Loading...
City Council Resolution 2016-833 EXHIBIT A TO OFFICIAL INTENT RESOLUTION NO. 2016-083 ADOPTED October 24, 2016 DATE OF DECLARATION DESCRIPTION OF PROJECT MAXIMUM PRINCIPAL AMOUNT OF DEBT FOR PROJECT 10/24/2016 2017 STREET IMPROVEMENT PROJECT: GILLARD AVENUE, 95TH STREET NE, HAUG AVENUE, 90TH STREET NE, MISSISSIPPI DRIVE, HART BOULEVARD, SANDBERG ROAD- including, but not limited to, construction of improvements and indirect costs, such as legal, engineering, administrative, right of way acquisition (land, etc.) and financing costs. Engineering costs includes survey, geotechinical evaluation, feasibility study, environmental documents, permitting, preliminary and final design, preparation of plans and specs, bidding administration, construction management, staking, inspection and material testing. $2,200,000 10/24/2016 IMPROVEMENTS AT THE 7TH STREET AND STATE HIGHWAY 25 INTERSECTION (15C004) - including, but not limited to, construction of improvements and indirect costs, such as legal, engineering, administrative, right of way acquisition (land, etc.) and financing costs. Engineering costs includes survey, feasibility study, environmental documents, permitting, preliminary and final design, preparation of plans and specs, bidding administration, construction management, staking, inspection and material testing. $2,300,000