Loading...
City Council Agenda Packet 11-17-1975AGENDA SPECIAL MEETING OF THE MONTICELLO CITY COUNCIL November 1 7, 1975 - 7:30 P. M. Mayor: Con Johnson. Councilmen: Denton Erickson, Dick Martie, Gene Walters, Stanley Hall. Meeting to be taped. J1. Public Hearing - proposed assessment roll - 1975-1 Sanitary Sewer and Watcrmain Improve- ment Project. /2. Review of plans and specifications for new liquor store. ✓3. Consideration of hockey rink. /. Approval of minutes November G and November 10, 1975. VS. Unfinished buesinces. VU. New business. ✓ o►y�t SNo�•/ 4. MAI LI NG TO: John Badalich Mrs. Ruth Moore Mike Holm Don Smith Ralph Block k ORR-SCHEIEN-MAYERON &ASSOCIATES. INC. :.,,,,,,r7vlzJ fnurneere November 17, 1975 Honorable Mayor & City Council 215 South Cedar Street Monticello, Minnesota 55362 Re: Assessment Roll Project 75-1 Gentlemen: The following are the costs used in preparation of the assess- ment rolls for the sewer and water improvement; Project Num- bers 75TS-1, 75LS-1, 75TW-1, 75LW-1 and appurtenant work. Final construction costs 5643,164.94 - Engineering Design Fee (6-1/28) 41,805.72 Inspection and Survey Fees 35,159.46 City expenses paid 7,632.94 a Preparation of Assessment Roll (1B) 6,431.65 City Administration (3%) 19,294.95 Total Project Cost $753,489.66 `Breakdown for final construction costs: Original contract $511,748.92 Chany,_- Order 01 N-. 66&1 47,186.04 ChanUQ Order #2 Nt' 11,195.05 Change Order 03 rj1.,17 57,718.61 Chanclo Order Nd (j,r� 8,548.53 Extra Work 6,767.59 Total 5643,164.94 Under direction of the City Council, we have combined all change orders wi:_h the exception of Maple Street Project, Change Order 02, to the ruin project and determined a unit parcel assessment. All oversizing of trunk mains, the Otter Creek culverts, and 509 of the street restoration was placed on ad valorem taxes. It was resolved that the Monticello Apartments were to pay the full project costs for Change Order Y2 excluding a unit parcel assessment for Lot 5, Block P. It was also resolved that Parcel 19585-A3 (Monticello 1st Baptist Church) be asscsood as two units. 'hyr 1".i•,f 1l••... • m r .1l'Ur'rM Stdfr• 23$ , t•J73 r 1. /7•x.1 � Honorable mayor 6 City Council City of Monticello —2- November 17, 1975 Re: Assessment Roll Project 75-1 We further recommended that the River Terrace Trailer Court be assessed as two units. This would be consistent with the pre- vious policy of subdividing larger lots into approximately 100' frontage for placement of sewer and water services. Based on this criteria, the number of assessable units amounts to 157 units, excluding Change Order q2. We have previously recommended placing a percentage of the project costs on ad valorem taxes in respect to the frontage of the cemetery and City Maintenance Building. by the same policy of subdividing into 100' lots, the cemetery would have contained 15 lots if residential, and the Maintenance Building, 4 lots. The assessable cost to this property or 19 units amounts to $52,275.83 which is being placed on ad valorem taxes. A breakdown of costs is as follows: Total Costs of Project $753,489.66 Total costs to be placed on ad valorem taxes: Water main oversizing $ 35,410.08 Sanitary sewer oversizinq 108,722.58 509 Street restoration with appurtenants (otter Creek) 112,003.29 Cemetery and Maintenance Bldg. credit 52,275.83 5308,411.78 Total to be assessed excluding Maple Street Change Order: �f $431,962.49 1 The City Council agreed to aosese 100% of street construction of Sandy Lane to the 15 parcels in Creekside Terrace. The k total net amount to be asocased is: `` $471,962.49 502 Sandy Lane -3,117.00 Assessable amount. $428,845.49 Therefore based on 157 unit parcols to be assessed, excluding Maple Street, the per unit. assessment is: $428,845.49 a $2,731.50/un.it 157 N // 7.r A"/ Honorable Mayor s City Council City of Monticello -3- November 17, 1975 Re: Assessment Roll Project 75-1 Those 15 parcels on Sandy Lane will also have a per parcel assessment including 100% street construction for a total asses- ment of: $2,731.50 + $3,117.00 15 = $2,939.30 The assessment for Change Order Number 2 will be as follows: Total construction costs Plus indirect costs Project Cost $11,195.05 1,920.34 $13,115.39 Parcel $20017, Lot 5, Block P, is to pay a unit assessment. In addition Parcel 20010, Lot 1, Block 0, should be assessed for the sewer and water stubs installed. This was previously served by the city, but no stubs were ever brought up to the property line. This stub assessment would be $405.15. The Monticello Apartments would then be assessed as follows: Project Costs $13,115.39 Unit Assessment (Parcel 020017) -2,731.50 Stub Assessment - 404.65 Amount Assessable to Apartment 5 9,979.24 At the City Council meeting, held November 10th, 1975, the City Council agreed to defer this amount of $9,979.24 to the Monticello Apartments, to the taxes payable in 1977. Yours very truly, ORR-SCII177LEN-KAYERON -6 ASSOCIATES, INC. ZXf�� John P. Badalich, P.E. City Engineer JPB/bsy //-/7 )s d J n RESOLUTION ADOPTING ASSESSMENT R01.1. ON 771E 1975-1 SANITARY SEWER AND WATERMAIN IMPROVEMENT BONDS BE 1T RESOLVED, that the City Counel1 of MonLi.- cel.lo hereby adopts the attached assessment, roll on the 1975-1 Sanitary Sewer and Watermain Improvement. Bonds issued by the, City to finance the 1975-1 Sanitary Sewer and Watermain Improvement. Project.. BE IT FURTHER RESOLVED, that the City of Monti.- celLo, pursuant to Minnesota Statutes, Section 429.061, hereby orders Lite assessment shall be prorated over twenty (20) years with equal installments of principal with interest accrued at seven and one-half (71) per cent per year to be paid annually. Maor• Citf'Administrator Date Resolution Adopted: November 17, 1975. I G //./7-7S''Z