City Council Resolution 2017-05CITY OF MONTICELLO
WRIGHT COUNTY, MINNESOTA
RESOLUTION NO. 2017-05
ACCEPTING FEASIBILITY REPORT, CALLING FOR PUBLIC HEARING
FOR THE 2017 STREET AND UTILITY IMPROVEMENT PROJECT, CITY PROJECT
NO. 16CO03
WHEREAS, approval was granted by the City Council authorizing the preparation of a feasibility
report addressing street and utility improvements and other appurtenance work for:
• Gillard Avenue, 95th Street, Haug Avenue and 90th Street (within City limits)
• Mississippi Drive
• Hart Boulevard
• Sandberg Road, south of Chelsea Road
Other improvements include:
• Fog seal or microsurfacing of the existing pathway along Gillard Avenue
• New pathway along the north side of CSAH 75 from Highland Way to the Wastewater
Treatment Plant (WWTP) administrative office building access
• Watermain replacement along Hart Boulevard between CSAR 75 and the hospital parking
area to improvement maintenance of the system
NO W THEREFORE, BE IT HEREB Y RESOL VED B Y THE CO UNCIL OF THE CITY OF
MONTICELLO, MINNESOTA:
1. Such improvements are necessary, cost-effective and feasible as detailed in the feasibility
report.
2. The City Engineer is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the snaking of such improvement.
4. A public hearing shall be held on such proposed improvement on February 27, 2017 in the
Council Chambers of City Hall at 6:30 p.m. and the Clerk shall give mailed and published
notice of such hearing and improvement as required by law.
ADOPTED BY the Monticello City Council this 13th day of February, 2017.
CITY OF MONTICELLO
`urian Stumpf, Mayo
ATTEST:
Jeff` %', Tw City Administrator