City Council Resolution 2016-833
EXHIBIT A
TO OFFICIAL INTENT RESOLUTION NO. 2016-083
ADOPTED October 24, 2016
DATE OF
DECLARATION
DESCRIPTION OF PROJECT
MAXIMUM
PRINCIPAL
AMOUNT OF DEBT
FOR PROJECT
10/24/2016 2017 STREET IMPROVEMENT PROJECT: GILLARD
AVENUE, 95TH STREET NE, HAUG AVENUE, 90TH
STREET NE, MISSISSIPPI DRIVE, HART
BOULEVARD, SANDBERG ROAD- including, but not
limited to, construction of improvements and indirect
costs, such as legal, engineering, administrative, right of
way acquisition (land, etc.) and financing costs.
Engineering costs includes survey, geotechinical
evaluation, feasibility study, environmental documents,
permitting, preliminary and final design, preparation of
plans and specs, bidding administration, construction
management, staking, inspection and material testing.
$2,200,000
10/24/2016 IMPROVEMENTS AT THE 7TH STREET AND STATE
HIGHWAY 25 INTERSECTION (15C004) - including,
but not limited to, construction of improvements and
indirect costs, such as legal, engineering, administrative,
right of way acquisition (land, etc.) and financing costs.
Engineering costs includes survey, feasibility study,
environmental documents, permitting, preliminary and
final design, preparation of plans and specs, bidding
administration, construction management, staking,
inspection and material testing.
$2,300,000