Loading...
Planning Commission Agenda 05-03-2011 AGENDA MONTICELLO PLANNING COMMISSION Tuesday, May 3rd, 2011 6:00 PM Mississippi Room, Monticello Community Center Commissioners: Rod Dragsten, Brad Fyle, Charlotte Gabler, William Spartz, and Barry Voight Council Liaison: Lloyd Hilgart Staff: Angela Schumann, Ron Hackenmueller, Steve Grittman – NAC 1. Call to order. 2. Consideration to approve the Planning Commission minutes of April 5th, 2011. 3. Citizen Comments. 4. Consideration of adding items to the agenda. 5. Public Hearing – Consideration of a request for Conditional Use Permit for Veterinary Clinic in a B-4 (Regional Business) and Amendment to Planned Unit Development for Quad Development. Applicant: Quad Development 6. Public Hearing – Consideration of a request for Rezoning from B-3(Highway Business) to B-4 (Regional Business) and a request for Amendment to Conditional Use Permit for Planned Unit Development for the Monticello Travel Center 2nd Addition. Applicant: IRET Properties 7. Public Hearing - Consideration of an amendment to the Monticello Zoning Ordinance, Chapter 2, Section 4, Chapter 5, Section 3(D) and Chapter 5, Section 4. (AS) Applicant: City of Monticello 8. Consideration to call for a public hearing on Amendment to the 2008 Monticello Comprehensive Plan for the Adoption of the 2011 Monticello Parks & Trails Plan. 9. Consideration to call for a Public Hearing on Amendment of the Monticello Zoning Map. 10. Community Development Director’s Report 11. Adjourn. Planning Commission Minutes – 04/05/11 1 MINUTES MONTICELLO PLANNING COMMISSION Tuesday, April 5, 2011 Commissioners Present: Rod Dragsten, Bill Spartz, Barry Voight, Charlotte Gabler, Brad Fyle Council Liaison Absent: Lloyd Hilgart Staff: Angela Schumann, Ron Hackenmueller, Steve Grittman-NAC, Andrea McDowell-Poehler 1. Call to order Chairman Rod Dragsten called the meeting to order at 6:00 p.m. 2. Consideration to approve Planning Commission minutes of March 1st, 2011 BRAD FYLE MOVED TO APPROVE THE MINUTES OF MARCH 1ST, 2011. MOTION WAS SECONDED BY BARRY VOIGHT. MOTION CARRIED 5-0. 3. Citizen Comments None 4. Consideration of adding items to the agenda a) Wild and Scenic DNR ruling 5. Public Hearing - Consideration of an amendment to the Monticello Zoning Ordinance relating to adult-oriented land uses, including amendments to Chapter 3.6 (Industrial Base Zoning Districts), 3.6 (D) I-1, Light Industrial District, 3.6 (E) I-2, Heavy Industrial District; and including amendments to Chapter 3.7, Overlay Zoning Districts; and including amendments to Chapter 5.1, Table 5-1; and amendments to Chapter 5.6, Table 5-6; and including amendments to Chapter 5.6 (F), Regulations for Commercial Uses; and amendments to the official zoning map of the City of Monticello. Applicant: City of Monticello The City’s existing regulations limit adult-oriented uses to the I-2 District, and maintain a 700 foot buffer from sensitive uses. This limitation has left the City with an “opportunity area” in the range of just one percent of usable land area, and just a few eligible parcels– a range that raises significant concerns over the legality of the regulations. In the City Attorney’s analysis, it is noted that the 5% informal threshold has virtually always served as adequate evidence of “reasonable opportunity” in providing for adult-oriented uses. Planning Commission Minutes – 04/05/11 2 The Planning Commission directed staff to examine opportunities to maximize the separation distance from adult-oriented uses while also providing a defensible regulation. Steve Grittman presented two options to address this request: recalculate the zoning and buffer zone distance to increase percentage above 5% of City area or reset zoning allowances to increase the number of available parcels making the percentage less relevant. The “Percentage Threshold” option would add I-1, Light Industrial District to the permitted use land area, decrease the buffer zone to 275 feet from sensitive uses, create a new base district (I-3) to avoid freeway exposure, and rezone freeway frontage parcels to I-3. This option would yield about 236 acres and provide about 5.1% of the City’s net usable land area for adult-oriented uses to locate. It is the most legally defensible option and the preferred approach of the City Attorney’s office. Staff was concerned that the creation of a new base zoning district, changes to the current base district, and rezoning of several parcels would be confusing to the property owners, and cumbersome to administer. The “Number of Parcels” or “Overlay District” option would add I-I, Light Industrial District to the permitted use land area, identify parcels that protect sensitive land uses, identify parcels that avoid freeway frontage, create an overlay district to include eligible parcels, and apply an overlay district to the subject parcels. This option provides for 43 individual parcels or approximately 3.5% of the City’s land area. Staff prefers the “overlay district” approach because it avoids reconfiguring and rezoning base districts for existing industrial properties, maintains a reasonable amount of opportunity for adult- oriented uses, avoids freeway exposure, maintains a better separation overall from nearly all existing sensitive use locations, and can be more easily manipulated in the future to maintain reasonable opportunity and adjust for changing land use patterns. Chairman Rod Dragsten opened the public hearing. The Commissioners asked for clarification related to both options. Bill Spartz wondered if anything could be done to protect the proximity en route to an elementary school near Fallon. Rod Dragsten voiced a concern about vacancies within an office building. There were a number of questions from the Commission as well as some discussion by the Commission about making certain parcels ineligible and the option of increasing the available area as the City grows. Hearing no further public comment, the public hearing was closed. BRAD FYLE MOVED TO RECOMMEND APPROVAL OF ALTERNATIVE 2, “NUMBER OF PARCELS” AND THE APPLICATION OF A “SPECIAL USE” OVERLAY ZONING DISTRICT AS RECOMMENDED BY CITY STAFF AS AN AMENDMENT TO THE ZONING ORDINANCE REVISING THE CITY’S ADULT- ORIENTED ZONING RESTRICTIONS. MOTION WAS SECONDED BY BARRY VOIGHT. MOTION CARRIED 4-1 WITH BILL SPARTZ OPPOSED. Planning Commission Minutes – 04/05/11 3 Rod Dragsten also recommended the elimination of one parcel from consideration involving an office building. 6. Consideration to call for a Public Hearing for the amendment of the Monticello Zoning Ordinance: Chapter 2.4(B) for the initiation of Zoning Ordinance Text and Map Amendments, Chapter 5.3(D) as related to the standards for Accessory Structures in the M-H District, and Chapter 5.4 as related to the General and Specific Standards for Temporary Uses Staff requested that the Planning Commission call for a public hearing on May 3rd, 2011 for the purpose of consideration of additional code tracking amendments. The amendments clarify existing components of the code, or are components of the previous code that need to be incorporated into the new code. These amendments are: Amendment to the Monticello Zoning Ordinance, Chapter 2.4(B)(2) for the initiation of Zoning Ordinance Text and Map Amendments This amendment would allow the Community Development Department to initiate public hearing action consistent with the previous zoning ordinance. Amendment to the Monticello Zoning Ordinance, Chapter 5.3(D) as related to the standards for Accessory Structures in the M-H District This amendment would replace references to former R-4 district with “M-H” in all locations. Amendment to the Monticello Zoning Ordinance, Chapter 5.4 as related to the General and Specific Standards for Temporary Uses 1. This amendment would make placement of a construction dumpster outside of a building permit an acceptable temporary use. 2. This amendment would define seasonal sales for fireworks or lawn displays as an acceptable temporary use with an administrative permit. Rod Dragsten noted that hoop type structures, generally utilized for seasonal greenhouses, are subject to a 30-day limitation in the current code. Staff suggested that it may be useful to consider making a language change to the code or an exemption for wayside stands or farmer’s markets. BILL SPARTZ MOVED TO CALL FOR A PUBLIC HEARING ON MAY 3, 2011 FOR CONSIDERATION OF AMENDMENT OF THE MONTICELLO ZONING ORDINANCE, CHAPTER 2.4, CHAPTER 5.3(d) AND CHAPTER 5.4. MOTION WAS SECONDED BY CHARLOTTE GABLER. MOTION CARRIED 5-0. Planning Commission Minutes – 04/05/11 4 7. Consideration to appoint a Planning Commissioner to the Transportation Advisory Committee On March 14th, 2011, the City Council established a Transportation Advisory Committee (TAC) to advise the Council and the Planning Commission on matters pertaining to the planning, operation and improvement of our local transportation system consistent with the City’s Comprehensive Plan, and for promoting a balanced, efficient and safe transportation system for local residents, businesses and industry. The TAC was approved with structure that provides a cross-section of stakeholders: two City Council representatives, one Planning Commission representative, two IEDC representatives, one EDA representative, and one resident at-large representative. Chairman Rod Dragsten had previously served as Planning Commission liaison to the BR&E Transportation Task Force. CHARLOTTE GABLER MOVED TO APPOINT ROD DRAGSTEN AS PLANNING COMMISSION REPRESENTATIVE TO THE TRANSPORTATION ADVISORY COMMITTEE (TAC). MOTION WAS SECONDED BY BILL SPARTZ. MOTION CARRIED 5-0. 8. Consideration to review progress on the Monticello Parks & Trails Plan Staff provided a brief summary of the progress and participants involved in the review of the Park and Trail Plan. The Parks Commission and MCC Advisory Council are kept apprised of meetings, opportunities for input and action steps. Staff have met with school district representatives and local athletic associations to obtain further input on the plan. NAC will be working to coordinate downtown trail and park planning efforts as well as to incorporate the concept sketch for the Bertram Chain of Lakes recreation area into the draft plan. A community meeting regarding the draft plan will be scheduled for May. Steve Grittman reported that survey results have been tabulated and will be provided to the Planning Commission. The top parks noted in terms of usage were Bertram, MCC and Ellison with East and West Bridge parks. The vast majority of respondents use the trail system. The most noted requests were the extension of the trail system and water use opportunities including improving access to and use of the river. The City has authorized WSB to begin working on the GIS base park and trail layers, and the development of a new online mapping interface to integrate, park, trail, activity, history and point of interest information available to the public. Staff demonstrated how the online component would function and be ready to use by June. The website will be accessible by mobile phone as well. Planning Commission Minutes – 04/05/11 5 9. 2011 Planning Commission Goals & Objectives As part of continued efforts to accomplish the vision set out by the 2008 Comprehensive Plan, the Planning Commission was asked to consider adoption of a set of Goals & Objectives for 2011. Staff prepared a preliminary outline for Commission’s consideration and offered the option of discussing these in a work session to ensure that all issues included are understood and prioritized. The Commission agreed to conduct a work session on Tuesday, May 17th at 6 p.m. 10. Community Development Director’s Report There were a few questions related to the Citizen Service Desk. Staff noted that these requests are routed to appropriate personnel and that all inquiries are responded to within the goal of two working days. There were close to 400 inquiries in 2010. Building Official Ron Hackenmueller responded to questions about the varied nature of the 65 blight/nuisance requests cited. He agreed to obtain a breakdown as to the percentage of these which may be foreclosure related. There have been three temporary sign permit applications since the int erim ordinance was put in place in March. 11. Consideration of items added to the agenda a) Wild & Scenic DNR Regulations Staff reported that the City has separated and resubmitted the Shoreland and the Wild & Scenic ordinances as directed by the regional DNR representative. The City has incorporated initial DNR comments into the ordinances and is awaiting final comment prior to preparing amendment language for the Planning Commission. Staff does not expect a response from the DNR until June. Upon approval of these amendments, City Emergency Management staff will meet with the DNR to consider flood plain regulations. 12. Adjourn BILL SPARTZ MOVED TO ADJOURN THE MEETING AT 7:53 PM. MOTION WAS SECONDED BY BARRY VOIGHT. MOTION CARRIED 5-0. Recorder: Kerry T. Burri __ Approved: May 3, 2011 Attest: ___________________________________________ Planning Commission Minutes – 04/05/11 6 Angela Schumann, Community Development Director Planning Commission Agenda – 05/03/11 1 5. Consideration of a request for Conditional Use Permit for Veterinary Facilities (Neighborhood) and an amendment to Planned Unit Development for Monticello Business Center 6th Addition/Quad Development. Applicant: Quad Development, LLC (AS) Property: Outlot A, Monticello Business Center 5th Addition 4300 School Boulevard The subject site is located west of Walmart of east of the Autumn Ridge Townhome development, on the south side of School Boulevard. Planning Case Number: 2011-010 REFERENCE & BACKGROUND Request(s): Amendment to Planned Unit Development to allow the construction of an approximately 7,680 square foot commercial building and a Conditional Use Permit to accommodate a Veterinary Facility. Deadline for Decision: June 3rd, 2011 (60 days) Land Use Designation: Places to Shop Zoning Designation: B-4 (Regional Business) The purpose of the B-4, regional business district, is to provide for the establishment of commercial and service activities which draw from and serve customers from the entire community or region. The proposed Phase II development for a Veterinary Facility use requires a conditional use permit in the B-4 zoning district. Current Site Use: The 4.5 acre site is currently platted into a single buildable lot and a large outlot. Lot 1, Block 1 has been developed as a two-story multi-tenant office building. The balance of the property is vacant. Planning Commission Agenda – 05/03/11 2 Surrounding Land Uses: North: Vacant, zoned B-4 East: Residential, zoned R-3 Autumn Ridge development, Planned Unit Development South: Commercial, zoned B-4 Walmart West: Commercial, zoned B-4 Walmart Project Description: Quad Development is requesting an amendment to the approved Planned Unit Development for Monticello Business Center 5th Addition to accommodate the construction of an approximately 7,680 square foot commercial building as Phase II of the approved Quad Development project. The amendment to PUD is required as the applicant is seeking to change the footprint size of the building, the building design, parking configuration, and landscaping treatments for the Phase II site. The Phase II commercial building is intended for use as a veterinary facility, which requires a Conditional Use Permit in the B-4 District. The applicant also intends to re-plat a larger lot area than original illustrated on the approved preliminary plat, which will be accomplished through the final plat process. Planned Unit Development and Ordinance Requirements: A Planned Unit Development allows for flexibility in performance standards with the understanding that the development will be held to higher standards of site and building design than would ordinarily be required. It is the applicant’s responsibility to design the development with significant benefits and communicate those benefits to the City. Parking. The original PUD approval required cross-easements for parking throughout the site. The easements will be required to remain in place for the Phase II site development and will be specifically addressed within a development contract for the proposed re-plat. Planning Commission Agenda – 05/03/11 3 In terms of parking requirements for the Phase II development, the proposed building totals 7,680 square feet of gross floor area. The parking for the proposed uses is calculated as follows. Use Proposed Square Footage Code Requirement Required Spaces Storage, Restrooms 938 sq. ft. 0 0 spaces Kennel 844 sq. ft. 1 space per 400 sq ft 2 spaces Clinic 5,897 sq. ft. 1 space per 250 sq ft 24 spaces TOTAL REQUIRED SPACES 26 spaces The provided site plan illustrates the limits of the parking to be constructed with Phase II. The site plan includes12 existing spaces subject to the cross-easement, and the construction of 22 additional spaces with the Phase II development. The City Engineer has recommended that the applicant provide turning template information for larger vehicles in order to ensure adequate circulation through the site when fully developed. The parking configuration proposed is acceptable, subject to the cross-easement and recommendation of the City Engineer. Landscaping. The original landscaping plan for the Planned Unit Development exceeded the requirements for commercial sites, providing 51 overstory trees and an intense foundation planting plan for each building. The overstory trees included a combination of four Emerald Lustre Maples, four Fallgold Ash, five Sienna Glen Maples, four Skyline Honeylocusts, and five Swamp White Oaks. The original PUD also included 7 Austrian Pines, 14 Black Hills Spruce, and 8 Colorado Spruces. The majority of the overstory trees are proposed along the east property line, to provide a buffer between the subject site and the townhome development to the east. These trees have already been placed with the Phase I office building development. The narrative provided by the veterinary clinic proposes a 3’ rock garden bed with a mixture of low height coniferous and deciduous shrubs along with grasses and flowering perennials. The suggested landscaping plan does not detail the exact species or quantity, but will be required to meet or exceed the approved foundation landscaping plan. (See page L2 of the approved PUD packet.) The 32’ x 34’ dog exercise area on the south side of the property will be fully enclosed and treated with masonry pillars of brick or cultured stone with a proposed 5’ fiberglass privacy fence. This area will be further screened with dwarf spruce on the west and south Planning Commission Agenda – 05/03/11 4 sides. The northern side yard will feature a synthetic turf area with additional landscape plantings, but will not be enclosed. In addition to the tree and shrub requirements, per the original PUD, sod is required between the buildings and on the back side of each building. The applicant’s narrative indicates that this requirement will be met. As part of the original PUD, a plaza area is located at the entrance to the proposed facility. Staff has verified that this area has been planted per the approved plan. Lighting. A photometric plan was submitted for the original PUD. That plan indicates that no glare exceeding one footcandle will spill over onto the adjacent right-of-way or adjacent properties. The maximum footcandle reading along the east property line, adjacent to Autumn Ridge, is 0.2. Any wall mounted lighting shall require a full cutoff fixture. A photometric plan compliant with the original approval will be required at building permit. Signage. The front facades of the one story plus mezzanine buildings were proposed at 3,620 square feet each. Under the original PUD, each of these buildings was allowed 181 square feet of signage. The applicant is proposing approximately 105 square feet of wall signage for the building. The applicant has indicated that sign placement will be on the north side for the building, facing School Boulevard. Final building elevations will be required to include placement and sizing of all wall signage. In addition to wall signage, the original PUD approval included two monument signs, one in the northeast corner of the site and one in the northwest corner of the site. These signs will contain placards for up to six tenants. Said signs are each 96 square feet in area and 15.33 feet in height, for a total of 192 square feet of signage. The veterinary clinic has indicated that they will be included within the existing pylon signage and no separate free-standing signage is proposed for the site. Building Design. The original Planned Unit Development illustrated an 8,400 square foot building footprint. This application for amendment to PUD indicates instead a 7,680 square foot building. The smaller building is shifted slightly eastward to accommodate changes in building design. The original PUD proposed five buildings, including both one and half (mezzanine) and two story structures, all similar in design and materials. The proposed PUD amendment would vary from the approved design and materials. The narrative and preliminary elevation states that a variety of materials, including Hardie-board siding, stone, and pre-formed steel or aluminum will be used on the Planning Commission Agenda – 05/03/11 5 building exterior. A draft building elevation drawing has also been provided. However, the veterinary clinic has indicated that the final design will include additional façade detail and window fenestration beyond what is shown on the draft. The applicant will provide a colored elevation at the Commission meeting. The applicant will be required to submit a final building elevation design illustrating final materials and location placement consistent with the code requirements below and compatibility with the original PUD. 1. No galvanized or unfinished steel, galvalum, or unfinished aluminum buildings, except those specifically designed to have a corrosive designed finish such as corten steel, shall be permitted in the districts listed herein. 2. Buildings in these zoning districts shall maintain a high standard of architectural and aesthetic compatibility with conforming surrounding properties to ensure that they will not adversely impact the property values of the abutting properties and shall have a positive impact on the public health, safety, and general welfare, insofar as practicable. 3. Exterior building finishes in the districts subject to this Section shall consist of materials compatible in grade and quality to the following: (a) Brick (b) Natural Stone (c) Decorative rock face or concrete block (d) Cast-in-place concrete or pre-cast concrete panels (e) Wood, provided that the surfaces are finished for exterior use and wood of proven exterior durability is used, such as cedar, redwood, or cypress (f) Glass (g) Exterior Insulated Finish systems, where said system is manufactured to (h) replicate the look of one of the approved building materials in this section (i) Stucco 4. Metal exterior finishes shall be permitted only where coordinated into the overall architectural design of the structure, such as in window and door frames, mansard roofs or parapets, and other similar features, and in no case shall constitute more than 15% of the total exterior finish of the building. Access and Circulation. The overall Planned Unit Development site has one access point extending south from School Boulevard. The access is 40 feet in width, excluding the island, with adequate space for turn lanes. All internal drive lanes are proposed at 24 feet in width, wide enough to accommodate two-way traffic. A cross-access easement document shall be provided to the City, verifying that the lot to be platted shall have access to School Boulevard. Planning Commission Agenda – 05/03/11 6 Pedestrian access will be accommodated by a concrete sidewalk running along the front the building. A crosswalk, as originally approved, will connect the east side of the site to the west side of the site. Grading and Drainage. The Phase II development will proceed in accordance with previously approved grading plans. The City Engineer has reviewed the plans in relationship to the proposed site plan and has provided comments. Comments from the City Engineer may be found attached as Exhibit H. Utilities. The Phase II development will proceed in accordance with previously approved utility plans. The City Engineer has reviewed the plans in relationship to the proposed site plan and has provided comments. Comments from the City Engineer may be found attached as Exhibit H. Conditional Use Permit Requirements Neighborhood Veterinary Facilities are permitted as conditional uses in the B-4 District. To follow is an analysis of the request per the conditional use permit requirements. 1. Treatment shall be limited to small household pets unless the facility is conditionally permitted as a rural veterinary facility. The applicant has indicated that the veterinary facility will offer services to small domestic animals only. 2. In the CCD district, animals shall only be housed overnight if they are undergoing medical treatment or observation. Overnight boarding for nonmedical reasons shall be prohibited. Not applicable. It is noted that the narrative indicates that boarding facilities will be provided to clients of the veterinary clinic. 3. The site shall be designed to prevent animal waste from being exposed to stormwater or entering the stormwater system, streams, lakes, or conveyances. The applicant’s narrative indicates that staff on-site will manage waste and will dispose of in appropriate facilities. The City Engineer made specific comment relative to the storm water system. 4. If an area is provided for animals walking, it shall not be exposed to stormwater and the waste shall immediately be picked up and disposed of properly. Planning Commission Agenda – 05/03/11 7 The applicant’s narrative indicates that staff on-site will manage waste and will dispose of in appropriate facilities. The applicant narrative indicates that two outdoor exercise areas will be provided. The first exercise area is proposed for the south side of the principal building and is approximately 32’ x 34’ in area. The second outdoor area is proposed for the north side of the facility and will be surfaced with artificial turf. 5. Animals shall not be kept outdoors or be allowed to remain outside unsupervised. The applicant narrative indicates that two outdoor fenced exercise areas will be constructed. Animals will be allowed in these areas during daytime hours and will be leashed when outside of fully enclosed areas. Conditions listed in Exhibit Z prohibit the overnight kenneling of animals outdoors. 6. All animals must be leashed. The applicant narrative states that animals will be leashed when outside, with the exception of the fully enclosed exercise area. 7. No outside storage of carcasses. No mention of this condition was made in the applicant narrative, but is listed as a condition of approval within Exhibit Z. 8. The facility shall be subject to an annual inspection by a City Health Officer at owner's expense. The City’s Animal Control officer will complete an annual inspection and submit a report to be filed with Conditional Use permit. Accessory Use Requirements Trash Handling. The trash handling enclosure serving the site is subject to the following code standards: 1. The location and configuration of screening for large trash handling and recycling collection areas shall be depicted on all required landscaping plans. The provided Suggested Landscape Plan illustrates the location of the enclosure along the south side of the facility. Planning Commission Agenda – 05/03/11 8 2. Large trash handling and recycling collection areas shall be fully screened from adjacent properties. The applicant has indicated that the trash handling will be fully enclosed with a maintenance-free vinyl fence. The final elevation drawings for this area shall be a requirement of the final site/building elevation plan. 3. In cases where access to large trash handling and recycling face a public right- of-way, the access way shall be screened with an opaque gate. Chain link shall not be used for such gates. The trash enclosure will be serviced from the interior (east-facing) side and will not face a right of way. The applicant has indicated that the gates will also be constructed of maintenance-free vinyl. 4. Compactors that are attached to the principal structure shall be totally screened from eye level view from public streets and adjacent nonindustrial properties by a screening wall constructed of the same building material as the principal structure. Not applicable. 5. Large trash handling and recycling shall meet the required setbacks for structures as required in the underlying zoning district. The B-4 District has a 0’ lot line setback and as such, the proposed location meets the required setback. 6. In all cases, large trash handling and recycling collection areas shall be at least six feet from a side or rear lot line, and shall not be located within front yards or corner side yards. The proposed site plan illustrates compliance with this requirement. 7. If a wall or detached accessory structure is used to screen or define a large trash handling and recycling collection area, the building materials used for the wall or accessory structure shall be compatible with the principal structure and be readily served through swinging doors. The proposed material for the enclosure is a maintenance-free vinyl in a color compatible with the principal building. Final elevations for the enclosure shall be a requirement of the final building elevation plan. Planning Commission Agenda – 05/03/11 9 8. Areas intended for large trash handling and recycling collection areas shall be surfaced with concrete that meets or exceeds minimum City standards. This shall be a requirement of the final building plan. 9. Eating establishments and other uses that produce significant amounts of liquid waste shall configure areas intended for large trash handling and recycling collection areas to drain to the sanitary sewer system through grease traps or similar devices as required by the Community Development Department. Not applicable. Retail Sales. The applicant’s narrative indicates that a limited amount of retail sales will occur on site. The zoning ordinance allows retail sales as a permitted accessory use for office facilities in a B-4, subject to the following: 1. All sales are conducted indoors within a clearly defined area of the principal building reserved exclusively for retail sales. Said sales area must be physically segregated from other principal activities in the building. 2. The retail sales area must be located on the ground floor of the principal building. 3. Sales Area. The retail sales activity shall not occupy more than fifteen (15) percent of the gross floor area of the building. The applicant has indicated their intent to comply with these conditions. Plat Standards Final Plat. The subject site is currently platted as Outlot A of the Monticello Business Center 5th Addition. The applicant is proposing to final plat a portion of the existing outlot for the Phase II site as Lot 1, Monticello Business Center 6th Addition. This replat will create a lot larger than that proposed under the preliminary plat. The preliminary plat platted only the building footprint for each of the five buildings, with the balance of the property platted as an outlot. The proposed verterinary clinic seeks to own a larger area outside of the building footprint in order to accommodate their use needs on the building perimeter. The development contract for Phase II will address the proposed lot’s relationship to the balance of the site for maintenance purposes and cross-easement documents will be required to accommodate parking and access configuration as proposed. Planning Commission Agenda – 05/03/11 10 Under City Ordinance, final plat review and approval occurs at City Council. The applicant intends to submit their re-plat/final plat on or before May 3rd for the review and approval of the proposed Monticello Business Center 6th Addition. ALTERNATIVE ACTIONS Decision 1: Resolution of Recommendation for Amendment to Conditional Use Permit for Planned Unit Development and Conditional Use Permit for Veterinary Facility (Neighborhood) 1. Motion to approve Resolution 2011-36 recommending approval of the amendment to Conditional Use Permit for Planned Unit Development for Monticello Business Center 5th Addition and Conditional Use Permit for Veterinary Facility for the proposed Lot 1, Block 1, Monticello Business Center 6th Addition, contingent on compliance with those conditions specified in Exhibit Z. 2. Motion to deny Resolution 2011-36 recommending approval of an amendment to Conditional Use Permit for Planned Unit Development for Monticello Business Center 5th Addition and the Conditional Use Permit for Veterinary Facility for the proposed Lot 1, Block 1, Monticello Business Center 6th Addition, based on findings to be made by the Planning Commission. 3. Motion to table action on the request for amendment to Conditional Use Permit for Planned Unit Development for Monticello Business Center 5th Addition and Conditional Use Permit for Veterinary Facility for the proposed Lot 1, Block 1, Monticello Business Center 6th Addition STAFF RECOMMNDATION Subject to the conditions listed in Exhibit Z, staff recommends approval of the Conditional Use Permit and amendment to Planned Unit Development. The proposed use is consistent with the Comprehensive Plan and with Zoning regulations for the property, subject to compliance with the stated conditions. Planning Commission Agenda – 05/03/11 11 SUPPORTING DATA A. Aerial Image B. Applicant Narrative C. Landscape Description D. Suggested Landscaping Plan E. Exterior Finishes & Parking Description F. Building Elevation Material Examples G. Site Plan H. Draft Elevations I. Floor Plan J. Approved Plans – Quad Development PUD (9/4/2007) K. City Engineer’s Comment Letter, dated 4/26/11 L. Resolution 2011-36 Z. Conditions of Approval Planning Commission Agenda – 05/03/11 12 Exhibit Z – Conditions of Approval Conditional Use Permit for Veterinary Facility and Amendment to Planned Unit Development Outlot A, Monticello Business Center 5th Addition – Proposed as Lot 1, Block 1, Monticello Business Center 6th Addition 1. The area provided for animals shall not be exposed to stormwater and the waste shall immediately be picked up and disposed of properly. 2. Animals shall not be kept outdoors overnight or be allowed to remain outside unsupervised. 3. All animals must be leashed. 4. No outside storage of carcasses shall be permitted. 5. The facility shall be subject to an annual inspection by a City Health Officer at owner's expense. 6. The applicant shall submitted final building elevations with specified materials consistent with code requirements and compatible with the original PUD. 7. The applicant shall submit a site plan/building elevation plan illustrating the following: a. The location and configuration of landscaping of screening for large trash handling and recycling collection areas. b. Large trash handling and recycling shall be at least six feet from a side or rear lot line, and shall not be located within front yards or corner side yards. c. If a wall or detached accessory structure is used to screen or define a large trash handling and recycling collection area, the building materials used for the wall or accessory structure shall be compatible with the principal structure and be readily served through swinging doors. d. Areas intended for large trash handling and recycling collection areas shall be surfaced with concrete that meets or exceeds minimum City standards. e. Final building design, materials and color consistent with the code requirements below and compatibility with the original PUD. f. Sign placement and size. Planning Commission Agenda – 05/03/11 13 8. The applicant shall submit a detailed landscaping plan illustrating the following: a. The number and species of plantings in order to verify compliance with the original PUD and base landscaping code requirements. b. The location, number, species and configuration of landscaping for large trash handling and recycling collection areas. 9. A photometric plan compliant with the original approval will be required at building permit. 10. A cross-access easement document shall be provided to the City, verifying that Lot 1, Block 1 of the proposed Monticello Business Center shall have direct access to School Boulevard and to PUD parking facilities. 11. The applicant shall comply with the comments per City Engineer’s memo dated April 26th, 2011. 12. The approval is subject to the re-plat and execution of Development Agreement for Monticello Business Center 6th Addition. QUAD DEVELOPMENT CONTRACTOR; 5GOTT BUILDERS 12 DIVISION 5TiREET BUFFALO, MINNE50TA 55313 tel.: (163) b84-0000 Fax: 063) 684-0402 contact: Reck Scott NEW BUILDINGS. MONTICELLO, MINNESOTA ARCHITECT: H.T.6. Al2(HITEGT5 9300 14ENNEPIN TOWN ROAD EDEN PRAIRIE, MINNE50TA 55341 Led-- (152) 2"18-8850 Fax: M52).21&-15522 Contort: Tom Moor5e DRAWING INDEX T5 TIRE 5HEET, DRAWING INDEX, d PROJECT DATA GI EA571W, 6ONDIT10% SURVEY 62 PRELIMINARY RAT CIVIL ENGINEER: ANDERSON ENGINEE-RIN6 f3bbO5 15T AVENUE NORTH, SUfTE 100 PLYMOUTH, 4NNE50TA 55441 tel,: (163) 383-1054 Fax: (Ib3) 383-1081 Gontoct: Mark Joster LAN05CAPE ENGINEER: MARKELL-LABERGE DE516N GROUP t5 EIRENTWOOD AVE. EXGEL510R, MN 55331 Lei.! 952-414-2260 Fax: 152-414-0155 Contact: Scott Morotz VICINITY MAP 0 LEGEND: NORTH (P XTIMUTE i8 STATE MMY O CMariGYM * fRaELT LXATY,N MATERIAL 5YME01-5 Ki/ STRE FINAL PIAT G3 GRADING, DRAIWE 1 ER05ION PLAN C4 511E UTILITY PLAN G5 CAN5TRUGTIOR DETAILS G6 GON5TRUGTON DETAIL5 LI LAN05CAPE PLAN 1-2 LANOSGAPE PLAN AIJ 517E PLAN Al2 PHOTOMETRIC LIGHTING PLAN A2.r FLOOR PLANS - 15TORY R MEZZANINE A2.2 FLOOR PLA16 - THO 5TORY A3J EXTERIOR ELEVATION5 A32 EXTERIOR ELEVATIONS A4J 516N PLAN CIVIL ENGINEER: ANDERSON ENGINEE-RIN6 f3bbO5 15T AVENUE NORTH, SUfTE 100 PLYMOUTH, 4NNE50TA 55441 tel,: (163) 383-1054 Fax: (Ib3) 383-1081 Gontoct: Mark Joster LAN05CAPE ENGINEER: MARKELL-LABERGE DE516N GROUP t5 EIRENTWOOD AVE. EXGEL510R, MN 55331 Lei.! 952-414-2260 Fax: 152-414-0155 Contact: Scott Morotz VICINITY MAP 0 LEGEND: NORTH (P XTIMUTE i8 STATE MMY O CMariGYM * fRaELT LXATY,N MATERIAL 5YME01-5 Ki/ STRE O LSD eLXKM WIN 1i4TT.lE LATZ4 -�� FY.E ER" O IMR)I. MY I= 6LOC,KM ® fJEAD II:sAA.k" OP`1:RET6 61MK (F,FU] /�% rw H= Pi wxv F�-1 ukl'.R MWfLMT MIR EARTH ++ 11 I I Accts m O 6YPriH 6OM0 OR A,-6THt rm SLAIV OR ORAVEL -E owm .�� 6x7. DM. 4 F0e5F*Y5TEM PATME WMv / 5TRd1. RRAL 51TH. OR VITAL 5TTA5 A�� ,l R( HI TE(3 TS w w w. h tg -a rc h I t e ots , e o m 9300 Hennepin Town Road Eden Pralria, MN 55347 Tel: 952,278.8880 Fax; 952.278.8822 cOPYRi6NT 0 Za07 bI NT6 Arc88eas PROJECT QUAD DEVELOPMENT NEW BUILDINGS MONTICELLO, MINNESOTA ISSUED SET 09dd-07 PNEL"IllklYPLAT 8E11510NS DATE 10. HIM BLOM R M H DWEM SF= BWA14 MN M3 FACIND 70,24-M I HEREBY COMFY THAT TMS FLAX SPEODUTIOB OR RPAOBr WAS PR£PAR£o BY TAE DR UHOfR yr DIRfoT SUPfBI K41 No THAr I Ay ADULY fKEBSfD ARQOT[CF MR THE IA/ S V TBE STATE OF MINNESCTw ..IAME� 6ROVER 121 , 09/Over REG. RD. DATE TITLE SHEET, DRAWING INDEX, & PROJECT DATA 'SEP ~'4 200 DWIM AAT aromar. 78}1 TS4� i^ 9i SIB]% SURVEY FOR: SCOTT BUILDERS / / 1 PROPERTY ADDRESS: School Boulevard, Monticello, Minnesota. LEGAL DESCRIPTION: Outlet A, MONTICELLO BUSINESS �; _JI • r CENTER 3RD ADDITION CERi1FICATTON: ��,� .�•' 1 _ J # .p/ hereby certify that this survey was prepared by me or under my direct supervision and that I am a duly Licensed Land Surveyor under the laws of the Stote of Minnesota. % / /' / _�\ \� \ '\_ # '{# L m •"a. Doted: May 31, 2007 / /,� / / JI I Anderson Engineering of Minnesota, LLC / <'!' i /' f / y Jack Balks / / -I `I p' # ° Minnesota License No. 20281 L 1 I f I _ / /,# / K, NOTES: / -4, 1. The orientation of this bearing system d based on the / ,�,,,.,� of south No line of Outlot A which is assumed to have o bearing of North 54 degrees 10 minutes 10 seconds West 1 / \. °0.+¢°'^s• •, ��^ 2. The area of the property shown hereon Is 196,028 square feet or 450D acres. . 3. No title work was provided for the preparation of this survey to verify the legal description or the existence of any easements or encumbrances. 1 4. According the City of Monticello, the subject property / /! / Is zoned B-- 4 Regional Business and has no setback '�- // �� `la t requirements. It is recommended that the property owner / / F;,�, obtain o zoning letter from the City to verify all conditions that affect the property through the city zoning ordinance. This survey does not purport to a ��� �`� \ # o / /�of /f M _�� °� (J•-> T \`\ \ \ € \ \ cc* ° h /s / / describe all conditions contained in said ordinance. 5. The location and extent of underground utilities, if shown, / �� -�� -�,\� \\� r +) A' �j / ,r- %� \�� "�-v,\\. ` ? are based upon existing drawings provided by the utility /`��\�\�, \ . ` 111 '/� �" J � \ d{ companies and by above ground evidence. There is no ` \ /I Jr/ ° / �`j 4'a guarantee as to the accuracy or the completeness of this \ \ II / �I w /-.�_ �� --Z information. The size and location should be considered -d / ! Its $ f \ ".o l\ g approximate. Additional underground utilities may be , iJ ° ��S,T \ql, �_� (� e / ,•, _ present. Vershould be t the existence and location of all utilities should be obtained from the utility Mprior to 1 •� __ ��__ .—___\ �_-___- g \ le / any planning or design. Iaccordance with Minnesota u Statute, the location of utilities shall be confirmed prior to / ::� ' 1 �\ �•�\1 i _��� '�,_- '+ r / any demolition or construction. 6. The tree information shown hereon was collected during field survey in non-forestry trained Anderson En Engineering of Minnesota survey personnel. Tree sizes are _ estimated; locations ore accurate to plus or minus three / %` - _ �- � oEp` feet; and the tree count Is within opproximotely / / \ \ 1 ninety-five percent. O '�_ 'tel, t}5�7�- "�` - �'�"• L _.� J / / ;`r•I Q 7. BENCHMARK: Top nut elevation of fire hydrant at % r northwest corner of Outlot A= 909.1 feet. -jy. 13 TREE LEGEND LEGEND11 1 O FENCE 1 MANHOLE — \ % - -FF1vl>t / � F DENOTES 2" ASH 0 CATCH BASIN =--OVERHEAD VIRES •° DENOTES 4' BASSWOOD a HYDRANT —-UNDERGROUND TELEPHONE e f 7! 1 DENOTES 4' BIRCH + SIGN--SANt7ARY SEWER / r DENOTES 4- CEDAR DENOTES 4` GATE VALVE —STORM SEWER / 1 ORNAMENTAL o GAS METER ---GAS MAIN DENOTES 2' PINE A POWER POLE —*—WATER MAIN DENOTES 2" SPRUCE a TELEPHONE BOX m ELECTRIC BOX • DENOTE5 FOUND IRON fiONUMENTA7IDN / I 0 50 100 S I I l SCALE IN FEET I i WAsT I It ! 41 4-07 CITY APPROVAL RECORD SET/PERMIT SET DESIGNED- •7-07 OWNER APPRAISAL RETNMtI Anderson Engineering of Minnesota, LLC QUAD DEVELOPMENT NEW BUILDINGS GoMH. No. F 2-07 RENStD PER OWNERY PLAN RENEW DRAWN: �I/'1 11854 2-07 REEIMI PAEIIMIN F PLAN FOR CITY SORFA7TAL NNIH CIVIL ENGINEERING AND LAND SURVEYING MON I II.ELL Oa MINNESOTA EXISTING CONDITIONS SURVEY DRAWING NO. 4-07 PRELIMINARY PLAN FOR CITY SUBMITTAL taeei 1.1 AVXN16 NORI31. ben& yap, PLYYp H TG ARCHITECTS, INC. CHECKED BY: tmr, yet s56S3 C1 IA7E DESCRIPTION OF REVISIONS DGA TM (]63) 4f2-4opo FAX (7831 41¢-splxt I MONTICELLO BUSINESS CENTER 4TH ADDITION DRAINAGE AND UTILITY BASEMENTS ARE SHOWN THUS! I6 6I Jb b� BERG b FEET IN WIDTH, AND ADJOINING LOT UNES UNLESS OTHERWISE INDICATED AND 12 FEET IN W91H AND All.1 M14G STREET UNES AS SHOWN ON THE PIAT. I I R In A/T I �Civi��tz Jfl/n nn i v ^ 41 U7t /VLAY II l D� It ZONED B4 M � i / 3 lfIt WAL U A R T ZONED B4 LL -u lilt `' BUILDING 0'v ;111 it J ,� it our -.o' �], ! l(A F ; ! '77 6' - _ r z J r J 1 Jalp Lj o TLor 1 'DAT ASE i\ d 1 jr7� '�"—� _ ,I Y r I� T I! 1 i r P �� � Q � � ' I � JJ� j j FUTURE PHASE I �`- J3 -L' f-�"`4`-..--�, fjJ1 T D P L1 LL N-�-�� FL P14A __-.: <. FUTU(TWIRE LOT UNES _ __ _ 'H'FY'b11 PA - _ - - _ - _ _ _ __ vY Div"' F�iNc BUILDING FOUR I LJ BUILDING FIVE — R22.II \Y�J 111 I LOT 1 85005E — -- — — � _ I N ------ 451- - - - -- -— 696.35 ---- � �----—--- - -_ -/- l ��1 ZONED PZ -M TO'aT�W1Es 1�, L_L,,,�_1 ;E,'i_� / m / !/ , ZONED B4 _ u�l c j rc^ o� s 0 SCALE IN FEET PROPERTY ADDRESS SCHOOL BLVD, MONTICELLO, NR EXISTING LEGAL DESCRIPTION OUTLOTA, MONTICELLO BUSINESS CENTER 3RD ADDITION. %RIGHT COUNTY, MINNESOTA SITE DATA P.I.D.: 155-169-ODJ010 E%ISIWG ZONING = B-4 REGIONAL BUSINESS LOT AREA = 196,028 S (4.500 AC.) HENONMARN: TIP NUT D-EVATION OF RNE HYDRANT AT NORTHWEST CORNER OF OLFILOT A= 969.1 FEET. SE SACKS SAME AS DRAINAGE A: DTUTY EASEMENT UNES OWNER OCELLO LLC 4065 CHELSEA RD W. MONTICELLO, MN 55362 APPLICANT QUAD DEVELOPMENT C/O SCOTT BUILDERS 12 DIVISION STREET BUFFALO, MN 55313 RICK SCOTT 753.604.0000 ARCHITECTS HTG ARCHITECTS, INC, 9300 HENNEPIN TOWN ROAD EDEN PRAIRIE, MN 55347 TOM MOORSE 957-278.SBBO ENGINEER: ANDERSON ENGINEERING OF MINNESOTA, LLC 13605 IST AVE N SUITE 100 PLYMOUTH, MN 55441 MARK T. JASTER, R.E. 763.412.4000 SURVEYOR: ANDERSON ENGINEERING OF MINNESOTA, LLC 13605 1ST AVE N SUITE 100 PLYMOUTH, MN 55441 JACK BOLKE, LS. 763.412.4000 ...... 4 R -7-a71 OWNER APPRAISAL SET - IATJ II Emtar axnrr THAT Tws w.v, SPEfFTCA1ICN. a+ repair wAs I MLY�umt�pRq�ID CNpj p,Epj1EER UN T THE LAWS THE Anderson Engineering of Minnesota, LLC QUAD DEVELOPMENT—NEW BUILDINGS COMM. N0, PLOTTED: 11854 3 7-16-07 REV9Sm PER OWNER/ARCNITECT REVIEW DRAWN' STATE OF LIDT8 & 2 7-2-67 REVISED PRELIMINARY PLAN FOR CIN SUBMITTAL T14i PRINT NAME. 14ARK T JASTER. PE C I V I L E N G I N E E R I N G A N D L A N D SURVEYING MONTICELLO, MINNESOTA PRELIMINARY PLAT DRAINNG NO. 1 6-4-07 PRELIMINARY PLAN FOR CITY SUBMITTAL CHECKED BY: SIGNATURE: lad" let AYCNNN NORTH, s ym lo0. PLYNoUTTI. RH 5seeT HTG ARCHITECTS INC. C2 NO. OATS DESCRIPTION OF REVISIONS DATE UNE 4 2007 U�5E j 4GS34 TSL (T&9) u -Ao FAY (1431 412-4oao MONTICELLO BUSINESS- CENTER 4TH ADDITION KNOW ALL MEN BY THESE PRESENTS: That Scott Builders, a Minnesota Company, fee owner of the following described property situate In the County of Wright, State of Minnesota, to wit: OuVot A 1ADNTICEIL0 BUSINESS CENTER 3RD ADDITION, according to the recorded plot thereof, Wright County: Minnesota In witness whereof sold Scott Builders, has caused these presents to be signed by its proper officer this day of 20D� Signed: Scott Builders. by its STATE OF MINNESOTA COUNTY OF The foregcing Instrument was acknowledged before me this day of 200— by , of Scott Builders, a Mlnresota Company, on behalf of the Company. Notary Public, County, My Commission Expires: I hereby certify that I have surveyed and platted the property described on this plat as MONTICELL BUSINESS CENTER 4TH ADDITION: that this plot is a correct representation of sold survey, that all distances are correctly shown on the plot In feet and hundredths of a foot• that all monuments have been correctly placed In the ground as shown, or will be placed asrequired by the local government unit, that the outside boundary lines are correctly designated on the plat; and that there are no wet lands os defined In MS 505.02 subd. 1, or public highways to be designated other than shown. Jack Balks, Land Surveyor Minnesota License No. 20281 STATE OF MINNESOTA COUNTY OF BRIGHT The foregoing surveyors certiRcate was acknowledged before me this day of 200— by Jack Bdke, Land Surveyor, Minnesota License No. 20281 Notary Public, County, Minnesota, My Commission Expires: This plat of MONTICELLO BUSINESS CENTER 4111 ADDITION was approved by the Planning Commission of the City of Monticello. Minnesota at a meeting held this day of , 200, By. Chairperson This plat of MONTICELLO BUSINESS CENTER 4TH ADDITION won approved and accepted by the City Council of the City of Monticello, Minnesota at a meeting held this day of , 200— By. Mayor By. , City Administrator Examined and recommended for approval this day of 200._. By. Wright County Surveyor Taxes paid for oil years through year and transfer entered this day of 200_, By. Wright County Auditor 1 hereby certify that taxes payable In the year on lands herein described are paid this day of 206—. By. Wright County Treasurer I hereby certify that this Instrument was filed in the office of the County Recorder for record on this day of , 200_., at o clock M, and was duly recorded in Cabinet Sleeve Sids _ , as Document Number BY Wright County Recorder A A /l A l 7— 1 /% T' IVr t1 1 v 1 1 v L_ � a.Inn1'rr/�r-r i n \ IVIlJ1V 11vL_L_L.L/ `� vL_! V 1 L_I l 8 A 1 7 T 1 1 A A o f r1 U I U IVI 1 V o DENOTES 1/2 INCH BY 14 INCH IRON MONUMENT SET AND MARKED BY LICENSE NO. 20281 • DENOTES FOUND 1/2 INCH 13Y 14 INCH IRON MONUMENT N A fti f -'11I -T- r n n I W n U L/ I i I U 1 V 141, S 0 50 100 150 SCALE IN FEET 1 INCH - 50 FEET Anderson Engineering ofMinnesota, LLC Cl VIL 811 G I N E R R I R G A R D LA ND . SURVEYING I A ry r1 !1 11 .LJ I I T I ! rl I U 1 n i 1 v% 1 I l \ N A fti f -'11I -T- r n n I W n U L/ I i I U 1 V 141, S 0 50 100 150 SCALE IN FEET 1 INCH - 50 FEET Anderson Engineering ofMinnesota, LLC Cl VIL 811 G I N E R R I R G A R D LA ND . SURVEYING I A ry r1 !1 11 .LJ I I T I ! rl I U 1 n i 1 v% 1 I l N A fti f -'11I -T- r n n I W n U L/ I i I U 1 V 141, S 0 50 100 150 SCALE IN FEET 1 INCH - 50 FEET Anderson Engineering ofMinnesota, LLC Cl VIL 811 G I N E R R I R G A R D LA ND . SURVEYING NOTES: 1. TOPOGRAPHY @ SATE SURVEY BY ANDERSON ENG(mm NC OF MN. Um. f I ; 2 ALL CONSTRUCTION SHALL COMPLY VATH RECOMMENDATIONS OF THE SOIL ENGINEER UNLESS DIRECTED OTHERWISE. 2 7. ALL CONSTRUCTION SMALL COMPLY 4NTN CRY OF MOHR5iL0 IXCIHFfRC1C t• �� STANDARDS NID T!ff 2005 FDInON OF MNDOT STANDARD CONS,RUCRON s I ,, AjiI I 1 + 1 I \\_ , \� S'EdFlCAnQVS (INCLUDING SUPPLEMENTS) UNLVaS DIRECTED OTHERWISE, SCALE W FEET ' f I f II t \ �.\\ \\ ` 4. ALL CO1STItUCnON SHALL COAfPLY WTH APPILCABLE MU CZ \ j WATERSHED D)STRICT, COUNTY, MPCA, DEPT. OF HEALTH, AND MNOOT �` i ( ) '1i \ PERMITS. A 5. ALL HANDICAPPED STALL NACCESS RAUPS SHALL COMPLY CURRENT ADA STANDARDS. SEE ARCHITECTURAL ATH PLANS FOR EXACT WA L A l LocanM ofFN SWLOWC R2AHLES, IV/ _ 6 ARE FORkn0N AND 0ENFRAL INFORMAT7OI E or Em�D:iLTHE YmTHEINEOROMAnON s H -- - �- --' i _ ; 1 v i I A ! a f r< WARRANTED TO BE AMMATE OR COMPLETE EHE COi{TRAOT IN -\\ COOPER CN ATH THE APPROPRIATE UTILITYCATOI COMPANY 7H MU AUTY, _ '(-' _ (' s �I )J _ IS RFSPONSELE FDR VEfMMRG THE LDCAnON AND DWRI OF �\\ - __ 60 ' a UNDERGROUND UTLOIE& ' \ ��-.,. \ , m V / wM �, - �^ <-`'m°`.'6a � \mac \\\_ HB'• \�'�\\��\\�.. ,. /- _.___ �� +„ d i'l � A 1---'` -�I _----- - ___-( - ,Ai.p_ .y -Y • gyWe ----------- M.VD 8ir4Y,N '`9' -�j3 f 0 14 sz Y " - Y W'►r`a �'�� Wv.9ss.a < cry .aaL•.a g _�` / / a 1 ` -_11 i-�+ �� SILT FENCE �/I j a� �E=ggY Y ' 4BUIL DINGN�CX. ORAINACF IND ' _ ,�' i +1 'x• `` `'J '\ �z, � ___ _ 5 EA NEN7�__�y� �.{ - �U� X.6, n CC F{ `a r f 1IN, FENCE _ _ (TYP.)'.1 <>__ - _F�-"� s O,.FUTURE t / r _ Bas "� �•_ 0 1 PHASE 1 .l ! :-� R / m m / 965— - B ----------- --- --- - - - - - - 0- i fl-tj I71 -I ST -N AI ' BI P N t+ J 1 �V n ' i i u PER DETAIL (TYP. A 1 r �6 ,bn i! f 1' \` FUTURE PHASE i E�HASE 1 rf J ,1 � to S ! p • Y ,� I I W I 7 . ---- ---------- --_---�FFfis--------- BUILDING FOUR--- ��t _ BUILDING FIVE _ _ - -—__-______E —___— ___-- ----- .0 1R INSTALL & MAINTAIN TEM ORARY ROCK - ' ° --_ _ CONSTRUCTION l l r NSD ENTRANCE PER DETAIL __ _ -- --- ---`, _ SlLT FENCE - - g,, o'I (TVP.)( 1 s t �I T1, I _ T - \ n i- �' I ill ' - '_y - V \�-�_-� � $� � ``/♦9 I`� T / } f 3$iAl� ' ,`J� , • ra -\ o E `T` ' \ Z_ .'I ; t a�; I v I I \ I I I - �, \ /T = _\/� 5 �9P P� p`;.f ''l I ' _ S�e 1 TOWNHOIAES / �\ "X •'/ \i l �L; Al m 1 9-4-071 CITY APPROVAL RECORD SET/PERMIT SET DESIGNED: I xwwr cFxmY THAr TIUS PUR 3+EaNCARa+ OR REPORT WAS 8-7-07 REM APPRAISAL SET MTJ AROULY� B OR I`E6sslo AL MY s w Un D,;, Anderson Engineering of Minnesota, LLC QUAD DEVELOPMENT NEW BUILDINGSGRADING, CONAM. NO. PLOTim: 7-16-07 REVISED PER OWNER/ARO4TECT REVTEW STATE W WvIflmTA. GRADING rR'� °R""" DRAINAGE &7-2-07 REVISED PRELIMINARY PLAN FCR CITY 9JBAlITTAL PRINT NAME MARK T. JASTER C]YIL EN GIN£BRING AND T,AND SURVRYING ,6-4-07 PRELIMINARY PLAN FOR CITY SUBMITTAL C , MINNESOTAPSH CELLO WNG NO, DAVE DESCRIPNON OF REVISONS CHECKED FLY: DATE E: 19806 Nei EL (7 s 41V- 000 FAX loo, PLT5+0,13M. 101 5594[ EROSION CONTROL PLAN DATE .UNE A 2007 LICENSE a 40931 SSL (Y&9T 912-4000 FA%(�6O) 912-1090 HTG ARCHITECTS, INC. C3 f NOTES; 1. TOPOGRAPHY & SITE SURVEY BY ANDERSON ENGINEERING OF MN, LLC. j ' 1 r L04PLY MSE. REC041UENOATIONS OF THE SpL I 2 ALL CONSTRUCTION DIRECTED ENGINEER UNLESS DIRECTED O NER NSE 3. ALL CONSTRUC71ON SHALL COMPLY WT1 CITY OF MONTICELLO ENGINEERING STANDARDS AND TiE 2005 EDITION OF NNDOT STANDARD CONSTRUCTION Z 4 SPECIFICATIONS (INCLUDING SUPPLEMENTS) UNLESS DIRECTED m T OT{ERW15E. 4. ALL CONSTRUCTION SHALL CCiLPLY N1Ti APPUCAgLE L1UNIpPAL, SCALE IN FEET .Y v r h WATERSHED DISTRICT, COVNI . MPC& DEPT- OF HEALTH, AND LNDOT i ! 1 A gpp PE7WI7S '� CURRALL ENT PADA ST NDARDSALLS '�SEE ARCHITECTURAL PLANSD ACCESS RAMPS SMALL SFF COMPLY EXACT WA LDCAn0M OF BUILDING ENTRANCES. q i 1 S. THE LOCATION AND TYPE OF 1ON OEXISTING UTILITIES DR"A ON THE \\ `- / / f ARE FOR GENERAL INFORMATION ONLY. THE RffCRNAnON 75 / WARRANTED TO BE ACCURATE OR COMFLElE THE CONTRACT IN \� �\\\� {{{ CDOPERA11ON WITH THE APPROPRIATE UTWN COIJPANY OR IAU- AIJTY ���\�, J v / B° J1 i IS RESPONSIBLE FCR YOU" UNDERGROUND UTLOCATIONC THE LOCATION AND DEPTH OF \\\\\\\ II f » jII r Twos -SI �,\_ MAINEAIN 7.5' MINIMUM COVER OYERALL WAIF WAN. • \,.�` \\ . - I COMM LIF I v� � �� � J l��e ' '' `\1 � ` �t /� � � �r4 4 ) f � <c `�wv�p�UL I ( l s�• r ' f INY<960.1 .STX yA I S,MN 'BUNC O J1 ( ( RIbK.� INV/ 7W 1 �� ujl n 1 ( 1( WV.959.64 'k\ �cg67.5 N V i/p � �, `�•� .mac- �� A I � / vN jI+N ¢ ; Y s J JJJ J I 1 &5ulL 1NG p �y N r a 2 e 311 Nl' 6 NY l� - OR4/N4gf AND ' UTILITY EA {�7�_ ---�� � iIl' (/ � c � � 1 •� • i '� ' ' •.` �s � j v2 ' � 1 ; IN B6 7 SNR O }.00X � R. :A',tr. V / ' •� ' � __ r � {�L• INV=9`A7 �1j ' / C9'D IWATEHN,IVi 2 ) NI { l I g l n W1 LC ro I f i -5 Po 9 .3 _ Il' a INV�96i-B5 S I _9 .D7 1`�N-77' i1�Y O V=956. E -'l i 06 .3 J I I rn a HV837.3 47 1. PVC 'DOA ]I 9S I Co WA ---�F MAIN all �� 1g' 1`1 fj 3 PVC AN' y m 'SJYn O �7URE p�� PHASE 1 1 35 SAN I I f ryZ O 1.�� ylFUTURE PHASE TIDP HAS'Ej N f I JJJ PHASE 1 65 5yµ O D. T 9 Po4 64.7 N24 tf 75' NmHASE 7 ;m-.3.9 863.9 l ` wl3 174 LF IIr HOPE SIN SYS O ME= 51L <� NV -98418 STM a Q60X SII/ RIH RIM -983.2 W 9 .72 I f / r ' NV 95663 WV 95977 P D 7 f ,` 1 IF 4' DP STA SRR a o.BOX FUTURE PHASE PHA'w.SEi'. 7 ) I—N—I �I--I 8" PVC C900 WATERM/JN N_ l I I! 8� PVC C90D WATFRAIAIN 1 7 IT TYP. It i I N-1--I—I-1 I 985.0 Sn qq RIM= 77(( 6 2 IF B' PVC SDR 35 SIN SWR O 0.40% ( I f 220 LF W pw STIR 35 SAN SWR O 11401( X Wif=9S4.d7(�� / 5 A ITTr > I 0 / GATE YALVE 6 I TrH IT64. / �E W TEE jl I I 1 1 I L W ` 37 NV- 55. CUR & HYDRANT (I W )+ - NV. 54. N a N % ( - ff R (TYp.) III / I 301E 6' PVC B0R 35 SAN SYR O 1.00X Al 55. CBM1 � 1 1p �'=SNE) / BUILDINGFOURBUILDING F VE ; N�-P t ~Z 11 I I a➢` - -- — — — — I J1 ^ DRAINTRE em 1 V 5eg o y PH SE 1 fFE=966.5 3D tF B' Pvr PUMP , - J 1 + FFE-966.0 SDR 35 SAN 't s I 1 I. 0� r SRR 0I.ODX > I c I 1/ �4 ri•Y Y � �, , / 1 / �i � � � � ( �2Pa 1 RlNagfi3.6 ' E r J t 32 LF 24' HDPE S1)A SWH O 201E -s I W { 1 015' �Ilt00 ------ -----------------—--—-- - - - - -- - _ / I wv9saD 1 b malas --- -- A - - - - - - -------------------—--- - - - - -- - --- �'.as - q A� - INET-93344:ux} COMNECT TD 7 �� 1 a / c 1 1 '+;�`ipe YB� CONSTRUCT T9.,a �WATERSET� I SII (- � T T � � �IT9DEDRDp 10 0 O TOWNHOMES m 04-11854UTIL 5 9-4-07 CITY APPROVAL RECORD SET/PERMIT SET ➢E9p{ED: 1 HFJrf9Y CFRNNEI' nun THS P.»N, TEO17CAnCN. 111 PoPURT w+s 4 3 8-7-07 OWNER APPRAISAL SEC 7-16-07 RENSEDPIROWNER/ARCHITECT RENEW MTJ WLY 65F1YaT�n p UNDER � � � Tyr¢ u mm An Anderson QUAD DEVELOPMENT — NEW BUILDINGS 00110. NO. PLCITED, 17654 STATECiNPRR30TA DRAVM. CIVIL 2 1 7-2-07 REVISED PRELIMINARY PLAN FOR CITY SUBM17TAL 6-4-07 PREULIINAITY PLAN FOR CITY SUBM17YAL PRINT NAME MARK T. JASTER Pte' E N G I N E E R I N C AND LAND SURVEYING MONTICELLO MINNESOTA 1 SITE UTILITY PLAN DRAWWG "°. CHECKED B1'; 9GNATURE: 13605 In 4y211Us RmiDt s NTs lDo, pLYyoure_ la 661u HTG ARCHITECTS, INC.C NO. DATE DESCRIPnON OF REVISIONS DATE JJNE 4. 2007 LICENSE F 40931 TCL. (959) 412-4000 TAY (763) 412-4M0 C4 I""Standi Morl for - .L, IS, Storm Sewer the -i City ?Aontll MM -r___?-- —400-1 Til Guard for Standard Plate rary for End Section 03-86 4003 1--i -AFER—M-1— Ux Nal FOR �"Vos > L cowIRAOE &cree &Gutter Ell i E[&ra Catch smnaero Plate Lwory for the (uy of MO. Standard Frame and Cover 1002 Typical Hydrant St-ve St -d.6 P'.i. LAry for r"Stallotian the City W 11.1ii a3 a9 2Wt SLondard Plate Ubrgry for the City of Monticello _14 IFE We Blocking for *AoStandord i iPor Wotermain C a ky .1 Zkelo mm '. I. - Gw�_ 2002 vs SLondard Plate Ubrgry for the City of Monticello Catch Basin Monhole 4007 T"loo'Water Standord Plate M—Y for Service the '�'l f iii Na on' E- -w .T Ramp Pedestrian . R MID .p @e ply of MantiWbra w o o . —3-0 5009A T MEMO, JW a MIN MI S 2YF AMMO .... . - maw - all Trical Connection or num Vkitennnolinelnsulcitlon Standord Sanitary . PV Unitary Sewer Standard Pmt¢ L-..ry f., and Lowering e Outside D4o&.S,Sctlon for P. Monhol W Sal hole st-d.rd let. i I'll far lic"'Jol, .0h desrion Sionderd Plate o LI, Curb Romp 12--oo 2006 Y kw na Ih4 City of tm.di Il CR "i le— _U. -as Mill 31 1. city f 1J 03 -BS Rare o Di 3006 pill 5 8-4--07 CITY APPROVAL RECORD SET / PERMIT sEr DESIGNED: I KENER, crxnrY TRAT tws Pill SPOOD'i US REPORT WAS 4 11-7-07 Wi APPRAISAL SET MTJ Pi BY K Me VNIDER all �YSKN MD WT I M cmilil. no. PLOTTED: 3 _ A i U PAMESSIal MMEIR UNDER ENE i a IRE Anderson Engineering of LLC — 7-110-D7 REVISED PER W_ CHIl ill DRAW SIAIEWNIW�T& QUAD DEVELOPMENT — NEW BUILDINGS 11854 2 7-2-07 REVISED PRELI)ANARY PLAN FOR CITY suEWTTAL PSH PRINT NAME- DARK T. JASIER CIVIL ENGINEERING AND LAND SUEVEY.IKG MONTICELLO, MINNESOTA DRAWING NO. 1 15-4-o? PRELIMINARY PLAN FOR CITY SUBMITFAL CONSTRUCTION DETAILS NO. DATECHECKED BY-. StONATURE 18111015 3,1 Anwn woRTH, sum ISS, PLYMem, UK 66441 IDESCRIPnDR OF REVISIGNS DATE --AELI-2-007— i M CM) 41"DDD PAX (1-3) -M�M HTG ARCHITECTS, INC. C5 _14 We Blocking for *AoStandord i iPor Wotermain C a ky .1 Zkelo mm '. I. - Gw�_ 2002 Catch Basin Monhole 4007 T"loo'Water Standord Plate M—Y for Service the '�'l f iii Na on' E- -w .T Ramp Pedestrian . R MID .p @e ply of MantiWbra w o o . —3-0 5009A T MEMO, JW a MIN MI S 2YF AMMO .... . - maw - all Trical Connection or num Vkitennnolinelnsulcitlon Standord Sanitary . PV Unitary Sewer Standard Pmt¢ L-..ry f., and Lowering e Outside D4o&.S,Sctlon for P. Monhol W Sal hole st-d.rd let. i I'll far lic"'Jol, .0h desrion Sionderd Plate o LI, Curb Romp 12--oo 2006 Y kw na Ih4 City of tm.di Il CR "i le— _U. -as Mill 31 1. city f 1J 03 -BS Rare o Di 3006 pill 5 8-4--07 CITY APPROVAL RECORD SET / PERMIT sEr DESIGNED: I KENER, crxnrY TRAT tws Pill SPOOD'i US REPORT WAS 4 11-7-07 Wi APPRAISAL SET MTJ Pi BY K Me VNIDER all �YSKN MD WT I M cmilil. no. PLOTTED: 3 _ A i U PAMESSIal MMEIR UNDER ENE i a IRE Anderson Engineering of LLC — 7-110-D7 REVISED PER W_ CHIl ill DRAW SIAIEWNIW�T& QUAD DEVELOPMENT — NEW BUILDINGS 11854 2 7-2-07 REVISED PRELI)ANARY PLAN FOR CITY suEWTTAL PSH PRINT NAME- DARK T. JASIER CIVIL ENGINEERING AND LAND SUEVEY.IKG MONTICELLO, MINNESOTA DRAWING NO. 1 15-4-o? PRELIMINARY PLAN FOR CITY SUBMITFAL CONSTRUCTION DETAILS NO. DATECHECKED BY-. StONATURE 18111015 3,1 Anwn woRTH, sum ISS, PLYMem, UK 66441 IDESCRIPnDR OF REVISIGNS DATE --AELI-2-007— i M CM) 41"DDD PAX (1-3) -M�M HTG ARCHITECTS, INC. C5 GRAVEL StnndDrd P101e L,brvry for CONSTRUCTION ENTRANCE We Cty Oi LIrnllcello --5015 03-05 5015 STORM WATER P01111PON PREVEN7.ON Tm NOTES WQxD mr+aAciDP swL wuFY LDc+m�s Af:D oEYArras a fu L�PED1nE YDUfv DaVAN6 PWIR TO Co16IIMTnos Cp.TRQ ,KA9JR6 CNl6 fat at 8:E2 PLNb NID SPETiICwIMK, wG uAY NEIN %i Edre. EEVDmrtAMf eAi'rs DR 1WYnARY SIIOGNt M3PS swi ¢misTmRLtm Aw sMs+..r L4 iNE CDILOMNG MOtle Saaicnai fJIR✓TI[ES A VNW W R ]0 FEET. � raASER¢ E srowi vA�g nn rRwx'�'sim°fn1uLA» vr:Euv TAnrtu r. rAlDrov auvATm Axo E�wwTRr lauwlc ) Ii mom'-Bni. D,r�,mLxs a L°TesQn rxAvrn APPas L DOEI AKD mn£T Rml6 seffpmT TQ 5[aSI SFYFA NnzA a o+ADPm axmAcnrn sHAa PwmaE AVD uAIInur Au EN�m ae+ma. ucfs,Nu a AxwD,� mT � ��tDffi PNASf F rmaArm�c IaanDJeTtTs As wE As wosrAt oafma loAan>a As •w uuur'i�Ai uAv sE Ru m Yo �va`w9ura.�omA.Rr N. 4A famat �laa rAalRs you � uwrAT+ID BY T� WHmA4TM DllesiD ig9tACRtl M.6E NLR iNDY��CATkY15 sPLL � RFvOHa BY INE ED.VNG mvt]ALnai twTl DFfc® of Tti �M DRID�IID <OttlilFCtCR svJ; Tx[N BStWE THE 4AXgR1rtV NKA N ACxfmwN¢' IeRI THEY FYN6 Ara SFE�IU.i]NS S Wn%A PICIX%AP. AEtPT� a415iY�L5 ll�LLTMP£�PoY9®��1K� de®'D AW UgNED�grgFlpR OF'l� rAO.CCi. 0- PAWL BE PCR+[nm NM A VDb1iN� �TOP� �IDlsTw�emV �uiID Bi r. LA� E Q YVI<NID AT INE PP66WID euTFS iDMM l3 NaltS CF PLNRt auDwG WAESS OMOYISE NOTEA rmratme uoA/Aa¢ RAY AWASVAtt A p�O�Pa�� �� Wvt�>� Oa�Da�a�[' WrW OPV It�K TJ3V5[D • vE F0.TOYm+O TAg,A69..Oo6 u9 TVE PnfuES - P✓� pledu0>, flee m am Cm row. qn .M1e. the ovR Y rrot 'MRN HIl IDI WK ], it AlnBe} �mrPLR Alo [anaq neVAttYa 31vw1 al 4H PWI xt> <TA�f {ppI A PINI DRVttNc AI>o pfpyal CaitRO[. 6FPAlNNS SW1L iNi PIAtE MiHn M CCNEI%UCoat lmfi '' no Wray sASAai os T'A°rr®nc TA°'inwnnl a mwxuzlw°�`cTawicO� BE acuan w.Er rRcu PAtsn IB raoSnE fEvnrnRBx sEumATwl.AVls As aaElm m Tu oID,�L AIL fdT[Rr.TVIXYs 61NE tDCll MAIOb!ID DOTUCf SN41 M SJ.ILSMD PFF TIE N'PRdhn PWS{. iL ALL Olosal Q r♦I)wDa Datut ro-nwnfs siaRv m TwS PINI AID 'P�AOIECOXG ATFR QI411YBi LC2IN OA1CA4 �IDmv�ivarE�iLIT�ICA�ias�sTn�i wEAmOTY. Il MOET4R P9L )LL DEOVI:R POOIIS 9 �.6E A�nEOuATd inortCun�rml—¢[ A Wei u56 MPA615D BTRIY d59PATL1 MSKES T l ALL SOLA HASTE/ Ca151RUCtb1 IrBOE SY41 B[ Gsr@'D 6 u ACWR04tfE YETH uiu IRI`Cl� �5H Vuw3 wTSIW,s yBA1A D_ STDaLa/ Dla0A0 ff W Wug1l4CE RtH oa-MActuT u91f6urrAD'�i WwsADRUAx�aR4Aial uETxms IIe�roT �irum�RE E + wE cars o- wiwTlws ATCLswY ro RA»DLY sTAsv¢ SyRIL rmncN. Rxrs, m ixEswlr oT ss snilanf umpx to mvPLV Nml Iwul: REo�Evons Tla Aaec wY sE mruH:�im ai sfw: uaAs i ui¢iuT�« i xm �'sA>mmu�LL xm�»D=uRf�w.ww�s e�w�rc w ��PIA>t°iTA n n¢ roliovRanl ,� uYrF+ac woorsTNmum stEcc�..xacTio: La*A:s swAx TMeam i m �Rppmelvl�suar � N mi�vAAmlmm rm Txrs a•rxAl�ms Tfs� fD.nxns PAr a uE010�01L ABLY tYPE 1 SNAALG M�'O rr�.ac xM�t'ME Slnauw[ SCC u'IASIIDV IC'IHW R In'CROSPAb Sf 1FFllRlm[ A`U 6 rfroxNwlG Sit Siratm m � PACE MIIIIXR�E uqF elm a�iP a�,Le51 N YAIX�i15[B�aT'A�PATYrCWY S Ivi a D,mavTAt TO A2 uro3a< WMRa ha 1-W. l6 � �4� fETyN1�aDLfNI Of1fA0ffR ELLS PoRnbL5516 n�4 P?a'[Ntt l0 YAwa5 HrtgA3) OR <FYRRTtti VL6T SudlDf A 9.IYAfLvai RfaTSTSsixn bOVI T oRYs n-15s�Y6 Aunalµ CMra1 tF T� sIE. CwuEN6Ya 1q� Drl MOR FOTTYYI R' DE 9L . CR a nD: Lf:At izwsTR Self OR ItOSNO VY llff HIIPotIY. lT. LRivM1119F &nMHs 814.E DE N®.Y:SCaE EIW EBD49NYD ANT Alto Au NEtLSAD♦ FROSa! CaR110. fKfS1AVs AS VAT $ I�IRBII li•7PExEp [ot5 suu TAN9Sr GF O3T NOI K ISDIW 6 SfANED II®t {W SAT 6AtA fP AIL LTsd iSfdi AT tlVlSlmX.ilcVlnmt EY uLLutLE 1 d.�N FM 5[L tl'ilidYSE1` �fiW�IXN4vUClg1 AV -A RCIX CR."1161G110N OnNAV[e flaYufS T` rO Y T,vx BOaC DPm avTcmE TNwc 0. SSER CILfIID.'G AS vAV 8E DFtlATID stRAD vTNaE INAacPN: OCCVi sl[ eJLLTAS l@ REOEasa TO vAwTA01 I4T5 UNfG SUtN 1rvE AE FiavDUq Y4:O5/fii£tATNN ASE iSrARUSGD. 16 T�MY DA9�N 5W YDE If5o6URY 3nTmItAGSY aC[f� iat Cm5TMF1KKl ts� �'M U ". GaICiER IAVOCE A5 N£uS^ VM. 19. Bui ��h}rtAnov anMQ R TD BE PROSILN➢ ro ALL 5]OTY •2YFA CATCH D.l 5 TIxdH.laf uuc`�':`irvu a rwrs rTu�sE� A'P'Lms w s � I+.&'AzsT Ruacwwr minas tw uw:Lmu AVn A) InslclaGon Pon 1� ao�L kO ZnVIr M'e?OF vVor roar ttxA rss 7 Trow 4 „amu � Tm . r.nYAlm soL �W I BEFEHY CEROK 1XAT TmS Pu.N, EPEYA1CAnR1, LYt —T -S AE+�I.A WDpC PTT o^ Bf N®nlAnonDe ro]M �� wt aE r ♦ rml r M P+ta. —� S TIC LTEI 17AB.3 H6 Slandord PlDte Lbrvey fcr FlTER FRIC the City Of MDnNce4'O I� o3 -w 1004 STORM WATER POLLUTION PREVENTION PI AN SCH D 1 OF INSTA ATION &MAIN NAN aEa �xwrnr'L� SE31GYAl PIYFEt 6 u1Qrt. Y Stl fliitE TF CATTC,Vq P AATU6 Eo.�Ltm~si� AffA 6 1S RELtA�A. S c�rAnsc PNDn�Tornamt� I�Ec�R�ai�x PRaD m vA� c. w as R ��5YdNOf uTce �FeMC�D �rtG�uRC ®mL PE3V1l.TNi. uiu"t' Q m ouuW Dale �T Iii:Aiwcuir �.auL.wc 50'NtE EDHST. AND AxD ArT[N NEAW i DStNLAnaI. fWtY/L.RMii A vAPnaa LCTaInm PdD �itax e'�s�' vDn�'� rmrxon. rNYa AS mIDfD. 4ID Q W l01 Nc QaT w VAaTAa Atl RdM/L BaERI.MfK mRa RfvIACE WA9c-� ��n�♦. /ETAS FIUEaAIO.Y. odE*m02C�pu �nqn wl£T tGUSIx'JLIpV DID IS WAOW � I]HA t1aMRARY AaR4 ME nALY fEnvSo HDv: my IafIDPu v6 ui f�arcAsffi`i¢ orosa� a s�oeli mrrwu nws. CALL 48 H. BEFORE DIGGING: GOPHER STATE ONE CALL riAN CIN AREA (551)434-o0G2 MINNESOTA TOLL FREE J_ Joe �KrA.ra I,I O Batt �BRLE D11GN CxECA rn e DILE (1(ECN TG PAOTECi $TDA4 SEYEF 1HLETS -A9L. 04E OEDI tAvw f r� HALE CHECK Slondord P"" HA -,y far OETYVLS the City o{ HA -,y +• Pwu 1005 T LE., A` VNCOT J139 a.A55 S AOCJtEOATi DAY luDt7 APPA0IID S1Bf6A0E LIGHT DUTY PAVEMENT SEQ-00N NDr m sunt -- - W OAATTIDrt YCT CX OEAGN AHD EAMriRADE R i�ID1T5 %t]N IYO1EtldDf�lL RTPdir AND >FcvYLaaAnovs PBiaT ro corminfcTbN. . hash for StDntla(d Plole LOrory lar End S.U.U. tM thR C{y of Mmtkdlo Ram 03-08 4003 LEj:'7 TACH 2W L" FAIUWRWSlfEN-Y3M (fEL7 eA` {MOOT ]ITO CLASS S AGREOAY OILS (VDi.7 APPROtID 9D3LAADE HEAVY DUTY PAVEMENT SECTION xar To scAlE HOIf vRPT PASEVOR SEDnCN MENTI ANO AN raDmwoD °1iADi-P�avrs vxl�w�To ranazr was Po vva.rt,V w. unw•rr"eer_��wm SlOndare PmtD IIDrOry for � SpHlway Secci� the Ci{y of Monacello o3 -os 4009 ,R o-rVR w. r nrrnvY xI / ruCfAl I x DESIGNED_ I BEFEHY CEROK 1XAT TmS Pu.N, EPEYA1CAnR1, LYt —T -S 4 3 8-7-07 ON47ER APPRAISAL SET 7--16--07 RT15DPEROHNER/ARCHITECT REVIEW MTJ MLY�VE011Yf8�fD EDF; DHu IX „lam � E u O* StAT68F10NHISOTA Anderson Engineering of Minnesota, LLC QUAD DEVELOPMENT - NEW BUILDINGS GWdM. N0. PLOTIm: 2 7-2-07REySED PREUA6NARY PLAN FOR CITY SUBMITTAL PLAN FOR CRY SUBMITTAL PSH PRINT NAMENARK T. JASIER CIVIL £NGINE£RINO AND LAND SURVEYING MONTICELLOARY MINNESOTACONSTRUCTION N0, DATE 6Y: URE: 19005 T,E A46NV6 ROItffi, slfRa PLYNDL4 > E6,.1HTG , ARCHITECTS, INC. DETAILSCHECKED tC OES(3UPRON OF REMS(ONS DATE GATE _SNE 4 20074 2007 LICF1lSE } 40931 111 (489) S12-9008 FAX (483) i12yp90 X ( B v Site Plan NORTH SCALE. 1" - 40' LANDSCAPE REQUIREMENTS The greater of one tree per 1,000 sq.ft, of gross building floor area,or one tree per 50 lineal feet of site pedmeter. SCI FF. 51.100 SCIAL11000=51.1=51 Irees required LN.Fr. 19441n.ft.i54=38.88=39 trees required Trees Required per code: 51 trees Trees Provided perplan: 57 trees PLANT SCHEDULE IRI' DN CPVAIOkROTbIiIGpLtWJE eQE 0.00 eDAlrtlf.. ORNAMENTAL TREES t✓E rMaE .Iwa.l.„nJi,mr tlS eB EVERGREEN TREES xr asN0l.E,l1A.IPlE j C xr s• ea SHRUBS A PERENNIALS gryH MRUBELIE HYOeJ.eGFA da s<n. •J,wl,eii• � m',L 27- �cwoPut�oaGTwwo . x iV KPYJ TI K0.9LF9ERSTER rsr - aWNJPYrtInE O0.K 26" LYNPw asf NPs TY Krnwrus 'tkm Fla W o,wusamer 611E SOB S(Ea.A OOBOpA111LY ee ORNAMENTAL TREES PP:KSPIRESC Pse s ue:iPaa ror r ee EVERGREEN TREES nu Pi " s ISMI 14 Paa ,.ra Ew,we C cos B I s• ea SHRUBS A PERENNIALS gryH MRUBELIE HYOeJ.eGFA da s<n. •J,wl,eii• � m',L 27- �cwoPut�oaGTwwo . x iV KPYJ TI K0.9LF9ERSTER rsr - it xair ler !Pe OI 1BT1£PRnlre LYNPw asf NPs TY Krnwrus 'tkm Fla W >z 611E SOB S(Ea.A OOBOpA111LY Si moL TAY IS TAIIr+IPY tt:IY t5 mat LANDSCAPE NOTES; 1. ALL "ONG BEDS 70 BE EDGED TAIN EACH GAifDID CR EWA BLACK fight EDGING AND MULCHED IRTH I -M,12' RIVER ROCK MULCH It 3' DD'TH 054E A WL POLY NEED BARfAER. 2 IAIOSAaE (A1N1RAC10R SWl BE RFSPOfSBIE FOR CONTACTING RAPHER STATE dIC CRL. FOR UNltiAOgR0UIL0 UIrK1Y IACADOHS PRIOR TO qC ,rl 3. PUNT TIES ES & MRS AFTER AHA GRADES ARE ESTABLISHED AND PRIOR TO PLAKDNG OF LAWKS, WUSS OTtERWSE ACCEPTABLE To CENTRAL CO Hbt4JDR OR RVHM IF PLAITING OF LA AT 80 U TO VOI MENHAU CE TO LA REI G�ERGY�PLLNEHRG OPAND �ERATIGRS REPAIRXY 4. F A�DOESCR�RttR OFAECUYAID�ETTIAIAT& NNOWY GENERAL CONTRACTOR OR MU AKNG 5. IF MM IS A DISMCPACY BETKEN THE TAMER U' PLANTS SHORN ON THE PLAN AND THE NUMBER SHOWN ON THE PLANT UST, BE TIMBER SHORN ON THE PLAN SHALL W011. & VInHSCAPE CONDUCTOR 9W.L VARBAfFf i(5E5 &SHRUBS FOR A PRIOR OF Oti LEAN AM DATE OF RNA ACCEPTANCE AC M'SYT D M=" INILUTARG BEATH, POOR CRDXIR, ANO PWAIS ORIENTATION. 7. PROVIDE SOL AMfNDMFN35 AT ILL TM & SHRUB PLANIRKG ROLES CONSISTING Or EOKUL MLY OF ORGANIC MATERIAL ELAAK ORT, AND SANG. 8 ALL MATERIAL SHALL BE RATEDTOR LI'MAATE TOIPU" AWRE ZONE AND SNAIL COMPLY 1RTH THE LATEST EDITION OF THE AVEflCAN STANDARD FOR NURSERY STOCK AUERfCAT A5SOCLATtON OF NHRSRD PX 9. AIL URN AAFAS TO RAPE IRRIGATION AOI 500 TO PROPERTY LINES At41/Ok TO RACK OF CIMIff ALONG ROTI DF 1lfAY5. IO SOO SAL BE CULTURED KENTUCKY H.ULQtASS, FREE OF NEEDS & CAULS. LANDSCAPE CONTRACTOR `RLL WATER AT TWE OF l4STALATICIR ALAI ROLL ALL SOD AS HEM To ASZgE SODSHALL111 TLIFF BEE RETI' A(f.D�BY THE LfNOS AIL S"ES CAPE � g�ORR.E SIAL BE SIAI(FD. AHr 5tIDIRG OF 11. ALL SOD IS TO BE IRRIGATED. 12 AL THOSPLANTED SHALL RECEIVE SUBJECTED WOOD MIAAI SAUCERS WIN A MDDUIM DEPTH OF 4' AS SHOWN IN BETAS.i td AL TREES SHALL BE STAKED IF OEE30 HECFSSARY AND MAPPED AT THE ENO OF THE GROWNG SEASON. 14. LANDSCAPE OD TO WOLLIDE A CUIM£aE IAM IRItlGAROR 51SUR AS REO RED. �Oe agIl�POrcmvmW iCanS ,m,emm.cy:l mmm,mm ms ,Darrwe mLKa nyl:t mikd4rm"ms4. •core me m ee w �a a e•ym myna a1 o aemee wa. SNede Truele pleDtil Oq elaU .eve a .n,�ama�m, ertBrs- �� ' • Yama ¢1t W DlMrgmSed aON.E, loo:arcp;ei Mgapa m a � 5t -b Plan' Delal Oomt al:w Eah/ armulf, mitamlm m,w iW cw,l�Wli lttod meM daBia,apecMin,apiUL 'ROTE: T,aeb W adFen 69�OenaJJmis iSaotlNEuk. SNede Tree Pfanlieg De�iH SIOpeAladtlan •,.m MARKELL — LABEREE DESIGN GROUP 15 8RENTYHDO0 AVE. EXCELSIOR MN 55331 PH; 651.222-9250 FAX; 852474.0155 I hereby certify that thus plan was prepare) by me or under my direct supervision and that I am a duly rcgistercd LANDSCAPE ARCWTECT under the laws of the State `//y�`yy-!/f' ofMiunesota. !_EE MARKELL Date: 6131104 License No. 14313 L930 TG ARCHITECTS 4 Hennepin Town Rd. n Prairie, MN 55344 REVISIONIISSUE DATE RBwftd PAbaeig i 711ZO Permit selJete'ser aSITN7 fwamiftw Pul grpQ p7 OFSISNED. SKM I SHEET,: ORAWM aKr•, L I CHECKED. LM DATE; 5.04.2W7 Typical Z -story Office Landscape NORTx SCALE: 1' = ID' 2 -STORY PLANT SCHEDULE NEY OTY Q01/.MONlsOTAN1EK NAME GTE ROOT REMARKG SHRUBS 8 PERENNIALS .R 9 yyp roalari,PafUn„ 95 maL DWE 4 E yamsaAM'Comp �s 910 —L IPS 6 SAa'Aaata= 1= Primase C2 rnAL LW 18 JaniaeM rliloe�uk'Nonkp• f,5 mnL 5TH is L AYl1LY rkvaem &—Skazdov 41 mnL TAY 28 TAUNTON YEW k5 TEA 2 TE EHNYUPAIGHTARnORNTAE q BB TOG ' acfide4. Ti MULTI -TENANT PLANT SCHEDULE 10=Y QTV EOAWONMOTM4CAL RAue SuE ft REMN.s SHRUBS & PERENNIALS ANN 4 MH-EHYDRMN 93 mK e erboresaw'Mnafxae• DIQ 7 Sy�Gga maavN-NEN ' 95 mnL ME 2 E�mrparprs ahau'EipxM' 910 mnl GALS 74 SpA�oai'GolOmmmtl' m^L Gl:t 18 LY ilomomaar'Sle@addo' � TAY 7 TAUMDNYEW 95 MARKELL — LABEREE DESIGN GROUP 15 BRENTWooD AVE EXCELSIOR, MN 55331 PH:952-07x2260 FAX: 952J74-0155 I hereby certify that this plan was prepared by me or undermy direct supervision and that I am a duly registered LANDSCAPE ARCHITECT under the laws of the State ofMinnesoM LEE 1AARl� Date: 8/31M License No. 19313 Lu CL a � O U O Q -0 M coz O g0 K u y 4 PREPARED FOR. HTG ARCHITECTS 9300 Hennepin Town Rd, Eden Prairie, MN 55344 ND. REWSIDNIISSUE DATE 1 Revrsed POasing 771ZD7 2 I-.-Itsevuidso aWiro7 3 l PmUmmary Plot 9/pgAyl DESIGNED; SHA{ SHEET: DRRSYN: SiUd L2 CHECKED; UA OA7E: 9,04.2007 Is- 5AW SRKGO RA OPAWL EQLiaaJ - P05T-ttP. i M:nT 51HL $ALL 18'GANE BOLT, G4S i 6X6 MAIM YLYD 5V RT OM < PART TD. FTG. I TEACH &ATE P05T T IMAL IV ammr, PAM CCW. �'J I/4'=4' -O' IFTE.•5EE 5774 G1, 2x4 /4700 STW w 4'6 STL PIPE BCllARD - 3N'TRCATEDRr------------- FELL _C.iklG.I PAJN7 VLWYER Of OWER i 7EiO JG. 1'TE5 b'R ' GATES --- — ---- pE (WE B0.15 4 agyI%4 u V FR F7. Q m � WOOD SLAT 3 — _____ • • l , �' �P. ice SRAVVEL . B : i �r amm 51. AS RFD%) II i —WLEU RAEEVE5 II FOR GAHE saT5 TYR TRA5H PLAN 51TE PLAN 2x4 WE FRAIL (PaIVJ km 1117O0 SLA75 TD. fRNa15 y' E1... b8'Q• KYY ARpOTeG All T' BARREL HRGE - 3 P£R— SATE, Eal "= FRaE TD RTEE RATE 4'0 5TL PIPE EMLIJV i FILL FAW 6Y6 TREATED MIX F05T IYPK.AL STD. FRAMING '51B' BREADED RM NEEDED TO STEEL EIY}•ET RATES - SCR54 PLATES 70 14700 KRAIT: TREATED P= r -Typ. bx6 TREATED WX P •--•---'J'=Vr r 14Eg,J LS7AT&EY i10f05TEEL R J EQLiaaJ - P05T-ttP. i M:nT 51HL $ALL 18'GANE BOLT, G4S i FILL R/GGw'. i iBEARDIS' SY,7VF1. A YcR BATE < PART TD. FTG. I TEACH &ATE 196,957 S.F. (4,52 ACRES) '� `�F 5fldG7. J-`ti�RE7+F. CCW. �'J I/4'=4' -O' IFTE.•5EE 5774 G1, TRA5H ENC L05URE ELEVATION 1/4'4-0' AUTUMN wj MOGE 2ND AUUN 6x5 TREATED HL70D POST TYPZAL xE wva i i' 32,000 S.F. (16%) PAVED AREA 96,177S.F. (49%) GREEN AREA 4 FT6.•SEE ST"T, ENOLOSURE ELEVATION 196,957 S.F. (4,52 ACRES) _TRASH �'J I/4'=4' -O' T AUTUMN ZONED B4 REGIONAL BUSINESS DISTRICT TOTAL PROPOSED BUILDING AREA 51,100 S.F. OFFICE PARKING REQUIREMENTS: 3 SPACES PLUS 1 PER 200 S.F. AREA USED FOR CALCULATIONS 90% OF ACTUAL AREA 51,100 x 90% = 46,990 S.F. 45,9901200 = 230 PARKING SPACES 230 + 3 = 233 TOTAL PARKING SPACES REQUIRED 243 TOTAL PARKING SPACES PROVIDED BUILDING AREA FOOTPRINT 32,000 S.F. (16%) PAVED AREA 96,177S.F. (49%) GREEN AREA 68,780 S.F. (35%) SITE AREA 196,957 S.F. (4,52 ACRES) ~1 TN .htg-architects,com 9300 Hennepin Town Road Eden Prairie, MN 55347 Tel; 952.278,88B0 Fax: 952.278,8822 WP-J61tf ®2OOf tai RFC, ArchEects PROJECT QUAD DEVELOPMENT NEW BUILDINGS MONTICELLO, MINNESOTA ISSUED SET 09-0447 PREUMINARYPLAT REVISIONS DATE NO, Nq BUiIDM fc U MOM SIREBT DUFFAIA, MN sm J HEREBY LfR7JfY Ila? EMS PIA& SPfCx7UnDN OR REPORT WA$ PRCPAREO DY MC OR VRDFR ur DJRfCl A SI/PFA',t.SKY;AO11Gl J ZPAER. LY U6CRSFD .fR,71tTfG1 UA9CR THE LAYS of IN£ 3Td/F DF .JNNESDTA ,.IAME�(, ERtJVER 4e9as 0410415] REG AD. DATE SITE PLAN N fRp'MBk AAT C7f{7QD8y. TRM s Al J v w� Quad Development Monticello, MN r! xreaur DIAM er: AAT MED® R. TFN ,afL 0,, LeDN L.rrop.rr.t Lww�v Lv lffcHp+cn s m� ] Y 31yRL ]t000 a]pp yryse CCcw C...cow III [N--Irr`wl-ai fWV Im rysr SV eep.ented rsye fell •w•+t !i J G] 2 ! 90 DL -H ]2[00 an Nc-1 Cd..n Gmcwsar 111 {q.Jpp-SW-33 1%. 1011>pr V srpxnira El90 2x] Dde ]rt esv E t! ]8Gr-84k 3p00p 0.>Or xcfsof Crrem cenrewf. llr Gx•lOs-lu•ss +wx w SYDr V :fp.�.,.tro epu0 esrt Dale vt m,. 2 !] ]yIN ]200L DTpO Nev.h Cdfrn [oxpnif ]il CfL-JM i01•+S JDpy 101 IYp! IV elD.mtea L —uA mrt ptl! art boc ]A 31E4L ]2tOL 0.500 )kb.i Ctlam Ca.cewar ]]I CQ-J00•IG-3S 4.. M SM III fe4ntnlea frph p3ft pole Sri ]air 3tolhfk.t nrrp Swwry LOMI ],q w. xn r..pnsn Ie,rxe, mfrrotpw Adp ] O.rxfp pal 62 a! SD] 1e30 Norh re ee yfa. f. map 3 wxtp ..eo %ag i]2 Poe4p 143 7A Ob ]23 12J3 IUrlx r{ .t yfrr ti map 1 prtl 2 parLiy .rrsf qap +t3 DorL:p 393 8i 05 Se6 lj680 — r[ of year w IDap J .�d 5 rroesp sear m / C 51TE PLAN Note! Wali mounted fixtures are cut-off fixtures. $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ wYvty. htg-arc}l iLacts.com 9300 Hennepin Town Road Eden Prairie, MN 55347 Tel: 952.276.888D Fax: 952.278.8822 COAYi OM 0.2001 N HT5 Archttecis PROJECT QUAD DEVELOPMENT NEW BUILDINGS MONTICELLO, MINNESOTA ISSUED SET NOW PRELIMMARYPLAT REVISIONS DATE N0. Buru�s.rvc. 12 Mum SmN MAEq 547 So fflcte �o LPULSE nevor mflftay 61J0 PN Gtlr 4. kmNnrt.. a] 3#U !n 9X21> -WD] r.c 95l•93Y164 trt 1.'. Contort r..a. Rezf r.arnOxp Dftr- J.Vp s 34 EO03 PHOTOMETRIC LIGHTING PLAN DIAM er: AAT MED® R. TFN Al m2 s m� t r2 \ I a I 1 MEZZANINE PLAN nz.i iia•=r-o• 4 4 o ---- Q O_n n n n www.htg-architectm- m Itim 9300 Hennepin Town Road Eden Prairie, MN 55347 Tok 852,278.8880 Fax: 952.278,8622 C01" MGM 0 X0 by HT6 ktha cis PROJECT QUAD - DEVELOPMENT NEW BUILDINGS - MONTICELLO, MINNESOTA ISSUED SET DMi-07 PEL!!AWYPIAT REYMONS — DATE N0, BLJlLDMWC - 22 SUFT'W. API = MOND 7S-WM r N£ROr cfentr Tzar ma Rwt SP alxdO N OR REPORT ryes H pmo 8r ME OR tMD£R MT OWa 5111fftld , AO THAT I Abi d O'4, Lr£HSfD mcmr£b7 VNKR TN£ TAS/$ Of rNE STAT£ OF MINN�SjOT.A' .IAHL^5:�.-ORpyCR (2999 ODIUM PEb. 9O.OATE l FLOOR PLANS - 1 STORY+MEZZANINE fI f oAaslaisr AAT ae=n RM s All Itim H am F1 UPPER LEVEL - OFFICE DUIL®INO - TNO 5TORY H rd1 u m MAIN LEVEL - OFFICE BUILUINC - TWO STORY A�22 I/ I-0 ww�,v. htg-arohltecfs,cprn 9300 Hennepin Town Road Eden Prairie, MN 55347 Tel; 952.278.8880 Fax: 952.278.0822 COM16HT ® 2007 Ij WC, Aralacls PROJECT QUAD DEVELOPMENT NEIN BUILDINGS MiONTICELLO, MINNESOTA ISSUED SET 00-04-07 PREUMNAAY PIAT REY6SIONS DATE N0. S94f BURDQtS W- 12 7XVEON == RUFFAM MN su P730NET T HERERr dfillY THAT 1l Pl1fZ SPWfrA'.. R".';'AS PRCPAREO 8' MOR !ND[R A+r DiffCT SWYRIK/Ai( ALT/ v7H471 ASS A IX2r LCfMSCP ANLM'TECT HIDER 7lfi L1,y5OF TRE STAT£ OP uuo+cmrn w -If+MfE�� .6ROVE12 1r1989 Dglp,,� AEG Ip, DAJC FLOOR PLANS - I WO STORY M" W. AT aeo�sr TI9A A2v2 (Z) ELEVATION5 - 15TORY + MEZZANINE A.I os IO T Q Q Q Q Q Q Q ELEVATION5 - ONE STORY + MEZZANINE n ELEVATION5 - ONE 5TORY + MEZZANINE ELEVATIONS - ONE 5TORY + MEZZANINE S'tY SIGNAGE SIGNAGE SIGNAGE SIGNAGE SIGNAGE SIGNAGE MEIME Y m 11 . Fi1T I4 Uq 1 TD, MIF"! -9 $ 1 MONUMENT 516N ELEVATION www. htg-aneh i facto. eom 9300 Hennepin Town Road Eden Prairie, MN 55347 Tel: 952278.8880 Fax: 952.278.8822 GOPMeM 6 2= tg Rr6 A.ra letis PROJECT QUAD DEVELOPMENT 1'11 VONTLELLO, MINNESOTA ISSUED SET 0990407 MELIKINARY PLAT REVISIONS DATE N0, sq4u BUI1DFR WC. u MEW shut' BU AUX Mh X93 FIKM 70 -0 -MM 1 N£R£8raR;GFY rRAr IHS ku.. SF£LPXOM OR RLFA47 Ou CR pmo Rr N£ OR UAOFR tJY D!R£Lr lt AW rWriRpp D/p.Y12£RS£D ARCR,7FLr UNDER WMosOr DQ STAT£ Or a.wxesorw JAMP.f�,{',TS BRAVER �R989 WNW A G. Np GATE EXTERIOR ELEVATIONS Z MAHMGe AAT Ofmut.. Tai All 07, I I I I I I I I ELEVATIONS - TWO STORY I I I I I I I I ELEVATIONS - TWO STORY a3� pB _I o 0f, -__-_BD_ 50FFli l �t�`�t�rF 4y iA.!M}N LE L C1 ELEVATIONS - TWO STORY rt �4kt ^S 0 a'.S! 'kY �t � _t �`"„ i [$�J3 .t- 3a.Y7•i �if:'%¢`IUFFfv. I I I 1 I i 1:6i �Afi&'N fit lF. .�.4 �....��'bl t.. $Ki"U' g NINE 0 1 ilml s ENORMOUS I I I 1 I i 1:6i �Afi&'N fit lF. .�.4 �....��'bl t.. $Ki"U' 60 �FFI7 EE'121-0' `r 'I'M Lt�fl. Gg TD�. WJIi LEVLi EL:I:p-0' Y ELEVATIONS - TWO STORY �J va•=r-o� ao. s�Frc TD. H�AR71.{VLL s Li. �1LV-0' `F www. nta-arch Iteetes,corn 9300 Hennepin Town Road Eden Pralde, MN 55347 Tel: 952.278,8880 Fax: 952.278.8822 00MIS4T 0.20n N Nre Arthrtects PROJECT QUAD DEVELOPMENT NEW BUILDINGS MONTICELLO, MINNESOTA ISSUED SET 090407 PR:UMI AYPtAT REVISIONS DATE ND. Sa BUILDMW— t2 WARM FIRM mom / HfAFBt 6fR ttms j��aM SPEC117GTAN IN AfPpR11111 PAfpdRLD 11 784rME IAIYIfR NY IXAfCI SUPfRY15h17/, iVA k{fAOLCYLKrNSCD ARCwI£Ct uxLix iNE LAAS G" 78E SIFJF lU MINNESOTA _IAMESj 6ROVER IRA. stir• oeir EXTERIOR ELEVATIONS a[LL1NMer. AAT OEmay. TEM g A3m2_ s ENORMOUS 60 �FFI7 EE'121-0' `r 'I'M Lt�fl. Gg TD�. WJIi LEVLi EL:I:p-0' Y ELEVATIONS - TWO STORY �J va•=r-o� ao. s�Frc TD. H�AR71.{VLL s Li. �1LV-0' `F www. nta-arch Iteetes,corn 9300 Hennepin Town Road Eden Pralde, MN 55347 Tel: 952.278,8880 Fax: 952.278.8822 00MIS4T 0.20n N Nre Arthrtects PROJECT QUAD DEVELOPMENT NEW BUILDINGS MONTICELLO, MINNESOTA ISSUED SET 090407 PR:UMI AYPtAT REVISIONS DATE ND. Sa BUILDMW— t2 WARM FIRM mom / HfAFBt 6fR ttms j��aM SPEC117GTAN IN AfPpR11111 PAfpdRLD 11 784rME IAIYIfR NY IXAfCI SUPfRY15h17/, iVA k{fAOLCYLKrNSCD ARCwI£Ct uxLix iNE LAAS G" 78E SIFJF lU MINNESOTA _IAMESj 6ROVER IRA. stir• oeir EXTERIOR ELEVATIONS a[LL1NMer. AAT OEmay. TEM g A3m2_ s Q ELEVATIONS - ONE STORY 4 MEZZANINE O n ELEVATIONS - TWO 5TORY A4J VS i-0 SIGNAGE SIGNAGE SIGNAGE SIGNAGE SIGNAGE SIGNAGE M a1 MONUMENT 510N ELEVATION A4J 1l4'=1'-0' 516N QATA OW 5TORT I MEZZARRE W11.01% 181 5F. TOTAL ALLOWABLE 516N AREA = 1151 5F 511.14DUETTE AREA 3,620 5F X 5% = 1815F 1815F t i TEMAWS = 258 5F Al - Al - WALL 516H 7 -.25.b 5F TM 5TORT BUILDIN5 217 5F. TOTAL ALLOWABLE -96H AREA = 211 5F 4,36b 5F X 5% = 216 5F 218 5F / 7 TENANTS = 31.14 5F Of - 6T - WALL 516N 7 - 31 5F M ORNEHT 516H 9b SF, TOTAL 61 - 6ROfil ✓D 5151 96 5.1. www. M1ig-arat9Kects_oom 9300 Hennepin Town Road Eden Prairie, MN 55347 Tel: 9$2,278.8880 Fax. 952.278.8822 GOPYRf6 02001 N HT6 Archllecis PROJECT QUAD gp p� DEVELOPMENT NEW BUILDINGS MONTICELLO, MINNESOTA ISSUED SET 048407 PRELNINARY PLAT REVISIONS DATE NO. 9Riff BL41DMW- 12D BUFFAIANNJW I R£R£RY rZRIFr Tim ARS pug SPZW'r170H OR REAWf S R%RARZO Rr NZ OR 7dYOZR MY DMZS7 SWDOIM,, PID TRAT I AR A Mr O!C£RSEO A9707£Or WD£R W{AIk�!.S Or THE STAT£ Of MINNESOTA r --�6ROVE:R — 09/69/07 SIGN PLAN � 777 0 ONAIYae6 AT mu Br. TRM 51TE PLAN A4.1 A4.1 I -100 0 5 �; 0rca K+Ot� MONTICELLO Mr. Troy Gamble Anderson Engineering of Minnesota, LLC 13805 1St Avenue North, Suite 100 Plymouth, MN 55441 Re: Quad Development Plan Review Comments Planning Project No. 2011-010 Dear Mr. Gamble: April 26, 2011 The City of Monticello's Engineering and Public Works Department's reviewed your site development plan for the above referenced project last revised on October 26, 2007, as well as the proposed revisions for the development of "Building One", and respectfully offer the following comments: 1. Construct the entire run of 8" PVC sanitary sewer between SMH-6 and SMH-7 to allow for proper maintenance of the sewer line, and connect the sanitary sewer service for Building One to the 8" PVC using an 8" x 6" wye as shown in the plans. 2. Construct 8" DIP watermain and the hydrant lead to the south side of Building Two as shown in the plans to allow for flushing of the watermain. 3. Run vehicle turning templates around north entrance feature to ensure delivery and emergency vehicles can safely navigate the site based on proposed parking lot revisions. 4. Delete proposed parallel parking stalls and replace with a minimum of six head -in stalls on south end of row of parking stalls. Ensure drainage design still functions properly. 5. Animal droppings from pet exercise areas must be fully contained on site. Please call me at 763-271-3236 with any questions on the comments above. When submitting the revised plans, please provide a written response to each of the comments. Sincerely, CITY OF MONTICELLO Bruce Westby, P.E. City Engineer cc: Angela Schumann, Community Development Director Bob Paschke, Public Works Director Monticello City Hall, 505 Walnut Street, Suite 1, Monticello, MN 55362-8831 - 763-295-2711 • Fax 763-295-4404 Office of Public Works, 909 Golf Course Road, Monticello, MN 55362 - 763-295-3170 - Fax 763-271-3272 Department of Motor Vehicles, 119 3rd Street East, Monticello, MN 55362 • 763-295-2712 • Fax 763-271-3239 CITY OF MONTICELLO WRIGHT COUNTY, MINNESOTA RESOLUTION NO. 2011 –36 Date: May 3rd, 2011 Resolution No. 2011-36 Motion By __________________ Seconded By _______________________ A RESOLUTION RECOMMENDING APPROVAL OF AMENDMENT TO PLANNED UNIT DEVELOPMENT FOR MONTICELLO BUSINESS CENTER 5TH ADDITION AND A REQUEST FOR CONDITIONAL USE PERMIT FOR VETERINARY FACILITIES (NEIGHBORHOOD). WHEREAS, Quad Development, LLC has requested an Amendment to Planned Unit Development for Monticello Business Center 5th Addition and a request for Conditional Use Permit for Veterinary Facilities (neighborhood); and WHEREAS, in accordance with this application, the Planning Commission has found it appropriate to review the City’s previous approval of the Conditional Use Permit for Planned Unit Development; and WHEREAS, the Planning Commission has reviewed the application for Conditional Use Permit for Veterinary Facilities pursuant to the regulations of the Monticello Zoning Ordinance; and WHEREAS, the Planning Commission held a public hearing on May 3rd, 2011 on the application and the applicant and members of the public were provided the opportunity to present information to the Planning Commission; and WHEREAS, the Planning Commission has considered all of the comments and the staff report, which are incorporated by reference into the resolution; and WHEREAS, the Planning Commission of the City of Monticello makes the following Findings of Fact in relation to the recommendation of approval: 1. The applications are consistent with the 2008 Monticello Comprehensive Plan for Places to Shop. 2. The applications are consistent with the Monticello Zoning Ordinances regulating Planned Unit Development and Conditional Use Permit, subject to conditions as outlined. NOW, THEREFORE, BE IT RESOLVED, by the Planning Commission of the City of Monticello, Minnesota: 1. Pursuant to Minn. Stat. §462.357, the application for Amendment to Conditional Use Permit for Planned Unit Development and Conditional Use Permit for Veterinary Facility (Neighborhood) are hereby recommended to the City Council for approval. 2. The recommendation for approval is subject to those Conditions as follows: ADOPTED this 3rd day of May 2011, by the Planning Commission of the City of Monticello, Minnesota. MONTICELLO PLANNING COMMISSION By: _______________________________ Rod Dragsten, Chair ATTEST: ______________________________ Jeff O’Neill, City Administrator Planning Commission Agenda: 05/03/11 1 6. Public Hearing – Consideration of a request for Rezoning from B-3(Highway Business) to B-4 (Regional Business) and a request for Amendment to Conditional Use Permit for Planned Unit Development for the Monticello Travel Center 2nd Addition. Applicant: IRET Properties (AS) A. REFERENCE AND BACKGROUND: The applicant has withdrawn their application at this time. B. ALTERNATIVE ACTIONS: No further action is required at this time. Planning Commission Agenda: 05/03/11 1 7. Public Hearing - Consideration of an amendment to the Monticello Zoning Ordinance, Chapter 2, Section 4, Chapter 5, Section 3(D) and Chapter 5, Section 4. (AS) A. REFERENCE AND BACKGROUND: The amended Monticello Zoning Code is in its 6-month code tracking period, which is intended to identify minor code language adjustments. With adoption of the new code, it was noted that such amendments may arise as a result of the new code’s daily use and application. Staff is requesting that Planning Commission consider amendments to various components of the code as described below. The amendments presented by staff below clarify existing components of the code, or are components of the previous code that need to be incorporated into the new code. These amendments are: 1. Amendment to the Monticello Zoning Ordinance, Chapter 2, Section 4(B)(2) for the initiation of Zoning Ordinance Text and Map Amendments Amendment allows the Community Development Department to initiate Zoning Ordinance Text and Map Amendments. A 2005 ordinance amendment had allowed this; it was not transferred to new code. Staff needs the flexibility (especially given the recently adopted comprehensive zoning ordinance amendment) to call for hearings for expediency. Text of amendment: 2.4(B)(2): (c) Recommendation of the Community Development Department; or Then re-letter (d) Action of the City Council. 2. Amendment to the Monticello Zoning Ordinance, Chapter 5, Section 3(D) as related to the standards for Accessory Structures in the M-H District. Amendment replaces references to former R-4 district with “M-H” in all locations. Text of amendment: 5.3(D)(2)(b): In the R-4 M-H district, one minor accessory building for storage of equipment and refuse is permitted for each manufactured home provided the accessory building can meet all required setbacks, and is designed of weather resistancet material that will enhance the general appearance of the lot. 5.3(D)(3)(a): In all residential districts except R-4 M-H, the following shall apply: Planning Commission Agenda: 05/03/11 2 5.3(D)(3)(b): In the R-4 M-H district, the following shall apply: 3. Amendment to the Monticello Zoning Ordinance, Chapter 5, Section 4 as related to the General and Specific Standards for Temporary Uses. The new code does not have a specific provision allowing for the outdoor sales and display of goods not related to the principal use (outside of agricultural/horticultural sales). The need for this seasonal permit relates to those businesses seeking to sell fireworks, etc. It was initially thought that the City’s Transient Merchant code could cover these uses, but the Transient Merchant provision covers only the licensing and not land use impacts related to these types of uses. The proposed amendment allows for such seasonal uses and also changes provisions for “Tents, Canopies, Tarp Garages and Hoop Buildings” for these uses. There is also a need for an amendment to accommodate construction dumpsters outside of a building permit. This is intended for those property owners making interior renovations which do not require building permits. Listed below are the suggested amendments: Table 5-8: Temporary Structure Amend text for Construction Dumpster (on private property). o Allowable Duration: 30 days without building permit. o Permit Required: No o Additional Requirements: 5.4(E)(1)(b). Table 5-8: Temporary Sale Amend to add additional line item for Seasonal Sales. o Allowable Duration: 60 days per permit/120 days per calendar year maximum term o Permit Required: Yes o Additional Requirements: 5.4(E)(7) Section 5.4(E)(1)(b: Construction Dumpster Additional text: (vi) Be secured with a cover to prevent litter and debris from escaping the dumpster. Section 5.4(E)(7)(d): Tents, Canopies, Tarp Garages and Hoop Buildings Amended text: Planning Commission Agenda: 05/03/11 3 o Not be erected for more than a total of 30 days in any calendar year; with the exception of those uses with valid permits issued under 5.4(E)(12). Section 5.4(E)(12) Seasonal Sales Add a new subsection after “Special Events’. Text of amendment: o Seasonal sales shall: o Be authorized in writing by the property owner if conducted on property not owned by the seasonal sale operator;. o Not be located within any right-of-way; o Not reduce available parking areas below that which is required by code; o Provide adequate ingress, egress and off-street parking areas; and o Be subject to the sign standards in Sections 4. B. ALTERNATIVE ACTIONS: 1. Motion to recommend approval of Ordinance #529, amendments to Monticello Zoning Ordinance, Chapter 2, Section 4, Chapter 5, Section 3 and Chapter 5, Section 4, based on a finding that the proposed amendments are consistent with the intent of the Purpose Statements of Monticello Zoning Ordinance Chapter 2 and Chapter 5ection 3 and 4. 2. Motion of other as directed by the Planning Commission. C. STAFF RECOMMENDATION: Staff recommends alternative 1 above. Staff has found that the proposed amendments are consistent with the intent of the Purpose Statements of Monticello Zoning Ordinance Chapter 2 and Sections 5.3 and 5.4. D. SUPPORTING DATA: A. Excerpt, Chapter 2, Section 4 (B) B. Excerpt, Chapter 5, Section 3(D) C. Excerpt, Chapter 5, Section 4(D) & (E) D. Ordinance #529 CHAPTER 2: APPLICATION REVIEWS AND PROCEDURES Section 2.4 Specific Review Procedures & Requirements Subsection (B) Zoning Ordinance Text and Zoning Map Amendments City of Monticello Zoning Ordinance Page 21 (b) Whether the proposed amendment is consistent with the guiding principles of the Comprehensive Plan; (c) The extent to which the proposed amendment addresses a demonstrated community need; (d) Whether the proposed amendment will protect the health, safety, morals, and general welfare of the public; (e) The impacts on the natural and built environments, including air, water, noise, stormwater management, wildlife habitat, water quality, vegetation, drainage, streets, and other engineering design or environmental factors; (f) Whether the proposed amendment is compatible with existing and proposed uses surrounding the subject property; whether the proposed design and land uses are appropriate for the land; and whether the proposed amendment will maintain or improve compatibility among uses and ensure efficient development within the City; (g) Whether the proposed amendment will result in a logical, orderly and predictable development pattern; and (h) Whether the proposed amendment is consistent with the purpose of this ordinance. (B) Zoning Ordinance Text and Zoning Map Amendments (1) Purpose and Scope This section sets out the procedures to be followed in reviewing and considering a text change to this ordinance or an amendment to the zoning map with the exception of a map amendment to a planned unit development, which shall be subject to the procedures in Section 2.4(P), Planned Unit Development. (2) Initiation of Proceedings Proceedings for the amendment of the text of this ordinance or the zoning map shall be initiated by one of the following: (a) An owner of property or an authorized representative of an owner pursuant to Section 2.3(B), Authority to File Applications; (b) Recommendation of the Planning Commission; or CHAPTER 2: APPLICATION REVIEWS AND PROCEDURES Section 2.4 Specific Review Procedures & Requirements Subsection (B) Zoning Ordinance Text and Zoning Map Amendments Page 22 City of Monticello Zoning Ordinance (c) Action of the City Council. (3) Application (a) All applications to amend the text of this ordinance or the zoning map shall be in accordance with Section 2.3, Common Review Procedures & Requirements. (b) In addition to the common review requirements, applications for changes to the text of this ordinance or the Zoning Map shall also include the following: (i) The name of the applicant; (ii) A narrative explaining the requested modification and the reasons why the changes are supported by the Comprehensive Plan; (iii) The legal description of all real property proposed for change, if applicable; (iv) The existing and proposed land use and zoning designations for all properties proposed for change, if applicable; (v) A map of the properties to be modified to a different zoning designation, showing the addresses and zoning designations for the subject properties and the adjacent properties, if applicable; (vi) The location of the proposed text to be added, amended, or deleted in this ordinance, if applicable. (4) Review (a) Planning Commission Before any amendment is adopted, the Planning Commission shall hold at least one public hearing after proper notice has been issued in accordance with Section 2.3(I). Following the hearing, the Planning Commission shall adopt findings and recommendations on the proposed amendment as soon as practical. The Community Development Department may forward an application to the City Council without a recommendation from the Planning Commission only if it is deemed necessary to ensure compliance with state mandated deadlines for application review. Section 2.3: Common Review Requirements Section 2.3(I): Public Notification CHAPTER 2: APPLICATION REVIEWS AND PROCEDURES Section 2.4 Specific Review Procedures & Requirements Subsection (C) Variances City of Monticello Zoning Ordinance Page 23 (b) City Council The City Council may hold a public hearing on the amendment if deemed necessary by the Community Development Department. After consideration of the Planning Commission recommendation and/or hearing, if applicable, the City Council may adopt the amendment or any part thereof in such form as it deems advisable. The amendment requires the approval of four-fifths of all the members of the City Council. (5) Approval Criteria Recommendations and decisions on zoning amendments shall be based on consideration of the following criteria: (a) Whether the proposed amendment corrects an error in the original text or map; or (b) Whether the proposed amendment addresses needs arising from a changing condition, trend, or fact affecting the subject property and surrounding area. (c) Whether the proposed amendment is consistent with achieving the goals and objectives outlined in the comprehensive plan. (C) Variances (1) Purpose and Scope The Variance process is intended to provide limited relief from the strict requirements of this ordinance in those cases where strict application of a particular requirement will create an unnecessary hardship due to circumstances unique to the individual property under consideration. It is not intended that Variances be granted to allow a use not permitted by the underlying zoning district, nor to merely remove inconveniences or financial burdens that the requirements of this ordinance may impose on property owners in general. Variances are intended to address extraordinary, exceptional, or unique situations that were not caused by the applicant’s act or omission. (2) Initiation of Proceedings Variances shall be initiated by an owner of property or an authorized representative of an owner pursuant to Section 2.3(B), Authority to File Applications. CHAPTER 5: USE STANDARDS Section 5.3 Accessory Use Standards Subsection (D) Additional Specific Standards for Certain Accessory Uses Page 306 City of Monticello Zoning Ordinance (e) Accessory dwelling units shall be positioned in one of the following locations: (i) Within the principal structure (e.g. a lower level apartment); (ii) Attached to the principal building; (iii) Detached and behind the principal structure as a freestanding building or above a detached outbuilding. (f) Attached accessory dwelling units shall adhere to the following: (i) The accessory dwelling unit must be attached to the principal structure and have an operative interconnecting door with the principal structure. (ii) Access to the unit shall only be from the side or rear yard of the principal structure. (g) Detached accessory dwelling units shall adhere to the following: (i) The detached accessory dwelling unit shall be a minimum of six (6) feet from the principal structure. (ii) The accessory dwelling unit must be located in the same base zoning district as the principal structure. (h) The use of manufactured homes, travel trailers, campers, tractor trailers, or similar vehicles as an accessory dwelling unit shall be prohibited. (i) An accessory dwelling unit shall have a floor area of at least 300 square feet and shall not exceed 25 percent of the floor area in the principal structure. (j) At least one, but no more than two, off-street parking spaces shall be provided for an accessory dwelling unit (in addition to the required off-street parking serving the principal use). (k) Accessory dwelling units shall not be sold apart from the principal structure. (l) Accessory dwelling units shall not include home occupations. (2) Accessory Building – Minor (a) Minor accessory buildings do not require a building permit, but shall comply with all applicable zoning regulations. (b) In the R-4 district, one minor accessory building for storage of equipment and refuse is permitted for each manufactured home provided the accessory building can meet all required setbacks, and is designed of weather resistance material that will enhance the general appearance of the lot. CHAPTER 5: USE STANDARDS Section 5.3 Accessory Use Standards Subsection (D) Additional Specific Standards for Certain Accessory Uses City of Monticello Zoning Ordinance Page 307 (3) Accessory Building – Major (a) In all residential districts except R-4, the following shall apply: (i) Size 1. Except by Conditional Use Permit issued pursuant to Section 5.3(D)(3)(a)(i)(2) below, no detached accessory building shall exceed ten percent (10%) of the rear yard of the parcel on which it is located, nor shall any combination of attached garage and detached accessory building exceed the following maximum area, whichever is less: a. 1,200 square feet; or b. The gross square footage of the principal building footprint. 2. The size limitations for accessory building area listed in Section 5.3(D)(3)(a)(i)(1) above may be increased, up to a maximum square footage of 1,500 square feet, by the issuance of a Conditional Use permit when the following conditions are found to exist: a. Accessory building space is to be utilized solely for the storage of residential personal property of the occupant of the principal dwelling, and no accessory building space is to be utilized for commercial purposes. b. The parcel on which the accessory building is to be located is of sufficient size such that the building will not crowd the open space on the lot. c. The accessory building will not be so large as to have an adverse effect on the architectural character or reasonable residential use of the surrounding property. d. The accessory buildings shall be constructed to be similar to the principal building in architectural style and building materials. (ii) Private Garages 1. Private garages shall be used by the family or families residing upon the premises, except as follows: a. One-half of the private garage spaces on the premises can be rented to non-residents of the property for private passenger vehicles and/or non-commercial vehicles, trailers, or equipment if sufficient off-street parking in full compliance with this ordinance is provided elsewhere on the property. CHAPTER 5: USE STANDARDS Section 5.3 Accessory Use Standards Subsection (D) Additional Specific Standards for Certain Accessory Uses Page 308 City of Monticello Zoning Ordinance b. All of the private garage spaces on the premises can be rented to non-residents of the property for private passenger vehicles and/or non-commercial vehicles, trailers, or equipment if the available garage space does not exceed two spaces. 2. No business, service, or industry shall be carried on within a private garage; 3. Private garages shall not be used for the storage of more than one (1) commercial vehicle owned or operated by a resident per dwelling unit. (b) In the R-4 district, the following shall apply: (i) Accessory storage buildings in manufactured home parks, if not reviewed and approved as part of a PUD, shall be conditionally permitted subject to the following additional requirements: 1. The storage building and any accompanying outdoor storage area shall be for the sole use of the residents of the manufactured home park and shall not be used by non-residents. 2. Accompanying outdoor storage areas shall be fully screened from surrounding manufactured home units and adjacent properties. (c) In all business and industrial districts, commercial or business buildings and structures for a use accessory to the principal use is permitted provided that: (i) In all districts except I-2, such use shall not exceed thirty (30) percent of the gross floor space of the principal use. (ii) In the I-2 district, such use shall not exceed forty (40) percent of the gross floor space of the principal use. (4) Adult Use/Accessory Activities provided that: (a) Activities classified as obscene as defined by Minnesota Statute 617.241 are not permitted and are prohibited. (b) An adult use which does not qualify as an accessory use shall be classified as an adult use/principal. (c) Adult use/accessory activities shall be prohibited from locating in any building which is also utilized for residential purposes. MN Statute 617.241 CHAPTER 5: USE STANDARDS Section 5.4 Temporary Uses Subsection (A) Purpose City of Monticello Zoning Ordinance Page 323 2. In all cases, large trash handling and recycling collection areas shall be at least six feet from a side or rear lot line, and shall not be located within front yards or corner side yards. (iv) Design Materials If a wall or detached accessory structure is used to screen or define a large trash handling and recycling collection area, the building materials used for the wall or accessory structure shall be compatible with the principal structure and be readily served through swinging doors. (v) Ground Surface Requirements Areas intended for large trash handling and recycling collection areas shall be surfaced with concrete that meets or exceeds minimum City standards. (vi) Drainage Eating establishments and other uses that produce significant amounts of liquid waste shall configure areas intended for large trash handling and recycling collection areas to drain to the sanitary sewer system through grease traps or similar devices as required by the Community Development Department. (31) Wind Energy Conversion System – Commercial All commercial WECS systems shall adhere to the requirements of Section 4.12 in this ordinance. (32) Wind Energy Conversion System – Non-commercial (a) Non-commercial WECS systems shall have a total height of less than 200 feet. (b) All non-commercial WECS systems shall adhere to the requirements of Section 4.12 in this ordinance. 5.4 Temporary Uses (A) Purpose This section allows for the establishment of certain temporary uses of limited duration and special events, provided that such uses comply with the standards in this subsection and are discontinued upon the expiration of a set time period. Temporary uses and special events shall not involve the construction or alteration of any permanent building or structure. Section 4.12: Wind Energy Conversion Systems CHAPTER 5: USE STANDARDS Section 5.4 Temporary Uses Subsection (C) General Standards for Temporary Uses Page 324 City of Monticello Zoning Ordinance (B) Permit Required Temporary uses and structures that require a permit shall be reviewed in accordance with the process outlined in Section 2.4(L), Temporary Use Permits; and if a building permit is also necessary, in accordance with Section 2.4(I), Building Permits. (C) General Standards for Temporary Uses Temporary uses, structures, or events shall comply with the following: (1) Obtain the appropriate permits (as required); (2) Not be detrimental to property or improvements in the surrounding area or to the public health, safety, or general welfare; (3) Be compatible with the principal uses taking place on the site; (4) Not have substantial adverse effects or noise impacts on nearby residential neighborhoods; (5) Not include permanent alterations to the site; (6) Meet all the setbacks of the underlying base and overlay zoning districts, unless expressly stated otherwise in this ordinance. (7) Temporary signs permitted under the Code and associated with the use or structure shall be removed when the temporary activity ceases. (8) Not violate the applicable conditions of approval that apply to a site or use on the site; (9) Not interfere with the normal operations of any permanent use located on the property; and (10) Contain sufficient land area to allow the temporary use, structure, or special event to occur, as well as adequate land to accommodate the parking and traffic movement associated with the temporary use, without disturbing environmentally sensitive lands. Section 2.4(L): Temporary Use Permits Section 2.4(I): Building Permits CHAPTER 5: USE STANDARDS Section 5.4 Temporary Uses Subsection (D) Table of Allowed Temporary Uses and Structures City of Monticello Zoning Ordinance Page 325 (D) Table of Allowed Temporary Uses and Structures Table 5-8 summarizes allowed temporary uses and structures and any general or specific standards that apply. Temporary uses or structures not listed in the table are prohibited. TABLE 5-8: TEMPORARY USES & STRUCTURES Temporary Use or Structure Allowable Duration (per site) Permit(s) Required Additional Requirements Temporary Structure Construction Dumpster (on public ROW/property) Until issuance of certificate of occupancy or two days following expiration or finaling of a building permit Yes Sec 5.4(E)(1)(a) Construction Dumpster (on private property) No Sec 5.4(E)(1)(b) Construction Trailer Until issuance of certificate of occupancy Yes Sec 5.4(E)(2) Recreational Vehicle Use 1 month Yes Sec 5.4(E)(3) Real Estate Office / Model Sales Home Until 85% occupancy of the phase is reached Yes + Building Permit Sec 5.4(E)(4) Temporary Mobile Cell Site 30 days Yes + Building Permit Sec 5.4(E)(5) Temporary Sign 40 days per year Yes Sec 4.5(I) Temporary Storage in a Portable Container 30 days per year Yes Sec 5.4(E)(6) Tents, Canopies, Tarp Garages, and Hoop Buildings 30 days per year Yes Sec 5.4(E)(7) Temporary Sale Farmer’s Market Continuous; up to 5 months per year on a single site Yes Sec 5.4(E)(8) Garage/Yard Sale 4 days per event; 3 events total per calendar year No Sec 5.4(E)(9) Temporary Merchant See Title 3, Chapter 10 of City Code Wayside Stands 3 days per week No Sec 5.4(E)(10) Special Events Special Events 14 days per calendar year, per parcel unless expressly stated otherwise Yes Sec 5.4(E)(11) CHAPTER 5: USE STANDARDS Section 5.4 Temporary Uses Subsection (E) Specific Standards for Temporary Uses Page 326 City of Monticello Zoning Ordinance (E) Specific Standards for Temporary Uses (1) Construction Dumpster (a) The placement of a temporary construction dumpster or other trash receptacle within a public right-of-way or other site owned by the City shall be subject to standards in the Monticello City code as may be applicable. (b) Temporary trash receptacles or dumpsters located outside public rights-of way are not required to obtain a temporary use permit, but shall comply with the following standards: (i) Be located to the side or the rear of the site, to the maximum extent practicable; (ii) Be located as far as possible from lots containing existing development; (iii) Not be located within a floodplain or otherwise obstruct drainage flow; (iv) Not be placed within five feet of a fire hydrant or within a required landscaping area; and (v) Be located outside of any required tree protection fencing and the dripline of existing trees. (2) Construction Trailer (a) Construction trailers may be permitted on a construction site provided that the trailer is: (i) Approved by the Community Development Department for location, safety, and compatibility with adjacent properties; (ii) Located on the same site or in the same development as the related construction; (iii) Not located within a required landscape area; and (iv) Associated with development for which a valid Building Permit has been or will be issued. (b) The applicant shall be required to restore the trailer site to its previous condition if the trailer is located off the construction site. (3) Recreational Vehicle Use (a) A recreational vehicle owned by a non-resident, guest, or visitor may be parked or occupied by the guest or visitor on private property containing a permanent dwelling unit for a period not to exceed thirty (30) days while visiting the resident of the property. CHAPTER 5: USE STANDARDS Section 5.4 Temporary Uses Subsection (E) Specific Standards for Temporary Uses City of Monticello Zoning Ordinance Page 327 (b) The recreation vehicle shall have self-contained sanitary facilities or standard on-site facilities as required by the Community Development Department. (c) The parking location of a recreational vehicle shall adhere to the requirements of Section 4.8, Off-Street Parking. (4) Real Estate Sales Office/Model Sales Home One temporary real estate sales office or model sales home per builder or developer shall be permitted in a section or phase of a new residential or nonresidential development provided the office or model home: (a) Is aesthetically compatible with the character of surrounding development in terms of exterior color, predominant exterior building materials, and landscape; (b) Complies with the applicable standards in the approved development plan (if applicable); (c) Is operated by a developer or builder active in the same phase or section where the use is located; and (d) Is removed or the model home is converted into a permanent residential use once 85 percent occupancy in the section or phase of the development is reached. (5) Temporary Mobile Cell Site (a) A temporary mobile cell site may be erected after issuance of a building permit in the case of equipment failure or testing, or for an interim period (limited to 30 days) after a conditional use permit for a permanent cell site is approved. (b) Temporary mobile cell sites shall be removed within 72 hours following completion of testing, the installation of the permanent tower, or resolution of equipment failure. (6) Temporary Storage in a Portable Shipping Container Temporary storage in a portable shipping container shall be permitted to serve an existing use subject to the following standards. A portable shipping container shall not be located: (a) On a lot without prior approval from the Community Development Department. Section 4.8 Off Street Parking Regulations CHAPTER 5: USE STANDARDS Section 5.4 Temporary Uses Subsection (E) Specific Standards for Temporary Uses Page 328 City of Monticello Zoning Ordinance (b) In a required front yard; (c) Within ten feet of any lot line or structure; (d) In a manner that impedes ingress, egress, or emergency access; and (e) On an individual parcel or site for more than 30 total days over any one-year period. (7) Tents, Canopies, Tarp Garages, and Hoop Buildings Tents, canopies, tarp garages, and hoop buildings or similar membrane structures shall: (a) Obtain a building permit from the Community Development Department; (b) Maintain a minimum clearance of 20 feet from all other structures and tents; (c) Not exceed more than two on a single parcel (the Community Development Department may approve more than two as a part of a special event on a single parcel of 20 or more acres in size); (d) Not be erected for more than a total of 30 days in any calendar year; (e) Be limited to a maximum of three occurrences per parcel per year; (f) Not be placed within required landscape areas; (g) Not obstruct emergency vehicle access to adjacent lots or disrupt pedestrian circulation; and (h) The lot or site shall be restored to its original condition within two days of removal of the tent, canopy, tarp garage, or hoop building. (8) Farmer’s Market Farmer’s markets shall: (a) Be limited to the retail sale of agriculture, horticulture, or floricultural products; (b) Provide adequate ingress, egress, and off-street parking areas; (c) Not reduce minimum parking areas below the minimum required for the property under the City Code; CHAPTER 5: USE STANDARDS Section 5.4 Temporary Uses Subsection (E) Specific Standards for Temporary Uses City of Monticello Zoning Ordinance Page 329 (d) Not be located with any right-of-way; (e) Renew all applicable temporary use permits annually. (f) Be subject to the sign standards in Section 4.5, Signs. (9) Garage/Yard Sales (a) Garage or yard sales shall: (i) Be limited to a maximum of three per dwelling per year. (ii) Not exceed a maximum duration of four consecutive days per sale; (iii) Occur only between the hours of 7:00 A.M. and 9:00 P.M.; (iv) Not place items for sale, signs or other advertising within the public right- of-way, or impede the passage of traffic on streets in the area of the sale; (v) Conduct vehicle parking in accordance with the standards in this ordinance and any other applicable City requirements; (vi) Not negatively affect neighboring properties in terms of noise, trash, parking, or impede the flow of traffic on nearby streets; (vii) Not permit loud or boisterous conduct on the premises; and (viii) Not allow unsold items or other sale-related materials to remain in public view following conclusion of the sale. (ix) Remove all sale related signage immediately upon conclusion of the sale. (b) The owner and/or tenant of the premises on which a sale is conducted, shall be responsible for the maintenance of good order and decorum on the premises during the hours of the sale. (10) Wayside Stands A wayside stand shall: (a) Be limited to the retail sale of agriculture, horticulture, or floricultural products; (b) Not exceed 750 square feet in area; (c) Not be located with any right-of-way; CHAPTER 5: USE STANDARDS Section 5.4 Temporary Uses Subsection (E) Specific Standards for Temporary Uses Page 330 City of Monticello Zoning Ordinance (d) Be authorized in writing by the landowner if conducted on property not owned by the operator of the wayside stand; (e) Not operate for more than three (3) days per site in any given week; (f) Not reduce available parking areas below that which is required by code; (g) Provide adequate ingress, egress, and off-street parking areas; and (h) Be subject to the sign standards in Section 4.5, Signs. (11) Special Events (a) Applicability The procedures and standards of this subsection shall apply to all special events that are planned for or which reasonably may be expected to attract more than 100 persons at any one time (including but not limited to cultural events, musical events, celebrations, festivals, fairs, and carnivals) held on private property within the City, unless expressly exempted. (b) Permit Required All special events subject to this subsection shall have a temporary use permit for a special event reviewed and approved or approved with conditions by the Community Development Department in accordance with Section 2.4(L), Temporary Use Permit, before conducting the special event. (c) Exemptions The following events or activities are exempt from the standards of this subsection (i.e., may occur without a Temporary Use Permit for a special event). Such activities are subject to all other applicable procedures and standards of this ordinance. (i) On Grounds of Private Residence Special events or activities occurring within, or on the grounds of, a private residence or on the common areas of a single-family attached, townhouse, two- to four-family, or multi-family residential development. (ii) Event Sponsored by City or State Any event sponsored in whole or in part by the City or state. Section 4.5: Signs Section 2.4(L): Temporary Use Permits CHAPTER 5: USE STANDARDS Section 5.4 Temporary Uses Subsection (E) Specific Standards for Temporary Uses City of Monticello Zoning Ordinance Page 331 (iii) Event or Activity at Site Intended for Such Event or Activity Any organized activities conducted at sites or facilities typically intended and used for such activities. Examples of such exempt activities include, but are not limited to, sporting events such as golf, soccer, softball, and baseball tournaments conducted on courses or fields intended and used for such activities; fairs and carnivals at fairgrounds; wedding services conducted at reception halls, or similar facilities; funeral services conducted at funeral homes or cemeteries; religious services, wedding services, and funeral services conducted at religious institutions. (iv) Event Approved as Part of another Permit Temporary special events that are expressly approved as part of another permit shall not require separate review under this subsection. (d) Standards In addition to the general temporary use criteria to be reviewed with the permit application, the following standards shall also apply: (i) False or Material Misleading Information The application shall be certified by the applicant as not containing intentionally false or materially misleading information. (ii) Unreasonable Risk There is a finding that the special event would not create an unreasonable risk of significant: 1. Damage to public or private property, beyond normal wear and tear; 2. Injury to persons; 3. Public or private disturbances or nuisances; 4. Unsafe impediments or distractions to, or congestion of, vehicular or pedestrian travel; 5. Additional and impracticable or unduly burdensome police, fire, trash removal, maintenance, or other public services demands; and 6. Other adverse effects upon the public health, safety, or welfare. (iii) Location Cannot be Accommodated The special event shall not be of such a nature, size, or duration that the particular location requested cannot reasonably accommodate the event. (iv) Time Permitted or Reserved for Other Activities The special event shall not conflict with another permitted special event at the same location in a manner that will negatively impact the public health, welfare, or safety. CHAPTER 5: USE STANDARDS Section 5.4 Temporary Uses Subsection (E) Specific Standards for Temporary Uses Page 332 City of Monticello Zoning Ordinance (e) Conditions In approving the Temporary Use Permit for the special event, the Community Development Department is authorized to impose such conditions upon the issuance of the permit as may be necessary to reduce or minimize any potential adverse impacts upon other property in the area, as long as the condition relates to a situation created or aggravated by the proposed special event. The Community Development Department is authorized, where appropriate, to require: (i) Provision of temporary parking facilities, including vehicular access and egress. (ii) Control of nuisance factors, such as but not limited to, the prevention of glare or direct illumination of adjacent properties, noise, vibrations, smoke, dust, dirt, odors, gases, and heat. (iii) Regulation of temporary buildings, structures and facilities, including placement, height and size, location of equipment and open spaces, including buffer areas and other yards. (iv) Provision of sanitary and medical facilities. (v) Provision of solid waste collection and disposal. (vi) Provision of security and safety measures. (vii) Use of an alternative location or date for the proposed special event. (viii) Modification or elimination of certain proposed activities. (ix) Regulation of operating hours and days, including limitation of the duration of the special event to a shorter time period than that requested or specified in this subsection. (x) Submission of a performance guarantee to ensure that any temporary facilities or structures used for such proposed special event will be removed from the site within a reasonable time following the event and that the property will be restored to its former condition. (f) Duration of Permit A temporary use permit for a special event authorized in accordance with this subsection shall be limited to a maximum duration of 14 days per site per calendar year, unless otherwise specifically authorized by the Community Development Department. ORDINANCE NO. 529 CITY OF MONTICELLO WRIGHT COUNTY, MINNESOTA AN ORDINANCE AMENDING TITLE 10 - ZONING ORDINANCE OF THE MONTICELLO CITY CODE FOR SECTION 2.4 – ZONING ORDINANCE TEXT AND MAP AMENDMENTS; FOR SECTION 5.3 – STANDARDS FOR ACCESSORY USES AND STRUCTURES; AND FOR SECTION 5.4 – TEMPORARY USES AND STRUCTURES THE CITY COUNCIL OF THE CITY OF MONTICELLO HEREBY ORDAINS: Section 1. Section 2.4(B) of Title 10 - Zoning Ordinance is hereby amended to add (2) (c) and renumber accordingly: 2.4(B) Zoning Ordinance Text and Zoning Map Amendments (2) Initiation of Proceedings (c) Recommendation of the Community Development Department; or (cd) Action of the City Council. Section 2. Section 5.3 (D) of Title 10 – Zoning Ordinance is hereby amended as follows: 5.3(D) Additional Specific Standards for Certain Accessory Uses (2) Accessory Building – Minor (b) In the R-4 M-H district, one minor accessory building for storage of equipment and refuse is permitted for each manufactured home provided the accessory building can meet all required setbacks, and is designed of weather resistancet material that will enhance the general appearance of the lot. (3) Accessory Building – Major (a) In all residential districts except R-4 M-H, the following shall apply: (b) In the R-4 M-H district, the following shall apply: ORDINANCE NO. 529 Section 3. Section 5.4(D) of Title 10 – Zoning Ordinance is hereby amended as follows: 5.4(D) Table of Allowed Temporary Uses and Structures Table 5-8: Temporary Uses & Structures – Temporary Structure Amend text for: Construction Dumpster (on private property) Allowable Duration: 30 days without building permit. Permit Required: No. Additional Requirements: 5.4(E)(1)(b). Table 5-8: Temporary Uses & Structures – Temporary Sale Amend text to add line item for: Seasonal Sales Allowable Duration: 60 days per permit/120 days per calendar year maximum term. Permit Required: Yes. Additional Requirements: 5.4(E)(7) Section 4. Section 5.4(E) of Title 10 – Zoning Ordinance is hereby amended as follows: 5.4(E) Specific Standards for Temporary Uses (1) Construction Dumpster Under (b), add this item and text: (vi) Be secured with a cover to prevent litter and debris from escaping the dumpster. (7) Tents, Canopies, Tarp Garages, and Hoop Buildings (d) Not to be erected for more than a total of 30 days in any calendar year; with the exception of those uses with valid permits issued under 5.4(E)(12). Add this new subsection to Section 5.4(E): (12) Seasonal Sales Seasonal sales shall: (a) Be authorized in writing by the property owner if conducted on property not owned by the seasonal sale operator; (b) Not be located within any right-of-way; (c) Not reduce available parking areas below that which is required by code; (d) Provide adequate ingress, egress and off-street parking areas; and (e) Be subject to the sign standards in Section 4. ORDINANCE NO. 529 Section 5. This Ordinance shall take effect and be in full force from and after its passage and publication. Revisions will be made online after adoption by Council. ADOPTED BY the Monticello City Council this 9th day of May, 2011. CITY OF MONTICELLO ____________________________ Clint Herbst, Mayor ATTEST: _____________________________ Jeff O’Neill, City Administrator VOTING IN FAVOR: VOTING IN OPPOSITION: Planning Commission Agenda: 05/03/11 1 8. Consideration to call for a public hearing on Amendment to the 2008 Monticello Comprehensive Plan for the Adoption of the 2011 Monticello Parks & Trails Plan. (AS) A. REFERENCE AND BACKGROUND: The Planning Commission is asked to call for a public hearing on Amendment to the 2008 Monticello Comprehensive Plan for the Adoption of the 2011 Monticello Parks & Trails Plan. As the Commission is aware, the updating of the Park & Trail Plan has been made possible through a grant by Live Wright, an initiative of the Minnesota Statewide Health Improvement Plan (SHIP). The Park & Trail Plan will be considered by the City for incorporation by reference as an Appendix to the Comprehensive Plan, similar to the Transportation Plan. NAC will also provide recommended amendments to the actual existing text of Chapter 5 of the Comprehensive Plan. Both the adoption of the Plan document and the text amendments to the Comprehensive Plan require a public hearing by the Planning Commission and a super majority vote of the City Council. Included with this staff report is a detailed timeline relating to the review and adoption of the Park & Trail plan. Primary to the review are two important dates, May 17th and May 24th. On May 17th, the Planning Commission will be asked to attend a community workshop on the draft Park & Trail Plan. This is the public’s opportunity to see and comment on concepts for Monticello’s future parks and trails, as well as provide feedback on needs and desires for the existing and future system. The community workshop is scheduled for 7:00-9:00 PM in the Mississippi Room. It will be held following the Special Meeting previously called by the Commission at 6:00 PM, which is a workshop for the formulation of 2011-2012 Planning Commission Goals & Objectives. Then, on May 23rd, Planning Commission is asked to attend a joint session with the City Council and Parks Commission. This special meeting of the Council will be a chance for the three groups to review the plan in its entirety. The three groups will also see a demonstration of the new interactive Park & Trail online map feature. Both of these meetings will be posted for a quorum of the Commission. Accompanying this staff report is Draft #2 of the Park & Trail Plan. The Planning Commission is asked to review this document fully for the May 3rd regular meeting. The comments and questions of the Commission will be addressed during the May 3rd Planning Commission meeting. Feedback of the Commission will then be incorporated for inclusion in the Draft #3 document, which will be provided in the packet for the June 3rd public hearing. Planning Commission Agenda: 05/03/11 2 Planning Commission will note that NAC and staff have a full schedule of review and recommendation meetings leading up to the May 17th workshop. These include meetings with the Embracing Downtown consultant team, Bertram Chain of Lakes Advisory Council representatives, School District Athletic Director, and various meetings with the Parks Commission and MCC Advisory Board. All of these will assist in the development of a coordinated, well-rounded Park & Trail plan. B. ALTERNATIVE ACTIONS: 1. Motion to call for a public hearing on June 7th, 2011 for Amendment to the 2008 Monticello Comprehensive Plan for the Adoption of the 2011 Monticello Parks & Trails Plan. 2. Motion of other as directed by the Planning Commission. C. STAFF RECOMMENDATION: Staff recommends alternative 1 above. D. SUPPORTING DATA: A. Draft #2 – Monticello Park & Trail Plan B. NAC Memo – Park Survey Results C. Park Survey Tabulation Results D. Monticello Comprehensive Plan Chapter 5 – Parks E. Park & Trail Plan Review and Adoption Timeline 1 2 Monticello Parks and Pathways System Plan 2011 Draft Version 7 Print Date 4/28/2011 3 Monticello Parks Plan Table of Contents I. Introduction a. Background b. Summary of Existing System and Previous Planning c. Coordination with LiveWright and SHIP Objectives d. Coordination with Comprehensive Plan Goals and Directives II. Existing Parks and Recreation Systems in Monticello a. System Components i. Regional Parks and Recreation Facilities 1. Bertram Lakes Regional Park 2. Monticello Community Center 3. Montissippi County Park ii. Community Parks and Recreation Facilities 1. Xcel Energy Athletic Fields 2. Freeway Fields 3. Monticello School District Athletic Facilities 4. Ellison Park 5. East and West Bridge Parks 6. Pioneer (Lion’s) Park 7. Swan Park (?) 8. River Mill Park (?) 9. Otter Creek Park (?) iii. Pathways, Trails, and Sidewalks 1. Broadway Pathway 2. Identify Other Primary Links iv. Neighborhood Parks and Recreation Facilities 1. Identify and List Existing Developed Parks 2. Identify and List Existing, but Undeveloped, Parks III. Park System Objectives a. Park Survey Results Summary b. Parks System Public Input Summary c. Park System Policies i. Proximity ii. Walkability and Linkage iii. Facilities, Contents, Elements 1. Types 2. Distribution iv. Pathways as Transportation 4 v. Pathways as Recreation System Elements d. Design Standards i. Park Components and Elements, by Type and Location ii. Pathway Design, by Type and Location iii. Specialty Elements, where appropriate e. Other Park System Objectives IV. Parks and Trails System Analysis a. Park System Gaps b. Park System Overlaps c. Park System Functional Issues i. Park Type ii. Park Conditions iii. Park Elements d. Pathway System Gaps e. Pathway System Design Issues i. Type of Trail ii. Trail Condition iii. Other Pathway Issues V. Parks and Trails System Plan a. Future Parks System Needs i. Changes to Existing Parks ii. Future Park Locations by Function and Type b. Future Pathway System Needs i. Changes to Existing Pathways ii. Future Pathway Routes by Function and Type 1. Main Pathway Routes 2. Loop Pathway Routes 3. Sidewalk Connections VI. Implementation Options a. Prioritization b. Funding Options c. Capital Improvements Programming VII. Parks and Trails System Brochure VIII. Integration of Plan with City’s GIS System 5 I. Introduction a. Background b. Summary of Existing System and Previous Planning c. Coordination with LiveWright and SHIP Objectives d. Coordination with Comprehensive Plan Goals and Directives Introduction (Section Title – bold 16pt.) The City of Monticello maintains an extensive system of Parks and Trails, with much of the system’s development paralleling the growth of the community. The City’s location on the Mississippi River resulted in the early development of riverfront park locations, including Ellison Park, East Bridge and West Bridge Park, and the County’s development of Montissippi Park at the west end of the community. As the City grew, focus on park facilities shifted away from the river, and a series of smaller neighborhood park facilities were added as new neighborhoods developed. Responding to a growing interest in trail development, the City undertook a major pathway project, establishing the pathway along the full length of Broadway /County 75 from the Meadow Oaks area on the east end of the community, to the west edge, past Otter Creek. This pathway has been enormously popular, even though it is primarily a single spine at the current time. More pathway development followed as new transportation routes sprang up, with the goal of providing off-road pedestrian and bicycle options along those routes, especially in the areas of the schools. Augmenting the downtown recreation options, the City partnered with the Army National Guard to establish the Monticello Community Center in (year), introducing both indoor and outdoor recreation opportunities which were locally unavailable to the community members, including an indoor pool and water park, climbing wall, and gymnasium, track, and weight facility, among other elements. The City and the School District later cooperated in the development of an indoor ice facility attached to the Monticello Middle School. In the middle 2000s, park development focus shifted again, as the YMCA organizati on announced an interest in selling its Camp Manitou facility to the west of Monticello. Operated as a private facility, the 1,200 acres included a series of lakes, wetlands, and native woodlands that were unique to the region. The City, together with Wright County, embarked on an effort to acquire this acreage, a venture that is still in process. The addition of the Bertram Lakes Regional Park to the local park and open space inventory, and the costs involved in this project, have necessarily changed th e way the City will need to plan for park development in the coming years. Many of these projects were anticipated by a Parks System Plan that was adopted in the mid 1990s. However, significant growth and shifting priorities have made that Plan 6 long since obsolete. Over the past few years, the City has experienced, along with the rest of the country, a significant slow-down in economic development activity. That downturn left a number of expected development projects idle or abandoned, and left several park locations undeveloped. During this period, however, Monticello has adopted a new Comprehensive Plan, and is currently undertaking an extensive study of its downtown. These projects have positioned the City for the expected rebound in the general economy, and this Parks and Trails System Plan is a part of the City’s infrastructure planning necessary to ready Monticello for a new era of growth pressure. This Parks Plan has been supported with funds from LiveWright, a program of Wright County’s Public Health Department. LiveWright has allocated funds from the Statewide Health Improvement Program (SHIP), with the intention of pursuing and promoting healthier lifestyles. In this case, park and trail planning is being undertaken to improve residents’ access to physical activity, and thus, overall community health. The strategy of the Parks and Trails Plan is to utilize the City’s long-term planning, coupled with the extensive existing inventory of parks and recreation facilities, to create a system that is accessible, efficient, and provides a full range of recreation opportunities, accounting for variations in age, interests, and activity levels. At the same time, a significant component of this project is to build in flexibility to the City’s Parks and Trails infrastructure, allowing the community to adapt its facilities to changing needs over time. Significant contributions have been made to the preparation of this Plan, including the following groups, individuals, and organizations: Monticello Parks Commission Monticello Community Center Advisory Board Monticello School District Monticello Community Education Etc. Etc. 7 II. Existing Parks and Recreation Systems in Monticello a. System Components i. Regional Parks and Recreation Facilities 1. Bertram Lakes Regional Park 2. Monticello Community Center 3. Montissippi County Park ii. Community Parks and Recreation Facilities 1. Xcel Energy Athletic Fields 2. Freeway Fields 3. Monticello School District Athletic Facilities 4. Ellison Park 5. East and West Bridge Parks 6. Pioneer (Lion’s) Park 7. Swan Park (?) 8. River Mill Park (?) 9. Otter Creek Park (?) iii. Pathways, Trails, and Sidewalks 1. Broadway Pathway 2. Identify Other Primary Links iv. Neighborhood Parks and Recreation Facilities 1. Identify and List Existing Developed Parks 2. Identify and List Existing, but Undeveloped, Parks v. Special Facilities 1. Moose Sherritt Ice Arena The Monticello Parks and Trails System consists of five layers of facility types. These types are described below, with a mapped inventory of each existing park in this class. The mapped inventory is superimposed on an aerial photograph of the park, and each entry includes a written inventory of park elements, where practical. Regional Parks and Recreation Facilities (Section Title – bold 16pt) The largest parks fall into a classification labeled in this Plan as Regional Parks and Recreation Facilities. These parks are those that attract users from a wide area beyond Monticello’s boundaries. Regional facilities commonly are larger in size, and/or have specific elements not found in more localized parks. Regional Parks in Monticello include the developing Bertram Lakes Regional Park (a joint venture between the City of Monticello and Wright County), and Montissippi Park (a Wright County Park). The Monticello Community Center also serves, in many ways, as a regional park facility, in both its scope of service area and its unique recreation elements. The Community Center is included in this section due to its role in the City’s recreation system. 8 A map of the Regional Park facilities in Monticello is displayed below. Regional Parks are often operated by higher levels of government, such as counties, metropolitan-wide organizations, or park districts. Montissippi Park is an example of this operational model. However, Bertram Chain of Lakes is a unique regional facility in that Monticello and Wright County will share in the operation of the park, with each jurisdiction operating a specific set of park elements. Although a locally devleoped facility, the Monticello Community Center (MCC) also extends its reach as a regional recreation facility, due primarily to the fact that such facilities are relatively rare in the region. As such, the MCC attracts regular users from many areas of northern Wright County and southern Sherburn e County. 9 Bertram Chain of Lakes Regional Park (Subsection title – UL 12pt) Figure___. Bertram Chain of Lakes Regional Park Source: WSB 2008 Aerial Photograph Park Name Location Acreage Amenities Bertram Regional Park 90th Street NE 1,200 acres (370 ac- city/county owned)  Canoe Launch  Hiking Trails  Natural Area  Parking  Scenic View Bertram Chain of Lakes Regional Park is a developing facility of what will eventually be approximately 1,200 acres of natural woodlands, wetlands, and prairie, co mbined with a series of improved active park spaces. The property also includes nearly 100 acres of farmland. Bertram is being acquired and developed jointly by the City of Monticello and Wright County from the Greater Minneapolis YMCA, which has used much of the area as a day camp for more than 50 years. The property includes a chain of four lakes, including Bertram, Long, Mud, and First Lakes, which also serve as the source of Otter Creek, flowing to the Mississippi River through developed portions of the City. Plans for the Regional Park are evolving, but are expected to include a full range of active and passive elements. A system of trails will connect all sections of the park 10 property, and the most active elements are expected to be located toward the north, centering on the site of the day camp areas. These areas include a swimming beach at the north end of Bertram Lake, and a number of other informal camp structures. The City is also considering inclusion of a field-sports complex on the land which is currently been farmed. To date, the City and County have acquired about one-third of the total acreage, and are in the process of working through the park design options for the property as a whole. As a part of the city’s parks system survey, Bertram Lakes received broad support from respondents, and was the single most commonly visited park location in terms of the number of different visitors. Also of note, many respondents identified Bertram as a potential location for proposed improvements and new elements to be added to the park system, indicating that Bertram’s more remote location was not seen as a negative factor in the location of new facilities. Montissippi County Park (Subsection title - UL 12pt) Figure___. Montissippi County Park Source: WSB 2008 Aerial Photograph Park Name Location Acreage Amenities Montissippi County Park 170 acres  Picnic Facilities  Rest Room Facilities  Playground Equipment  Fishing Pier  Paved Hiking Trails 11  Boat Launch  Trail Connection Montissippi County Park is a 170 acre county park facility wholly within the boundaries of the City of Monticello. The Park has several hundred feet of frontage on the Mississippi River, including a boat launch and picnic grounds, and provides a wide variety of passive recreational activities, including two miles of hiking and skiing trails. Montissippi is a heavily used park by Monticello residents, based on comments in the parks survey. Resident responses indicated a number of desired improvements and additions to the park, which are being forwarded to County parks staff. For the City, the primary comments related to access to this park, including better pedestrian and bike access from the “Broadway” Pathway which runs along the south side of County Highway 75. Monticello Community Center (Subsection title - UL 12pt) Figure___. Monticello Community Center Source: Wright County Beacon 2008 Aerial Photograph Park Name Location Acreage Amenities Monticello Community Center 505 Walnut Street 2.08 acres  Friendship Island  Community Garden  Leagues  Indoor Play Area  Indoor Ice Arena  Drop In Childcare  Basketball Court 12  Climbing Wall  Community Room  Concessions  Fitness Center  Indoor Pool & Waterslide  Parking  Restrooms  Volleyball Court  Walking Track A major provider of recreation facilities in the City, the Monticello Community Center is situated on about four acres of property in downtown Monticello. The building includes an indoor pool and water park, fitness equipment, climbing wall, a gymnasium and indoor walking track. Other community uses also occupy in the building, including the Army National Guard, Senior Center, community and meeting rooms, and the Monticello City Hall offices and Council Chambers. The Community Center received significant support and atten tion from the parks system survey respondents. The MCC comments were indicative of much of the survey with a large focus on water-oriented recreation, including a solid majority who encouraged expansion of pool and water-park style facilities, whether indoor or outdoor. Another aspect of this showed us a support for a “spash pad” facility. Respondents to the survey who don’t use the MCC facilities cited crowded conditions (including pool, gym, walking track, and fitness areas) as one of the primary factors, supporting the idea that some expansion would increase facility use. Community Parks (Section Title - Bold 16pt) Whereas regional parks serve a population that typically extends well beyond the boundaries of the City, at the Community Park level, the size and park elements serve a community-wide population, very often because of specific aspects of the park itself. Ballfield complexes are one common example of these parks. Community Parks also are characterized by one-of-a-kind elements and will commonly include parking areas to permit their use by members of the community that do not live near enough to walk or bike. These facilities often serve a dual role in that they will also play the role of neighborhood park to those living or working n earby. In Monticello, nine existing parks have a community-wide role. The first six are the most common examples of Community Parks, and include Ellison, East Bridge, West Bridge, Xcel/City Athletic Fields, Freeway Fields, and Pioneer (Lions) Park. These parks include community facilities such as ballfields, reservable picnic shelters, and in a few cases, access to the Mississippi River. 13 The line separating a park’s definition as community or neighborhood can be a narrow one, and the role of a particular park may change over time as its facilities change, or as the neighborhood in which it is located changes in demographic makeup, even (for some parks) the season of the year. As such, these definitions should be taken with some measure of flexibility. Three other parks, although smaller than typical for this class, also play a Community Park role due to their unique elements: Swan (Mississippi) Park, with an extensive and popular location for viewing the area’s large Trumpeter Swan population; River Mill Park, primarily due to the popularity of its winter sliding hill; and Otter Creek Park, an intersection of Otter Creek and oak savanna/native prairie which serves as a shaded rest area along the City’s Broadway Street Trail near its current western terminus. A map of the Community Parks in Monticello is displayed on the next page. *** NOTE: Add Groveland Park to this list of Community Park facilities along with map on following page ****. 14 Add location maps for each Community Park photo 15 Ellison Park (Subsection Title – UL 12pt) Figure___. Ellison Park Source: WSB 2008 Aerial Photograph Park Name Location Acreage Amenities Ellison Park 811 River Street E 4.2 acres  Trail Connection  Barbecues  Baseball Fields  Boat Launch  Canoe Launch  Community Room  Fishing Pier  Gazebo  Handicapped Play Area  Log Shelter  Mississippi River View  Natural Area  Open Space  Parking  Picnic Area  Picnic Tables  Playground  Restrooms  Rollerblading  Scenic View  Shelter  Trumpeter Swan Viewing Ellison Park serves as one of the City’s most important community facilities due to its riverfront location and (sometimes barely) enough room to support community-wide events. Ellison Park provides the City’s primary point of contact with the Mississippi River through its boat launch, fishing pier, and visual proximity. It is also a major trail location terminus from both the west and a sidewalk access from Broadway through the New River Hospital parking lot. 16 East Bridge and West Bridge Park (Subsection title – UL 12pt) Figure___. East Bridge Park Source: Wright County Beacon 2008 Aerial Photograph Park Name Location Acreage Amenities East Bridge Park 119 River Street E 2.5 acres  Trail Connection  Arboretum  Community Room  Gardens  Gazebo  Mississippi River View  Natural Area  Parking  Scenic View  Sliding Hill East and West Bridge Parks are perhaps the most visible parks in the community, flanking the Trunk Highway 25 bridge that spans the Mississippi River at the north edge of the community’s downtown area. Both parks provide a variety of facilities, but despite their proximity, have significantly different environments. East Bridge is more passive in setting and use, with the exception of its extensive use as a sliding hill during the winter season. Apart from this, the park is used for its views and its gardens. 17 West Bridge Park has a much more active nature, including a playground facility, reservable shelter, and more direct access to the riverbank, including a fishing pier. A pathway connects the two parks under the highway bridge at the river, however, this connection is somewhat inconvenient and uninviting at the current time. Figure___. West Bridge Park Source: Wright County Beacon 2008 Aerial Photograph Park Name Location Acreage Amenities West Bridge Park 107 River Street W 3 acres  Basketball Ball Court  Canoe Launch  Community Room  Fishing Pier  Ice Skating  Mississippi River View  Natural Area  Parking  Picnic Area  Picnic Shelter  Picnic Tables  Playground  Restrooms  Rollerblading  Scenic View  Shelter  Trail Connection 18 City/Xcel Athletic Fields (Subsection title – UL 12pt) Figure___. City/Xcel Athletic Fields Source: WSB 2008 Aerial Photograph Park Name Location Acreage Amenities City/Xcel Athletic Fields 2171 River Street W 14 acres  Baseball Field  Bleachers  Concessions  Parking  Picnic Area  Restrooms  Shelter  Trail Connection The City/Xcel Athletic Fields are the primary location for softball and youth baseball competition fields in the community, with fenced, lighted fields and other amenities supporting this specific use. The property is provided to the City for this use by Xcel Energy, and as such, is operated, but not owned by Monticello. Because the fields are fenced for competition, they do not lend themselves to multiple use for other field sports such as soccer or lacrosse. 19 Freeway Fields (Subsection title – UL 12pt) Figure___. Freeway Fields Source: Wright County Beacon 2008 Aerial Photograph Park Name Location Acreage Amenities Freeway Fields 2331 Meadow Oak Avenue 5.5 acres  Baseball Field  Little League Ball Field  Parking  Picnic Area  Rollerblading  Snowshoeing  Soccer Field  Trail Connection Text description for Freeway Fields 20 Pioneer (Lions) Park (Subsection title – UL 12pt) Figure___. Pioneer Park (Lion’s Park) Source: Wright County Beacon 2008 Aerial Photograph Park Name Location Acreage Amenities Pioneer Park (Lion’s Park) 5010 Fallon Avenue 16.3 acres  Community Room  Concessions  Kitchen Facilities  Natural Area  Parking  Picnic Area  Playground  Restrooms  Rollerblading  Shelter  Trail Connection  Volleyball Court Text description for Pioneer Park 21 Mississippi (Swan) Park (Subsection title – UL 12pt) Figure___. Mississippi Drive (Swan Park) Source: WSB 2008 Aerial Photograph Park Name Location Acreage Amenities Mississippi Drive (Swan Park) 121 Mississippi Drive E 0.09 acres  Trail Connection  Mississippi River View  Natural Area  Parking  Picnic Area  Scenic View Insert revised photo showing river frontage Text description for Swan Park 22 River Mill Park (Subsection title – UL 12pt) Figure___. River Mill Park Source: Wright County Beacon 2008 Aerial Photograph Park Name Location Acreage Amenities River Mill Park 6332 River Mill Drive 7 acres  Baseball Field  Basketball Court  Lighted Sliding Hill  Natural Area  Picnic Area  Playground  Restrooms  Shelter  Trail Connection  Volleyball Court Text description here for River Mill park 23 Otter Creek Park (Subsection title – UL 12pt) Figure___. Otter Creek Park Source: Wright County Beacon 2008 Aerial Photograph Park Name Location Acreage Amenities City/Xcel Athletic Fields 1350 Broadway W 8 acres  Gazebo  Trail Connection  Community Room  Creek Side View  Natural Area  Picnic Area  Scenic View Text description for Otter Creek Park Here - along with changes to boundaries 24 Groveland Park (Subsection title – UL 12pt) Insert park data for Groveland Park Revise Map for Groveland Park to address format, etc. Text description of Groveland park here Insert Summary Discussion of Community Park issues here 25 III. Park System Objectives a. Park Survey Results Summary 2. Please identify the amenities you or your family members use in the City parks. Select an option that represents the frequ ency of those amenities you use from "Rarely Used" to "Often Used". Rarely Used Occasionally Used Often Used Rating Average Response Count Playgrounds 19.0% (32) 1.2% (2) 19.6% (33) 6.5% (11) 53.6% (90) 3.74 168 Restrooms 12.6% (22) 8.0% (14) 30.3% (53) 16.6% (29) 32.6% (57) 3.49 175 Picnic Tables 10.9% (19) 6.3% (11) 41.7% (73) 16.0% (28) 25.1% (44) 3.38 175 Picnic Shelters 21.2% (33) 12.8% (20) 37.2% (58) 11.5% (18) 17.3% (27) 2.91 156 Community Center 8.5% (14) 4.9% (8) 17.1% (28) 11.6% (19) 57.9% (95) 4.05 164 Winter activities (sledding, skating) 22.5% (36) 10.6% (17) 36.3% (58) 14.4% (23) 16.3% (26) 2.91 160 Play Equipment 22.6% (36) 6.9% (11) 13.2% (21) 11.3% (18) 45.9% (73) 3.51 159 Walking/Bike Paths 2.8% (5) 1.7% (3) 12.2% (22) 18.9% (34) 64.4% (116) 4.41 180 Pet Exercise 49.4% (76) 4.5% (7) 11.0% (17) 9.7% (15) 25.3% (39) 2.57 154 Disc Golf 77.3% (109) 7.1% (10) 7.8% (11) 5.0% (7) 2.8% (4) 1.49 141 Basketball Courts 57.0% (86) 14.6% (22) 19.9% (30) 4.6% (7) 4.0% (6) 1.84 151 Ball Fields 46.7% (70) 11.3% (17) 17.3% (26) 9.3% (14) 15.3% (23) 2.35 150 Boat Launches 54.4% (81) 11.4% (17) 18.8% (28) 6.0% (9) 9.4% (14) 2.05 149 Events (Music, Movies, Festivals) 13.1% (21) 18.1% (29) 40.0% (64) 20.6% (33) 8.1% (13) 2.93 160 Indoor Ice Rink 59.2% (90) 7.2% (11) 16.4% (25) 7.9% (12) 9.2% (14) 2.01 152 Fishing Docks 41.2% (61) 16.9% (25) 19.6% (29) 12.2% (18) 10.1% (15) 2.33 148 Other Amenity (specify below) b. Parks System Public Input Summary 26 Insert text discussion – highlight association comments, other public input c. Park System Policies i. Proximity The City’s objectives for park system proximity will transition under this plan from what was a heavy emphasis on neighborhood park and totlot access to more reliance on fewer, but larger park facilities, with the focus of the syste m on the Bertram Lakes facility and a more extensive trail system. This policy reflects a number of factors, not the least of which is the extensive investment necessary to acquire and develop the Bertram Lakes facility. However, other prominent factors support this policy, including the following:  Park variety. In larger facilities, the City is able to provide a broader range of facilities and elements, helping each park to appeal to a wider range of age groups and users.  Maintenance and efficiencies. By focusing system growth on fewer, but larger, distinct facilities, the City’s maintenance costs can be reduced by minimizing travel time and other similar efficiencies.  Park acquisition can be phased in over time when future park locations are sited to accommodate dedication by several development interests, rather than relying on each development to provide its own separate park facility.  Fewer, larger parks creates a greater reliance on effective trail and pathway connections, a design preference strongly supported by respondents to the parks survey. As such, the City’s park and trail acquisition efforts will focus on supporting the development of a pathway system that provides access to primary trail corridors within less than one-half mile to most residences. Access to the primary system will be via a sub-system of sidewalks, some minor trail development, and including some on-street trail marking where low-volume roadways can safely support this design. As an implementation technique, the City may negotiate waivers from the sidewalk requirements (when appropriate) in exchange for trail corridor dedications or other related improvements consistent with the parks system plans. Insert graphics illustrating proximity/expansion 27 In this illustration, a series of park dedications is made to create a single larger park facility that serves a broad area of development, rather than a series of individual smaller park installations. The key to this approach will be (1) Siting park dedication areas to accommodate future expansions by dedication or acquisition from neighboring development, and (2) Preserving corridors to the City’s trail system so residents from the general community can utilize the park through safe and attractive pedestrian and/or bicycle access. Park System Policies ii. Facilities, Contents, Elements 1. Types 2. Distribution iii. Pathways as Transportation iv. Pathways as Recreation System Elements d. Design Standards i. Park Components and Elements, by Type and Location Graphic illustrating Community Park – location, elements, exposure, etc . COMMUNITY PARK 28 Use: Area of diverse environmental quality which may include areas suited to intense recreational facilities such as athletic complexes as well as passive type areas, depends largely upon the site location, suitability, and community need Service Area: Several neighborhoods, 1 to 4 mile radius Population Served: All ages, toddler to retiree, entire community for cities up to 25,000 Desirable Size: 20 to 35+ acres Acres/1,000 Population: 5.0 to 10.0 Site Characteristics: Provides for a combination of intensive and non-intensive 29 development ranging from play equipment to trails. May include natural features, such as waterbodies or forested land, must include support elements such as restrooms, drinking water, parking, lighting. Uses should complement those found in a community playfield and should provide diversity in facilities or use areas. Typical Elements: Ballfields, tennis courts, ice skating rinks, walking trails, picnic areas, off-street parking 30 Graphic illustrating Neighborhood Park – location, elements, exposure, etc. NEIGHBORHOOD PARK Use: Area for designated active and passive recreation areas Service Area: ½ to 1 mile radius to serve a population of up to 5,000 persons (a large neighborhood) Population Served: Focus upon ages 5 through 39 with emphasis upon ages 5 through 18 Desirable Size: 5 to 10 acres Acres/1,000 Population: 1.5 to 2.0 Site Characteristics: Suited for multi-use development, easily accessible to neighborhood population, geographically centered with safe walking and bike access, may include school facilities Typical Elements: Play equipment, walking trails, picnic areas, limited fields 31 ii. Pathway Design, by Type and Location Primary Pathway – cross section, construction, improvements, etc. Secondary Pathway – cross section, construction, improvements, etc. Sidewalk – cross section, construction, improvements, etc. iii. Specialty Elements, where appropriate 32 e. Other Park System Objectives 33 IV. Parks and Trails System Analysis a. Park System Gaps b. Park System Overlaps c. Park System Functional Issues i. Park Type ii. Park Conditions iii. Park Elements d. Pathway System Gaps e. Pathway System Design Issues i. Type of Trail ii. Trail Condition iii. Other Pathway Issues 34 V. Parks and Trails System Plan a. Future Parks System Needs i. Changes to Existing Parks ii. Future Park Locations by Function and Type b. Future Pathway System Needs i. Changes to Existing Pathways ii. Future Pathway Routes by Function and Type 1. Main Pathway Routes 2. Loop Pathway Routes 3. Sidewalk Connections 35 VI. Implementation Options a. Prioritization b. Funding Options c. Capital Improvements Programming 36 VII. Parks and Trails System Brochure VIII. Integration of Plan with City’s GIS System MEMORANDUM TO: Monticello Parks File FROM: Stephen Grittman DATE: April 19, 2011 RE: Monticello Parks Plan – Survey Summary NAC FILE: 191.10 This memorandum summarizes the information in the electronic survey conducted for the Monticello Parks and Trails Plan between January and March of 2011. The survey questions and a summary of the answer data is attached to this memorandum. A total of 261 responses were received. Because the survey was conducted as an on - line, voluntary response survey, most respondents skipped various questions. The average question response number was about 75% to 80% of the total respondents. In general, the responses indicated a highly favorable opinion of the Monticello Parks system, and broad support for continued park development. The Bertram Lakes facility was strongly supported by the respondents, with no negative comments received, and some respondents specifically suggesting a “transfer” of resources from other, smaller park facilities to encourage continued acquisition and development of Bertram Lakes. The Monticello Community Center was also well supported, with as many as 70% of the respondents indicated some use of the facility. For the MCC, the primary indication of need related to interest in additional classes of various types and age groups. Respondents indicated a desire for expanded gymnasium, running track, and fitness facilities, and racquetball was the most commonly mentioned facility not currently available. With regard to the overall system, there were two primary categories of interest. The first is a general interest in increasing water-oriented facilities. This ranges from additional outdoor swim opportunities (sometimes voiced as beach, sometimes as outdoor pool and/or waterpark), several requests for a “splash park” or splash pad 2 facility, and related to this – extensive interest in increased access to, and use of, the Mississippi River. These interests were wide-spread throughout the survey, and appeared to cross most of the demographic categories. The second category of support related to trails and natural open space development. In the questions offering an opportunity to increase trail development, this answer was consistently chosen in the top tier of responses. Spe cifically, in Question 8 (a question asking respondents to identify the highest priorities for new facilities), the top “Very High Priority” response related to “Natural Areas such as nature trails . . “, and the highest “High Priority” response was “Passive Community Parks with walking trails, etc. . .” In other open-ended questions, trails were also highly supported. When asked in Question 3 to identify the one amenity most wanted to be added to the park most visited, the top individual response was trails (these options were self-identified, rather than asking to choose from a list). Further, in Question 2 where respondents were to identify the most commonly-used park system amenities from a list fo 16 items, Walking/Bike Paths received the most responses, with the MCC second (these were the only two with received an average ranking of greater than 4.0 on a scoring scale from 0 - 5). Apart from these two categories, there were two notable aspects to the various questions. The most commonly mentioned self-generated new facility was for a dog park, which was mentioned more often than any other new amenity other than trails. The second observation (not related to the first) is a strong interest in improvements to Groveland Park, which received the highest amount of attention from the respondents. Inclusion of Groveland in the list of Community Parks is supported by this interest. Supplementing the Parks Plan to give some attention to the design and elements in this facility would be valuable in serving its long-term role in the system. Apart from these observations, the survey supports many of the objectives already identified by the City and by the Parks Commission, which include the following: Concentration of resources on the Bertram Lakes facility. Refocus park system prioritization on larger, broad -impact facilities, rather than many smaller neighborhood parks. Extensive increase in trail development, from closing existing gaps to expanding the reach of the trail system. Focus on increasing access and use of water-oriented facilities, both natural and man-made. Increasing attention on natural areas for park and trail access, including passive park design and development. 1 City of Monticello Park and Trail System Survey We want to hear from you! Please take a few moments to complete this survey. The information you provide will assist the City of Monticello in understanding the park and trail system needs and desires of the Monticello community. 1. Referring to the enclosed Park Location Map on page 7, please identify the frequency of your park use in the community. Please indicate with an “X” your frequency of use and how you arrive there. County/City Parks Daily Weekly Monthly Yearly Walk/Bike Drive 1. Bertram Lake Regional Park* 2 7 23 57 11 72 2. 4th Street Park 1 10 16 30 10 38 3. Balboul Park 0 0 3 11 2 10 4. Battle Rapids Park 0 2 5 10 4 8 5. Cardinal Hills Park 4 2 3 13 7 10 6. Cardinal Hills Tot Lot 2 1 3 9 2 9 7. City/Xcel Ball Fields 3 10 9 16 5 28 8. Country Club Park 1 1 4 11 3 8 9. East Bridge Park 4 16 43 48 42 66 910. Ellison Park 5 29 63 44 47 91 11. Fallon Park 1 2 3 7 4 7 12. Featherstone Park 2 0 4 7 4 7 13. Freeway Fields 5 16 10 12 19 22 14. Front Street 3 9 10 14 19 11 15. Groveland Park 8 15 8 10 22 12 16. Hillcrest Park 3 10 6 10 16 12 17. Hunter’s Crossing Park 1 0 2 6 1 4 18. Meadow Oak Park 8 9 10 8 24 8 19. Mississippi Drive (Swan Park) 2 4 16 46 10 48 20. Montissippi Park** 17 46 61 25 43 99 21. Otter Creek Park 7 18 17 16 35 16 22. Parkside Park 1 3 2 7 6 6 23. Par West Park 5 4 7 9 13 10 24. Pioneer Park (Lion’s Park) 7 28 30 40 33 65 25. River Mill Park 3 9 7 10 18 11 26. Rolling Woods Park 1 6 1 6 8 4 27. Sunset Ponds Park 8 6 5 9 16 8 28. Water Tower Park 0 2 6 9 6 7 29. West Bridge Park 8 35 50 43 49 79 *Bertram Lakes is a facility jointly developed and operated by Monticello and Wright County **Montissippi Park is a Wright County Park within the city limits of Monticello 2 2. Please identify the amenities you or your family members use in the City parks. Select an option that represents the frequency of those amenities you use from "Rarely Used" to "Often Used". Rarely Used Occasional Use Often Used Average Walking/Bike Paths 5 3 23 35 116 4.40 Community Center 14 8 28 19 96 4.06 Playgrounds 32 2 24 11 91 3.75 Play Equipment 36 11 21 18 74 3.52 Restrooms 22 14 53 30 58 3.50 Picnic Tables 19 11 74 28 45 3.39 Events (Music, Movies, Festivals) 21 29 65 34 13 2.93 Picnic Shelters 33 20 59 19 27 2.92 Winter activities (sled, skate) 36 17 59 23 26 2.91 Pet Exercise 76 7 17 15 40 2.59 Ball Fields 71 18 26 14 23 2.34 Fishing Docks 62 25 30 18 15 2.33 Boat Launches 82 17 29 9 14 2.05 Indoor Ice Rink 91 12 25 12 14 2.00 Basketball Courts 87 22 30 8 6 1.85 Disc Golf 110 11 11 7 4 1.49 Other Amenity (specify below) 3 2. (Continued) 17 Other (please specify): Wide variety of responses to “Other” – nothing that was unique or dominant 3. If you could have one amenity added to the park you most often visit, what would it be? Dog Park Ice Rink Splsh Park Ten- nis Play- grnd Field sport More Trails Horse Trail Sled Amen Outd Swim Rest rooms Picnic Shltr Other 1. Bertram Lake 2 1 1 1 2 1 a,k,p 2. 4th Street Park i 1 3. Balboul Park 2 4. Battle Rapids 5. Cardinal Hills 1 2 6. Card Hills Tot 7. City/Xcel Ball 1 8. Country Club 9. East Bridge 1 e 10. Ellison 11. Fallon 12. Featherstone g 13. Freeway Fld 1 h,l 14. Front Street 15. Groveland 3 2 1 1,j 2 2 16. Hillcrest n 17. Hunter’s X’g 18. Meadow Oak 1 j 1 o 19. Miss’ippi Dr 20. Montissippi 2 1 1 1 1 b,d,f.k 21. Otter Creek 22. Parkside 1 23. Par West 3 24. Pioneer 2 4 2 25. River Mill 1 2 26. Rolling Wds 27. Sunset Pds 1 3 c 28. Water Twr 29. West Bridge i 3 1 e,q Any Park OK 6 4 1 7 2 m Dog Park Ice Rink Splsh Park Ten- nis Play- grnd Field sport More Trails Horse Trail Sled Amen Outd Swim Rest rooms Picnic Shltr Other 3. continued below 4 a. Dirt Bike/4-Wheeler Trails at Bertram b. Garbage Cans at Montissippi c. Basketball Court at Sunset Ponds d. Drinking Fountain at Montissippi e. More BBQ Grills at E/W Bridge f. Rope Play Structure at Montissippi g. Existence at Featherstone h. Improve dugout and bleacher area at Freeway Fields i. Add hours to warming house at 4th Street, W Bridge j. Younger play equipment at Groveland, Meadow Oak k. Add Cross-country skiing at Bertram, Montissippi l. Add parking at Freeway Fields m. Add a fitness course anywhere n. Improve backstop/sunscreen at Hillcrest o. Benches at Meadow Oak p. Improved canoe launch at Bertram q. Add tow rope at East Bridge Also Noted (non-specific locations): a. More maintenance of landscaping in street medians b. Creation of a pleasure garden with fountains, statutes, etc. c. Some restroom comments related to adding running water, or permanent restrooms instead of port-a-potties. d. Create a screened gazebo as a picnic shelter/gazebo e. Some splash-park comments included desire to have benches at edge of fountain for adult seating, etc. 4. In your opinion, is there a particular park that needs improvement? Please indicate the name of the park and the improvement needed. Name of Park: Answers varied, reflected answers to Question 3. 5. Is there a place that you would like to walk/run/bicycle/skate, but no trail or pathway currently exists? Please indicate a beginning and ending location, such as an intersection, park, or building. Trail Beginning: See map Trail Ending: 6. In your opinion, is there a particular trail or pathway segment that needs improvement? Please indicate a beginning and ending location, such as an intersection, park, or building. Beginning Point: Answers reflected Question 5. End Point: Type of Improvement: Primary comments related to completing segments to get beyond neighborhoods 5 7. Please indicate how you feel about the following statements (check appropriate box). Statement Strongly Agree Agree No Opinion Disagree Strongly Disagree Parks are important / essential to our community for a better quality of life.. 155 32 2 0 3 The primary focus of our City should be to maintain and improve the facilities that we have rather than build new facilities or amenities. 47 58 36 44 4 It is important to continue to add to the City walking and biking path system. 96 61 19 12 3 It is important to create safer pathway crossings. 74 72 28 11 2 It is important to continue to improve water and waterfront access. 53 65 58 11 1 It is important to continue to improve opportunities to use and enjoy the Mississippi River. 62 77 43 6 0 The City should increase its emphasis on flowers, plantings and landscaping in the parks. 28 49 59 49 2 The City should add additional picnic pavilions in the parks where possible. 29 63 58 34 2 Non-residents should pay a higher fee when renting or using City taxpayer supported parks and facilities. 45 62 37 25 17 The City should improve handicap access to City parks. 22 34 119 7 2 8. Which of the following types of parks & trails do you feel are currently needed to better serve community residents (check appropriate box to indicate level of priority)? Park Type Low Priority High Priority Very High Priority No Opinion Tot lots (small 1 - 2 acre parks with limited playground equipment, benches, etc.) 89 46 13 26 Neighborhood parks (3 - 10 acres with ball fields, playgrounds, basketball, tennis court, ice skating, etc.) 50 75 40 12 Active community parks (10 acres+ with lighted fields, concessions, swimming facilities, tennis courts, etc.) 56 66 46 10 Passive community parks (10 acres+ with walking trails, picnicking, playgrounds, wading pool, geocaching, etc.) 38 82 52 8 Natural areas such as nature trails, wildlife viewing, interpretive nature centers focused on rivers, streams, ponds, wetlands, woodlands, etc. 45 59 66 12 Bicycle and pedestrian trails which utilize existing public right-of-ways 51 66 51 10 Bicycle and pedestrian trails which utilize off-road corridors and more natural settings 45 61 66 9 Bicycle and pedestrian trails which include markers indicating trail distances 63 48 60 11 6 9. How satisfied are you with the current park facilities provided by the community (check appropriate box)? Very Satisfied Somewhat Satisfied Somewhat Dissatisfied Very Dissatisfied 72 104 14 0 The following questions (10 - 14) relate specifically to the Monticello Community Center (MCC). 10. How often do you or your family members presently use the Community Center facility (check appropriate box)? Never Daily Weekly Monthly Yearly 18 30 59 56 29 11. If you use the facility, how do you get to and from the Center (check appropriate box)? Walk / Bike Drive 29 170 12. If you never or rarely use the MCC, please tell us why. Answers clustered in three areas: (1) Cost. (2) Hours and convenience. (3) Crowds and conflicts between adult/children activities. 13. If you or your family members use the Monticello Community Center, please indicate the specific amenities which you utilize (check all that apply) 139 Pool / Indoor Water Park 61 Gymnasium 27 Birthday Party Room 121 Walk/Jog Track 59 Indoor Play Area 22 Fitness Classes 93 Fitness Center 47 Climbing Wall 19 Drop-in Daycare 62 Special Events 42 Food / Concessions 14 Senior Center 11 Other (please identify) 11 responses related to specific events at the MCC. 14. Are there any activities which are not currently provided at the Community Center which you or your family members desire. For instance, some which have been discussed are racquetball courts, additional gymnasium, expanded water park, splash park, expanded fitness center, or other activities you believe would be beneficial. Answers clustered in 3 primary areas: (1) Water facilities – including outdoor pool, splash park; (2) Increased access to classes and class capacity; (3) Expanded gym and addition of racquetball courts, including expanded walking/jogging track. 7 The following questions refer to events, activities, or programs that you or your family may participate in throughout the community (not just the Community Center). 15. Of the activities, events and programs listed below, which do you or your family members currently participate in (check all that apply)? 64 Aerobics / Fitness 1 Cheer America 8 Learn to Skate 13 Community Garden 72 Movies in the Park 1 Friendship Island 33 Pre-school Programs 56 Swimming Lessons 10 Softball Leagues 5 School of Self Defense 22 Teen Activities 48 Youth Programs 16. Of the activities, events and programs listed below, which do you or your family members have an interest in participating in at a future time (check all that apply)? 87 Aerobics / Fitness 4 Cheer America 33 Learn to Skate 36 Community Garden 86 Movies in the Park 16 Friendship Island 40 Pre-school Programs 57 Swimming Lessons 26 Softball Leagues 31 School of Self Defense 48 Teen Activities 69 Youth Programs 17. Are there any classes, events and programs not listed above which you or your family members would like to see provided by the Monticello Community Center or Parks Department? Answers varied widely, strong interest in classes of all sorts – Community Education, etc. 18. How satisfied are you with the current recreation programs provided by the community (check appropriate box)? Very Satisfied Somewhat Satisfied Somewhat Dissatisfied Very Dissatisfied 55 108 11 1 19. Do you currently use the Mississippi River for any type of recreation? If so, how? More than 100 yes responses – primarily fishing, with a large number walking and viewing river/wildlife, etc. 8 20. What types of activities, programming, or improvements would you like to see developed for the future use of the Mississippi River (check all that apply)? 85 Kayaking 95 Canoeing 55 Organized youth fishing programs 55 Interpretive markers and signs 83 Nature programs 105 Tubing/Float Trips Others? (Please identify) 12 “Other” responses – primarily related to enhancing river use. 21. For the future acquisition and development of major park facilities and improvements, the community may consider the option of a property tax levy. Please indicate how supportive would you be of such a levy by indicating a yearly amount that would be added to your annual property tax bill. 20 $0 11 $1 - $5 17 $6 - $10 4 $11 - $15 25 $16 -$20 18 $21 - $25 14 $26- $30 8 $31-$40 27 $41-$50 30 more than $50 Median Response - $23.50 per year 22. How do you prefer to receive information related to recreational classes, events and programs to community residents (check all appropriate boxes)? 19 Cable Television 69 Direct Mail 141 Email 47 Fliers 6 Network Television 72 Newspaper 41 Social Media (i.e. Facebook) 4 Radio 76 City Website 23. Do you have any additional comments or suggestions related to the City’s park and trail system? See answers attached. 9 These last few questions will help us with an understanding of your family’s demographics so we can better develop a park system that meets the needs of the community. 24/25. Please indicate the number of people in your household in the following age groups: Age: 0-5 yrs 6-12 13-18 19-25 26-35 36-45 46-55 56-65 65+ Female 55 41 29 10 58 64 24 17 6 Male 63 38 27 21 48 62 24 18 5 26. What is the zip code of your place of residence? __________ 27. Do you live or work in the area (check all that apply)? City limits of Monticello Monticello Township Other Live 146 12 32 Work 73 8 110 Thank you for helping us improve Monticello’s park and recreation facilities! Please return your completed, printed survey by January 31st to City Hall, 505 Walnut Street, Monticello, Minnesota 55362. You may also fill the survey out online at: www.Surveymonkey.com/s/MonticelloParksPlanSurvey (a link to this site is also available on the City’s website at www.ci.monticello.mn.us) Parks | 5-12008 Comprehensive Plan Th e term “parks” does not adequately describe the breadth of the this chapter of the Comprehensive Plan. Th ere are many facets to the park system in Monticello: Parks are public spaces developed as places to play and gather. Parks include facilities for organized and unstructured outdoor rec- reational activities. Parks provide a means of preserving open space, natural resources and wildlife habitat. Trails allow access to parks and connect individual parks into a sys- tem. Th e primary focus of the Comprehensive Plan is on parks owned and main- tained by the City of Monticello. Th e Monticello School District, Wright County and the State of Minnesota are also important providers of park, recreation and open space facilities for the residents of Monticello. Th e park system is an essential part of the quality of life in Monticello. Parks play an important role in making Monticello an active and healthy place to live. Parks are integral parts of Monticello neighborhoods. A direct link exists between parks, recreation facilities open space, and trails and the community’s of life. Th e future of Monticello, to a degree, will be determined by its ability to attract new residents. People will view Monticello and assess what it has to off er compared to other area com- munities. Maintaining and enhancing an already strong park system is one measure that can be taken to ensure Monticello’s reputation as an attractive place to live. Th e process of preparing the Comprehensive Plan did not seek to duplicate previous eff orts of the City in park planning. Rather, the Comprehensive Plan builds a strong link between community development and the provi- sion of parks and recreation facilities. 5Parks Chapter Contents Park Standards ............................5-2 Current Park System ...................5-2 Comprehensive Plan Initiatives 5-5 Neighborhood Parks ...............5-5 Community Parks ....................5-7 Community Greenway ............5-9 Trails ........................................5-11 Park Dedication.........................5-11 5-2 | Parks City of Monticello Park Standards Parks and trails are classifi ed according to their use and function. Th e information below is a summary of typical park characteristics: classifi cations, park sizes, and service areas. Th is section is intended to act as a general guide to park planning, acquisition and use. Th e standards are designed to assure that Monticello residents have convenient access to neighborhood parks and that the community has a range of active and passive recreation facilities to meet current and future needs. Mini-Park Use : Specialized park that serves a concentrated population (i.e. tots or seniors) or geographic area. Used in areas where geographic barriers prevent access to a neighborhood park. Service Area : Less than ¼ mile radius Size : 0.5 to 2 acres Location : Typically near higher density housing that does not have access to a neighborhood park or as a supplement to a neighborhood park. Neighborhood Park Use : Basic unit of the park system, developed for both active & passive activities. Design criteria should anticipate the changing demographic pro- fi les of the neighborhood served, as to provide appropriate facilities. Focus on informal and un- structured activities. Service Area : 1/3 mile radius Size : 4-10 acres Location : Easily accessible to the neighborhood population with safe walking and biking access uti- lizing trail networks. Parking facilities limited to a minimum. Site should have well-drained soils and not include topography of excessively steep slops. Community Park Use : Area designed for community scale recreation either active (athletic fi elds, etc),. passive (picnic facilities, nature study, etc.) or a combination of both. Service Area : Community wide Size : 20-65 acres Location : Site should be suited for community use, be easily accessible to the population it is intended to serve. Located near high traffi c areas such as schools and major thoroughfares. School Park Use : Depending on circumstances, combining parks with school sites can fulfi ll the space requirements of other classes of parks, such as neighborhood, community, athletic complex and special use. Service Area : Driven by the location of the school property. Size : Variable - depends on function. Location : Land should typically be suited for ac- tive recreation use, but may also include natural areas. Linear Park/Greenway Use : Trails incorporating ROW widening and land acquisition long rivers and natural areas. Service Area : Community wide Size : Varies Location : Along major river corridors, sensitive areas and exiting roadways. Incorporate multi-use and multi-modal trails. Current Park System Planning for the future begins with an understanding of the park system in 2007. Monticello’s park system currently includes 23 parks totalling approximately 108 acres. Th e location of each park is shown in the map in Figure 4-1. Th e section that follows summaries the basic characteristics of each park. 4th Street Park Shelter Rest rooms Ball diamond Tot lot Skating facilities (with lighting) - recreational skating and 2 hockey rinks Off -street parking Balboul Park Play facilities Parks | 5-32008 Comprehensive Plan 10 10 2 5 14 11 43 50 68 5 81 94 25 75 18 37 117 39 1 3 1 10 6 00 . 5 1 0. 2 5 Mi l e s Ju l y 1 1 , 2 0 0 7 Da t a S o u r c e : M n D N R , S h e r b u r n e C o u n t y , W r i g h t Co u n t y , a n d W S B & A s s o c i a t e s . Figure 4-1 - Existing Park and Trail System Ex i s t i n g P a r k a n d Re c r e a t i o n S y s t e m 1 4 t h S t r e e t P a r k 2 B a l b o u l P a r k P o n d s 3 C a r d i n a l H i l l s P a r k 4 C a r d i n a l H i l l s T o t L o t P a r k 5 C o u n t r y C l u b M a n o r 6 E a s t B r i d g e P a r k 7 E l l i s o n P a r k 8 F r e e w a y F i e l d s P a r k 9 F r o n t S t r e e t P a r k 10 G r o v e l a n d P a r k 11 H i l l c r e s t P a r k 12 M e a d o w O a k s P a r k 13 M e a d o w s P a r k & P o n d s 14 M i s s i s s i p p i D r i v e P a r k 15 M o n t i c e l l o C i t y B a l l f i e l d s 16 M o n t i s s i p p i C o u n t y P a r k 17 O a k R i d g e P a r k 18 O t t e r C r e e k P a r k 19 P a r W e s t P a r k 20 P a r k s i d e P a r k 21 P i o n e e r P a r k 22 P r a i r i e W e s t P a r k 23 R i v e r M i l l P a r k 24 R o l l i n g W o o d s P a r k 25 W e s t B r i d g e P a r k 26 E a s t v i e w E l e m e n t a r y S c h o o l 27 L i t t l e M o u n t a i n E l e m e n t a r y 28 P i n e w o o d E a s t E l e m e n t a r y S c h o o l 29 M o n t i c e l l o M i d d l e S c h o o l 30 M o n t i c e l l o H i g h S c h o o l 31 M o n t i c e l l o C o m m u n i t y C e n t e r & C i t y H a l l 32 M o n t e C l u b H i l l 5-4 | Parks City of Monticello Picnic facilities Natural area/open space Battle Rapids Park Natural area/open space Cardinal Hills Park Volleyball courts Picnic area Cardinal Hills Park Tot Lot Tot lot play area City/Xcel Ballfi elds Lighted softball fi elds (4) Bleachers Shelters Restroom Concession stand Country Club Manor Playground Ball fi eld Volleyball Picnic tables East/West Bridge Park Play lot Gazebo Picnic facilities Skating rink Warming house with rest rooms Sliding hill Off -street parking Ellison Park Shelter Rest room facilities Creative play area Tot recreational equipment Swings for the handicapped Parking Boat launch Fallon Park Open space Freeway Fields Soccer/football fi eld Basketball court Little league ball fi eld Softball fi eld Groveland Park Youth football fi elds Softball diamond Play area Shelters Parking Hillcrest Park Skating facilities Play lot Picnic facilities Ball fi eld Meadow Oak Park Picnic tables Nature trail Basketball court Meadows Natural area/open space Mississippi Drive Natural area/open space Scenic river overlook Swan viewing Oak Ridge Park Open space Gazebo Flower park Otter Creek Park Gazebo Natural area/open space Par West Park Playground Disc golf area (3 hole) Basketball court Picnic tables Pioneer Park (Lions Park) Play area Community building with rest rooms Picnic area with shelters Parks | 5-52008 Comprehensive Plan Off -street parking Nature trails River Mill Park Playground Lighted sliding hill Ball fi eld Shelters Basketball court Volleyball court Soccer fi eld Rolling Woods Playground area Basketball court Sunset Ponds Park Ball fi eld Soccer/football fi eld Comprehensive Plan Initiatives Th e process of preparing the Comprehensive Plan identifi ed a variety of initiatives related to the future park system in Monticello. Th ese initiatives should be considered by the Park Commission in its planning eff orts. Neighborhood Parks Th e map in Figure 4-2 illustrates the areas served by the existing park system. Each circle on this map represents an approximate one-third mile radius. Th is map sug- gests that there are no critical gaps in the distribution of city parks. All neighborhoods have reasonable access to some form of park. Th e Comprehensive Plan does not show individual neighborhood parks in areas guided for new residential development. Instead, it is assumed that neighborhood parks will be added as property is platted. Th e following policies will guide City actions in the de- velopment and maintenance of neighborhood parks. Neighborhood parks are essential elements of 1. Monticello neighborhoods. Neighborhood parks are intended to be two to six acres in size. 5-6 | Parks City of Monticello Th e Comprehensive Plan seeks a service area of 2. one mile or less for a neighborhood park. Th is service area must account for barriers created by natural and man-made features. Th e goal is to have a neighborhood park within walking or biking distance of every home. Th ere is a clear nexus between development and 3. the need for additional parks. Th e City will use the park dedication powers convey by State Law to acquire land (or cash) to implement this Plan. Th e City will require the dedication of desirable locations for parks in all new subdivisions, unless the subdivision is adequately served by an existing (or planned) neighborhood park. Land received by the City through park dedication must have the capacity for park use. Dedicated land should not be encumbered by steep slopes, poor soils, utility 2 5 14 68 9 4 18 17 39 106 Figure 4-2: Existing Park Service Areas Parks | 5-72008 Comprehensive Plan easements and other impediments to intended park uses. Parks should be connected by trails and sidewalks 4. to provide walking and biking access for both neigh- borhoods and the broader community. Th e development, improvement and maintenance 5. of the park system requires careful financial planning. With park dedication providing a key resource, this planning must be tied to ongoing projections of future growth. Th is planning should work to ensure that funding plans for the acquisi- tion and development of the regional park do not deplete funding for the rest of the system. Timely development of neighborhood parks is es-6. sential. Funding of the park system should provide for both acquisition and timely development of neighborhood parks. Th is objective may require new fi nancial strategies. Finance tools such as special assessments and housing improvement areas would allow a park to be built at the outset of residential construction. Planning for neighborhood parks should also con-7. sider the needs of rural residential subdivisions. A less dense development pattern does not remove the need for neighborhood parks, but may alter the service area and location. Community Parks Th e acquisition and development of YMCA Camp Manitou is the sole new community park initiative pro- posed in this update of the Comprehensive Plan. Th e illustration in Figure 4-3 shows a preliminary concept for the development of this regional park. This initiative meets a wide range of community needs. Acquisition of this property protects and preserves critical natural areas. As Monticello grows, it is important to preserve these areas for future gen- erations. Th e recent and future growth of Monticello creates the need for more community recreation facilities. Th e regional park provides the space to meet these needs. Th e park provides a wide range of amenities that will attract new development to Monticello. Th e 5-8 | Parks City of Monticello Active Park Use (26 acres) Environmental Learning Center Horseback Riding Stable Parking Lot Passive Park Use (11 acres) Dog Park Parking Lot Passive Park Use (32 acres) Frisbee Golf Course Archery Range Passive Park Use (11 acres) Primitive Camping Passive Use (40 acres) Nursery Passive Use (40 acres) Arboretum Picnic Grounds BERTRAM 102 acres LONG 88 acres MUD 27 acres FIRST 15 acres 1/ 8 t h m i l e s e w a g e t r e a t m e n t b u f f e r Pi p e l i n e E a s e m e n t P o s s i b l e S c h o o l B l v d . A l i g n # 1 Po s s i b l e S c h o o l B l v d . A l i g n # 2 Active Park Use (65 acres) Phase I:a) Parking lot for approximatly 100 vehicles b) 4 Softball fields 300’ base pads c) 5 International size soccer fields 100 - 120 yds x 70-80 yds Phase II:a) Parking lot expansion b) 4 Softball fields 300’ base pads c) 3 International size soccer fields 100 - 120 yds x 70-80 yds Active Park Use (53 acres) Campground / R.V. Park Boat / Canoe Launches Swimming Beach Picinic Grounds Rental Chalet Cabin Camping Playground Fishing Pier Amphitheatre ENTRANCE EN T R A N C E E N T R A N C E 1 2 3 0.5 mile loop 1.0 mile loop Long Lake Overlook Mud Lake Overlook 4.5 mile loop (all 4 lakes) First Lake Overlook OTTER C R E E K Otter Creek Overlook Wetland Overlook WETLAND COMPLEX Long Lake Overlook #3 Long Lake Overlook #2 4.5 mile loop (all 4 lakes) Ridgeline Overlook 0.5 mile to overlook 1/8th mile sewage treatment buffer 0.75 mile loop Canoe Routes Canoe Route Adjacent Use: Low Density Residential and Golf Course Adjacent Use: Low Density Residential Adjacent Use: Low Density Residential Adjacent Use: Low Density Residential Adjacent Use: Low Density Residential Adjacent Use: Commercial Nursery April 10, 2006 Adjacent Use: Industrial Figure 4-3: Concept for Development of Regional Park Parks | 5-92008 Comprehensive Plan park brings community-scale assets that benefi ts new development and enhances the quality of life across the community. Th ese amenities create the setting that should be a catalyst for the quality of neighborhood and housing stock desired by the City. Th ese factors help to create the nexus between de- velopment and this regional park initiative. Th e City anticipates using a portion of monies received from payments in lieu of park land dedication to pay for the acquisition and improvement of the regional park. Th e Park Plan identifi es two types of parks designed to meet the needs of the broader community. Th e Land Use chapter describes how the park will relate to adjacent development and connected to the broader community. Community Greenway Th e Parks chapter reinforces the concept of a greenway introduced in Land Use. As Monticello continues to grow to the west and south, it has the opportunity to establish a community greenway. Monticello has a his- tory of protecting natural features as growth occurs. A greenway builds on this commitment to create a con- nected system of natural areas that ring the community. Th e intent of this initiative is: Th e corridors are a tool for preserving important el- ements of the natural environment in Monticello. Th e corridors provide public access and use to these areas. Th e corridors connect community parks. Greenway corridors become part of the defi ning characteristics and identity of Monticello. Th e corridors provide routes for the trail system and a means of linking parks, community facilities and neighborhoods. Th ese areas provide habitat for wildlife. Th e map in Figure 4-4 shows a potential layout of a community greenway system. Th is illustration is not intended to show a specifi c plan, but rather the critical elements of a community greenway. Th ese elements include: 5-10 | Parks City of Monticello 10 11144 11 44433 5550 666888 5 8881 999 444 75 3999 10 0 0.5 1 0.25 Miles MaMM rch 13, 2008 Datatt Souruu ce: MnDNR, Sherbr uruu ne Countytt , WrWW ighthh Countytt , andnn WSB & Associcc ates. Figure 4-4: Potential Elements of Community Greenway 06 1 3 1 2 5 333333333333333333333 777777 1117 7 18 2255 Le g e n d P o t e n t i a l g r e e n w a y c o r r i d o r K e y p a r k c o n n e c t i o n s Parks | 5-112008 Comprehensive Plan Linking park and open space destinations such as Montissippi County Park, Mississippi River, larger City parks (Ellison, Pioneer and West/East Bridge), Downtown, YMCA property, and Pelican Lake. Preserving and providing public use of key areas of trees, wetlands and other natural features as part of future development. Using powerline corridors, trails and bike lanes to fi ll in gaps where it is not possible to have natural areas in the greenway. A key next step in this initiative is to conduct a Natural Resources Inventory (NRI). A NRI determines the type, quality and location of natural features in Monticello and the orderly annexation area. Th e NRI can be used to identify key property to acquire for the greenway. It will also be useful in identifying potential gaps in the greenway that must be bridged with some other form of public space. Trails A system of trails is an essential part of the Compre- hensive Plan. Trails build connections, allowing people to move through the community without a car. Trails provide the means for using area wide parks and other natural areas. Trails off er recreational opportunities for Monticello residents. For the purposes of the Comprehensive Plan, continued planning and development of the trail system should be guided by the following objectives: Trails must be viewed as a system. Individual seg- ments must combine into a network that connects places within the community. Th ese connections facilitate the movement envisioned by the trail plan. Trail development should be incorporated with street construction. Th e construction and im- provement of streets provides an excellent oppor- tunity to build new segments of the trail system. Where possible, the trail should be detached and separate from the roadway. Integrate trails into new subdivisions. Focusing on trails at the platting and site planning stage of development allows for routes that serve the neighborhood and link with other elements of the trail system. Park Dedication Th e use of park dedication is essential to achieving the City’s plans and goals for parks, trails and open space. In fact, it would be diffi cult for the City to acquire and create the park system envisioned by the Comprehen- sive Plan without park dedication. Th e experience of Monticello and other cities clearly demonstrates a nexus between the development of land and the need for the municipal park system. Th e development of land for residential purposes increases the demands for parks, trails and recreational facilities in Monticello. Th e development of land also creates opportunities to preserve open space and natural re- sources. Th e Comprehensive Plan establishes a system of neigh- borhood and community oriented facilities. Monies received from payments in lieu of dedication shall be used pursuant to the park plan to meet the needs of the park system. Th e demands on the park system from new development are not tied to physical proximity of a subdivision making dedication. New residents may also be served by the development of parks and trails and the preservation of open space in other parts of Monticello. Th e overall plan for the park system seeks to provide ev- ery resident with reasonable access to the park system. In implementing the Comprehensive Plan, the City will work to distribute neighborhood parks throughout the community. Community parks and recreational facilities will be developed at locations appropriate for the function of each park. Park dedication allows the fl exibility to: Acquire land suitable for parks in both location and character. Acquire land for trails that connect neighbor- hoods with the park system and other community destinations. Acquire and preserve natural resources areas and to connect these areas into a community greenway. 5-12 | Parks City of Monticello Accept cash payments in lieu of dedication where land from a subdivision does not meet the park development needs and plans of the City. Each proposed plat should be carefully reviewed to determine if the subdivision contains land that should be dedicated to implement the park plan. If the dedi- cation of land does not satisfy the requirements of the park dedication ordinance, then the City should receive a cash payment in lieu of dedication. State Law (Minnesota Statutes, Section 462.358, Sub- division 2b) authorizes the City to require the dedica- tion of land for the purposes of this plan as part of the subdivision and platting of land. Th e City has adopted an ordinance that establishes regulations for the use of park dedication. Th is ordinance should be reviewed from time-to-time to ensure consistency with State Law and the Comprehensive Plan. 1 CITY OF MONTICELLO PARK & TRAIL PLAN REVIEW & ADOPTION TIMELINE April 20th Parks Commission meeting o Comments on 3/24/11 Parks & Trail Plan Draft 1 o Review of latest Park & Trail Plan concepts for comment o Review of survey tabulation results April 26th Staff meeting (Tom Pawelk, Angela Schumann, Jeff O’Neill, Kitty Baltos) o Park & Trail Plan Draft 2 due to staff, to include:  Policy Statements  Park Facilities Plan - Type, Location, Phasing  Trail & Pathway Plan  Greenways Plan  Phasing and Capital Improvement Plan  Appendix: Data Distribute Draft 2 to Parks Commission Distribute Draft 2 to MCC Advisory Board Distribute Draft 2 to City staff May 3rd Meeting with Gary Revnick, Monticello School District Athletic Director Meeting with Bertram Chain of Lakes team, (Chair, staff) Meeting with Embracing Downtown Planning/Engineering Consultant Planning Commission meeting o Comments on Parks & Trail Plan Draft 2 o Review of survey tabulation results May 17th Park & Trail Plan Community Workshop Staff comments due to NAC May 23rd Park & Trail Plan Draft 3 due to staff This draft to incorporate input/comments from: o Parks Commission o Embracing Downtown team 2 o Bertram Chain of Lakes team o Monticello School District o MCC Advisory Board o Community Workshop o City staff Distribute Draft 3 to Parks Commission Distribute Draft 3 to MCC Advisory Board Distribute Draft 3 to Planning Commission Distribute Draft 3 to City Council City Council Workshop – Park & Trail Plan o Joint session with Planning, Parks Commission, MCC Advisory Board May 26th Parks Commission formal review and recommendation on Park & Trail Plan, Draft 3 Park Commission review of website applications City staff comments/revisions due on park brochure to WSB May 27th – June 2nd – NAC prepares FINAL DRAFT May 31st Staff meeting – final administrative revisions to Park & Trail Plan June 2nd Park & Trail Plan FINAL Draft due for inclusion in Planning Commission packet June 7th Public Hearing – Amendment to Comprehensive Plan for adoption of Park & Trail Plan June 13th City Council consideration of Parks & Trail Plan and Comp Plan Amendment ADMINISTRATIVE TASKS DURING THIS TIME: Parks Department to take pictures of all parks and all amenities Creation of point of interest urls for website Creation of content on individual park web pages Grant follow-up Planning Commission Agenda: 05/03/11 1 9. Consideration to call for a Public Hearing on Amendment of the Monticello Zoning Map. (AS) A. REFERENCE AND BACKGROUND: In the previous version of the Official Zoning Map, two annexed parcels were inadvertently left of the map. The Planning Commission is asked to call for a public hearing for the adoption of a revised map illustrating the inclusion of these two parcels. In addition to the amendment for the excluded parcels, the map features a slightly re- configured legend for ease-of-use. The revised map will also illustrate the Special Use Overlay District (related to Adult- Oriented Uses), as City Council adopted the overlay district amendments on April 24th, 2011. B. ALTERNATIVE ACTIONS: 1. Motion to call for a public hearing on June 7th, 2011 for Amendment to the Official Monticello Zoning Map. 2. Motion of other as directed by the Planning Commission. C. STAFF RECOMMENDATION: Staff recommends alternative 1 above. D. SUPPORTING DATA: A. Official Zoning Map – Current 1/24/11 B. Proposed Official Zoning Map County Hwy 75 Chelsea Rd State Hwy 25 85th St NE 9 0th St N E Linn St Pine St 7th St School Blvd Riverview Dr Cedar St W River St M a r v i n R d Jason Ave Dundas Rd W Broadway St Hart Blvd Country La Haug Ave NE Elm St W 4th St Fenning Ave NE Oakwook Dr Ma lla rd La 95th St NE Fallon Ave NE Edmonson Ave NE Mississippi Dr 5th St Country Club Rd Sandberg Rd P e l i c a n L a F a l c o n D r Fenning Ave Walnut St Oak Ridge Dr Oriole La Club View Rd Broadway St Hillcrest Rd E River St Headman La M i l l T r a i l L a Falcon Ave NE Wright StBenton St Elwood Rd Ramsey St 6th St River Mill Dr Wildwood Way Hilltop Dr Mill Run Rd O a k V i e w L a Farmstead Ave Martin Dr 4th St E 3rd St E Red Rock La Gillard Ave NE Maple St Fallon Dr Willow St View La E Grey Stone Ave Marvin Elwood Rd Fieldcrest Cir Fairway Dr Jason Ave NE Vine St M e a d o w L a Jerry Liefert Dr Praire Rd Starling Dr Palm St U nkn own or N o Streetn ame Fallon Ave Golf Course Rd Falcon Ave Kevin Longley Dr Craig La R e d O a k L a Front St 5th St W Thomas Park Dr Locust St M o c k i n g b i r d L a W 3rd St Eas twood C ir Briar Oaks B lvd F a r m s t e a d D r Henipin St E i d e r L a Dayton St Oak La River Forest Dr Meadow Oak Ave Kampa Cir O a k R i d g e C i r M i l l C t R i v e r R i d g e L a Garrison Ave Oakview Ct Dundas Cir Kenneth La Otter Creek Rd Minnesota St Eagle Cir Crocus La Meadow Oak La Stone Ridge Dr Chestnut St 1 2 0 t h S t N E Darrow Ave NE Diamond Dr Pebble Brook Dr Widgeon La Washington St Bunker Cir Homestead Dr Thomas Cir E n d i c o t t T r Center Cir Oak View Cir Sandtrap Cir Country Cir Cheyen Ct Old Territoral Rd Tanager Cir Hillcrest Cir Os p rey Ct Acorn Cir Balboul Cir S w allo w C ir R iv e r si d e C ir Meadow Oak Ct Matthew Cir E Oak Dr S t o n e R i d g e C ir Oakwood Dr Meadow Oak Ave NE County Hwy 75 Hart Blvd Marvin Rd Marvin Rd Wright St Cedar St Minnesota St City of Monticello Official Zoning Map Zoning Districts A-O R-1 R-2 R-3 R-PUD B-1 B-2 B-3 B-4 CCD I-1 I-2 R-A (formerly R-1A) T-N (formerly R-2A) I-BC (formerly I1-A) M-H (formerly R-4) Other Mississippi Wild, Scenic & Rec Overlay District Overlay Districts CCD Residential Overlay District Performance Based Overlay District Water 1-24-11 County Hwy 75 Chelsea Rd State Hwy 25 85th St NE 9 0th St N E Linn St Pine St 7th St Sch ool Blvd Riverview Dr Cedar St W River St M a r v i n R d Jason Ave Dun das Rd W Broadway St Hart Blvd Country La Haug Ave NE Elm St W 4th St Fenning Ave NE Oakwook Dr Mal lar d La 95th St NE Fallon Ave NE Edmonson Ave NE Mississippi Dr 5th St Country Club Rd Sandberg Rd P e l i c a n L a F a l c o n D r Fenning Ave Walnut St Oak Rid ge Dr Oriole La Club View Rd Broadway St Hillcrest Rd E River St Headman La M i l l T r a i l L a Falcon Ave NE Wright StBenton St Elwood R d Ramsey St 6th St River Mill Dr Wildwood Way Hilltop Dr Mill Run Rd O a k V i e w L a Farmstead Ave Martin Dr 4th St E 3rd St E Red Rock La Gillard Ave NE Maple St Fallon Dr Willow St View La E Grey Stone Ave Marvin Elwood Rd Fieldcrest Cir Fai rw ay Dr Jason Ave NE Vine St M e a d o w L a Jerry Liefert Dr Praire Rd Starling Dr Palm St Un k n o w n o r N o S tr e e tn am e Fallon Ave Golf Course Rd Falcon Ave Kevin Longley Dr Craig La R e d O a k L a Front St 5th St W Thoma s Pa rk Dr Locust St M o c k i n g b i r d L a W 3rd St East wo o d C ir Bria r O ak s Blvd F a r m s t e a d D r Henipin St E i d e r L a Dayton St Oak La River Forest Dr Meadow Oak Ave Kampa Cir O a k R i d g e C i r M i l l C t Ri v e r R i d g e L a Garrison Ave Oakview Ct Dun das Cir Kenneth La Otter Creek Rd Minnesota St Eagle Cir Crocus La Meadow Oak La Stone Ridge Dr Chestnut St 1 2 0 t h S t N E Darrow Ave NE Diamond Dr Pebble Brook Dr Wi dgeon La Washington St Bunker Cir Homestead Dr Thomas Cir E n d i c o t t T r Center Cir Oak View Cir Sandtrap Cir Country Cir Cheyen Ct Old Territoral Rd Tanager Cir Hillcrest Cir Os p re y C t Acorn Cir Balboul Cir S w allo w C ir R iv e r si d e C ir Meadow Oak Ct Matthew Cir E Oak Dr S t o n e R i d g e C ir Oakwood Dr Meadow Oak Ave NE County Hwy 75 Hart Blvd Marvin Rd Marvin Rd Wright St 90th St NE Cedar St Minnesota St City o f Monticell oOfficial Zoning Map 4-22-11 : Mississippi Wild, Sce nic & Rec Overlay District OVERL AY DISTRICTS CCD Residential Overlay District ! ! ! !!!! ! ! !!!!! Pe rformance Based Overlay District ! ! ! !!!! ! ! !!!!! Shoreland District OTHER Water Legend A-O R-1 R-2 R-3 M-H BASE ZONING D ISTRICTS Residential Districts -- Low R esidential Densities -- Med ium R esidential Densities -- High R esidential D ensities B-2 B-3 B-4 IBC I-1 I-2 Business D istricts Industrial Districts R-A B-1 T-N R-PUD CCD Planning Commission Agenda: 05/03/11 1 10. Community Development Director’s Report. (AS) Special Meeting – May 17th At their last meeting, the Planning Commission called for a special meeting at 6:00 PM on May 17th for a review and discussion of 2011-2012 Goals & Objectives. The Community Workshop for the Park Plan has also been scheduled for that evening. As such, a special meeting notice and notice of quorum will be posted for both the 6:00 Special Planning Commission meeting and the 7:00 Parks Community Workshop, as Planning Commission is asked to attend that meeting, as well. Interim Ordinance – Temporary Signage To date, 19 temporary sign permits have been issued and staff has been monitoring their placement and use. There have been some minor issued with illegal placement in residential areas, which staff have immediately addressed. Adult Use Ordinance The City Council unanimously approved the proposed ordinance amendments to the Adult-Oriented use provisions on April 25th, 2011. As such, staff will be following up with required publication and postings. The new ordinance should be available online by mid-May. Census Info The U.S. Census Bureau released the 5-year American Community Survey (ACS) estimates making available social, economic, housing and demographic statistics for every community in the nation. This release consisted of about 11.1 billion individual estimates and covered more than 670,000 distinct geographies. Prior to this data release, small geographic areas had to rely on outdated 2000 Census figures for detailed information about the characteristics of their communities. Commission will be emailed a separate link to the data set for Monticello as the URL was too long to include here. Detailed 2010 Census tract-level information for cities beyond these 5-year aggregates has not yet been released. Cargill Employees Support Bertram Lakes Restoration Project Cargill Kitchen Solutions has made restoration of oak savannah at the Bertram Chain of Lakes their employee contribution project for 2011. Each year, the Cargill employees select a community project and contribute funds toward that project during their annual employee event. This year’s event, to be held on April 30th, will support efforts to restore an area of oak savannah on the park’s east side (in an area currently owned by the City/County). Cargill Kitchen Solutions will also be able to apply for matching grant funds through Cargill corporate. This is a tremendous opportunity to work proactively on an area identified by Bertram Advisory Council’s Technical Subcommittee for restoration. Council can expect additional updates on this project as it takes shape. Many thanks to Cargill Kitchen Solutions for their support of this effort. Planning Commission Agenda: 05/03/11 2 Embracing Downtown The Embracing Downtown project continues to proceed in a positive manner. The consulting group presented four concept plans to the Steering Committee, Downtown Stakeholders, commissions/boards and residents. The concepts have generally been well received a nd continue to create excitement about potential redevelopment in downtown. The next step will include selecting a preferred alternative and beginning to work on the phasing and financing plan. A more specific timeline will be established within the next few weeks. TH 25 / CSAH 75 NE Quadrant Improvements Construction has resumed on this project and is planned to be completed by the end of May. The signal system at the intersection of TH 25 & River Street has been turned off and will remain off until mid-May. The signal system at the intersection of TH 25 & CSAH 75 will remain operational throughout the project, with the exception of a few hours while the old pole is disconnected prior to removing it. Access to local businesses will be maintained at all times during construction. TH 25 / CSAH 11 / CR 14 Intersection Improvements Mn/DOT will begin construction on this project on June 6th. The plan is to complete the project by September 2nd. Motorists will encounter intermittent lane closures on TH 25, and traffic on northbound TH 25 will be channeled from two lanes to one lane south of Broadway for a period of 4 to 6 weeks beginning after July 4th. This will likely cause significant traffic congestion, especially during the evening rush hour. Access to local businesses will be maintained at all times. Mn/DOT provided an article to the City for inclusion into our Newsletter, and they will be distributing letters to local businesses before construction begins. More information on this project, including construction updates and detour mapping, can be found on Mn/DOT’s District 3 web site at www.dot.state.mn.us/d3.html.