EDA Agenda 09-10-2014EDA MEETING
Wednesday, September 10th, 2014
6:00 p.m.
Mississippi Room - 505 Walnut Street, Monticello, MN
EDA/City Council Tour
EDA/City Properties
4:00 PM
Meet at Monticello City Hall
Commissioners: President Bill Demeules, Vice President Bill Tapper, Treasurer
Tracy Hinz, Matt Frie, Rod Dragsten and Council members Tom Perrault and Brian Stumpf
Staff: Executive Director Jeff O'Neill, Wayne Oberg, Angela Schumann
1. Call to Order.
2. Approve Meeting Minutes:
a. August 13th, 2014
3. Consideration of additional agenda items.
4. Consideration of approving payment of bills.
5. Consideration to approve funding for 2015 Initiative Foundation Membership.
6. Consideration of Market Matching Report.
7. Consideration of Director's Report.
8. Adjourn.
MINUTES
REGULAR MEETING - ECONOMIC DEVELOPMENT AUTHORITY (EDA)
Wednesday, August 13, 2014, Mississippi Room, Monticello Community Center
Present: Bill Demeules, Bill Tapper, Tracy Hinz, Rod Dragsten, Tom Perrault, Brian
Stumpf
Absent: Matt Frie
Others: Jeff O'Neill, Wayne Oberg, Angela Schumann
1. Call to Order
Bill Demeules called the meeting to order at 6:00 p.m.
2. Approval of Minutes
a. July 9th, 2014 Regular Meeting Minutes
BRIAN STUMPF MOVED TO APPROVE THE JULY 9TU, 2014 REGULAR
MEETING MINUTES AS PRESENTED. BILL TAPPER SECONDED THE
MOTION. MOTION CARRIED 6 -0.
b. July 14th, 2014 Special Meeting Minutes
BILL TAPPER MOVED TO APPROVE THE JULY 14TU, 2014 SPECIAL
MEETING MINUTES AS PRESENTED. ROD DRAGSTEN SECONDED THE
MOTION. MOTION CARRIED 5 -0. (Tracy Hinz did not vote as she was not present
at that meeting.)
3. Consideration of adding items to the agenda
• Preliminary Development Agreement, Rocky Mountain Group LLC
• TIF Information
4. Consideration of approving payment of bills
Tom Perrault pointed out that it appears that the EDA should not have been charged a
meeting recording cost for July 14, 2014 as the special EDA meeting scheduled for that
evening had not been recorded on camera. Angela Schumann agreed to check into and
resolve the matter as appropriate.
BILL TAPPER MOVED TO APPROVE PAYMENT OF BILLS THROUGH AUGUST
8TU, 2014 WITH THE MEETING RECORDING EXPENSE OF JULY 14TU SUBJECT
TO STAFF CLARIFICATION. BRIAN STUMPF SECONDED THE MOTION.
MOTION CARRIED 6 -0.
EDA Minutes: 8/13/14
5. Consideration to approve funding for 2014 Industry of Year /MN Manufacturer's
Week activities
Angela Schumann requested that the EDA consider funding the $1,000 expense
associated with providing breakfast for those in attendance at the 2014 Industry of the
Year event. The event is a business retention and expansion effort coordinated in
partnership with the Industrial and Economic Development Committee (IEDC) and the
EDA. This year's event is scheduled for Wednesday, October 22nd at the MCC in
conjunction with MN Manufacturer's Week. The event is Monticello's opportunity to
thank the manufacturing and industrial community for its efforts and contributions.
BILL TAPPER MOVED TO APPROVE FUNDING FOR THE 2014 INDUSTRY OF
THE YEAR EVENT. TRACY HINZ SECONDED THE MOTION. MOTION
CARRIED 6 -0.
6. Consideration to authorize a Request for Quote for Environmental, Structural and
Demolition Services and for Redevelopment Qualification for City and EDA -owned
Properties on Block 34 and to appoint EDA members to a Development RFP team
for Block 34
Angela Schumann reported that City and EDA -owned properties on Block 34 must be
removed prior to the start of construction of the phased Highway 25 /CSAH 75
intersection improvements scheduled to begin in 2015. The EDA was asked to extend its
prior authorization for quotes for redevelopment district qualification, environmental and
structural analysis and demolition of buildings located at 100 and 112 Broadway East and
to include the property that the City recently acquired at 130 Broadway East. Staff would
then request quotes and bring forward various funding options for EDA consideration.
Schumann pointed out that it would be most efficient and cost beneficial to direct WSB
& Associates (WSB) to prepare a quote for handling the environmental and structural
analysis as they have been managing the overall intersection improvement project. The
EDA attorney recommended that LHB & Associates (LHB) submit a quote for
redevelopment qualification as this firm is widely recognized and accepted for this type
of work. Staff would rely on LHB and Kennedy and Graven to recommend the timing
related to building removal. The EDA has up to three years to establish a redevelopment
district after declaring the properties sub - standard. The overall project timeline is
dependent upon the availability of funding.
Staff had recommended obtaining a quote solely from WSB because, due to staff
limitations, WSB would prepare the RFQ as the City's in -house engineering firm and
then submit an RFQ in response. Although the commissioners seemed to agree, in
general, to the importance of obtaining multiple quotes, most acknowledged the
complexity and timing of this particular RFQ process. Schumann also pointed out that
multiple quotes are not required because the City contracts with WSB for such
EDA Minutes: 8/13/14
professional services. The RFQ must be prepared by September 1st to meet the
September 30th target date.
TOM PERRAULT MOVED TO AUTHORIZE STAFF TO REQUEST QUOTES FOR
ENVIRONMENTAL, STRUCTURAL AND DEMOLITION SERVICES FROM WSB
AND OTHER SOURCES AND REQUEST QUOTES FOR REDEVELOPMENT
QUALIFICATION FOR CITY AND EDA -OWNED PROPERTIES ON BLOCK 34
FROM LHB AND OTHER SOURCES. MOTION FAILED DUE TO LACK OF A
SECOND.
BRIAN STUMPF MOVED TO AUTHORIZE STAFF TO REQUEST A QUOTE FOR
ENVIRONMENTAL, STRUCTURAL AND DEMOLITION SERVICES FROM WSB
AND REQUEST A QUOTE FROM LHB FOR REDEVELOPMENT QUALIFICATION
FOR CITY AND EDA -OWNED PROPERTIES ON BLOCK 34. BILL TAPPER
SECONDED THE MOTION. MOTION CARRIED 5 -1 WITH TOM PERRAULT
VOTING IN DISSENT.
Staff also asked that the EDA appoint two members as liaisons to a team responsible for
developing a Request for Proposal (RFP) for the redevelopment of Block 34. A draft RFP
will be presented to the EDA and City Council for consideration.
ROD DRAGSTEN MOVED TO APPOINT EDA MEMBERS TRACY HINZ AND
TOM PERRAULT TO A DEVELOPMENT RFP TEAM FOR BLOCK 34. BILL
TAPPER SECONDED THE MOTION. MOTION CARRIED 6- 0.
7. Consideration of a recommendation for 2015 EDA Budget Request to the Monticello
City Council
Finance Director Wayne Oberg reviewed proposed revenue and expenditure sheets
related to the 2015 EDA budget and recommended that the EDA request a City Council
allocation of $94,900 to the EDA General Fund for 2015. This is a 2.1% or $1,900
increase in the operating budget over the 2014 allocation approved by the Council last
year. Oberg noted that the budget includes $250 in additional revenue resulting from of a
proposed increase in the fee for land rental to offset the amount of property tax the City
pays on the parcel. The proposed allocation amount was included in the recent budget
presentation to the City Council.
Oberg highlighted the financial status of the TIF districts and pointed to a few
transactions that need be handled differently in order to comply with state reporting
requirements. He indicated that staff were working with Tammy Omdahl of Northland
Securities to prepare budget modifications on some TIF projects in order to comply with
the TIF Plan.
Oberg clarified that the $220,000 shortfall in TIF 1 -22 is the result of borrowing against
future increment in that district to pay for downtown redevelopment activities including
EDA Minutes: 8/13/14
the recent Monticello Liquors acquisition.
Oberg noted that more money had been transferred out of TIF 1 -34 over the life of the
district than the district had been collecting. Angela Schumann pointed out that, in
addition to changes in valuation, less increment had been generated in that district
because not all of the district had developed as anticipated. Staff have proposed an
interfund loan resolution to address the $235,708 shortfall. That will be the subject of
another discussion. Future transfers will reflect the amount actually collected.
Oberg pointed out that almost all the GMEF loans had been paid off and there is a $1
million dollar balance in that account. He clarified that the $3.4 million reflected in the
EDA General Fund balance includes $1.1 million in cash and $2.3 million in land held
for resale.
He also noted that, in future, staff would report the status of TIF districts beyond the date
of decertification until funding has been utilized.
BILL TAPPER MOVED TO RECOMMEND THAT THE CITY COUNCIL
ALLOCATE $94,900 TO THE 2015 EDA GENERAL FUND BUDGET. TRACY HINZ
SECONDED THE MOTION. MOTION CARRIED 6 -0.
8. Consideration of the Director's Report
Market Matching Update — On August I Ph, staff hosted a site selector luncheon to
showcase Monticello. The site selector was very impressed with the 1 gig speed of
FiberNet and the tour of Suburban Manufacturing. The Market Matching team will
provide an update during the City Council meeting on August 251h
City /EDA Land Tour — The tour of EDA /City owned properties is scheduled for 4 p.m.
Wednesday, September 10th. Tom Perrault pointed out that city -owned parcels numbered
1 -9 should be extracted from the listing as these are not for sale.
Building Business in Monticello Website — The $150 web hosting services contract will
be extended for one year in order to maintain an economic development site presence
while evaluating options for best use and opportunities to update the site more frequently.
The EDA was asked to review the site and provide input.
Business Subsidy Compliance - Northland Securities continues to update TIF District
and loan program compliance records. Business subsidies are in good shape in regard to
wage and job goals.
TAC /Transportation Update - Staff will continue to discuss options with the Wright
County Transportation Committee for maintaining on street parking on west CSAH as
part of intersection improvements to TH25 /CSAH 75 and bring forward a
recommendation for TAC consideration by mid - August.
4
EDA Minutes: 8/13/14
Regional Transportation Planning — Clint Herbst and Tom Perrault continue to
represent Monticello in regional transportation planning meetings in an effort to enable a
collaborative area -wide process.
9. Consideration of items added to the agenda
Preliminary Development Agreement - The EDA had received a letter of request
from Dahlheimer Beverage (Rocky Mountain Group, LLC) to extend their
Preliminary Development Agreement which expires August 15, 2014. This would
allow for a continued option to purchase two outlots adjacent to the company's
existing facility and the inclusion of these parcels within the existing TIF District.
Staff has learned, however, that the existing TIF District is scheduled to decertify in
2015, and, due to changes in TIF law, it is no longer eligible for expansion because it
has been more than 5 years since the 2005 district certification. Staff will work with
Dahlheimer Beverages to discuss options for establishing an agreement which allows
for the option of future TIF district expansion under a business subsidy arrangement.
• TIF Information — The EDA received copies of a document which provides an
overview about tax increment financing for reference purposes.
10. Adjournment
BRIAN STUMPF MOVED TO ADJOURN THE MEETING AT 7:08 PM. BILL
TAPPER SECONDED THE MOTION. MOTION CARRIED 6 -0.
Recorder: Kerry Burri
Approved:
Attest:
EDA Representative
EDA Agenda: 9/10/14
4. Consideration of approving payment of bills (WO)
A. REFERENCE AND BACKGROUND:
Invoices submitted during the previous month are included for review and
consideration.
B. ALTERNATIVE ACTIONS:
1. Motion to approve payment of bills through August 2014 in the amount of
$605,548.10.
2. Motion to approve the registers with changes directed by the EDA.
C. STAFF RECOMMENDATION:
Staff recommends approval of payment for invoices submitted.
D. SUPPORTING DATA:
Invoices
Accounts Payable
Transactions by Account
User: Debbie.Davidson
Printed: 08/07/2014 - 2:29PM
Batch: 00203.08.2014
Account Number
Vendor Description
GL Date Check No Amount Pa No
213- 46301- 430300 WSB & ASSOCIATES INC Economic Development & Market Ma 08/12/2014 0 4,000.00
Vendor Subtotal for Dept:46301 4,000.00
213 - 46301 - 430400 KENNEDY AND GRAVEN CHAR] Legal Sery thru 6/30/2014 for EDA 08/12/2014 112709 398.00
Vendor Subtotal for Dept:46301 393.00
The preceding list of bill payable was reviewed and approved for payment.
Date: 9 -10 -14 Approved by
Subtotal for Fund: 213 4,398.00
Report Total: 4,398.00
Tracy Hinz, Treasurer
AP- Transactions by Account (0810712014 - 2:29 PM) Page 1
Accounts Payable
Transactions by Account
User. Julie.Chency
Printed: 08/20/2014 - 2:17PM
Batch: 00206.08.2014
Account Number
Vendor
Description GL Date
Check No
Amount PO No
213 - 46301 -431990
WSB & ASSOCIATES INC
Economic Dev & Market Matching 6/ 08/26/2414
0
4,000.00
Vendor Subtotal for Dept:46301
4,000.00
213 - 46301431990
NORTHLAND SECURITIES INC
Services for Compliance business sub: 08/26/2014
112790
400.00
213 - 46301 - 431990
NORTHLAND SECURITIES INC
June 2014 Compliance w/ business sul 08/26/2014
112790
640.00
Vendor Subtotal for Dept-46301
1,040.00
213 - 46522 -430400
CAMPBELL KNUTSON PA
MGFARM- RELOEX - EDA/G Ekegn 08/12/2014
0
- 266.00
Vendor Subtotal for Dept-.46522
-266.00
21346522-431990
NORTHLAND SECURITIES INC
TIF 1 -22; services related to this tax it 08/26/2014
112790
400.00
Vendor Subtotal for Dept:46522
400.00
213 - 46522 - 443990
WRIGHT CO AUDITOR -TREAS
EDAApproving return of tax incr:remc 08/26/2014
112816
595,959.00
Vendor Subtotal for Dept46522
595,959.00
Subtotal for Fund: 213
601,133.00
AP- Transactions by Account (08/20/2014 - 2:17 PM) Page 1
Account Number
Vendor
Description
GL Date Check No
Report Total:
The preceding list of bills payable was reviewed and approved for payment.
Date: 9 -10 -14 Approved by
Tracy Hinz, Treasurer
Amount PO No
601,133.40
AP- Transactions by Account (08/2012014 - 2:17 PN D Page 2
Accounts Payable
Transactions by Account
User: Debbie.Davidson
Printed: 09102/2014 - 12:3 IPM
Batch: 00216.08.2014
Account Number
Vendor Description
GL Date Check No
Amount P® No
213 - 46522 - 438100 XCEL ENERGY ZCULPS - 51- 0623082 -8 09/08/2014 0 17.10
Vendor Subtotal for Dept:46522 17.10
Subtotal for Fund: 213 17.10
Report Total: 17.10
The preceding list of bills payable was reviewed and approved for payment/
Date: 9 -10 -14 Approved by
Tracy Hinz, Treasurer
AP- Transactions by Account (0910212014 - 12:31 PK Page 1
WSB
&Associates, Inc.
engineering • planning 'On ViTORM817tal • conslr 609
City of Monticello July 31, 2014
Attn: Wayne Oberg, f=inance Director Project No:
505 Walnut Street, Suite 1 Invoice No:
Monticello, MN 55362 -8831
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
01494 -720 Tel: (763) 541.4800
12 Fax: {7631 541 -1700
1 7)
Economic Development & Market Matching r, U' -3�) � . L z 1 �
Professional Services from June 01, 2_014 to June 30. 2014
Phase 01 ^ _ 2013 -2014
Fee
Total Fee 48,000.00
Percent Complete 100.00 Total Earned 48,000.00
Previous Fee Billing 44,000.00
Current Fee Billing 4,000.00
Total Fee 4,000.00
Total this Phase $4,000.00
Total this Invoice $4,000.00
Comments:
Approved by. zt�
Reviewed by: Bret Weiss
Project Manager: John Uphoff
Equal Opportunity Employer
wsheng.com
Kennedy & Graven, Chartered
200 South Sixth Street, Suite 470
Minneapolis, MN 55402
(612) 337 -9300
July 17, 2014
Statement No, 121089
City of Monticello
Wayne Oberg
Accounts Payable
505 Walnut Avenue, Suite 1
Monticello, MN 55362
Through June 30, 2014
MN190 -00145 Economic Development TIF District
I declare, under penalty of law, that this
account, claim or demand is just and correct
and that no part of it has been paid.
Signature of Clai a t
0 k"
398.00
Total Current Billing: 398.00
��p�p0
U k0i
Page: 1
Kennedy & Graven, Chartered
200 South Sixth Street, Suite 470
Minneapolis, MN 65402
City of Monticello
Wayne Oberg
June 30, 2014
MN190 -00145 Economic Development TIF District
Through June 30, 2014
For All Legal Services As Follows: Hours
Amount
6/30/2014 GAF Review emails from M Ingram regarding TIF District; review1.10
176.00
materials from City regarding financial details of T[F
District; discuss possible TIF District with M Ingram;
phone call to City regarding potential TIF District
6/30/2014 MNI Review materials from A Schumann for potential new TIF 0.50
92.50
District; office conference with G Fiorini regarding same,
6/30/2014 MNI Conference call with A Schumann, G Fiorini regarding 0.70
129.50
potential new industrial park tenant.
Total Services: $
398.00
Total Services and Disbursements: $ 398.00
WSB
&Associates, Inc.
engineering • planning 'On ViTORM817tal • conslr 609
City of Monticello July 31, 2014
Attn: Wayne Oberg, f=inance Director Project No:
505 Walnut Street, Suite 1 Invoice No:
Monticello, MN 55362 -8831
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
01494 -720 Tel: (763) 541.4800
12 Fax: {7631 541 -1700
1 7)
Economic Development & Market Matching r, U' -3�) � . L z 1 �
Professional Services from June 01, 2_014 to June 30. 2014
Phase 01 ^ _ 2013 -2014
Fee
Total Fee 48,000.00
Percent Complete 100.00 Total Earned 48,000.00
Previous Fee Billing 44,000.00
Current Fee Billing 4,000.00
Total Fee 4,000.00
Total this Phase $4,000.00
Total this Invoice $4,000.00
Comments:
Approved by. zt�
Reviewed by: Bret Weiss
Project Manager: John Uphoff
Equal Opportunity Employer
wsheng.com
Northland Securities, Inc.
45 South 7th Street
Suite 2000
Minneapolis, MN 55402 -1625
USA
Voice: 617 -951 -5900
Fax: 67.2. -B51. -5951
NORTHLAND SECURITIES
Sold To:
City of Monticello
Angela Schumann
505 Walnut Street, Suite 1
Monticello, MN 55362
Customer PO Payment Terms
11, IF 1 -22 Net 30 Days
Description
or services related to Tax Increment D
i
OK 0
pc,hd i� uy J�U twla ut�-
YO-
Sal Rep ID
ct 1 -22. Please see atta
Invoice
Invoice Number:
3821
Invoice Date:
8/6/14
Page:
1
Due Date
9/5/14
4C0.00
Subtotal 400 .0 0
Sales Tax
Total Invoice Amount 400.00
Check No: Payment .Received
TOTAL
Nordrland Securities, Inc. 45 South 7th Street, Suite 2000, Minneapolis, MN 55402 •saltFree 1 -800 -851 -2920 ma it, 612 -851 -5900 Fax 612- 851 -5987
www.ftorthlandsecurities.com
Member PINRA and SIPC
NORT1-]LAND STRATEGIES
Speciat Projects Group
INVOICE SUPPLEMENT
Client: City of Monticello
Project: Tax Increment District 1 -22
Contact: Angela Schumann
City of Monticello
505 Walnut Street Suite 1
Monticello, MN 55362
Billing Period: ruly 2014
Services Performed
• Update excess increment calculation based on final 2013
• Submit updated report to city staff and provide guidance
Staff Tune Position
Hours Rate
Billable
Senior Professional
2,50 $160
$400.00
Professional
- $135
$0.00
Support
- $105
$0.00
Total Staff
2.50
$400.00
Fxpenses Mileage
$0.00
Printing
$0,00
Other
$0,00
Total Expenses
$0.00
Total This Period $440:00
Project Summary Total Budget* $ -
Billed This Period ($400.00)
Billed Previous $0.00
Budget Remaining $ (400.00)
*Billed hourly.
Northland Securities, Inc Page 2 of 2
Northland Securities, Inc.
45 South 7th Street
Suite 2000
Minneapolis, MN 55402 -1625
USA
Voice: 612 - 851 -5900
Fax: 612- 851 - -5951
NORTHLAND SECURITIES
Sold To:
City of Monticello
Angela Schumann
505 Walnut Street, Suite 1
Monticello, MN 55362
Invoice
Invoice Number:
3723
Invoice Date:
7/16/]_4
Page:
1
Customer PO
Payment Terms
Sales Rep ID Date
Reporting
Net 30 Days
8/15/14
Description.- �_...�.____
Amount
For services related to Compliance with business subsidy & income qualification
640.00
reporting. Please see attached detail,
i
Subtotal 640.00
Sales Tax
Total Invoice Amount 640.00
Check No; Payment Received
TOTAL
Northland Securities, Inc. 45 South 7th Street, Suite 2000, Minneapolis, MN 55402 V1 Free 1 -800 -851 -2920 maii, 612 -851 -5900 Fax 612 - 851 -5987
www.tiorthlandsecutities.com
Member FINRA and WC
NORTHLAND STRATEGIES
Special Projects Group
INVOICE SUPPLEMENT
Client: City of Monticello
Project: Compliance with business subsidy and income qualification reporting
Contact: Angela Schumann
City of Monticello
505 Walnut Street Suite 1
Monticello, MN 55362
Billing Period: June 2014
Services Performed
• Prepare and submit letters to companies
• Follow -up with companies
Staff Time Position
Hours Tate
Billable
Senior Professional
4.00 $160
$640.00
Professional
- $135
$0.00
Support
- $105
$0.00
Total Staff
4.00
$640.00
Expenses Mileage
$0.00
Printing
$0.00
Other
$0.00
Total Expenses
$0.00
Total This Period $640.00
Project Summary Total Budget*
$ 1,600.00
Billed This Period
($640.00)
Billed Previous
$0.00
Budget Remaining
$ 960.00
*Authorized by city staff up to 10 hours.
Northland Securities, Inc. Page 2 of 2
CAMPBELL KNUTSON
Professional Association
Attorneys at Law
Federal Tax I.D. #41- 1562130
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, Minnesota 55121
(851) 452 -5000
City of Monticello
City Hall
505 Walnut Street
Monticello MN 55362
RE: EDAIGARRY EKEGREN DIBIA PIZZA FACTORY
SERVICES RENDERED TO DATE:
PREVIOUS BALANCE
CREDIT BALANCE
Page: 1
June 30, 2014
Account # 2348 -123G
9
Amounts due over 30 days will be subject to a finance charge of
.5% per month (or an annual rate of 6 %). Minimum charge - 50 cents.
- $266.00
- $266.00
Northland Securities, Inc.
45 South 7th Street
Suite 2000
Minneapolis, MN 55402 -1625
USA
Voice: 612 -651 -5900
17 ax: 612 -851 -5951
NORTHLAND SECURITIES
Sold To:
City of Monticello
Angela Schumann
505 Walnut Street, Suite 1
Monticello, MN 55362
OK 1� PJd
�hdjn� vevicw /auk
K/ �&
Invoice
Invoice Number:
3820
Invoice Date:
8/6/14
Page:
1
Customer PO Payment Terms Sales Rep ID Due Date
Compliance & Reporz Net 30 Days 9/5/14
Description Amount
For services related to Comnl.anra with business subsidy and income quali.fi.r-.at.ion 400.00
reporting. Please see attached detail.
'Q )'� _ qLp I -- L1319`)0
Subtotal 4 D O• o 0
Sales Tax
Total Invoice Amount 400.00
Check No: Payment Received
TOTAL
Nordilancl Securities, Inc. 45 South 7th Street, Suite 2000, Minneapolis, MN 55402 'ran Tree 1- 800 -851 -2920 As. . 612-- 851 -5900 r,x 612 -851 -5987
www.nordilandsecurities.com
Member FIMRA and SIPC
NORTHLAND STRATEGIES
Special Projects Group
INVOICE SUPPLEMENT
Client: City of Monticello
Project: Compliance with business subsidy and income qualification reporting
Contact: Angela Schumann
City of Monticello
505 Walnut Street Suite 1
Monticello, MIS 55362
Billing Period: July 2014
Services Performed
• Follow -up with companies
• Contract review with legal
• Follow -up with city on status
Staff Time Position
Hours Rate
Billable
Senior Professional
2.50 $160
$400.00
Professional
- $135
$0.00
Support
- $105
$0.00
Total Staff
2.50
$400.00
Expenses Mileage
$0.00
Printing
$0AD
Other
$0.00
Total Expenses
$0.00
Total This Period'
$400.00
Project Summary 'Total Budget* $ 1,600.00
Billed This Period ($400.00)
Billed Previous ($640.00)
Budget Remaining $ 560.00
*Authorized by city staff up to 10 hours.
Northland Securities, Inc. Page 2 of 2
CITY OF MONTICELLO
ECONOMIC DEVELOPMENT AUTHORITY
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2014-067
A P PROVO NG RETURN OF TAX LNCREMENTS FROM
TAX INCREMENT FINANCING DISTRICT NO. 1-22 TO WRIGHT COUNTY
W EREAS, on March 10, 1997, the City and the HRA approved a Tax Increment
Financing Plan. (the "TIF .flan ") for Tax Increment Financing District No. 1 -22 (the "TIF District ")
located within the Redevelopment Project, pursuant to the IIRA, Acct and Minnesota Statutes,
Sections 469.174 to 469.1794, as amended (collectively, the "TIF Act "); and
WIEREAS, ,administration of the TIF District was subsequently i`ransferred to the City of
Monticello Economic Development Authority (the "Authority "); and
WHEREAS, on June 30, 1997, the County of Wright (the "County") certified the District;
and
WHEREAS, the .Authority has completed an analysis of financial activity for the TIT
District to confirm compliance with the TIF Act; and
WHEREAS, authority has determined there to be excess tax increments in the account for
the TIF District, pursuant to Minnesota Statutes Section 469.1 763, Subdivision 4.
NOW, THEREFORE, BE IT RESOLVED, SOLVED, by the City of Monticello Economic Development
Authority as follows:
1. The Community Development Director is authorized and directed to return $595,959 of
excess tax increments in the account for Tax Increment Financing District No. 1 -22 to
Wright County for redistribution to the City of Monticello, Wright County, and Independent
School District No. 587, pursuant to Minnesota Statutes 469.176, Subdivision 2,
Approved by the City of Monticello Economic Development Authority this 9th ay of July,
2014.
lr!e�sident ___
A EST:
Secreta
Debbie D d . .:
From: Wayne Oberg
Sent: Thursday, August 14, 2014 3:36 PM
•ro: Debbie Davidson
Subject: FW: FDA Resolution 2014 -067
Attachments: 2014 -067 CDA - Appr Tax Incr TI 1 -22 070914.pdf
DID,
Please pay the attached to Wright County with the next AP - code 213 - 46522- 443990.
Thank You! Y�,t„,..;
Wayne
Fr• ®wry: Kerry [3urri �.___W .. .. ......w....M.M...�.....��.....
Sent. Thursday, August 14, 2014 3 :t6 PM
To: Wayne Oberg
Subject;: E DA Resolution 201.4 -067
Xcel Energy
RESPONSIBLE BY MATURE®
QTLirnuRnces°�
Las;Yea' r
Temperature 7i4
Electricity kWh 00 1
Electricity Cost
QUESTIONS ABOUT YOUR BILL?
See ourwobsite:
xcelenergy.com
Email us at:
Customerservice@xcelenergy.com
Please Call:
1 -800 -481 -4700
Hearing Impaired:
1- 800 -895 -4949
Fax:
1 -800- 311 -0050
Or write us at:
XCEL ENERGY
PO BOX 8
EAU CLAIRE WI 54702 -0008
XcelEnewe
NORTHERN STATES POWER COMPANY
Page 1 of 4
TAILING ADDRESS
ACCOUNT NUMBER
1 1
MONTICELLO EDA
505 WALNUT ST STE I
MONTICELLO MN 55362 -8822
51.0623082 -8
08/05/2014
STATEMENT NUMBER
STATEMENT DATE
1 1
419044752
07/09/2014
$17.10
SUMMARY OF CURRENT CHARGES (detailed charges begin on peg
Electricity Service
Current Charges
ACCOUNT BALANCE
Previous Balance
Payment Received
Balance Forward
Current Charges
Amount Due
06/08/14 - 07/08/14 0 kWh
INFORMATION ABOUT YOUR BILL
Thank you for your payment.
As of 06/08
Auto Pay 07/07
$ r
j WN - IE
$17.10
$17.10
$15.96
- $15.96 CR
$0.00
$17.10
$17.10
RETUnN BOTTOM POHTIQN WITH YOUR PAYMENT • PLEASE 00 NOT USESTAPLES,TAPE OR PAPER CUPS
ACCOUNT NUMBER I DUE DATE
51- 0623082 -8 1 08/05/2014 1 $17.10
Your bill is paid through an automated hank payment plan.
AV 01 018029 64740E 78 A' *5DGT
IIIhII,IIIII IIrII11Il,IIIII I'III'III'II I'I II'IIIIIII'IIIIIIIIIII
MONTICELLO EDA
505 WALNUT ST STE 1
MONTICELLO MN 55362 -8831
Automated Bank Payment
1 2
3 4 n fi 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
1I IIIIIIII I II I III III II III III IIIIIIIIIIII'II IIII I'III Illill EII I111
XCEL ENERGY
P.O. BOX 9477
MPLS MN 55484 -9477
31 510805 14 06230828 0000000 ,71100000000117]10
9
M
A
a
.� 1t
1.
E
7 Xce1 Energy°
E i
Do It Yourself Tip
Keep your employees comfortable
and happy this summer by buying new,
energy - efficient cooling and ventilation
units. They are usually 20 to 30 percent
more efficient than older models.
Cool Down and Stark Saving
Page 2 of 4
MAILING ADDRESS
ACCOUNT HUMBER
e e
MONTICELLO EDA
505 WALNUT 5T STE 1
MONTICELLO MN 55362 -8822
51- 0623082_$
08185 /2014
STATEMENT NUMBER
STATEMENT DATE
e e
419044752
07/09/2014
$17.10
SERVICk ADDRESS: 349 W BROADWAY ST MONTICELLO, MN 0362 -MS6
NEXT READ DATE: 08/08/14
ELECTRICITY SERVICE DETAILS
PREMISES NUMBER: 303657358
INVOICE NUMBER: 0528942312
ELECTRICITY CHARGES
RATE; Sm Gen Svc (Metered)
DESCRIPTION
USAGE UNITS RATE
CHARGE
Basic Service Chg
$10.00
Energy Charge Summer
0 kWh $0.082300
$0.00
Fuel Gost Charge
0 kWh $0.030520
$0.00
Affordability Chrg
$0,93
Resource Adjustment
$0.01
Interim Rate Adj
$0.66
Subtotal
$11,60
_City Fees
$5.50
Total
$17.10
INFORMATION ABOUTYOUR BILL
For an average non - demand customer, 72% of your bill refers to power plant costs,
10% to high voltage line costs, and 18% to the cost of local wires connected to your
business. For an average demand- billed customer, 82% of your total bill refers to
power plant costs, 10% to high voltage lines, and 8% to the cost of local wires
connected to your business.
If your business is using an old, inefficient cooling system, you could be
wasting a lot of energy and money year after year to keep your facil ity
cool_ Put an end to Waste and start saving instead by upgrading to an
energy- efficient system. Our Cooling Efficiency rebates can louver the cost
of your upgrade and help you gain long -term energy savings. Call an energy
efficiency specialist at 1- 800 - 4914700 for more information.
0
Xce1 Energy
Protecting your account
information is very
important to us.
To ensure the security of your
information when you use our
automated phone system, we are going to
require you to enter your account number
to obtain billing and payment information.
We encourage you to continue to use our
automated phone system for payment
transactions as it is often faster than
speaking with a representative.
n
ACCOUNT NUMBER
i k
MONTICELLO EUA
505 WALNUT ST STE 1
MONTICELLO MN 55362 -8822
51 -0623882 -8
08/05/2014
STATEMENT NUMBER
STATEMENT DATE
X17.10
419044752
07/09/2414
-�d
C
Page 3 of 4
MAILING ADDRESS
ACCOUNT NUMBER
i k
MONTICELLO EUA
505 WALNUT ST STE 1
MONTICELLO MN 55362 -8822
51 -0623882 -8
08/05/2014
STATEMENT NUMBER
STATEMENT DATE
X17.10
419044752
07/09/2414
Join the crowd and get Saver's Switch® this summer!
Join over a half million customers and have a free Saver's Switch installed on your
central AC unit. You'll earn an automatic credit on your electric bill this year, and every
year you have Saver's Switch. Best of all, ifs easy. Just sign up and we'll do the rest.
Saver's Switch helps keep all our electric customers powered up and cooled off on
blistering -hot summer days. When temperatures peak so does electric demand. On a
few summer days, for a few hours, Saver's Switch will cycle your AC on and off in 15 to
24- minute intervals. The AC fan will circulate your cool indoor air, keeping you
comfortable. Saver's Switch is a little box installed near your AC unit that works
seamlessly to help reduce the demand for electricity foryour whole community. You'll
rarely notice its on, but the credit on your electric bill will be a cool reminder.
Join the Saver's Switch crowd that`s already helping your community stay cool.
Visit xc alone rgy.comJSaversSwitch to learn more.
It's not just hot working outside in the summer —it can be dangerous too. Summer storms
can damage electrical equipment and lines. If you see a downed or sagging power line,
don't touch it. Always assume it's energized and can hurt or kill you.
Look up and all around when you work outside or climb a ladder. Keep yourself and any
tools at least 10 feet from overhead electric lines.
Find more about electric safety at xcellenergy.com/Safety.
N
s
EDA Agenda - 09/10/14
5. Consideration of authorizing a 2015 contribution to the Initiative Foundation. (AS)
A. REFERENCE AND BACKGROUND
The Initiative Foundation is a Central Minnesota community foundation providing
financial assistance to the region's communities, businesses and non - profits.
The Foundation is requesting the Monticello EDA contribute $2,250 to the organization in
2015. No increase in contribution is proposed for 2015. The EDA authorized a $2,250
contribution for 2014. The EDA has been a contributing partner in this organization for a
number of years, dating back to at least 2009.
Included with the supporting data to this report is a statement regarding local economic
impact resulting from Initiative efforts. Investments made by local communities in the
Initiative Foundation have resulted in an economic impact of $8.87 for every dollar of
investment in Wright County alone. $5.1 million has been returned to Wright County
since the Foundation's inception. ReSTOREing Downtown has received a grant from the
Initiative Foundation to assist in their initial launch and promotion projects.
In reviewing the materials, numerous Wright County communities have obtained funding
for economic development initiatives over the past years. Staff has arranged for a meeting
with Initiative Foundation staff to discuss funding opportunities specific to Monticello,
including work on Block 34. An Initiative Foundation representative will also be on hand
during the meeting to answer questions and present a short segment on the Foundation's
efforts.
It should also be noted that the EDA's contribution to the Foundation is matched by the
McKnight Foundation, thereby doubling the reach and capacity of committed resources.
Per State Statute, cities are able to contribute not more than $50,000 annually for
promoting, advertising, improving, or developing the economic and agricultural resources
of the city or town
Al. Budget Impact: The investment of $2,250 for the proposed contribution would come
from the 2015 EDA general fund, Dues and Memberships line item. As currently
proposed at $10,000, the EDA will have sufficient funds in this line item to cover the
estimated costs.
A2. Staff Workload Impact: As noted, it is recommended that staff meet with Initiative
Foundation representatives to discuss partnership opportunities in more detail.
B. STAFF RECOMMENDATION
City staff recommends approval of the contribution to the Initiative Foundation. The
Foundation is a well known and established organization that provides economic growth
support to Wright County. The City/EDA's continued support of their activity should be
coupled with renewed efforts to utilize IF services. Over the coming years, the ability to
partner with the Foundation on downtown activities is an opportunity that should be
explored and utilized to further the Embracing Downtown goals.
C. ALTERNATIVE ACTIONS
1. Motion to approve contributing $2,250 of the 2015 EDA general fund to the Initiative
Foundation.
2. Motion to deny contributing money to the Initiative Foundation.
3. Motion to table action for further research and discussion.
D. SUPPORTING DATA
A. Initiative Foundation Letter of Request and Information
2
(320 )632 -9255
405 First Street SE
Little Fads, MN 56345
June 20, 2014
Jeff O'Neill
City of Monticello
505 Walnut Ave Ste 1
Monticello, MN 55362 -8822
Dear Mr O'Neill and members of the Monticello City Council,
Your support is an integral part of what we do to stimulate business growth, create quality jobs and
ensure a climate for economic success. The Central Minnesota economy is showing increased signs of
health, and we believe that 2015 — with the right partnerships and investments — will be a strong year
for business expansion and hiring.
For nearly three decades the Foundation has responded to requests for assistance in Central
Minnesota. When organizations want to advance an important project, we respond with grants and
training. When businesses work to expand, we respond with financing and support. When communities
need an ally, we engage local citizens and facilitate public - private partnerships that lead to results.
Our community, organizational and economic development work is supported by a spectrum of public
and private donors who partner with the Foundation to build thriving communities. All of our grant -
making, lending and leadership development activities are designed to create a skilled workforce; to
make Central Minnesota a destination of choice to live, work and play; and to inspire people to share
their time, talent and resources.
To support our critical work in economic growth and community enhancement, we respectfully
request consideration for an investment of $2,250 in 2015.
An Initiative Foundation contribution earns a substantial return on investment. For every local dollar
contributed, the Foundation has returned $8.87 back to Wright County in grants, loans and
scholarships.
After your budget is finalized, would you please sign the enclosed commitment form and return it in
the postage -paid envelope? Again, thank you for your consideration and support of our work in the City
of Monticello. Please contact us with questions or to request a staff presentation.
Sincerely,
Kathy Gaalswyk
President
Eric Stommes
Vice President for External Relations
ifoundorg
13 Powering Possible Equal opportunity lender. provider and employer.
It Economy. Community. AVandmW
The Initiatiue Foundation: Empowering People to Build, Sustain Healthy Communities
Formed in 1986 by a partnership of regional leaders and The McKnight Foundation, the Initiative
Foundation is one of six unique, nonprofit Minnesota Initiative Foundations serving the regions of
Greater Minnesota. We believe Local people - not outside organizations - have the necessary enthu-
siasm, knowledge and relationships to achieve a brighter future.
Good Works Supported By Sound Strategy
The Foundation's strategic framework is based on the philosophy that economy, com-
munity and philanthropy are intertwined. This three - pillared approach helps us to
collaborate in truly meaningful ways to unlock the power of each community and all of
Central Minnesota.
Our charitable work is supported by a spectrum of public and individual donors. Earn-
ings from investments in the Foundation's operations and permanent endowment are
returned to Central Minnesota communities through grants, programs and business
financing.
We are proud to serve the 14 counties of Central Minnesota that include
160 hometowns and two tribal nations, each with its own unique character and local assets.
__ % Economy
i Woven into our fabric is the firm belief that a quality job is the most essential element of
a stable family and a strong community. We offer business loans to secure qualityjobs,
1 and we invest grants in workforce training to fill these job opportunities. Our goal is to
€ support local business growth and attract new revenue to the region.
BUSINESS FINANCING, CONSULTING MANUFACTURING, TECHNOLOGY AND EXPORTING i ECONOMIC, WORKFORCE DEVELOPMENT GRANTS
Community
Central Minnesota is defined by its quality of life - the special people, places and or-
ganizations of each hometown. We gather business, nonprofit and government leaders
FLE -�.'-. to identify and enhance these unique assets. Working together, we inspire community
. service and plan for a brighter future.
COMMUNITY VISIONING AND PLANNING NONPROFIT TRAINING AND CONSULTING 1 GRANTS TO SUPPORT QUALITY OF LIFE
_1� Philanthr,
We help donors give back to Central Minnesota and leave a permanent legacy. Every
donated dollar is matched by The McKnight Foundation and returns more than $6 in
grants, loans and scholarships to the region. We also work with families, businesses and
nonprofits to create named funds that support their favorite charities.
DONOR SERVICES TURNKEY CHARTTABLE FUNDS PROFESSIONAL INVESTMENT OVERSIGHT TAX - ADVANTAGED GIFTS
For more information, contact:
Initiative Foundation 7
(877) 632 -9255 f info @ifound.org
ifound.org 1 (877) 632 -9255 1 405 First Street SE I Little Falls, MN 56345 Equal Opportunity Lentler ,Provitler, and Employer
04114
WRIGHT C Highlight
For a full listing of Initiative Foundation investments in Wright County, Contact us at (877) 632 -9255.
Grants Thriving Economy, Thriving Communities
Annandale Area Community Team
Big Brothers Big Sisters of Central MN, St Cloud
City of Clearwater
City of Cokato
City of Howard Lake
City of Montrose
City of Rockford
City of Waverly
Delano School District
Friendship Ventures. Annandale
Friendship Ventures, Annandale
HIS Healing Heart, St Michael
Rivers of Hope, Monticello
RiverWorks Community Development Organization, Rockford
Wright County Economic Development Partnership, Rockford
Community Field Day event
College Bound Developing Leaders for Life
Youth engagement
Regional marketing for business retention and attraction
Economic development project
Small businesses consulting services
Local businesses consulting support; business plan for Crow River Food
Cooperative
Downtown revitalization
Auditorium restoration project (DCF)
Operating support
Camps of Courage & Friendship for Elk River Area (TRCF)
Equine therapy for victims of abuse CI RCF)
Empowerment and legal advocacy (TRCF)
Strategic and business planning
Business outreach
Business Financing Local Ownership, Quality Jobs _
BK Properties dba IKER Manufacturing, LLC., St. Michael
BolLn Properties. LLG dba CowgirLTufFCompany. Cokato
Cinch Systems, Inc., St. Michael
Plug Technologies, Hanover
The Asphalt Company, Inc., Monticello
Tribte Stone Compnay, Howard Lake
Charitable Funds Activating Generosity
CNC machining
Western clothes wholesaler
Hardware /software company
Manufacturer of rubber rlflata.ble pipe plugs
Asphalt coating and sealing
Manufacturer rs distributor of manmade stone exterior products
Delano Community Foundation I Delano Emergency PamiLy Fund I Manufacturing Fund of Central Minnesota I Minnesota Pioneer Park Endowment Fund I
Wright County Historical Society Fund
Technical Assistance Investing in talent
Eden Medical, Howard lake
PeLLco Machine, St Michael
Patent application and support
International sales and marketing analysis
Community Action The Power of Partnership
Cokato -based Cowgirl Tuff has anew
30.000- square -foot office and warehouse
thanks in part to an Initiative Foundation
construction loan. Cowgirl Tuff designs and
distributes fashionable western apparel
with an emphasis on comfort. The company
distributes its products through a network of
more than 1,700 stores nationwide.
The city of Howard Lake is utilizing a $10,000
grant supported by a gift from the Xcel Energy
Foundation and the Initiative Foundation
to organize a new Chamber of Commerce.
carry out downtown beautification, market
its industrial park, enhance the lakeside Lions
Park and complete a detailed retail area
analysis.
The Wright County Economic Development
Partnership (WCEDP) in February welcomed
new Executive Director Duane Northagen to
the team. The WCEDP, the county's economic
development arm and the primary point of
contact for existing, startup and relocating
businesses, is a frequent Initiative Foundation
partner for grant and Loan disbursements.
WRIGHT C Envest lent Highlight
For a full listing of 7nitiatiue Foundation investments in Wright County, Contact us at (877) 632 -9255.
Grants Thriving Economy, Thriving Communities
Annandale Area Community Team
Big Brothers Big Sisters of Central MN, St Cloud
City of Clearwater
City of Cokato
City of Howard Lake
City of Montrose
City of Rockford
City of Waverly
Delano School District
Friendship Ventures, Annandale
Friendship Ventures, Annandale
HIS Healing Heart, St Michael
Rivers of Hope, Monticello
RiverWorks Community Development Organization. Rockford
Wright County Economic Development Partnership, Rockford
Community Field Day event
College Bound Developing Leaders for Life
Youth engagement
Regional marketing for business retention and attraction
Economic development project
Small businesses consulting services
Local businesses consulting support, business plan for Crow River Food
Cooperative
Downtown revitalization
Auditorium restoration project (DCF)
Operating support
Camps of Courage i3 Friendship for Elk River Area (TRCF)
Equine therapy for victims of abuse (TRCF)
Empowerment and legal advocacy (TRCF)
Strategic and business planning
Business outreach
Buodno.as Financinv Local Ownership, Quality Jobs
BK Properties dba IKER Manufacturing, LLC_, St. Michael
Bollin Properties LLC dba Cowgirl Tuff Company, Cokato
Cinch Systems, Inc., St. Michael
Plug Technologies, Hanover
The Asphalt Company, Inc., Monticello
Trdite Stone Company, Howard Lake
CNC machining
Western clothes wholesaler
Hardware/software company
Manufacturer of rubber inflatable pipe plugs
Asphalt coating and sealing
Manufacturer u distnbutor of manmade stone exterior products
Charitable Funds Activating Generosity
Delano Community Foundation i Delano Emergency Family Fund I Manufacturing Fund of Central Minnesota Minnesota Pioneer Park Endowment Fund i
Wright County Historical Society Fund
Technical Assistance Investing in Talent
Eden Medical, Howard Lake
Pellco Machine, St Michael
Patent application and support
International sales and marketing analysis
Commur The Power of Partnership
Cokato -based Cowgirl Tuff has anew
30,000- square -foot office and warehouse
thanks in part to an Initiative Foundation
construction loan. Cowgirl Tuff designs and
distributes fashionable western apparel
with an emphasis on comfort. The company
distributes its products through a network of
more than 1,700 stores nationwide.
The city of Howard Lake is utilizing a $10,000
grant supported by a gift from the Xcel Energy
Foundation and the Initiative Foundation
to organize a new Chamber of Commerce,
carry out downtown beautification, market
its industrial park, enhance the lakeside Lions
Park and complete a detailed retail area
analysis.
The Wright County Economic Development
Partnership (WCEDP) in February welcomed
new Executive Director Duane Northagen to
the team. The WCEDP, the county's economic
development arm and the primary point of
contact for existing, startup and relocating
businesses, is a frequent Initiative Foundation
partner for grant and loan disbursements.
6.
A.
B.
C.
EDA Agenda - 09/10/14
Consideration of Market Matching Report. (AS)
REFERENCE AND BACKGROUND
John Uphoff of the WSB Market Matching team will be present to provide an update on
the efforts and activities completed over the last month.
One event of note was a recent familiarization tour for site selectors. WSB represented
Monticello at the DEED Fam Tour which spanned three days. This was excellent exposure
for the City of Monticello as the site selector was local and will allow for increased
exposure, familiarity, and contact moving forward. Monticello had the opportunity to host
a site selector during this tour. The site selector toured Suburban Manufacturing and City
reps had the chance to showcase the community during a host lunch. The DEED regional
representative, Brad Brzezinski, also attended the Suburban Tour. Familiarizing DEED
with Monticello's resources and opportunities was a secondary benefit of the tour.
WSB prepared a Press Release regarding the fam tour, which was released to the local
media. That release is attached for reference.
Mr. Uphoff s report t o
www. ci.monti cello.mn
Meeting" link.
the City Council in August can also be viewed by visiting
and clicking on the "City Council" tab, then on the "Watch a
ALTERNATIVE ACTIONS
Not applicable.
STAFF RECOMMENDATION
Not applicable.
D. SUPPORTING DATA
A. Monthly Market Matching Summary, August 2014
B. Familiarization Tour Press Release
WSB
&& Associates, engineering- planning• environmental • construction 701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel 763 - 541 -4800
Fax 763 - 541 -1700
9/4/14
City of Monticello
505 Walnut Street
Monticello, MN 55362
Re: August Monticello Market Matching Update
Dear Mr. O'Neill:
Per our communication plan, the aim of this report is to provide you with an update on activities
that occurred during the month of August as it relates to the Market Matching service contract.
This report will be distributed to City Staff, as well as the City's EDA and City Council.
Meetings WSB Held /Attended:
• MN Marketing Partnership — Quarterly Meeting
• City Staff meeting to update downtown property availability maps
• Regional Planning Meetings
• Two meetings with prospect on Fred's Garage Site. Additional follow -up with prior
prospect on site.
• Special Council Meeting CSAH 75 /Hwy 25
• Regular Council Meeting
• Bi- Weekly Meetings with City Staff
WSB Market Matchine Efforts:
• WSB represented the City of Monticello as a co -host for MNDEED's 2nd annual Site
Selector Familiarization Tour. WSB provided detailed market information to the site
selector assigned to the Central MN region. WSB also participated in a presentation
providing information on Wright County and the Central MN Region. Monticello was
one of a few cities that was able to spend time with the site selector within the City and
was able to showcase one of Monticello's precision manufacturing firms. Follow up with
the site selector is ongoing.
• Provided City Staff with MPR sound bite regarding positive light shed on FiberNet.
• Discussion with City Staff regarding Xcel's plans or requirements for development of a
substation. Discussion over the site location was conducted.
Equal Opportunity Employer
wsbeng.com
F: \COmmonily Develop..[ Direc[or\FCOnomk De I,pmen[\DOartls\FDA\ AAGIN 0014 \Sep[ ember\ I[ em6. MarkelMa[ching \AOgos[MomicelloP
Page 2
• Commercial Prospect. Currently operating locally, interested in expanding to
Monticello. Follow up is ongoing.
• WSB has continued work on the housing demand analysis and will provide a draft to City
staff for review. Final Housing Demand Analysis is slated to be presented to City Council
and EDA by end of October.
• WSB attended the Sensible Land Use Coalition Meeting. Topic was development of
statewide transit systems. Two developer prospects were picked up at this meeting.
• WSB compiled a list of developers in preparation for the downtown redevelopment RFP.
All developers will receive a community flyer highlighting Block 34 as well as the other
three blocks at the intersection of CSAH 75 /Hwy 25.
• WSB prepared a press release regarding the DEED Familiarization Tour.
• WSB connected with a developer in the hospitality sector with regard to the Hotel
Market Report. WSB provided the Embracing Downtown Monticello Plan as a follow up
to the Hotel Market Report. Follow up is ongoing.
• WSB connected with a local attorney who is representing a firm looking to relocate
within the Monticello region. No immediate feedback was obtained. Follow up on
going.
Sincerely,
94UIL') --If t
John Uphoff
WSB & Associates, Inc.
F: \Community Development Dic ecfor\ ECOnomlc Development\B—d,\EDA\EDA GO D\2014 \SeptemberUtem 6.Muk,t ,t &ivg \AOgoet Moufi cello Movtlily
MNDEED Site Selector Tour Comes to Wright County
On Monday, August 11th the Wright County Economic Development Partnership
teamed up with the Greater St. Cloud Development Corporation to host one of eight
national site selection consultants. Site selection consultants work with businesses
across every sector to help them relocate or expand their operations.
The event was part of the MN Department of Employment and Economic
Development's initiative to highlight economic assets throughout the State. Duane
Northagen, Executive Director of the Wright County Economic Development
Partnership, made a presentation on behalf of the cities located in Wright County. The
presentation focused on the educated workforce, access to the major transportation
corridors, and the high quality of life located throughout Wright County.
Monticello based Suburban Manufacturing provided a plant tour offering insight on
the precision manufacturing sector and discussing the reasons they believe being
located in Wright County provides them competitive advantages. Peter Thompson,
CEO of Suburban Manufacturing, commented on the importance of high- speed, highly
secure internet and was pleased with the world class telecommunication options
available in Monticello. City of Monticello officials reinforced the growing importance
of fast and secure internet to all businesses and highlighted the fiber optic infrastructure
available to every household and business throughout the City.
The overall objective for the site selector tour is to develop a network connecting cities
throughout Minnesota with businesses all over the globe. This event illustrated to site
selectors that cities in Wright County have a lot to offer prospective businesses and are
poised for growth now and well into the future.
EDA Agenda: 09/10/14
7. Director's Report (JO /AS)
Block 34 Update
City staff will meet with W SB environmental analysis staff and structural analysis firms on
Block 34 on Friday, September 5th. Staff have also arranged to meet with a representative
from LHB & Associates to discuss the qualification component of the project.
A verbal update on the outcome of these discussions will be provided at the September
meeting. Again, the goal is to have detailed scope of work documents with estimates for
environmental, structural and qualification components of the project prepared for the EDA's
consideration in October. WSB will also be provided an estimate of demolition costs. This
will be an estimate only, as the demolition component is required to be bid.
City Council will be selecting their representative to the RFP committee on Monday the 81h of
September. At that time, staff will schedule an RFP introductory meeting.
Xcel Energy Substation Update
As the EDA may recall, the City Council previously authorized staff to begin working with
Xcel Energy on the possible location of a new substation facility in Otter Creek Business
Park.
Since that time, City staff has reached out to the business park's current property owners to
discuss the possible use. Approval of the current property owners on such use is required due
to the existing declaration of covenants in place throughout Otter Creek. There was not
universal support for the location of the substation in Otter Creek among these existing
property owners.
At this time Xcel has shifted its focus to a parcel of land outside of the current City limits.
The City will continue to work with Xcel Energy as needed as they develop plans for this
substation. A second substation in this area of Monticello is critical to continued growth and
development for the City and to the ability to provide a consistent, reliable power source for
existing business and residential users.
TAC /Transportation Update
On August 25th, the City Council held a workshop regarding the design plans for the
intersection improvements at TH 25 /CSAH 75. The City's goal has been to find a design
which supports the full functionality of the intersection, while maintaining parking along
north and south Broadway west of TH 25. A copy of the agenda packet prepared for the City
Council is included with this packet.
After discussion, the Council's direction to staff was to continue to pursue a design option
which sets the intersection up for final functionality (with dual left turns from east -bound
CSAH 75 to north -bound TH 25) while maintaining parking on Broadway until
redevelopment allows for additional parking options. Designs have been developed which
EDA Agenda: 09/10/14
support this configuration — shown in figures in the attached packet. These design plans
require that CSAH 75 be reduced to a single- through lane in some capacity. Wright County's
Highway Engineer is not supportive of these configurations. The City's next step is to discuss
these design options with the Wright County Board of Commissioners (acting as the
Transportation Committee), as well as potential triggers which remove the Broadway parking
in the future in favor of adding back the additional through lanes.
2
WSB
& Associates, Inc.
Infrastructure n Engineering n Planning n Construction
Memorandum
To: Honorable Mayor and City Council
Monticello Transportation Advisory Committee (TAC)
From: Bret A Weiss, PE, President
Chuck Rickart, PE, PTOE, Transportation Engineer
WSB & Associates, Inc.
Date: August 21, 2014
Re: TH 25 at Broadway Improvement Update
City of Monticello
Project No: 1494 -80
701 Xenia Avenue South
Suite #300
Minneapolis, MN 55416
Tel: 763 541 -4800
Fax: 763 541 -1700
Staff has met with Wright County staff and the County Board (Committee of the Whole) to
discuss the improvements at the TH 25 and Broadway (CSAH 75) intersection. These
conversations have come to a point where direction is needed from the City Council and TAC on
the preferred concept plan to move forward into final design and construction.
The issues that have surfaced through our meetings with the County are:
1. Maintaining parking on Broadway (CSAH 75) west of TH 25.
2. Maintaining two lanes in each direction on Broadway (CSAH 75).
3. Construction of improvements to accommodate future growth.
4. Using the Federal and State funding secured for future improvements.
With the current right of way constraints west of TH 25, not all of these issues are able to be
addressed at the same time. The City's primary concern is maintaining parking on CSAH 75
(Broadway) specifically west of TH 25; while the County's primary concern is maintaining two
through lanes in each direction.
There are several options to address these issues including:
1. Short Term CSAH 75 One Lane w/Parking: This option would include providing the
full improvements on TH 25 including the southbound to eastbound dual left turn lane.
On CSAH 75, the approaches would be reconstructed within the existing roadway width
to include (Figure 1):
• Raised concrete median
• Single through lane in each direction
• Eastbound to northbound dual left turn lane
• Parking on both sides west of TH 25
TH 25 at Broadway Improvement Update
City of Monticello
August 21, 2014
Page 2 of 3
This option would address 3 of the 4 issues including: Maintaining parking on CSAH
75, providing improvements to accommodate future growth and using the secured
funding.
2. Optional Two Lane w/No Parking: Should, traffic grow faster than projected an
optional short term phase can be implemented. This phase would eliminate the parking on
both sides of CSAH 75 (Broadway) and provide an additional through lane in each
direction. This would strictly be a signing and striping change (Figure 2).
This option would address 3 of the 4 issues including: Maintaining two lanes in each
direction on CSAH 75, providing improvements to accommodate future growth and using
the secured funding.
CSAH 75 Left Turn Lane Extension: This option would include providing the full
improvements on TH 25 including the southbound to eastbound dual left turn lane. On
CSAH 75, the single eastbound to northbound left turn lane would be reconstructed to
extend the available storage to Walnut Street. No other improvements would be made to
CSAH 75, maintaining two through lanes in each direction, single left turn lanes and
parking (Figure 3).
This option would address 2 of the 4 issues including: Maintaining parking on CSAH
75 and providing two through lanes in each direction on CSAH 75. This option would not
construct the needed dual left turn lanes and would turn back approximately $650K of the
secured funding.
4. Two Lanes Eastbound w /Parking: This option includes providing two through lanes for
eastbound CSAH 75 by shifting the lanes and using the outside, future eastbound to
northbound left turn lane, as a through lane. The impact of this option would be removing
some parking on the south side of CSAH 75 just east of Walnut Street (approximately 2
to 3 spaces) and modifying the median on the eastside of TH 25. Westbound CSAH 75
would stay as a proposed one lane with parking (Figure 4).
This option would address 3 of the 4 issues fully and 1 partially including:
Maintaining parking on CSAH 75, providing two lanes for eastbound traffic only,
providing improvements to accommodate future growth and using the secured funding.
Staff also agreed that the City would provide the County with a "Proposal" on the improvement
option and the specific triggers that would cause parking to be removed and the second through
lane be added. Below is a draft of this proposal to the County.
In conjunction with the intersection improvements at TH 25 and CSAH 75 (Broadway)
programed for 2015 construction, the City of Monticello is requesting that parking be
maintained on CSAH 75 west of TH 25, by eliminating one through lane on CSAH 75 and
providing a short term and ultimate contingency plan if issues arise requiring the second
lane in each direction on CSAH 75 based on the following conclusions:
TH 25 at Broadway Improvement Update
City of Monticello
August 21, 2014
Page 3 of 3
• The loss of parking on CSAH 75 west of TH 25 and its impact on business
outweighs any improvement gained by maintaining the second lane in each
direction.
• Constructing the CSAH 75 turn lanes today provides the most capacity where
it is needed, with secured funding at a lower cost than in the future.
• The City has a contingency plan that can easily be implemented by just
removing the parking and restriping the roadway, if issues arise.
• As development occurs west of TH 25, the additional width to provide parking
and a second through lane can be provided. This can be completed one side at
a time, if development occurs separately and determined to be necessary.
• The City has invested and will be investing a significant amount of money in
the downtown area including this intersection.
The City is willing to consider committing to triggers to add the second lane in each
direction and the cost associated with removing the parking and restriping the CSAH 75
approaches if deemed necessary. These triggers would include:
• Traffic delay and queue backup during the average weekday periods (not
recreational peak times) 3 to 4 times per week) impacts adjacent intersections.
• Traffic queues from the left turn lanes on eastbound CSAH 75 approaching
TH 25 during the average weekday periods (not recreational peak times)
impact the through traffic lane for more than 3 to 4 times per week on average
days.
• Traffic safety is impacted with an increase in crashes associated with the lack
of a second through lane (i.e. eastbound at Walnut Street) increase by more
than three crashes per year.
• By the year 2025 or 10 years from the completion of the intersection
improvements.
WSB
- Infrastructure n Engineering n Planning n Construction
& Associates, Inc.
Memorandum
To: Jeff O'Neill, City Administrator
Shibani Bisson PE, City Engineer
City of Monticello
From: Bret A Weiss, PE, President
Chuck Rickart, PE, PTOE, Transportation Engineer
WSB & Associates, Inc.
Date: August 20, 2014
Re: TH 25at Broadway Improvement Alternatives Background
City of Monticello
Project No: 1494 -80
701 Xenia Avenue South
Suite #300
Minneapolis, MN 55416
Tel: 763 541 -4800
Fax: 763 541 -1700
The City of Monticello, its residents and its downtown businesses are significantly impacted by
TH 25 and the associated Mississippi river bridge. This river crossing is centered between
crossings at TH 101, 14 miles to the east, and at Clearwater, 16 miles to the west. TH 25 is
already very congested and traffic volumes are expected to increase from 33,000 today to more
than 45,000 in 2030. The City of Monticello's downtown has struggled to maintain business and
will continue to do so until this intersection is properly addressed. The northeast quadrant and
associated improvements were recently completed and has provided some relief to the area. The
City has further invested in right of way purchases and is planning to relocate businesses in the
southeast quadrant to allow for this project to be constructed. This project will complete the
intersection improvements and allow the City to proceed with redevelopment efforts that are
focused on reconnecting with the Mississippi River and Restoring downtown!
To address the existing and future needs the City has prepared preliminary studies and designs to
determine the appropriate level of intersection improvements required now and in the future.
These improvements will not only improve the access for vehicles and pedestrians to the
downtown area, but will significantly improve travel times through the City on TH 25.
Currently the primary movements in the intersection that cause delays are:
• Southbound TH 25 to eastbound CSAH 75 (Broadway) left turn
• Eastbound CSAH 75 (Broadway) to northbound TH 25 left turn
Both of these movements are proposed to be improved with dual left turn lanes. These
improvements together with the improved operations with Flashing Yellow Arrow left turn
phasing provides for an overall LOS D, with the projected 2016 and 2020 traffic conditions. By
2030, the overall intersection would be operating at a LOS F assuming no river new river
crossing to relieve TH 25.
TH 25 at Broadway Improvement Alternatives Update
City of Monticello
August 20, 2014
Page 2 of 4
The City has spent or will spend more than $2.5 million on already completed improvements and
preparing for the future improvements including:
• CSAH 75 dual right turn lanes, River Street improvement and additional right -of-
way with Walgreens development.
• Southeast quadrant right -of -way acquisition.
• Project development / secured funding ($1.2 million in Federal STP and $506K in
C ITV S).
• Design and construction services.
One short term issue that has been a concern of the City is maintaining parking on CSAH 75
(Broadway) specifically west of TH 25. This parking is vital to the existing businesses adjacent
to the roadway. The original concept plans were developed to accommodate as much parking as
possible (i.e. maintaining parking on the south side only). This, however, resulted in only
providing a single through lane for westbound CSAH 75 (Broadway). The results of the traffic
analysis conducted for this concept concluded that the operations of the intersection would be at
a satisfactory level of service (LOS D). Modifying the through movement on CSAH 75
(Broadway) from two lanes to one lane is the primary concern of Wright County Public
Works staff. During the funding application process the County did support the project
with the condition that two lanes in each direction be maintained.
The City of Monticello and Wright County are partners in economic growth as there is benefit to
both agencies. Additionally, the City has no desire to create issues with traffic in the downtown
area and is actually spending significant funds to accomplish improvement that are a benefit to
the transportation system. The analysis we have provided to the County shows that reducing to a
single lane in each direction will accommodate current and projected traffic volumes and if the
County has concerns in the future, we have provided a fall back corrective position. We have
asked the County Board to allow the City to proceed with the single lane option with an
agreement on terms that would require a change back to the original two lane option. This will
continue to keep our businesses with on- street parking, while minimizing the width of the
roadway section and will allow the City to maximize the intersection improvement funds that
have been secured from the State and Federal process.
Two primary improvement alternatives are being considered at this time, each is discussed below
with the advantages and disadvantages
1. Short Term CSAH 75 One Lane w/Parking: This option would include providing the
full improvements on TH 25 including the southbound to eastbound dual left turn lane.
On CSAH 75, the approaches would be reconstructed within the existing roadway width
to include (Figure 1) :
• Raised concrete median
• Single through lane in each direction
• Eastbound to northbound dual left turn lane
• Parking on both sides west of TH 25
TH 25 at Broadway Improvement Alternatives Update
City of Monticello
August 20, 2014
Page 3 of 4
Should, traffic grow faster than projected an optional short term phase can be
implemented. This phase would eliminate the parking on both sides of CSAH 75
(Broadway) and provide an additional through lane in each direction. This would strictly
be a signing and striping change (Figure 2).
It is anticipated that the northwest and southwest quadrants of TH 25 and CSAH 75
(Broadway) will redevelop in the next 10 to 20 years. When this redevelopment would
occur, additional right -of -way can be secured to widen the roadway to accommodate two
lanes in each direction with on- street parking, if desired at the time. In addition, improved
pedestrian accommodations could be provided including a boulevard between the
roadway and sidewalk.
Advantages:
Maintains parking which benefits business on Broadway west of TH 25.
Provides most flexibility for future turn lanes (i.e. eastbound to
northbound dual lefts).
• Existing 261 left, 182 through and 66 right turn vehicles
• Projected 313 left, 219 through and 79 right turn vehicles (assumes
1. 1, 20 year growth factor)
• Rule of thumb is that dual left turn lanes are needed with more
than 300 vehicles in the peak hour period
• Provides 420 feet (17 vehicles) of left turn storage vs 190 feet (8 vehicles)
with existing or 315 feet (13 vehicles) with extending the left turn lane
(Alternative 2).
• If needed, converting from one through lane to two through lanes, can be
accomplished by simply removing parking and restriping the roadway.
• The overall intersection LOS is the same for one through lane or two
through lanes with existing traffic conditions or future projections
assuming no river crossing.
• State and Federal funding is in place to construct improvements with little
County participation.
Disadvantages:
Removes an existing through lane.
State Aid variance may be needed to reduce the number of through lanes.
2. CSAH 75 Left Turn Lane Extension: This option would include providing the full
improvements on TH 25 including the southbound to eastbound dual left turn lane. On
CSAH 75, the single eastbound to northbound left turn lane would be reconstructed to
extend the available storage to Walnut Street. No other improvements would be made to
CSAH 75, maintaining two through lanes in each direction, single left turn lanes and
parking (Figure 3).
TH 25 at Broadway Improvement Alternatives Update
City of Monticello
August 20, 2014
Page 4 of 4
Advantages:
• Maintains parking which benefits business on Broadway west of TH 25.
• The overall intersection LOS is the same for one through lane or two
through lanes with existing traffic conditions or future projections
assuming no river crossing.
Provides 315 feet (13 vehicles) of left turn storage vs 190 feet (8 vehicles)
with existing conditions.
Disadvantages:
• Provides no flexibility for future turn lane needs (i.e. eastbound to
northbound dual lefts). The roadway would need to be reconstructed in the
future to provide for dual left turn lanes.
• Funding is in place for providing maximum intersection capacity. The cost
that would be given up is approximately $650,000, and if not used would
need to be replaced in the future when the dual left turn lane
improvements are needed. That cost would then be the responsibility of
the County.
• Provides 315 feet (13 vehicles) of left turn storage vs 420 feet (17
vehicles) with dual left turn lanes (Alternative 1).
• Eliminates the existing left turn from westbound CSAH 75 to southbound
Walnut Street, creating a potential safety issue with left turn vehicles
turning from a through lane.
o existing 30 left turns crossing (conflicting) with 327 vehicles
eastbound on CSAH 75
o projected 36 left turns crossing (conflicting) with 392 vehicles
eastbound on CSAH 75 (assumes 1. 1, 20 year growth factor)
The alternative to extend the CSAH 75 eastbound to TH 25 northbound left turn lane
through the Walnut Street intersection was also considered. This would provide an
additional 160 feet (6 vehicles) of left turn storage. However, this has a significant impact
on the existing landscaped median considered a transition between the commercial
downtown area and the residential area to the west. This together with the safety concerns
with traffic conflicts at Walnut Street it was determined that ending the turn lane at
Walnut would function better.
With these alternatives we met with County Staff. They were adamant that four lanes (two in
each direction) needed to be maintained on CSAH 75. After an extensive discussion an
additional option was discussed. It includes providing two through lanes for eastbound CSAH 75
by shifting the lanes and using the outside, future eastbound to northbound left turn lane, as a
through lane. The impact of this option would be removing some parking on the south side of
CSAH 75 just east of Walnut Street (approximately 2 to 3 spaces) and modifying the median on
the eastside of TH 25. Westbound CSAH 75 would stay as a proposed one lane with parking
(Figure 4).
Date. Pr/nted. 811112014
East Bridge FW k-'
I _
I I
alai
01
+ r I
AL I I f
PeOM"N -01
- - - - - . - - - - -
�7
do
I5
i = LEGEND
r•
r
-Wv
r i
3rd STREET W
CITY Of
°F
N�ontl TH 25 at CSAH 75 Intersection
__. City of Monticello, Minnesota
Proposed R/W
Existing RAN
�
Figure 1
Short Term One Lane w/ Parking
August 11, 2014
i }
fi,4r t -_'-
!
Q Proposed Roadway Reconstruction
Q Proposed Parking
I" on
Q Proposed Curb & Gutter / Median
i do a°9� ? i
Q Proposed Concrete Sidewalk
Landscaped Median
Q Existing Roadway
3rd STREET W
CITY Of
°F
N�ontl TH 25 at CSAH 75 Intersection
__. City of Monticello, Minnesota
Proposed R/W
Existing RAN
�
Figure 1
Short Term One Lane w/ Parking
August 11, 2014
Date. Pr/nted. 811112014
- - ter•• �AHOMUW
L;
. -�
f r
ir
Ails
� • . 1 �� � Cr t�
I I
�RaFAlc4c Eel ,� fir]St BJ`! Park
I
• I
N' 4
I'
� I a
MMM �
r "
I
LEGEND
117,
-Wv
ri
CITY Of
°F
N�ontl TH 25 at CSAH 75 Intersection
__. City of Monticello, Minnesota
an scape a Ian
' Q Existing Roadway
Proposed R/W
Existing RAN
�
Figure 2
Optional Two Lane (if deemed necessary)
w/ No Parking under Existing Conditions
August 11, 2014
1-4
Q Proposed Roadway Reconstruction
Proposed Parking
Q Proposed Curb & Gutter / Median
—
I
Q Proposed Concrete Sidewalk
*
I I d d M d'
CITY Of
°F
N�ontl TH 25 at CSAH 75 Intersection
__. City of Monticello, Minnesota
an scape a Ian
' Q Existing Roadway
Proposed R/W
Existing RAN
�
Figure 2
Optional Two Lane (if deemed necessary)
w/ No Parking under Existing Conditions
August 11, 2014
Date: Pr/nted: 811112014
mooCITY OF TH 25 at CSAH 75 Intersection Figure 3
cello CSAH 75 Left Turn Lane Extension
__. City of Monticello, Minnesota
August 11, 2014
Date: Pr/nted: 812112014
CITY OF TH 25 at CSAH 75 Intersection Figure 4
Monticello Short Term Two Lanes Eastbound w/ Parking
__. City of Monticello, Minnesota
August 20, 2014