Loading...
City Council Agenda Packet 04-22-1991AGENDA FOR THE MEETING OF THE CITY COUNCIL Monday, April 22, 1991 - 7:00 p.m. Mayor: Ken Maus Council Members: Shirley Anderson, Dan Blonigen, Brad Fyle, Clint Herbst 1. Call to order. 2. Approval of minutes of the regular meeting held April 8, 1991. 3. Citizens comments/petitions, requests, and complaints. 4. Consideration of request for abatement of delinquent special assessments--Outlot A of Country Club Manor. 5. Consideration of adopting resolution designating minimum restricted fund balances --general fund. 6. Consideration of extending probationary period/residency requirement --Rich Cline. 7. Consideration of hills for the month of April. ' 8. Adjournment. 9• inn ✓S. c/. t� d'��jg.��C 1aF �G s y>r7(Af in/fr .JCf.S aaaar araraaraarara arra +a aariaaaraaa rr ra aaa .............. SPECIAL CITY COUNCIL MEETING 1. Call to order. 2. Convene special meeting for consideration of selecting planner to assist with development of industrial park/school district development plan. Interviews A. Kermit Krouch B. David Licht, Northwest Associated Consultants 3. Adjournment. MINUTES REGULAR MEETING - MONTICELLO CITY COUNCIL Monday, April B, 1991 - 7:00 p.m. Members Present: Shirley Anderson, Dan Blonigen, Clint Herbst, Brad Fyle, Ken Maus Members Absent: None 2. Approval of minutes. After discussion, a motion was made by Dan Blonigen and seconded by Shirley Anderson to approve the meeting minutes of March 25, 1991, as presented. Voting in favor: Shirley Anderson, Dan Blonigen, Clint Herbst, Brad Fyle. Abstaining: Ken Maus. 3. Citizens comments/petitions, requests, and complaints. None forthcoming. 4. Consideration of proposal to remodel old fire hall buildinq into facility for Social Services and Foodshelf. Rick Wolfsteller reported that the committee charged with researching the proposal has held two meetings to review the proposal and receive input from City representatives along with input from the Jaycees, Lions, Foodshelf, and Social Services agencies. Wolfstoller reported that it was the consensus of the committee to develop the following remodeling program and arrangements. The City would retain ownership of the building and sti11 be responsible for exterior maintenance. 2. Proposal calls for the City maintaining the grounds, including snow removal and garbage removal. 3. The City would agree to enter into a lease arrangement with the Foodsholf and Christian Social Services for a period of ton years with a review after eight years for possible extension of the lease. The annual lease charge is proposed at $1 per year plus loosee being responsible for all utilities. 4. The Fondaheif and Christian Social Services would be required to provide liability insurance for their activities with the City named as additional insured and provide their own insurance coverage for their contents. Page 1 0 Council Minutes - 4/8/91 The Monticello Jaycees, along with other organizations, would commit to funding the improvements estimated at $36,000. Wes Olson of the Monticello Jaycees went on to review the plan in more detail. Council then went on to discuss the details of the arrangement. After discussion, a motion was made by Dan Blonigen and seconded by Brad Fyle to approve the subcommittee's proposal for remodeling and leasing the old fire hall to the Foodshelf and Christian Social Services. Final approval of the proposal is to occur with Council approval of agreements governing the use of the fire hall. Motion carried unanimously. Consideration of qrantinq seasonal sales permit--Martie's Farm Service. Assistant Administrator O'Neill reported that the Planning Commission had recommended that City Council grant a seasonal sales permit to Martie's Farm Service, which would allow retail sale of items from a temporary tent structure placed on the property from April 15, 1991, to June 15, 1991. Mayor Maus noted that this item had been reviewed and approved by the Planning Commission. It was his view that this type of retail land use is appropriate at this location. Dan Blonigen concurred that Martie's Farm Service is in an appropriate location for the type of business activity that is conducted. A motion was made by Brad Fyle and seconded by Dan Blonigen to grant a seasonal sales permit to Martie's Farm Service. Motion carriod unanimously. Review operation of auto sales activity and determine if use represents an enlargement of non-conformina use. Aoolicant. Hoqlund Transportation/94 Services. Assistant Administrator O'Neill reported that Hoglund Transportation/94 Services has been selling used vehicles from a grassy area along the Oakwood Drive aide of their property. In response to this activity, staff requested that Hoglund apply for a conditional use permit, as it appeared to City staff that establishment of an auto sales lot represented a new use or at a minimum represented an enlargement of existing commercial use of the property. In response, Hoglund submitted a plan for providing improvements to the site. The Page 2 10 Council Minutes - 4/8/91 plan also outlined a manner of operation that would be consistent with conditional use requirements set forth by ordinance. O'Neill went on to report that the Planning Commission recommended a reversal of initial staff determination that the auto sales lot represents an enlargement of an existing use. Planning Commission determined that auto sales at this location on the property as proposed is merely a continuation of sales activity that existed prior to the inception of the ordinance; therefore, auto sales as proposed is a lawful non- conforming use. If one agrees with this conclusion, then a conditional use permit is not needed; and existing non- conforming unpaved parking and drive areas associated with the Hoglund Transportation business activity need not be upgraded. Council reviewed the proposed plan for establishment of an auto sales lot. It was Council's conclusion that the proposal represented an enlargement to an existing use; therefore, a conditional use permit is needed in order for the auto sales lot to continue. Jenny and Gordy Hoglund noted that their organization is willing and able to comply with all of the conditions noted by the ordinance with or without the need for a conditional use permit. After discussion, a motion was made by Shirley Anderson and seconded by Brad Fyle to grant variances to Section 3-5: 9 (K) of the Monticello Zoning Ordinance, which requires that all areas intended to be utilized for parking space and driveway shall be surfaced with material suitable to control dust, and grant a variance to Section 3-5: 9 (0), which requires that all open, off-street parking shall have a perimeter curb around the entire parking lot. Mction was based on the finding that the traffic over parking areas associated with the variance is minimal, and paving and curbing are not necessary to control dust or drainage; therefore, granting of the variance does not impair the intent of the ordinance. Furthermore, granting the variance will not be detrimental to the adjoining properties. Motion carried unanimously. Motion was then made by Shirley Anderson and seconded by Brad Fylo to grant a conditional use permit allowing auto sales activity on the Hoglund property subject to the following conditions: Page 3 Council Minutes - 4!8191 1. The enclosed principal use is a minimum of 4,500 square feet, excluding the area used for mechanical repair and reconditioning. 2. Outside sales and display areas are fenced or screened from view of neighboring residential uses or an abutting "R" district in compliance with Chapter 3, Section 2 [G], of this ordinance (does not apply because residential use is actually on the site, not abutting "R" district). 3. All lighting shall be hooded and so directed that the light source shall not be visible from the public right-of-way or from neighboring residences and shall be in compliance with Chapter 3, Section 2 ]H], of this ordinance. 4. The outside sales and display area shall be hard surfaced. 5. The outside sales and display area does not utilize parking spaces which are required for conformance with this ordinance. b. vehicular access points shall create a minimum of conflict with through traffic movement; shall comply with Chapter 3, Section 5, of this ordinance (parking design requirements); and shall be subject to the approval of the City Engineer (curbing must be installed). 7. There is a minimum lot area of twenty-two thousand five hundred (22,500) square feet and minimum lot dimensions of one hundred fifty (150) feet by one hundred thirty (130) feet. 8. A drainage system subject to the approval of the City Engineer shall be installed. 9. All signing shall be in compliance with Chapter 3, Section 9, of this ordinance. 10. The provisions of Chaptor 22 of this ordinance are considerod and satisfactorily met. 11. No more than ton cars may be parked for sale at any one point in time. Page 4 8 Council Minutes - 418191 12. Four trees shall be planted east of the two garages on the site. 13. The conditional use permit requires common ownership of the property containing the office space and the site of the sales lot. 14. A culvert shall be installed under the drive leading to the Hoglund Transportation office. Said culvert shall have a minimum diameter of 15 inches. 15. The drive area in front of the bus storage facility shall be paved per the attached site plan by October 15, 1992. Motion was based on .the finding that operation of the auto sales lot at this location under the conditions specified is consistent with the character of the area and will not tend to depreciate adjoining properties. Motion carried unanimously. Consideration of authorization to purchase motor vehicle registrar commuter software packaae. Assistant Administrator O'Neill reported that the original computer RFP prepared for the City of Monticello, which was initiated in 1986, included the provision for a deputy registrar package for motor vehicle and DNR registrations. The package prepared by the vendor in conjunction with the 1986 computer purchase was woefully inadequate, and the City elected not to implement this system. A new computer development plan, which included a proposal to replace the City's hardware and software, was approved by City Council on January 22, 1990. The plan included a provision for deputy registrar software at a cost of up to $800. The deputy registrar package was not purchased in 1990 due to several reasons. Upon investigation, there was not a package that met the City and state's requirements for the amount of money budgeted. Also, due to time constraints associated with implementation of finance applications, word processing, payroll, recycling, and utility billing programs, we were unable Lo implement additional deputy registrar software. Now that the major financial systems have boon implemented, staff has the resources to install the deputy registrar program which, when completed, will result in a cost savings to the City duo to increased efficiency and accuracy. Page 5 E] Council Minutes - 4/8/91 After discussion, a motion was made by Shirley Anderson and seconded by Dan Blonigen to approve the proposal to purchase Minnesota Motor Vehicle Registrar computer software at a cost of $3,000. Motion carried unanimously. 8. Consideration of ourchasinq a slide -in qrass riq fire unit -- Monticello Fire Department. Rick Wolfsteller reported that as an add-on item at the last Council meeting, Council discussed the fire department's request to purchase a slide -in tank unit for fighting grass fires. On a tie vote, authorization was not granted to allow the purchase, and it was discussed whether the Township would actually be paying a larger share of this purchase since it would primarily be used in rural areas. Wolfsteller went on to note that the entire joint fire agreement has recently been reviewed and approved for a five- year period, which includes a formula for establishing each jurisdiction's share of the operating cost. Presently, Monticello Township contributes 378 of the total capital purchasing cost and operating cost annually toward the fire department budget. While some items are utilized more in the city and some are utilized more in the township, it may not be appropriate to single out only one item for special treatment in regard to the cost sharing formula. Wolfsteller went on to note that it would be a difficult problem to try and allocate all items and expenditures based on where the equipment is utilized. Unless the City Council would like to terminate the joint agreement and renegotiate the entire formula, the only decision should be whether this piece of equipment is actually needed by the fire department. Ken Maus and Shirley Anderson agreed that the contract is in place and that we should abide by it. Dan Blonigon stated that this unit will be used primarily in the township, and the City should not be paying a major portion of the cost to purchase it. Clint Herbst noted that this discussion should plant the seed for changes in the contract, which he felt is at this time a one-way street. After discussion, a motion was made by Shirley Anderson and seconded by Brad Fyle to approve the purchase of a grass fire rig as proposed in the amount of $2,734.12 with cost allocation based on the present joint agreement. Motion carried unanimously. Pago 6 Council Minutes - 4/8/91 Consideration of adoptinq policy on City Hall van use. Rick Wolfsteller reviewed the objective of the van use policy, which is to provide a guideline for use of the City Hall vehicle, enable the Building Inspector to have available a vehicle for performing duties of the Building Inspection and Civil Defense Departments, and also set procedures to allow the vehicle to be utilized by other staff members whenever feasible. Council reviewed the van policy; and after discussion, a motion was made by Shirley Anderson and seconded by Brad Fyle to adopt the proposed policy with the addition that the vehicle shall be available for use by City Hall staff and volunteer fire department officials only. Motion carried unanimously. 10. Review of Citv vehicle use. Rick Wolfsteller reported that this item concerns the use of the City vehicle by the Public Works Director for transportation between work and home. He reported that the practice of allowing the Public Works Director to utilize the City vehicle is to provide him with a radio, small tools, a fire extinguisher, an 8 -minute self contained breathing apparatus, traffic cones, and other necessary equipment for opening manholes and lift stations. This enables the Public Works Director to respond directly to emergencies rather than having to obtain a vehicle out of storage at the public works building, which could first require the moving of one or two other vehicles. The radio gives the Public Works Director direct contact with the field crews, especially in the wintertime. This enables the Public Works Director to respond to citizens' requests during off hours even if it was not necessarily an immediate emergency. Secondly, the use of the pickup is a direct benefit to the Public Works Director, as he does not have to provide his own vehicle to and from work; and initially, the $380 benefit did not need to be reported on his taxes. It was essentially tax free. initially, emergencies, responses to citizens' requests, and use of the radio to contact field crews was approximately two times per month or more. Wolfstoller went on to say that since the practice of allowing the Public Works Director to use the City vehicle began, some changes have taken place. First, the number of emergency responses by the Public works Director has decroased due to Pago 7 Council Minutes - 4/8!91 improvements made to our infrastructure system such as the wastewater treatment plant, lift stations, and water system. Responses are now less than half of what they were in 1981. In addition, IRS regulations changed and require the reporting of personal use of an employer's vehicle to be reported as income on the employee's W-2 form at the end of the year. This is proper, as in most instances, private use of the company-owned vehicle is generally given in lieu of wages. For the past few years, the City has reported to the IRS additional income in the amount of $720 per year on the Public Works Director's W-2 form. Wolfsteller went on to remind Council that the Public Works Director was provided use of the City vehicle in lieu of salary increases in the past. If Council eliminates the practice of allowing the Public Works Director to take a vehicle home, then a salary adjustment should be considered. Brad Fyle noted that the original intent of having the vehicle available in case of emergencies is not as important since emergency situations are becoming infrequent. Fyle was not convinced that a City employee should be taking a City vehicle home. Clint Herbst stated that there are cost savings in having a City employee having immediate access to the vehicle. He doesn't have to go to the garage to pick it up. The City does not have to house the vehicle. It doesn't make sense to be spending this much time on this item. John Simola reported that nine times during the year he needed the vehicle for emergency situations. He also noted that he would have no problems at all if he did not have access to the vehicle as he now does as long as he is reimbursed for the loss of the benefit with an increase in salary. Shirley Anderson noted that the use of the vehicle by the Public works Director should be part of the job description. Anderson went on to note that the number of times that the Public Works Director responds per year is not important. One big emergency situation where having use of the vehicle makes a difference justifies the present practice. Ken Maus noted that the practice of allowing the Public Works Director to drive the City vehicle to and from work has probably not cost the City a penny. The City has not had to house the vehicle, and past salary increases were reduced in exchange for providing the use of the vehicle. Page 8 Council Minutes - 4!8191 After discussion, a motion was made by Clint Herbst and seconded by Shirley Anderson to continue the existing practice of allowing the Public Works Director use of the vehicle commuting to and from home and lunch and that the Public Works Director, when using his own vehicle on City business in the community, is not reimbursed for this expense. Voting in favor: Clint Herbst, Shirley Anderson, Dan Bionigen, Ken Maus. Opposed: Brad Fyle. 11. Consideration of adopting plan for extension of sewer and water utilities and development of roadways servino school district property. Assistant Administrator O'Neill outlined a plan for extending and financing utilities to the elementary school site. O'Neill noted that the plan results from discussions between City staff, the School Superintendent, and the developers of the property to the south of the school district site. O'Neill went on to note that the conservative nature of the plan resulted from the existence of a significant level of debt associated with previous improvement projects. O'Neill noted that the plan presented, if approved in concept form, will become the basis of the feasibility study and development agreement to be prepared if the school district bond issue is approved. O'Neill went on to detail the public utilities plan, which included the following components: - Sanitary sewer extended along Fallon Avenue from Dundas at an approximate cost of $26,000 to be financed by assessments to the Farm Credit and school district properties. - School district will pay an area assessment of $50,000, which is equal to $12,050 per acre based on a 40 -acre elementary school development area. - Sewer trunk line installation to occur in the future with development of the Klein property. - Water main service will be gained by extending water main from Dundas to the northern boundary of the elementary school site at a coat of approximately $22,000. This cost will be assessed evenly to the Farm Credit property and to the school district. The cost to extend the water main beyond the northwest boundary of the school site will be paid entirely by the school district with Page 9 U Council Minutes - 4!8191 reimbursements made to the school district when future users obtain access to the water main originally paid for by the school district. Roadways will include a 40 -foot wide roadway constructed with rural design features and Installed along the southern boundary of the school district property. The cost of this roadway is estimated at $224,000, not including grading and other subgrade preparation. This project will be conducted as a public improvement with 508 of the cost assessed to the school and 508 to the Farm Credit property. This assessment arrangement would require a major portion of the principal cost to be paid or guaranteed prior to start of construction, thereby eliminating risk associated with assessing roadway expenses against Farm Credit property. The school district will develop a driveway extending from Chelsea Road in a southerly direction to the middle school site. This road will be installed and financed by the school district. In the event that this road becomes a through street and not used primarily for school related access, the City will accept this road as a dedicated right-of-way. The existing zoning designation of the value Plus Homes site is agricultural and would remain unchanged until development of existing residential areas now served with sewer and water or until significant progress is made toward retirement of the various residential tax delinquent properties in the city. Rezoning of the school district property from agricultural to R-2 must also be achieved through cooperative planning efforts between the school district and City. O'Neill went on to review modifications that could be made to the plan in the event that Council elects to extend utilities to potential residential areas to the south of the school site. Shelly Johnson noted his support of the plan and that things have gone well up to this point. He went on to note that by the middle of September, he would like the rezoning and conditional use permit issues resolved and be in position to obtain a building permit. Page 10 Council Minutes - 4/8/91 Council reviewed the plan in detail. After discussion, a motion was made by Shirley Anderson and seconded by Dan Blonigen to approve the concept plan for extending utilities to the school district property with said plan becoming the basis of future plan work. Motion carried unanimously. 12. Consideration of abatinq special assessment penalties and interest on 82-2 improvement project --Farm Credit Systems property. Rick Wolfsteller requested that Council consider reducing the special assessment balance against Farm Credit properties in exchange for immediate cash payment of the remaining assessment balance. Wolfsteller noted that the only assessments paid by the original owners, Jim Boyle and Dickman Knutson, have resulted from homes being built and sold; and as a result, a large outstanding assessment balance remains for the entire project in the amount of over $570,000. Farm Credit Systems, the mortgage holder on Mr. Boyie's property, recently foreclosed on the property and is now the owner. Since their foreclosure, Farm Credit has been attempting to market the property to developers without much success. Except for the recent sale of approximately 50 acres to the school district and a small acquisition by the City to supplement Remmele Engineering property, Farm Credit Systems has been unable to sell the balance of the property at this time. According to Farm Credit, it appears that the amount of outstanding assessments against the Meadow Oak residential parcels may be excessive relative to the estimated value of the property. Farm Credit has indicated that it may have an interest in paying off the entire assessments, including delinquents and future balances, if the City would reduce assessments by about $100,000. wolfstellor noted that the penalties and interest that have accumulated on the delinquent assessments total approximately $88,375, which, if eliminated, could be sufficient to entice Farm Credit to consider paying off the entire assessment in one lump sum. Wuifetellar suggested that Council seriously consider reducing the assessment by $88,378 if Farm Credit would agree to pay off the assessment balances in full. wolfstoller noted reasons why the City should consider reduction in the assessments. He noted that duo to the distribution of the assessments against various outlets, it is likely that the City would stand to lose at least $88,000 just trying to market one of the outlets if we would wait for tax forfeiture Page 11 0 Council Minutes - 4/8/91 proceedings. The proposed reduction would allow the average cost per acre for assessments to be approximately $2,500 per acre, which would enable Farm Credit to market the property and still cover their mortgage cost. The City would be able to reimburse the bond funds that have had to support the debt payments for the past eight years and would make our balance sheet look better for bond rating purposes. Finally, under the proposal the City would receive ownership of Outlot A for park dedication purposes and would then not have to deal with each individual developer for park dedication purposes. Ken Maus noted his support of staff's recommendation and that as an alternative, the City may offer to take Outlot I and use revenue from the sale of that parcel to pay the delinquent assessments. The remaining assessments against the other outlots would then be paid by Farm Credit. Shirley Anderson noted that economically this is a better approach, and she supports the elimination of penalties and interest if it will result in payment of the balance of the assessment. Paul Weingarden noted that reducing the assessment may require a re -assessment hearing. He cautioned that lowering the assessment may result in future requests by other land owners. Brad Fyle noted that he preferred the City avoid acquiring property and he, therefore, supports the proposal to reduce the assessment. After discussion, a motion was made by Brad Fyle and seconded by Shirley Anderson to authorize City staff to propose a reduction in special assessments against all land owned by Farm Credit Systems in the amount of $88,378 contingent upon Farm Credit paying off all the remaining assessment balances totaling $483,370 within 30 days, along with the dooding to the City of Outlot A for park dedication purposes. Motion carried unanimously. 13. Consideration of chanoe order ii and final payment for Proloct 88-05, 800,000 gallon water tank. John Simola reported that there are a few warranty items that need to be taken care of. Some rust has developed in the interior portion of the tank. This problem will be taken care of In May by Caldwell's subcontractor, Newman Painting. In addition, the drain from the valve pit near the tank has failed. The City has worked out an agreement with Caldwell whereby we do this warranty work and are paid by Caldwell. Page 12 Council Minutes - 4/8191 There are a few Items left for the City to do, most of which monies were withheld from the contractor for completion. we have completed a tabulation of costs related to the purchase of the land and construction of the water tank. It is the recommendation of the Public Works Director and City Engineer that the Council authorize final payment to Caldwell Tanks as outlined under alternative #1. Council asked if there was any reason why the final payment should not be made to Caldwell Tanks. John Simola responded by saying that everything is in order. Motion was made by Shirley Anderson and seconded by Clint Herbst to approve change order #1 and final payment to Caldwell Tanks in the amount of a credit of $2,717.47. This brings the total payment to Caldwell in the amount of $305,208.53. Motion carried unanimously. 14. Consideration of replacinq chlorine scale in pump house #2. John Simola reported the chlorine scale, which is located in pump house #2 near the old fire hall, is 20 years old, and we refurbished the pump house and pump last year. The scale was in poor condition with a significant amount of corrosion. In preparation for its replacement, $1,500 was placed in the 1991 budget. The City obtained two quotes for the purchase of a new chlorine scale, one from Feedrite of Minneapolis for $1,268, the other from Henry & Associates of St. Cloud in the amount of $965. Henry 6 Associates is a new company, and it appears that they are selling a scale to the City for near cost to got some of our business. Simola recommended that the City Council authorize the purchase of the chlorine scale from Henry b Associates of St. Cloud. After discussion, a motion was made by Brad Fyle and seconded by Dan Blonigon to purchase a Series 50-345 Wallace 6 Tiernan chlorine scalp from Henry 6 Associates of St. Cloud, Minnesota, for $965. Motion carried unanimously. 15. Consideration of modification of sick loavo section of Personnel policies and procedural manual. Rick Wolfsteilor requested that the personnel policy be amended to allow employees to use the weekly disability Page 13 Council Minutes - 4/8/91 insurance benefits to cover the cost of non -reimbursed medical expenses resulting from non -job related sickness or injury for which the disability benefits are claimed. After discussion, a motion was made by Shirley Anderson and seconded by Clint Herbst to table this matter for further discussion. The item was tabled to the first meeting in June. Motion carried unanimously. 16. Consideration of request for one -day setup/3.2 beer license for Ducks unlimited Banquet and one -day 3.2 beer license for July 7 Riverfest Celebration - Lions Club. Motion was made by Shirley Anderson and seconded by Clint Herbst to approve said license request. Motion carried unanimously. 17. Consideration of authorizinq City Attorney to take legal action necessary to enforce the terms of Fair's Garden Center's conditional use permit. Assistant Administrator O'Neill reported that Fair's Garden Center was granted a conditional use permit in 1989 which allowed expansion of sales and storage areas. The conditional use permit outlined 14 conditions, one of which was a requirement that 24 parking stalls be available for employee and customer use. O'Neill noted that a number of the parking stalls are consistently being used for storage of landscaping equipment and inventory for sale. He went on to review a letter submitted by Kevin Fair to the City which noted that the use of the parking spaces is temporary, and they are being used for moving stock and setting up for spring. The letter went on to note that prior to the busy season of May 1, the garden center will have 24 spaces available for customers and employees. Dan Bionigen stated that the parking spaces need to be open for the public. If they are used for storage of materials, the customers will be parking in the street and on other private properties. Kon Maus noted that the parking problem is difficult to quantify. He questioned at what point should we stop in. City Attorney, Paul Weingardon, responded by saying that conditional use permit requirements such as this one are difficult to enforce and that the act of compliance ends enforcement. He wont on to note that in order to bring Page 14 Council Minutes - 4/8/91 effective enforcement action, City staff needs to further develop evidence of a violation of the conditional use permit and develop evidence of parking problems created by the violation. Brad Fyle suggested that citizens' complaints and demonstrated traffic hazards need to be created before further action is justified. Paul Weingarden informed Council that the current ordinance does not contain a provision for withdrawing a conditional use permit and that only provision for penalties is now provided. Weingarden noted that the City ordinance should be updated to include a provision for withdrawing conditional use permits if continual violations occur that create problems. Ken Maus suggested that the City compile further documentation which would include an outline of past violations to the conditional use permit and include documentation of parking problems. Maus noted that the City needs to position itself better if it intends on taking enforcement action. Dan Blonigon stated that there was not a single day last season where the garden center was in compliance with the parking requirement, and he suggested that it is not likely that Fair's Garden Center will comply with the parking requirements by May 1. Staff was directed to continue to monitor the situation pertaining to Fair's Garden Center's conditional use permit and to review other existing conditional use permits for similar violations and prepare a report. Further action regarding enforcement of the Fair's Garden Center conditional use permit is to be considered after May 1 if violations continue after this date. 18. At the close of the meeting, Mayor Maus read a proclamation proclaiming the week of April 8-12 as Building Safety Week in Monticello. There being no further discussion, the meeting was adjourned. Jeff O'Neill Assistant Administrator Page 15 Council Agenda - 4/22/91 3. Citizens comments/petitions, requests, and complaints. (R.W.) Attached is a copy of a petition City staff received from Mr. Joe Robinson, owner of the River Inn, expressing concerns over the apparent open-door policy that exists at the Monticello American Legion Club. As you will notice, the majority of the petition signers are not even Monticello businesses but primarily consists of establishments located in Sherburne or other counties. First of all, veterans organizations are allowed to have a club license for selling intoxicating liquor at a license fee established by their membership, which ranges between $500 and $700 annually. Normal on -sale liquor establishments pay a license fee of $3,750 annually, and the petitioners feel that since the Legion Club solicits business from the general public, they should also be paying the regular license fee. I believe the River Inn's concern at this time is due to the fact that the Legion Club has now been advertising and is open for noon lunches. While this may be competition for some businesses, only two of the signatures, the Silver Fox Inn and Joyner Lanes, are Monticello businesses that are open for noon lunches along with having liquor available. The legitimacy of the balance of the signatures has to be questioned, and the petition should probably be submitted to the City of Big Lake rather than Monticello. It is true that veterans organizations are suppose to be open for members only in order to receive a club license, but I believe it's common knowledge that this is not strictly enforced, not only in Monticello but statewide. I discussed the situation with the Legion Club Commander, Wayne Mayor, to inform him that the petition would be presented at the Council meeting Monday night. He understands the City's concern and indicated a willingness to at least not advertise the lunch business if that is what the Council desired. He also noted that the only lunch menu they provide is burgers, chili, and soup, and their attempt was to provide a service for NSP employees during the outage that is now occurring, and he did not feel they were encroaching on the normal businesses by providing this service. I think we all realize that in order for the Legion and/or VFW clubs to survive, they normally have to seek patrons other than club members. Although they are charged a lower license fee than other license holders, these organizations also contribute funds back to the community through contributions and community services. The City would certainly have the right to require that those organizations not solicit general Council Agenda - 4/22/91 patronage and/or require them to pay the normal on -sale liquor license fee; but in the long run, this could be detrimental to the community as a whole through a decrease in charitable contributions locally. April 12, 1991 Council Members; You must realize that the non-profit Veteran's Organizations are putting a burden on the restaurants and liquor establishments in the area. A few years back, when the Veteran's Clubs were struggling to stay in business, the food and liquor establishments could look the otnui way if they abused their non-profit license. But now they are, by far, the wealthiest businesses in the area, with their non-profit status and their charitable gambling. It is time for them to pay for a regular "on -sale license", or to limit their clientele to their members only. Anyone who reads the papers knows of their wealth. Apple pie, motherood and American veterans are great, but this issue doesn't have'anything to do with any of them. Now, as an example, it is said that the Monticello American Legiun Club has leased their kitchen to a private operator for zero rent to .,:,v, meals to the public, but the.Leglon Club gets more customers in to buy liquor on their non-profit license and to engage in playing pull -tabs and other charitable qambling games. If anyone thinks that these non- profit organizations ion't get into the proceeds of charitable gambli„y, they are very naive. Our area is a growing one, but give the legitimate, private businesses an even break. that is all we ask. X IL i Rr �•,rr�..t�_ April 12, 1991 Council Members; You must realize that the non-profit Veteran's Organizations are putting a burden on the restaurants and liquor establishments in the area. A few years back, when the Veteran's Clubs were struggling to stay in business, the food and liquor establishments could look the ower way if they abused their non-profit license. .But now they are, by far, the wealthiest businesses in the area, with their non-profit status end their charitable gambling. It is time for them to pay for a regular "on -sale license", or to limit their clientele to their members only. Anyone who reads the papers knows of their wealth. Apple pie, mothe rood and American Veterans are great, but this Issue doesn't have anything to do with any of them. Now, as an example, it is said that the, Monticello American Legimm Club has leased their kitchen to a private operator for zero rent to b•mv.• meals to the public, but the Legion Club gets More customers in to buy liquor on their non-profit license and to engage in playing pull -tat, and other.charitable gambling games. If anyone thinks that these nnn- prof!t organizations don't get into the proceeds of charitable gammimiimnl, they are very naive. Our area is a growing one, but give the legitimate, private businesses an even break. That is all we ask. e ef L Council Agenda - 4/22/91 4. Consideration of a request for abatement of delinquent special assessments --Out lot A of Country Club Manor. (R.W.) REFERENCE AND BACKGROUND: When the Country Club Manor residential plat was approved in 1978, an outlet fronting along I-94 was created, and the City of Monticello constructed a future collector road segment and installed utilities to service this outlet. Our original comprehensive plan indicated this outlet would be developed in a commercial fashion and that the collector road would eventually connect West County Road 39 with 7th Street near the present Kmart. The original assessments against Out:ot A for the street and utility improvements total $231,402.32. To date, nothing has been paid on these assessments; and with penalties and interest that have accumulated since 1979, the outstanding delinquents are now over $550,000. For the last 13 years, Marvin George, the developer of the Country Club plat, was the owner of the property; but recently West Prairie Partners acquired an interest in the property from Mr. George. Mr. Jim Metcalf, Brad Larson, and John Sandberg are the partners who have indicated they now own the property and are interested in developing the parcel for single family residential housing. The developers presented a concept sketch plan consisting of a 26 -lot development fronting along the collector road that would also create outlets adjacent to the freeway. The City staff believes the intention of creating the outlets near the freeway is to allow for the present three billboards to remain on this property and allow the developers to generate income for years to come. In reviewing the sketch plan, the City staff had a number of concerno, Including allowing 26 driveways to exist along the collector road which could cause future traffic problems. In addition, the staff questions the necessity for having outlots near the freeway, as they will probably become a maintenance problem, and some have no access to street frontage. It appears obvious the intention would be to allow the signs to remain, as the billboards generate $7,000 to $8,000 revenue annually, and our current City ordinances require billboards to be removed prior to developing property. A number of years ago, the property was rezoned from commercial to R-3, multiple family, and a proposal was presented by Marvin George to create a number of cul-de-sac arrangements on the property for a quad -unit housing development. This never materialized, but City staff fools the property could be utilized in a similar fashion for Council Agenda - 4/22/91 single family housing with the creation of three or four cul- de-sacs to lessen the direct access to this collector street. The developers feel the additional cost of cul-de-sac street construction and sewer and water extensions would make the project unfeasible and would rather develop the property according to their sketch proposal. Since it appeared the developers were unwilling to propose an alternate design for the property, the Public Works staff has been working on a preliminary design that would utilize the cul-de-sac arrangement and has come up with a plan that appears to create 25 lots on four cul-de-sacs and provides for a portion of the property to be utilized for storm water pending area that would not only benefit this development but could allow for future storm water needs of adjacent areas. It has been estimated that an additional $150,000 in improvement cost would be needed to develop this property. Under the City staff's proposal, if the 25 lots were created and each lot was worth $15,000, it appears that the delinquent special assessments would have to be reduced substantially to approximately $200,000 to $225,000 in order to make this project feasible for development. While the cul-de-sac design proposal utilizes all of the property up to the freeway, it is assumed that the billboards would have to be removed, which I'm sure the developers are not in favor of because of the lost revenue. Since the assessments have not been paid on this property, it Is assumed that if the City does not negotiate a special assessment reduction on this property in the near future, the property will probably go through the tax forfeiture procedures. It appears that to develop this property in a residential fashion, the City will be faced with reducing the assessments, as the property is not worth the $550,000 currently owed against it. The question becomes how much of the original assessment can the property sustain; and without knowing how it would be developed, the staff is not able to provide the Council with a recommendation. it appears that to develop the property as single family residential, somewhere between 20 and 25 lots can be created. With the final market value of each lot being estimated at $15,000 to $17,000, you can see that a substantial assessment reduction will have to be made to make any project economically feasible. If the City is going to reduce the assessments outstanding, the staff believes the Council should have some control over the design of the property. The developers prefer the simple method of creating individual lots with direct access to the street for the simple reason that they hope to have the Council reduce the assessments to a level that will still allow them to generate a profit on the sale and also allow the billboards to remain for additional revenue in the future. To allow this Council Agenda - 4/22/91 concept will set a precedent for the City in that we have required other parcels with billboards to remove the signs before allowing construction of buildings. In addition, there are not enough individual sewer and water services for the lots proposed, and it is assumed the developers will also request permission to have more than one home connected to a service connection. It is assumed that any residential development in this location may need Farmers Home or FHA subdivision approval because of its location near the freeway. The City staff will be discussing our concept plan with Farmers Home personnel to see if our design would be acceptable, as a noise barrier or berm may be required. The request by the developers for a reduced assessment may be premature without knowing exactly what can be developed on this parcel. The developers have requested that the Council consider an offer of $200,000 cash as payment for all special assessments against this parcel. While it may turn out that this is a fair and reasonable settlement, the staff believes any reduction in the assessment should be linked to a subdivision approval. The developers have also indicated that if the Council was not agreeable to their $200,000 offer, they would deed the property to the City and let the City deve:op it in any manner it chooses provided they were allowed to keep the signs for the next 27 years. The staff feels this is an unreasonable offer in that in another year or two the City will probably own the property through tax forfeiture and could have the billboards removed. If the Council is receptive to the cash offer, the staff assumes that the developers will proceed with a request for the 26 -lot subdivision and still request that the billboards be allowed to remain, that outlots are created adjacent to the freeway, and that they be allowed to utilize the present services for multiple connections to each service. ALTERNATIVE ACTIONS: Accept a cash settlement of $200,000 as full payment for all special assessments against Outlet A. The Council should determine that the original assessments were excessive and that the increased value to the property is only $200,000. It is assumed that by accepting this amount, the Council would be agreeable to the property developing in a single family residential fashion under the concept plan proposed by the developers. While they have indicated there are no strings attached to this offer, you can assume that they will be asking for subdivision approval that will create 20 to 26 lots fronting along the collector street, the Council Agenda - 4122141 creation of outlots adjacent to the freeway to enable the billboards to remain, and possibly a request for allowing more than one lot to utilize a sewer and water connection. 2. Accept their offer of deeding the property to the City of Monticello in exchange for the right to maintain the billboards for the next 27 years. STAFF RECOMMENDATION: Last fall, the City had attempted to negotiate a transfer of the property to the City from Marvin George, the original owner, in lieu of the delinquent assessments. This was an attempt to expedite the eventual tax forfeiture proceedings that were inevitable in that Mr. George indicated he did not plan on paying the assessments. The negotiations fell through, and it was decided to wait for tax forfeiture proceedings by the county to commence. At this point, City staff is not comfortable with the sketch plan proposed by West Prairie Partners; and until it is determined that there are no other feasible means of developing the property, the staff does not have a firm recommendation on the amount of assessments that should be abated. While the offer of $200,000 is tempting, we believe the City should obtain the necessary ponding area within this outlet in conjunction with a reduction in the assessments, and also the Council will have to decide whether we are willing to grant a variance from our ordinances and allow the billboards to remain in this situation. While the staff feels the cul-de-sac design prepared by the City staff could be a better development, we are aware that the assessments would probably have to be reduced to an amount near the offer proposed to accomplish this plat. The benefits of the cul-de-sac design would be to limit direct access to the future collector road and also provide the City with a ponding area that could possibly be beneficial to other properties and allow us to recapture additional funds in the futuro through a storm sewer assessment. If the Council is comfortable with the developer's sketch plan and will allow the billboards to remain and possibly allow the developers to connect more than one home to a service, then the $200,000 offer may be Inadequate and should probably be in the $250,000 category. The justification for the higher assessment amount is based on the fact that there will be Council Agenda - 4/22/91 little additional cost involved in developing the property under their proposal; and if they created 20+ lots at $15,000 each, there is not a need to reduce the assessments to the $200,000 level. Until we know how the property will be platted, the staff does not have a recommendation on an acceptable assessment reduction. D. SUPPORTING DATA: Copy of developer's sketch plan; Copy of City's alternate sketch plan with cul-de-sacs. For West Prairie Partnership ! 313 West Broadway ' Monticello. Mo. 35361 Prepared By �. Meym-ROMA MC --T — J 1 tl Location Map ` of CVV / 13 a � Al 1 1� s APPROXIMATE LOCATION 01• 0" RATER SERVICE AND 4. � �• err: r ! • 1 � � � ~ to � I r �I � • „p/ ' '+ WWII— J •A Jl.se�vtu LOCATION OF SEWER SERVICE CO CT !Lt tae • w Daacliptlan of !.61 6m r wale �'•ira �"' e'" Oudot A f Country Club Manor Wright County, Mn. 4. � �• err: r ! • 1 � � � ~ to � I r �I � • „p/ ' '+ WWII— J •A Jl.se�vtu s A C( UIM It I INC. VI ANNIMS . LAI11150AI'L Am-Illlrl IC .urn 1'IIt1;r Aar Fn,U"NOR'rlr Starr �u1 t.11NNI"1I'I, tl 15. MN 441111 t, tO 111111 MEMORANDUM DATE: 21,March 1991 TO: Planning Commission, City of Monticello FROM: John Uban RE: Review of Outlot A of Country Club Manor Country Club Road was developed as part of a continuation of ajrontaga road system_ hetween llighway 25 and'Gulf Course Road. The portion between Highway25 and Minnesota Street has been completed with the extension of Seventh Street pastK,Mam In the past, the entire stretch of land along the interstate has been zoned D;3 and, more recently, Outlot A'pf the'.Country Club subdivision was. rezoned R-3.. 9lie strategy of connecting frontage roads along the'interstate with crossover bridges - facilitates more intense development along the interstate, system and completes_ traffic circulation that. is severed hy'the limited access nature of the interstate. 17ic.depth of the land between C9unty.Club Road and the 1.94 ROW varies between 300 and 400 feet on the average. Thisis an extreme depth.for single-family'lots, as illustrated in a sketch showing the proposed 26 lots. A si nificant'amount of the urea , against'the interstate is.left unusable in sonic outlot configuration which will more than likely be tax'forfeited back to the City., This land can only be utilized as open space. This land does not meet any of the criteria for the City's park and open space plan. 9h'econfiguralion 'of ihc'land with its 300•foot'or more depths is more appropriate for inuhiple•fomily, taunhpuse' and'apenmenls, or for certain commercial uses, Wewould not expect the entire interstate frontage to go to ❑'commercial use, unless there is t► future interchange at G"IrCourse Rnad with the interstate.. This has not I*cn,proposed in thu past, liw would he nl cessary to draw commercial all the way along the interstate. As the interchange with I loway 23 continues to become busier and busier, nn alternate interchange might be ennsidered in the western Monticello area, Single-family development in Oudot A would hinder future implementation of such a plan, 0 lReview orOullot A of Country Club Manor Page 2 Placing single-family homes along the interstate is not good development practice. Traffic noise and the general lack of buffering in this area would only promote a single-family housing pattern that would initially be of a lower value than others in the neighborhood and would possibly depreciate in value more quickly. Usually it is not wise to plan for a diminishing tax base by placing certain land uses in jeopardy of the significant impacts of the adjacent use. Since the single-family proposal is inefficient land use and does not support the assessments for the street and utility improvements. Apartments and townhouses are better suited in this arca where the typical users remain indoors and structures are designed to minimize the effect of interstate noise. Also, the multiple -family solution will provide the necessary development w pay the assessments and generate a higher tax base. An alternative is available as a combination of the two using small lot detached townhouse in clusters of approximately 300 feet deep. This type of development has been successfully built in many other communities in the metropolitan area and could have some potential in Monticello. Once again, an edge of buffering needs to be included in such development and homes built to FAA standards addressing noise concerns. The southernmost portion of Outlot A should actually he combined with the property to the south along Glm Sueet. 'Phc irregularly platted lots would combine to make a larger assemblage of property with much more development flexibility. In summary, the single-lamily development on Outlot A is inefficient and underutilizes the property. 'Ihc City should nut have to subsidized the land owner in this fashion by forgiving assessments toward a single-family development. 0 S�IDorr1 , 1BStq tf Ani T,YrA l.n. Yg.o K•+r t..rR to R•! Is ii !0 Ny NOTES A" WATC»` STUBS 6• D.r.ft ALL SAH.STUBS VC.+.1! LCE ASBur, T Snrr TSR 3 AW0 ITw F0» itCS Ae0 E4lvg. COUff TRY CI UB ROAD FE4 Si B'l1TT STUOY LOT DIMENSIONS y,., ', bn' 1 ...w.Ys r. lens r• 1 n.{1 r„f s1l19' j � IOw.v wwr 4 1 ti. t ♦ C ��o — rr~ ♦A • ,s. � {4��` a a' two J�•; �•.�, .H •• - AI`s Q' NOTES v:' � L Stam Is $040" WIOf Af acrs TOP �' `,,,�, • ♦I� ' • •''. , 3 .•., P' WITII 3:1 SI.UPfB ANO APPPt:•. B• •yr• 11 tA.4 � •IM •, NIDit t:N PPC1PfRTr SIOC. ' c i,ta • ,. P. C/Acle APOUNO CLIL' Of• SAC ♦. - S r�. .• .a4, tNDICATE88tALO1N6 SfjAAt+t Llrrf ..�—�- -� -• ~"' SfCOND fU► ILD 19 70 FROM SEH ACK. T6 .�_ 'Y •"'' •—� T �• � �- �7;' • • ii,. _ _ 1. INC A[NAtNmG ARE MTNf CAST p LSrVFS APPRVA. J.1 ACRIS W WWCN- Tf• SutLO A S IfiCRI POND. , •' t.UUN I N'T LL Ud NUAO t tASid+lt I \\ GRADING' PLAN• rn: tl/ttrr - � 2^ 0 n NOTES ..L C.1111.a $1-89.41 s• CODU TFY C,ue ROAD FEASIBILITY STUD" too !t$ .38.R r 9»1119 '.9 ..o 11. ro.TIES .•Dtuv9. UTILITY PLAN 8t.i{ or$ ..rt. 1..91,0 ems.11l .10-C9 Do.. rot $C.nC1$. K••• ' 10O ESTIMATED CONSTRUCTION COSTS COUNTRY CLUB ROAD, ADDITION NO. 571 APRIL 18, 1991 Pond $4,250 3 -acre ft 1. Grading 6 mist. Utilities Street 2. Gradjng, fill, berm, 6 mist. Utilities Street 3. Grading, fill, berm, 6 mist Utilities Storm sewer Street 4. Grading, fill, 6 mist Utilities Street GRAND TOTAL: $ 2,540 16,950 9,769 $29,259 $ 5,170 12,952 9,648 $27,770 $ 6,145 12,925 4,540 9.318 $32,928 $ 3,470 19,032 10,686 $33,188 $127,395 or 35,095.80/Lot The above estimates do not include the followinq: 1. Dewatering 2. Contingency 3. Engineering, inspections, or platting cost 4. Plantings 5, imported fill hauling figured at $1.50/cu yd (estimated free material close to site) ox D Council Agenda - 4/22/91 5. Consideration of adoptinq resolution designating minimum restricted fund balances --general fund. (R.W.) REFERENCE AND BACKGROUND: Gruys Johnson & Associates, the City's auditing firm, is currently in the process of auditing our 1990 city financial records. Prior to the audit being completed, I am requesting that the City Council consider designating a certain portion of our general fund fund balance into additional categories labeled "working capital" and "contingency." A fund balance is the cumulative result of all revenues received and expenditures made by the City, and it is also referred to as "fund equity" or the "surplus assets" that have accumulated over a period of time. The general fund, being the main operating fund of the City, has the largest accumulation of fund balance estimated at approximately $1,250,000 at the end of 1990. For accounting purposes, the fund balance is categorized in our audit report as either reserved or unreserved fund balances. Reserved fund balances are portions of our equity that are legally restricted to a specific ftitu re use and are not available for appropriation or expenditures. These reserved funds are held for the payment of obligations which are anticipated or will occur in succeeding fiscal years. Unreserved funds are amounts which are not being held for a specific program and for which no formal, separate fund amount has been established. At the end of a given year, these funds are either appropriated in the budget of the following year as revenue items or are treated as funds available for the City to use. In the past, the entire general fund fund balance has been designated as unreserved and is technically available for expenditures if so desired. With the recent publicity by the state on anticipated budget shortfalls, state legislators are continually looking for now sources of revenue to tap. One area that has boon brought up in the past by state legislators concerns the amount of unreserved fund balances cities have accumulated. Some individuals may Boo largo fund balances and assume that a city government does not need any state assistance because we have unspent funds available. Thorn has even boon discussion recently that cities with large fund balances should maybe give some of its tax revenue to the state to help correct Lhoir budget probloms; and as a result, it is suggested that a city establish in its audit report that certain funds are designated for certain purposes. Council Agenda - 4/22/91 Although it may seem like a million dollars is a large surplus, one fact that is forgotten is that the City needs a substantial amount of money to operate for the first six months of each year before any revenue is received. Enclosed with the agenda is a cash flow statement I prepared for our general fund showing the monthly revenue and the monthly expenditures throughout the year. As you will note, the City accumulates a negative cash flow totaling approximately $750,000 before our first large revenue is received in the early part of July. In other words, if we did not have a surplus fund balance at the end of a year, we would have to borrow money to operate until July of each year. while this should be common knowledge to anyone familiar with government financial statements, it is wise to note this information on our balance sheet and as such designate a specific amount of our unreserved fund balance as designated working capital. In any given year, the working capital should be approximately 50% of our ensuing year's general fund budget, which for 1991 equals $1,801,000. As a result, I recommend establishing a resolution designating 50% of our next year's budget be set aside as a designated working capital fund balance, which would equal $900,500. Because of the unstable climate we are in regarding revenue sources, I would also request that a contingency fund be established in an amount equal to 108 of next year's budget, or $180,100. This designation would provide for any shortfall in anticipated revenues which occur because of tax delinquents or state aid cuts or a miscalculation in projected other revenues. For example, in 1991 the City was to receive approximately $250,000 in homestead credit aid from the state, but we have already boon informed that we will not receive $60,000 of this amount, and It is projected that we may lose another $60,000 at the end of the your. These revenue shortfalls were not anticipated but can occur from year to year. In addition, designating a contingency amount would also resorve some of our surplus funds for unexpected expenditures that Como up during a year. By adopting the resolution designating portions of our unreserved fund balance for workinq capital and contingency purposes, I believe it will give a truer picture of our fund balance amounts and show that there is a reason for accumulating nurplus funds to meet general operating needs. These designations do not change the financial picture for the city other than providing for a better explanation of our reserve funds and their intended use. In the future, it may be wise to analyze other fund balances and designate their future use for specific projects or improvements that we may be anticipating. Council Agenda - 4/22/91 B. ALTERNATIVE ACTIONS: 1. Adopt the resolution designating a portion of our unreserved general fund balance for working capital Spurposes and an additional contingency category. If adopted, these funds would automatically be adjusted annually to correspond with our next year's budget to accurately reflect the funds needed to operate. 2. Do not adopt the resolution. If a working capital account and a contingency account are not set up, it does not change materially our financial statement but may leave the impression that the City has huge amounts of unspent funds and should be able to lower taxes by utilizing this money. While the majority of this money is needed just to operate, I do believe it would be beneficial to so designate these amounts within our audit report, as it would more accurately reflect why we have surplus funds in the first place. It has become more common amongst cities to designate a specific use of all fund balances, and I believe this would be a good starting point for Monticello. C. STAFF RECOMMENDATION: As noted above, I recommend that $1,080,600 of our general fund fund balance be designated and so noted on our 1990 audit report. I realize that fund balances and the terminology "reserved" versus "unreserved" versus "designated" can be confusing, and hopefully I will be able to answer any questions you may have at the Council meeting if you are still confused. with the audit report nearing completion, I would like to see the designations made prior to the audit being printed. D. SUPPORTING DATA: Copy of cash flow chart for the year; Copy of resolution for adoption. E 1991 MONTHLY CASH FLOW ANALYSIS GENERALFUND C 0 CUMULATIVE MONTH REVENUES EXPENDITURES DIFFERENCE DIFFERENCE Jan $26,935 $133,757 ($106,822) ($106.822) Feb $15,615 $146,757 ($131,142) ($237,964) March $16,330 $175,582 ($159,252) ($397,216) April $26,155 $132,757 ($106.602) ($503.818) May $14,955 $149,757 ($134,802) ($638,620) June $41,355 $151,757 ($110,402) ($749,022) July $759,320 $132,757 $626,563 ($122,459) August $20.575 $180,257 ($159,682) ($282,141) Sept $16,905 $172,657 ($155,752) ($437,893) Oct $83,330 $159,457 ($76,127) ($514,020) Nov $13,605 $132,757 ($119,152) ($633,172) Dec $765,925 $132,753 $633,172 ---- C 0 RESOLUTION 91 - RESOLUTION DESIGNATING MINIMUM RESTRICTED GENERAL FUND BALANCES WHEREAS, only limited revenues are received during the first six months of each budget year and as much as 508 of the expenses occur during that period of time, and WHEREAS, a minimum level of cash is necessary to pay expenses during that first six months of each year, and WHEREAS, a minimum general fund balance is necessary to begin each budget year for the purposes of covering the anticipated operating expenditures that will occur within the first six months without having to resort to temporary borrowing between receipt of major revenues, and WHEREAS, it is financially prudent to provide funds for unforeseen expenditures or anticipated expenditures of an uncertain amount or unforeseen shortfalls of anticipated revenues, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF MONTICELLO, MINNESOTA, that a general fund working capital reserve balance equal to 50% of the following year's general fund budgeted expenditures be designated for cash flow purposes and shall be adjusted annually so that it equals one-half of the sum of the ensuing year's budget expenditures. BE IT FURTHER RESOLVED that an additional contingency reserve balance be established equal to 10% of the ensuing year's budgeted general fund expenditures, and this designation shall be adjusted annually so that it equals 108 of the ensuing year's general fund expenditures to provide for unforeseen expenditures or unforeseen revenue shortfalls. BE IT FURTHER RESOLVED that these minimum unreserved designated fund balances may be changed by the Council upon a simple motion recognizing the need to do so. Adopted this 22nd day of April, 1991. Mayor City Administrator .05 Council Agenda - 4/22/91 6. Consideration of extending probationary period/residencir requirement --Rich Cline. (J.S.) REFERENCE AND BACKGROUND: Rich Cline was transferred from the street department to the water/wastewater collection system department effective April 23, 1990. Due to the nature of the position, it is important that employees in the water and wastewater collection system be able to respond quickly to an emergency. In the wastewater department, sewer water can back up quickly into basements. In the water department, emergencies can range from an inconvenience of one homeowner to contamination or loss of water supply for the whole community. Since the water/wastewater collection operator is considered to be the first responder, it is a requirement of his position that he or she will reside within a 10 -minute response time to city emergencies. Consequently, it is part of the job description, and both Rich Cline and the previous employee, Tony Strands, have signed employee agreements which require residency within a 10 -minute response time. Rich Cline currently lives about 8-1/2 miles west of tho city of Monticello and a little over 11 miles from the public works building. Matt Theisen lives less than 2 miles from the public works building, and he indicates his average response time would be approximately 6 minutes. Being 6.9 miles from the public works building, my response time to the building is approximately 15 minutes. Rich's current response time is probably near 20 minutes. Since most of our major water and sewer facilities are east of the public works building, site responses could take slightly longer. When Tony Strando was hired for the position, he was given a 6 -month period of time to relocate, as he lived in Palmer, Minnesota, and was generally mora than 30 minutes away. Tony did not actively try to market his house but was given two additional 6 -month oxtonsionR and finally a 3 -month extension of the employment agreement for a total of 21 months. Tony finally changed employers on his own so he could be closer to home rather than relocate to the Monticello area. When Rich Cline was hired, he asked for an extension from the Initial 6 -month period to a l-yoar period. He indicated that he would relocate within a 1-yoar period of time. Initially, as I understand it, Rich did attempt to market his home, which he had just purchased a few months before accepting the position with the City. Rich then decided to take his home off the market until he could make some improvements to the Council Agenda - 4/22/91 home and property to make it more saleable. I do not believe at this time that he has his home listed and is still making improvements to make it more saleable. Rich has asked for an additional extension of time in which to sell his home. He would like to have the rest of the summer, possibly three to six months. Rich Cline has been a good employee and is continuing to learn the workings of the water and wastewater collection system. He has not reported any problems with his serious back problem while working in the water/wastewater department. Matt Theisen, the Water Superintendent, who is a long time close friend of Rich Cline's, has continued to be the first responder for emergencies rather than call Rich in. B. ALTERNATIVE ACTIONS: 1. The first alternative would be to grant an extension of three months to the residency requirement for Rich Cline provided he actively attempts to market and sell his home. r.• 2. The second alternative would be to grant a six-month extension of the residency requirement to Rich Cline C1' provided he actively markets and attempts to sell his home. 3. The third alternative would be to grant a 1 -year extension of time to the residency requirement. 4. The fourth alternative would be to rescind the requirement of the position to reside within a 10 -minute response time so that employees in this position can live anywhere or to modify the response time to 20 minutes, which would go as far west as Clearwater and as far cast as Elk River. This would require a modification of the job description and would not be in the best interest of the City. C. STAFF RECOMMENDATION: It is the opinion of the City Administrator and Public Works Director that the City Council look at granting an extension of throo to six months as per alternatives 01 or Y2. It is not in the best interest of the City of Monticello to modify its response time requirement for this position. This condition must remain with the iob description, not just the individual. 12 Council Agenda - 4/22/91 home and property to make it more saleable. I do not believe at this time that he has his home listed and is still making improvements to make it more saleable. Rich has asked for an additional extension of time in which to sell his home. He would like to have the rest of the summer, possibly three to six months. Rich Cline has been a good employee and is continuing to learn the workings of the water and wastewater collection system. He has not reported any problems with his serious back problem while working in the water/wastewater department. Matt Theisen, the Water Superintendent, who is a long time close friend of Rich Cline's, has continued to be the first responder for emergencies rather than call Rich in. B. ALTERNATIVE ACTIONS: 1. The first alternative would be to grant an extension of three months to the residency requirement for Rich Cline provided he actively attempts to market and sell his home. r.• 2. The second alternative would be to grant a six-month extension of the residency requirement to Rich Cline C1' provided he actively markets and attempts to sell his home. 3. The third alternative would be to grant a 1 -year extension of time to the residency requirement. 4. The fourth alternative would be to rescind the requirement of the position to reside within a 10 -minute response time so that employees in this position can live anywhere or to modify the response time to 20 minutes, which would go as far west as Clearwater and as far cast as Elk River. This would require a modification of the job description and would not be in the best interest of the City. C. STAFF RECOMMENDATION: It is the opinion of the City Administrator and Public Works Director that the City Council look at granting an extension of throo to six months as per alternatives 01 or Y2. It is not in the best interest of the City of Monticello to modify its response time requirement for this position. This condition must remain with the iob description, not just the individual. 12 EMPLOYMENT AGREEMENT WATER SYSTEMS/WASTEWATER COLLECTION SYSTEM OPERATOR POSITION I, ( '/' I .._iI hereby acknowledge that I have recZv d a copy of the job description for the Water System/Wastewater Collection System Operator and understand that the general requirement of this position with the City of Monticello is to be able to respond to emergency needs of the community in regards to the water and sewer systems and understand that as a condition of employment within this position for the City of Monticello that I must be able to respond to an emergency call within a 10 -minute period of time after being notified at my residence. Because the response time to an emergency is a bona fide condition of employment, I understand that 1) although residency within the corporate city limits is not a requirement, a condition of employment with the City requires the ability to respond to any emergency within the City within a 10 -minute period of time; 2) I understand that if I am not presently residing in the city or within an area within a 10 -minute response time, I agree to relocate my residency within a 12 -month period of time; 3) failure to do so will result in termination of my employment with the City of Monticello. Employee CIT F NTICELLO (/_/!)t/ bhn Slmola, Public Works Director 40e Rick Wolfs ellor, City Administrator DATED: 30 a C WATER SYSTEM/WASTEWATER COLLECTION SYSTEM OPERATOR April 26, 1988 Job Description This is a skilled position involving the operation and maintenance of the municipal water system and wastewater collection system. The position requires skills relating to municipal water system and collection system operations, including maintenance and operation of various vehicles and equipment, routine custodial duties, and daily record keeping. II. Responsibilities The operator shall be directly responsible to the Foreman/Superintendent for the water system/wastewater collection system and shall be in direct contact with water/wastewater collection system controls and monitoring. The operator will carry out in an accurate and timely fashion operational directives established by the Superintendent. The operator will also be responsible for other duties assigned by the Superintendent, Public Works Director, City Administrator, and/or Council as required. The operator will be required to work various shifts and days to provide continuous utility service. Routine observation rounds are regularly scheduled on Saturdays, Sundays, and holidays. IIT. Examples of Work 1. Operate light equipment and use small hand tools in conjunction with manual labor involved in the installation, operation, and repair and maintenance of various water and sanitary or storm sewer systems. 2. Operate lift station pumps, valves, and controls, and monitor flow, back pressure readings, and draw down levels as required. Troubleshoot, maintain, repair, clean, and inspect lift stations. 3. Locate water, sanitary sewer, and storm sewer lines and manholes. Raise, lower, and rebuild manhole castings and valve extensions to grade. 4. Jet, rod, flush, vacuum, bucket sanitary sewer and storm sewer lines, manholes, and catch basins. Unplug sanitary and storm sewer lines and clean up or assist in the clean up of residence due to sewer malfunction. Install, operate, repair, and maintain watormain lines, service lines, hydrants, valves, and miscellaneous plumbing and fixtures. Make service taps, operate, lubricate, and exercise hydrants and valves, flush watermains, maintain and monitor water tower and reservoir pumping facilities. Monitor systems for leaks. Perform water and newer system repairs in emergency situations. water system/4astewa.er Collection System operator Page 2 6. Check and a,ainia£n,wall charts, meters, collect water samples. Conduct routine fluoride, chlorine, pH, alkalinity, and total hardness tests and other tests as required. Monitor and adjust chemical feed, handle and mix chemical ingredients and solutions. Troubleshoot process problems. Maintain small mechanical equipment such as chemical feed pumps, motors, switch boxes, relays. Replace bearing shafts, seals, gears, and floats as required. 7. Maintain, repair, operate, and troubleshoot wells and equipment. Inspect and clean well buildings and equipment. Monitor flow, pressure readings, and draw down level. Install, read, repair, and calibrate water meters. Install remote reading devices. Determine cause for unusual readings. 8. Monitor and check wastewater flows by installing meters in manholes or other confined spaces as required. Collect wastewater samples from confined spaces. 4. Perform routine maintenance and repair of automotive and truck type equipment to include routine maintenance and repairs. Repair and adjust small engines. Repair, adjust, replace hydraulic systems, electrical systems, transmission systems, and other mechanical systems. 10. Perform horizontal, vertical, overhead, acetylene gas welding. Perform miscellaneous soldering and brazing. 11. Install drinking fountains, plumbing, sinks, toilets, drains, lines,' valves. Clean and repair sump pumps, circulating pumps, unclog and clean sanitary sewer service lines. 12. Haul materials using light and heavy equipment. Manually dig holes and trenches. Perform lawn, tree, shrub, and plant care activities. Lay sod, seed, and mow using various light equipment. Perform general maintenance such as picking up litter, shoveling snow, sanding sidewalks, painting, cleaning, and sweeping. 13. Assist other departments within the city as required such as maintaining lee rinks, hauling or plowing snow, and other work as required. W. Desirable Qualifications UrenA.-S lecial-.�„_„_ w - Certification as a Class D Waterworks Operator by .. e Minn6s66 Department of Health, and certification as a Class S -D operator for wastewater collection systems by the Minnesota Pollution Control Agency. V. Minimum Qualifications A. Licensesr Valid Class 8 State of Minnesota driver's license. Water System/Wastewater Collection System Operator Page 3 B. Formal Education Minimum high school graduate or equivalent with two (2) years' practical experience in operation and maintenance of municipal water systems and wastewater collection systems or other related field. C. General Requirements 1. Knowledge of process and equipment, repairs, maintenance involved in municipal water systems, including basic chemical and bacteriological knowledge. 2. Knowledge of processes and equipment repairs and maintenance involved in wastewater collection systems. 3. Ability to accurately prepare and maintain meter, pumping, and maintenance logs. 4. Ability to establish and maintain effective communication and working relationships with the general public and various contractors on a routine basis. 5. Skill in the operation of equipment and tools associated with the work. 6. Knowledge of occupational hazards of the work and necessary safety precautions. 7. Residency within the corporate city limits is not a requirement. However, because of the emergency needs of the community in regard to water and sewer services, the individual shall be expected to be able to respond to an emergency within the city within a 10 -minute period of time after being notified at his or her residence. All other qualifications being equal, city residents shall be given primary consideration. 8. Because of the need to respond to emergencies and provide continuous utility service to the public, the use of radios and pagers are integral to this job description. D. Physical Requirements The individual must be in excellent health, as a variety of tasks at times can require heavy lifting, bending, climbing, and exposure to severe weather conditions. Duties require at times exposure to hazardous conditions in work areas. The individual must be able to function utilizing various resr:ue equipment to include, but not limited to, a self-contained breathing apparatus. It must be noted that a self-contained breathing apparatus will not seal to a bearded face; therefore, the individual must be clean shaven. A physical by the City's Health Officer is mandatory prior to appointment for this position to ensure that the individual can fulfill all of the requirements of the job relating to physical capabilities. water System/wastewater Collection System Operator Page 4 vi. Working Conditions This position involves a mixture of inside and outside work. Occasional exposure to inclimate weather, fumes, odors, dust, and risk of bodily injury is possible. Handling of various chemicals and confined space entry gives possible exposure to toxic conditions. A working knowledge of the safety equipment involved in the field, as well as sound safety practices, shall be a requirement for this position. vil. Entry Sources Progression from a smaller or less complex system or those individuals with minimal experience after completing vocational school classes in water and wastewater. VIII. Advancement To Superintendent. I&I Council Minutes - 2/26/90 g. Consideration of an additional extension to probationary period/residencv requirement - Tonv Strande. After discussion, motion made by Fran Fair and seconded by Warren Smith to extend the existing employment agreement for a period of approximately three months. As of May 15, City staff is authorized to seek a replacement for the position in the event Strande is unable to comply with employment agreement. The extension of the agreement by the City is also contingent upon Strande-s signature on the extension to the agreement. Voting in favor of the motion: Blonigen, Fair, Smith, Maus. Opposed: Anderson. 0 Council Agenda - 2/26/90 Consideration of an additional extension to probationary period/residencv requirement --Tony Strande. (R.W.) A. REFERENCE AND BACKGROUND: On June 10, 1988, the City hired Tony Strande to work in the water department to fill the vacancy that was created by Walt Mack's retirement. Matt Theisen was offered the supervisor's position, and Tony then filled Matt's former job classification. The union contract requires a six-month probationary period at 808 of the prevailing wage for the first six months, then 90% of the prevailing wage for the next year. But because Tony had been a past City employee, we started him at 908 of union scale and made a separate agreement with him that he signed that would increase his wage to 1008 of union scale upon completion of the probationary period. In addition, because of the time factor on answering emergency calls in the water and sewer collection system, we also included in the agreement that Tony would be required to move from Palmer, Minnesota, into the Monticello area within six months so that he could answer an emergency call within a 10 -minute time period. Currently, it takes Tony at least 20-25 minutes to reach the city after being notified of an emergency. The original six-month probationary period expired on December 10, 1988, and the City Council on December 12, 1988, agreed to extend Tony's probationary period for an additional eight months or until he had relocated. I believe the reason for the eight-month extension was to allow Tony sufficient time through the summer of 1989 to sell his house and relocate to within that 10-minuto response time area. On August 14, 1989, the City Council again agreed to extend Tony's probationary period for another six months or until he relocated. As of today, Tony has not yet sold his home and relocated. The question now being asked of the City Council is whether additional extensions should be granted or whether the terms of the employment agreement should be initiated which would result in a termination notice being given to Tony. Although there has not been a life or death emergency call situation relating to his ability to respond, there have boon numerous occasions where he has been difficult to got ahold of or Matt Theisen, the Water Superintendent, has boon required to respond to the emergency calls. To give you an idea, Matt has had to respond to at least 26 call-backs or emergency situations after hours or on weekends; whereas Tony has only responded to 6 in the last 1-1/2 years. Since it is to be the responsibility of Tony to respond to these emergency calls or call-backs and not the Superintondent's normal responsibility, 10 0 Council Agenda - 2/26/90 you can see that a disapportioned amount of calls are being taken by the supervisor due to his residency in Monticello versus Tony who is up to one-half hour away. This current situation is putting our supervisor in an uncomfortable position in knowing that if he waits to rely on Tony to respond to any call, the situation could become an emergency or result in further problems or damage by waiting for Tony to respond. When Walt Mack was the Water Superintendent, it was Matt's responsibility to answer the emergency calls. Now that Matt is the supervisor, it should be Tony's responsibility to be the first one to respond to the calls; but as you can see by the number taken by Matt, this is not being done. I believe the requirement of the job position, having the employee within a 10 -minute response time, is a valid concern and a reasonable condition of employment in this position. While it was initially felt that there was enough incentive to anticipate Tony moving closer to Monticello because of the 90% pay scale, over 18 months have passed since his employment; and it does not appear that at this point Tony is any closer to moving than he was the day he started. I have discussed this situation with our labor attorney, Mr. Mike O'Connor, who has indicated that our employment agreement requiring Tony to move was a valid condition of employment: but he did caution that continued extensions of the probationary period may not be appropriate forever. He cautioned that if any additional extensions are granted, the next one should be the last one with a specific date being established and termination proceedings being initiated if this date is not met. B. ALTERNATIVE ACTIONS: 1. The first alternative could be to extend Tony Strands's probationary period again for a reasonable time period with a specific ending date, at which time his employment would be terminated if he did not meet the conditions agreed to. Under this alternative, the Council would be reaffirming that the 10 -minute response time is a valid concern of the City, and the Council would indicate that this condition must be met to retain employment. Also, it is r recommended that Tony again acknowledge this r4/ -4(----Understanding b., cosigning the original employment agreement with these terms and conditions spelled out. 2. The second altornativo would be to and Tony Strande's probationary period and increase his wages to 1008 of union scale. Under this alternative, the Council would be agreeing to eliminate the 10 -minute response time as a condition of 11 0 Council Agenda - 2/26/90 employment and as a result would be resigning itself to requiring the supervisor to respond to emergency calls rather than the operator. Although the City's policy could be to have Tony still respond to all emergency calls instead of Matt, we would in effect be accepting the fact that emergency calls would be handled probably 30 minutes after we were notified and would be taking a chance that no serious problem would occur during that time period. As I indicated before, Matt, being a conscientious employee, is responding first because he knows that Tony would not be able to get here before a half hour has passed. I think this puts Matt in an uncomfortable position if he chose not to respond; and if we waive the condition of employment now for Tony, we are in effect condoning this in the future. The third alternative would be to not grant any additional extensions and initiate termination proceedings at this time for not meeting the conditions of his original employment agreement. While I feel it's not in the best interest to continue to grant extensions on the employment agreement forever, it may be appropriate to allow some additional time for Tony to meet his residency requirement but with the knowledge that this would be the last time it would be extended. The fourth alternative could be to transfer Tony to another department within the public works and reassign a current employee to the water system operator position. Public Works Director, John Simola, and myself discussed this briefly; and while there is one employee who had previously expressed an interest in working within the water/collection system, this employee also is not a current resident of the city but does live closer. while I do not know if this option is feasible, John may have more comments at the Council meeting on this option. C. STAFF RECOMMENDATION: The staff's position has not changed in our opinion that a 10 -minute response time is necessary for this position. In light of the recommendations made by our labor attorney, Mike O'Connor, continued extensions of the probationary period should not be granted forever. Because the City has previously granted extensions, it is recommended that any termination proceedings against Tony provide for a reasonable advance notice that the City intends to terminate his position under the terms of the agreement. As a result, it is the staff's recommendation that alternate YI be adopted informing Tony that the probationary period would be extended one more 12 9 Council Agenda - 2/26/90 time only until April 1 and that the notification should be given to Tony that the position will be terminated on that date if he has not completed his move to within a 10 -minute response time. By April 1, Tony would have been given almost two years to make the move, which certainly has been a reasonable amount of time to accomplish this. Two weeks prior to this date, I would also send a second notice to provide ample warning that the position would terminate April 1. This recommendation is based upon the assumption that the City Council does not wish to change the job description to require the supervisor to be responsible for all emergency calls. Although I'm sure the Council does not wish to cause any hardship to any employee, I do want to again point out that Tony accepted the job with the full understanding that a relocation would be required, and he did sign the agreement indicating he would do this within a reasonable amount of time. In addition, I would recommend that the City, if adopting this motion, also require Tony to sign an additional acknowledgement of the employment agreement and the conditions being imposed for the April 1 deadline. D. SUPPORTING DATA: Copy of employment agreement of June 13, 1988. 13 f a �i �►rPdM�r�7:�dd�l:Ria���i WATER SYSTEMS/WASTEWATER COLLECTION SYSTEM OPERATOR POSITION I, � �/Gj , hereby acknowledge that I have received a copy the jobdescription for the water System/Wastewater Collection System Operat and understand that the general requirement of this position with the City of Monticello is to be able to respond to emergency needs of the community in regards to the water and sewer systems and understand that as a condition of employment within this position for the City of Monticello that I must be able to respond to an emergency call within a 10 -minute period of time after being notified at my residence. Because the response time to an emergency is a bona fide condition of employment, I understand that 1) although residency within the corporate city limits is not a requirement, a condition of employment with the City requires the ability to respond to any emergency within the city within a 10 -minute period of time; 2) I-inderstand that if I am not presently residing in the city or within an area within a 10 -minute response time, I agree to relocate my residency within a 6 -month period of time; 3) failure to do so will result in termination of my employment with the City of Monticello. l ` John Simola, Public Works Director R�'�oete [, City ACmin istrator DATED: Z*11 ,1 im 7 Y BRC FINANCIAL SVSTEM 03/21/91 14:05:28 WARRANT DATE VENDOR F. GENERAL CHECKING 31375 03/22/91 PETTY CASH 31375 03/22/91 PETTY CASH 31375 03/22/91PET7Y CASH 31375 03/22/91 PETTY CASH 31375 03/77/91PETTY CASH 31375 03/22/91 PETTY CASH 31376 03/22/91 MN DEPART OF NATURAL 31377 03/22/91 MN DEPART OF NATURAL 31379 03/25/91 A.E. MICHAELS 31379 03/25/91 ADAM'S PEST CONTROL 31380 03/25/91 AUTOMATIC GARAGE 000 31391 03/25/91 CMRI STIAN5014 GIFTS/C 31382 03/25/91 COMPANION PETS 31303 03/75/91 CONTINENTAL SAFETY E 11384 03/25/01 CYR/BRAD 31385 03/75/91 OAHLGREN SMAROLOW AH 31388 03/25/91 UVNAMIC SYSTEMS. INC 31307 03/25/91 FLICKER'S T.V. S APR 31385 03/25/91 FYLE. BRAD 31319 03/25/91 GREAT RIVER REGIONAL 31390 03/25/01 M041DAY CREDIT OFFIC 31301 03/75/91 LARKIN.MOFFMAN.DALV 31392 03/25/01 LARSON/LVNDON 31393 03/75/91 LIBERTY COMPUTER up 31306 O3/25/01 LIEFERT/TOM 31315 03/75/:1 LUVACN/101411 31398 03/75/01 LUMACK/JOHN 31395 03/25/91 LUKACH/JOHN 51395 03/25/01 LUKACN/JOHN Disbursement Journal DESCRIPTION AMOUNT CLAIM INVO 106 WARRANTY OEEO RECOPOEO 10.00 160 VAN WASH/BLD INSP 13.00 108 VAT, P. SAMPLE/WATER DEPT 1.45 to CITY HALL SUPPLIES 2.00 160 SUPPLIES/SHOP 4 GARAGE 7.25 106 POSTAGE/CITY HALL 22.90 51.60 -CHECK TOTAL 118 WATERCRAFT TITLE REPOR 15.00 116 WATER/SNOWMOSIL/ATV R 249.00 338 BLO REPAIR SUP/WATER 15.00 3 PEST CONTROL/LIBRARY 44.00 260 REPAIR DOOR/FIRE OEPAR 80.00 33 NEW SIGNS/BLD INSP/VA 247.20 39 AOUARIUM MTC/LIBRARY 16.20 256 FIRE DEPT REPAIRS 20.03 505 TRAVEL EKP/FIRE SCHOOL 84.00 6B PPOF SERVICES/PL►N 9 '107.00 478 CONTROL PANEL FOR 19.075.00 60 T►PES/BLO INSP 14.97 02 TRAVEL EVP/FIRE SCHOOL 84.00 506 VCR PLAVER/LIBRARY 315.45 90 GAS/FIRE DEPART 130.48 697 LEGAL FEES 670.65 501 TRAVEL EXP/CIRI SCHOOL 94.00 09 COMPUTER PAPER 119.70 314 TRAVEL EKP/FIRE SCHOOL 64.00 127 MILEAGE E4PEI19E 17.50 327 MILEAGE EXPENSE 5.97 371 MILIAGE EIPENSE 5.67 177 141LIAGE EXPENSE 9.91 0 BRC FINANCIAL SYSTEM 03/71/01 14:05:29 WARRANT DATE VENDOR GENERAL CHECKING 31396 03/25/91 MCDOWALL COMPANY 31397 03/25/01 MINNESOTA CONWAY FIR 31390 03/25/01 MOBIL 31390 03/25/91 MOBIL 31396 03/25/91 MOBIL 31396 03/25/91 MOBIL 31399 03/25/91 NUTECH ENVIRONMENTAL 31400 03/25/01 O.E.I. BUSINESS FOO' 31600 03/75/91 O.E.I. BUSINESS FOPM 31601 03/75/91 OLSON 6 SONS ELECTRI 31407 03/25/01 ORR-SCMELEN-MAVERON 3 1607 03/25/91 ORR-SCMELEN-MAYERON 31402 03/75/91 ORR-SCMELEN-MAVERON 31603 03/25/91 PHILLIPS 66 COMPANY 31404 03/25/91 RELIABLE CORPORATION 31606 03/75/91 RELIABLE CORPORATION 31405 03/25/01 RESCUE MAGAZINE 31400 07/75/91 SIMPSON/MARC 31407 03/25/01 SITE AMENITIES. INC. 31400 03/75/01 SNAP-ON TOOLS COPPOP 31600 03/75/91 ST.CLOUD FIRE EOUIPM 31410 03/75/01 STUMOrIKEVIN 31411 03/15/91 THE ISSN/MATT 31612 03/75/91 TUPNOVIST PAPER COMP 91619 01/75/01 UNIVERSITY OF MINNES Disbursement Journal DESCRIPTION AMOUNT CLAIM INVO' 35.25 -CHECK TOTAL 171 FURNANCE REPAIRS/FIRE 459.04 255 EOUIP REPAIR PARTS/1`1 134.00 131 OAS/BLO INSP 15.90 131 GAS/WATER DEPT 49.30 131 GAS/SEWER COLL 49.35 131 GAS/STREET DEPT $2.S7 197.27 -CHECK TOTAL 157 CHEMICALS/WWTP 1.199.50 159 COPY MACHINE PAPER 156.20 156 CORRECT COOING 70.IOCR 70.10 -CHECK TOTAL 100 BLD P,EPAIR6/SEH CITI2 037.07 162 ENG GEES/K MAPT 659.30 102 ENO FEES/K MART 2.051.10 102 ENG FEES/REMMELE 34.00 3.555.64 -CHECK TOTAL 167 GAS/STREET DEPT 13.07 179 CITY HALL SUPPLIES 19.90 179 COMPUTER OFFICE SUPFL 160.20 170.19 -CHECK TOTAL 767 MAGAZINE SUS/FIRE DEPT 9.05 504 TRAVEL EXP/FIRE SCHOOL 06.00 503 REFRACTOR$/STREETSCAP 541.00 105 TOOLS/SHOP & OAR 4.17 242 FIRE EATINOUISMER/91R 105.60 500 TRAVEL E10/FIRE SCHnOL 06.00 457 TRAVEL EYP/FIRE SCHGO 421.00 201 SUPPLIES/CITY HALL 67.23 212 REO FEE/SCHOOL/TOM 10$ $0.00 DRC FINANCIAL SYSI EM 03/71/91 11.:05:26 Disbursement Iournel WARRANT OATE VENDOR DESCRIPTION am.01JNT CLAIM! INVOICE GENERAL CHECKING 31LIG 03/25/91 VIKING OFFICE SUPPLY 509 OFFICE SVP/DLO INSP 51.62 GENEPAL CHECKING TOTAL 30.566.04 StC F1NrNC1a1• SYSTEM 03/70/91 09:54:12 WAPPAN1 (.ATE vE 1+90P GENERAL CMEC°INS 11409 03/79/91 ST.CLOUO FI4E fOUTPM 31400 03/28/91 s.•:1,pUb Ft -E EOVIPM 31415 03/26/91 W:WICE!+.0 ANIMAL rn 3 1410 031?9/'31 461>P7 • a -9-f / ?1411 0.'/2H/^1 !°ac,•3 re afN.r: e.r•r.a 31419 0:•:94'31 Dc•ncf SS:C•tJa1. 4E 4L'ICE 31419 03/211/41 LE•1.UE OF MN ril1E5 31A.y ,; !<rp.s :c •.. 1:T"Tf5 31419 03/7811)11cAcpc r•c , Ci'iES- 16 1- 141- .?Dr?1 LEAGUE 09- MN 1:111c F. 31410 03/28/91 I.E Ar VC 0; •.0 CITIES 3'A 19 -)3/26/91 LEAGUE 0- MN 1:111E5 31&19 03/7D/01 LEAGUE OF x•11 CITIES 31119 133/78/91 LE A6!'r. •?P MN 1:111ES 31619 03/211/01 LEAGUE OF MN CITIES 31610 U:/7(1/01 EF rr•UE •19 .,N CIIIES 31619 03/7(1/01 1•E AGUE OF MN CITIES 31610 03/78/01 LEAGUE OF MN CITIES 316+0 03/79/91 LEAGUE OF MN CITIES 3161? 1)1111•�I Lf AGVf f'c -I CITIES 31619 03/JA• 1 Lem',,+f uc MN CI r1fS 3111? 01.4 'A' LE11111- .11 •..r -:11IES 311.1n 03/78.'71 LFAGUE OF MN C1+TES 31&?0 7^/"tD�" ,i A•:!1. !11 -1) C371f5 tiG,` •J'. 4A N f.F 7r c' tJr 11111, ,.4?? p?. :9/9, MN OEc Aer nc NATVGA� 5 •1 03120E 91 1•FdAUE f1c MN CtTIES r•,NfDr1• f.7:E{e1N1i Oisoursentnt Journal OESCPIP, S(.It: r,rOUNi CL< -T'•. V+': •>3 247 CORRECT COOING +05.50 761 COPrECT rr.l.[ .b5. 50': 11•,)C •fvE1:V 1fT M1•, 18g AN7•+-1L C1}1419-01• fnNrPA 638.25 6 aN TMAL CO:+t P JaOdQ I I Or: 355.00 9? c;A Eft s• Vn.cg -.. i= 70. i'C 17'i •:-)N T PICT PA,-I/W"1 31.490.24 243 Ir+S!1DA"CE PCf MI LI.• 17.956.00 ?L3 IN511cr•:rF PP: -,I Or t.n,e.0i' 21.? 0SUPA"CE PPE..1 .... .• 7(P.00 :c3 Iu5 L1Pr'1{;, :ss..11; A•5.'p3 243 WSUPANCE PDEM111M 1,051,00 ?63 IIJSUPANCE PPE MI VM 2.477.00 243 V)SURANrE PDEMIL•^+ 1,7&6.00 243 INSUP-J.'.f POE MY Q. :;11.00 243 IN6L1r'AN• •.QE •+T !'^+ t. 023.011 763 INSUPf N':E :PENT VM 1,77,:.00 743 INSUPANCE PPEMIOM 939.00 743 1NSUDr•'CE PPEMIUM 1.053.00 243 INSUQ4NCE PPE.,ILIM 26.00 243 IN41JP1,N1:E PPE••1 .M 097.09 ?A9 11+SUD4rJSE Dc f^•I0•+ 3.6A7.nn 263 I':5VPr rr+ 11.y 0&•7.00 769 TNSUc'ANCE P E L•" +90.00 ' 59.599.00 ••'w:�'• 1•tTM1I 2hD INcn:•+u:E •1(1 1laTE Pf PrEr rE r• R 1111•E ?q•Op 1/(1 vA rE A/SNpu/A ry PCPOtf 107.00 A2 el. ra .. if.1P41Gf .'fN•7:: 'a .00 .'1) •r, ,1'. JT r', 763 INSURANCE DPLMI.- I.PO6.('0 11;1e1 .97 SPC FINANCIAL SYSTEM 06/11/01 09:07:19 Disbursement Journal WARRANT DATE VENOOP OESCRIPTIC.4 AMOUNT CLAIM INVO GENERAL CHECKING 31320 04/07/91 SIFF$. 111C. 395 CHECK VOIDED 69.02CP, 31425 04/07/91 SCHWARTZ/GAIL .90128 RECYCLING PRIZE SO -OD 31470 04/07/91 KLEINSTUSER/ARLYS .90127 RECYCLING PRIZE 50.00 31427 04/07/91 MINNESOTA TRUCKING A .90120 REG FEE/SEMINAR 90.00 31428 04/07/91 LEAGUE OF MINNESOTA 96 REG FFE/5 ANDERSON 70.00 31629 04/01/91 MN DEPART OF NATURAL 118 WATERCRAFT/SNOW/ATV R 382.00 31630 04/07/91 MN DEPART OF NATURAL 118 WATERCRAFT REG i TITLE 27.00 31431 04/07/91 NORTHWEST MINNESOTA 156 REO FEE/G ANDERSON 10.00 31632 04/10/91 ANNANDALE VETERINARY 367 ANIMAL CONTROL/VET FEE 64.00 31433 04/10/01 BIO LAKE MACHINE AOS STEEL/SEWER COLL SUPPL 14.00 31436 04/10/91 BRIDGEWATER TELEPHON 24 TELEPHONE CHAPGES 596.12 31436 04/10/91 SRIDOEWATER TELEPHON 74 TELEPHONE CHARGES 78.56 31436 04/10/91 SRIOOEWATEP TELEPHON 76 TELEPHONE CHARGES 67.9h 31434 04/10/01 OR IOGEWATER TELE PHON 24 TELEPHONE CHARGES 27.80 31434 06/10/91 BRIDGEWATER TELE PHON 26 TELEPHONE CHARGES SO.47 31434 04/10/91 BRIDGEWATER TELE PHON 26 TELEPHONE CHARGES 52.75 31436 04/10/91 BRIDOEWATER TELE PHON 26 TELEPHONE CHARGES 70.00 31434 06/10/91 BRIDGEWATER TELE PHON 24 TELEPHONE CHARGES 13.50 1 31434 06/10/91 BRIDGEWATER TELEPHON 24 TELEPHONE CHAPGES 177.35 31436 06/10/91 BRIDGEWATER TELEPHON 20 TELEPHONE CHARGES 20.00 31436 06/10/91 BRIDGEWATER TEL EPHON 26 TELEPHONE CHARGES 30.28 31436 04/10/01 BRIDGEWATER TELEPHON 2h TELEPHONE CHARGES 87.13 31434 00/10/91 BRIDGEWATER TEL EPHON 24 TELEPHONE CHARGES 18.75 31434 04/10/01 BRIDGEWATER TELEPHON 26 TELEPHONE CHARGES 16.10 31636 04/10/91 BRIDGEWATER TELEPHON 24 TELEPHONE CHARGES 70.60 1.200.77 -CHECK TOfAI 31435 04/10/01 COMPUTER -A10. INC. 515 COMPUTER EOVIPMENT 845.00 3th30 04/10/91 DECISION DATA SERVIC 41 COMPUTER MTC AGREEMENT 78.50 31437 04/10/91 DUERR'$ WATER CARE $ 40 WATEP CAPE/WWTP RENTAL 14.75 31439 00/10/91 FRONTLINE PLUS FIRE $10 SUNK SOOT!/FIRE DEPT 73.00 31439 04/10/01 GENERAL FIRE COUIPME 669 FIREMEN COATS/FIRE Of 700.71 3/4h0 00/10/91 HERMES/JERRI 91 LIOP40V CLEA111N0 CONT 721.50 BFC FINANCIAL SYSTEM (Ib/11/91 0902919 WARRANT DATEVEHOOR GENERAL CNECKING '31461 04/10/91 HOGLUND COACH LINES 3144'2 04/10/91 J M OIL COMPANY 31443 04/10/91 K MART STORE 31664 04/10/01 LARK I N. HOF FMAN,.DALV 31465 04/10/91 LUVACH/JOHN 31445 04/10/01 LUKACM/JOHN 31bbS 04/10/91 LUrtACH/JOHN 31665 04/10/91 LUKACH/JOHN 31446 04/10/91 MAR71E'S FARM SERVIC 31667 04/10/91 MIDWEST GAS COMPANY 31467 04/10/91 MIDWEST GAS COMPANY 31467 06/10/91 MIDWEST GAS COMPANY 31447 04/10/91 MIDWEST GAS COMPANY 31647 04/10/91 MIDWEST OAS COMPANY 316h7 04/10/91 MIDWEST GAS COMPANY 31467 04/10/91 MIDWEST GAS COMPANY 316b7 04/10/91 MIDWEST GAS COMPANY 31468 06/10/01 MINNESOTA ANIMAL CON _ _-3,16Ao 04/fn/91-M IN!I £.BOT A, COM•!E PCE 0 31450 04/10/91 MINNESOTA STATE 7REA 31451 04/10/91 MN CLERKS & FIN OFFI 31451 04/10/01 MN CLERKS 0 FIN OFFI 91452 OA/10/01 MONTICELLO ANIMAL CO )1457 06, 10/91 M011110ELLO ANIM6t FO 31457 06/10/01 MONTICELLO ANIMAL CO 31453 04/10/01, NORTHERN STATES POWE 31AS3 04/,10%91 NORTHEPN 9T4TES FOWE 31453 04/10/91 -NORTHERN STATES POWE 314,03 64'/10J91 NORTHERN STATES POWE 31453 04%10/01 NORTHERN STATES POWE 31453. 04,/10/91 NORTHERN STATES POWE 31453 04/10/01 NORTHERN STATES POWE 31653 04/10/01 NORTHERN STATES POWE 31453 01./.10/41 NORT14ERN STATES ROWE 12 Di'sbu"ement'Journel- DESCRIPTIONAMOUNT CLAIM INVOI 663 TRANSPORTATION CONT 5.455.01 95 +IOTOR FUEL/STREET DEP 101.95 660 FILM/PUBLIC WORKS IO.A4 497 LEGAL FEES 641.55 327 MILEAGE EXPENSE 70.57 327 MILEAGE EXPENSE 0.96 327 MILEAGE EXPENSE 8.05 327 MILEAGE EXPENSE 8.85 53.13 107 SUPPLIES/DARK DEPT 20.90 115 UTILITIES 447.77 115 UTILITIES 117.37 115 UTILITIES 45.04 115 UTILITIES 612"675 115 UTIL171ES 11.54 115 UTILITIES 87.09 115 UTILITIES 3.00 115 UTILITIES 210.61 1.595:7.1 117 MEMCERSHIR DUES/ANIMAL 70.00 511 NOTARY REAPPOINT/KOVIG 10:00 262 BLD PERMIT SURCHARGE 42.72 315 CONFERENCE REG' /C SHUMA 49.00 3i5 ACCOUNTINO BOOK X0.05 ?e .9$ 105 ANIMAL OONTPOL CONTRIA 603;75 105 TRAVEL EXPENSE TO'VE1 ,30.00 185 PROF SER/RABIES CLiNI 100.00 503.75 140 UTILITIES 361:70 140 UTILITIES 110.71 160 UTILITIES 3.107.06 160 UTILITIES 14.15 140 UTILITIES 102.03 160 UTILITIES 0.07 140 UTILITIES 37:08 160 UTILITIES 00.47 148 UTILITIES 22.15 'CHECK TOTAL -CHECK TOTAL -CHECK TOTAL I -CMECF. TOTAL (11 I BRC FINANCIAL SYSTEM '? 04/11/91 09:07:19 Disbursement Journal, V, C WAPPANT DATE VENDOR OESCRIPTION AMOUNT CLAIM IfsV,x GENERAL CHECKING -31'653 04/10/91 NORTHERN STATES ROWE 149 UTILITd ES 6.50 31453 06/10/91 NORTHERN STATES ROWE 146 UTILITIES 782.SO, 4.159.03 •CHECK TOTAL 31454 04/10/01 NORWEST INVESTMENT 5 155 COMPUTER PAYMENT 7,407.51 31455 04/10/91 PACE. INCORPORATED 380 WATER ANALYSIS FEES 37.00 31456 04/10/01 POLKA OOT RECYCLING 170 RECYCLING CONTRACT 1.140.47 31657 04/10/91 PROFESSIONAL SERVICE 175 WWTP CONTRACTV PVM 76.407.50 31457 04/10/91 PROFESSIONAL SERVICE 175 ADD'L 1090 WWTP CH 11.857.74 31457 04/10/91 PROFESSIONAL SERVICE 175 REIMS/FRH WWTP/COPIER 199.73CP 30.061.01 -CHECK TOTAL 31459 04/10/91 RELIABLE CORPORATION 179 OFFICE SVD/WATER DEPT 0.95 31459 04/10/91 RELIABLE CORPORATION 179 OFFICE SUPPLIES/SEWER 9.05 31650 06/10/91 RELIABLE CORPORATION 179 MISC OFFICE SUPPLIES 109.03 31656 04/10/91 RELIABLE CORPORATION 170 DATA TABLE/ECON OEVEL 117.50 763.43 'CHECK TOTAL 31450 04/10/91 SIMONSON LUMBER COMP 103 SUPPLIES/SHOP 3• GARAGE 0.40 31660 a 04/10/91 ST.C1000 FIRE EOUIPM 767 SERVICE FIRE E>TINOUS 147.15 31401 04/10/01 YONAK LANDFILL. INC. 773 ADD'L LAND FILL CNA 5.577.00 GENEPAL CHECKING o TOTAL 00.119.77 (11 A• t i' BP.0 6r=1NnNC1AL- SYSTEM _ "13' 4i olsourseM.nT Journe:l .{, LlARPANI DATE VENOQP. OESCR7PT10N 4Mo1JNT 'CLAIM IIIVO' 1_ 'GENEFAL CHECKING 31296 04/15/91 CORROW SAIIITATION 47 rOPPECT C+?n111G 730.16 -31294 04/15/01 LIOVOR STORE FUND 100 C,OPRECT COOING 739 .,16CR 0 0:00 ":HECK TOTAL " 31482 06/15/91 BALOGN/JAMES .00070 PAYROLL OEOUCTIONS 506,29 31403 04/15/91 U.S. POSTMASTER 210 POST OFFICE BOX RENTAL 31.50 31664 04/15/91 LEAGUE OF MINNESOTA 08 REG FEE/P WOLFSTLLEP 70.00 31664 04/+5/91 LEAGUE OF MINNESOTA 99 REG FEE/S ANDERSON 79.00 a 158.00 ACHECK TOTAL 31465 06/15/91 MN DEPART OF NATURAL 118 WATERCRAFT PEG & TI7L +74.00 31468 04/15/91 MN DEPART OF NATURAL 118 WATERCRAFI/SNOW/AIV R 847.00 GENERAL CHECKING TOTAI. 1.514,78 A• t i' BRC FIN/NCIAL SYSTEM O4/17/01 15:01:14 WARRANT OA7E VE NOOR GENERAL CHECKING 31407 06/15/91 A T & 7 11190 SYSTEMS 31488 04/15/91 ANDERSON/SHIRLEY 31469 06/15/91 ARA COPY REFRESHMENT 31470 04/I5/91 GEN FRANKLIN 31670 04/15/91 BEN FRANKLIN 31671 04/15/91 BUSINESS RECORDS COR 31471 06/15/01 BUSINESS RECORDS COR 31411 04/15/91 BUSINESS RECORDS COR 31677 06/15/91 CENTRAL MCGOWAN. INC 31677 06/15/01 CENTRAL MCGOWAN. INC 31673 04/15/91 CLARK BOAROMAN 3 14 74 06/15/91 COAST TO COAST 31476 Ob/15/97 COAST TO COAST 31476 04/15/91 COAST TO COAST 3 14 74 Ob/15/01 COAST TO COAST 31474 04/15/91 rf)AST TO COAST 31476 Ob/15/01 COAST TO COAST 31476 06/15/91 COAST TO COAST 31476 04/15/91 COAST TO COAST 31614 06/15/91 COAST TO COAST 31474 04/15/91 COAST TO COAST 3 16 76 06/15/91 COAST TO COAST 31676 06/19/91 COAST TO COAST 31674 06/19/91 COAST TO COAST 31676 06/15/01 COAST TO COAST 31674 04/15/91 COAST TO COAST 31674 04/15/91 COAST TO COAST 31476 06/15/91 COAST TO COAST 31676 04/15/91 COAST TO COAST 31476 O6/15/91 COAST TO COAST 3141h 04/15/91 COAST TO COAST )1415 06/15/91 CL.MMISSIONER OF kk VL 11479 06/15/91 COMMVIIICATION AVOI10 31471 06/15/91 r.OMPRF89 All A FONIP Disbursement Journal OESCRIRTIO11 AMOVtIT CLAIM VIVO 15 FIRE PHONE CHARGES 4.40 13 MILEAGE EXPENSE/SEMINA 33.00 408 CITY HALL SUPPLIES 80.00 70 PUBLIC WORKS SUPPLIES 50.07 70 UPS MAILING/COMPUIER 0.77 56.34 77 SEVER/MATER CARDS 300.00 77 SEVER/WATER CARDS 300.00 77 INVOICE STATEMENTS 768.53 SSS.S3 30 SHOP E GARAGE SUPPLIE 130.79 30 RENTAL OF EOUIMEtIT 100.00 730.79 00045 800KS/PLANNING ► 7ONI11 53.00 35 STPEET MIC MATERIAL 0.79 35 MISC SUPPLIES/SEWER CO 31.70 3S MTC OF VEHICLES/FIRE 0 30.07 35 SMALL TOOLS/FIRE DEPT 54.40 )5 SLD REPAIR SUR/SEWEP C 17.11 35 OLD REPAIR SUP/WATEP 0 73.06 35 CORRECT C001110 54.42CR 35 SMALL TOOLS/SHOP ► GAR 77.95 35 SLO REPAIR SUP/MUSEUM 0.50 3S MISC SUP/SH/1P ► 0ARA5f 0.05 35 MISC SUPPLIES/CIIV HALL 1.59 35 VEHICLE PARTS/STREETS 13.10 35 MISC SUPPLIES/STRf ETS 0.90 3S MISC SUPPLIES/ANIMAL 73.18 35 MISC SUPPLIES/PARKS 0 103.Oh 35 MISC SUPPLIFS/LIGRARV 4.69 35 BLD REPAIR SUP/LISPARV 37.57 31 CLEANING SUP/LTSPADV 7.01 34 SMALL TOOL$/SLD INSPEC 10.99 35 MISC SUP/1LD INSPECT 5.99 405.30 37 WATER SALES YAK DUE 366.73 3S PAGER PEPAIRS/FIRE OFR 11.37 159 AA9FTV VAIVF/rnm0RF55 7@A.00 -CHECK TOTAL •CHECK. TOTAL -CHECK TOTAL -CHECK TOTAL 0 C� BRC FIIIANC IAL SYSTEM 04/17/91 15:01:14 Disbursement Journal WARRANT DATE VENDOR OESCP.IPTION AMOUNT CLAIM INVOI GENERAL CHECKING 31478 04/15/91 COPY OUPLCATING PROD 41 COPY MACHINE MTC/LIBRA 45.00 31470 04/15/91 DAHLGREN SHARDLOW AN 45 PROF SERVICES/PLAN A 746.18 31480 04/15/91 DUO CHEM INr.. 517 CHEMICALS/SEWER COLL 156.06 31481 04/15/01 DYNA SYSTEMS 50 MISC SUPPLIES/SHOP A 115.33 3148? 04/15/91 FEEOPITE CONTROLS. I SO PROF SEPV/WATER DEPT 48.00 31483 04/1$/91 GARBAGE 478 SUSCRIPTION RENEWAL/P. 71.00 31494 04/15/91 GENEPAL PENIAL CENTS 64 MISC SUP/SHOP 8 "PAGE 10.95 31684 04/15/01 GENERAL RENTAL CENTE 64 MISC SUP/SEWER COLL 0.95 31484 04/15/91 GENERAL RENTAL CENTE 04 SMALL TOOLS/WATER DEP 116.00 143.90 •CHECK TOTAL 31405 04/15/91 HAPRY'S AUTO SUPPLY 78 MISC SUP/SHOP 8 GARAGE 83.73 31485 04/15/01 HARRV'S AUTO SUPPLY 78 MISC SUP/SEWER COLL 37.39 31685 06/15/91 HARRY'S AUTO SUPPLY 78 VEM PEPAIR PARTS/WATER 6.10 31465 04/15/91 HARRY'S AUTO SUPPLY 76 VEM REPAIR PARTS/$TREE 88.00 31485 04/15/91 HARRY'S AUTO SUPPLY 76 OIL/SHOP 6 GARAGE 4.95 31489 04/15/91 HARRY'S AUTO SUPPLY 78 EOUIP REPAIR PARTS/TRE 18.15 31485 04/15/91 HARRY'S AUTO SUPPLY 70 SMALL TOOLS/SHOP 0 GAR 17.43 31485 04/15/91 HARRY'S AUTO SUPPLY 78 OIL/STREET DEPT 35.76 31485 06/15/91 HARRY'S AUTO SUPPLY 76 EQUIP REPAIRS/SIPEET 05.11 31485 04/15/91 HARRY '$ AUTO SUPPLY 78 EOVIP REPAIR PARTS/ST 11).15 31485 04/15191 HARRY S AUTO SUPPLY 78 VEHICLE REPAID/FIRE DED 9.84 31485 04/15/91 HARRV'$ AUTO SUPPLY 70 VEHICLE REPAIR/BLD INSP 3.75 653.95 •CHEC1' TOTAL 31468 06/15/91 HEPMES/JERRY 01 LIBRARY CLEANING CONT 277.50 )1407 04/15/91 HOGL UND BUS COMPANY 07 I4ISC PARTS/WATER DEPT 73.94 )1688 04/1S/91 INHOL TE/RTCHARD .90170 RECYLCING PRIZE 75.00 31609 06/15/91 111DUSTRTAL MAINT. SU $16 NUTS 4 60LTS/SHOP 6 GA 87.00 )1400 04/15/01 kOUE'TlN/JIM .00130 RECYLCING PRIZE 75.00 31691 06/15/91 9RAN7/OAVE .90129 RECYLCING PPIZE 75.00 )1402 04/15/91 M A P TRANSPORT. INC 785 SAND/SOFTBALL FIELDS 679.87 31493 04/15/91 MANKATO TECHNICAL CO 340 FIRE SCHOOL/FIRE 0107 700.00 31696 06/19/91 MARCO BUSINES9 PPODL' 100 COPY MACHINE SUPPL1E9 107.00 31496 OL/IS/91 MARCO PUSINESS PRODU 100 COPY MACHIIIE MTC ACRE 717.50 )1494 04/15/01 MARCO BUSINESS PRODU 106 TYPEWRITER MTC AGREEM 770.00 D Gat FINANCIAL SYSTEM 04/17/01 15:07: to WARPAUT DATE VE1,000, GENERAL CHECKING 31405 04/15/91 MALTS FOODS 31495 04/15/91 MAUS FOODS 31495 04/15/01 MAUS FOODS 31495 04/15/91 MAUS FOODS 31496 06/15/91 MILAN POLLUTION CONTR 31497 04/15/91 MONTICELLO OFFICE PR 31497 04/15/91 MONTICELLO OFFICE PR 31497 04/15/01 MONTICELLO OFFICE PR 31400 04/15/91 MONTICELLO PRINTING 31490 04/15/91 MONTICELLO PRINTING 31400 04/15/91 MOUTICELLO SENIOR CI 31500 06/15/91 MONTICELLO TIMES 31500 04/15/91 MONTICELLO TIMES 31500 06/15/91 MONTICELLO TIMES 31500 06/15/91 MONTICELLO TIMES 31500 06/15/91 MONTICELLO TIMES 31500 06/15/01 MONTICELLO TIMES 31501 06/15/91 MONTICELLO VACUUM CE 31507 06/try/91 MMN MOTUP SALES. IN 31507 04/15/01 MOON MOTOR SALES. IN 31503 04/13/91 MTI O1S&TRISUfING CO 31564 04/15/91 NATIONAL GUSHING PAR )1506 '04/16/01 NATIONAL GUSHING PAR 31505 04/15/91 NELSON/AL A JULIE 31000 04/15/91 UNION MANUFACTURING 31501 04/15/91 OLSON 6 $ONS ELECTRI 31501 06/15/51 OLSUN 6 SONS ELECTRI 31b07 06/11,/91 OLAw 6 SONS ELLCIRI 31501 06115/91 OL SON 6 SONS ELECIPI 31507 04/15/51 OLSON 6 SONS ELECTRI Olsbursement Journal DESCRIPTION AMOUNT CI AIM INV( 539.50 -CHECK TOTAL 109 MISC SUPPLIES/SEWEP CO 15.69 100 CLEANING SUP/ANIMAL CO 10.67 109 CLEANING SUP/LIBRARY 7.86 109 CITY HALL SUPPLIES 19.03 54.05 -CHECK TOFAI 177 ANNUAL PERMIT FEE/WWT 790.00 136 CITY HALL OFFICE SUPP 5$5.67 130 DEPUTY REGISTP,A SUPPLIE 7.90 136 PUB WORKS OFFICE SUPPL 10.36 573.76 •CHECV TOTAL 137 COPY PAPER/BUDGET/C HAL 7.80 137 VEH MTC CAROS/SHOP 6 G 75.70 78.00 -CHECK TOTAL 130 SALARIES DUE FOR INFO 615.77 t40 6L0 PEP.MIT INFO 95.70 160 SNOWPLOWING INFO 57.05 160 PUBLIC HEARING NOTICES 43.75 140 GARBAWLEAF PICKUP 1 706.70 160 DOG LICENSE/PARIES AO 311.06 160 LEGAL NOTICE PUSLICAT7 75.44 011.70 'CHECK TOTAL 161 VACUUM CLEANER BELTS/L 17.56 167 VEH REPAIR. PAP1S/PARKS 6.70 147 EOUIP REPAIR PAPTS/STS 75.03 79.73 -CHECK TOTAL 709 EQUIP PARTS/TORO/PARK 551.45 164 MISC SUPPLIEY/bHUV s V 69.77 144 SMALL TOOLS/.HOP p CCR 17,67 07.16 'CHECK TOTAL IGS NEWSPAPER SUS/CIIV HAL 17.10 511 FIRE 011 SIGNS 606.70 160 MISC PARTS/PARK DEPT 45.00 100 MISC PAPTS/FIRE DEPT 10.08 160 STREET L'ILiMI REPAIRS 994.18 160 PREVENT MTr/CITV HALL 391.50 160 PREVENT MFC/LISRAPY 170.00 1 BRC FINANC IPL SYSTEM 04/12/91 15:01:14 Di<pVrgement .1011ro01 WARRANT PATE VENDOR OE SCR IPT ION AMOUNT CLAIM IUVOI GENERAL CHECKING 1.602.14 -CHECK TOTAL , 31500 04/115/ORR-SCHELEM-MAVEPON 01 162 PROF SER/SANDOERG E 1.000.72 3'508 06/7 5/91 Cl-SCHELEO-MAYERON 162 MISC PROF SERVICES 1.500.63 31500 06 /911 /15 ORR-SCHELEN-MAVERON 162 PROF SERV/ELEM SCHCOL 264.13 31500 04/15/91 OPR- SCHELEN-MAVERON 102 PROF SERV/WWTP 526.00 4.178.34 -CHECK TOTAL 31509 06/15/91 PLUM9ERV-PUPCELL'S P ?51 MISC SUPPLIES/WA7EP OE 37.75 3151() 06/15/91 DPEUSSE'S CLEAr+Ir+G $ 173 FIRE HALL CLEANING 50.00 31510 04/15/91 PRE USSE'S CLEer+I1lG S 173 Ci TV HALL CLEAN IrIG 400.00 450.00 'CHECK TOTAL 31511 06/1E./01 PRINCIPAL MUTUAL LIF 174 INSURANCE PDEMIUM 60.08 315117 04 n 5/91 PELIAEILE f.00PQPAT17rt 179 M.TSC SUDPLTES/PEP REGIS 6.17 31512 Ob/tS/O1 oELiABLE COPPOR AT i ON 179 COMPUTER RIBBONS & SU 230.00 235.05 *CHECK TOTAL 31513 06/115/011 ROAD MACHINERV & SLIP 197 BRUSH CHIPPER/TREE 14.4hi.00 31514 04/15/01 RUFF AUTO PARTS 700 MISC SUPPLIES/SHOP & GA S.00 319119 06/15/91 SAFETY-KLEEN CORD. 104 MTC OF EOUID/SHOP & GA 52.50 31510 06/15/91 SHUMAN/CATHY 191 TRAVEL EXPfN5(/Sf MINAR 6.1S 31518 04/15/9: SHUMAt:/CATHY 101 TRAVEL EXPENSE/SEMINAR 8.78 31510 04/15/91 SHUMAN/CATMV 191 TRAVEL EXPENSE/SEMINAR 10.40 31.03 -CHECK TOTAL 31517 04/15/91 STf NCEL/PEGOV 199 APRIL ASSESSING PAYME 949.50 31519 011/'5/01 TIOPECANOE PRESS INC 513 RING BINOEPS/WA7EP 785.54 31510 04/15/911 IIPPECANOE Po(SS INC 913 PING BINDERS/SEWER 285.54 571.00 'CHECK TOTAL 7';119 !14; t•+191 TRI'E u�•I _WE l -rope. 111E 71)) Fel1110 REPAIR PARTS/PARK 7.64 31520 04/19/91 UNITOG PENIAL SEPVIC ?li UtlIF ORM DfuTeL 1?.00 31520 Ou /19/91 Qui TOG RENTAL Sf4vlC 711 UN I90 m P(u T aL 12.00 31520 04/15/01 LINT TOG RENTAL SECVIC 211 UNIFORM RENTAL 97.10 31570 Oh/15/91 IJNI TOG PEIITAL SEPVIC 211 IJNIFOPM RENTAL 25.93 31970 06/15/01 UNI TOO RENTAL SEOViC 711 Uri IF ORM RENTAL 9.011 31520 06/15+911 UNI TOG RENTAL SEPVIC 711 UNIFORM 0(t+T At O.Oh 1511.70 -CHECK TOTAL 31571 06+15/01 VISION ENERGY 510 STREf7 MIC SUPPLIES/S Obb.00 L I I DiepNrSement .fournil OESCRIPTION AMOUNT :L A 114 1NVn1 210 METEPS. ErC/UATc,P OEP 193.90 219 TA- LISTINCS 39.40 219 APRIL SHERIFF-$ CO 14,330.95 219 MAILED HOMESTEAD CAPD 454.70 16.1330.05 'CHECK TOTAL 775 SAND/SALT MI�TUPE/SrR 370.50 233 14EWSPAPER SUBSCRIPTION 10.00 512 STREET LIGHTS 5.00 224 APRIL CONIPACT PAVMEN 025.00 TOTAL 48.731.17 C� BRC FINANCIAL SYSTEM 04/12/91 15:01:14 1 �1 WARRANT DATE VENDOQ GENERAL CHECKING 31522 04/15/91 WATER PROnnCTS COMPA 31523 04/151D1 WRIGHT COUNTY AVDIT0 31523 OL /15/91 WRIGHT COUNTV AUOITO - 31523 04/15/01 WRIGHT COU:+TV AUDTTO . 31524 04/15/91 WRIGHT COUaTY DEPT 0 31525 04/15/91 WRIGHT COIJNTV JOUPNA 31526 04/15/91 WRIGHT-HENNEPIN COOP 31527 04/15/91 Y.M,C.A. OF MINNEAPO GENERAL CHECKING DiepNrSement .fournil OESCRIPTION AMOUNT :L A 114 1NVn1 210 METEPS. ErC/UATc,P OEP 193.90 219 TA- LISTINCS 39.40 219 APRIL SHERIFF-$ CO 14,330.95 219 MAILED HOMESTEAD CAPD 454.70 16.1330.05 'CHECK TOTAL 775 SAND/SALT MI�TUPE/SrR 370.50 233 14EWSPAPER SUBSCRIPTION 10.00 512 STREET LIGHTS 5.00 224 APRIL CONIPACT PAVMEN 025.00 TOTAL 48.731.17 C� t W B PC FI/J I,N•: 1/•t SYSTEM 04/18/91 13:49:05 NARPANI DAT; VE N90P GENE PAL CHECMING 315?9 04/18/91 SOVEPNAIENT 7PAINING 31529 04/18/91 MN METP.000ME HILTON 31530 04/19/91 DEPT OF TPAOE 8 ECON 3 153 1 04/19/91 MN DEPART OF NATURAL 31532 04/18/91 MN DEPART OF NATURAL 31533 04/22/91 OPEM.EP/TONY 31534 04/22/91 FIRE ENGINEERING 31535 04/22/01 FIREHOUSE MAGAZINE 31536 06/?7/91 FPONILINE PLUS FIPE 31537 04/22/01 GREG SMITH A ASSOC ?1538 O6/??/91 HATCH-PETEPSON SALES 31539 04/27/91 HOGLUND FPANSPORTATI 31540 O6/?7/91 /IYORO SUPPLI 1:l7MPANV 31541 04/27/01 JEnSEN/GENE 31547 04/72/91 KOPOPCHAK/OLIVE i1S42 04%22/91 KOROPCHAK/OLIVE 31543 04/27/01 KRA712/DAVE 31544 06/77/91 MACOUEEN EOUIPMENI 1 31545 04/27/01 MONTICELLO-BIG LAKE 31560 06/77/91 NATIONAL FIVE PP,OTEC 31547 OA/?7/91 OLSON. USSET.AGAN A 31567 06/27/91 OLSON. USSEI.AGAN 6 31547 011/7?l01 OLSON. USSET.AGAN A 3151.0 06/27/01 PtTNEV OOWfS 31,49 06/77/91 V111NO OFFICE SUPPLI D55Pur slmint jou—el OESCPIPTI ON AM•1UNT CLAIM INVC' 77 SEMINAR PEG/P.ICK W 15.00 90179 ROOM REC:/OLI.IE K 57.00 170 SEMINAR REG/OLIVE K 65.00 118 WATERCRAFT/SNO''4/ATV R 268.00 118 WATERCRAFT b TITLE RE 705.00 522 TRAVEL EXP/SEMINAP/PI 290.00 57 SUBSCRIPTION/FIPE DEPT 71.95 519 SUBSCRIPTION/FIPE DEPT +0.97 510 CLOTHES/FIRE DEPT 221.50 106 LEGAL FEES 756 .87 96 9POOM5/S1•OVE. /S7PEE +.059.?? 86 BLD INSP VAN REPAIPS 177.10 467 WPENCH/tJATEP DEPT 71,00 521 TRAVEL EYP/SEMINAP/FI 7UO.00 97 TRAVEL E7PENSE 73.15 07 TRAVEL EAPENSE 17.VU 60.75 520 TRAVEL EAP/SEMINAO/FIR 99.00 104 EOUIP REPAR PARTS/SIRE 80.76 403 TRAINING SEMINAR/FIRE 190.00 778 MEMSEP,SHIP OUES/FIRE 0 75.00 202 LEGAL fEES/PLAN A 7 1.117.50 792 PPOF SEPV/SANDBERG EA ?81.75 292 PROF SERV/HRA 150.00 1.003.75 169 POSTAGE MAC.MINE RENTAL 7?.00 1,09 OAFICE SUP/et0 I1 -SP 98.71 •CHECM TOTAL •r HEC.: TOTAL RRC FINANCIAL SYSTEM '04/19/91 13:49:05 WARRANT DATE VENDOR C, GENERAL CHECKING 31•i50 04/22/91 WEST PUBLISHING COMP 3+551 04/22/91 WRiGHT COUNTY AUDITO 3+55+ 04/27/91 WR/GHt COUNTY 7.UD1 TO 31551 04/22/01 WRIGHT COUNTY AUDTTO 3 155 1 04/22/91 WRIGM1 r01/.TY 41!0110 GENERAL CHECKING OIsDursement Journal DESCRIPTION AMOUNT CLAIM I1JV- 250 MN LAW SESSION BOOKS 115.00 210PROP TAXES/TIF PROJECT $3.79 219 PROP TA7FS/C HALL R 1.759.74 719 PROP FAXES/ELDERLV PRO 41.97 719 PPOP TA7ES/WWTP RENTA 600.00 1.960.05 'CHECK TO'r Al TOTAL 7.306.77 i Ep,sv'llex 03/79/91 09:53:06 oistlurlement Journal WI F'PA11T GATE v E QE I.C: I OTT,:- 1N)YNT r t ST, tL1)11,:P DESTAUPA,IT 3 G Cj,) 4 S MiC J=;LlfS+55.50 C�LIDUIT 600045 MIS • V--)LZSA 00007? LIO7OP 099,C. -Si 74 .90 se;s. 75 ryA,ig E L L A yc e S S S C, 0 0 3 ri VCPT IS r -O %5606 0' P -.i 1 1) 5 14j$T CC-94TCATI 800093 A(`JE% 7- 1 ! PJG 15607 03/70/91 J 0yfj S On OPOS WMOLESA 900027 WINE PUPCHASE 2 Osq. 3 3 15607 03/76/91 J014r)S0r1 SQ0$ WHOLESA 000027 LIOLIOP PURCHASE 1 .758.70 3 fji$. i? T— iS5O9 03/78/91 OUNL ITV W WE iL spiet e000lo Lrouoo PVRCH%Sc tk- . +-) 15608 03/20/91 OVALITY %)1hC & SPIQ1 000040 WINE PURCHASE 756.111. 1 257 71. -O:HEC4 TC-',, SO-? 0?/21/91 "u '... I IV U11 -F j!L '% C. I f 1 40906.) 1[609 03/79/91 OVAI. ITV WINE A SPIRI 000040 WINPOC144SE 74 15510 03/7619, CIT4 WC•'JTICELL) 000003 REIMS To C1T11e%.:jE 1..443.74 1-:ELLO 000001 !"iP A':) 11 -SP 15. ?A ,1917 0?i79i9i SE.V[CE 5,A -.:S COQPOP 800042 $UPCIASS ,:6.07 150111 0!/71f4i VAN 1090 ELECTRIC $00102 PE*AIQ Lj.jM1 FTIT'jg'E 75 '47"E 0000 W1 "f :1 - 151. '"M v:"i 600017 P'D.h 15615 0? /?8 1 C-ILLIPS & SONS ME 000017 L10900 PUP044St .33 3 .7 7 15$15 0)/79191 &MILI.10$ # -.k0115 CO/E 4000) 7 WINE PUPCHABE 4')1.91 15015 :1 1 ? I �'f I L L I Pi 4 SO"i C.011 40001 7 -IV lk"Lff: ib . 1r I 8?0.94 1 Tr 11016 n)/76/91 GRIGGS. C009110 4 CO- 800014 LIQUOR PUPCHASIE 11.610.056 1581$ 03/7$/91 GRIC.3S. COOPER & COM 000019 0415C PURCHASES 77.4) S.4911.07 -CHF.. T1.1. 0 BRCF INANCAL SYSTEM I 06/0 0/91 3:29:60 Olsoursement Journal WARRANT DATE VENDOR DESCRIPTION AMOUNT CLAIM 7"VC LIQUOR FUND 15017 06/09/91 FOSTER-FRA14ZEIJ-CARLS 800015 AOO'L LIABILITY INSUR 527.00 15010 04/00/01 WRIGHT COUNTY STATE 600053 INVESTMENTS/C.D. 150.000.00 15619 04/09/91 QUALITY WANE 4 SRIRI 800060 LIQUOR PURCHASE 523.77 ' 15810 04/09/91 QUALITY WINE f SPIRI 600060 VINE PURCHASE 1.010.76 7.363.03 •CHECK TOTAL 15620 04/00/81 PHILLIPS A SONS CO/E 800031 LIQUOR PURCHASE 1.456.53 15820 04/09/91 PHILLIPS 4 SONS CO/E 800037 WINE PURCHASE 405.01 1.850.56 *CHECK TOTAL 15021 Ob/09/91 JOHNSON BROS WHOLESA 800072 WINE PURCHASE 7.706.79 15621 04/00/91 JOHNSON BROS WMOLESA 800022 LIQUOR PURCHASE 7.073.72 6.770.51 -CHECK TOTAL 15622 06/10/91 SERNICK'S PEPSI COLA 800001 POP PURCHASE 230.75 15073 06/10/91 BRIDGEWATER TELEPMON 800007 PHONE CHARGES 79.14 15626 04/10/91 CITY OF MONTICELLO 800003 REI.B CITY FOR INSU 7.506.00 15625 06/10/91 COMMISSIONER OF REVE 800008 SALES TAF DUE FOR M 9.899.96 15626 04/10/01 DAMLHEIMER OISTRIBUT 800008 ORANGE JUICE PURCHASE 79.30 15078 06/10/91 OAHLHEIMER OISTRIBUT 800009 BEER PURCHASE 19.439.05 19.517.35 *CHECK TOTAL ' 10027 01/10/91 DAY OISTRIOUTING COM 000010 MISC ITE14S FOR RESALE 33.80 15821 06/10/01 DAY DISTRIBUTING COM 800010 MISC OPERATING SUPPLIES 3.815 ( i 15877 06/10/91 DAY O10TRIBUTINO CON 800010 BEER PURCHASE 663.20 J 480.85 •CHECK TOTAL 15878 06/10/91 DICK WHOLESALE CO.. 000011 BEER PURCHASE 1.784.05 15620 06/10/91 OICK WHOLESALE CO.. 800011 LIOUOR STORE SUPPLIES 36.50 1.310.55 *CHECK TOTAL 16820 04/10/01 GROSSLEIN BEVERAGE 1900010 BEER PURCHASE 11.058.80 15029 04/10/91 GROSSLEIN BEVERAGE I 800019 JUICE PURCHASE 13.90 11.077.70 -CHECK TOTAL 10010 06/10/91 JUDE CANOY 4 TOBACCO 800021 MISC OPERATING SUPPLE! 71.90 1SB)0 06/10/01 JUDE CANDY f TOBACCO 000021 CIGARS. CIPS FOR RESA 237.05 - 310.85 -CHECK TOTAL 15611 04/10/01 KOLIES SAIIITATTOII 900023 GARBAGE CONTRACT 201.60 15032 06/10/91 KRWC RADIO STATIOU 804026 AOV9RTTSTIIG 90.00 1 - IF f i, - 1 ORCFINANCIAL SYSTEM 06/00/01 13:29:40 Disbursement Journal WARRANT DATE VENDOR DESCRIPTION AMOUNT CLAIM INV LIQUOR FUND 15033 04/10/81 LIEFERT TRUCKING 800025 FREIGHT CHARGES 337.50 15834 06/10/91 MAUS FOODS 600027 LIOVOR STORE SUPPLIES 6.70 15835 06/10/81 NIOWEST GAS CONPANV 900028 UTILITIES 122.96 15836 04/10/01 MOWICELLO SHOPPING 800075 ADVERTISING 180.00 15037 06/10/91 MONTICELLO TTVeS 900032 AOVERTISIr:G 90.00 15638 04/10/91 PAUSTIS A SONS 800103 BEER PURCHASE 60.00 15638 06/10/91 PAUSTIS A SONS 800103 WINE PURCHASE 308.65 438.35 -CHECK TOTA- 15039 04/10/91 RON'S ICE COMPANY 800061 ICE PURCHASE 55.80 15860 06/10/91 SEVEN-UP BOTTLING CO 800043 POP PURCHASE 208.50 15041 06/10/91 ST. CLOUD RESTAURANT 800045 LIQUOR STORE SUPPLIES 39.85 15861 06/10/01 ST. CLOUD RESTAURANT 800065 CLEANING SUPPLIES 37.82 15861 04/10/91 ST. CLOUD RESTAURANT 800045 MISC ITEMS FOR RESALE 09.39 168.80 1CMECK TOTA- 15862 06/10/91 THORPE DISTRIBUTING 000068 BEER PURCHASE 16.217.15 15843 04/10/01 VIKING COCA-COLA BOT 000051 POP PURCHASE 227.00 LIOUOR FUND TOTAL 217.726.07 Ab Special Council Agenda - 4/22/91 2. Consideration of selectinq planner to assist with development of industria.. park/school district development plan. (J.O.) A. REFERENCE AND BACKGROUND: At the February 25, 1991, meeting of the City Council, staff requested that Council authorize staff to work with the City Planner toward development of an industrial park master plan. The issues to be addressed by the master plan were outlined at that meeting and are attached again as supporting documentation. As a result of Council discussion at the 2/25 meeting, it was the consensus of Council to table authorization to conduct the planning study pending additional Input from the City Planner. Council was concerned that the cost of the study was somewhat excessive at $19,000, and it was suggested that the scope of the study could possibly be reduced in an effort to reduce the cost as well. Council also suggested that the City work •with Farm Credit to get their cooperation on the project. Finally, Council was very concerned about the storm drainage issues relating to that area and authorized an expenditure of $5,000 toward payment of costs associated with development of a storm water management plan for the school district and industrial land areas. Subsequent to Council action on this matter, staff has collected additional information and requests again that Council consider this matter. John Uban of Dahlgren, Shardlow b Uban reviewed the original proposal as requested and submitted a scaled-down version of the original study. The now proposal drops the cost from $19,000 to about $8,500; however, with the reduction in cost is a reduction in the scope of services. Please review both proposals submitted by John Uban for more detail. They are attached. In summary, under the now proposal, the costs are reduced by approximately $10,000; however, additional staff time would be required to complete the project under the now alternative, which carries with it addiLlunal OLaff COOLS. In addition, the now proposal submitted by Uban creates generalized land use plan alternatives for the Planning Commission and City to consider and will not include a comploto comprehensive mastor plan with detailed illustrative examples as first contemplated. Also, proparation of ordinance amendments would not be included in the now proposal. Staff also contacted Farm Credit to determine to what extent Farm Credit would be willing to participate financially in tho development of tho plan for the commercial areae adjoining tho school district property. Representatives from Farm Credit indicated general support for preparing storm drainage and land use plans for the area; howover, they were noncommittal regarding funding any of those activities. 14 Special Council Agenda - 4/22/91 City staff took the liberty of also contacting two other planners regarding this project. As of Thursday, the City has received a response from David Licht of Northwest Associated Consultants. In my conversations with David Licht, I provided him with complete information regarding the various issues associated with industrial development in the community and also provided him a copy of John Uban's proposal. In response, Mr. Licht provided a proposal which, in summary, includes all of the work originally contemplated by Uban; however, Licht's proposal would cost the City an amount equal to Uban's scaled-back proposal. Please review Licht's proposal for more detail. The total cost of the proposal submitted by David Licht from Northwest Associated Consultants amounts to $8,450. Another planner by the name of Kermit Krouch was recommended to me by the City Administrator of the City of Mahtomedi. I expect that Mr. Krouch will be providing the City with a proposal sometime on Friday or Monday. This information will be available at the meeting on Monday. Both planners will be available for an intarview at a special meeting scheduled to occur after the regular meeting. As you recall, at the previous meeting of the CiLy Cuuncil there was a strong indication from the school district that the school district would be willing to pay a portion of the cost to complete this study. It would appear reasonable to request that the school district pay a portion of this study because placing the school district uses on the fringe of the industrial areas is the action that has precipitated the need for the study. Unfortunately, at this time I do not have a specific amount that the school will pay toward completion of this study. This commitment will likely be forthcoming once the scope of the study is clearly defined and the benefits to the school district are better understood. There appears to be an opportunity at this time to coordinate long-term city planning with short-term facilities planning completed by the school district. According to both John Uban and David Licht, it Is important to successfully integrate the plans prepared by the school with the ultimate development pattern oxpocted in the area. It appears prudent to begin our planning soon, which will enable us to provide information and any nocossary guidance on a timely basis to tho school district regarding school site pian development. Time is of the essonco. In order for the City to be able to provide recommendations to the school district, wo nood to select a planner and begin the planning process as soon as possible. Special Council Agenda - 4/22/91 B. ALTERNATIVE ACTIONS: Motion to authorize City staff to work' with Northwest Associated Consultants toward development of an industrial park master plan per the proposal submitted to the City by Northwest Associated Consultants on April 11, 1991, total cost not to exceed $8,450. Under this alternative, City Council finds that the land use issues defined in the memo of 2/25/91 merit further study and Northwest Associated Consultants should be selected to complete the comprehensive planning study. The work program detailed by Northwest Associated Consultants is comprehensive and about equal to the original work program submitted to the City by John Uban; however, the Northwest Associated Consultants' fee is less than one-half that which was proposed by John Uban. Northwest Associated Consultants does have an established track record in this area with the cities of Albertville, Buffalo, Crystal, New Hope, and others among their client list. Between now and Monday, I will be checking a few references. I expect that references will be excellent because in most of these communities, Northwest Associated Consultants has been the planner for a number of years. 1 was informed by Paul Waingarden that he has worked closely with NAC on various issues, and he has found the NAC staff to be very capable. Commissioning Northwest Consultants to complete this planning study would provide the City an opportunity to see another planner at work, which would assist Council In determining if the City could save costs and maintain an adequate level of planning support with a different planner. At the end of the planning project, the City could evaluate the performance of Northwest Consultants and determine if the service level provided merits establishment of a continued relationship, or possibly the City could request proposals from other planners. Another alternative will be available if Kermit Krouch submits a proposal. Motion authorizing City staff to work with Dahlgren, Shardlow 6 Uban toward development of an industrial park master plan at an estimated cost of $8,000 to $9,000. Under this alternative, City Council would be selecting the scalod-beck version of the plan originally submitted to the City by Dahlgren, Shardlow 6 Uban. DSU would focus on the school property and adjacent areas and create a generalized land use plan for Planning Commission and Council to consider. DSU would develop an outline of now standards that would be written into new ordinances but would not include a complete comprehensive master plan with detailed examples as first contemplated. 16 Special Council Agenda - 4/22/91 Also, the plan would not anticipate preparation of ordinance amendments for the City to consider. The proposal submitted by DSU does not provide the same level of services as outlined by Northwest Associated Consultants, and the cost to complete the DSU study is about the same. Council may be reluctant to change planners because John Uban is very familiar with the city, which may give him a slight advantage in terms of the ability to successfully complete the planning project. In addition, the selection process, though providing Uban with two opportunities to quote a price, was not conducted under fair, competitive conditions. NAC had the luxury of access to Uban's proposal, which provided NAC with the opportunity to undercut the price to get the business. The process used raises ethical issues but does not raise any legal issues, as no formal bidding process was violated. Motion denying authorization to work with any planner to complete the planning study. Under this proposal, Council would find that the planning study is noL necessary or too expensive, or perhaps Council could direct City staff to complete ordinance amendments that might pertain directly to industrial property directly north of the school district. Under this alternative, Council would determine that the existing land use controls are sufficient. STAFF RECOMMENDATION: Unless Kermit Krouch presents a superior proposal, staff recommends that the City move forward and authorize Northwest Associated Consultants to complete the study as proposed in NAC's letter to the City dated April 11, 1991. Staff recommendation is based on the following conclusions: It is our view that the land use study done in concert with the storm drainage study already eommissionPd la necessary. Professional planning assistance will help the City create an environment where both industrial land uses and school land uses can prosper side by side. A proper development pattern in tho area will not just happen, and we fool that we need to take a pro-activo approach and set a framework for future development that will be in the long-term beat interest of the community. We do not believe that the City staff has the expertise to complete the typo of planning work that is necessary at this critical juncture in the development of the city. 17 Special Council Agenda - 4/22/91 It is our view that Northwest Associated Consultants has the expertise and the track record that will allow them, along with the City, to successfully complete the planning process at a reasonable cost. Dahlgren, Shardlow, b Uban has provided good service to the City throughout the years; however, the pricing structure appears to be high relative to other planners. For instance, I requested that DSU provide us a cost estimate to complete the adult land use study. It was estimated that this study would cost at least $4,000. As a result of obtaining the relatively high estimate, City staff elected to do the work internally. It is my understanding that Northwest Associated Consultants completed a very comprehensive adult land use study for the City of Buffalo that cost about $2,500. You can see that there is evidence that the City could be obtaining planning services at a more reasonable rate; therefore, working with Northwest Associated Consultants merits strong consideration. As noted earlier, selection of Northwest Associated Consultants for this particular project does not necessarily mean that they will become the City Planner. The City can use this opportunity to evaluate the performance of NAC_ and use the evaluation for future reference. Perhaps at the end of the study it will be determined that NAC did a great job and we will want to continue with them full time. On the other hand, we may determine that they did a good job, but we need to continue to test the waters for other planners; and if that's the conclusion, we can simply request proposals from others as well, including a proposal from DSU. Finally, time is of the essence. It is important to begin the planning process in earnest if the City is going to be in a position to provide information to the school district that they need to assist them with the design of their plan for development of school facilities; therefore, it is recommended that Council act now to got the planning process moving by authorizing the initiation of this study. SUPPORTING DATA: Itom /7 of Council Agenda 2/25/91, Consideration of authorizing staff to work with City Planner toward development of industrial park master plan; Meeting minutes of 2/25/91; original proposal submitted to the City by John Uban on 10/11/90 and revised proposal submitted 3/21/91; Area plan proposal submitted by David Licht of Northwest Associated Consultants. is Council Agenda - 2/25/91 Consideration of authorizing staff to work with Citv Planner toward development of an Industrial Park Master Plan. (J.O.) REFERENCE AND BACKGROUND: The Industrial Development Committee has recommended that the City Council authorize staff and the City Planner to analyze issues pertaining to future development of industrial areas in the community. The goal of the study would be to develop a basis for zoning ordinance and comprehensive plan amendments designed to assist the City in achieving industrial land development potential. Following are the various concerns that have been raised in the past few months along with a proposed method for addressing the concerns. Attached is a map which corresponds by number with the issues noted below. I. DEVELOPMENT OF "BUSINESS PARK" DESIGN STANDARDS (BLUE) School District/Industrial Park Compatability As you know, the School District recently purchased over 40 acres of land in addition to the original 80 acres purchased in 1986. The School District now owns approximately 130 acres of land adjacent to industrial areas as shown on the attached map. As you can see, the close proximity of the two land uses can create potential for future conflicts between school uses and industrial uses. One reason for the study would be to establish industrial development standards designed to minimize the potential conflict between school and industrial uses. Also included in the study will be identification of possible linkages of opon space or trails into a park system that can serve as a unique element providing better integration with future residential development and school activities. Remmole/Tapper Concerns The City is fortunate to have become the now home of two high-quality firms that feature attractive development sitos. We have been told by both of those firms that one of the negative features about Monticello is the lack of aesthetic controls in the industrial park areas. Remmolo Engineering almost located elsewhere becauso of this concern. If the City is interested in improving our ability to attract high-quality industries, we may wish to establish higher dovolopment standards in certain 0 Council Agenda - 2/25/91 industrial areas. Specifically, the City may wish to develop new standards consistent with the Remmele and Tapper sites for industrial areas located along the Chelsea Road corridor and eapt of the existing Oakwood Industrial Park. The Remmele and Tapper development would serve as the "entry point" to this "Business Park Area." In sum, this concept might have the following positive results: Development of a business park concept will provide a place for companies interested in locating in an area where site development standards must remain high. It is likely that high development or business park standards will be necessary in the industrial areas adjacent to the school facilities. The business park standards will not impact existing industrial land; therefore, industries that cannot achieve the higher development standards will continue to have a place to locate. II. ANALYZE FUTURE USE OF B -2/B-3 PROPERTY NORTH OF MIDDLE SCHOOL (BLUE) Much of the land directly north of the middle school site is zoned B-2 and B-3, which allow primarily commercial uses. The proposed study would review the present zoning designation and determine if this property might achieve a higher use if all or a portion of this area is placed under a different zoning designation. In addition, special regulations would be adopted which would ensure development that is compatible with school uses. Perhaps a portion of this area could be included in the business park area designation. Following are some of the concerns regarding the existing designation of the area north of the middle school as B-3 (highway business) and B-2 (limited business district). 1. Preservation of industrial land is important to the long-term economic health of the community. It may be possible to allow light industrial development in this area without negatively impacting school uses. 0 Council Agenda - 2/25/91 It may not make sense to encourage B-3 (highway commercial) uses outside of the Highway 25 corrider. Typically, commercial uses should be kept centralized and near major highways. • The existence of the large B-3 zone at this location is not consistent with this concept. The area is not a great retail location because it is not on a major highway and because there is no access to the freeway; therefore, the property may develop slowly under the existing designation. III. FUTURE DEVELOPMENT OF THE KLEIN FARM (PURPLE) The Industrial Development Committee has recognized that there are limits to the availability of industrial land, and the committee is interested in identifying areas for future industrial development in addition to the areas now identified for industrial use. The area directly south of the Oakwood Industrial Park, or the "Klein farm," has been identified informally as a potential area for future industrial use. One goal of the study would be to analyze potential uses for the Klein farm given the close proximity to the future elementary school and given the presence of the power lines that traverse the site. IV. FUTURE DEVELOPMENT OF THE HOGLUND PROPERTY (YELLOW) The Hoglund property consists of 72 acres of land zoned I-1 (light industrial). This property is sandwiched between the freeway on the south and Highway 75 on the north. Dahlheimer's property serves as the easterly boundary. The proposed study would analyze the existing zoning designation and determine if any changes are appropriate. In addition, concepts for future development of the site, specifically a potential route for East Seventh Street, and the street's relationship to the Fallon Avenue crossing would be identified. This particular aspect of the study is of a lesser priority and could be abandoned to save expenses. V. DEVELOPMENT OF FREEWAY ACCESS AT COUNTY ROAD 118 The existing comprehensive plan identifies the need to develop access at this location to I-94. The proposed study would examine the need to develop approach ramps and determine to what extent the City should be taking a proactive approach toward acquisition of land or casements necessary to develop freeway access at this location. (2) Council Agenda - 2/25/91 VI. DEVELOPMENT OF FREEWAY CROSSING AT FALLON AVENUE The comprehensive plan calls for development of a freeway crossing at Fallon Avenue. The proposed study would examine the need to develop the proposed overpass in light of continued traffic congestion at Highway 25/I-94 and in light of continued development south of the freeway. The results of the study could become the basis for establishing a fund dedicated to financing this expensive improvement. VII. DEVELOPMENT OF A PLAN FOR STORM WATER MANAGEMENT The efficient use of available industrial land can be improved through development of a common, integrated storm water management system. At present, there are no plans in place for development of such a system; and until such a plan is in place, each development proposal will need to be designed to accommodate storm water on site. Such a piecemeal approach will result in a development pattern that does not result in the highest development potential of the land. The City Engineer will be asked to participate in the study to assist with development of a storm water management plan that would be integrated with land use plans prepared by John Uban. I have been informed that OSM will conduct the study at a cost not to exceed $5,000. BUDGET IMPACT The City budget includes $19,000 for the cost to study the land use issues as noted above. In addition, $20,000 was placed in the budget to address city-wide storm water issues. Sufficient budgeted funds are available to finance the study. ALTERNATIVE ACTIONS: Motion to authorize staff to work with consultants toward development of a study that addresses the issues noted above. Under this alternative, staff would begin to coordinate the efforts of the City Planner and Engineer and work toward addressing issues noted above. Council may wish to select this option but limit the scale of the study by eliminating some of the issues above, or Council may wish to expand the scope of the study. The cost of this (2) Council Agenda - 2/25/91 option for planning alone is estimated to be $20,000. Please see John Uban's proposal for more details. Engineering expenses not to exceed $5,000. Motion to authorize the study of a limited number of items noted above utilizing City staff resources only. Under this alternative, Council may wish to direct staff and Planning Commission to study the matter without the direct involvement of the City Planner. Staff and Planning Commission are capable of preparing new zoning regulations that might fit a "business park" environment. Such regulations would be patterned after standards already in place in another community. Under this alternative, staff would utilize the City Planner as an "advisor" only. Under this alternative, planner fees might amount to $5,000. Motion to deny authorization to study issues noted above. Under this alternative, no action would be taken to address the issues noted above, and the current zoning designation and land use controls would remain in place. Council should select this alternative if it is not convinced that new land use controls need to be established in light of the emerging development patterns in the area. STAFF RECOMMENDATION: The study as proposed is an expensive proposition; at the same time, the magnitude and complexity of the issues, along with the potential far reaching impact of plans made today may justify the expense. Staff recommends that Council review the issues noted in this memo and determine the scope of the project. Once this is accomplished, staff will contact John Uban and have him refine his proposal accordingly. If Council wishes to go ahead using Uban's services, a "not to exceed" figure should be established. Finally, if Council is not satisfied with the quote provided by Uban, staff could quickly prepare an RFP and submit it to other planners in hopes of receiving a better price. SUPPORTING DATA: Map showing areas noted above; Industrial Park Master Plan proposal submitted by City Planner, John Uban. 10 0 94 � R2 -t - � i � , ••FG. r .��;,� ` � -,L�' zC ,t�, a �'-I - `. t 1 N AV ISE - HOGLUND PROPER SQVENTH STREET J, . .. 1 l •' f i00 - - �. Tappa fit /Ta B2' D -- A. J. f. , KLEIN�FARM NEW ROADWAY DEVELOPED WITH ELEMENTARY S HOOD PROPOSED RESIDENTIAL � I 1 Council Minutes - 2/25/91 Consideration of authorizing staff to work with Citv planner toward development of Industrial Park Master Plan. Assistant Administrator O'Neill reported that the Industrial Development Committee has recommended that the City Council authorize staff and City planner to analyze issues pertaining to future development of industrial areas in the community. O'Neill went on to note that one of the goals of the study would be to develop a basis for zoning ordinance and comprehensive plan amendments designed to assist the City in achieving industrial land development potential. O'Neill went on to review the various concerns that have been raised in the past few months regarding industrial land development along with a proposed method for addressing the concerns. In his report, O'Neill outlined the concept of development of a business park design standard in the area of the proposed school district/elementary school development. The study would attempt to establish an industrial development standard designed to minimize potential conflict between school and industrial. uses. O'Neill also noted that the City may wish to develop new standards consistent with the Remmele and Tapper sites for industrial areas located along the Chelsea Road corridor and east of the existing Oakwood Industrial Park. The new standards developed under a business park concept would provide a place for companies interested in locating in an area where site development standards must remain high. He went on to note that the business park standards will not impact existing industrial land; therefore, Industries that cannot achieve the higher development standards will continue to have a place.to locate. O'Neill also went on to review the importance of development of a drainage plan for the area between the school district property and the freeway. At this time, development of that land is hampered by an absence of storm water drainage plans. It may be the appropriate time to develop a plan that would allow for the most efficient use of the industrial property. Council reviewed the proposal to conduct a planning study. It was the consensus of the Council to table the authorization to conduct the planning study pending additional input from the City planner. Council was concerned that the cost of the study is somewhat excessive, and it was suggested that the scope of this study be reduced in an effort to reduce the cost as well. O'Neill noted that he would discuss the matter with the planner and prepare a revised method and program for addressing the planning issues. Council also noted that it makes sense to get the cooperation of Farm Credit on this project. O'Neill noted that he would contact Farm Credit and request their participation in this planning process. Q, t Council Minutes - 2/25/91 Council was concerned that the drainage issues are not properly understood in the area; therefore, a motion was made by Shirley Anderson, seconded by Dan Blonigen, to authorize expenditure of $5,000 toward payment of costs associated with development of a storm water management plan in the area. Motion carried unanimously. O'Neill noted that the cost to conduct the storm water management plan could be incorporated into a public improvement project and said expense could be incorporated into a future assessment role. I C --W- CONSULTING PLANNERS LANDSCAPE ARCHITECTS .100 FIRST AVENUE NORTH SUITE 210 MINNEAPOLIS, MN 55401 612 319.3300 11 October 1990 Jeff O'Neil Assistant City Administrator City of Monticello 250 E. Broadway Monticello, MN 55362 RE: Industrial Park Master Plan Dear Jeff: As we discussed a few weeks ago, we would be happy to assist the City in preparing new development standards and a master plan for Monticello's industrial park. This work would combine existing promotional approaches being used by the Economic Development Commission and Chamber of Commerce to further enhance the industrial park and its ability to attract new industry to Monticello. Initially, the area around the industrial park should be looked at as it relates to future land development and the relationship of industrial traffic on the new school location, as well as other platted residential properties. In reviewing the existing conditions of the Industrial Park, potential industrial growth and land requirements should be reexamined to make sure that, to today's market conditions, the City has an appropriate amount of industrial property for future development. Part of the initial analysis of the area will include reconnaissance using aerial photography, topographic maps, and engineering utility data from the City and LGSM. From this reconnaissance, we will make recommendations for enhancements to the industrial park including circulation and interstate highway identity. Based on these findings. we will prepare a strategy for industrial park development. This may include issues of utilities, hridges and highway access, open space, new performance standards for development, and ordinance changes including setbacks and building construction. After reviewing these findings with City Staff and the Economic Development Commission, we will proceed with the master planningof the industrial park. 'Kris will include new strategies for encouraging an industrial ase development that will provide for a high quality business park atmosphere. Also included in the master planning will be patterns of ownership, recent development, and possible linkages of open space or trails into a park system that can serve as a unique element providing better integration with future residential development and school activities. G) JeR O'Neil, Industrial Park Master Plan Page 2 An illustrative plan showing all of the elements of the industrial park will be prepared. This Master Plan can be used for future promotional activity and decision making necessary to direct development in the industrial park. Furthermore, we will explore a new business park zone and/or special development standards applicable to the industrial master plan to assure continued coordination and enhanced development practices. Throughout the process of developing the master plan and zoning ordinances, we would work closely with City Staff and the Economic Development Commission in reviewing this project with the Planning Commission and business groups. To develop a consensus of purpose and direction needed to complete a master plan for the industrial park, it is important to have the support of the affected land owners, as well as with City leaders. The plan works best with community consensus. Although the described work program may vary after meeting with the Economic Development Commission and others, we propose to proceed in the following order: I. Analysis of Existing Conditions 2. Prepare Findings of Development Review 3. Prepare Mastrr Plan for Industrial Park 4. Prepare Appropriate Ordinances and Comprehensive Plan Amendments 5. Make Presentations Before the City Council, Planning Commission, Business Groups. and land Owners We estimate the costs to he as follows: 1. Analysis $4,500.00 2. Findings 2,200.00 3. Master Plan 4,400.00 4, Ordinances and Amendments 4,800.00 5. Meetings and Presenmtions 3,000.00 Thr. ahrive costs may vary depending on actual requested work and the cuent of assistance from City Staff and others in the gathering of data. As the industrial park today has a variety of types of development, both old and new, there needs to be a cohesive overview and a conceited effort to enhance its image and regional importance. We believe that this effort will have many long term and positive effects on the community, stahilizing both its tax base and employment opportunities, as well as developing a very useful tool to attract new husinesses. Sincerely. DAIILGREN. SHARDLOW, AND UBAN. INC. C. John Uhan, President CJ U/gms ,�C CONSULTING PLANNERS LANDSCAPE ARCHITECTS 300 FIRST AVENUE NORTH SUITE 210 MINNEAPOLIS. MN 55401 612339.3300 21 March 1991 Jeff O'Neil City of Monticello 250 E. 6roauway Bux 83A Monticello, MN 55362 RE: Proposal fur Industrial Park Master Plan Dear Jeff: I have reviewed our proposal and believe that we can adjust the work program to meet many of your basic concerns and, at the same time, reduce the costs. To assist us in keeping the costs as low as possible, we would rely on the City to develop for us an upprepriate base map of the study area. This map would include property lines, parcel uwncrship, roads. power lines, utilities, buildings, parking lots, etc. Staff assistance in obtaining information and the development of the base map will help considerably in our proposed work program. We prupose to prepare a land use study focusing on the school property and adjacent ureas. From this, we will create generalized land use plan alternatives for the Planning Commission and City Council to consider. With the alternate uses, we would develop an outline of new standards that could he applied or written into new ordinances. This revtew will not include a complete comprehensive master plan with detailed illustrative G� utiles a, fust wntanNl.teJ. Also, under this phase of work, we woulo not antictpatc the preparation of ordinance amendments for the City to consider. We will also work with the City Engineer on utility and storm drainage issues as may be needed. A critical element in all of this will be an open space plan that will help buffer adjacent uses and, at the same time, create a unique and attractive setting for both residential and industrial developments. The open space system also can include some of the drainage features and existing utility lines, We will take our land use plans and suggested standards and assist the City in making presentations beforevarious groups and individuals in order to solicit their support for the direction of planning and new industrial standards, 0 C ' Jeff O'Neil, 21 March 1991 Page 2 I envision this process to be a very cooperative one between the City Staff and DSU in developing the most complete and cost effective product possible. We believe that there is great potential for improving the area in south Monticello before additional development takes place. It is estimated that the costs for the reduced scope of services would be between Eight and Nine Thousand Dollars (48,000.00 to $9,000.00). The amount of meetings and presentations, of course, would be controlled by the City, but may need some additional emphasis later in the project. As always, we will continue to work with City Staff to help develop a consensus in the community toward developing an effective planning program for industrial growth in Monticello. Sincerely, DAHLGREN. SHARDLOW, AND UBAN, INC. (i , �J,i* /,//Jr,� C. John Uhan, President CJ U/gms C �D r 11 Council Agenda - 4/22/91 ADDITIONAL AGENDA ITEM: Consideration of renewal of gambling licenses --Monticello Jaycees. (R.W.) A. REFERENCE AND BACKGROUND: The Monticello Jaycees currently have three gambling licenses that are to expire June 30, 1991, and are located at the Silver Fox Motel, the Comfort Inn, and Joyner's Bowling Alley. New state regulations require that organizations apply for renewal of their gambling licenses at least 10 weeks prior to the expiration; and as such, the Monticello Jaycees are requesting the Council approve the issuance of the licenses by agreeing to waive the 60 -day waiting period. Technically the City does not officially approve license renewals, but the Gambling Control Division does allow the City Council to prohibit the activity if It passes a resolution in opposition. The City Council has 60 days after the application is received in which to express opposition to the Gambling Control Board. It the Council does not oppose the issuance of the gambling license renewals, I will write a letter to the Gambling Control Division indicating the City has no opposition to the renewals taking effect June 30, 1991. D. SUPPORTING DATA: Copy of the financial report and charitable contributions. 7 /5 ao I �5i9. co L2 go G� I ,S/,--2 7.. -/o4/5• °y I /507. co an5,9 Cu i --,9 -3 7 C� —� 6 <9.CSD � 41 Council Agenda - 4/22/91 ADDITIONAL AGENDA ITEM: Consideration of renewal of qamblinq licenses --Monticello Jaycees. (R.W.) A. REFERENCE AND BACKGROUND: The Monticello Jaycees currently have three gambling licenses that are to expire June 30, 1991, and are located at the Silver Fox Motel, the Comfort Inn, and Joyner's Bowling Alley. New state regulations require that organizations apply for renewal of their gambling licenses at least 10 weeks prior to the expiration; and as such, the Monticello Jaycees are requesting the Council approve the issuance of the licenses by agreeing to waive the 60 -day waiting period. Technically the City does not officially approve license renewals, but the Gambling Control Division does allow the City Council to prohibit the activity if it passes o resolution in opposition. The City Council has 60 days after the application is received in which to express opposition to the Gambling Control Board. if the Council does not oppose the issuance of the gambling license renewals, I will write a latter to the Gambling Control Division Indicating the City has no opposition to the renewals taking effect June 30, 1991. D. SUPPORTING DATA: Copy of the financial report and charitable contributions. C 1 41 _9v 10 dil P, 7 "0 to 410 J T�O - &V -5-1,P 7. 60 5r,/ o'l. tL. x'75 GG 13 7 19e«:a27.