City Council Resolution 2017-09CITY OF MONTICELLO
WRIGHT COUNTY MINNESOTA
RESOLUTION NO. 2017-09
ORDERING IMPROVEMENTS AND AUTHORIZING PREPARATION OF
PLANS AND SPECIFICATIONS FOR 2017 STREET RECONSTRUCTION AND
UTILITY IMPROVEMENTS, CITY PROJECT NO. 16CO03
WHEREAS, a resolution was adopted by the City Council on February 13, 2017, accepting the
Feasibility Report with reference to the proposed 2017 Street Reconstruction and Utility
Improvements as identified as street and utility improvement for Gillard Avenue, 95th Street, Haug
Avenue, 90the Street, Mississippi Drive, Hart Boulevard, and Sandberg Road including including the
adjustment, construction, reclamation, removal, and/or repair of existing pavement; curb and gutter;
sanitary sewer, storm sewer and water supply systems; signage; and other necessary appurtenance
work, and improvements. In addition, other improvements include: fog seal or microsurfacing of the
existing pathway along Gillard Avenue; new pathway along the north side of CSAH 75 from
Highland Way to the Wastewater Treatment Plant (WWTP) administrative building access; and
watermain replacement along Hart Boulevard between CSAH 75 and the hospital parking area to
improvement maintenance of the system.
WHEREAS, a resolution was adopted by the City Council on February 13, 2017, calling for a
Public Hearing on February 27, 2017, where the Council shall consider the proposed
improvements in accordance with the feasibility reports and the assessment of abutting properties
for all or a portion of the cost of the improvements pursuant to Minnesota Statutes, Chapter 429;
and,
WHEREAS, on February 16, 2017 and February 23, 2017, the City published notice of a Public
Hearing to be held on February 27, 2017, to consider ordering improvements for said project;
and,
WHEREAS, on February 16, 2017, affected property owners were mailed a notice of the Public
Hearing to be held February 27, 2017; and,
WHEREAS, at said hearing there was available a reasonable estimate of the amount to be
assessed and a description of the methodology was presented.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Monticello,
Minnesota as follows:
Said improvements are necessary, cost-effective, and feasible as detailed in the
Feasibility Reports at an estimated cost of $2,272,850. It is advisable, expedient and
necessary that said improvements as described in the Notice of Hearing thereon be
constructed, and the same are hereby ordered made.
2. WSB & Associates, Inc., is hereby designated as the engineer for this improvement. The
engineer shall prepare plans and specifications for the making of such improvements.
3. The City Council shall let the contract for all or part of the work for said improvements
or order all or part of the work done by day labor or otherwise as authorized by
Minnesota Statutes, Section 429.041, Subdivision 2 within one year of the date of this
resolution ordering said improvements.
ADOPTED BY the Monticello City Council this 27th day of February, 2017.
ATTEST:
Jef ' city Administrator
CITY OF MONTICELLO
Brian Stumpf,