Loading...
City Council Agenda Packet 03-13-2017 SpecialAGENDA CITY COUNCIL SPECIAL MEETING MONTICELLO CITY COUNCIL Monday, March 13, 2017 — 5:15 p.m. Academy Room AGENDA 1. Five Bugles Fire Study Presentation and Discussion V� - � ir`'�;� Af t t � ,l �� ■ ���� .-..sirmru.wrwrr.sw.nrv.�,vn.+..rs�wr,r:.roi ssr.avwr..w..rrw�«..,+�wwow�wrs.n,w.ir• February 15, 2017 Michael Mossey, Fire Chief City of Monticello, MN 505 Walnut Street Monticello, MN 55362 RE: Monticello Fire Department Facilities Study Dear Chief Gilles, Five Bugles Design respectfully submits the attached facilities study for the Monticello Fire Department. It has been a pleasure working with you and your department to develop the information contained herein. We thank you and your staff for taking the time to meet with us and participate in the effort of this study, the information provided that is specific to your department and its specific challenges is invaluable to making this report a comprehensive review of your existing facility, its current and future needs. Please review the attached study and its details. We are available to answer any questions you, your staff, and your community might have. Sincerely, Five Bugles Design Michael Clark, AIA Market Sector Leader BaabM Plae Building D04 Suitc 204 Mailbox Z 800 Wisconsin Screcc Eau. Cl 54705 715:832.4 - FAX 715.514:1860 4715 Pilgrim Lane 1*l Mimxc poli! , UN 55442 a 612.M377d Fax 714.5.14.186D gra Bu-Wos DQsigT� i i�i' r C� , `rit IVE 8B.a`c+fftt G '` BELES Arch irct DcAgn for EmcWncy Services FIYcBugIc,%Dcsign com .. �..,...=-r�sr•„V �..a�-� T.,:.rrs�^�r.:ritisa �.srsch:'neo-c:.�cuI'll .kr.Yet-�rst�z.�s'��s���e3s:carcYrx.ts'-rete:.::SaR•_,...�....rzsak')nti&: February 15, 2017 Michael Mossey, Fire Chief City of Monticello, MN 505 Walnut Street Monticello, MN 55362 RE: Monticello Fire Department Facilities Study Dear Chief Gilles, Five Bugles Design respectfully submits the attached facilities study for the Monticello Fire Department. It has been a pleasure working with you and your department to develop the information contained herein. We thank you and your staff for taking the time to meet with us and participate in the effort of this study, the information provided that is specific to your department and its specific challenges is invaluable to making this report a comprehensive review of your existing facility, its current and future needs. Please review the attached study and its details. We are available to answer any questions you, your staff, and your community might have. Sincerely, Five Bugles Design Michael Clark, AIA Market Sector Leader BaabM Plae Building D04 Suitc 204 Mailbox Z 800 Wisconsin Screcc Eau. Cl 54705 715:832.4 - FAX 715.514:1860 4715 Pilgrim Lane 1*l Mimxc poli! , UN 55442 a 612.M377d Fax 714.5.14.186D gra Bu-Wos DQsigT� i i�i' r C� , `rit ( ' t , $ INTRODUCTION The Monticello Fire Department has been serving the community from the existing fire station at j 303 West 6th Street in Monticello since approximately 1985. There has been growth in the community and hence within the Fire Department in the past 30 years, and while there have been some minor cosmetic and operations and maintenance type projects, there have not been any major -- expansions or reconfigurations of the facility. Interviews with the Fire Chief and the fire staff have developed the following basic pieces of information as direction for the study. • The current location is assumed to be optimal for the next several decades. Response time is currently good. City growth is limited by a number of obstacles such as the Mississippi River to the north, Highway 94 to the south and the nuclear power plant to the west. These obstacles will present impediments to response no matter where the station would be located and therefor would suggest satellite stations rather than a relocation of the fire station. • The existing ladder truck is scheduled for replacement in the coming years. The -planned replacement vehicle will be larger than the current truck and will no longer fit in station. j • Management and operations for the department have changed in the past 30 years. A single office is no longer adequate for planning, recording, and record storage for the department. • The department's equipment has exceeded the capacity of the facility and a number of pieces of equipment are currently siting outside in trailers. Other equipment that is seasonal in nature is stored off site. • The department can foresee a time in the future when the consideration of a small ' complement of full-time staff, such as a fire chief, fire marshal or inspectors may become advisable in order to retain staff, maintain service and effectively manage the department given probable increases in equipment maintenance, training and reporting requirements. The purpose of the study is to examine the department's current space needs and to plan for the next several decades of fire service to the City of Monticello. PROCESS 1 The Five Bugles Design team met with the fire department on a number of occasions. The Fire Chief and staff provided detailed information regarding the age of the existing facility, and major _J maintenance upgrades that have occurred over time. The Monticello Fire Department team also provided information regarding current and future space needs. And finally Five Bugles Design's ` team of architects and planners reviewed the existing facility and recommended spaces and needs that are considered best -practice in the fire industry. The information we gathered was used by the team to develop an option for the expansion of the j existing facility that solves those needs and issues that were uncovered. Square foot costs have f been assigned for recommended construction and those numbers have been inflated to include all currently understood construction related costs including FF&E, technology, fees, inflation and contingencies. All projection of construction costs are based on a projected construction start of 2017 since there in no current construction plan. Any future planning should assume a range of 3- 5% inflation on total project cost annually per year of delay. 1 MAJOR FINDINGS: Facilities The following are some of the major findings of our review of the facility as well as the space needs study. 1. The facility is in fairly good physical condition with no obvious physical deterioration visible. Parking, drives, aprons and approaches all appear to be in relatively good condition. It is reported that the singe makeup air unit in the apparatus bay is original and it is uncertain if it is operational. The furnaces that serve the office areas were replaced in the past 10 years and remain in good condition. • It should be noted that more economical mechanical equipment maybe available for the facility that would reduce operational costs. • An additional concern is the sloped roof structure. Several options for smaller additions at the current office/training location were investigated but invariably failed due to a need to revise roof structures above the existing apparatus bay. 2. There are several Americans with Disability Act Code violations, specifically in bathroom and shower areas that will need to be corrected if a major expansion or renovation is required. 3. The facility is crowded with all apparatus bays full and equipment parked at 90 degrees to travel paths. Two trailers are parked outside. Mechanical rooms are used for record and equipment storage. All officers share a single office. 4. Training options are mixed. The classroom type training space is in good condition and allows for a variety of audio and visual presentations. Physical training and operations training are limited and there is no fitness training. A small training tower exists, but is limited in its usefulness. Important training such as extraction, search and rescue, confined space, standpipe and fire protection system practice must all be performed off site. S. There are several concerning practices that the design of the existing facility requires. While not specifically code violations, the following are NOT considered 'best practice' operational procedures today: • There is no direct vehicle exhaust system. This allows carcinogenic contaminant to build up in the air and settle on equipment and gear used on a regular basis by the firefighters. Turnout Gear is wall in ounted at the `back' of the apparatus bays. This puts the gear in direct contact with the exhaust of the vehicles and can be dangerous when donning or removing gear as vehicles are backed into their spaces after a call. Equipment and gear decontamination spaces are generally located in the apparatus bays; this negates some of the gains of the decontamination processes and puts this activity in inappropriate locations meaning it gets used less than it should. 2 Project: Monticello Fire Department Location: Monticello, MN Date: September 28, 2016 Floor tngmes 45 x 16 720 i 1440 Ladder/Snorkel 90 x 16 = 1440 1440 Telesquirt 90 x 16 = 1440 0 r 'hescue Pumper I 30 x = 0 0 Boat/Trailer i 30 x 16 _ 480 Arson Unit 45 x ' 16 _ 720 0 Utility/Pickup 22 x 16 _ 352 704 Haz Mat Trailer 35 I x 16 _ 560 0 Haz Mat-Diking/Booming I 20 x 16 _ 320 _ 0 i Portable Pump/Trailer x = 0 0 Snowmobile/ATV/Trailer 20 x 16 I = 320 0 Firefighter Rehab Unit ( x _ D 0 0 Tanker 45 x 16 = 720 j�1440 Command Vehicle 35 x 16 _ 560 6 6 0 Portable Lighting I 24 x 16 _ I 384 0 0 �2escue Squad ' 45 x 16 _ 720 0 Brush Buggy #31 ' 24 x 16 _ 384 0 Mass Casualty 24 x 16 _ 384 0 0 Decon/Cleanup - homeland I 20 16 320 10 Vehicle Maintenance Bay ' 40 x 16 I = I 640 0 0 Wash Bay 70 x 0 0 0 Portable air and light unit 24 x 16 = 384 0 i EMS Command Vehicle x = 0 0 0 Ambulance 50 x 16 _ 800 0 0 Mass Casualty Trailer x = 0 I 0 0 Phsyc Unit 25 x 1 16 = 400 0 0 Total 1 4,981 7.984 1,597 9,581 Existing Equipment MUElFuture Equipment See also Training for other Apparatus and Large Equipment Table (Ft) 7,984 NumberofBaysl 3 4 FS 6 7 1 8 erlgth 4600 6240 7880 9120 10560 12000 CD I : 1 6400 6320 10240 12160 1408D 16000 Q 8000 I 10400 112800 15200 I 17600 20000 21,625 Apparatus Floor'lbtai Overall Space Estimate (Ft`) ___ udErgPRg C7fi4, Sg Q!, !`rs00'4 scd!1 stt S% P)ailbq j Eattr Ealret,UV6.547ff' 1 7 5 832.4u48 j rntefitigin Gr Sig_tt CoiYk, y 1 3 Project: Monticello Fire Department Location: Monticello, MN Date: September 28, 2016 Protective Gear Locker 240 2 x 4 Dirty Restroom 25 8 x 8 Hose/Training Tower 72 30 x 20 Mezzanine 288 80 x 20 Detached garage 300 1 x _ 96 I Walk-in med checked space 6 x 8 K-9 spaces 1 6 x 8 Work Room/SCBA 96 8 x 11 SCBA Clean and Fill Room 8 x 12 Hose Dryer 0 x 1 Commercial Laundry Room 15 10 x 10 Vehicle Maintenance Room 111 10 x 12 EMS Report Writing ' 8 I x I 12 EMS Storage 8 x 20 Regulated Storage 6 x 6 Bio Hazard Control 6 x 6 Janitors Closet 113 ' 6 x 4 Equipment Decon 8 x 10 Total I 1260 Su = 8 35 belt-contamea space wan ventnatior = 64 1 = 600 1 Some training/ = 1000 1 Access issues/training _ 0 0 1 bay of City building (trailer, misc.) _ 48 0 _ 48 0 _ 88 1 Too small -replace and repurpose _ 96 I 1 = 0 0 Hanging in tower = 100 1 Replace and repurpose _ 120 1 Replace and repurpose _ 96 0 = 160 0 36 I 0 36 0 = 24 1 = 80 0 Stair, smokable, repelling l 2,846 1 Apparatus Suppod Total (Ft) I ._U_ifitmgiD04,Sutter.962� OWisfonsiis t %plObox2.1"r5atr alaiYe„4r'JI”54703 775532': 8`4ti�,ftryliuglcsde5igrn om; 4 Project: Monticello Fire Department Location: Monticello, MN Date: September 28, 2016 Training Office Training Room 'Draining Storage (equip) Table and Chair Storage Exercise/Wellness Room Kitchenette POC Shower/Locker Room POC Shower/Toilets APPARATUS & EQUIPMENT Mobile Live Burn Trlr (MLFTU) Mobile Training Tower (MTT) Ventilation Trlr (Vent) Driving Simulator (Driving) Training 1 (Semi) Training 2 (Semi) Survive Alive Trailer Suburban (chief 3) Pick up (Rehab) Pick up -104 Portable lighting Boat and Trailer Snowmobile/ATV/Trailer Total 12 987 30 20 I 10 15 95 16 245 20 8 60 60 40 40 30 30 40 24 24 24 24 35 16 x 12 X 50 x 20 x 12 x 30 X 12 X 15 I x 10 Training 144 1 = 1500 1 { 400 I 1 = 120 1 = 450 1 = 192 1 300 1 80 0 960 960 640 640 480 480 640 384 384 384 384 560 256 0 0 0 0 0 0 0 0 0 0 0 0 0 Bay 45 people Current at Farm house Current Eisele Update Update 3882.5 Includes efficiency ratio 0 Includes efficiency ratio Total SiaaTe Toff 00 -WR nsit7 SEr Nfaslfiort2 E`a�CI'aire, llf 47f1 1795.832.434E 5 Project: Monticello Fire Department Location: Monticello, MN Date: September 28, 2016 Administration/Office Spaces Fire Chief 146 20 x 12 Inspector/Fire Marshal 1 16 x 12 Evidence Storage 6 x 8 Officers Office shared 16 x 12 Battalion Chiefs 30 x 10 Sleeping Room 1 10 x 13 Toilet shower 8 x 10 Captains Office 1 20 x 12 Aub Ed Office 14 x 12 Pub Ed Storage 0 6 x 8 StudyMfork Area I 8 x 10 Resource Library i 2 x 10 Administrative Assist. Office 16 x 12 Dation Dispatch Office 46 16 x 12 POC Staging Area I 8 x 12 Future 1 16 x 10 Conference Room 20 x 20 Communications/ IT 10 x 20 Record/Report Storage 47 8 x 10 Misc. Office Supplies I 4 x 6 General StorageI e x 10 New Gear and Uniform Storages 8 x 16 Elevator 10 x 20 Public Toilets 10 x 14 Janitors Closet I 6 x 4 Entrance Vestibule 20 x 20 Stairs I 24 x 10 Law Enforcement Office i 10 x 12 Historic Display 20 x 40 Other I I x Ixl 239 192 48 192 300 130 80 240 168 48 80 20 192 192 96 160 400 200 80 24 80 128 200 140 24 400 240 120 800 0 0 1 Current is one office for all officers 0 0 1 3 shared spaces 0 0 0 0 0 One of officers above 1 Closet in office spce 0 1 + Closet in office space 0 Will ulilize City staff 1 Current is 4 x 4 ... update 0 0 0 Shared in training room 1 Update 1 Currently in furnace room 1 1 0 0 0 0 0 0 1 Office and break w/ own entrance 1 1929 truck 25 plus feet, display space 1 4495 1 Admini�t�rationl0i fce Spaces Total SFt`) I NOTES: Fire Chiefs office is sized for an executive desk/credenza with separate table with seating for up to 4. 6 Project: Monticello Fire Department Location: Monticello, MN Date: September 28, 2016 Day Room Kitchen Pantry Dining for 8-12 Bedroom Restrooms/Showers POC Shower/Locker Room POC Shower/Toilets Linen Closet Supply Closet kesidential Laundry Janitor's Closet L — 20 20 8 20 10 8 20 8 6 4 8 6 Quarters x 15 _ 300 x 15 _ 300 x 8 _ 64 x 15 = 300 X 13 = 1130 x 10 = 80 x I 15 _ 300 x 10 = 80 x 8 = I 48 x 5 = 20 x 10 I 80 X 6 = 36 0 0 0 a 0 0 0 0 0 0 0 0 0 Living Qfi'irte PS Spaces Total (Ft`) — -- fir W) 00 : a c iAko. a v(� u fl-e-o.A' 7 Project: Monticello Fire Department Location: Monticello, MN Date: September 28, 2016 EMS Staff Parking Public Parking Other Parking needs Fire Apparatus Apron x EMS Apparatus Apron Outdoor Training Outdoor Patio Enclosed Dumpster External Generator Storm Water Treatment Heliport Pad Extrication pavement Other Other Other Otherl I I I I I I I f Site 0 0 shared with City Hall 0 0 0 Vehicle extraction space 0 0 -- 0 17 KW new 0 0 0 8 Project: Monticello Fire Department Location: Monticello, MN Date: September 28, 2016 Totals Pro)oosed Existing • • ° 9,581 4,981 Apparatus ' ' ' 2,846 1,260 Jraining 3,883 1,327 �'Administration2,495 239 •Qua,rters 0 'Trainin•: - Tempered 0 0 Station Footprint (Ft2) Sub Total Infrastructure (M S E) Space Factor 15% TOTAL PROGRAM SPACE REQUIRMENT 8,25al Apparatus Bays 1. Center to Center on existing bays is smaller than recommended Apparatus Support 1. 1000 SF Mezzanine Training 1. 900 SF Fitness Room Administration 1. 800 SF Historic Display aBuilding 001, Suite 302 S'00'Nisconsin St, Nflailbox 2 ) Eau Claire, N!i 54703 j 716,BS2.4,8,48 j tivebugies lesi 1n.com 9 j r� MAJOR FINDINGS: Space Needs The following issues were uncovered by the space needs portion of the study, were discussed with ' the team and used to inform the attached planning study. A space programming effort was led by Five Bugles. This effort examined in detail the needs of each ' of the five areas of major activities generally found in all fire departments: Apparatus Bays, Apparatus Support, Administration, Training and Living Quarters. A detailed breakdown of these spaces is included at the back of the report, however the space needs can be summarized as follows: SPACE EXISTING AREA 20 YR NEED Apparatus Bays 4,981 SF 9,581 SF Apparatus Support ( 1,260 SF 2,846 SF Administration 1,327 SF 4,445 SF Training 239 SF 2,495 SF Living Quarters 0 SF 0 SF Mechanical and Elect. spaces Included above 2,905 SF Totals 8,250 22,272 SF *Living Quarters are not anticipated in the current long term plan for the department, but it was considered prudent to plan for future additional space should it become necessary. ' The space needs study projecting the 20 year need essentially compares the spaces of the existing facility against what a new facility would include. This methodology allows us to compare the cost of additions and jremodeling against the cost to replace the facility. This will be covered in the Cost section of the report A few additional comments on the above numbers: 1. A mechanical mezzanine of 1000 SF is included in the twenty year need as inexpensive space for mechanical rooms and training space. 2. The 4,500 square foot difference between existing and new apparatus bays reflects the larger size apparatus bays today versus what was considered the norm 30 years ago. Some observations regarding these numbers includes: • Office space is severely lacking in the existing facility. Reporting, training and record keeping requirements have increased in the past 30 years and it is expected to continue to grow over the next 20 years. Adequate space for planning and record keeping should be planned into any future facility. s • Apparatus bays are not wide enough, too short and are all single entrance, back -in type with i the exception of the one drive through for the ladder truck. Newer fire trucks have multiple 1 side operated pumps, doors and compartments that must be opened, restocked or supplies checked at the station. Drive through bays reduce the amount of backing into station as well as provide for a more immediate response profile for first and second line equipment than the current station allows. Any new apparatus bays should be designed for drive through capacity and should be wide enough for two adjacent fire trucks to have side _.� opening doors open simultaneously. 10 Decontamination equipment is not provided adequate space and is currently located in the apparatus bay—adding to the contamination of the decontamination equipment. Consolidate this equipment into an enclosed and ventilated space. Gear is located in the apparatus bay. This leads to lack of proper ventilation for drying and subjects it to harsh, contaminated exhaust fumes shortening the life span of this expensive gear. If possible place turn out gear in a separate, well ventilated space. The facility lacks adequate training space for required physical types of training such as search and rescue, confined space, and other related exercises. Seek out inexpensive ways to add training opportunities to any newly constructed facilities. In summation the Space Needs portion of the work would indicate a need for a new facility at approximately 22, 272 square feet. This is comparable with facilities for similar sized departments in this region. Conversely an addition of approximately 14,000 square feet would provide the required square footage as detailed above. Corrections of approximately 2000 SF can be made to account for reuse of smaller than normal apparatus bays and other spaces in an addition and remodeling scenario. Therefore an anticipated size addition size of 12,000 gross square feet should be considered. 11 _A PROPOSED DESIGN SOLUTION Working together with the Department our team developed several potential solutions to the space needs discrepancies that are detailed in the previous section. The results of those options are NOT presented here as they were considered failed attempts to solve the Departments long term needs. Those options that failed include: • A small office expansion with two additional drive through bays. This option was considered feasible but only solved the department's needs for today. It did not take into consideration long term needs, did not resolve safety issues related to gear storage and decontamination, would curtail any future additions to the facility and did not allow for required parking. • Major reconstruction of the office area to add adequate space for all issues and addition of two bays. This solution failed mostly due to the configuration of the existing roof. A major expansion on the north side of the building would require rebuilding the entire roof structure including that over the apparatus bays. This added cost and work was deemed to be a poor investment if other solutions could be found. • Solutions were explored that tried to avoid impacting the Eisley building that shares the Fire Station lot. No solutions were found that could provide adequate parking on the site, meet the space needs and NOT call for the demolition of the Eisley building. At the end of this section of the report is a schematic plan with the proposed facility solution. The proposed solution detailed here provides the following benefits over others studied and will meet the needs of the department for an additional 20 years. 1. Space is added as an addition versus building with substantial savings by reusing existing functional infrastructure. 2. Contiguous space is provided for turn out gear and decontamination processes. This will allow for the space to be adequately and separately vented from the apparatus bay and insure longer lasting, healthier gear for the fire fighters. 3. An enlarged office component is provided that provides the increased space required as a y contiguous component that will aid in planning, record keeping and overall management of the department. It will also serve well if the department ever considers a full time fire chief d or other staff. l 4. An enhanced training element is added that includes a larger training room, expanded training tower and open space on a mezzanine for enhanced physical training elements such as confined space and search and rescue. S. The training room will be available to the pubic without impacting fire operations. It will also be large enough to host regional trainings that could be used as a revenue source for the department. 6. The existing training room will be repurposed to display the department's historic truck as - ; well as to serve as expanded training space for the department. 12 I I I I I i i I I I I I I I F ---j --------------------------------------------------- i/ I\ IC I I I I ��9 t 1 - I L 1 I I I I I � 1 I I I I 1 1 I 1 I I I I I I 1 I I I � I I I I q 1@4 I I 1 O i z e l _ \ -------------------------------------------------- 13 ---------------------------- --13 i 14 ESTIMATES OF PROBABLE COSTS Following this section is an estimate of probable costs for construction of the recommended solution that has been detailed in other sections of the report. There are few things the City and Department should consider in reviewing these costs: • The costs are reflected in a low and high range due to the early nature of this work. It should be anticipated that the final cost of the project will be somewhere between these numbers. • The low and high range of the costs is created by comparing the historical costs of fire station development as tracked by Five Bugles Design and locally adjusted national costs as published by Engineering News Record. • The attached Statement of Probable Costs details construction costs plus all known or anticipated project costs including Site Development, Building Construction, FF & E, Technology, Contingencies and Professional Fees. • The projected costs represent costs anticipated for 2017 construction. These numbers should be inflated by 3-5% for each year construction is delayed. Probable Cost Summary Element I Low Range High Range Site and Building $2,862,694 $2,973,013 Other Costs $869.228 $1,296,172 Total $3,731,922 ( $4,269,185 In comparison a new 22,625 square foot fire station on City owned property would likely cost between $6,000,000 and $7,000,000 in total project cost. 15 Project: Monticello Fire Department Location: Monticello, MN Date: 29 -Nov -16 Potential Costs I Natural Gas Extentions ( I $0 $0 15000 Demo Storm Water I I 0 0 $15,000 Site Improvements (hardscape) 15%-20% of buil ing costs $373,395 $509,252 $0 Sub Total I $373,395 $426,752 $15,000 CostsIll. Building Construction RS Means (2014/2015) 10,850 $196.66 2.5-4%aFCosts $71,567 1 $118,921 $2,133,761 Building Only Five Bugles Historic (2016) 10,850 $191.41 $2,076,799 Building Only I Renovations 8,250 $50.00 $412,500 412500 Clean/Paint/Refurbish Demolition of Eisele Building I 1 $10,000 $15,000 Sub Total $2,489,299 $2,546,261 IV. �urniture Fixtures and Equipment FF&E 5-8% of Building Construction 1 $124,465 1 $203,701 Assumes mostly new Apparatus $0 I $0 Others I $50,000 $90,000 vehicle exhaust Sub Total I I $174,465 j $293,701 Technology 3-5% of Building Construction 1 $74,67 $$127,313 Data systems, backbone, patch panels Communcations I 1 1 $0 $0 Radio, Tower, Repeaters, Etc Audo Visna Equipment lowance I $10,000 $15,000 Relocate Existing+Same Additional Sub Total I $84,679 $142,313 Inflation to mid -point of construction 3%-5% total construction costT $93,655 $170,451 Assume spring of 2017 construction start Owners Contingency 5% of total construction costs I $160,775 $178,974 nforeseen Conditions, Owner Changes, E& Sub Total II I I $254,430 $349,425 Architectural/Engineering 7-9% of Construction Costs 1 $239,086 I $sub,ulz i Geotechnical Studies 1 $15,000 1 $25,000 Commissioning $15,000 $35,000 1 LEED/Sustainability $0 $0 Hazardous Materials $0 $0 1 Testing and Inspections $15,000 $25,000 Legal 2.5-4%aFCosts $71,567 1 $118,921 I Sub -Total 1 $355,655 1 $510,733 16 Assumes no LEED requirement During Construction Cost of borrowing, Att. Fees, etc. I I I I I r x FIVE BIUGI ES I1a11burV I'lacc BUIldin,g D04 SUI) Wiscousin Strcct Eau Clairc, ACI 54703 715.532.-1S-13 4713 Pil<rrina Laic N Dlinncal»l.is, MN 33443 612.8-10.3773 I � i�-cI3u71rsDcsigti.com