Loading...
City Council Resolution 2017-09CITY OF MONTICELLO WRIGHT COUNTY MINNESOTA RESOLUTION NO. 2017-09 ORDERING IMPROVEMENTS AND AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS FOR 2017 STREET RECONSTRUCTION AND UTILITY IMPROVEMENTS, CITY PROJECT NO. 16CO03 WHEREAS, a resolution was adopted by the City Council on February 13, 2017, accepting the Feasibility Report with reference to the proposed 2017 Street Reconstruction and Utility Improvements as identified as street and utility improvement for Gillard Avenue, 95th Street, Haug Avenue, 90the Street, Mississippi Drive, Hart Boulevard, and Sandberg Road including including the adjustment, construction, reclamation, removal, and/or repair of existing pavement; curb and gutter; sanitary sewer, storm sewer and water supply systems; signage; and other necessary appurtenance work, and improvements. In addition, other improvements include: fog seal or microsurfacing of the existing pathway along Gillard Avenue; new pathway along the north side of CSAH 75 from Highland Way to the Wastewater Treatment Plant (WWTP) administrative building access; and watermain replacement along Hart Boulevard between CSAH 75 and the hospital parking area to improvement maintenance of the system. WHEREAS, a resolution was adopted by the City Council on February 13, 2017, calling for a Public Hearing on February 27, 2017, where the Council shall consider the proposed improvements in accordance with the feasibility reports and the assessment of abutting properties for all or a portion of the cost of the improvements pursuant to Minnesota Statutes, Chapter 429; and, WHEREAS, on February 16, 2017 and February 23, 2017, the City published notice of a Public Hearing to be held on February 27, 2017, to consider ordering improvements for said project; and, WHEREAS, on February 16, 2017, affected property owners were mailed a notice of the Public Hearing to be held February 27, 2017; and, WHEREAS, at said hearing there was available a reasonable estimate of the amount to be assessed and a description of the methodology was presented. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Monticello, Minnesota as follows: Said improvements are necessary, cost-effective, and feasible as detailed in the Feasibility Reports at an estimated cost of $2,272,850. It is advisable, expedient and necessary that said improvements as described in the Notice of Hearing thereon be constructed, and the same are hereby ordered made. 2. WSB & Associates, Inc., is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvements. 3. The City Council shall let the contract for all or part of the work for said improvements or order all or part of the work done by day labor or otherwise as authorized by Minnesota Statutes, Section 429.041, Subdivision 2 within one year of the date of this resolution ordering said improvements. ADOPTED BY the Monticello City Council this 27th day of February, 2017. ATTEST: Jef ' city Administrator CITY OF MONTICELLO Brian Stumpf,