from a prime contractor must b e awarded its costs and
disbursements, including attorney's fees, incurred in bringing the action.
L. Each right, power or remedy herein conferred upon the City is cumulative and in addition to
every other right, power or remedy, express or implied, now or hereafter arising, available to City, at law or in equity,
or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing
may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not
be a waiver of the right to exercise at any time thereafter any other right, power or remedy.
M. The Developer may not assign this Contract without the written permission of the City
Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells a part
or parts of the platted land.
N. Retaining walls that require a building permit shall be constructed in accordance with plans
and specifications prepared by a structural or geotechnical engineer licensed by the State of Minnesota. Following
construction, a certification signed by the design engineer shall be filed with the City Engineer evidencing that the
retaining wall was constructed in accordance with the approved plans and specifications. All retaining walls the
development plans, or special conditions referred to in this Contract required to be constructed shall be constructed
before any other building permit is issued for a lot on which a retaining wall is required to be built.
31. NOTICES. Required notices to the Developer shall be in writing, and shall be either hand
delivered to the Developer, its employees or agents, or mailed to the Developer by certified mail at the following
address: _________________________________________. Notices to the City shall be in writing and shall be
16
123633
either hand delivered to the City Administrator, or mailed to the City by certified mail in care of the City
Administrator at the following address: Monticello City Hall, 505 Walnut Street, Monticello, Minnesota 55362.
CITY: CITY OF MONTICELLO
BY: ___________________________________________
Brian Stumpf, Mayor
(SEAL)
AND __________________________________________
Jeff O’Neill, City Administrator
STATE OF MINNESOTA )
( ss.
COUNTY OF WRIGHT )
The foregoing instrument was acknowledged before me this ________ day of ______________, 20 15, by
Brian Stumpf and by Jeff O’Neill, the Mayor and City Administrator, respectively, of the City of Monticello, a
Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City
Council.
______________________________________________
NOTARY PUBLIC
BENOIT PROPERTIES, LLC:
BY: ___________________________________________
Its President
STATE OF MINNESOTA )
( ss.
COUNTY OF WRIGHT )
The foregoing instrument was acknowledged before me this ________ day of ______________, 2015 by
__________________________________ the ____________________________________ of
_____________________________. a Minnesota corporation, on its behalf.
______________________________________________
NOTARY PUBLIC
DRAFTED BY:
CAMPBELL, KNUTSON
Professional Association
17
123633
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, MN 55121
Telephone: (651) 452-5000
[SMM]
EXHIBIT A
TO
DEVELOPMENT CONTRACT
Legal Description
18
123633
EXHIBIT B TO DEVELOPMENT CONTRACT
Plans
19
123633
MORTGAGE CONSENT
TO
DEVELOPMENT CONTRACT
________________________, ____________________, which holds a mortgage on the subject
property, the development of which is governed by the foregoing Development Contract, agrees that the
Development Contract shall remain in full force and effect even if it forecloses on its mortgage.
Dated this _____ day of ____________, 2015.
_________________________,
_________________________
By:
Its:
STATE OF MINNESOTA )
)ss.
COUNTY OF __________ )
The foregoing instrument was acknowledged before me this _____ day of ________________,
2005, by _____________________________________ the ________________________
of__________________, _________________________, on its behalf.
________________________________________
NOTARY PUBLIC
DRAFTED BY:
CAMPBELL KNUTSON
Professional Association
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, Minnesota 55121
(651) 452-5000
20
123633
IRREVOCABLE LETTER OF CREDIT
No. ___________________
Date: _________________
TO: City of Monticello
505 Walnut Street
Monticello, Minnesota 55362
Dear Sir or Madam:
We hereby issue, for the account of (Name of Developer) and in your favor, our Irrevocable Letter of Credit in
the amount of $____________, available to you by your draft drawn on sight on the undersigned bank.
The draft must:
a) Bear the clause, "Drawn under Letter of Credit No. __________, dated ________________, 2_____, of (Name of
Bank) ";
b) Be signed by the Mayor or City Administrator of the City of Monticello.
c) Be presented for payment at (Address of Bank) , on or before 4:00 p.m. on November 30, 2007.
This Letter of Credit shall automatically renew for successive one-year terms unless, at least forty-five (45) days prior to
the next annual renewal date (which shall be November 30 of each year), the Bank delivers written notice to the Monticello City
Administrator that it intends to modify the terms of, or cancel, this Letter of Credit. Written notice is effective if sent by certified
mail, postage prepaid, and deposited in the U.S. Mail, at least forty-five (45) days prior to the next annual renewal date addressed
as follows: Monticello City Administrator, Monticello City Hall, 505 Walnut Street, Monticello, MN 55362, and is actually
received by the City Administrator at least thirty (30) days prior to the renewal date.
This Letter of Credit sets forth in full our understanding which shall not in any way be modified, amended, amplified, or
limited by reference to any document, instrument, or agreement, whether or not referred to herein.
This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw may be made under
this Letter of Credit.
This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and Practice for
Documentary Credits, International Chamber of Commerce Publication No. 500.
We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly honored upon
presentation.
BY: ____________________________________
Its ______________________________
21
123633
CERTIFICATE OF INSURANCE
PROJECT:
CERTIFICATE HOLDER: City of Monticello
505 Walnut Street
Monticello, Minnesota 55362
INSURED:
ADDITIONAL INSURED: City of Monticello
AGENT:
WORKERS' COMPENSATION:
Policy No. __________________
Effective Date: ______________ Expiration Date: _____________
Insurance Company:
COVERAGE - Workers' Compensation, Statutory.
GENERAL LIABILITY:
Policy No. __________________
Effective Date: ______________ Expiration Date: _____________
Insurance Company:
( ) Claims Made ( ) Occurrence
LIMITS: [Minimum]
Bodily Injury and Death:
$500,000 for one person $1,000,000 for each occurrence
Property Damage:
$200,000 for each occurrence
-OR-
Combination Single Limit Policy $1,000,000 or more
22
123633
COVERAGE PROVIDED:
Operations of Contractor: YES
Operations of Sub-Contractor (Contingent): YES
Does Personal Injury Include Claims Related to Employment? YES
Completed Operations/Products: YES
Contractual Liability (Broad Form): YES
Governmental Immunity is Waived: YES
Property Damage Liability Includes:
Damage Due to Blasting YES
Damage Due to Collapse YES
Damage Due to Underground Facilities YES
Broad Form Property Damage YES
AUTOMOBILE LIABILITY:
Policy No. __________________
Effective Date: ______________ Expiration Date: _____________
Insurance Company:
(X) Any Auto
LIMITS: [Minimum]
Bodily Injury:
$500,000 each person $1,000,000 each occurrence
Property Damage:
$500,000 each occurrence
-OR-
Combined Single Limit Policy: $1,000,000 each occurrence
ARE ANY DEDUCTIBLES APPLICABLE TO BODILY INJURY OR PROPERTY DAMAGE ON ANY OF THE
ABOVE COVERAGES:
If so, list: Amount: $________________
[Not to exceed $1,000.00]
23
123633
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE
THEREOF, THE ISSUING COMPANY WILL MAIL TEN (10) DAYS WRITTEN NOTICE TO THE PARTIES TO
WHOM THIS CERTIFICATE IS ISSUED.
Dated at _____________________________ On __________________________________
BY: _________________________________
Authorized Insurance Representative
SUMMARY OF EXPENSES/FINANCE PLAN
Single Phase
6/2/2015 DRAFT
Total Acres in Development 0.36 gross 0.36 net
Total Acres in Phase 0.36 gross 0.36 net
Total Units in Development 2
0 Single Family
2 Townhome
0 Mutli-Family
Total Units in Phase 0 Single Family
2 Townhome
0 Multi-Family
Trunk Area Charges & Park Dedication
Acreage Acres or Credits Net Notes
Charge Units Charge
Park & Pathway Dedication
Park Dedication Provided NA
Park Dedication Required (11%)0.4 land dedication - not applicable per Parks Commission
Park Dedication Deficiency NA
Park Dedication Deficiency as a % of total NA
Prevailing Park Dedication $2,750 cash in lieu; paid based on value of raw land at time of plat
Total Park Dedication Required $2,750.00 applicable per Parks Commission
Special Assessments
Road Reconstruction NA
Lift Station NA
Booster Station NA
San Sew, Water, Storm Sewer Trunk Fees*NA
Total Amount $2,750.00
Per Lot Charge based on (#) units 2 $1,375.00 May be assessed per unit by agreement
City Fees/Deposit
Preliminary Plat/Variance Expenses over Deposit $2,377.49
City Fee (General Admin)$500.00 Actual; cost reconciled at project completion
Legal incl above Actual; cost reconciled at project completion
Planning incl above Actual; cost reconciled at project completion
Engineering and Inspection incl above Inspector /Engineer cost reconciled at project completion
Grading and Restoration
Streets and Utilities
GPS Locate $60 2 NA Existing
Total City Fees $2,877.49
Improvement Construction Costs (Used to Calculate City Fees/Escrows/Securities)
Notes
Sanitary Sewer NA
Watermain NA
Storm Sewer NA
Roads, Driveways and Sidewalks/Trails NA
Lighting, Street Signage, Mailboxes NA
Construction total (for purpose of calculating other fees)$0.00
Lot Corners/Iron Monuments $300 2 $600.00
Total Construction Cost for the purpose of calculating LOC $600.00
Letter of Credit Amount (Total cost X 125%)$750.00
Maximum allowable reduction prior to acceptance and bond 90.00%$675.00
ADDITIONAL REQUIRED LETTERS OF CREDIT/SECURITY
Landscaping $200 2 2.00 $800.00
Prairie Restoration NA
Tree Preservation NA
Grading $3,000 payable with grading permit or included with bldg. permit
Street Sweeping $500 2 Per DA, Sec.15
Total Additional LOC/Cash Security $800.00
* Trunk fee program intended to apply to lots located in community growth areas where downstream systems need oversizing in order to accommodate growth.
this situation does not apply for infill - R1 or R2 development that occurs within the existing plat of the City.
1
(reserved for recording information)
ENCROACHMENT AGREEMENT
AGREEMENT made this _______ day of _____________, 2015, by and between the CITY
OF MONTICELLO, a Minnesota municipal corporation ("City"), and BENOIT PROPERTIES, LLC, a
Minnesota limited liability company ("Owner").
1. BACKGROUND. Owner is the fee owner of certain property located within the City of
Monticello, County of Wright, State of Minnesota legally described as follows:
Lot 1, Block 1 and Lot 2, Block 1, Vine Street Place, according to the recorded plat
thereof.
("subject property"). The City owns easements for drainage and utility purposes over portions of the
subject property as shown on the attached Exhibit “A”. Owner would like to construct a paved access
drive aisle and patio area on the subject property which will encroach into the City's easement areas as
depicted on the attached Exhibit “B”.
2. ENCROACHMENT AUTHORIZATION. The City hereby approves the encroachment
in its easement areas for the construction, use, and maintenance of the proposed paved drive aisle and
patio area as depicted on the attached Exhibit “B”.
2
3. MAINTENANCE. Owner shall be responsible for all costs relating to construction,
reconstruction, maintenance, and repair, including snow removal, with respect to the paved drive aisle and
patio area. This maintenance agreement is a personal obligation of Owner and shall be binding upon the
executors, administrators, successors, heirs and assigns of Owner.
4. HOLD HARMLESS AND INDEMNITY. In consideration of being allowed to
encroach in the City's easement areas, Owner, its/their successors, heirs and assigns, hereby agree(s) to
indemnify and hold the City harmless from all costs and expenses, claims and liability, including
reasonable attorney's fees, relating to or arising out of this grant to Owner of permission to encroach in the
City's easement areas for the construction, reconstruction, maintenance, use, operation, and the like of the
paved drive aisle and patio area.
5. TERMINATION. If the City reasonably determines that the drive aisle and/or patio
unreasonably interferes with the use, maintenance or repair of the City’s utilities within the easement
areas, Owner upon request by the City shall remove and replace the interference at its/their sole expense.
If Owner fails to remove the interference in the timeframe required by the City, the City may remove the
interference and shall have no obligation for damages to, or repair or replacement of the interference
removed by the City. Further, the Owner consents to the City levying an assessment against the subject
property for the City’s costs.
If Owner fails to maintain the drive aisle and/or patio or fails to remove and replace any
interference as provided in this paragraph, the City may, at its sole discretion, terminate this Agreement by
giving the current owner of the subject property thirty (30) days advance written notice except that no
notice period will be required in the case of an emergency condition as determined solely by the City
and the Agreement may then be terminated immediately.
3
The City may unilaterally terminate this Agreement if the drive aisle interferes with any
maintenance or improvements within the City’s easement areas as determined by the City.
6. RECORDING. This Agreement shall be recorded against the title to the subject property
and shall be binding upon Owner, its/their assigns, heirs and successors in interest.
CITY OF MONTICELLO
BY: _________________________________
(SEAL) Brian Stumpf, Mayor
AND ________________________________
Jeff O’Neill, City Administrator
STATE OF MINNESOTA )
( ss.
COUNTY OF WRIGHT )
The foregoing instrument was acknowledged before me this _______ day of ______________,
2014, by Brian Stumpf and by Jeff O’Neill, respectively the Mayor and City Administrator of the City of
Monticello, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority
granted by its City Council.
____________________________________
NOTARY PUBLIC
4
BENOIT PROPERTIES, LLC
a Minnesota limited liability company
_____________________________________
By: ______________________
Its: President
STATE OF MINNESOTA )
( ss.
COUNTY OF HENNEPIN )
The foregoing instrument was acknowledged before me this _______ day of ___________, 2014,
by________________, the President of Benoit Properties, LLC, a Minnesota limited liability company, on
behalf of the limited liability company.
____________________________________
NOTARY PUBLIC
THIS INSTRUMENT DRAFTED BY:
CAMPBELL KNUTSON
Professional Association
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, Minnesota 55121
Telephone: (651) 452-5000
SRN:ms
5
EXHIBIT “A”
SKETCH OF CITY DRAINAGE AND UTILITY EASEMENTS
6
EXHIBIT “B”
SKETCH DEPICTING
ACCESS DRIVE AISLE AND PATIO ENCROACHMENTS
94+)*6%1706;/+00'516#
BSBBSB
BS
B
BS
B
BS
B
BS
B
BS
B
BSB
BS
B
BS
B
BS
B
BS
B
BSB
N
BS
B
BSBBSB
BS
B
BS
B
BS
B
BS
B
BS
B
BSB
BS
B
BS
B
BS
B
BS
B
BSB
N
BSBBSB
BS
B
BS
B
BS
B
BS
B
BS
B
BSB
BS
B
BS
B
BS
B
BS
B
BSB
N
N
1
2
Bl
o
c
k
1
¾
¾
BSB
BS
B
BS
B
BS
B
BS
B
BS
B
BS
B
BS
B
BS
B
BS
B
BS
B
BS
B
BSB
/
SB
L
SB
L
8S
J
H
I
U
$
P
V
O
U
Z
.
J
O
O
F
T
P
U
B
7*
$
*
/
*
5
:
.
"
1
4F
D
T
5
X
Q
3
H
F
MONTICELLO SUBDIVISION ORDINANCE TITLE XI/Chapt 3/Page 1
CHAPTER 3
PROCEDURE
SECTION:
11-3-1:Procedure
11-3-2:Preliminary Plat
11-3-3:Final Plat
11-3-1:PROCEDURE: Prior to formal plat review by the Planning Commission, the applicant
is encouraged to present a sketch plan to the Planning Commission for purposes of
informally discussing, to present his intentions for development of the property, and be
able to obtain the views and opinions of the City Planning Commission.
11-3-2:PRELIMINARY PLAT:
(A)FILING: Fifteen (15) copies of the preliminary plat shall be filed with the City
Clerk. The required filing fee as established in Chapter 10 shall be paid, and
any necessary applications for variances from the provisions of this ordinance
shall be filed with the required fee before the proposed plat shall be considered
officially file. All plats shall be accompanied by an abstractor’s certificate,
properly certified, identifying the owner of the property in question and the
owners of all properties situated within three hundred fifty (350) feet of the
boundary of the property in question. Applications for a Preliminary Plat shall
be due no later than eight (8) weeks plus one (1) day prior to the Planning
Commission meeting at which the item is to be considered. Applications that
are deemed incomplete as of that date shall be returned to the applicant in
accordance with the requirements of Minn. Stat. § 15.99. Applications for
Preliminary Plats that consist of nineteen (19) or fewer residential units or non-
residential plats of five (5) or fewer acres may, at the discretion of the Zoning
Administrator, be placed on an earlier Planning Commission agenda, but in no
case shall said meeting be sooner than four (4) weeks and one (1) day from the
date of a complete application. (#426, 7/11/05)
(B)HEARING: Upon receipt of said application, the City Clerk shall set a public
hearing for the next regular meeting of the Planning Commission. The
Planning Commission shall conduct the hearing and report upon findings and
make recommendations to the City Council. Notice of said hearing shall be
published in the official newspaper at least ten (10) days prior to the hearing,
an d wri t t en notifi cat i o n of s ai d hear i n g shall b e mailed a t leas t ten (10) days
prior to all owners of land identified on the above-mentioned abstractor's
certificate.
MONTICELLO SUBDIVISION ORDINANCE TITLE XI/Chapt 3/Page 2
(C)TECHNICAL ASSISTANCE REPORTS: After the public hearing has been
set, the City Administrator shall instruct the staff to prepare technical reports
(where appropriate) and provide general assistance in preparing a
recommendation on the action to the City Council.
(D)REVIEW BY OTHER COMMISSIONS OR JURISDICTIONS: When
appropriate, the City Administrator shall file copies of the preliminary plat with
the Park and Recreation Commission and/or Wright County for their review
and comment.
(E)REPORT TO COUNCIL: The Planning Commission shall make a
recommendation to the City Council within sixty (60) days following the public
hearing.
(F)CITY COUNCIL ACTION:
1.The Council shall act upon the preliminary plat within one hundred
twenty (120) days of the date on which it was officially filed. If the
recommendation of the Planning Commission has not been received in
time to meet the requirement, the Council may act on the preliminary
plat without such recommendation.
2.If the preliminary plat is not approved by the City Council, the reasons
for such action shall be recorded in the proceedings of the Council and
transmitted to the applicant. If the preliminary plat is approved, such
approval shall not constitute final acceptance of the layout. Subsequent
approval will be required of the engineering proposals and other
features and requirements as specified by this ordinance to be indicated
on the final plat. The City Council may require such revisions in the
preliminary plat and final plat as it deems necessary for the health,
safety, general welfare, and convenience of the City of Monticello.
11-3-3:FINAL PLAT: After the preliminary plat has been approved, the final plat may be
submitted for approval as follows:
(A)APPROVAL OF THE PLANNING COMMISSION: Following approval of the
Preliminary Plat by the City Council, a Final Plat may be submitted for
approval. The Zoning Administrator shall place the proposed Final Plat on the
agenda for the next City Council which is no less than three (3) weeks later
than the date of submission. No Final Plat application shall be considered
complete unless that applicant shall have also submitted a revised Preliminary
Plat which as been revised to reflect all required conditions of approval, a
signed copy of the Development Agreement for the area subject to the Final
Plat, shall have paid all bills due for processing of the Preliminary Plat, and has
provided evidence of adequate financial security for completion of the
construction work in the proposed plat. If the City Council determines it is
MONTICELLO SUBDIVISION ORDINANCE TITLE XI/Chapt 3/Page 3
necessary, the final plat shall be filed with the City Clerk and submitted to the
Planning Commission at least twenty (20) days prior to a Commission meeting
at which consideration is requested. During the said twenty (20) days, the City
staff shall examine the final plat and prepare a recommendation to the Planning
Commission. Approval, disapproval, or any delay in decision of the final plat
will be conveyed to the subdivider within ten (10) days after the meeting of the
City Planning Commission at which such plat was considered. In case the plat
is disapproved, the subdivider shall be notified in writing of the reason for such
action and what requirements shall be necessary to meet the approval of the
Commission. If the plat is disapproved, a waiting period of one hundred eighty
(180) days shall lapse before another application can be filed on that tract of
land. In cases where the preliminary plat is approved, the final plat must be
filed within one (1) year of the preliminary plat approval or the approval is not
valid. (#426, 7/11/05)
(B)APPROVAL OF THE CITY COUNCIL: After review of the final plat by the
Planning Commission, if necessary, such final plat, together with the
recommendations of the Planning Commission, shall be submitted to the City
Council for approval. The City Council has the option of requesting a public
hearing if it is determined necessary on the final plat. If accepted, the final plat
shall be approved by resolution, which resolution shall provide for the
acceptance of all agreements for basic improvements, public dedication, and
other requirements as indicated by the City Council. If disapproved, the
grounds for any refusal to approve a plat shall be set forth in the proceedings of
the Council and reported to the person or persons applying for such approval.
(#8, 2/23/76)
(C)RECORDING FINAL PLAT: If the final plat is approved by the City Council,
the subdivider shall record it with the County Recorder within one hundred
(100) days after said approval. If the subdivider fails to so record the final plat,
the approval shall be considered void, unless a request for time extension is
submitted in writing and approved by the City Council prior to the expiration of
the one hundred (100) day period. The subdivider shall, immediately upon
recording, furnish the City Clerk with a print and reproducible tracing of the
final plat showing evidence of recording. No building permits shall be let for
construction of any structure on any lot said plat until the City has received
evidence of the plat being recorded by the County. (#412, 8/23/04)
(D)RECORDING OF MULTIPLE-PHASED PLATS: If a preliminary plat is
final platted in stages, unless otherwise provided for in the development
contract, all stages must be final platted into lots and blocks (not outlots) within
three (3) years after the preliminary plat has been approved by the City Council.
If the final plats are not approved and recorded in accordance with this time
frame, the preliminary plat approval shall be considered void, unless a request
for time extension is submitted in writing and approved by the City Council
prior to the expiration of the three (3) year period. (#412, 8/23/04)
MONTICELLO SUBDIVISION ORDINANCE TITLE XI/Chapt 3/Page 4
MONTICELLO SUBDIVISION ORDINANCE TITLE XI/Chapt 3/Page 5
MONTICELLO SUBDIVISION ORDINANCE TITLE XI/Chapt 3/Page 6
CityCouncilAgenda:6/08/2015
1
2H.ConsiderationtoadoptResolution2015-045approvingaFinalStagePlanned
UnitDevelopment(PUD),FinalPlatandDevelopmentAgreementforHoglund
BusPark,atwolotcommercialdevelopmentinanexistingPlannedUnit
DevelopmentDistrict,andtoapproveasidewalkeasementassociatedwiththe
plat.Applicant:WAGPartners,LLP(AS/NAC)
Property:Legal:Lengthy,seeplat
Address:116EastOakwoodDrive
PlanningCaseNumber:2014–043,ZHOGL-EFINAL
A.REFERENCE&BACKGROUND
Request(s):AmendaPlannedUnitDevelopmentandplattingto
allowforare-subdivisionofsixexistingparcelsinto
twoplattedlotsaccommodatingdistinctbusinesses.
DeadlineforDecision:Extendedperwrittenrequestofapplicant
LandUseDesignation:PlacestoWork
ZoningDesignation:PUD,PlannedUnitDevelopment
ThepurposeofthePlannedUnitDevelopment(PUD)
zoningdistrictistoprovidegreaterflexibilityinthe
developmentofneighborhoodsandnon-residential
areasinordertomaximizepublicvaluesandachieve
morecreativedevelopmentoutcomeswhileremaining
economicallyviableandmarketable.
CurrentSiteUse:BusandTruckGarage/Maintenance/Sales
SurroundingLandUses:
North:I-94,Commercial
East:Business/LightIndustrial
South:Commercial
West:Commercial
ProjectDescription:Theapplicantsseektorecombinetheseveralexisting
parcelsintotwoplattedlots,dividedbyafence,to
clarifyownershipandactivitiesbetweenthetwo
principalbusinessesoccupyingthesubjectproperty.
CityCouncilAgenda:6/08/2015
2
ANALYSIS
TheCityCouncilapprovedtheamendmenttodevelopmentstageplannedunit
developmentandpreliminaryplatfortheproposedHoglundBusParkinMarchof
thisyear.
Thepropertyhasbeenutilizedforbusandtrucksales,storage,andmaintenancefor
manyyears,evolvingoverthattimetothecurrentcondition.Thepropertywaszoned
tothePUD,PlannedUnitDevelopmentDistrictin2001.ThePUDwasappliedtothe
propertyprimarilytoallowthedevelopedusestocontinuegrowintheirtraditional
manner.
Theproposedplatisintendedtoclarifytheunderlyingtitleissuesandallowthe
businessownerstoseparatetherealestateholdingsofthetwoprincipalbusinesses
thatoccupytheproperty.Todoso,theplatrecombinesalloftheunderlyingparcels
andcreatesasingledividingboundaryline,generallynorthtosouththroughthe
property.
Asnotedwiththepreliminaryplatanalysis,thenewpropertylinewillhavenew
utilityanddrainageeasementsconsistentwiththeCity’splattingrequirements.The
siteplanillustratesa“new”accesstoThomasParkDrive,howeverthereisan
existingaccessfromThomasParkinplaceatpresent.Staff’sunderstandingisthat
theapplicantmayintendtomodifytheaccess,creatingabetterdefinedentranceat
thispoint.SuchworkwillrequirearightofwaypermitandreviewbytheCity
Engineer.
Theonly“improvement”beingproposedasapartofthePUDamendmentisthe
constructionofachainlinkfencealongthenewpropertyline,alongwithgates
throughthefencethatwillcontinuetoaccommodatecrossaccessbetweenthetwo
businessproperties.Thechainlinkfenceisproposedat6’inheightandisshownon
thesiteplantosurroundtheproposedLot2atthepropertyline.Theunderlying
zoningdistrictforthislotisI-1,whichwouldallow6’tallfencesinside,rearand
frontyards,providedthefenceis50%transparentinfrontyards.ThePUDzoning
forthepropertywouldfurtheraccommodatetheproposedfence.
Theplatincludesthecontinuationofseverallong-standingcrossaccesseasements
andaddressesafewneweasements,discussedbelow.
1.Anextensionoftheexistingaccesseasementalongthesouthboundaryofthe
propertythatextendsbetweenOakwoodDriveandThomasParkDrive.The
platshowssomeofthateasementinacurrenteasementdocument,andother
portionsappeartobenew.
2.Additionofasidewalkeasementinthesouthwestcorneroftheplatalong
OakwoodDrive,reflectingtheadditionalsidewalkservingthearea.A
CityCouncilAgenda:6/08/2015
3
separateeasementdocumentisincludedforCouncilreviewandapprovalfor
saideasement.
3.AportionofThomasParkDriveisbeingdedicatedasrightofway,rather
thanitspreviousstatusasstreeteasement.Thefinalplatdrawingshowsthis
dedication.
Asnoted,theapplicantsaremakingnootherchangestothefunctionorusesofthe
site.ThePUDisnecessaryonlytoaccommodatethere-subdivision.
DEVELOPMENTAGREEMENT&SIDEWALKEASEMENT
ThedevelopmentagreementincludedforCouncilreviewandapprovalisamodified
versionofstandardtemplateagreementsusedforotherfinalplatprojects.Inthis
case,astheplatisessentiallyareplatofexistinglots,thedevelopmentagreement
focusesprimarilyontheproposedconfigurationandmemorializingtheexisting
conditionsonthesiteforPUDpurposes.
Astheprojectdoesnotincludeanynewpublicimprovementssuchasstreetsor
utilities,nodepositsfortheseitemsisrequired.Additionally,withnoadditionalsite
development,nosecuritiesforlandscaping,erosioncontrolorotherdevelopment-
relatedsecuritiesisrequired.However,theagreementdoesrequireasecurityforthe
placementofironmonumentsonthenewlotcornersandalsorequiresasecurityfor
platadministration.
Thesidewalkeasementdocumentprovidesforthefutureconstructionofasidewalk
onOakwoodDrive.
B.ALTERNATIVEACTIONS
1.MotiontoadoptResolution#2015-045approvingaFinalStagePlannedUnit
Development(PUD),FinalPlatandDevelopmentAgreementforHoglundBus
Park,atwolotcommercialdevelopmentinanexistingPlannedUnitDevelopment
District,andtoapproveasidewalkeasementassociatedwiththeplat,subjectto
thoseconditionsoutlinedinExhibitZ.
2.Motiontodenyadoptionof#Resolution2015-045approvingaFinalPlatand
DevelopmentAgreementforHoglundBusPark,atwolotcommercial
developmentinanexistingPlannedUnitDevelopmentDistrict,andtodeny
adoptionResolution2015-046approvingaFinalStagePlannedUnit
Development(PUD)forHoglundBusPark,andtodenyapprovalofthesidewalk
easement.
CityCouncilAgenda:6/08/2015
4
C.STAFFRECOMMENDATION
StaffrecommendsapprovalofthePUDAmendment,FinalPlatandsidewalk
easement.Thefinalplatisconsistentwiththeapprovedpreliminaryplatandwill
servetoclarifyexistingandproposedeasements,aswellasprovidedefinitionrelated
tothetwoseparatebusinessenterprisesoperatingundertheexistingPUD.
D.SUPPORTINGDATA
A.Resolution#2014-045
B.AerialImage
C.ApplicantNarrative
D.ApplicantExtensionLetter
E.FinalPlat
F.PUDSitePlan
G.DevelopmentAgreement
H.ConsenttoPlat
I.SidewalkEasement
J.ApprovedPreliminaryPlat
K.MnDOTCommentLetter
L.OfficialMonticelloZoningMap
Z.ConditionsofApproval
CityCouncilAgenda:6/08/2015
5
EXHIBITZ
FinalStagePUDAmendmentandFinalPlat
116EastOakwoodDrive
ProposedLegalDescription:Lots1and2,Block1,HoglundBusPark
1.ExecutetheDevelopmentContractforthePUDandFinalPlat.
2.ExecuteasidewalkeasementadjacenttoOakwoodDriveperCityEngineer
requirements.
3.RevisefinalanddevelopmentstagePUDplanstoillustrateproperstripingand
signing,andatleasttwohandicappedparkingspacesforeachbuilding.
4.ModificationstoaccesspointsatOakwoodDriveorThomasParkrequirearightof
waypermitandreviewbytheCityEngineer.
5.SubjecttodocumentationexhibitingresolutionofcommentsmadeduringMnDOT
review.
6.ThefinalplatissubjecttothecommentandsuggestedrevisionsoftheWrightCounty
Surveyor.
7.AnyothercommentsandrecommendationsoftheCityEngineer.
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2015-045
APPROVING FINAL STAGE PLANNED UNIT DEVELOPMENT
AND FINAL PLAT OF HOGLUND BUS PARK AND
DEVELOPMENT AGREEMENT FOR HOGLUND BUS PARK
WHEREAS, WAG Partners LLC has submitted an application for approval of the replatting of a
series of parcels of land; and
WHEREAS, in addition to the request for re-subdivision, the applicant has requested a Planned
Unit Development (PUD) approval to amend the existing PUD; and
WHEREAS, the final plat and final stage PUD, as amended by the conditions in Exhibit Z of the
staff report, will meet design standards and other provisions outlined in the development stage
and preliminary plat approvals; and
WHEREAS, the proposed project will continue to meet the goals and policies of the Monticello
Comprehensive Plan; and
WHEREAS, the Planning Commission held a public hearing on March 3rd, 2015 on the
application and the applicant and members of the public were provided the opportunity to present
information to the Planning Commission; and
WHEREAS, the City Council considered the Development Stage PUD and Preliminary Plat at
its meeting on March 23rd, 2015, approving said applications pursuant to conditions identified in
the staff report; and
WHEREAS, the applicant has supplied amended documents demonstrating compliance with the
terms of the Preliminary Plat and Development Stage PUD approvals; and
WHEREAS, the City Council has considered all of the comments and the staff report, which are
incorporated by reference into the resolution; and
WHEREAS, the City Council of the City of Monticello hereby makes the following Findings of
Fact in relation to the recommendation of approval:
1. Together with the conditions identified in Exhibit Z of the staff report, the application
meets the City’s intent for PUD projects as identified in the Zoning Ordinance and the
joint Planning Commission/City Council review.
2. The areas of flexibility requested by the applicant are existing conditions and are
considered reasonable and consistent with the objectives of the Comprehensive Plan.
3. The details of the Plat, along with the conditions identified in Exhibit Z of the staff
report, are consistent with the requirements of the Subdivision Ordinance.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Monticello,
Minnesota:
The Monticello City Council hereby approves the proposed Final Plat and the Final Stage
Planned Unit Development for Hoglund Bus Park, and the Development Agreement regulating
development and completion of required plat improvements, subject to those conditions
identified in Exhibit Z of the approval.
ADOPTED this 8th day of June, 2015, by the City Council of the City of Monticello,
Minnesota.
MONTICELLO CITY COUNCIL
_______________________________
Brian Stumpf, Mayor
ATTEST:
______________________________
Jeff O’Neill, City Administrator
Amend Development Stage PUD & Preliminary
Plat - Hoglund Bus Park
155-500-113412 (115 Oakwood Dr. E.), 155-500-113415 (117 Oakwood Dr. E.), 155-500-114302, 155-500-142105, 155-500-142106
Created By: City of Monticello
Date Created: 2/19/2015
1
180562v2
(reserved for recording information)
AMDENDMENT TO
DEVELOPMENT CONTRACT
AND PLANNED UNIT DEVELOPMENT
(Developer Installed Improvements)
HOGLUND BUS PARK
This AMENDMENT TO DEVELOPMENT CONTRACT AND PLANNED UNIT
DEVELOPMENT (“Amendment”) made the ____ day of _________________, 2015, by and between the
CITY OF MONTICELLO, a Minnesota municipal corporation (“City”), and WAG PARTNERS,
L.L.C., a Minnesota limited liability company (the “Developer”).
1. BACKGROUND. The City Council previously approved a Planned Unit Development
(“PUD”) as documented by Monticello City Council Minutes dated February 12, 2001. No other
documentation of the PUD was prepared or recorded. The City and the Developer desire to establish the
PUD zoning by this Amendment and to reflect approval of the plat for HOGLUND BUS PARK. The land is
situated in the County of Wright, State of Minnesota, and is legally described on the attached Exhibit A.
2. CONDITIONS OF PLAT APPROVAL. The City hereby approves the plat on the
condition that the Developer enter into this Amendment, record the final plat with the County Recorder or
2
180562v2
Registrar of Titles within 100 days of the date the final plat is approved and provided the Developer abides
by the specific conditions, requirements and PUD flexibility as set forth in City Resolution 2015-020,
adopted by the Monticello City Council on March 23, 2015, and City Resolution 2015-046 adopted by the
Monticello City Council on June 8th, 2015, attached hereto as Exhibit B.
3. ZONING. The PUD District for the property is hereby amended as shown on the Site
Plan attached hereto as Exhibit C.
4. PUD AGREEMENT AND CONDITIONS. As a condition to the plat approval and this
Amendment to PUD, Developer agrees to continue to operate consistent with the approved site plan and
further agrees to complete the proper striping and signing for each building, including at least two
handicapped parking spaces for each building.
5. MODIFICATIONS. Any modifications or changes to the Site Plan will require an
Amendment to the PUD, which amendment must be signed by all parties and recorded with the Wright
County Recorder/Registrar of Titles.
6. LOT CORNERS. In accordance with Minnesota Statutes 505.02, the final placement of
iron monuments for all lot corners must be completed before the applicable security is released. The
Developer's surveyor shall also submit a written notice to the City certifying that the monuments have been
installed. To guarantee compliance with the terms of this provision, the Developer shall furnish the City
with a security in the amount of $750.00. The amount of the security was calculated as follows:
Lot Corners/Iron Monuments ($300.00 x 2 x 125%) $ 750.00
7. CITY ADMINISTRATION, PLANNING AND LEGAL EXPENSES, CITY
ENGINEERING ADMINISTRATION AND CONSTRUCTION OBSERVATION. An escrow for
City staff administration relating to processing of the plat and associated administration, planning,
engineering and legal costs shall be required in the amount of $500.00. This is subject to reconciliation
based on actual costs at the completion of the project.
3
180562v2
8. RECORDING. This Amendment to Development Contract and Planned Unit
Development for Hoglund Bus Park shall be recorded with the Wright County Recorder/Registrar of
Titles.
IN WITNESS WHEREOF this Amendment was executed by the parties the day and year first
above written.
[Remainder of page intentionally left blank.
Signatures contained on following pages.]
4
180562v2
CITY: CITY OF MONTICELLO
BY: ___________________________________________
Brian Stumpf, Mayor
(SEAL)
AND __________________________________________
Jeff O’Neill, City Administrator
STATE OF MINNESOTA )
( ss.
COUNTY OF WRIGHT )
The foregoing instrument was acknowledged before me this _____ day of _____________, 2015,
by Brian Stumpf and by Jeff O’Neill, the Mayor and City Administrator, respectively, of the City of
Monticello, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority
granted by its City Council.
______________________________________________
NOTARY PUBLIC
5
180562v2
DEVELOPER: WAG PARTNERS, L.L.C.
BY: ___________________________________________
Wayne Hoglund, Its Manager
STATE OF MINNESOTA )
( ss.
COUNTY OF WRIGHT )
The foregoing instrument was acknowledged before me this ______ day of _____________, 2015
by Wayne Hoglund the Manager of WAG Partners, L.L.C., a Minnesota limited liability company, on
behalf of the limited liability company.
______________________________________________
NOTARY PUBLIC
DRAFTED BY:
CAMPBELL, KNUTSON
Professional Association
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, MN 55121
Telephone: (651) 452-5000
[JJJ]
6
180562v2
EXHIBIT A
TO
AMENDMENT TO DEVELOPMENT
CONTRACT AND PUD
(Hoglund Bus Park)
Legal Description
Lots 1 and 2, Block 1, Hoglund Bus Park, Wright County, Minnesota.
7
180562v2
EXHIBIT B
TO
AMENDMENT TO DEVELOPMENT
CONTRACT AND PUD
(Hoglund Bus Park)
[Attach City Council Resolution]
8
180562v2
EXHIBIT C
TO
AMENDMENT TO DEVELOPMENT
CONTRACT AND PUD
(Hoglund Bus Park)
[Attach Site Plan]
9
180562v2
MORTGAGE HOLDER CONSENT
TO
AMENDMENT TO DEVELOPMENT
CONTRACT AND PUD
(Hoglund Bus Park)
PREMIER BANK MINNESOTA, a Minnesota Corporation, which holds a mortgage on all of the property
more particularly described in the foregoing Amendment to Development Contract and PUD, which mortgage is dated
April 22, 2008 and recorded April 23, 2008 as Document No. 1086267 with the office of the Wright County Recorder,
and which mortgage is subject to a Modification of Mortgage in favor of Premier Bank Minnesota, dated June 26,
2009 and recorded July 6, 2009 as Wright County Document No. 1122340; for good and valuable consideration, the
receipt and sufficiency of which is hereby acknowledged, consented to, and is subject to the foregoing Amendment to
Development Contract and PUD..
Dated this _____ day of ____________, 2015.
PREMIER BANK MINNESOTA
By ______________________________________
Casey O. Regan, President and CEO
STATE OF MINNESOTA )
( ss.
COUNTY OF ___________ )
The foregoing instrument was acknowledged before me this _____ day of ________________, 2015, by
Casey O. Regan, the President and CEO of Premier Bank Minnesota, a Minnesota Corporation, on behalf of said
corporation.
________________________________________
Notary Public
DRAFTED BY:
CAMPBELL, KNUTSON, P.A.
1380 Corporate Center Curve, #317
Eagan, MN 55121
Telephone: (651) 452-5000
JJJ
180998
(Reserved for Recording Data)
CONSENT TO PLAT
BY MORTGAGEE
THIS CONSENT TO PLAT, made as of this _____ day of ____________, 2015, is
granted by PREMIER BANK MINNESOTA, a Minnesota Corporation (“Mortgagee”) in favor
of WAG PARTNERS, L.L.C., a Minnesota limited liability company (“Developer”).
For One Dollar and other good and sufficient consideration, in hand received, the
Mortgagee hereby consents to the platting of land in Wright County, Minnesota, legally
described on the attached Exhibit “A”, to be known as HOGLUND BUS PARK.
PREMIER BANK MINNESOTA
By ______________________________________
Casey O. Regan, President and CEO
180998
STATE OF MINNESOTA )
( ss.
COUNTY OF ___________ )
The foregoing instrument was acknowledged before me this _____ day of
________________, 2015, by Casey O. Regan, President and CEO of Premier Bank Minnesota,
a Minnesota Corporation, on behalf of said corporation.
_____________________________________
Notary Public
DRAFTED BY:
Campbell Knutson
Professional Association
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, Minnesota 55121
Telephone: (651) 452-5000
JJJ
180998
EXHIBIT “A”
LEGAL DESCRIPTION OF SUBJECT PROPERTY
181000 1
(Reserved for recording)
GRANT OF PERMANENT EASEMENT
WAG PARTNERS, L.L.C., a Minnesota limited liability company, “Grantor”, in
consideration of One and No/100 Dollar ($1.00) and other good and valuable consideration, the
receipt and sufficiency of which is hereby acknowledged, does hereby grant unto the CITY OF
MONTICELLO, a municipal corporation organized under the laws of the State of Minnesota,
Grantee, hereinafter referred to as the “City”, its successors and assigns, a permanent easement
for public sidewalk purposes over, on, across, under and through the land situated in the County
of Wright, State of Minnesota, as legally described on the attached Exhibit “A”.
INCLUDING the rights of the City, its contractors, agents, servants, and assigns, to enter
upon the permanent easement premises at all reasonable times to construct, reconstruct, inspect,
repair, and maintain said public sidewalk over, across, on, under, and through the permanent
easement premises, together with the right to grade, level, fill, drain, and excavate the permanent
easement premises, and the further right to remove trees, bushes, undergrowth, and other
obstructions interfering with the location, construction, and maintenance of said public sidewalk.
The above named Grantor, for itself, its successors and assigns, does covenant with the
City, its successors and assigns, that it is well seized in fee title of the above described easement
181000 2
premises; that it has the sole right to grant and convey the easements to the City; that there are no
unrecorded interests in the easement premises; and that it will indemnify and hold the City
harmless for any breach of the foregoing covenants.
IN TESTIMONY WHEREOF, the Grantor hereto has signed this document this ____
day of _______________, 2015.
GRANTOR:
WAG PARTNERS, L.L.C.
By: ______________________________________
Wayne Hoglund, Its Manager
STATE OF MINNESOTA )
( ss.
COUNTY OF WRIGHT )
The foregoing instrument was acknowledged before me this ______ day of
_____________, 2015 by Wayne Hoglund the Manager of WAG Partners, L.L.C., a
Minnesota limited liability company, on behalf of the limited liability company.
_________________________________________
Notary Public
DRAFTED BY:
Campbell Knutson
Professional Association
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, Minnesota 55121
Telephone: (651) 452-5000
(JJJ)
181000 3
EXHIBIT “A”
TO
GRANT OF PERMANENT EASEMENT
Legal Description
A permanent easement for sidewalk purposes over, under, and across that part of Lot 1, Block 1,
Point Minne, as is on file and of record in the Office of the County Recorder, Wright County,
Minnesota, said permanent easement is described as follows:
Commencing at the westerly most corner of said Lot 1; thence North 33
degrees 27 minutes 59 seconds East, assumed bearing along the northwesterly
line thereof, 11.07 feet to the point of beginning of said easement to be
hereinafter described; thence South 52 degrees 16 minutes 46 seconds East,
20.20 feet; thence South 74 degrees 38 minutes 14 seconds East, 19.09 feet;
thence South 35 degrees 53 minutes 37 seconds East, 7.98 feet; thence South
41 degrees 36 minutes 37 seconds West, perpendicular to the southwesterly
line of said Lot 1, 19.05 feet to the southwesterly line of said Lot 1; thence
North 48 degrees 23 minutes 23 seconds West, along said southwesterly line
43.49 feet to the point of beginning, and there terminating.
181000 4
EXHIBIT “A”
TO
GRANT OF PERMANENT EASEMENT
Easement Sketch
181000 4
MORTGAGE HOLDER
CONSENT TO EASEMENT
PREMIER BANK MINNESOTA, a Minnesota Corporation, which holds a mortgage on all of the
property more particularly described in the foregoing Grant of Permanent Easement, which mortgage is
dated April 22, 2008 and recorded April 23, 2008 as Document No. 1086267 with the office of the Wright
County Recorder, and which mortgage is subject to a Modification of Mortgage in favor of Premier Bank
Minnesota, dated June 26, 2009 and recorded July 6, 2009 as Wright County Document No. 1122340; for
good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, does consent
to, and is subject to the foregoing Grant of Permanent Easement.
Dated this _____ day of ____________, 2015.
PREMIER BANK
By _________________________________
Casey O. Regan, President and CEO
STATE OF MINNESOTA )
( ss.
COUNTY OF ___________ )
The foregoing instrument was acknowledged before me this _____ day of ____________, 2015, by
Casey O. Regan, the President and CEO of Premier Bank Minnesota, a Minnesota Corporation, on behalf
of said corporation.
____________________________________
Notary Public
DRAFTED BY:
CAMPBELL, KNUTSON, P.A.
1380 Corporate Center Curve, #317
Eagan, MN 55121
Telephone: (651) 452-5000
JJJ
County Hwy 75
Chelsea Rd
State Hwy 25
85th St NE
9 0th St N E
Linn St
Pine St
7th St
School Blvd
Riverview Dr
Cedar St
W River St
M
a
r
v
i
n
R
d
Jason Ave
Dundas Rd
W Broadway St
Hart Blvd
Country La
Haug Ave NE
Elm St
W 4th St
Fenning Ave NE
Oakwook Dr
Ma ll a r d L a
95th St NE
Fallon Ave NE
Edmonson Ave NE
Mississippi Dr
5th St
Country Club Rd
Sandberg Rd
P
e
l
i
c
a
n
L
a
F a l c o n D r
Fenning Ave
Walnut St
Oak Ridge Dr
Oriole La
Club View Rd
Broadway St
Hillcrest Rd
E River St
Headman La
M
i
l
l
T
r
a
i
l
L
a
Falcon Ave NE
Wright StBenton St
Elwood Rd
Ramsey St
6th St
River Mill Dr
Wildwood Way
Hilltop Dr
Mill Run Rd
O a k V i e w L a
Farmstead Ave
Martin Dr
4th St E
3rd St E
Red Rock La
Gillard Ave NE
Maple St
Fallon Dr
Willow St
View La E
Grey Stone Ave
Marvin Elwood Rd
Fieldcrest Cir
Fairway Dr
Jason Ave NE
Vine St
M e a d o w L a
Jerry Liefert Dr
Praire Rd
Starling Dr
Palm St
Un
kn
ow
n
o
r N
o
S
tree
tn
ame
Fallon Ave
Golf Course Rd
Falcon Ave
Kevin Longley Dr
Craig La
R
e
d
O
a
k
L
a
Front St
5th St W
Thomas Park D r
Locust St
M o c k i n g b i r d L a
W 3rd St
Ea
s
two
o
d
C
i
r
Bri ar Oa ks Bl v d
F
a
r
m
s
t
e
a
d
D
r
Henipin St
E
i
d
e
r
L
a
Dayton St
Oak La
River Forest Dr
Meadow Oak Ave
Kampa Cir
O
a
k
R
i
d
g
e
C
i
r
M i l l C t
R i v e r R i d ge L a
Garrison Ave
Oakview Ct
Dundas Cir
Kenneth La
Otter Creek Rd
Minnesota St
Eagle Cir
Crocus La
Meadow Oak La
Stone Ridge Dr
Chestnut St
1 2 0 t h S t N E
Darrow Ave NE
Diamond Dr
Pebble Brook Dr
Widgeon La
Washington St
Bunker Cir
Homestead Dr
Thomas Cir
E
n
d
i
c
o
t
t
T
r
Center Cir
Oak View Cir
Sandtrap Cir
Countr y Cir
Cheyen Ct
Old Territoral Rd
Tanager Cir
Hillcrest Cir
Os prey Ct
Acorn Cir
Balboul Cir
S
w
allo
w
C
ir
R iv e r si d e C ir
Meadow Oak Ct
Matthew Cir
E Oak Dr
S t o n e R i d g e C ir
Oakwood Dr
Meadow Oak Ave NE County Hwy 75
Hart Blvd
Marvin Rd
Marvin Rd
Wright St
90th St NE
Cedar St
Minnesota St
01
City of MonticelloOfficial Zoning Map
10-10-14
:Legend
BASE ZONING DISTRICTS
Residential Districts
-- Low Residential Densities
-- Medium Residential Densities
-- High Residential De nsities
Business Districts
Industrial Districts
OTHER
Water
A-O
R-A
R-1
T-N
R-2
R-PUD
R-3
R-4
B-1
B-2
B-3
B-4
CCD
IBC
I-1
I-2
M-H
Mississippi Wild, Scenic & Rec Overlay District
OVERLAY DISTRICTS
Performance Based Overlay District
!
!
!
!!!!
!
!
!!!!!
Shoreland District
Special Use Overlay District
!
!
!
!!!!
!
!
!!!!!
Freeway Bonus Sign District
PUDs
Swan River01
CityCouncilAgenda:6/08/15
1
2I.ConsiderationofadoptingResolution#2015-036Aapprovinganassessment
agreementwithNorthernStatesPower,dbaXcelEnergyforFirstLakeSubstation
(CS)
A.REFERENCEANDBACKGROUND:
CouncilisaskedtoadoptResolution#2015-036Aapprovinganassessmentagreement
betweenNorthernStatesPower,dbaXcelEnergyandtheCityofMonticello.This
housekeepingactionwillformalizetheactiontakenbyCouncilonApril27,2015,
approvingadeferredassessmentagreementwithXcelEnergy.Inorderforassessment
agreementstobecertifiedandturnedovertotheWrightCountyAuditor’sOfficefor
futureassessment,itisrequiredbyMNStateStatutestoadopttheseagreementsby
resolution.Followingcouncilactiontoadopttheresolution,citystaffcanthenforward
thenecessarydocumentstotheCountyAuditorforinclusionintheassessmentrollsasa
deferredassessment.
A1.BudgetImpact:NA
A2.StaffWorkloadImpact:NA
B.ALTERNATIVEACTIONS:
1.MotiontoadoptResolution#2015-036Aapprovinganassessmentagreementwith
NorthernStatesPower,dbaXcelEnergyforFirstLakeSubstation.
2.Motionofother.
C.STAFFRECOMMENDATION:
CitystaffrecommendsAlternative#1.
D.SUPPORTINGDATA:
Resolution#2015-036A
Copyofapprovedassessmentagreement(recordedasof5/21/15)
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2015-036A
APPROVING AGREEMENT OF ASSESSMENT AND WAIVER OF IRREGULARITY
AND APPEAL FOR NORTHERN STATES POWER COMPANY, DBA XCEL ENERGY
FOR THE FIRST LAKE SUBSTATION PROPERTY,
A 10-ACRE PORTION OF PID 213-100-103300 (TO BE PLATTED)
WHEREAS, Northern States Power Company, DBA Xcel Energy wishes to enter into an
assessment agreement for property legally defined as follows:
The North 544.51 feet of the West 799.29 feet of the Southwest Quarter of the
Southwest Quarter of Section 10, Township 121 North, Range 25 West, Wright
County, Minnesota.
WHEREAS, an assessment agreement has been executed as shown in Attachment “A”; and
WHEREAS, said assessment agreement contains an allowance for deferral of the assessment
until such time as the Subject Property is provided with municipal services including road,
sidewalk, street lighting, sanitary sewer, water, and utilities;
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF MONTICELLO,
MINNESOTA: that the City Council approves the Agreement of Assessment and Waiver of
Irregularity and Appeal for said property under the terms stated in the agreement.
ADOPTED BY the Monticello City Council this 8th day of June, 2015.
CITY OF MONTICELLO
___________________________
Brian Stumpf, Mayor
ATTEST:
__________________________
Kerry Burri, Interim City Clerk
ATTACHMENT “A”
AGREEMENT OF ASSESSMENT AND WAIVER OF IRREGULARITY AND APPEAL
For First Lake Substation Property owned by Northern States Power DBA Excel Energy
CityCouncilAgenda:6/08/15
1
2J.ConsiderationofadoptingResolution2015-044approvingarequestforan
AmendmenttoDevelopmentStagePlannedUnitDevelopment(PUD)andFinal
StagePlannedUnitDevelopment(PUD)forasinglelotcommercialdevelopmentin
aB-4(RegionalBusiness)District.Applicant:MFMonticello,LLC(NAC)
Property:Parcel#155205001030(noaddressassigned)
Lot3,Block1,UnionCrossingsSecondAddition
Thesubjectsiteislocatedinthenorthwestquadrantofthe
Interstate94/CountyRoad18interchange,northof7th
StreetEastandwestofFenningAvenueNortheast.The
siteispresentlyvacant.
PlanningCaseNumber:2015-020
A.REFERENCE&BACKGROUND
Request(s):PlannedUnitDevelopmentAmendment–Development
andFinalStage
DeadlineforDecision:July7,2015
LandUseDesignation:PlacestoShop
ZoningDesignation:B-4,RegionalBusinessDistrict
ThepurposeoftheB-4,RegionalBusinessDistrictisto
providefortheestablishmentofcommercialandservice
activitieswhichdrawfromandservecustomersfromthe
entirecommunityorregion.
CurrentSiteUse:VacantProperty/MattressFirmretailsalesstore(approved
viaseparateamendmenttoCUPforPlannedUnit
DevelopmentonMarch23,2015).
SurroundingLandUses:
North:Commercialretail,zonedB-4,RegionalBusiness
South:Interstate94/vacantproperty,zoned,B-2,Limited
Business
Dr
a
f
t
O
n
l
y
CityCouncilAgenda:6/08/15
2
East:Interstate94interchange,zoned,A/O,AgriculturalOpen
SpaceandI-2,HeavyIndustrial
West:Commercialretail,zonedB-4,RegionalBusiness
ProjectDescription:Therequestedamendmentinvolvestheadditionofa2,188
squarefootretailcellularsalesstoreuponthesubject
40,772squarefootsite.Thestoreisproposedtooccupy
thenorthernone-thirdofthesite.
OrdinanceRequirements:AConditionalUsePermitforPlannedUnitDevelopment
(PUD)iscurrentlyinplaceforthesubjectsite.ThecurrentPUDprovideslandfor
existingandfutureretailusers,withtheexpectationthatvariouspartsofthepropertywill
bedevelopedovertime.TheoriginalPUDidentifiedconceptualsiteuse,requiringPUD
amendmentstooccurasnewusersthatvaryfromtheinitialplanareidentified.This
amendmentisproposedtoaccommodateasecondretailfacility,locatedinlinetothe
proposedMattressFirm,approvedviaanamendmenttoCUPforPUDearlierin2015.
TheCityCouncil’sreviewincludesboththedevelopmentandfinalstagePUDofthis
expansionforthesecondtenant.Thedevelopmentparcelwaspreviouslyplattedandno
plattingorsubdivisionreviewisrequired.
LandUse.ThesubjectsiteiszonedB-4,RegionalBusiness,whichlists“commercial
retailuses”asapermitteduse.Theproposedstoreisexpectedtodrawfromandserve
customersfromtheentirecommunityorregion.Inthisregard,theproposedcellularsales
storeisconsistentwiththeintentoftheB-4District.
Off-StreetParking.Withtheadditionof2,188squarefeet,11additionalparkingspaces
willbeneededforatotalof32spaceswhenconsideredincombinationwiththe
previouslyapprovedMattressFirmstore.Asdrawn,theapplicanthasincluded45
parkingspacesinsonoadditionalparkingspaceswillberequired.Becausethesiteis
servedwithanexcessparkingsupply,thestaffwouldencouragetheapplicanttoconsider
removing9parkingspacesalongthenorthsideofthepropertyandreplacewithgreen
space.Althoughthisiscondition,thelanguageiswrittenaspermissive.Theapplicant
maywishtokeepthestallsfortenant’sowninternalparkingrequirements.
BuildingMaterials.Asshownonthesubmittedbuildingelevations,thebuildingistobe
finishedinacombinationofsplit-facedmasonry(atthebaseofthebaseofthestructure)
andanexteriorinsulatingfinishingsystem(EIFS).Thebaseofthebuildingistobe
“JaredTan”incolorwhiletheupperthree-quartersofthebuildingistobe“Jefferson
House.”Fabricawnings(red)areproposedabovewindowsanddoorways.
Dr
a
f
t
O
n
l
y
CityCouncilAgenda:6/08/15
3
Allproposedbuildingfinishmaterialsareconsistentwiththematerialrequirementsofthe
OrdinanceandtheoriginalPUDapprovals.
Signage.Therenderingshowsonewallsignlocatedontheandeastbuildingelevation
overtheentrydoorfortheAT&Tstore.Thesignisnotdimensioned,butappearstobe
approximately80squarefeetinarea,about10percentofthetenantbuildingwallarea.
Theareaofsuchsignappearstofallwithinthemaximumarearequirementsallowedby
Ordinance.AsaconditionofPUDamendmentapproval,thelocation,sizeanddesignof
allsignsuponthesubjectpropertymustbeverifiedandfoundtobeconsistentwiththe
previouslyapprovedmastersignplan.
FreestandingsignageonthesitehasbeenapprovedundertheoriginalPlannedUnit
DevelopmentapprovalforUnionCrossings,andisnotproposedtochangewiththis
amendment.
Grading,DrainageandUtilities.Asrequired,theapplicanthassubmittedagrading
anddrainageplanandautilityplanforreview.AsaconditionofPUDamendment
approval,theplansshouldbesubjecttoreviewandapprovalbytheCityEngineer.The
Engineerhasprovidedthefollowingspecificcommentsrelatedtothisamendment:
a.Sanitarysewerservicestobothbuildingsshouldhavewyeconnectionstothemain.
Servicesarenotallowedtodirectlyconnecttoamanhole.
b.Waterservicestobothbuildingsshouldincludeacurbstopandboxwhereitteesto
themainwithintheeasement.ThiswillallowtheCitytoshutoffthewaterseparately
ifnecessary.
c.Moredetailshouldbeprovidedonthegradingplanforthenortherlyaccessdriveand
parkingareatoensuredrainageisbeingaccommodated.Spotelevationswith
drainagearrowsshallbeshownonthegradingplantoshowhowdrainagewilltie
intotheexistingroadway.
PUDAmendmentCriteria.InconsideringanamendmenttotheUnionCrossingsPUD,
theCitymustconsiderwhethertheproposedamendmentaffectsthePUD’sabilityto
continuetoachievePUDgoalsoutlinedbyCode.Specifically,adeterminationshouldbe
madewhethertheamendmentsupportshigherstandardsofsiteandbuildingdesign,
efficientuseofland,amoredesirableenvironmentthanpossiblethroughstrict
applicationofthezoningregulations,andinnovativedevelopmentoptionsatalllevels.
Inthisregard,itisnotanticipatedthatapprovaloftheamendmentwillnegatively
impactsthehealthandsafetyoftheCity.
Dr
a
f
t
O
n
l
y
CityCouncilAgenda:6/08/15
4
PLANNINGCOMMISSIONREVIEWANDRECOMMENDATION
ThePlanningCommissionreviewedthedevelopmentstageapplicationduringtheir
regularmeetingonJune2nd,2015.TheCommissionhadnoconcernswiththeproposed
additionaltenantspaceandamendedPUD.TheCommissionheldahearingonthe
request.Nopublicwaspresenttooffertestimony.
TheCommissionunanimouslyrecommendedtheamendmentasproposedwiththose
conditionslistedinExhibitZ.
B.ALTERNATIVEACTIONS
ThePlanningCommissionunanimouslyrecommendsalternative1below.
1.MotiontoapproveResolution2015-044approvingtheDevelopmentandFinal
StagePlannedUnitDevelopmentAmendmentforLot3,Block1,Union
CrossingsSecondAddition,contingentoncompliancewiththoseconditions
specifiedinExhibitZ.
2.MotiontodenyResolution2015-044forapprovaloftheDevelopmentandFinal
StagePlannedUnitDevelopmentAmendment,basedonfindingstobemadeby
thePlanningCommission.
3.Motiontotableactionontherequest,pendingadditionalinformationasidentified
bytheCityCouncil.
C.STAFFRECOMMENDATION
StaffbelievesthattherequestedPUDamendmentisconsistentwiththeCity’soverall
developmentobjectivesforthearea,aswellaswiththeanticipateddevelopmentofthe
parcelwhentheoriginalprojectwasapprovedearlierthisyear.Withthisinmind,Staff
recommendsapprovaloftheamendmentsubjecttotheconditionslistedinExhibitZ.
D.SUPPORTINGDATA
A.Resolution2015-044
B.ResolutionPC-2015-010
C.AerialImages
D.ApplicantNarrative
E.ZoningMap
F.SiteVicinity
G.SitePlan
H.Grading,DrainageandErosionControlPlan
Dr
a
f
t
O
n
l
y
CityCouncilAgenda:6/08/15
5
I.UtilityPlan
J.LandscapePlan
K.Details
L.LightingPlans
M.BuildingElevations
N.SignPlans–UnionCrossings
O.SignImageIllustration
Z.ConditionsofApproval
Dr
a
f
t
O
n
l
y
CityCouncilAgenda:6/08/15
6
ExhibitZ
ConditionsofApproval
AT&TRetailStore
PlannedUnitDevelopmentAmendment
1.AllpreviousconditionsrelatedtotheMattressFirmapprovalremaininplace.
2.Theapplicantconsiderremoving9parkingstallsonthenorthsideofthepropertyand
replacethemwithgreenspace.
3.SignagefortheAT&TfacilityisverifiedforcompliancewiththeCity’sSign
Ordinance.
4.CommentsfromtheCityEngineer:
a.Sanitarysewerservicestobothbuildingsshouldhavewyeconnectionstothe
main.Servicesarenotallowedtodirectlyconnecttoamanhole.
b.Waterservicestobothbuildingsshouldincludeacurbstopandboxwhereittees
tothemainwithintheeasement.ThiswillallowtheCitytoshutoffthewaterif
necessary.
c.Moredetailshouldbeprovidedonthegradingplanforthenortherlyaccessdrive
andparkingareatoensuredrainageisbeingaccommodated.Spotelevationswith
drainagearrowsshallbeshownonthegradingplantoshowhowdrainagewilltie
intotheexistingroadway.
5.CommentsofotherCityStaff.Dr
a
f
t
O
n
l
y
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2015-044
APPROVING A DEVELOPMENT AND FINAL STAGE PLANNED UNIT
DEVELOPMENT AMENDMENT RELATING TO THE UNION CROSSINGS RETAIL
PROJECT WITH THE DEVELOPMENT OF AN AT&T WIRELESS RETAIL STORE
LOT 3, BLOCK 1, UNION CROSSINGS SECOND ADDITION
WHEREAS, the applicant has a property interest in Lot 3, Block 1, Union Crossings 2nd
Addition; and
WHEREAS, the subject property is a part of a Planned Unit Development (PUD) governing the
uses and development of the parcel; and
WHEREAS, the applicant proposes to amend the PUD to accommodate the development of a
portion of said Lot 3, Block 1; and
WHEREAS, the property is zoned B-4, Regional Business District, in which the proposed store
is a permitted use; and
WHEREAS, the proposed development amendment is consistent with the requirements and
intent of the applicable zoning regulations; and
WHEREAS, the proposed development amendment is consistent with the intent of the
Monticello Comprehensive Plan; and
WHEREAS, the proposed development amendment is consistent with the general intent of the
Union Crossings PUD approvals; and
WHEREAS, the Planning Commission held a public hearing to consider the matter at its regular
meeting on June 2nd, 2015 and the applicant and members of the public were provided the
opportunity to present information to the Planning Commission; and
WHEREAS, the Planning Commission has considered all of the comments and the staff report,
which are incorporated by reference into the resolution; and
WHEREAS, the Planning Commission of the City of Monticello makes the following Findings
of Fact in relation to the recommendation of approval:
1. The proposed subdivision amendment is consistent with the intent of the Monticello
Comprehensive Plan.
2. The proposed subdivision amendment creates lots that meet the requirements of the
Monticello Zoning Ordinance.
Dr
a
f
t
O
n
l
y
3. The proposed development amendment is consistent with the intent and approvals of the
Union Crossings PUD.
4. The proposed development amendment will not create undue burdens on public systems,
including streets and utilities.
NOW, THEREFORE, BE IT RESOLVED, by the Planning Commission of the City of
Monticello, Minnesota that the proposed subdivision amendment is hereby recommended for
approval, subject to the conditions found in Exhibit Z of the staff report on the matter as follows.
1. All previous conditions related to the Mattress Firm approval remain in place.
2. The applicant consider removing 9 parking stalls on the north side of the property and
replace them with green space.
3. Signage for the AT&T facility is verified for compliance with the City’s Sign
Ordinance.
4. Comments from the City Engineer:
a. Sanitary sewer services to both buildings should have wye connections to the
main. Services are not allowed to directly connect to a manhole.
b. Water services to both buildings should include a curb stop and box where it tees
to the main within the easement. This will allow the City to shut off the water if
necessary.
c. More detail should be provided on the grading plan for the northerly access drive
and parking area to ensure drainage is being accommodated. Spot elevations with
drainage arrows shall be shown on the grading plan to show how drainage will tie
into the existing roadway.
5. Comments of other City Staff.
ADOPTED BY the Monticello City Council this 8th day of June, 2015.
CITY OF MONTICELLO
___________________________
Brian Stumpf, Mayor
ATTEST:
___________________________
Kerry Burri, Interim City Clerk
Dr
a
f
t
O
n
l
y
Dr
a
f
t
O
n
l
y
Dr
a
f
t
O
n
l
y
Draft Only
Dr
a
f
t
O
n
l
y
County Hwy 75
Chelsea Rd
State Hwy 25
85th St NE
9 0th St N E
Linn St
Pine St
7th St
School Blvd
Riverview Dr
Cedar St
W River St
M
a
r
v
i
n
R
d
Jason Ave
Dundas Rd
W Broadway St
Hart Blvd
Country La
Haug Ave NE
Elm St
W 4th St
Fenning Ave NE
Oakwook Dr
Ma ll a r d L a
95th St NE
Fallon Ave NE
Edmonson Ave NE
Mississippi Dr
5th St
Country Club Rd
Sandberg Rd
P
e
l
i
c
a
n
L
a
F a l c o n D r
Fenning Ave
Walnut St
Oak Ridge Dr
Oriole La
Club View Rd
Broadway St
Hillcrest Rd
E River St
Headman La
M
i
l
l
T
r
a
i
l
L
a
Falcon Ave NE
Wright StBenton St
Elwood Rd
Ramsey St
6th St
River Mill Dr
Wildwood Way
Hilltop Dr
Mill Run Rd
O a k V i e w L a
Farmstead Ave
Martin Dr
4th St E
3rd St E
Red Rock La
Gillard Ave NE
Maple St
Fallon Dr
Willow St
View La E
Grey Stone Ave
Marvin Elwood Rd
Fieldcrest Cir
Fairway Dr
Jason Ave NE
Vine St
M e a d o w L a
Jerry Liefert Dr
Praire Rd
Starling Dr
Palm St
Un
kn
ow
n
o
r N
o
S
tree
tn
ame
Fallon Ave
Golf Course Rd
Falcon Ave
Kevin Longley Dr
Craig La
R
e
d
O
a
k
L
a
Front St
5th St W
Thomas Park D r
Locust St
M o c k i n g b i r d L a
W 3rd St
Ea
s
t
wo
o
d
C
i
r
Bri ar Oa ks Bl v d
F
a
r
m
s
t
e
a
d
D
r
Henipin St
E
i
d
e
r
L
a
Dayton St
Oak La
River Forest Dr
Meadow Oak Ave
Kampa Cir
O
a
k
R
i
d
g
e
C
i
r
M i l l C t
R i v e r R i d ge L a
Garrison Ave
Oakview Ct
Dundas Cir
Kenneth La
Otter Creek Rd
Minnesota St
Eagle Cir
Crocus La
Meadow Oak La
Stone Ridge Dr
Chestnut St
1 2 0 t h S t N E
Darrow Ave NE
Diamond Dr
Pebble Brook Dr
Widgeon La
Washington St
Bunker Cir
Homestead Dr
Thomas Cir
E
n
d
i
c
o
t
t
T
r
Center Cir
Oak View Cir
Sandtrap Cir
Countr y Cir
Cheyen Ct
Old Territoral Rd
Tanager Cir
Hillcrest Cir
Os prey C t
Acorn Cir
Balboul Cir
S
w
allo
w
C
ir
R iv e r si d e C ir
Meadow Oak Ct
Matthew Cir
E Oak Dr
S t o n e R i d g e C ir
Oakwood Dr
Meadow Oak Ave NE County Hwy 75
Hart Blvd
Marvin Rd
Marvin Rd
Wright St
90th St NE
Cedar St
Minnesota St
01
City of MonticelloOfficial Zoning Map
10-10-14
:Legend
BASE ZONING DISTRICTS
Residential Districts
-- Low Residential Densities
-- Medium Residential Densities
-- High Residential Densities
Business Districts
Industrial Districts
OTHER
Water
A-O
R-A
R-1
T-N
R-2
R-PUD
R-3
R-4
B-1
B-2
B-3
B-4
CCD
IBC
I-1
I-2
M-H
Mississippi Wild, Scenic & Rec Overlay District
OVERLAY DISTRICTS
Performance Based Overlay District
!
!
!
!!!!
!
!
!!!!!
Shoreland District
Special Use Overlay District
!
!
!
!!!!
!
!
!!!!!
Freeway Bonus Sign District
PUDs
Swan River01
Dr
a
f
t
O
n
l
y
7699 Anagram Drive
Eden Prairie, MN 55344
PHONE 952-937-5150
FAX 952-937-5822
TOLL FREE1-888-937-5150
Dr
a
f
t
O
n
l
y
7699 Anagram Drive
Eden Prairie, MN 55344
PHONE 952-937-5150
FAX 952-937-5822
TOLL FREE1-888-937-5150
x
x
x
x
x
x
x
x
x
x
x
x
x
Dr
a
f
t
O
n
l
y
7699 Anagram Drive
Eden Prairie, MN 55344
PHONE 952-937-5150
FAX 952-937-5822
TOLL FREE1-888-937-5150
Dr
a
f
t
O
n
l
y
7699 Anagram Drive
Eden Prairie, MN 55344
PHONE 952-937-5150
FAX 952-937-5822
TOLL FREE1-888-937-5150
Dr
a
f
t
O
n
l
y
7699 Anagram Drive
Eden Prairie, MN 55344
PHONE 952-937-5150
FAX 952-937-5822
TOLL FREE1-888-937-5150
Dr
a
f
t
O
n
l
y
7699 Anagram Drive
Eden Prairie, MN 55344
PHONE 952-937-5150
FAX 952-937-5822
TOLL FREE1-888-937-5150
Dr
a
f
t
O
n
l
y
7699 Anagram Drive
Eden Prairie, MN 55344
PHONE 952-937-5150
FAX 952-937-5822
TOLL FREE1-888-937-5150
Dr
a
f
t
O
n
l
y
Lu
m
i
n
a
i
r
e
S
c
h
e
d
u
l
e
Sy
m
b
o
l
Qt
y
La
b
e
l
Ar
r
a
n
g
e
m
e
n
t
To
t
a
l
L
a
m
p
L
u
m
e
n
s
LL
F
De
s
c
r
i
p
t
i
o
n
Lu
m
.
W
a
t
t
s
3
CC
SI
N
G
L
E
30
0
0
0
0.
7
5
0
CO
O
P
E
R
G
S
M
-
X
X
-
3
2
0
-
M
P
-
X
X
-
5
S
-
F
G
-
B
Z
-
L
O
N
2
0
'
P
O
L
E
W
/
2
'
B
A
S
E
35
0
4
BB
SI
N
G
L
E
30
0
0
0
0.
7
5
0
CO
O
P
E
R
G
S
M
-
A
I
S
-
3
2
0
-
M
P
-
M
T
-
S
L
-
F
G
-
B
Z
-
L
2
0
'
P
O
L
E
W
/
2
'
BA
S
E
35
0
21
AA
SI
N
G
L
E
N.
A
.
0.
9
0
0
CO
O
P
E
R
X
T
O
R
2
A
@
9
'
21
.
4
1
EX
I
S
T
I
N
G
P
O
L
E
BA
C
K
-
B
A
C
K
40
0
0
0
0.
7
5
0
MA
Y
N
O
T
B
E
E
X
A
C
T
P
E
R
W
H
A
T
I
S
I
N
S
T
A
L
L
E
D
45
2
Ca
l
c
u
l
a
t
i
o
n
S
u
m
m
a
r
y
La
b
e
l
Ca
l
c
T
y
p
e
Un
i
t
s
Av
g
Ma
x
Mi
n
Av
g
/
M
i
n
Ma
x
/
M
i
n
CA
L
C
P
O
I
N
T
S
Il
l
u
m
i
n
a
n
c
e
Fc
0.
7
6
13
.
3
0.
0
N.
A
.
N.
A
.
PR
O
P
E
R
T
Y
L
I
N
E
Il
l
u
m
i
n
a
n
c
e
Fc
0.
7
5
4.
1
0.
0
N.
A
.
N.
A
.
FR
O
N
T
E
N
T
R
A
N
C
E
Il
l
u
m
i
n
a
n
c
e
Fc
5.
6
0
5.
9
5.
4
1.
0
4
1.
0
9
NO
R
T
H
L
O
T
Il
l
u
m
i
n
a
n
c
e
Fc
3.
2
0
5.
8
1.
0
3.
2
0
5.
8
0
PA
R
K
I
N
G
L
O
T
Il
l
u
m
i
n
a
n
c
e
Fc
4.
6
1
6.
7
1.
5
3.
0
7
4.
4
7
pa
r
k
i
n
g
p
e
r
i
m
e
t
e
r
Il
l
u
m
i
n
a
n
c
e
Fc
4.
1
1
6.
7
1.
3
3.
1
6
5.
1
5
4,
1
7
9
G
R
O
S
S
S
F
3,
8
6
5
N
E
T
S
F
RE
T
A
I
L
1
RE
T
A
I
L
2
2,
1
8
8
G
R
O
S
S
S
F
1,
9
4
7
N
E
T
S
F
11
11
7
7
9
FR
O
N
T
E
N
T
R
A
N
C
E
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
Av
e
r
a
g
e
=
5
.
6
0
Ma
x
i
m
u
m
=
5
.
9
Mi
n
i
m
u
m
=
5
.
4
Av
g
/
M
i
n
R
a
t
i
o
=
1
.
0
4
Ma
x
/
M
i
n
R
a
t
i
o
=
1
.
0
9
FR
O
N
T
E
N
T
R
A
N
C
E
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
Av
e
r
a
g
e
=
5
.
6
0
Ma
x
i
m
u
m
=
5
.
9
Mi
n
i
m
u
m
=
5
.
4
Av
g
/
M
i
n
R
a
t
i
o
=
1
.
0
4
Ma
x
/
M
i
n
R
a
t
i
o
=
1
.
0
9
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
Av
e
r
a
g
e
=
3
.
2
0
NO
R
T
H
L
O
T
Ma
x
i
m
u
m
=
5
.
8
Mi
n
i
m
u
m
=
1
.
0
Av
g
/
M
i
n
R
a
t
i
o
=
3
.
2
0
Ma
x
/
M
i
n
R
a
t
i
o
=
5
.
8
0
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
Av
e
r
a
g
e
=
3
.
2
0
NO
R
T
H
L
O
T
Ma
x
i
m
u
m
=
5
.
8
Mi
n
i
m
u
m
=
1
.
0
Av
g
/
M
i
n
R
a
t
i
o
=
3
.
2
0
Ma
x
/
M
i
n
R
a
t
i
o
=
5
.
8
0
PA
R
K
I
N
G
L
O
T
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
Av
e
r
a
g
e
=
4
.
6
1
Ma
x
i
m
u
m
=
6
.
7
Mi
n
i
m
u
m
=
1
.
5
Av
g
/
M
i
n
R
a
t
i
o
=
3
.
0
7
Ma
x
/
M
i
n
R
a
t
i
o
=
4
.
4
7
PA
R
K
I
N
G
L
O
T
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
Av
e
r
a
g
e
=
4
.
6
1
Ma
x
i
m
u
m
=
6
.
7
Mi
n
i
m
u
m
=
1
.
5
Av
g
/
M
i
n
R
a
t
i
o
=
3
.
0
7
Ma
x
/
M
i
n
R
a
t
i
o
=
4
.
4
7
pa
r
k
i
n
g
p
e
r
i
m
e
t
e
r
Av
e
r
a
g
e
=
4
.
1
1
Ma
x
i
m
u
m
=
6
.
7
Mi
n
i
m
u
m
=
1
.
3
Av
g
/
M
i
n
R
a
t
i
o
=
3
.
1
6
Ma
x
/
M
i
n
R
a
t
i
o
=
5
.
1
5
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
pa
r
k
i
n
g
p
e
r
i
m
e
t
e
r
Av
e
r
a
g
e
=
4
.
1
1
Ma
x
i
m
u
m
=
6
.
7
Mi
n
i
m
u
m
=
1
.
3
Av
g
/
M
i
n
R
a
t
i
o
=
3
.
1
6
Ma
x
/
M
i
n
R
a
t
i
o
=
5
.
1
5
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
2
0
.
4
0
.
3
0
.
2
0
.
2
0
.
2
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
4
0
.
6
0
.
7
0
.
9
0
.
8
0
.
9
0
.
8
0
.
8
0
.
5
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
5
1
.
2
1.
4
2.
5
4.
4
5
.
1
3.
9
2
.
2
1.
4
0.
8
0
.
5
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
3
0
.
5
1.
5
2.
5
3
.
8
4.
7
5.
6
6
.
6
5
.
6
4
.
3
2
.
7
1.
4
0.
8
0
.
5
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
7
1.
1
4.
3
5
.
2
6
.
5
6
.
7
5
.
9
5
.
6
4.
4
4.
2
2
.
9
1
.
9
1
.
3
0
.
8
0
.
5
0
.
3
0
.
1
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
5
4
.
2
5
.
0
5
.
9
5
.
6
6
.
1
5
.
2
4
.
8
4.
4
3.
8
3
.
0
2
.
4
1.
7
1.
3
0
.
7
0
.
4
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
3
1.
5
4
.
5
5
.
7
5.
2
5.
1
5
.
1
4
.
4
4.
3
4
.
0
3
.
9
3
.
2
2
.
9
2
.
3
2
.
0
1.
1
0.
5
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
6
1.
4
3.
3
4.
5
4
.
1
4.
6
3
.
6
3
.
7
4
.
0
4
.
6
4
.
8
4
.
2
3
.
9
4
.
0
3
.
2
2
.
6
0
.
9
0
.
6
0
.
2
0
.
1
0
.
1
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
6
1
.
2
3
.
0
3
.
8
4
.
0
4
.
0
4
.
0
5
.
1
5
.
8
8
.
5
8
.
0
5
.
9
4
.
9
5
.
6
5.
5
5
.
4
2.
7
1
.
0
0
.
4
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
5
1
.
3
3
.
1
4.
5
5
.
5
5.
9
6
.
6
6
.
9
4
.
6
1
1
.
8
7
.
0
5
.
6
5.
7
6.
0
6
.
5
5
.
6
1
.
3
0
.
6
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
5
1
.
9
8
.
1
5.
5
9.
5
6
.
5
5
.
8
6
.
0
5
.
9
6
.
6
5
.
9
3
.
0
0
.
8
0
.
3
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
4
2
.
2
7
.
1
5.
8
6
.
2
5.
5
5.
8
5
.
6
5
.
8
5.
4
2.
9
1
.
5
0
.
6
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
3
1
.
7
6
.
0
6.
2
6
.
9
5
.
9
5.
4
5
.
7
5
.
5
5.
2
3
.
5
1
.
8
0
.
8
0
.
3
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
1
.
1
4
.
2
9.
9
7
.
0
5
.
2
5
.
3
5
.
2
5.
4
4
.
7
2.
7
1
.
1
0
.
4
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
6
2
.
6
10
.
1
7.
4
5.
2
5
.
0
5
.
2
5.
5
5
.
5
5.
2
2
.
3
0
.
6
0
.
3
0
.
1
0
.
1
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
4
0
.
2
9.
9
7
.
0
5.
4
5.
0
5
.
2
5
.
2
5.
7
5.
3
4
.
6
0
.
9
0
.
4
0
.
2
0
.
1
0
.
0
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
7.
5
7
.
4
5.
6
5
.
2
4
.
8
5
.
3
5.
4
5.
9
4.
4
0.
7
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
6
2
.
9
5.
8
1
0
.
6
6
.
2
4
.
8
4.
7
4.
8
5
.
0
5
.
1
2
.
9
0
.
9
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
9
3
.
7
5.
6
7
.
9
9
.
2
6
.
4
4
.
6
4
.
3
4
.
2
4
.
3
4
.
0
2
.
1
1
.
0
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
7
3
.
7
1
3
.
3
4
.
8
7.
4
5.
6
5
.
6
5
.
1
5
.
3
5
.
6
5
.
8
5
.
3
4
.
2
3
.
7
3
.
6
3
.
2
2
.
5
1
.
4
0
.
8
0
.
3
0
.
2
0
.
1
0.
1
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
5
1
.
6
3
.
6
2
.
9
3
.
2
2
.
7
3
.
0
3
.
0
3
.
3
3
.
8
4
.
3
4
.
3
3
.
6
3
.
3
3
.
0
2
.
5
1
.
7
1
.
1
0
.
6
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
6
1
.
0
1
.
3
1
.
7
1
.
9
2
.
3
2
.
9
3
.
3
4
.
1
4
.
2
4
.
0
3
.
6
3
.
2
2
.
6
2
.
1
1
.
4
0
.
9
0
.
5
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
4
0
.
7
1
.
0
1
.
4
1
.
9
2
.
6
3
.
1
3
.
7
2
.
4
3
.
9
3
.
9
3
.
6
2
.
9
2
.
4
1
.
7
1
.
2
0
.
8
0
.
5
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
1
0
.
2
0
.
4
0
.
6
0
.
9
1
.
3
2
.
1
2
.
6
3
.
4
4
.
1
4.
7
5.
0
4.
5
3.
8
3
.
1
2
.
5
1
.
6
1
.
1
0
.
8
0
.
5
0
.
2
0
.
1
0
.
1
0
.
1
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
1
0
.
2
0
.
4
0
.
6
1
.
0
1
.
3
2
.
1
2
.
8
3
.
7
5
.
0
6
.
3
6
.
7
5
.
9
4
.
2
3
.
3
2
.
4
1
.
5
1
.
1
0
.
8
0
.
5
0
.
2
0
.
1
0
.
1
0
.
1
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
6
0
.
9
1
.
2
2
.
0
3
.
0
3
.
8
5
.
2
6
.
7
6
.
9
5
.
9
4
.
1
3
.
2
2
.
4
1
.
5
1
.
1
0
.
8
0
.
5
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
5
0
.
8
1
.
1
1
.
8
2
.
7
3
.
3
4
.
2
5
.
0
2
.
6
4
.
2
3
.
4
2
.
8
2
.
2
1
.
4
1
.
0
0
.
7
0
.
4
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
5
0
.
8
1
.
1
1
.
4
2
.
2
2
.
7
3
.
1
3
.
3
1
.
6
3
.
1
2
.
9
2
.
2
2
.
0
1
.
3
1
.
0
0
.
7
0
.
4
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0.
0
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
4
0
.
7
1
.
0
1
.
3
1
.
9
2
.
1
2
.
4
2
.
7
1
.
4
2
.
6
2
.
1
1
.
9
1
.
4
1
.
2
1
.
0
0
.
7
0
.
4
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0.
0
1
1
1
1
1
1
1
2
2
2
2
2
2
2
0.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
3
0
.
3
0
.
2
0
.
4
0
.
3
0.
4
0.
9
0.
9
0.
9
0.
9
0.
9
0.
8
0.
6
0.
5
0.
5
0.
4
0.
4
0.
2
0.
2
0.
2
0.
2
0.
2
0.
2
0.
3
0.
3
0.
2
0.
2
0.
2
0.
1
0.
1
0.
2
0.
3
0.
5
0.
9
1.
3
1.
9
2.
4
3.
1
3.
4
3.
8
4.
1
2.
5
4.
1
3.
7
3.
1
2.
4
1.
5
1.
1
0.
8
0.
5
0.
3
0.
3
0.
3
0.
4
0.
5
0.
5
0.
5
0.
3
0.
1
0.
2
0.
4
0.
5
0.
6
0.
6
0.
5
0.
4
0.
4
0.
3
0.
1
0.
1
0.
1
0.
0
0.
0
0.
0
0.
0
3,
8
6
5
N
E
T
S
F
RE
T
A
I
L
1
4,
1
7
9
G
R
O
S
S
S
F
RE
T
A
I
L
2
2,
2
8
4
G
R
O
S
S
S
F
2,
0
3
3
N
E
T
S
F
11
9
11
7
7
SI
T
E
PH
O
T
O
M
E
T
R
I
C
P
L
A
N
OP
T
I
O
N
B
E0
-
1
B
Ha
r
r
i
s
s
A
s
s
o
c
i
a
t
e
s
,
L
L
C
51
5
N
W
a
s
h
i
n
g
t
o
n
A
v
e
Su
i
t
e
2
0
0
C
Mi
n
n
e
a
p
o
l
i
s
,
M
N
5
5
4
0
1
HA
RE
T
A
I
L
BU
I
L
D
I
N
G
MO
N
T
I
C
E
L
L
O
,
M
N
MO
N
T
I
C
E
L
L
O
,
M
N
CI
T
Y
SU
B
M
I
T
T
A
L
DA
T
E
:
I
H
E
R
E
B
Y
C
E
R
T
I
F
Y
T
H
A
T
T
H
I
S
P
L
A
N
,
S
P
E
C
I
F
I
C
A
T
I
O
N
O
R
R
E
P
O
R
T
W
A
S
P
R
E
P
A
R
E
D
B
Y
M
E
O
R
U
N
D
E
R
M
Y
D
I
R
E
C
T
S
U
P
E
R
V
I
S
I
O
N
A
N
D
T
H
A
T
I
A
M
A
D
U
L
Y
L
I
C
E
N
S
E
D
P
R
O
F
E
S
S
I
O
N
A
L
E
N
G
I
N
E
E
R
U
N
D
E
R
T
H
E
L
A
W
S
O
F
T
H
E
S
T
A
T
E
O
F
M
I
N
N
E
S
O
T
A
.
Draft Only
Lu
m
i
n
a
i
r
e
S
c
h
e
d
u
l
e
Sy
m
b
o
l
Qt
y
La
b
e
l
Ar
r
a
n
g
e
m
e
n
t
To
t
a
l
L
a
m
p
L
u
m
e
n
s
LL
F
De
s
c
r
i
p
t
i
o
n
Lu
m
.
W
a
t
t
s
3
CC
SI
N
G
L
E
30
0
0
0
0.
7
5
0
CO
O
P
E
R
G
S
M
-
X
X
-
3
2
0
-
M
P
-
X
X
-
5
S
-
F
G
-
B
Z
-
L
O
N
2
0
'
P
O
L
E
W
/
2
'
B
A
S
E
35
0
4
BB
SI
N
G
L
E
30
0
0
0
0.
7
5
0
CO
O
P
E
R
G
S
M
-
A
I
S
-
3
2
0
-
M
P
-
M
T
-
S
L
-
F
G
-
B
Z
-
L
2
0
'
P
O
L
E
W
/
2
'
BA
S
E
35
0
21
AA
SI
N
G
L
E
N.
A
.
0.
9
0
0
CO
O
P
E
R
X
T
O
R
2
A
@
9
'
21
.
4
Ca
l
c
u
l
a
t
i
o
n
S
u
m
m
a
r
y
La
b
e
l
Ca
l
c
T
y
p
e
Un
i
t
s
Av
g
Ma
x
Mi
n
Av
g
/
M
i
n
Ma
x
/
M
i
n
CA
L
C
P
O
I
N
T
S
Il
l
u
m
i
n
a
n
c
e
Fc
1.
6
7
11
.
8
0.
0
N.
A
.
N.
A
.
PR
O
P
E
R
T
Y
L
I
N
E
Il
l
u
m
i
n
a
n
c
e
Fc
0.
3
3
1.
0
0.
0
N.
A
.
N.
A
.
FR
O
N
T
E
N
T
R
A
N
C
E
Il
l
u
m
i
n
a
n
c
e
Fc
5.
5
0
5.
9
5.
2
1.
0
6
1.
1
3
NO
R
T
H
L
O
T
Il
l
u
m
i
n
a
n
c
e
Fc
1.
8
7
4.
7
0.
1
18
.
7
0
47
.
0
0
PA
R
K
I
N
G
L
O
T
Il
l
u
m
i
n
a
n
c
e
Fc
4.
5
2
6.
9
1.
4
3.
2
3
4.
9
3
pa
r
k
i
n
g
p
e
r
i
m
e
t
e
r
Il
l
u
m
i
n
a
n
c
e
Fc
4.
0
2
6.
7
1.
2
3.
3
5
5.
5
8
4,
1
7
9
G
R
O
S
S
S
F
3,
8
6
5
N
E
T
S
F
RE
T
A
I
L
1
RE
T
A
I
L
2
2,
1
8
8
G
R
O
S
S
S
F
1,
9
4
7
N
E
T
S
F
11
11
7
7
9
FR
O
N
T
E
N
T
R
A
N
C
E
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
Av
e
r
a
g
e
=
5
.
5
0
Ma
x
i
m
u
m
=
5
.
9
Mi
n
i
m
u
m
=
5
.
2
Av
g
/
M
i
n
R
a
t
i
o
=
1
.
0
6
Ma
x
/
M
i
n
R
a
t
i
o
=
1
.
1
3
FR
O
N
T
E
N
T
R
A
N
C
E
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
Av
e
r
a
g
e
=
5
.
5
0
Ma
x
i
m
u
m
=
5
.
9
Mi
n
i
m
u
m
=
5
.
2
Av
g
/
M
i
n
R
a
t
i
o
=
1
.
0
6
Ma
x
/
M
i
n
R
a
t
i
o
=
1
.
1
3
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
Av
e
r
a
g
e
=
1
.
8
7
NO
R
T
H
L
O
T
Ma
x
i
m
u
m
=
4
.
7
Mi
n
i
m
u
m
=
0
.
1
Av
g
/
M
i
n
R
a
t
i
o
=
1
8
.
7
0
Ma
x
/
M
i
n
R
a
t
i
o
=
4
7
.
0
0
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
Av
e
r
a
g
e
=
1
.
8
7
NO
R
T
H
L
O
T
Ma
x
i
m
u
m
=
4
.
7
Mi
n
i
m
u
m
=
0
.
1
Av
g
/
M
i
n
R
a
t
i
o
=
1
8
.
7
0
Ma
x
/
M
i
n
R
a
t
i
o
=
4
7
.
0
0
PA
R
K
I
N
G
L
O
T
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
Av
e
r
a
g
e
=
4
.
5
2
Ma
x
i
m
u
m
=
6
.
9
Mi
n
i
m
u
m
=
1
.
4
Av
g
/
M
i
n
R
a
t
i
o
=
3
.
2
3
Ma
x
/
M
i
n
R
a
t
i
o
=
4
.
9
3
PA
R
K
I
N
G
L
O
T
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
Av
e
r
a
g
e
=
4
.
5
2
Ma
x
i
m
u
m
=
6
.
9
Mi
n
i
m
u
m
=
1
.
4
Av
g
/
M
i
n
R
a
t
i
o
=
3
.
2
3
Ma
x
/
M
i
n
R
a
t
i
o
=
4
.
9
3
pa
r
k
i
n
g
p
e
r
i
m
e
t
e
r
Av
e
r
a
g
e
=
4
.
0
2
Ma
x
i
m
u
m
=
6
.
7
Mi
n
i
m
u
m
=
1
.
2
Av
g
/
M
i
n
R
a
t
i
o
=
3
.
3
5
Ma
x
/
M
i
n
R
a
t
i
o
=
5
.
5
8
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
pa
r
k
i
n
g
p
e
r
i
m
e
t
e
r
Av
e
r
a
g
e
=
4
.
0
2
Ma
x
i
m
u
m
=
6
.
7
Mi
n
i
m
u
m
=
1
.
2
Av
g
/
M
i
n
R
a
t
i
o
=
3
.
3
5
Ma
x
/
M
i
n
R
a
t
i
o
=
5
.
5
8
Il
l
u
m
i
n
a
n
c
e
(
F
c
)
0.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
2
0
.
4
0
.
3
0
.
2
0
.
2
0
.
2
0
.
1
0.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
4
0
.
6
0
.
7
0
.
9
0
.
8
0
.
9
0
.
8
0
.
8
0
.
5
0
.
3
0.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
5
1
.
3
1.
5
2.
6
4
.
6
5
.
0
3
.
9
2
.
2
1.
4
0.
8
0
.
5
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0
.
3
0
.
5
1
.
6
2
.
5
3
.
9
4
.
8
5
.
6
6
.
6
5.
5
4.
2
2
.
6
1
.
3
0
.
8
0
.
5
0
.
3
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
.
0
0
.
1
0
.
2
0
.
7
1
.
2
4
.
3
5
.
2
6
.
5
6
.
7
5
.
9
5.
5
4
.
4
4.
2
2
.
8
1
.
9
1
.
3
0
.
8
0
.
4
0
.
2
0
.
1
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
.
0
0
.
1
0
.
3
0
.
5
4.
4
5.
0
5
.
9
5.
7
6.
1
5
.
2
4
.
8
4.
4
3.
8
3
.
0
2
.
3
1.
7
1.
3
0
.
7
0
.
4
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
0.
0
0
.
0
0
.
1
0
.
3
1
.
6
4
.
6
5.
7
5.
2
5.
1
5.
0
4.
4
4.
3
4
.
0
3
.
8
3
.
2
2
.
9
2
.
3
1
.
9
1
.
0
0
.
5
0
.
3
0
.
1
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0.
0
0
.
1
0
.
2
0
.
6
1.
5
3.
4
4.
5
4
.
1
4.
6
3
.
6
3
.
8
4
.
0
4
.
6
4
.
8
4
.
2
3
.
9
4
.
0
3
.
1
2
.
5
0
.
8
0
.
5
0
.
1
0
.
1
0
.
1
0
.
0
0.
0
0
.
0
0.
0
0
.
1
0
.
2
0
.
6
1
.
3
3
.
1
3
.
8
3
.
9
4
.
0
4
.
0
5
.
2
5
.
8
8
.
5
7
.
9
5
.
8
4
.
9
5.
7
5.
6
5
.
3
2
.
5
1
.
0
0
.
4
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0.
0
0
.
1
0
.
2
0
.
5
1
.
3
3
.
2
4
.
6
5.
5
6.
1
6
.
4
7
.
2
4.
5
11
.
6
6
.
8
5
.
6
5
.
6
6
.
1
6
.
3
5.
5
1.
2
0
.
5
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0.
0
0
.
1
0
.
2
0
.
5
2
.
1
8
.
4
5.
4
9.
3
6
.
4
5
.
8
6
.
0
5
.
9
6
.
5
5
.
8
2
.
8
0
.
8
0
.
3
0
.
1
0
.
1
0
.
0
0
.
0
0.
0
0
.
0
0
.
1
0
.
5
2
.
4
7
.
1
5.
9
6
.
1
5.
4
5.
9
5
.
6
5
.
8
5
.
3
2
.
7
1
.
4
0
.
5
0
.
2
0
.
1
0
.
0
0
.
0
0.
0
0
.
0
0
.
1
0
.
4
1
.
8
6
.
3
6.
3
6
.
9
5
.
9
5.
4
5
.
7
5
.
5
5.
2
3
.
3
1
.
8
0
.
8
0
.
3
0
.
1
0
.
1
0
.
0
0.
0
0
.
0
0
.
1
0
.
2
1
.
2
4.
4
11
.
1
9
.
7
6
.
9
5
.
1
5
.
3
5
.
2
5.
4
4.
6
2
.
6
1
.
0
0
.
4
0
.
2
0
.
1
0
.
0
0.
0
0
.
0
0
.
0
0
.
1
0
.
6
2
.
7
9.
9
7
.
2
5
.
0
4
.
9
5
.
2
5.
5
5
.
5
5.
1
2
.
0
0
.
6
0
.
2
0
.
0
0
.
0
0.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
4
0
.
2
9.
5
6
.
7
5
.
1
4
.
8
5
.
0
5
.
0
5
.
6
5
.
1
4
.
3
0
.
8
0
.
3
0
.
1
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
2
0
.
3
7.
3
7
.
0
5
.
2
4
.
8
4.
4
5.
0
5
.
2
5.
5
4.
2
0
.
6
0
.
3
0
.
1
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
7
3
.
1
11
.
8
9
.
7
5.
5
4.
2
4
.
1
4.
4
4.
6
4.
7
2.
6
0
.
7
0
.
2
0
.
1
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
8
3
.
9
4.
5
6.
6
8
.
1
5.
4
3.
6
3
.
4
3
.
4
3
.
7
3
.
5
1
.
7
0
.
7
0
.
2
0
.
1
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
6
3
.
7
6
.
3
4
.
2
6
.
1
4.
7
4.
2
4
.
0
4
.
0
4.
4
4
.
7
4.
0
3
.
0
2
.
6
2
.
5
2
.
4
1
.
9
1
.
0
0
.
6
0
.
2
0
.
1
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
3
1
.
4
3
.
1
2
.
1
2
.
1
1
.
6
1
.
6
1
.
6
1
.
9
2
.
5
2
.
7
2
.
6
2.
1
2
.
0
1
.
7
1
.
5
1
.
0
0
.
6
0
.
4
0
.
2
0
.
1
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
3
0
.
4
0
.
5
0
.
5
0
.
6
0
.
8
1
.
0
1
.
2
1
.
7
1
.
8
1
.
7
1.
4
1
.
3
1
.
2
1
.
0
0
.
6
0
.
4
0
.
2
0
.
1
0
.
1
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
1
0
.
2
0
.
3
0
.
6
0
.
8
0
.
9
0
.
9
1
.
0
0
.
9
0.
9
0
.
8
0
.
7
0
.
6
0
.
4
0
.
2
0
.
1
0
.
1
0
.
0
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
4
0
.
5
0
.
6
0
.
6
0
.
6
0
.
6
0.
5
0
.
4
0
.
4
0
.
3
0
.
2
0
.
2
0
.
1
0
.
0
0
.
0
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
2
0
.
3
0
.
3
0
.
3
0
.
3
0
.
3
0.
3
0
.
2
0
.
2
0
.
2
0
.
1
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
1
0
.
2
0
.
2
0
.
1
0
.
1
0.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
1
0
.
0
0
.
0
0
.
0
0
.
0
1
1
1
1
1
1
1
2
2
2
2
2
2
0.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
1
0
.
1
0
.
3
0
.
3
0
.
2
0
.
4
0
.
3
0.
4
0.
9
0.
9
0.
9
0.
9
0.
9
0.
8
0.
6
0.
5
0.
5
0.
4
0.
3
0.
2
0.
1
0.
1
0.
2
0.
2
0.
2
0.
2
0.
2
0.
1
0.
1
0.
1
0.
1
0.
0
0.
1
0.
1
0.
3
0.
4
0.
6
0.
8
1.
0
1.
0
0.
9
0.
8
0.
8
0.
7
0.
6
0.
6
0.
4
0.
2
0.
1
0.
1
0.
0
0.
0
0.
0
0.
0
0.
1
0.
1
0.
3
0.
4
0.
4
0.
2
0.
1
0.
2
0.
4
0.
5
0.
6
0.
6
0.
5
0.
4
0.
4
0.
3
0.
1
0.
1
0.
1
0.
0
0.
0
0.
0
0.
0
SI
T
E
PH
O
T
O
M
E
T
R
I
C
P
L
A
N
OP
T
I
O
N
A
E0
-
1
A
Ha
r
r
i
s
s
A
s
s
o
c
i
a
t
e
s
,
L
L
C
51
5
N
W
a
s
h
i
n
g
t
o
n
A
v
e
Su
i
t
e
2
0
0
C
Mi
n
n
e
a
p
o
l
i
s
,
M
N
5
5
4
0
1
HA
RE
T
A
I
L
BU
I
L
D
I
N
G
MO
N
T
I
C
E
L
L
O
,
M
N
MO
N
T
I
C
E
L
L
O
,
M
N
CI
T
Y
SU
B
M
I
T
T
A
L
DA
T
E
:
I
H
E
R
E
B
Y
C
E
R
T
I
F
Y
T
H
A
T
T
H
I
S
P
L
A
N
,
S
P
E
C
I
F
I
C
A
T
I
O
N
O
R
R
E
P
O
R
T
W
A
S
P
R
E
P
A
R
E
D
B
Y
M
E
O
R
U
N
D
E
R
M
Y
D
I
R
E
C
T
S
U
P
E
R
V
I
S
I
O
N
A
N
D
T
H
A
T
I
A
M
A
D
U
L
Y
L
I
C
E
N
S
E
D
P
R
O
F
E
S
S
I
O
N
A
L
E
N
G
I
N
E
E
R
U
N
D
E
R
T
H
E
L
A
W
S
O
F
T
H
E
S
T
A
T
E
O
F
M
I
N
N
E
S
O
T
A
.
Draft Only
Draft Only
Draft Only
Draft Only
Draft Only
Draft Only
Draft Only
Draft Only
Draft Only
Draft Only
Draft Only
Draft Only
Dr
a
f
t
O
n
l
y
Dr
a
f
t
O
n
l
y
Dr
a
f
t
O
n
l
y
CityCouncilAgenda:6/08/15
1
2K.ConsiderationofadoptingOrdinanceNo.616forAmendmentstotheMonticello
ZoningOrdinance,Chapter5,Section3–AccessoryUseStandardsandChapter8,
Section4–Definitions,asrelatedtoregulationsforAccessoryBuilding-Majorand
AccessoryBuilding–Minor.Applicant:CityofMonticello (AS)
PlanningCaseNumber:2015-021
A.REFERENCE&BACKGROUND
Request(s):AmendmentstothetextoftheMonticelloZoning
Ordinance
DeadlineforDecision:NA
LandUseDesignation:Varies
ZoningDesignation:Varies
ANALYSIS
TheCityCouncilisaskedtoconsideramendmentstotheMonticelloZoningOrdinance
relatedtothesizeof“AccessoryBuildings–Minor”.
TheproposedamendmentsarearesultofarecentchangetotheMinnesotaStateBuilding
Code,whichadjustedtherequirementforbuildingpermitondetachedaccessorystructure
from120squarefeetto200squarefeet.
Atpresent,theMonticelloZoningOrdinanceisconsistentwiththepriorbuildingcode,
statingthat“AccessoryBuildings,Minor”are120squarefeetorless.
Theproposedordinanceamendmentswouldthereforeadjusttheaccessoryusetableand
definitionstoaddresstheincreaseinsizeallowanceforminoraccessorystructures.
Inaddition,anamendmentisproposedtoaddresssetbackforsuchstructures,notingthat
althoughthezoningsetbackis6’feet(20’forcornerlots),allstructuresarealsorequired
tomeetbuildingcoderequirements.Thisamendmentisintendedtoaddresssituations
whereadetachedaccessorystructuremaymeetthezoningsetback,butmayhaveaneave
oroverhangwhichencroachesintothesetback.Whilethatconditionisallowableby
zoningordinance,thebuildingitselfmayberequiredtomeetspecificfirecode
requirementsintermsofconstructionmethods.
CityCouncilAgenda:6/08/15
2
PLANNINGCOMMISSIONREVIEWANDRECOMMENDATION
ThePlanningCommissionreviewedthisitemduringtheirregularmeetingonJune2nd,
2015.ThePlanningCommissionheldapublichearingontheproposedamendment.No
publictestimonywasofferedontheitem.ThePlanningCommissionvotedunanimously
torecommendtheproposedamendment.
B.ALTERNATIVEACTIONS
ThePlanningCommissionunanimouslyrecommendsalternative1below.
1.MotiontoadoptOrdinanceNo.616approvingAmendmentstotheMonticello
ZoningOrdinance,Chapter5,Section3–AccessoryUseStandardsandChapter8,
Section4–Definitions,asrelatedtoregulationsforAccessoryBuilding-Majorand
AccessoryBuilding–Minor,basedonafindingbasedonafindingthattheordinance
amendmentsasproposedcontinuetosupporttheComprehensivePlan,serveto
clarifyexistingordinanceregulations,andsupportconsistencywithadoptedbuilding
codes.
2.Motionofother.
C.STAFFRECOMMENDATION
Staffsupportstheproposedamendments,astheywillprovideneededclarityand
consistencyintheapplicationoftheordinanceinrelationshiptothebuildingcodefor
accessoryusestructures.
D.SUPPORTINGDATA
A.OrdinanceNo.616
B.Chapter5,Section3–GeneralStandardsandLimitationsforAccessoryUsesand
StructuresandUseTable,Table5-1,UsesbyDistrict,excerpt
C.Chapter8,Section4–Definitions,excerpt
D.MinnesotaStateBuildingCode,excerpt
ORDINANCE NO. 616
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
AN ORDINANCE AMENDING TITLE 10 OF THE MONTICELLO ZONING CODE
FOR THE FOLLOWING SECTIONS:
CHAPTER 5, SECTION 1 – USE TABLE (TABLE 5-1: USES BY DISTRICT)
CHAPTER 8, SECTION 4 – DEFINITIONS
THE CITY COUNCIL OF THE CITY OF MONTICELLO, MINNESOTA, HEREBY
ORDAINS:
Section 1. Section 5.3(B) – General Standards and Limitations for Accessory Uses and
Structures, Title 10 – Zoning Ordinance is hereby amended as follows:
(3) Location of Accessory Uses or Structures
Except for fences and walls, the following standards shall apply to all accessory
structures:
(a) All accessory structures, except as may be specifically denoted, shall be
located at least six (6) feet from all lot lines, and at least the minimum
distance from public rights-of-way as denoted in the individual zoning
district regulations. All such structures must meet applicable building
codes related to fire separation distance.
(i) A side yard setback of twenty (20) feet shall be maintained from
property lines abutting public streets.
Section 2. Section 5.3(C) – Table of Permitted Accessory Uses and Structures (Table 5-4
Accessory Uses by District), Title 10 – Zoning Ordinance is hereby amended as
follows:
TABLE 5-4: ACCESSORY USES BY DISTRICT
Use Types
“P” = Permitted
“C” = Conditionally
Permitted
“I” = Interim Permitted
Base Zoning Districts
Additional
Requirements A
O
R
A
R
1
R
2
T
N
R
3
R
4
M
H
B
1
B
2
B
3
B
4
C
C
D
I
B
C
I
1
I
2
Accessory Dwelling Unit P P P P P 5.3(D)(1)
Accessory Building – minor
(≤ 120 square feet) P P P P P P P P P P P P P P P P 5.3(D)(2)
Accessory Building – major
(> 120 square feet) P P P P P P P C P P P P P P P P 5.3(D)(3)
Section 3. Section 8.4 – Definitions, Title 10 – Zoning Ordinance is hereby amended as
follows:
ORDINANCE NO. 616
ACCESSORY BUILDING -- MAJOR: A building which is accessory to a principal
structure and is required to be constructed with a building permit per MN Rule
1300.0120exceeds 120 square feet in size.
ACCESSORY BUILDING -- MINOR: A building which is accessory to a principal
structure and exempt from a building permit per MN Rule 1300.0120is equal to or less
than 120 square feet in size.
Section 11. The City Clerk is hereby directed to make the changes required by this Ordinance
as part of the Official Monticello City Code, Title 10, Zoning Ordinance, and to
renumber the tables and chapters accordingly as necessary to provide the intended
effect of this Ordinance. The City Clerk is further directed to make necessary
corrections to any internal citations and diagrams that result from such
amendments, provided that such changes retain the purpose and intent of the
Zoning Ordinance as has been adopted.
Section 12. This Ordinance shall take effect and be in full force from and after its passage and
publication. Revisions will be made online after adoption by Council. Copies of
the complete Zoning Ordinance are available online and at Monticello City Hall.
ADOPTED BY the Monticello City Council this 8th day of June, 2015.
CITY OF MONTICELLO
__________________________________
Brian Stumpf, Mayor
ATTEST:
___________________________________
Jeff O’Neill, City Administrator
VOTING IN FAVOR:
VOTING IN OPPOSITION:
CHAPTER 5: USE STANDARDS
Section 5.3 Accessory Use Standards
Subsection (B) General Standards and Limitations for Accessory Uses and Structures
City of Monticello Zoning Ordinance Page 361
(B) General Standards and Limitations for Accessory Uses and Structures
(1) Compliance with Ordinance Requirements
All accessory uses and accessory structures shall conform to all applicable
requirements of this Ordinance. The provisions of this Section establish
additional standards and restrictions for particular accessory uses and structures.
(2) General Standards
All accessory uses and accessory structures shall meet the following standards:
(a) Directly serve the principal use or structure;
(b) Be customarily accessory and clearly incidental and subordinate to the
principal use and structure;
(c) Be subordinate in area, extent, and purpose to the principal use or structure;
(d) Be owned or operated by the same person as the principal use or structure;
(e) Be located on the same lot as the principal use or structure;
(f) Not be constructed or established prior to the time the principal use or
structure is constructed or established;
(g) Together with the principal use or structure, not violate any standards of this
Ordinance;
(h) Not be located within platted or recorded easements or over underground
public utilities;
(i) An accessory building shall be considered an integral part of the principal
building if it is connected to the principal building either directly or by an
enclosed passageway. Such accessory buildings shall adhere to requirements
for the principal building.
(j) If a principal building is proposed to be removed with no immediate
replacement, all accessory structures shall also be removed.
(k) Not constitute a combination use, which is the combination of two principal
uses (combination uses will not meet the above standards in terms of being
subordinate or providing service to the principal use).
CHAPTER 5: USE STANDARDS
Section 5.3 Accessory Use Standards
Subsection (B) General Standards and Limitations for Accessory Uses and Structures
Page 362 City of Monticello Zoning Ordinance
(3) Location of Accessory Uses or Structures
Except for fences and walls, the following standards shall apply to all accessory
structures:
(a) All accessory structures, except as may be specifically denoted, shall be
located at least six (6) feet from all lot lines, and at least the minimum
distance from public rights-of-way as denoted in the individual zoning district
regulations.
(i) A side yard setback of twenty (20) feet shall be maintained from property
lines abutting public streets.
(b) Detached accessory buildings shall be six (6) feet or more from any other
building or structure on the same lot.
(c) Accessory structures shall not be located beyond the front building line
established by the principal structure.
(4) Maximum Height
(a) Detached accessory buildings shall not exceed fifteen (15) feet in height
except in the I-1 and I-2 districts.
(b) No accessory structure shall exceed the height of the principal structure unless
specifically allowed by this ordinance.
(5) Maximum Number of Accessory Structures
In all residential zoning districts, the following limitations on accessory structures
shall apply:
(a) No more than one (1) private, detached major accessory building may be
erected for each dwelling;
(b) No more than one (1) private, detached minor accessory building may be
erected for each dwelling;
(c) Additional major or minor accessory buildings may be erected if approved via
a conditional use permit pursuant to Section 2.4(D).
Section 2.4(D):
Conditional Use
Permits
CHAPTER 5: USE STANDARDS
Section 5.3 Accessory Use Standards
Subsection (C) Table of Permitted Accessory Uses
City of Monticello Zoning Ordinance Page 363
(C) Table of Permitted Accessory Uses
(1) Listed Accessory Uses
Table 5-4, lists the allowed types of accessory uses and structures within each
zoning district. If a specific accessory use is allowed in a district, the column
underneath the district is marked with a "P." If a specific accessory use is
conditionally permitted in a district, the column underneath the district is marked
with a "C." If the accessory use or structure is not allowed in a district, the
column is shaded. If there is a reference contained in the column entitled
"Additional Requirements", refer to the cited section(s) for additional standards
that apply to the specific accessory use.
(2) Interpretation of Unidentified Accessory Uses
(a) The Community Development Department shall evaluate applications for
accessory uses that are not identified in Table 5-4 on a case-by-case basis
using the following standards:
(i) The definition of “accessory use” (see Section 8.4 – Definitions) and the
general accessory use standards and limitations established in Section
5.3(B);
(ii) The additional regulations for specific accessory uses established in
Section 5.3(D), Specific Standards for Certain Accessory uses;
(iii) The purpose and intent of the base and overlay districts in which the
accessory use or structure is located;
(iv) Any potential adverse impacts the accessory use or structure may have on
other lands in the area as compared to other accessory uses permitted in
the district; and
(v) The compatibility of the accessory use or structure, including the structure
in which it is housed (if applicable), with other principal and accessory
uses permitted in the district.
(b) The decision of the Community Development Department to permit or deny
an unlisted use or structure is final, but may be appealed pursuant to Section
2.4(H).
Section 8.4:
Definition of
“accessory”
Section 8.4:
Definition of “use”
Section 5.3(B):
General Standards
and Limitations for
Accessory Uses and
Structures
Section 5.3(D):
Specific Standards
for Certain
Accessory Uses
Section 2.4(H):
Appeal of
Administrative
Decisions
CHAPTER 5: USE STANDARDS
Section 5.3 Accessory Use Standards
Subsection (C) Table of Permitted Accessory Uses
Page 364 City of Monticello Zoning Ordinance
(3) Table of Permitted Accessory Uses and Structures
TABLE 5-4: ACCESSORY USES BY DISTRICT
Use Types
“P” = Permitted
“C” = Conditionally
Permitted
“I” = Interim Permitted
Base Zoning Districts
Additional
Requirements A
O
R
A
R
1
R
2
T
N
R
3
R
4
M
H
B
1
B
2
B
3
B
4
C
C
D
I
B
C
I
1
I
2
Accessory Dwelling Unit P P P P P 5.3(D)(1)
Accessory Building –
minor (≤ 120 square feet) P P P P P P P P P P P P P P P P 5.3(D)(2)
Accessory Building –
major (> 120 square feet) P P P P P P P C P P P P P P P P 5.3(D)(3)
Adult Use – accessory C 5.3(D)(4)
Agricultural Buildings P 5.3(D)(5)
Automated Teller
Machines (ATMs) P P P P P P P P 5.3(D)(6)
Automobile Repair –
Major C 5.3(D)(7)
Automobile Repair –
Minor C 5.3(D)(8)
Boarder(s) P P P 5.3(D)(9)
Co-located Wireless
Telecommunications
Antennae
C C C C C C C C C C C C C C C C
4.13(E)
Commercial Canopies P P P P P P P P 5.3(D)(10)
Commercial Transmission/
Reception Antennae/
Structures
C C C C C C
4.13(D)
Donation Drop-off
Containers P P 5.3(D)(11)
Drive-Through Services P P P C P P P 5.3(D)(12)
Entertainment/Recreation
– Outdoor Commercial C C C C 5.3(D)(13)
Fences or Walls P P P P P P P P P P P P P P P P 4.3
Greenhouse/Conservatory
(non-commercial) P P P P P P P P P P P P P P P P 5.3(D)(14)
Heliports C C C C C 5.3(D)(15)
Home Occupations P P P P P P P P P P 5.3(D)(16)
Indoor Food /
Convenience Sales P P P P P P P P 5.3(D)(17)
Indoor Storage P P P P P P 5.3(D)(18)
Incidental Light
Manufacturing P P P P P P P P 5.3(D)(19)
Machinery/Trucking
Repair & Sales C 5.3(D)(20)
Office P P P P P P none
Off-street Loading Space P P C P P P P P P P 4.9
CHAPTER 8: RULES & DEFINITIONS
Section 8.4 Definitions
Subsection (B) Lots
City of Monticello Zoning Ordinance Page 421
8.4 Definitions
The following words and terms, wherever they occur in this ordinance, shall be interpreted as
herein defined:
ACCESSORY: A use, activity, structure, or part of a structure that is subordinate and
incidental to the main activity or structure on the site.
ACCESSORY BUILDING -- MAJOR: A building which is accessory to a principal structure
and exceeds 120 square feet in size.
ACCESSORY BUILDING -- MINOR: A building which is accessory to a principal structure
and is equal to or less than 120 square feet in size.
ADULT USES: Adult uses include adult bookstores, adult motion picture theatres, adult
mini-motion picture theatres, adult massage parlors, adult steamroom/bathhouse/sauna
facilities, adult companionship establishments, adult rap/conversation parlors, adult
health/sport clubs, adult cabarets, adult novelty businesses, adult motion picture arcades, adult
modeling studios, adult hotels/motels, adult body painting studios, and other premises,
enterprises, establishments, businesses, or places open to some or all members of the public, at
or in which there is an emphasis on the presentation, display, depiction, or description of
"specified sexual activities" or "specified anatomical areas" which are capable of being seen
by members of the public. Activities classified as obscene as defined by Minnesota Statute
5617.241 are not included.
Specified Anatomical Areas:
(A) Less than completely and opaquely covered human genitals, pubic region, buttock, anus,
or female breast(s) below a point immediately above the top of the areola; and
(B) Human male genitals in a discernibly turgid state, even if completely and opaquely
covered.
Specified Sexual Activities:
(A) Actual or simulated sexual intercourse, oral copulation, anal intercourse, oral-anal
copulation, bestiality, direct physical stimulation of unclothed genitals, flagellation or
torture in the context of a sexual relationship, or the use of excretory functions in the
context of sexual relationship, and any of the following sexually-oriented acts or
conduct: anilingus, buggery, coprophagy, coprophilia, cunnilingus, fellatio, necrophilia,
pederasty, pedophilia, piquerism, sapphism, zooerasty.
(B) Clearly depicted human genitals in the state of sexual stimulation, arousal, or
tumescence.
CityCouncilAgenda:6/08/15
1
2L.ConsiderationofadoptingResolution#2015-048approvinganapplicationfora
GamblingPremisesPermittoconductgamblingattheMonticelloCountryClub.
Applicant:MonticelloYouthHockeyProgram (CS)
A.REFERENCEANDBACKGROUND:
TheMonticelloYouthHockeyProgramsubmittedaPremisesPermitApplicationto
conductgamblingattheMonticelloCountryClubat1209GolfCourseRoad.Councilis
askedtoadopttheresolutionsotheapplicationcanbesubmittedtotheStateforapproval.
TonyLarson,MYHPGamblingManager,hascompletedthebackgroundcheckformand
turnedinfinancialpaperworkasrequiredbycitycodeforlawfulgambling.Monticello
YouthHockeyProgramisawareofthegamblingregulationsandthecity’stradeareaand
reportingrequirements.
TheStateGamblingControlBoardrequiresCounciltoadoptaresolutionapproving
gamblingpremisespermitapplications.CitystaffdoesnotfindanyreasonthatCouncil
wouldnotapprovethisapplication.Mr.Larsonhasbeenaskedtobepresentatthe
meetingifCouncilwouldhaveanyquestions.
A1.BudgetImpact:NA
A2.StaffWorkloadImpact:NA
B.ALTERNATIVEACTIONS:
1.MotiontoadoptResolution#2015-048approvinganapplicationforaGambling
PremisesPermitattheMonticelloCountryClub,locatedat1209GolfCourse
Road,fortheMonticelloYouthHockeyProgram,contingentuponsuccessful
completionofthecity’sbackgroundcheckandsubmissionofallnecessary
paperwork.
2.Motiontodenytheresolutionatthistime.
C.STAFFRECOMMENDATION:
CitystaffrecommendsAlternative#1.
D.SUPPORTINGDATA:
Resolution#2015-048
CopyofGamblingPremisesPermitapplication
CopyofCityCoderelatedtoLawfulGamblingRegulations
FinancialreportsfromMonticelloYouthHockeyProgram
https://mwhco.sharefile.com/d-s8dd7600c1b14d4bb
CopyofleaseforuseofspaceatMonticelloCountryClub(tobeprovided)
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2015-048
APPROVING AN APPLICATION FOR A PREMISES PERMIT TO CONDUCT
LAWFUL GAMBLING AT THE MONTICELLO COUNTRY CLUB
WHEREAS, Monticello Youth Hockey Program Inc. has submitted an application to the City
Council of Monticello for a Premises Permit to conduct lawful gambling activities at the
Monticello Country Club located at 1209 Golf Course Road in Monticello, Minnesota; and
WHEREAS, the Council is not opposed to a gambling permit being issued by the State
Gambling Control Board;
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL that the application by
the Monticello Youth Hockey Program Inc. for a Premises Permit to conduct lawful gambling
activities at the Monticello Country Club is hereby approved, contingent on the following:
1. Successful completion of City background check.
2. Submission of all necessary paperwork, such as financial reports and lease.
ADOPTED BY the Monticello City Council this 8th day of June, 2015.
CITY OF MONTICELLO
________________________
Brian Stumpf, Mayor
ATTEST:
___________________________
Kerry Burri, Interim City Clerk
CERTIFICATION
STATE OF MINNESOTA
COUNTY OF WRIGHT
I hereby certify that the foregoing is a true and correct copy of Resolution #2015-048
duly passed, adopted and approved by the Monticello City Council at their scheduled meeting on
June 8, 2015, and recorded in minutes of said meeting.
____________________________________
Kerry Burri, Interim City Clerk
Notary Public: _______________________________
Date: ___________________________
(STAMP)
Organization Description 2011 Organization Description 2012 Organization Description 2013 Organization Description 2014
JANUARY - Silver Creek Township 500.00 Brent Stromme Video Camera for Boy's High School 469.42 Christian Social Services Meat Donation 20.00
Moose Sherrit Ice Arena Youth Ice Time 11,565.00 Christian Social Services Meat Donation 480.00 Woodbury Hockey Club Tournament Cancelled (900.00)
Christian Social Service Meat Donation 540.00
FEBRUARY MN Revenue Unsold Ticket Refund (34,983.57) Gambling Control Board License Permit for the Station 150.00 Moose Sherrit Ice Arena Youth Ice Time 21,000.00 Woodbury Area Hockey Club Bantam AA Tournament Registration 900.00
MN Revenue Unsold Ticket Refund (29,625.27) Christian Social Services Meat Donation 40.00 Monticello Women of Today 300.00
MN Revenue Unsold Ticket Refund (25,210.97) Moose Sherrit Ice Arena Youth Ice Time 16,000.00
Christian Social Services Meat Donation 20.00
MARCH Christian Social Services Meat Donation 180.00 Moose Sherrit Ice Arena Youth Ice Time 20,430.00 Moose Sherrit Ice Arena Youth Ice Time 17,622.31 Moose Sherrit Ice Arena Youth Ice Time 17,000.00
Christian Social Services Meat Donation 260.00 Moose Sherrit Ice Arena Youth Ice Time 13,551.25
Christian Social Services Meat Donation 20.00
APRIL Moose Sherrit Ice Arena Youth Ice Time 17,499.40 Christian Social Services Meat Donations 220.00 City of Monticello 10,000.00 Moose Sherrit Ice Arena Youth Ice Time 12,928.99
Moose Sherrit Ice Arena Youth Ice Time 12,326.79 Christian Social Services Meat Donations 80.00
Christian Social Services Meat Donation 80.00
MAY - Christian Social Services Meat Donation 220.00 Silver Creek Township Playground Maintenance 3,000.00
Christian Social Services Meat Donation 80.00
Eric & Kristen Moen 2013 Exempt Raffle Donation 6,242.67
JUNE Moose Sherrit Ice Arena Youth Ice Time 14,043.75 Christian Social Services Meat Donation 40.00 Eden Prairie Hockey Association Bantam AA Tournament Registration 850.00 Christian Social Services Meat Donation 60.00
Monticello Youth Hockey Program 6,000.00 Mounds View Youth Hockey Bantam B1 Registration 1,150.00
Rogers Youth Hockey Tournament Registration 675.00
Bloomington Youth Hockey Squirt A Squirtacular 995.00
Christian Social Services Meat Donation 40.00
Anoka Area Hockey Bantam A & B Tournament Registration 1,350.00
JULY - Christian Social Services Meat Donation 260.00 Christian Social Services Meat Donation 260.00
AUGUST - Nate Johnson Benefit Bucket Raffle Proceeds Donated 3,650.00 Osseo/Maple Grove Youth Hockey Registration 1,225.00 Christian Social Services Meat Donation 200.00
Anoka Area Hockey Tournament Registration 625.00
Woodbury Area Hockey Club Bantam AA Tournament Registration 900.00
Spring Lake Park Youth Hockey Tournament Registration 600.00
Armstrong Cooper Youth Hockey Squirt C Tournament Registration 750.00
New Ulm/Sleepy Eye Youth Hockey Tournament Registration 1,000.00
St. Cloud Youth Hockey Peewee A Tournament Registration 1,100.00
Christian Social Services Meat Donation 520.00
Breezy Point Tournaments Bantam B & Power A Tournament Registration 1,590.00
SEPTEMBER AST Sports Youth Hockey Jerseys 2,100.00 Christian Social Services Meat Donation 200.00 Fargo Youth Hockey Squirt A Tournament Registration 975.00 Daves Sports Jerseys 8,000.00
Fargo Youth Hockey Squirt B Tournament 975.00 Mounds View Youth Hockey Peewee A Tournament 750.00
Dave Sports Bantam Jerseys 5,548.00 Fargo Youth Hockey Squirt B Tournament 995.00
Christian Social Services Meat Donation 80.00 Fargo Youth Hockey Squirt A Tournament 995.00
New Ulm/Sleepy Eye Youth Hockey Tournament Cancelled (1,000.00) OMGHA Peewee B Tournament 1,295.00
Christian Social Services Meat Donation 340.00
OMGHA Squirt A Tournament 1,225.00
OCTOBER - Christian Social Services Meat Donation 1,000.00 Rogers Youth Hockey Tournament Registration 1,000.00
AAHA Tournament Registration 1,025.00
NOVEMBER Moose Sherrit Ice Arena Youth Ice Time 7,740.00 Christian Social Services Meat Donation 320.00 Christian Social Services Meat Donation 120.00 Daves Sports Jerseys 10,180.00
DECEMBER Gambling Control Board 2012 Licensing Fee 1,050.00 Gambling Control Board 2013 Licensing Fee 1,050.00 Gambling Control Board 2014 Licensing Fee 1,050.00 Moose Sherrit Ice Arena Youth Ice Time 7,220.00
Christian Social Service Meat Donation 780.00 Moose Sherrit Ice Arena Youth Ice Time 12,000.00 State of Minnesota 2015 Annual Licensing Renewal 900.00
Christian Social Services Meat Donation 440.00 MN Gambling Control Board Gambling Manager's License Renewal 100.00
TOTAL:8,409.58 28,959.73 81,079.47 80,893.99
By Donation Category:2011 2012 2013 2014 Totals:
Youth Ice Time:39,283.15 43,995.00 64,500.35 53,148.99 200,927.49
Tournament Registration:2,100.00 13,760.00 7,285.00 23,145.00
Meat Donation:960.00 3,240.00 1,720.00 980.00 6,900.00
Raffle Donation:3,650.00 6,242.67 - 9,892.67
Jerseys:5,548.00 18,180.00 23,728.00
Licensing:1,050.00 1,200.00 1,050.00 1,000.00 4,300.00
Other:6,500.00 13,469.42 300.00 20,269.42
Unsold Ticket Refund:(34,983.57) (29,625.27) (25,210.97) - (89,819.81)
Total:8,409.58 28,959.73 81,079.47 80,893.99 199,342.77
MONTICELLO YOUTH HOCKEY PROGRAM
LAWFUL PURPOSE EXPENDITURES RECAP
FOR YEARS 2011, 2012, 2013, AND 2014
CityCouncilAgenda:6/08/15
1
2M.Considerationofauthorizing50/50costsharewiththeCityofWindomfor
purchasingbandwidthforfinalimplementationof10GigRing(JO/RL)
A.REFERENCEANDBACKGROUND:
TheCityCouncilisaskedtoconsiderthefinalimplementationofthe10gigringby
authorizinga50/50costshareplanbetweenFiberNetandtheCityofWindomfor
bandwidthonthering.Theconceptforthe10gigringwasinitiatedbyBrianEstremand
DanOlsenin2014;constructionisnearingcompletionandFiberNetwillsoonbeableto
utilizethebandwidthonthering.Thetotalcostofthebandwidthis$12,000permonth.
UnderthecostsharingagreementwithWindom,FiberNetwouldberesponsiblefor
$6,000permonth.
AccesstothiscircuitwillenableFiberNettosatisfygrowingbandwidthdemand,provide
capacitytooffer1gigservice,andenableuserstogaintheoptimumexperienceofthe
proposedGigaCenterdevice.Also,the10gigringprovidesaredundantcircuitenabling
servicetocontinueiftheringisinterruptedorcut.SinceWindomandMonticellowillbe
onthesamecircuit,thereisincreasedpotentialforcostsavingsassociatedwithsharing
equipmentandapplications.
Byworkingtogether,MonticelloandWindombenefitfromthebulkpurchaseof
bandwidth.Aswithmanypurchasedgoods,buyingbandwidthinsmallerincrementsis
morecostly.Thusitmakessenseforthetwosystemstopurchasebandwidthtogetherata
lowerrate.Underthisarrangement,EnventiswillbechargingMonticello50%ofthecost
andWindom50%.Althoughactualusageineachcommunitywilllikelyvarysomewhat
fromdaytoday,itisrecommendedthattheplanbesimplifiedbyhavingeach
communitypayaflat50%.However,thebandwidthusagewillbemonitoredsothat
adjustmentscanbemadeintheeventonecommunityusessignificantlymorebandwidth
thantheother.
ThetimingoftheadditionalbandwidthisbeneficialbecauseFiberNetisexperiencing
increaseddemandassociatedwithnewsubscribersaswellaspeakusagetimes.The
systemiscurrentlyexceedingcapacityduringthesepeaktimes.Withoutincreasing
capacity,duringperiodsofhighusage,customerspeedtestswillnotalignwithadvertised
speeds.FiberNethasalreadyreceivedsomecomplaintsinthatregardandwecertainlydo
notwanttoestablishareputationfornotdeliveringonadvertisedspeeds.
AttachedisaspreadsheetthatshowsthecostforbandwidthpaidbyFiberNet.Pleasewill
notethattheXOcontractcostishighincomparisontotheEnventiscircuit;XOcosts
$7,100for1giguntilAugustof2016whereasthenewringwillhavemorebandwidthat
acostof$6,000.Also,currently,additionalbandwidthisprovidedbyVaultusatacost
of$4,400.TheVaultuscontractismonthtomonth,soFiberNetwoulddropthisservice
whentheEnventiscircuitisestablished.
Basedonthesechanges,thecostforbandwidthduringtheremainingperiodoftheXO
agreementwouldincreaseby$1,600permonththroughAugust2016;however,the
bandwidthcapacitywouldalsogreatlyincrease.InAugust2016,theXOcontractwould
bediscontinueddroppingcostsby$7,100.ItshouldalsobenotedthatEnventisis
CityCouncilAgenda:6/08/15
2
providingafreemonthofserviceduetothelengthoftimeithastakenforthemtomake
thecircuitavailable.
A1.BudgetImpact:Therewillbeanincreaseof$1,600inthemonthlycostof
bandwidthduringtheremainderoftheagreementwithXO.Oncethecontract
withXOiscomplete,themonthlycostwilldropto$6,000permonth.The
increaseinbandwidthcapacitywouldbeginassoonasFiberNetbeginsusingthe
10gigring.
A2.StaffWorkloadImpact:Thereshouldnotbeanimpacttostaffworkloads.
B.ALTERNATIVEACTIONS:
1.Motiontoauthorize50/50costshare($6,000/monthpercity)withtheCityof
Windom,Minnesotaforpurchasingbandwidthtocompletefinalimplementation
of10GigRingarrangement
2.MotiontodenythecostsharingarrangementwiththeCityofWindom,Minnesota
forpurchasingbandwidth
C.STAFFRECOMMENDATION:
TheFiberNetAdvisoryBoardandstaffrecommendAlternative#1.
D.SUPPORTINGDATA:
Tableshowingabriefhistoryandprojectedcostofbandwidth
Nov 2014 Dec 2014 Jan 2015 Notes:The Vaultas invoice would also be reduced under the yondoo video
Monthly Pmt.$4,749.00 $4,400.00 $4,400.00 option- it would be reduced by $150.00 per month.
Aug 2013 Dec 2013 Oct 2014 May 2015 Notes:The price for XO was reduced once during an agreement renegotiation and then reduced again
Circuit 1 Pmt.$9,327.47 $4,991.26 $5,004.87 $5,230.12 when FiberNet began utilizing MICE in 2014. Incremental increases are due to increased
Circuit 2 Pmt.$7,596.22 $1,819.44 $2,256.59 $1,918.42 bandwidth usage.
Vendor
Jun 2015 Jul 2015 Aug 2015 Sep 2015 Oct 2015 Nov 2015 Dec 2015 Jan 2016 Feb 2016 Mar 2016 Apr 2016 May 2016 Jun 2016 Jul 2016 Aug 2016
XO (Comb.)
(1 Gig)$7,148.00 $7,148.00 $7,148.00 $7,148.00 $7,148.00 $7,148.00 $7,148.00 $7,148.00 $7,148.00 $7,148.00 $7,148.00 $7,148.00 $7,148.00 $0.00 $0.00
Vaultas $4,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Windom
(10 Gig)$0.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00 $6,000.00
Total $11,548.00 $13,148.00 $13,148.00 $13,148.00 $13,148.00 $13,148.00 $13,148.00 $13,148.00 $13,148.00 $13,148.00 $13,148.00 $13,148.00 $13,148.00 $6,000.00 $6,000.00
$1,600.00
$19,200.00
However, this includes significantly increased internet capacity to offset increased
internet traffic with the expectation that costs will decrease significantly after
the completion of the XO agreement in 2016.
XO Price/M = $7.00
Additional Per Month:
Additional for the Year:
For Final Year of the XO Agreement:
Windom Price/M = $1.20
$1,600.00 -$7,148.00
Vaultas History
-$349.00
XO History
CityCouncilAgenda:06/08/2015
1
2N.Considerationofauthorizingsendingaletterofinteresttoparticipateincooperative
costsavingventureswiththeCityofWindomrelatedtotelephoneswitching
equipment(JO)
A.REFERENCEANDBACKGROUND:
CityCouncilisaskedtoconsidersendingtheCityofWindomaletterofinterestin
supportofexploringopportunitiestosharecostsorpurchaseservicesfromWindom
relatingtotheoperationoftelephoneswitchingequipment.MonticelloandWindom
bothoperateMetaswitchequipmentandeachpartypayscostsforupgradesand
maintenanceseparately.Withthisletterofinterest,MonticellowouldsupportWindom’s
effortstoexploreopportunitiestojoinforcestodrivedowncostsforbothentities.This
letterisnotacommitmentbutasignalthatreviewingthispotentialisworthinvestigating.
Thelevelofsavingsisstilltobedetermined;however,itisclearthatsignificantsavings
couldbeaccruedbysharingequipmentandknowledge.Forinstance,oneofthelargest
annualexpendituresisamaintenancecontracttotaling$30,000thatsupportsoperationof
theMetaswitch.Theopportunitytocutthisexpenseinhalfisveryinviting.Also,
equipmenteventuallyreachesendoflifeandneedstobeupgraded.Currently,Monticello
isoperatingaSessionBorderControllerthatneedstobeupdatedsoon.Thecostofthis
upgradewillbeincludedinthe2016budgetandwillbeasignificantcostitem.Thisis
anotherexpensethatcouldbemitigatedthroughcostsharingorpurchaseofservicefrom
Windom.
A1.BudgetImpact:Nobudgetimpact
A2.StaffWorkloadImpact:Minoramountsofstafftimewillbeneededtodraftand
sendtheletterofinterest.
B.ALTERNATIVEACTIONS:
1.Motiontoauthorizesendingaletterofinteresttoparticipateincooperativecost
savingventureswiththeCityofWindomrelatedtotelephoneswitching
equipment
2.Motiontodenyauthorizationofsendingaletterofinterest
C.FIBERNETADVISORYBOARD/STAFFRECOMMENDATION:
TheFiberNetAdvisoryBoardrecommendsAlternative#1.Thisinitiativeisinkeeping
withoureffortstoreducecostsforeachcommunitythroughsharingequipmentand
redundantservices,thusdroppingoverallcostsforeachentity.Thepresenceofthe10gig
ringprovidesadirecthighspeedconnectionthatenablesaswitchtoresideinWindom
andoperateasthoughitwereintheMonticelloheadendfacility.
D.SUPPORTINGDATA:None
CityCouncilAgenda:6/08/15
1
4A.ConsiderationofadoptingResolution#2015-049acceptingbidsandawarding
contractfortheSchoolBoulevard/FallonAvenueand85th StreetImprovements,
CityProjectNo.14C003 (SB)
A.REFERENCEANDBACKGROUND:
OnApril13,2015,theCityCouncilapprovedfinalplansandspecificationsand
authorizedtheadvertisementofbidsforimprovementsSchoolBoulevard/FallonAvenue
and85thStreetimprovementproject,whichincludesstreetandpathwayimprovements.
Theprojectwasbidasfollows:
BaseBid:
•SchoolBoulevard:Includes2-inchfullwidthmillandoverlayfromFenningAvenue
toEdmonsonAvenue.Includesdrivewaywideningforthehighschoolexit.Includes
boulevardtreeplantinginselectareastoavoidtransmissionline,signsandstreetlight
constraints.
•SchoolBoulevardPathways:Includespathwayreconstructionalongthenorthsideof
SchoolBoulevardfromEdmonsonAvenuetoFallonAvenue.Includespathway
reconstructionalongthesouthsideofSchoolBoulevardfromFallonAvenueto
CardinalHillsPark.Arootbarrierwillbeinstalledtomitigatetheimpactofexisting
treerootsthathavedamagedthepathway.
•FallonAvenue/85th Street:IncludesabituminousoverlayalongFallonAvenueand85th
StreetadjacenttotheHuntersCrossingDevelopmentandincludesculvertreplacement.
Alsoincludesacombinationofa bituminousoverlayandreclamationandpaving along
85thStreetbetweenTH25andEdmonsonAvenuewithintheCitylimits.
•FallonAvenuepathwayextension:Includesextendingapathwayalongthewestsideof
FallonAvenuefrom87th AvenuetoFarmsteadAvenue.
Awetlanddelineationhasbeencompletedandtheprocessforpermittingforwetland
mitigationisinprocess.TheCitywillneedtopurchasewetlandcreditsforthe
mitigation.Afutureagendaitemwilladdressthis.Thisprocessshouldnotdelay
constructionofthepathway.
AlternateBids-PioneerParkPathway(FarmsteadDrivetoFallonAvenue):
•Alternate1:Includesreconstructionofthe920-footpathwaytoa10-footwidth.
•Alternate2:Includesabituminousoverlayofthe920-footpathwaytotheexisting8-
footwidth.Includessubgradecorrectioninselectareas.
CityCouncilAgenda:6/08/15
2
Bothalternativesincludeinstallinga40-footwideconcretesectionofthepathwaywhere
vehiclescrossthepathwayatthecurbcutfromSchoolBoulevardduringevents.A
concretesection,asopposedtoathickerbituminoussection,willprovidetheadded
strengthtoaccommodatetruckloadingsandwilldelineatetheareawherevehiclesand
truckscancross.
BidsfortheprojectwerereceivedandopenedonThursday,May28,2015.TheCity
received2bids,withKnifeRiverCorporationsubmittingthelowbidforthisprojectas
determinedbytheBaseBidplusAlternative1or2.Thefollowingtablesummarizesthe
bidresults.
Contractor TotalBaseBid
(SchoolBlvd/85th/Fallon)
TotalAlt.1
(Reconstruct
PioneerPark
Path)
TotalAlt.2
(Overlay
PioneerPark
Path)
TotalBaseBid
+
Alt.1
TotalBaseBid
+
Alt.2
KnifeRiverCorp $863,559.10 $32,246.00$28,816.00$895,805.10$892,375.10
Hardrives,Inc.$899,735.86 $34,095.44 $24,079.05$933,831.30$923,814.91
Engineer’s
Estimate $969,764.00 $38,440.00 $34,445.00$1,008,204.00$1,004,209.00
Asummaryandamoredetailedbreakdownofallthecontractorsbidforeachalternate
bidisenclosed.
ItisrecommendedtoawardtheAlternate1bidforthePioneerParkpathwayatthistime
basedonthefollowingreasons:conditionofthepathway,needforimprovement
comparedtootherpathwayneeds(seeenclosedpathwayconditionsmap),competitive
bidprice,minimalbidpricedifferencebetweenAlternate1and2resultinginincreased
pavementlifeandvaluewithAlternate1,completepathwayimprovementsinthisareaof
theCityatthistimeratherthanalaterdatetominimizedisruptiontothearea.
ConstructiononSchoolBoulevardwilloccurforaperiodbetweenJuly13andAugust
21,2015afterRiverfestandwhenschoolisnotinsession.ConstructiononFallon
Avenueand85th StreetistobecompletedbyAugust28,2015.
A1.BudgetImpact:Theestimatedprojectcostforconstructingtheimprovements
withtheBaseBidplusAlternate1is$1,100,000.Thisincludes22%forindirect
costs.Fundingsourcesfortheproposedimprovementsincludespecial
assessmentstotheschooldistrict,MunicipalStateAid,andafuturebondissueto
financetheproject.
Theestimatedassessmenttotheschooldistrictis$200,000whichincludestheir
frontageshareoftheSchoolBoulevardimprovementsandthecomplete
constructionofthehighschooldrivewayexpansion.
TheStateAideligibleamountfortheSchoolBoulevardimprovementsis
approximately$680,000.TheCityhaspassedareimbursementresolutionforthis
CityCouncilAgenda:6/08/15
3
project.Abondissueisplannedforlaterintheyear.Proceedsfromtheissuewill
beusedtorecoverreimbursablecosts.
Approximately$40,000wasincludedinthegeneralfundforpathway
maintenancethatcouldbeusedtofundthePioneerParkpathwayimprovements.
A2.StaffWorkloadImpact:Constructioninspectionoftheprojectwillbe
completedbyacombinationofCitystaff(ifanewhireisonboardandtrainedby
theprojectstartdate)andWSB.WSBwillbecompletingtheconstruction
stakingandconstructionadministrationservices.
B.ALTERNATIVEACTIONS:
1.MotiontoadoptResolution#2015-049acceptingthebidsandawardingthe
contracttothelowestresponsiblebidder,KnifeRiver,Corp.intheamountof
$895,805.10fortheBaseBid-SchoolBoulevard/FallonAvenueand85th Street
ImprovementsplusAlternate1(reconstructPioneerParkpathway)CityProject
No.14C003
2.MotiontoadoptResolution#2015-049acceptingthebidsandawardingthe
contracttothelowestresponsiblebidder,KnifeRiver,Corp.intheamountof
$892,375.10fortheBaseBid-SchoolBoulevard/FallonAvenueand85th Street
ImprovementsplusAlternate2(overlayPioneerParkpathway)CityProjectNo.
14C003
3.MotiontoadoptResolution#2015-049acceptingthebidsandawardingthe
contracttothelowestresponsiblebidder,KnifeRiver,Corp.intheamountof
$863,559.10fortheBaseBid-SchoolBoulevard/FallonAvenueand85th Street
ImprovementsCityProjectNo.14C003
C.STAFFRECOMMENDATION:
CitystaffrecommendsapprovingAlternative#1.
D.SUPPORTINGDATA:
Resolution#2015-049
LetterofRecommendation
BidSummary&Tabulation
PathwayConditionsMap
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2015-049
ACCEPTING BIDS AND AWARDING CONTRACT FOR THE SCHOOL
BOULEVARD/FALLON AVENUE AND 85TH STREET IMPROVEMENTS,
CITY PROJECT NO. 14C003
WHEREAS, pursuant to an advertisement for bids for the project which included a base bid and
two alternate bids. The base bid consisting of street, pathway and other necessary appurtenant
work to segments of School Boulevard, 85th Street and Fallon Avenue. The alternate bids
consisting of: (1) reconstruction of Pioneer Park pathway, and (2) mill and overlay with
subgrade correction of Pioneer Park pathway. Bids were received, opened, and tabulated, and
the following bids were found to comply with the advertisement for bids:
Contractor Total Base Bid
(School Blvd/85th/Fallon)
Total Alt. 1
(Reconstruct
Pioneer Park
Path)
Total Alt. 2
(Overlay
Pioneer Park
Path)
Total Base Bid
+
Alt. 1
Total Base Bid
+
Alt. 2
Knife River Corp $863,559.10 $32,246.00 $28,816.00 $895,805.10 $892,375.10
Hardrives, Inc. $899,735.86 $34,095.44 $24,079.05 $933,831.30 $923,814.91
Engineer’s
Estimate $969,764.00 $38,440.00 $34,445.00 $1,008,204.00 $1,004,209.00
WHEREAS, the bid of Knife River Corporation of Sauk Rapids, MN in the amount of
$895,805.10 for the total base bid plus alternate bid 1 for the construction of said improvements,
in accordance with the approved plans and specifications and advertisement for bids, is the
lowest responsible bidder and shall be and hereby is accepted.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF THE
CITY OF MONTICELLO:
1. The Mayor and City Administrator are hereby authorized and directed to enter into a
contract with said bidder for the construction of said improvements for and on behalf of
the City of Monticello.
2. The City Administrator is hereby authorized and directed to return forthwith to all
bidders the deposits made with their bids, except that the deposit of the successful bidder
and the next lowest bidder shall be retained until a contract has been executed.
CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2015-049
ADOPTED BY the Monticello City Council this 8th day of June, 2015.
CITY OF MONTICELLO
____________________________________
ATTEST: Brian Stumpf, Mayor
_______________________________
Jeff O’Neill, City Administrator
engineering planning environmental construction 701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
Equal Opportunity Employer
wsbeng.com
K:\01494-960\Admin\Construction Admin\1494-96&97 CST LTR RECMMDTN-hmcc-060215.docx
June 2, 2015
Honorable Mayor and City Council
City of Monticello
505 Walnut Street, Suite 1
Monticello, MN 55362
Re: School Boulevard/Fallon Avenue and
85th Street Improvements
City of Monticello Project No. 14C003
S.A.P. 222-105-002
WSB Projects No. 1494-96 and 1494-97
Dear Mayor and Council Members:
Bids were received for the above-referenced project on Thursday, May 28, 2015, and were opened
and read aloud. Two bids were received. The bids were checked for mathematical accuracy and
tabulated. It should be noted that the project was bid with a Base Bid and two alternates, Pioneer
Park Pathway Reconstruct (Alternate 1) and Pioneer Park Pathway Overlay (Alternate 2). The
recommended basis of award is the Pioneer Trail Reconstruct (Base Bid plus Alternate 1). Please
find enclosed the bid tabulation indicating the low bidder as Knife River Corporation – North
Central, Sauk Rapids, Minnesota, with a total bid in the amount of $895,805.10 (Base Bid plus
Alternate 1). The Engineer’s Estimate for the project was $1,008,204.00.
We recommend that the City Council consider these bids and award a contract for the Base Bid plus
Alternate 1 in the amount of $895,805.10 to Knife River Corporation – North Central based on the
results of the bids received.
Sincerely,
WSB & Associates, Inc.
Shibani K. Bisson, PE
Project Manager
Enclosures
cc: Jeff O’Neill, City of Monticello
Eric Eckman, WSB & Associates, Inc.
Honorable Mayor and City Council
June 2, 2015
Page 2
K:\01494-960\Admin\Construction Admin\1494-96&97 CST LTR RECMMDTN-hmcc-060215.docx
Mark Magnuson, Knife River Corporation
srb
!"b$
!"b$
State Highway 25 S
River F orest D r N e
C o u n t y R o a d 3 9 N e
F
e
n
n
i
n
g
A
v
e
N
e
G o l f C o u r s e R d
Matthew Cir
Alpine
Dr
Willow St
8 7 t h S t N e
Linn St
C o u n t y Roa d 39 N e
6 1 /2 S t
Chestnut St
8 3r d S t N e
G o l d e n E agle
L
n
99th S t N e
Gold
e
n
P
on d L nP
e
l
i
c
a
n
L
n
B
i
s
o
n
Ave
S
t
o
n
e
r
i
d
g
e
Dr
Elk
A
v
e
F
o
x
S
t
ParkPlac e D r
Mou n t C urveB l v d
Spirit
Hills
Rd
Gate w a t e r D r
Oakridg e D r
89thStNe
Eas
t
w
o
odLn
N
e
Vine St
C
o
u
n
try
A
v
e
Coun
t
r
y
L
n
Otter
c
r
e
ek
R
d
M
a
r
v
i
n
E
l
w
o
o
d
R
d
OrchardCir
Gateway C i r
T
r
o
y
M
a
r
q
u
e
t
t
e
D
r
R e dford L n
Fi
e
l
d
c
r
e
stCir
8 6 t h S t N e
WashingtonSt
E
i
d
e
r
L
n
B akken S t
9 3 r d S t Ne
Oak Ln
G o o drich
D
r
J a s o n Ave Ne
Orc
h
a
rdCi
r
E
ChelseaRdW
4thStE
M e a d o w O a k A v e N e
O r i o l e L n
Minnesota St
8 7 t h S t N e
F a r m s t e a d D r
D e e r S t
R i v e r R i d g e L n N e
O a k l e a f C t
P r a iri e R d
Harvest Ct
Mill Tr ai l Ln N e
D i a m o n d D r
3rd St E
P a r k D r
Prescott Dr
Summ
i
t
C
t
B a d g e r S t
Walnut St
Hart Blvd
7 t h S t W
Apple Ln
MinnesotaSt
Sandberg
R
d
5thStW
Cedar St
Meado
w
O
a
k
D
r
E Broadway St
River St E
W Broadway St
Vine St
3rd St W
Walnut St S
Linn St
Front St
River St W
4th St W
5th St W
Locust St
S c h o o l B l v d
C h e l s e a R d
Palm St
Hennepin St
Elm St
Ramsey St
Wright St
Maple St
New St
Palm St
Elm St
Du
n
d
a
s
C
i
r
6th St W
LocustSt
Overlook
Ln
D u n d a s R d
Brentwood Dr
I n n s b r o o k D r
GinghamCt
7 t h S t E
T e rritorial
R
d
G
i
l
l
a
r
d
A
v
e
N
e
V
ineLn
OakviewCt
CraigLn
KennethLn
T
r
oy
Marquette L n
S a v a n n a h A v e
B
e
a
r
A
v
e
C o b b l e s t o n eCt
SomersetLn
Oakwood Dr E
M e a d o w OakLn
N
e
8 5 t h S t N e
P e b b l e b r o o k D r
EbersoleA
v
e
S t a r l i n g D r
K amp
a
Cir
B r i a r O a k e s B lvd
Elm St
G
o
odrichDrNe
PrairiePineCt
M a l l a r d L n
G
r
a
y
s
t
o
n
e
A
v
e
9 0 t h S t N e
E
a
g
l
e
C
t
H o m e s t e ad Dr
Oak
Ri
d
g
e
C
i
r
Dalton
W
ay
97th St Ne
Je r r y L i e f e r t D r
OrchardLn
St o nerid g e L
n
Oakwood
Dr
G
arveyCt
Kevin Longley Dr
Ri v e r v i e w D r N e
85th S t N e
S
u
mm i t P o i nteR
d M e a d o w L n N e
D
a
r
lin
gto
n
A
v
e
N
e
Giff
o
r
t
A
v
e
N
e
CedarSt
D
alton
Ct
G
iff o r t C t
E
i
s
e
l
e
A
v
e
N
e
DaltonAve N e
H il l to p D r
Private Dr
Fa i r w a y D r
8 4 t h St Ne
Pine St
State Highway 25 Ne
E
a
s
t
w
oodC i r N e
Red O ak Ln N e
Ha y w a r d C t S
MarvinElwoodRd
H ay w a r d Ct N
Sandy Ln
M
o
c
k
i
n
g
b
i
r
d
LnFallonDr
8 8 t h St N e
C r o c usLn
E a g l e R i d g e Ln
E
d
m
o
n
s
o
n
A
v
e
N
e
PrairieCreekLn
R e d R ock
L
n
Farmstead Ave
D
a
lt
o
n
A
v
e
N
e
River St W
River Mill Dr N e
R i v er S t W
8 7 t h S t N e
Cl u b V i e w D r
Woo d s i d e D r
O a k v i e w L n
Da
v
e
rn
A
v
e
Ne
Darrow Ave Ne
Hig hland Way
9 4 t h S t Ne
Wi
l
d
w
ood W ay
H
art Blvd
Oa
k
r
i
d
g
e
D
r
N
W es ton
Dr
M a r t i n D r
Fairhill
L
n
M
a
r
v
i
n
R
d
HedmanLn
Spru
c
e D r
Fallo
n
A
v
e
N
e
T h o m a s P a r k D r
E a s t O a k D r
F a l c o n A v e
DeeganAve
Hillcr e s t R d
Gilbert
Ave
N
e
9 5 t h S t N e
WbI94ToPineStP
ine S t T o Eb I94
D alton A v e N e
I n t e r s t a t e 9 4
110 th St Ne
EbI94ToFenning
A
v
e
Ne
Eak e r nCi
r
Ne
Fenning A v eNe
T
o
WbI94
E Broadway St
P i n e S t T o E b I 9 4
C
h
a
m
b
e
r
l
a
i
n
A
v
e
N
e
EbI94ToPineSt
Mill R u n Rd
Mississippi Dr Ne
P i n e S t T o W b I94
F e n ning Ave Ne To E b I 9 4
ChelseaRd
W
b
I
94
ToFenning Ave N e
8 5 t h S t N e
Interstate 94
MISSISSIPPI
RIVER
SE39P
SE54P
NW06P
S E 4 0 P
S E 3 1 P
NE05P
NW05
SE12P
SE09P
SW10P
SW15P
N
E
0
2
P
S
W
0
8
P
SE37P
SE06P
SW08P
N E 1 3 P
S
E
4
4
P
S E 3 3 P
NW07P
S
E
2
2
P
NW08P
SE
4
5
P
NE 11P
NE10P
SE36P
NW09
SW07P
SW14P
S
E
3
2
P
SE2
1
P
NW03P
NE01P
S
E
4
2
P
NW04P
SE15P
NW06P
S
E
4
8
P
SE07P
SE43P
S E 5 6 P S E 4 3 P
SE26P
SE25P
S W 0 5 P
NE07P
SE55P
SE16P
SE29P
S E 1 3 P
SE09P
NE01P
NE06P
SE47P
S
E2
8
P
SE11P
SE51P
SW03P
S
E
5
3
P
SE01P
SE12P
SE17P S E 2 0 P
S E0 5 P
S
W
08P
S E1 4 P
SE10P
SE49P
SE03P
S W 0 4 P
SE4 1 P
NW02P
SW13P
SE27P
S
E
3
8
P
SE02P
S
W
1
1
P
NE01P
NE
12P
SE50P
NE 13P
SW01P
NE14P
SW 1 4 P
NE02P
SE34P
SW12P
S E 3 5 P
SE04P
SE30P
SW06P
SE08P
SE18P
NE09P
SE46P
SW
02P
NE08P
SW10P
NE04P
SE24P
NW01P
City ofMONTICELLO2013 Pathway Conditions Map !
0 1,200 2,400
Feet
Legend
NO RATING
Pathway Inspection Rating
0 - 4: POOR
5 - 7: FAIR
8 - 10: GOOD
J:\gis\city\MONT\Maps\Pathway Map.mxd Date: 4/9/2015
CityCouncilAgenda:6/08/2015
1
4B.ConsiderationofapprovingtheinitialpurchaseanddeploymentofCalix
GigaCentersforFiberNetMonticelloresidentialcustomers(JO/RL)
A.REFERENCEANDBACKGROUND:
CityCouncilisaskedtoconsiderapprovingtheinitialpurchaseandimplementation
strategyofCalixGigaCentersservingFiberNetMonticelloresidentialcustomers.
Currently,FiberNetrequires3piecesofequipmenttoprovideresidentialservice:An
ONT,acyberpower,andarouter(forinternetcustomers).Asacost-savingmeasure
FiberNetre-usesequipmentfromdisconnectedsubscribersatnewproperties;however,
thecurrentstockofONTsisdepletedandtheolderequipmentneedstobereplacedover
time.FiberNetwillneedtopurchasenewONTsin2015.
StaffhasexaminedtheoptionsforpurchasingnewONTsandrecommendspurchasinga
newCalixproductcalledaGigaCenter.FiberNetalreadyusesCalixONTs,but
GigaCentersarelessexpensive,requirefewerpiecesofindividualequipment,and
provideanenhancedexperienceforsubscribers.Inaddition,staffhaspreparedalong-
termstrategyforrecoveringthecostoftheGigaCenters,somethingthathasnot
previouslybeenusedforONTpurchases.
Initially,theGigaCentersarelessexpensivetopurchase.CurrentlyFiberNetpays
approximately$488.00totalfortheONT,cyberpower,androuter.Ifthecustomer
provideshisorherownrouter,thetotalis$398.00.Incontrastthecostforthe
GigaCenteris$320.00andnoadditionalequipmentisneeded.TheGigaCentershave
greatlyimprovedwirelesscapabilityintermsofrangeandspeedwithouttheneedforan
additionalrouter.ThismeansneitherFiberNetnorthesubscriberneedstosupplyoneand
FiberNetwillbeabletotroubleshootmoreefficientlywithfewerpiecesofequipment,
particularly3rd partyequipment.
GigaCentersalsoofferanenhancedexperienceforsubscribersaswellasbenefitsto
FiberNet’sstaffandbudget.
ForSubscribers
•Muchstrongerwirelesssignalthroughoutthewholehouseandproperty
•Capacitytosupportmoredevicesatpeakperformance
•Capabilityforhighersymmetricalspeeds(uptoagigonwireless)Current
limitis100mbps.
•EnablesFNMabilitytoprovide1gigspeeds.
ForFiberNet
•TakesadvantageofthenewE7platform
•Moreefficienttroubleshooting
•Fewertruckrollsmeansmoneysavedontechsupport
•Lesswiringduringinstallsmeanstimeandmaterialsmoneysaved
•Potentialtoaddfeatureslikewirelessset-topboxes
•DeploymentoftheGigaCenterplaystoFiberNet’sstrength:Internetservice.
Theenhancedcustomerexperienceandcapacityforhighendperformance
makesitthepremierinternetserviceinMonticello.
CityCouncilAgenda:6/08/2015
2
Basedonthelowercost,needforlessequipment,andenhancedcustomerexperience,
staffrequeststoimplementtheuseofGigaCentersinMonticellousingthefollowing
strategy:
a)FundstopurchasetobederivedfromcapitalequipmentportionoftheFiberNet
budgetunderacostrecoveryprogram.
b)AllnewsubscribersareinstalledwithaGigaCenter(approximately20-25per
month).
•AllnewsubscribershaveaGigaCenterGatewayfeeof$15.99ontheir
account.Thishelpscoverthecostoftheequipmentandalsoentitlesthe
customertofreeservicecallsontheFiberNetequipment.
•AllnewsubscriberssignaninstallationformagreeingtopayanEarly
TerminationFeeiftheycancelservicewithin2years.ThecostoftheETFis
15.99xnumberofmonthsremaininginthe2yearterm.Thisisjustafee-itis
notaresidentialcontract.
c)ExistingsubscriberswouldreceiveaGigaCenteruponrequest.
•IftheyoptfortheGigaCenterforabetterexperience,theywouldagreetothe
sametermsasnewsubscribers:theGigaCenterGatewayFeeandtheEarly
TerminationFee.Or,thecustomercouldpurchasetheGigaCenterout-right
for$320.
d)ExistingsubscriberswithONTsthatfailwouldhaveachoice.
•TheycouldhavetheiroldONTreplacedwithausedONTfornoadditional
cost.
•TheycouldhaveanewGigaCenterinstalledwiththesamefeesasanew
subscriber.
Basedonthisplan,fundsfromthebudgetwouldbeusedforaninitialcapitalexpenditure
onthenewequipment.However,thecostoftheGigaCenterswouldberecoveredwithin
2yearswiththegatewayfeeorthroughtheearlyterminationfee.After2years,the
gatewayfeebecomesrevenue.Mostimportantly,FiberNet’sinternetsubscribersget
accesstohighqualityequipmentwithagreatuserexperience.
FormoreinformationontheGigaCenteranditsperformance,visittheCalixwebsite.
Oncethere,checkoutthevideolibraryforafirsthanddescriptionofperformanceina
residentialsetting.Thisvideodemonstratesthecompactsize,rangeandpowerofthe
GigaCenterinaresidentialsetting.http://www.calix.com/gigacenter/
Currently,therearesomecustomersthatneedtobuyathirdpartyrouterinordertoboost
signalstothefarreachesoftheirproperty.TheGigaCenterrangeandpowerwill
eliminatetheneedforacustomertospendmoneyonanddeployathirdpartyrouter.
A1.BudgetImpact:Staffrequeststouseapproximately$8,750ofthe2015budgeted
capitalexpensestopayforthefirst25GigaCenters.Staffrecommendsinstituting
twonewsubscriberfeestooffsetthecostofpurchasingtheequipment.Thefirst
isaGigaCenterGatewayFeewhichissimilartothecurrentrouterrentalfeeand
thesecondisanearlyterminationfee.Thiswillensurethecostoftheequipment
CityCouncilAgenda:6/08/2015
3
isrecoveredwithin2years.Insomerespects,CapitalFundsarebeingusedtoset
uparevolvingfundthatshouldreplenishitselfovertime.
Pleasenote,iftheuseofGigaCentersissuccessful,FiberNetwillneedto
continuetopurchaseenoughequipmenttocovernewinstalls.Aswiththecurrent
system,FiberNetwouldrecycleanydisconnectedGigaCentersatnewresidences.
However,enoughequipmentisneedtocovertheprojected25newinstallsper
month.TheGigaCenterswouldbepurchasedonanas-neededbasisasstaff,the
FiberNetAdvisoryBoard,andCityCouncilmonitorhowthecontinuedpurchase
ofequipmentimpactsthe2015budgetandincludethecostofGigaCentersinthe
2016budget.Useofthisequipmentwillhaveashort-termeffectonthebudget
sincethefundstocovertheinitialcostsarerecoveredovera2yearperiod.The
totalfundsneededforpurchaseofGigaCentersin2015willbedependenton
demand.
A2.StaffWorkloadImpact:Therewillbeaninitialshort-termincreasein
workloads,particularlyforinstallationtechnicians,asstafflearnstoimplement
thenewequipment.Overtime,theGigaCentersshouldmakestaffmoreefficient
withfewpiecesofequipmenttoinstallandimprovedtroubleshooting
capabilities.
B.ALTERNATIVEACTIONS:
1.MotiontoapprovetheinitialpurchaseandimplementationstrategyofCalix
GigaCentersforFiberNetMonticello.
2.MotiontoapprovetheinitialpurchaseandimplementationstrategyoftheCalix
GigaCenterswithchangesasdirectedbytheCityCouncil:
3.Motiontodenyapprovaloftheinitialpurchaseandimplementationstrategyof
CalixGigaCentersforFiberNetMonticello.
C.STAFFRECOMMENDATION:
DavidRusselfromCalixprovidedinformationontheGigaCentertotheFiberAdvisory
BoardandtheFiberAdvisoryBoarddiscussedoptionsfordeployingthedevice.The
FiberAdvisoryBoardvotedunanimouslytorecommenddeploymentoftheGigaCenter
asnotedunderAlternative#1basedonthelowercost,needforlessequipment,and
enhancedcustomerexperience.Staffconcurswiththisrecommendation.
D.SUPPORTINGDATA:
http://www.calix.com/gigacenter/
FiberNetAdvisoryBoardHandout
Calix GigaCenters
Currently, FiberNet requires several pieces of equipment to provide residential service:
A. ONT
B. Cyber Power
C. Router (internet customers)
As a cost-saving measure FiberNet re-uses equipment from disconnected subscribers at new
properties; however, the current stock of ONTs is depleted and the older equipment is beginning
to fail. FiberNet will need to purchase new ONTs in 2015.
Staff has examined the options for purchasing new ONTs and recommends purchasing a new
Calix product called a GigaCenter. FiberNet already uses Calix ONTs, but GigaCenters are less
expensive, require fewer pieces of equipment, and provide an enhanced experience for
subscribers. In addition, staff has prepared a long-term strategy for recovering the cost of the
GigaCenters, something that has not previously been used for ONT purchases.
Cost
ONT $350.00 GigaCenter $320.00
Cyber Power $48.00
Router $90.00
Total $488.00 Total $320.00
GigaCenters cost less than traditional ONTs. Staff requests to use money budgeted for capital
expenses in 2015 to pay for the GigaCenters. These funds would be used to purchase ONTs
regardless of whether the new or old model of ONT is approved.
Staff also recommends instituting two new subscriber fees. The first is a GigaCenter Gateway
Fee which is similar to the current router rental fee and the second is an early termination fee;
both would offset the cost of purchasing the equipment.
Equipment
The GigaCenters are more efficient because they combine previously separate pieces of
equipment into a single item. This is less expensive for FiberNet to provide and requires that
customers have fewer pieces of equipment in their homes.
Also, since GigaCenters are installed inside the homes, this equipment is not exposed to the
weather conditions like traditional ONTs. This should help extend the life of the equipment.
Features
GigaCenters offer an enhanced experience for subscribers as well as benefits to FiberNet’s staff
and budget.
For Residential Subscribers
Stronger wireless signal throughout the whole house
Capability for more devices at peak performance
Capability for higher symmetrical speeds (up to a gig on wireless)
For FiberNet
Takes advantage of the new E7 platform
More efficient troubleshooting
Fewer truck rolls means money saved on tech support
Less wiring during installs means time and materials money saved
Potential to add features like wireless set-top boxes
Deployment
Based on the lower cost, need for less equipment, and enhanced customer experience, the
FiberNet Advisory Board is asked to consider recommending the following GigaCenter
deployment plan to the Monticello City Council.
1. Funds are allocated from the capital equipment portion of the FiberNet budget to
purchase GigaCenters.
2. All new subscribers are installed with a GigaCenter (approximately 20-25 per month).
a. All new subscribers have a GigaCenter Gateway fee of $15.99 on their account.
This helps cover the cost of the equipment and also entitles the customer to free
service calls on the FiberNet equipment.
b. All new subscribers sign an installation form agreeing to pay an Early
Termination Fee if they cancel service within 2 years. The cost of the ETF is
15.99 x number of months remaining in the 2 year term. This is just a fee- it is not
a residential contract.
3. Existing subscribers would receive a GigaCenter if they request it.
a. They could retain their current equipment with no change to their bills.
b. If they opt for the GigaCenter for a better experience, they would agree to the
same terms as new subscribers: the GigaCenter Gateway Fee and the Early
Termination Fee.
4. Existing subscribers with ONTs that fail would have a choice.
a. They could have their old ONT replaced with a used ONT for no additional cost.
b. They could have a new GigaCenter installed with the same fees as a new
subscriber.
Based on this plan, money from the budget would be used for an initial capital expenditure on
the new equipment. However, the cost of the GigaCenters would be recovered within 2 years
with the gateway fee or through the early termination fee. After 2 years, the gateway fee
becomes revenue.
Please note, if the use of GigaCenters is successful, FiberNet will need to continue to purchase
enough equipment to cover new installs. As with the current system, FiberNet would recycle any
disconnected GigaCenters at new residences. However, staff and the advisory board will need to
continue to monitor how the continued purchase of equipment impacts the 2015 budget and
include the cost of GigaCenters in the 2016 budget. Use of this equipment will have a short-term
effect on the budget since the funds to cover the initial costs are recovered over a 2 year period.
CityCouncilAgenda:6/08/2015
1
4C.ConsiderationofapprovingtheconceptofFiberNetMonticellocontractingwith
Yondooforhostedvideoservices(RL/BR/JO)
A.REFERENCEANDBACKGROUND:
CityCouncilisaskedtoconsiderapprovingtheconceptofFiberNetMonticello
contractingwithYondooforhostedvideoservices.IfsodirectedbytheCityCouncil,
staffwillnegotiateafinalagreementwithYondoothatwouldbebroughtforwardtoCity
Councilforapprovalatalaterdate.
FiberNet’sfeasibilityreportproposedatripleplayproviderofferingtelephone,internet,
andvideoservices.Atthattime,thebestoptionforvideoservicewasatraditional
businessmodel;FiberNetpurchasestheequipmenttoprovidetheservice,independently
holdsprogrammingagreementswiththenetworks,upgradesandmaintainsitsown
equipment,andcoversthecostswithrevenuefromtheservice.
However,overtimeFiberNet’srelianceonthismodelhasbecomeanobstacletoits
financialindependence.Videoisbyfarthemostexpensivetripleplayservicetoprovide,
requiresfrequentupgradestoequipmenttoremainviable,andismostaffectedbythe
competitiveenvironmentofMonticello.Inaddition,therearerecurringfixedcosts
associatedwithdeliveringvideothatfortheforeseeablefuturesurpasstherevenue
potentialforthesysteminthishighlycompetitivemarket.
Atthesametimehowever,theavailabilityofvideo(tripleplay)remainsanimportant
serviceformanycustomersandakeyfacetofthesystemfromamarketability
standpoint.Infact,accordingtoFNMstaff,akeyfactoraffectingsubscriberratesisthe
costandqualityofthevideoservice.
Itisnolongerfeasibletocontinueoperatingatthestatusquo.ThusFiberNetneedsto
findawaytocontinueprovidingtripleplayserviceswhiledecreasingthelossonvideo.
Thereisarelativelyrecent,less-traditionalmodelusingathirdpartyhostedprovider
calledYondoothatcouldofferFiberNetawaytoretainahighqualityvideoservicefor
subscribers,thusallowingFiberNettoshedsignificantfixedcosts.Theirwebsitecanbe
viewedat:http://www.yondoo.tv/
YondooisasubsidiaryofCSIDigital,acurrentvideovendorforFiberNet.Theelements
oftheYondoobusinessmodelhaveexistedasseparatepartsformanyyears,butthey
recentlyintegratedthemintoacompletehostedvideomodel.InthismodelFiberNet
connectstoYondoo’ssuperheadendbyanexistingfiberfeed.FiberNetcontinuesto
install,bill,andprovidetechsupportforvideosubscribers;however,Yondoois
responsibleforthecontent,hardware,licensing,andsoftware.Theyspreadthosecosts
outamongtheirvariousclientnetworkswhichallowsFiberNettocontinueofferingthe
serviceoveritsnetworkatasignificantlyreducedcost.EachmonthYondoowouldbill
FiberNetforthenumberofsubscribersandtheirvideopackages.Inreturnforaccessto
thenetwork,YondoowouldalsopayFiberNet$3.00persubscriberinthetop2service
packages($23,000/yearatcurrentcustomercount).
ThereareseveralessentialoutcomesofanagreementwithYondoothatwouldhavea
positiveimpactonFiberNet.Mostsignificantly,theagreementwithYondoowould
reducethecostofprovidingvideoservice.ByutilizingYondoo,currentcostsforvideo
CityCouncilAgenda:6/08/2015
2
wouldbeeliminated.FiberNetwouldnolongerberesponsibleformonthlyprogramming
costs,softwareandsupport,orequipmentupgradesandmaintenance.Insteaditwouldbe
billedmonthlybyYondoopersubscriber,andthesemonthlyfeeswouldbecoveredby
thesubscribers’monthlypaymentsforvideoservice.Thishasthepotentialtoeliminate
themonthlylossfromprovidingvideo.Inaddition,FiberNetwouldseeareductionin
budgetaryitemsliketheenergybill.ByusingtheYondooheadend,FiberNetcould
removeequipmentfromtheheadendinMonticellowhichreducesenergyconsumption.
Thereisalsothepossibilityforareturnontheresaleoftheremovedequipment.
EnteringtheagreementwithYondoowouldalsoenhancethevideoserviceofferedto
FiberNetsubscribers.Currently,thegreatestobstaclestogainingandretainingvideo
subscribersareagingequipmentandalackoffeatures.Yondooiscompatiblewith
FiberNet’scurrentequipment,buttheywillalsoprovideupdatedset-topboxesandDVRs
whichallowFiberNetsubscriberstohaveanupdateduserinterface,extendedtimelinefor
thechannelguide,andadditionalDVRstorage.Theupdatedequipmentwillberolledout
tocurrentsubscribersovertimeandgiventoallnewsubscribersatinstall.Inadditionto
theequipment,Yondooprovidesthefeaturesmostfrequentlyrequestedbysubscribers
includingVideoonDemand,TVEverywhere,andWholeHomeDVR.These
enhancementswillmakeFiberNetmorecompetitiveinthemarketwithouthavingto
expendagreatdealofcapitaltoupdateitsexistingequipment.Lastly,theproposed
introductionoftheGigaCenteralongwithYondooenablesthepotentialofextending
Yondoototelevisionsinthehomewirelesslythusreducinginstallationtimeand
improvingflexibilityforcustomertomoveoraddtelevisionswithinthehome.
Finally,theagreementwithYondoowouldreduceFiberNet’srelianceonahighnumber
ofsubscriberstocoverthenetwork,equipment,andmaintenancecosts.Thepastfive
yearshaveshownthatwithoutconsistent,considerablereinvestmentinthesystem,the
necessarynumberofsubscriberstofundvideoisnotplausible.UsingYondooreduces
FiberNet’sindividualrelianceonthenumberofsubscriberstomakevideoprofitable.
FiberNetpaysforthesubscriberswehave;Yondoointurntakestheresponsibilityfor
highsubscribercountsandspreadsthemoutamongseveralclientnetworks.
TheinitialtermfortheagreementwithYondooisaminimumof3years;thisisin
responsetoprogrammingrightswhichoperatein3yearcycles.However,Yondoois
willingtonegotiatethetermsofthecapitalstartupcostsestimatedat$65,000ifFiberNet
agreestoa5yearterm.Iftheconceptforhostedvideoserviceisapprovedbythecity
council,staffwillnegotiatewithYondooandbringthefinalizedagreementbacktothe
councilforapproval.
Itisalsoimportanttonotethattherearepotentialchallengestotheagreementwith
Yondoo.InordertocoverthecostsofitsmonthlypaymenttoYondoo,FiberNetmust
ensurecustomersarebilledatYondoo’sprices.Thismeanshigherpackagepricesand
lowerequipmentcosts;somesubscriberbillswilldecreaseandsomewillincrease
dependingonthespecificelementsofthesubscriber’sbill.Thisalsomeansmostexisting
promotionsanddiscountswillbeeliminatedinfavorofYondoo’spricingstructure.It
willbechallengingtoamendallsubscribers’billstoaccurateYondoopricing,butitis
theonlywayFiberNetwillensurerevenuetocoveritsowncoststoYondoo.Finally,
FiberNetwillneedtoimplementanyfuturechangestoYondoo’spricing.Iftheirrates
increasein2016,FiberNetwouldfollowwithanincreasetovideosubscribers.
CityCouncilAgenda:6/08/2015
3
Duetothechangesincustomerbills,thereisthepotentialforashort-termlossofvideo
subscribers.Staffanticipatesarecoveryofsubscriberratesovertimeduetothepremier
productoffering,butthereisnowaytoguaranteethat.Thiscouldmakeitchallengingto
reachthe1,000videosubscriberthresholdwithinthefirst18months.Itshouldbenoted
thatthequalityoftheproductwillenableFNMtocompeteforservicetoapartments
whichincreasesthelikelihoodofachievingthe1,000threshold.Lastly,thepresenceof
enhancedvideoofferingisanothertoolfortheBusinessManagerinmarketingFiberNet
services.
Lastly,sincethecurrentequipmentprovidingvideoservicetodayisdatedandneeding
replacementsoon,andbecausethecostofreplacingtheequipmentissohigh,itisnot
likelythatFNMwillgobacktoprovidingvideoserviceonanindependentbasisiffor
somereasontheYondooprogramdoesnotworkout.
Overall,theYondoohostedvideooptionallowsFiberNettosignificantlyreducethecosts
ofprovidingvideowhileenhancingtheserviceofferedtotheMonticellocommunity.The
transitionwouldbeachallenge,andtherewouldlikelybeaninitialdeclineinvideo
subscribers,butthereisastronglikelihoodthehostedoptionwouldmakeFiberNet
strongeroverthelong-term.
A1.BudgetImpact:SwitchingtoYondoowillresultinareductionofapproximately
$102,554inreoccurringnetworkfeesassociatedwithdeliveringvideocontent
underthecurrentplatform.SeeattachedFiberAdvisoryBoardhandoutfordetail.
Thereisthepotentialforapproximately$65,000incapitalstartupcosts,but
Yondoohasexpressedwillingnesstonegotiatethosecosts.Duringagreement
negotiationsFiberNetcouldagreetoattempttoreach1,000subscribersinthefirst
18monthsinordertohavethefeeswaivedordeferthepaymentuntilafterthe
first18monthswhenthecostcouldbebudgeted.Yondoohasalsoexpressed
willingnessinanoptiontoletFiberNetwaivetheIRUpaymentof$3.00per
customerinthetop2packagesuntilthesystemreaches1,000videosubscribersin
Monticello.
Inaddition,thereisapossibleshorttermcostofapproximately$2,000to
integrateelementsofYondoowithFiberNet’sbillingsystem,SourceOne
Solutions.
Howevertherearepotentiallypositivelong-termbudgetimpacts.Withthe
Yondooagreementthecurrentcostsforvideoareeliminated.Yondoowillassist
FiberNetwithexitingcurrentagreementswithproviders,andtheonlyremaining
costwillbetheYondoofeeforeachvideosubscriber.Thosefeeswillbecovered
bytherevenuefromthesubscribers.ThiswillreduceFiberNet’sannualbudget
shortfall.
A2.StaffWorkloadImpact:Therewillbeatemporarystaffworkloadincrease
duringthetransitionwithsupportfromYondoostaff.Oncethesystemisinplace,
itisanticipatedthatworkloadswillreturntonormalwithonlyaslightlong-term
increaseofworkintheofficeforrecordkeepingandbillingaccuracy.
CityCouncilAgenda:6/08/2015
4
B.ALTERNATIVEACTIONS:
1.MotiontoapprovetheconceptofFiberNetMonticellocontractingwithYondoo
forhostedvideoservices
2.MotiontodenyapprovaloftheconceptofFiberNetMonticellocontractingwith
Yondooforhostedvideoservices
C.FIBERNETADVISORYBOARD/STAFFRECOMMENDATION:
TheFiberNetAdvisoryBoardandstaffsupportAlternative#1.Althoughvideoservice
demandisdiminishingnationwideandinternetserviceisincreasingasameansfor
obtainingvideocontent,videoserviceremainsanimportantelementofamarketable
serviceinMonticello.UtilizingservicewithYondoowillenableFiberNettogreatly
enhanceitsvideoofferingwithoutacapitalinvestmentandatthesametimegreatly
reduceexistingoverheadassociatedwithprovidingvideoservice.Thecosttothe
subscribersmayincreaseslightlyundertheYondooplatform,butwiththatincrease
comesimportantpremiumfeatures.
D.SUPPORTINGDATA:
FiberNetAdvisoryBoardHandoutsfrom6/3/2015specialmeeting
YondooExecutiveSummary
YondooChannelLine-Up
FiberNet Monticello and Potential Agreement with Yondoo
I. FiberNet Monticello Video
Currently video is an obstacle to FiberNet’s financial independence because:
a. It’s expensive to provide
b. It requires frequent upgrades to equipment
c. It requires significant staff time for operations and maintenance
d. The local market is competitive
e. It is undergoing shifts as consumers weigh the benefits of opting out of traditional
television options in favor of streaming options.
Because of these factors, FiberNet is facing diminishing subscriber numbers and
escalating costs. In recent years revenues have not been enough to cover the cost of
providing the service to the Monticello community.
Monthly Annually
Total Revenue $56,341.39 $676,096.68
Total Costs $60,995.33 $731,943.96
Total Loss -$4,653.94 -$55,847.28
It is no longer feasible to continue operating at the status quo. FiberNet’s budget
cannot support the upgrades necessary to match the competition, but it would risk
losing subscribers if video service were eliminated. However, there is a relatively
recent, less-traditional model; a third party hosted provider called Yondoo that could
offer FiberNet a way to retain video service for subscribers.
II. Yondoo Video Services
Yondoo is a subsidiary of CSI Digital, a current video vendor for FiberNet. The
business model behind Yondoo has existed as various parts for many years, but they
recently pulled everything together into a new hosted video model.
In the hosted video option FiberNet connects to Yondoo’s super-headend by an
existing fiber feed. FiberNet continues to install, bill, and provide tech support for
FiberNet video subscribers; however, Yondoo is responsible for the content,
hardware, licensing, and software. This allows FiberNet to continue offering the
service at a significantly reduced cost.
Yondoo FiberNet
Equipment & Software Installations
Maintenance Billing
Programming Contracts Tech Support
III. Impact on FiberNet
There are several essential outcomes of a Yondoo agreement that would positively
impact FiberNet.
a. Reduced Costs: By utilizing the Yondoo hosted model many current costs for
video would be eliminated, most would be eliminated immediately. For example,
instead of paying CSI Digital each month for software and support, trouble
tickets, etc., FiberNet would be billed per Yondoo subscriber. This cost would be
covered by the subscribers’ monthly payments for video service.
In addition to these costs, FiberNet would see a reduction in budgetary items like
the energy bill. By using the Yondoo headend, FiberNet could remove equipment
from the headend in Monticello which reduces energy consumption. There is also
possibility for resale value of the sold equipment.
MONTHLY NETWORK FEES
Vendor Monthly Annually Notes
Vubiquity $779.50 $9,354.00 PPV and VOD- out of service still in contract
Vaultus $150.00 $1,800.00 Cross connect fees
CSI Digital $2,700.00 $32,400.00 Fiber feed from Portland
CSI Digital $2,500.00 $30,000.00 Software and Support
CSI Digital $250.00 $3,000.00 Trouble Tickets (cost varies per month)
Minerva $2,166.67 $26,000.00 Software and Support
Total Network Costs $8,546.17 $102,554.00 Eliminated under Yondoo
MONTHLY PROGRAMMING FEES
(Based on billing information from May 2015)
(Costs vary depending on the number of subscribers)
Vendor Monthly Annually Notes
Local Broadcast Channels $6,345.33 $76,143.96
NTTC $33,809.91 $405,718.92 Majority of the channels
NBCU $4,596.97 $55,163.64 Approximately 20 channels
Direct Pay Channels $6,194.07 $74,328.84 Includes Fox Sports
FOX Retail $87.50 $1,050.00
Premium Channels $554.00 $6,648.00 Except Starz & Encore
Bulk Premium $513.05 $6,156.60 Hotels
Music Choice Digital Music $348.33 $4,179.96
Total Programming Costs $52,449.16 $629,389.92 Eliminated under Yondoo
b. Enhanced Video Service: The greatest obstacles to gaining and retaining video
subscribers is the lack of features and aging equipment. However, these
complaints are addressed by the features offered by Yondoo.
In addition, the pricing for Yondoo features and equipment matches current
market rates. FiberNet’s is several years old which makes the sale of certain
services, such as HD, more difficult in a competitive market.
c. Updated Pricing Model: One of the most significant legacies of the past is the
existence of promotional pricing on video subscriber accounts. It would very
difficult to correct or update these promotional prices individually, but
transitioning to Yondoo would update each bill and ensure that FiberNet is
covering its costs.
d. Economy of Scale
FiberNet’s current video system is reliant on a high number of subscribers to
cover the network, equipment, and maintenance costs. The past five years have
shown that without consistent, considerable reinvestment in the system, this
number of subscribers is not plausible.
Using Yondoo reduces FiberNet’s individual reliance on the number of
subscribers to make video profitable. FiberNet pays for the subscribers we have;
Yondoo in turn takes the responsibility for high subscriber counts and spreads
them out among several client networks.
IV. Yondoo Agreement
The specific elements of the Yondoo agreement include:
a. A minimum term of 3 years (necessary for programming rights which operate in
3 year cycles). With the 3 year term capital startup costs apply immediately.
b. Option for a 5 year term. Under the 5 year term FiberNet has 2 options to waive
capital startup costs:
1. FiberNet would have 18 months to achieve 1,000 video subscribers. If
that number is met, the fees are waived. If not, the startup costs would be
due.
SERVICE UPGRADES
FiberNet Yondoo Notes
Set-Top Boxes X X Updated version with Yondoo
DVR X X Updated version with Yondoo
Whole Home DVR X X
HD X X
TV Everywhere X
Video on Demand X
Pay Per View X
Premium Channels X X
2. FiberNet could opt to waive the monthly IRU payment ($3 per subscriber)
until 1,000 video subscribers are achieved. At that point the IRU payment
would be reinstated.
c. Within the agreement FiberNet agrees to provide Yondoo with access to the
network. In return, Yondoo would provide FiberNet with an IRU payment of
$3.00 per subscriber.
d. FiberNet will continue to bill customers directly for their video service. Yondoo
will submit a monthly bill to FiberNet based on the number of subscribers and
their video packages.
e. FiberNet will continue to collect and distribute Cable PEG fees as established in
the franchise agreement.
V. Challenges
The long-term effect of an agreement with Yondoo has the potential to have a
significant positive impact on FiberNet subscribers and the budget. However, there
are challenges that should be acknowledged.
a. In order to cover the costs of its monthly payment to Yondoo, FiberNet must
ensure customers are billed at Yondoo’s prices. This means higher package prices
and lower equipment costs; some subscriber bills will decrease and some will
increase depending on the specific elements of the subscriber’s bill. This also
means most existing promotions and discounts will be eliminated in favor of
Yondoo’s pricing structure. It will be challenging to ensure all subscribers’ bills
have accurate Yondoo pricing, but it is the only way FiberNet will ensure revenue
to cover its own costs to Yondoo.
b. Due to the changes in customer bills, there is the potential for a short-term loss of
video subscribers. Staff anticipates a recovery of subscriber rates over time due to
the improved product offering, but there is no way to guarantee that.
VI. Summary
The Yondoo hosted video option allows FiberNet to significantly reduce the costs of
providing video while enhancing the service offered to the Monticello community.
The transition would be a challenge, and there would likely be an initial decline in
video subscribers, but there is a strong likelihood the hosted option would make
FiberNet stronger over the long-term.
VII. FiberNet Advisory Board Options
a. Recommend signing the Yondoo agreement for hosted video services with the
terms as presented in the original document. FiberNet would need to reach 1,000
video subscribers within the first 18 months to have the set-up costs waived or
would have to budget for those costs in the 2016 budget.
b. Recommend signing the Yondoo agreement for hosted video services with the
option to waive the monthly IRU payment to cover the start-up costs. Once
FiberNet reaches 1,000 video subscribers then the monthly IRU payment would
be reinstated.
c. Recommend rejecting the agreement with Yondoo for hosted video services.
20015 SW Pacific Hwy -Suite 100 -Sherwood, OR 97140
503.715.2525
1
3/26/15
Executive Overview
Client/Grantor:Fibernet Monticello
A high level overview of how CSI views the video world on both a technical and financial
illustration can be explained by two models.
Model 1, which is the traditional operator model, is much like the current Headend located at most
smaller regional providers. In this model each independent operator has their own equipment
which provides the content to their customers. Each independent operator is required to procure
equipment, keep their own equipment up to date, provide service, and cover the costs to run the
system. For smaller operators, this can become overwhelming due to the inability to spread out
the capital costs over large amount of subscribers.
Model 2, which is the hosted model. In this model, we have basically acquired all the separate
components in which individual operators would implement for their own networks, and
implemented them in a cloud environment. This environment and package has been named
Yondoo.This model basically provides you, the network Grantor, the capability to provid e your
Internet customers a top of the line video service without breaking both your return on investment
and our mutual customers’bank accounts.The service Model 2 provides you the third “check” in
the box for your offering, thereby stopping and then hopefully reversing the loss of customers to
other triple play providers.
Business Case Overview
We purchase content, hardware, licensing,and software at a discounted wholesale level via long term
strategic agreements we have setup with multiple prime vendors. We spread that Capital Expenditure cost
over not just our estimated 800 mutual customers, but over all our Yondoo customers. This truly allows us
to be able to provide customer’s top of the line video options at no cost to you. Additionally after careful
review of your market area and subscriber counts we are ready to extend you the option to go with our
Yondoo product for zero startup costs.The only requirement to this waiving of the installation fees is a
commitment of 1,000 users within 18 months of the go live.Fibernet currently has 800 video customers.
Business Process Overview
We provide a data service to Fibernets 11th Avenue South Minneapolis MN handoff location, which
Fibernet carries to its customer’s premise, at which point we pick it bac k up inside their location with our
Set top boxes. We will work with you on a mutually agreeable process to complete installations, trouble
calls, and other ongoing operational requirements. We implement state of the art process tracking and
interface tools directly from our management and billing system to yours! We will tailor a process that
both your staff and customers find easy to utilize and satisfying. We document the process so it is easily
trainable and have included some information in the following pages to illustrate this process.
Technical Overview
CSI Digital provides all carrier grade handoff services within its Portland Datacenter location.Additionally
we also have enabled POPs around the country and will work to find the most economical connection for
your organization. In this case, we will hand off services in your 11th Avenue location.CSI recommends
2.5GBs of traffic to be set aside for Video. Once the video traffic is in your operations center, we will
inject any local content, then hand it back off to your network engineers for distribution into customers’
locations.
Think of yondoo as your video solution bundled together and delivered on one single piece of fiber optic
cable. That is how we yondoo! How will your customers yondoo?
The next steps are to execute the attached documents, at which time we will contact you to establish a roll
out timeline.
Page
1
of
5
DRAFT
(1c)
Channel
Lineup
At-‐A-‐Glance
yon
d
o
o
5
0
f
o
r
$
5
0
Sta
r
t
e
r
Ba
s
i
c
Exp
a
n
d
e
d
Top
50
Popular
Networks SD HD 50.00$
29.90$
74.90$
99.90$
STB
included STB
included STB
included
Top
10
Popular
Broadcast Channel
Channel
1 ABC
-‐
KATU 2 702 √√√√
2 CBS
-‐
KOIN 6 706 √√√√
3 FOX
-‐
KPTV 12 712 √√√√
4 NBC
-‐
KGW 8 708 √√√√
5 PBS
-‐
KOPB 10 710 √√√√
6 CW
-‐
KRCW 3 703 √√√√
7 ION
-‐
KPXG 5 705 √√√√
8 MeTV
-‐
KATU 4 √√√√
9 MyTV
-‐
KPDX 13 713 √√√√√√√
10 This
TV
-‐
KRCW 7 √√√√
11 Univision
-‐
KUNP 16 716 √√√√
Top
40
Popular
Pay
TV Channel
Channel
1 A&E
Network 95 795 √√√
2 ABC
Family 113 813 √√√
3 AMC 158 858 √√√
4 Animal
Planet 102 802 √√√
5 BBC
America 128 828 √√√
6 Bravo 86 786 √√√
7 Cartoon
Network 54 √√√
8 CNBC 53 753 √√√
9 CNN 46 746 √√√
10 CNN
Headline
News 47 747 √√√
11 C-‐Span 24 √√√√
12 C-‐Span
2 25 √√√√
13 Discovery
Channel 101 801 √√√
14 Disney 60 760 √√√
15 E!
Entertainment 84 784 √√√
16 ESPN 30 730 √√√
17 ESPN2 34 734 √√√
18 Food
Network 81 781 √√√
19 Fox
News
Channel 49 749 √√√
20 FX 114 814 √√√
21 Golf
Channel 37 737 √√√
22 Hallmark
Channel 94 √√√
23 HGTV 80 780 √√√
24 History
Channel 96 796 √√√
25 Lifetime
Television 77 777 √√√
26 MLB
√√
27 MSNBC 52 752 √√√
28 NBA
TV 63 763 √√
29 NBC
Sports 38 738 √√√
30 NFL
Network √√
31 NHL
Network √√
32 Oxygen 83 783 √√√
33 SyFy 123 823 √√√
34 TBS 120 820 √√√
35 TLC 103 803 √√√
36 TNT 121 821 √√√
37 Travel
Channel 92 792 √√√
38 TruTV 59 √√√√
39 USA
Network 125 825 √√√
40 WE
TV 76 776 √√√
Page
2
of
5
DRAFT
(1c)
Channel
Lineup
At-‐A-‐Glance
yon
d
o
o
5
0
f
o
r
$
5
0
Sta
r
t
e
r
Ba
s
i
c
Exp
a
n
d
e
d
Other
Popular
PAY
TV
1 American
Heroes
√
2 AWE √
3 BBC
World 58 √
4 Bloomberg 51 √
5 Boomerang 68 √
6 Chiller 130 √
7 Cloo 131 √
8 CNBC
World 53 753 √
9 Cooking
Channel 90 790 √
10 Crime
&
Investigation 129 829 √
11 C-‐Span
3 26 √√√
12 Destination
America 110 810 √
13 Discovery
Family 64 764 √√
14 Discovery
Life 108 √
15 Disney
Jr 62 √√√
16 Disney
XD 61 761 √√
18 DIY 89 789 √
19 ESPN
Classic 31 √√
20 ESPN
U 33 733 √√
21 ESPNEWS 32 732 √√
22 Esquire 85 785 √√
24 EWTN 21 √√√
25 Fox
Business
Channel 50 750 √√
26 Fox
College
Sports
-‐
Atlantic 43 √
27 Fox
College
Sports
-‐
Central 44 √
28 Fox
College
Sports
-‐
Pacific 45 √
29 Fox
Movie
Channel
850 √
30 Fox
Sports
1 36 736 √√
31 Fox
Sports
2 40 740 √
32 Fusion 48 √√
33 FXX 39 743 √
34 FYI
√√
35 GAC 140
√
37 Game
Show
Network 55
√
38 H2
(History
International)98 798 √√
39 HSN 17 √√√
40 IFC 859
√√√
41 Investigation
Discovery 109 809 √
42 Ion
Life 171 √√√
43 Lifetime
Movie
Network 79 779 √√
44 National
Geographic 100 800 √√
45 Outdoor
Channel 41 741 √
46 OWN 75 √√
47 Palladia
HD*600
√√
48 Qubo 170 √√√
49 QVC 14 714 √√√
50 Science
Channel 104 804 √√
52 Sprout √
53 Sundance 160 √√√
54 TBN 20 √√√
55 Weather
Channel 23 √√√
Regional
Sports
($12.95
w/50For50)
1 Comcast
Sports
-‐
NW
Zone
1 11 711 √√
2 PAC12
(Oregon)35 735 √√
3 ROOT
Sports √
Page
3
of
5
DRAFT
(1c)
Channel
Lineup
At-‐A-‐Glance
yon
d
o
o
5
0
f
o
r
$
5
0
Sta
r
t
e
r
Ba
s
i
c
Exp
a
n
d
e
d
Expanded
Music
Channels
(need
to
confirm
channel
numbers)
1 Adult
Alternative 900 900 √√√
2 Alternative
Rock
Classics 905 905 √√√
3 Baroque 917 917 √√√
4 Big
Band 916 916 √√√
5 Blue
Grass 911 911 √√√
6 Celtic 946 946 √√√
7 Chamber
Music 918 918 √√√
8 Classic
Masters 919 919 √√√
9 Classic
Rock 901 901 √√√
10 Country
Americana 908 908 √√√
11 Country
Classics 907 907 √√√
12 Dance
Clubbin 922 922 √√√
13 Disco/Dance
Classics 930 930 √√√
14 Easy
Listening 923 923 √√√
15 Everything
80's 925 925 √√√
16 Flashback
70's 924 924 √√√
17 Folk
Roots 912 912 √√√
18 Gospel 938 938 √√√
19 Hard
Rock 904 904 √√√
20 Hit
List 928 928 √√√
21 Holiday
Hits 945 945 √√√
22 Hot
Country 909 909 √√√
23 Jammin 937 937 √√√
24 Jazz
Masters 913 913 √√√
25 Jazz
Now 914 914 √√√
26 Jukebox
Oldies 929 929 √√√
27 Kid's
Stuff 949 949 √√√
28 Latino
Tejano 943 943 √√√
29 Latino
Tropical 939 939 √√√
30 Latino
Urbano 941 941 √√√
31 Maximum
Party 931 931 √√√
32 No
Fences 910 910 √√√
33 Nothin
but
90's 926 926 √√√
34 Opera
Plus 921 921 √√√
35 Pop
Adult 933 933 √√√
36 Pop
Classics 920 920 √√√
37 Regional
Mexican 944 944 √√√
38 Retro
Latino 942 942 √√√
39 Retro
R&B 934 934 √√√
40 Rock 902 902 √√√
41 Rock
Alternative 903 903 √√√
42 Smooth
Jazz 915 915 √√√
43 Soul
Storm 932 932 √√√
44 Standards 927 927 √√√
45 The
Blues 906 906 √√√
46 The
Chill
Lounge 947 947 √√√
47 The
Light 935 935 √√√
48 The
Spa 948 948 √√√
49 Today's
Latin
Pop 940 940 √√√
50 Urban
Beats 936 936 √√√
Page
4
of
5
DRAFT
(1c)
Channel
Lineup
At-‐A-‐Glance
yon
d
o
o
5
0
f
o
r
$
5
0
Sta
r
t
e
r
Ba
s
i
c
Exp
a
n
d
e
d
Premium
Channels
(need
to
confirm
channels)
Cinemax
($14.90)
1 MAX
(W)
2 ActionMAX
(W)
3 MoreMAX
(W)
4 Cinemax
(W)
HD*410 510
5 MoreMAX
(W)
HD*411 511
6 ActionMAX
(W)
HD*412 512
HBO
($15.90)
1 HBO
(W)400 500
2 HBO
2
(W)401 501
3 HBO
Family
(W)402 502
4 HBO
Signature
(W)403
5 HBO
Latino
(W)404
6 HBO
(W)
HD*
7 HBO
2
(W)
HD*
8 HBO
Family
(W)
HD*
Showtime/TMC/FLIX
($15.90)
1 Showtime
(W)420 520
2 Sho
2
(W)421 521
3 Showtime
Family
(W)422
4 Sho
Next
(W)423
5 Showtime
Showcase
(W)424
6 The
Movie
Channel
(W)430 530
7 The
Movie
Channel
Extra
(W)431
8 FLIX
(W)432
9 Showtime
(E)
HD*
10 Sho
2
(E)
HD*
11 Sho
2
(W)
HD*
12 Showtime
Showcase
(W)
HD*
13 The
Movie
Channel
(E)
HD*
14 The
Movie
Channel
(W)
HD*
Starz/Encore
($13.90)
1 Starz
(W)440 540
2 Starz
Cinema
(W)441 541
3 Starz
Comedy
(E)442 542
4 Starz
Kids
&
Family
(W)443 543
5 Encore
(W)450 550
6 Encore
Action
(W)451
7 Encore
Love
(E)452
8 Encore
Westerns
(W)455
9 Starz
(E)
HD*
10 Starz
Cinema
HD*
11 Starz
Comedy
(E)
HD*
12 Starz
Kids
&
Family
(E)
HD*
13 Starz
Edge
(E)
HD*544
14 Encore
HD*
(E)
Page
5
of
5
DRAFT
(1c)
Channel
Lineup
At-‐A-‐Glance
yon
d
o
o
5
0
f
o
r
$
5
0
Sta
r
t
e
r
Ba
s
i
c
Exp
a
n
d
e
d
Spanish
Language
(need
to
confirm
channels
and
channel
numbers)
Network SD HD
1 Azteca
America
SD
&
HD
2 CNN
en
Espanol
3 Discovery
Familia
4 Enlace
5 ESPN
Desportes
6 Estrella
TV
7 Fox
Deportes
SD&
HD
8 LA
TV
9 Mega
TV
10 Mexicanal
11 Multimedios
TV
12 Mun2
is
now
NBC
Universo
13 Mundo
Fox
14 Nat
Geo
Mundo
15 Telemundo
16 Unimas
17 Univision
18 Univision
tinovelas
19 VME
Kids
20 ZUUS
Latino
(music
videos)
CityCouncilAgenda:06/08/15
1
4D.ConsiderationofapprovingprocessandtermsofsaleforCity-ownedpropertylocated
at1022W.RiverStreet (JO/AS)
A.REFERENCEANDBACKGROUND
TheCityCouncilisaskedtoconsidertheprocessandtermsforthesaleoftheCity-owned
propertyonWestRiverStreet.
TheEDArecentlyplaced“forsale”signsonthreeofitsproperties.Forefficiency,staffhas
alsomovedforwardwiththedevelopmentofa“forsale”signfortheWestRiverStreet
property.Thesignisinplaceontheproperty.
Atthistime,Councilisaskedtoprovidestaffwithdirectionontheresponsedesiredtoany
interestgeneratedinthesite.
ThepropertyiszonedR-2(SingleandTwo-FamilyResidence)Districtandislocatedjust
outsideoftheShorelandandMississippiWildScenicandRecreationalRiverDistricts.The
propertyisapproximately16,850squarefeetinarea.Thepropertyissurroundedbysingle-
familyusestothewest,eastandsouth.
TherearetwobasicdirectionstheCouncilmaywishtotakeonthepropertysale,withsome
variationsbasedondirection.
1.Saleofpropertyatasetprice(orpricerange)tobedeterminedpriortosale,withno
distinctionastotheuseofthepropertyoutsideofarequirementtomeetbasecode
standards.
•Underthisoption,theCouncilwouldholdaseparatemeetingtodeterminetheasking
pricerangefortheproperty.Subsequentmeeting(s)wouldbeheldtoreviewoffers.
•Underthisoption,aduplexcouldbeconstructedonthepropertyasapermitteduse,as
theparcelmeetsbasesquarefootagerequirementsforsuchdevelopment.
2.Saleofthepropertyfordevelopment.
•IfCouncilwishestoproceedwiththisoption,staffhaspreparedadraftoutlineof
termsforCouncilreviewbelow.
o Single-familyhomedevelopment;noduplexormulti-familyuse.
o Mustmeetbasezoningrequirementswiththefollowingadditional
requirements:
Mustexceedbasezoningrequirementsforsquarefootageofsingle-
familyhomeconstructed–currently1050squarefootfoundationand
2000squarefeetfinishable.
Mustconstructatwo-carattachedgarageexceedingbasezoning
requirementof450squarefeet.
Must meetaminimumof20%ofthefrontbuildingfaçadecovered
withbrickorstone.Anyattachedormajordetachedaccessorybuilding
thatcanbeseenfromthestreetshallmeetthissamestandard.
CityCouncilAgenda:06/08/15
2
Structureswithfrontfacadescoveredbyatleast70%stuccoorreal
woodmayreducethebrickorstonecoverageto5%.
o Mustinstalllandscapeirrigationsystem.
o Mustreceiveacertificateofoccupancywithin2yearsfromclosing.
o StaffwillresearchtheCouncil’sabilitytoincludea“rightofreverter”
provisionbywhichthepropertywillrevertbacktoCityownershipineventof
default.
•Underthisoption,theCouncilcouldelecttoopenaformalquoteorbidprocess(as
required),withapre-determinedsetoftermssuchasthoseabove.TheCouncilwould
requirethatthebuyerenterintoapurchaseanddevelopmentagreementspecifying
terms,withthetermsofthedevelopmentagreementsurvivingagainstthesiteafterthe
sale.
•TheCouncilcouldalsochosetoidentifytermsforanybuyer,butnotruntheformal
quoteprocess.Again,theCouncilwouldrequirethatthebuyerenterintoapurchase
anddevelopmentagreementspecifyingterms,withthetermsofthedevelopment
agreementsurvivingagainstthesiteafterthesale.
A1.BudgetImpact:CityCouncilhasindicatedinpriormeetingsandworkshopsthatit
wishestodisposeofdevelopableproperties.Thesaleofthispropertywouldhavea
positiveimpacttotheCity’sgeneralfund.
A2.StaffImpact:StafftimewouldbeconsumedinanyoptionselectedbyCounciland
wouldbevariablebasedontheprocessselectedandthenumberofoffersreceived.
B.ALTERNATIVEACTIONS
1.Motiontosellthesubjectpropertyataprice(orpricerange)tobedeterminedbythe
Councilpriortosale,withnodistinctionastotheuseofthepropertyoutsideofa
requirementtomeetbasecodestandards.Thismotioniscontingentonareviewof
processandrequirementswiththeCityAttorney.
2.Motiontosellthepropertyfordevelopmentunderapurchaseanddevelopment
agreement,withtheprocessandtermsasdirectedbyCouncil.Thismotioniscontingent
onareviewofprocessandrequirementswiththeCityAttorney.
3.Motiontotableforadditionaldiscussionandresearch.
C.STAFFRECOMMENDATION
StaffdeferstoCouncildirectiononthisitem.
D.SUPPORTINGDATA
WrightCountyParcelDataInformation
MonticelloZoningOrdinance,R-2Zoning,excerpt
Wright County, MN
Date Created: 6/4/2015
Summary
Parcel ID 155020005050
Property Address
Sec/Twp/Rng 03-121-025
Brief Tax Description Sect-03 Twp-121 Range-025 RIVER TERRACE Lot-005
Block-005
(Note: Not to be used on legal documents)
Deeded Acres 0.00
Class 958 - (NON-HSTD) MUNICIPAL PUB-OTHER
District (1101) 1101 CITY OF MONTICELLO 882 H
School District 0882
Creation Date 01/01/0001
Owner
Primary Owner
City Of Monticello
505 Walnut St Ste 1
Monticello, MN 55362
GIS Acreage
Parcel: 155020005050
Acres: 0.39
Acres USAB: 0.39
Acres WATE: 0.00
Acres ROW: 0.00
Sq Ft: 16,850.52
Land
Seq Code CER Dim 1 Dim 2 Dim 3 Units UT Unit
Price Adj 1 Adj 2 Adj 3 Adj 4 Eff
Rate Div %Value
1 RES I UNIMPROVED LOT 0 0 0 0 1.000 LT 30,000.000 1.00 1.00 1.00 1.00 30,000.000 1.000 30,000
Total 1.000 30,000
Valuation (working)
2017
+Land Value $30,000
+Building Value $0
+Extra Features Value $0
=Total Value $30,000
% Change 0.00 %
Taxation
2015 Payable 2014 Payable 2013 Payable 2012 Payable 2011 Payable
Total Estimated Market Value $25,000 $20,000 $20,000 $32,000 $35,000
-Excluded Value $0 $0 $0 $0 $0
-Homestead Exclusion $0 $0 $0 $0 $0
=Taxable Market Value $25,000 $20,000 $20,000 $32,000 $35,000
Net Taxes Due $0.00 $0.00 $0.00 $0.00 $0.00
+Special Assessments $0.00 $0.00 $0.00 $0.00 $0.00
=Total Taxes Due $0.00 $0.00 $0.00 $0.00 $0.00
Tax Statements
Click here to view the Tax Statements for this parcel.
CRV Documents
Click here to view the CRV document(s).
Property Card Images
Click here to view the Property Card image(s).
Map
No data available for the following modules: Land GA/RP, Buildings, Extra Features, Sales, Transfer History, Valuation, Taxes Paid, Photos,
Sketches. Click here for help.
DISCLAIMER: Maps and documents made available to the public by Wright County are not legally recorded maps nor surveys
and are not intended to be used as such. The maps and documents are created as part of a Geographic Information
System (GIS) that compiles records, information, and data from various city, county, state and federal sources. The
source data may contain errors. Additionally, maps and documents prepared by the GIS from multiple sources, even if
derived from data that is error free, may not be reliable due to differences in the databases or computer programs of the
source materials. Wright County has attempted to include more specific clarifications or advisories on the specific
documents or maps however, none of the maps or documents should be used for navigational, tracking or any other
purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features.
If errors or discrepancies are found please contact Wright County. The preceding disclaimer is provided pursuant to
Minnesota Statutes §466.03, Subd. 21 (2000), and Wright County shall not be liable for any damages or claims that
arise out of the user's access to, or use of the maps, documents and data provided.
Last Data Upload: 6/4/2015 9:47:23 AM
CHAPTER 3: ZONING DISTRICTS
Section 3.4 Residential Base Zoning Districts
Subsection (E) R-1: Single Family Residence District
Page 90 City of Monticello Zoning Ordinance
TABLE 3-5: R-1 DEVELOPMENT STANDARDS
REQUIRED YARDS (in feet) Max
Height
(stories /
feet)
Minimum Floor Areas
(sq ft)
Minimum
Building
Width
(ft)
Minimum Roof
Pitch & Soffit
(vertical rise/
horizontal run)
Front Interior
Side [1]
Street
Side
Rear
[3]
Single
Family
Building
30 10
[2] 20 30 2.5 stories
35 feet
1,050 foundation/
2,000 finishable [4]
24
5” / 12”
no minimum
soffit
[1]: For interior lots in R-1 and R-A districts, an attached accessory structure may be allowed to meet a 6’
setback, provided that the sum of both side yard setbacks shall be a minimum of 20 feet..
[2]: Interior side yard setbacks for single family homes on lots of record with a lot width 66 feet or less in
the Original Plat of Monticello and Lower Monticello shall be at least six (6) feet.
[3]: The required rear yard shall consist of a space at least 30-feet in depth across the entire width of the lot
that is exclusive of wetlands, ponds, or slopes greater than 12 percent.
[4]: Finishable square footage is exclusive of attached accessory space.
Accessory
Structures
An attached garage shall be included with all principal residential structures in the R-1 district.
See Section 5.3(B) for all general standards and limitations on accessory structures.
The minimum floor area for all attached accessory structures shall be 550 sq. ft.
See footnote [1] above as related to setbacks for attached accessory structures on interior lots.
Other
Regulations
to Consult
(not all
inclusive)
Section 3.3, Common District Requirements
Section 3.4(B), Standards Applicable to All Residential Base Zoning Districts
Section 4.11, Building Materials
Section 4.8, Off-Street Parking
Section 4.1, Landscaping and Screening Standards
CHAPTER 3: ZONING DISTRICTS
Section 3.4 Residential Base Zoning Districts
Subsection (F) R-2: Single and Two Family Residence District
City of Monticello Zoning Ordinance Page 91
Typical R-2 Lot Configuration
(F) R-2: Single and Two Family Residence District Section 3.4 (F)
R-2 Single and Two-Family Residence District
The purpose of the "R-2" single and two-family residential district is to provide for low to moderate
density one and two unit dwellings and directly related complementary uses.
Maximum Density through PUD or Performance Standards = 5,445 sq. ft. per unit (8.0 units per
gross acre)
Base Density
Unit Type
Minimum Lot
Area/Unit Base Density
Single Family 10,000 square feet 4.3 units/acre
Duplex/Two-Family 7,000 square feet 6.2 units/acre
Townhome * 7,000 square feet 6.2 units/acre
Multi-Family
(3-4 units) *
10,000 sq ft for 1st
unit + 4,000 sq ft for
each additional unit
5.9 – 6.7
units/acre
* By Conditional Use Permit Only
Minimum Lot Width
R-2 District Original Plat
Lot Width 80 feet 66 feet
Typical R-2 Building Types