Parks Commission Agenda Packet 04-27-2006
.
1.
2.
3.
4.
5.
6.
7.
8.
. 9.
10.
.
Call to Order
AGENDA
PARKS COMMISSION
April 27, 2006 - 4:30 p.m.
"To enhance community pride through developing and
maintaining city parks with a high standard of quality"
futroduction of Seth Nelson, Park Superintendent.
Approve minutes of March 23, 2006 regular Parks Commission meeting.
Consideration of adding items to the agenda.
Citizens comments and requests.
Update on YMCA Property
Park Maintenance
Riverside Cemetery
Other Items, if any
Adjourn.
I
-
-
,..
I
Parks Commission Minutes: 3/23/06
MINUTES
MONTICELLO PARKS COMMISSION - REGULAR MEETING
Thursday, March 23, 2006 - 4:30 p.m.
"To enh3llce COmmunity pride through developing and
maintaining city parks with a high standard of quality."
Members Present:
Ben Hitter, Nancy McCaffrey, Larry Nolan and Council Liaison, Tom Perrault.
Members Absent:
Fran Fair and Rick Traver
Others Present:
Public Works Director, John Simola; Interim Parks Superintendent, Tom
Pawelk, Park Department staff, Tom Grossnickle and Deputy City
Administrator, Jeff O'Neill..
1. Call to Order.
Chair Larry Nolan called the meeting to order at 4:30 p.m. and declared a qnorum present.
2. A rove minutes of March 2 2006 re ular Parks Conuuission meetin .
NANCY MCCAFFREY MOVED TO APPROVE THE MINuTES OF THE MARCH 2, 2006
REGULAR PARKS COMMISSION MEETING. BEN HlITER SECONDED THE
MOTION. MOTION CARRIED UNANIMOUSLY.
3. Consideration of addinl! items.
Public Works Director, John Simola had information about an individual who was interested in
doing some plantings for Riverside Cemetery.
4. Citizens comments and requests.
None.
S. Walk N Roll Participation.
Walk N Roll will be held on June 10,2006. Park COmmission members will check tlieir schedule
for that date and ifthere are enough members who would be available to work that day, tlie Parks
Commission would Participate. Park Commission members need to let Larry Nolan know if they
would be available that day
6. Hidden Forest/Nial!ara Falls Development.
The Parks Commission was informed tliat area of wetland in the development will not contain open
water but will end up being more of a marsh area. The pond area will be two feet less in elevation
than was originally proposed and will not sustain open water. Tlie preliminary plat will be coming
before the City Council for approval. The Parks Commission needs to determine if the amenity of
a trail around a marsh area instead of an open water area is acceptable to tlie Commission.
I
,
,
,
Parks Commission Minutes: 3/23/06
Nancy McCaffrey asked about management control practices governing marsh lands. This land is
an outlot which will be deeded to the City for ponding purposes. The Par~f~9mmission
discussed the actual acreage of the park which appears to be about 4 acres. 1i)1questioned whether
the pathway around the marsh and the boardwalks are stilI in the developer'?pJan., The Parks
Commission felt this was an important item and that what was constructed was of good quality.
The Parks Commission also requested more detail on the park at the end of the marsh area. They
also wanted accurate information on the number of acres in the development and the amount of
land allotted for park.
Nancy McCaffrey asked how often the City would expect to get the rain event the ponding area
was designed for. Staff did not know what this ponding area was designed for.
The Parks Commission indicated they were not averse to having the marsh area instead of open
water ifthe project was constructed well and included appropriate plantings along the edge of the
marsh. The Parks Commission also wanted to see the final configuration of the park site.
Tom Perrault asked if there would be a problem with the bituminous trail because of the low
ground. Staff indicated that the trail was proposed to be located outside the low area. The Parks
Commission noted that in the original plan it showed an overlook but the latest version did not
show that. Nancy McCaffrey asked if there was enough space allowed for parking. Originally
parking was shown in the area ofthe power line easement but that has been removed.
The Parks Commission felt the lot could be expanded by one lot and that there needs to be
sufficient parking spaces. They also want confirmation of exactly what is going into the park. As
far as the trail and boardwalk, Tom Pawelk noted that Lake Maria has that type of set up as does
Elm Creek. Park staff will determine specifications for the trail and boardwalks. The question of
mosquito control was raised and what action could be taken to reduce that problem.
Tom Pawelk stated he had met with Jay Weber regarding the equipment that was going into the
play area and the equipment being proposed was very basic and nothing outstanding.
7. Poplar Hills Park.
This project is not going forward for economic reasons. The property Owner is looking for another
developer to take OVer the development. The park area in this proposed development was
primarily going to be used for soccerlballfield development and this will not happen since the
project has been put on hold.
8. YMCA Property.
Larry Nolan reported on a meeting held with Wright County staff and YMCA representatives
regarding the sale of the YMCA property which approximately 1100 acres. The City is trying to
get a cooperative venture with Wright County to acquire this land and develop it as park. Larry
Nolan submitted some maps of the property prepared by the YMCA. Wright County in their plan
for the park had an area designated for soccerlballfield use. John Simola noted this area is adjacent
to the land the City spreads sludge on and if the YMCA land is developer for park the City would
have to increase the buffer area between the two uses. The County's plan also includes a boat
launch and campsites but otherwise the area would remain fairly primitive. Tom Perrault asked if
2
,
,
~
-
Parks Commission Minutes: 3/23/06
the YMCA was going to keep any of the land. Staff indicated that they woold prohab ly only keep
the area oftheir day camp.
The Parks Commission discussed the lakes in the area and other natural features. Wright County
would like to keep the land in a natural state as much as possible. It was pointed out that the
alignment of School Boulevard would run through the YMCA property, possibly along the edge of
the property. Based on an appraisal done by the YMCA they are looking at a price of $34.5
million. It Was noted that a workshop on the YMCA property is being scheduled for April 10,
2006. It was also brought up that Wright County is having a bilJ introduced at the legislature to
get funding for this project.
As far as the ballfields being located on the property, a site would have to identified that would be
suitable for ballfield use. Staff emphasized that this is just in the beginning stages of discussion
and a great deal of work has to be done in order to make it happen. In general the Parks
Commission was in favor of the project and the goal of keeping the area pristine. Tom Pawelk
iudicated he had a docnment that provided background on how the YMCA acquired the land. The
Parks Commission felt that since Tom Pawelk grew up in the area and had good knowledge of the
site, he would be valuable resource person.
9. Rollinl!s/Ruff Concept Plan Review.
Staffreport on the proposed development for the site that was fonnerly Ruff's Auto Salvage.
Although no park is identified in the plan there is open or green space for the development and
park dedication fee of$3,500 per unit will be paid to the City. The development consists of
attached and detached townhomes and some single family homes on small lots. The development
contains approximately 100 residential units. The Parks Commission will see the plan when it
comes to development stage pun approval.
10. Park Superintendent Position.
John Simola reported that the Personnel Committee had selected Seth Nelson for the position.
John Simola provided some background infonnation on the new Park Superintendent who will be
starting the first part of April. Staff is also discussing the creation of a Park Foreman position.
11. Park Maintenance.
Tom Pawelk indicated that the Parks Department has attended training to get re-certification for
tree inspector license and briefly summarized other work that the department has completed.
12. Cemetery Plantinl!s.
John Simola reported he had talked with Jo Havel who was on the original Cemetery Committee.
She is encouraging the Parks Commission to keep going forward with the goals set by the
Cemetery Committee. The City will be putting in new roads and a 6 foot concrete sidewalk this
year. New fencing for the cemetery was selected last year but the prices will have to updated. The
surveyor indicated that the brickwork at the cemetery actually lies within the street right-of-way as
does the cement shed.
3
,
,
,
Parks Commission Minutes: 3/23/06
Jo Havel is interested in donating fnods for some plantings. Originally it Was thought that
plantings would be in lien of the fence. Ifthe fence goes in, they would be looking at alternate
planting sites. Park staff would come up with a landscape plan and tbis would be presented to Jo
Havel. Larry No Ian felt the east side of the cemetery needs to be better defined. Tom Pawelk said
the area by the flagpole needs to be dressed np as well. The landscape plan wiH COver these areas
and will be a plan that can be done increments as funds are available. The Parks Commission wiH
meet at the cemetery once the snow is gone and see what the needs are. Tom Grossnickle
indicated that if the fence is instaHed the base of it should be elevated to allow greater ease in
maintenance work such as weed whipping and clearing around it. The Parks Commission needs to
discuss what happens once Riverside Cemetery is filled. This item wiH be on the next parks
agenda.
13. Adjourn.
NANCY MCCAFFREY MOVED TO ADJOURN AT 5:50. BEN HITTER SECONDED THE
MOTION. MOTION CARRIED UNANIMOUSLY.
Recording Secretary
4
I
.
:::J
~
:i.;o
klC'Jo
f-<..
CIllIlrl
:><0
CIl",.:J
OJH
~rlES
H kI
UlflQ
~25",
ZC'lO
H........
"'I.D,.:)
rlkl
CIl,>
Urlkl
<<;rl,.:)
Orl
,.:)
,.:)
kI
U
HkI
~~
00;
:E
o
rz.r-
o
I.D
:><0
f-<>
HI
u~
a
C'J
1Il
,.:J
"
f-<
U
0;
OJ~OOO~~OlflOOOoomoo OJ
~~ ~ OJ m ~
m ~ rl ~
m m
I t I I
rl~OOOO~OOOOOOOC'lOO rl
MI.DOOOOr-OOOOOOOMOO I.D
"
ZkI
HU
es~
~~
kllll
~
1Il1Il0001IlMOlIlOOOOOOOO
l""""'irl r-iC"or--. 0
OJ~ ~~OOO a
I.DM lIl~Mrl I.D
o
~
1Il
I.D
m
::r:
"
;:J
o
~
~i5
.,.;
rl
<l!1Il
'00
.";0
~C'I
"
<l!rl
~O
~
~~
n:;
OC/J
i:i/C/J
HkI
C/JU
00
o.r:<:
0;
o
f-;Z
:><H
f-;Q
~~
QCi)
klCIl
f-<i:i/
CIlU
00
O;~
0;
Q
f-<Z
::C:H
HQ
~~
H
J&
@
rr1
H
~
H
i:t.
f-;
kI
"
@
rr1
o
kI
f-<
n.
o
~
00000000000000000
00000000000000000
1Il0000000000000000
.-< 0000 a
a OlIlOC'l a
1Il I.D MC'J I.D
OJ
r-
a
.-<
'<l'
1Il
a
a
C'I
m'<l'OOOO'<l'OOOOOOOC'JOO
1.D1.D0000r-0000000MOO
mlIlOOOlIlMOlIlOOOOOOOO
~rl OJr-. r-.
.-<m lIlm a
m
M
.-<
M
OJM ~ ~
r-.
M
f-;
U
o
OOOOOO~OOOOOOOOOO
OOOOOor-.OOOOOOOC'lOO
OOOOOlIlMOOOOOOOOOO
001'
1Il'<l'
C'I
00000000000000000
00000000000000000
1Il0000000000oooooo
rl 0000 0
o OlIlOC'l 0
1Il I.D MC'I I.D
00
I'
CIl
Q
o
H
~
i:i/
0;
i:i/
i5
~
o
rz.
a
CIl
C/J i:i/
CIl~ ~ > ~ es ~2
i:i/f-< i:i/ H kI rz.s
~~! : & ~~~ ~rz.
n:: 0 0 C/J Hn:;kI ~n::
:EO,.:J H r:<:i:i/:EkIkIkI
i:i/,.:J ~ CIl ~CIlO;n.kI~Z~
~~ >f-; CIlCllO" OCllZklf-;
O>X H i:i/klrz.ZIr:<:n::i:i/"O
,.:J <<;QQ Ui:i/ H O;~>
~QH~C:j Zi:t.CIlZCIl IllJJl:E:E
><<; ~ 0 JJln::Z~:Er:<:OO
C:j'U U,.:J"<<;Of-<H ~~
Of-<:E CIl ~n::i:i/HHklUrz.rz.
~<<;ZOHqCllJJlQf-<~ f-;Un::C/J
JJl~Z<<;klC:j,.:JZ~f-<~ ........Hr:<:n::
H~ HJJlJJli:t.klklUCIlIlli:t.C/J:i.;kIkI
rz.ZOi:i/ f-<rz. Hr:<: JJlHOQ rz.rz.
klZH0C1l Orz. n::r:<:n:; Sr:<:Ci)CIl
~~8~z~~~j~~~~~rz.~33
~:::JklOJJlOklH~~f-;ZO~klH~~
O;UQ:EO;~Hrz.IllO;OHUCIlr:<:Of-<f-<
C'J
rl'-<,-<oC'JOrlC'lomoOOOmrlM
rlC'JMrlOl'I'I'OJ~rlM'<l'mmoo
lIlOoom~r-.r-.I'I'mC'JC'JC'JC'lC'lC'lN
C'JrlrlrlrlM~~~~~l.Dl.Dl.Dl.Dl.Dmm
C'lMMMMMMMMMMMMMMMMM
m
'<l'
r-.
rl
m
M
~
m
OJ
lI]
a
M
a
a
1Il
rl
I'
C'I
a
OJ
a
a
1Il
rl
I'
C'J
a
OJ
~
rz.
~
~
~
o
f-;
.
Monticello Parks Monthly Completed Tasks
APRIL 2006
.
Xcel concession stand repair
o New stainless sink installed
o Interior walls and windows painted
o Cleaned and washed out
o New cooler brought in
o New trim - interior
o Door sweeps put on
o Hot water heater replaced
o Old shelving removed
o Bathrooms cleaned and sanitized
o Beer taps hooked up and drain installed
o Ice machine removed
o New wiring and GFCI outlets installed
- Completed several chipping requests
Xcel ballfields irrigation up and running
4 seasonals brought on for summer- Herb, Jerry, Mark, and Don
Burial Staking at Riverside Cemetery
Closed slide at West Bridge until new slide section arrives
Ordered new Quick L tube for slide at West Bridge
Installed decks on mowers
Maintenance on mowers and equipment
o Removed snow blower units
o Removed path brooms
o Removed cab on john deere 4310
o All mowers received seasonal maintenance
Cleaned bathrooms and trash run every Monday and Friday
Graded Xcel parking lot
Worked on cemetery requests
Hauled 5 yards of black dirt and 25lbs grass seed to Riverside Cemetery
Check docks
Took fence down at East Bridge Park
Removed straw bales from East Bridge
Trim shrubs around shop
Install basketball poles
Opened Ellison Park bathroom for season
Opened 4th Street Park bathroom for season
Lawn mowing equipment up and running for season
Began mowing and weed wiping for the season
Public works city clean up
Fixed break in irrigation at Hillcrest
Irrigation up and running at Hillcrest
Irrigation up and running at West Bridge
.