Loading...
City Council Agenda Packet 10-14-1996AGENDA v REGULAR MEETING - MONTICELLO CITY COUNCEL Monday, October 14, 1898.7 p.m. Mayor. Brad Fyle Council Members: Shirley Anderson, Clint Herbst, Brian Stumpf, Tom Perrault 1. Call to order. 2. Approval of minutes of the regular meeting held September 23, 1996. 3. Consideration of adding items to the agenda.-,��11: i -r c. 4. Citizens comments/petitions, requests, and comigain-U." M'1 A. Introduction of Superior Services by Tom Dullinger (formerly Vasko Rubbish). 6. Coneent agenda. A. Consideration of final payment to Bonine Excavating, Inc., for Southwest Area Utility Improvements, City Project No. 86-01 C. 6. Consideration of a request for an amendment to a conditional use permit allowing commercial and restaurant uses in a PZM zone. Applicant, Rob Hoffman/Hillside Partnership. 7. Consideration of a resolution accepting transfer of Riverside Cemetery from the Masonic Lodge. 8. Consideration of adopting a policy on charging for false fire alarm responses and consideration of establishing a salary schedule for fire department officers. 9. Consideration of amendments to union and non-union sick leave/severence policy. 10. Consideration of authorizing purchase of city hall oftico workstation dividers. 11. Consideration of authorizing advertisement for bids for purchase of snow removal equipment - Pathway. Agenda Monticello City Council October 14, 1996 Page 2 12. Review of bids for a 150 -horsepower diesel -powered snow blower for street cleaning and widening, and consideration of purchase. 13. Consideration of amending job description for Chief Building Official and consideration of adding step 7 to the pay equity salary schedule. 14. Adjournment. MINUTES REGULAR MEETING - MONTICELLO CITY COUNCIL Monday, September 23,19M - 7 p.m. Members Present: Brad Fyle, Shirley Anderson, Clint Herbst, Brian Stumpf, Tom Perrault Members Absent: None Approval of men es of the special meeting h .1dSS_ptember 9 and the reg +u 1=r meeting held September 9, 1996. Councilmember Stumpf noted a typographical error in item 3C of the regular meeting minutes. A MOTION WAS MADE BY SHIRLEY ANDERSON AND SECONDED BY TOM PERRAULT TO APPROVE THE MINUTES OF THE SPECIAL MEETING HELD SEPTEMBER 9 AND THE MINUTES OF THE REGULAR MEETING HELD SEPTEMBER 9, 1996, AS CORRECTED. Motion carried unanimously. Consideration of adding items to the ng n a. A MOTION WAS MADE BY BRIAN STUMPF AND SECONDED BY TOM PERRAULT TO ADD THE UPDATE ON THE TREATMENT PLANT STUDY TO THE AGENDA. Motion carried unanimously. 0 Public Works Director John Simola reported that at the August 26 meeting, HDR reviewed the estimated cost of the proposed wastewater treatment plant expansion, which increased from $10,000,000 to $12,000,000, approximately $2,000,000 over the previous estimate. Council directed City staff and PSG to work with HDR to lower the coat of the project to bring it more in line with the original estimate. After reviewing the plane, Simola reported that their goal was to reduce the cost but maintain the scope of the project, its integrity, its operability, its maintainability, and the enhancements regarding odor control and tree planting that were promised to neighbors. Several small changes were made, along with the deletion of small pieces of equipment that were not absolutely necessary, for a savings of $489,870. By also deleting the 3'% contingencies on the savings and the 16% engineering fee on the savings, a total savings of $666,293 was reached, Page 1 0 Council Minutes - 9/23/96 Simola requested that Council authorize advertisement for bids in order to keep the project moving forward; however, at the same time, staff would continue to review the plans with HDR for additional savings. AFTER DISCUSSION, A MOTION WAS MADE BY CLINT HERBST AND SECONDED BY TOM PERRAULT TO AUTHORIZE ADVERTISEMENT FOR BIDS FOR THE WASTEWATER TREATMENT PLANT EXPANSION PROJECT AND AUTHORIZE CITY STAFF TO CONTINUE REVIEWING THE PLANS AND NEGOTIATING WITH HDR TO FURTHER REDUCE THE PROJECT COST. Voting in favor: Clint Herbst, Tom Perrault, Brad Fyle. Opposed: Brian Stumpf, Shirley Anderson. Motion passed. Councilmembers Stumpf and Anderson noted their dissatisfaction with the fact that HDR submitted the lowest bid originally but continues to increase the project cost to an amount higher than all the original bids received. It was their view that it was unreasonable for HDR's fee to increase as the project cost increased since they were awarded the project based on their low bid. 3B. Consideration of advertiainC for hila for anowhlower. Public Works Director John Simola reported that a new snowblower is needed and requested that Council authorize advertisement for bids at this time to expedite the process before snowfall. The cost of a new snowblower was estimated at $65,000. It was the consensus of Council to authorize the Public Works Director to advertise for bids for a new snowblower for the public works department. 3C. nnunont. on letter rn n Vauphn Veit. Councilmember Herbst stated that the City received a letter fHom Vaughn Veit alleging that the City of Monticello had informed Veit's truck drivers that they could not use County Road 75 in Monticello. In his letter. Veit demanded that the City publish an apology in the newspaper. Herbst stated that the City has never forbid anyone the use of a city street. It was noted that there had been a discussion between City staff and the City of Minneapolis Public Works Department regarding the number of trucks on County Road 75 in Monticello, and Herbst Pago 2 0 Council Minutes - 9/23/96 praised the City of Minneapolis for agreeing to cooperate by using the second Monticello exit whenever possible to help reduce the truck traffic for residents living on County Road 75. After discussion, it was the consensus of the Council that no apology would be printed in the newspaper. 4. Citizem commenter/ itio a , s and coMplainU. None. VoriRpritaffenda. Counc ilmember Herbst requested that item 5A be removed from the consent agenda for discussion. A. Consideration of final navment_on-nublic_works building eamanaion. M -1 -Rx" M- 77TItG , : • : , : , , Councilmembers Anderson and Herbst questioned making final payment prior to all project items being completed. Public Works Director Simola noted that the items should be completed within a week. A MOTION WAS MADE BY SHIRLEY ANDERSON AND SECONDED BY CLINT HERBST TO AUTHORIZE FINAL PAYMENT TO SHINOOBEE BUILDERS FOR THE PUBLIC WORKS PHASE II EXPANSION IN THE AMOUNT OF $24,265.98 CONTINGENT UPON ALL ITEMS BEING COMPLETED BEFORE PAYMENT. Motion carried unanimously. Mayor Fyle opened the public hearing. It was reported by the City Administrator that Mr. Sandip Bhakte was in the process of purchasing the Comfort Inn Motel and Treehouse Lounge from Robert Eidsvold. As part of the transfer of ownership, Mr. Bhakte applied for the on -sale liquor license to be transferred to his new corporation. A background check showed no information that would prohibit him from obtaining the license. Page 3 9 Council Minutes - 9/23/96 There being no public comment, the public hearing was closed. A MOTION WAS MADE BY SHIRLEY ANDERSON AND SECONDED BY BRIAN STUMPF TO APPROVE THE TRANSFER OF THE CURRENT ON -SALE LIQUOR LICENSE FOR THE COMFORT INN/TREEHOUSE LOUNGE TO MR. SANDIP BHAKTE, DBA GAGA CORPORATION. Motion carried unanimously. Assistant Administrator O'Neill reported that John Bondhus of the Bondhus Corporation requested a variance to the 40-11 rear yard setback requirement for parcels located in the 1.1 zone. The request proposed an extension of the existing building line at the current 3 -ft setback for a length of 179 ft. A similar variance was approved in 1989 based on the finding that the variance would not result in a depreciation of adjoining land values due to the infrequency of use of the Burlington Northern Railway. ONeill noted that the Planning Commission recommended approval of the variance. It was their view that granting the variance would not set a precedent due to the existing building at the requested setback and due to the narrowness of the parcel. Public Works Director John Simola asked whether the Planning Commission discussed the safety of care parking near the steep slope on the northwesterly side of the site. He was concerned about cars going over the embankment if curbing is not installed in this area. O'Neill noted that the Planning Commission didn't discuss curbing in this area since the ordinance allows elimination of curbing in an expansion area. O'Neill noted that the safety issue can be handled administratively by City staff working with Bondhus on the site plan. AFTER DISCUSSION, A MOTION WAS MADE BY SHIRLEY ANDERSON AND SECONDED BY BRIAN STUMPF TO APPROVE THE VARIANCE REQUEST FOR THE BONDHUS CORPORATION. Motion was based on the finding that the variance would not result in a depreciation of adjoining land values, and it would not be possible to obtain reasonable use of the property for I.1 purposes without a variance due to the unique shape of the parcel and the location of the existing building on the site. Motion carried unanimously. Page 4 9 Council Minutes - 9/23/96 • A�� A MOTION WAS MADE BY BRIAN STUMPF AND SECONDED BY TOM PERRAULT TO WITHDRAW THIS ITEM FROM THE AGENDA AS REQUESTED BY THE APPLICANT, INVESTORS TOGETHER. Motion carried unanimously. 10. rn aidpration of anprovin¢ an option ag=m nt for thta saleof LotA Block_ LL Oakwood Industrial Park 2nd Addition - I.akp Tool. City Administrator Rick Wolfsteller reported that he has been working with Eric Rondhus of Lake Tool to finalize a purchase agreement offer from Lake Tool for the acquisition of Lots 1 and 2, Oakwood Industrial Park 2nd Addition, as previously approved by the City Council. In addition to purchasing Lots 1 and 2, Lake Tool requested consideration of a 3 -year option on Lot 3. The proposal offered a 3 -year agreement to purchase Lot 3 at the City's asking price of $27,232, with Lake Tool paying an annual option fee of 3% of the asking price. AFTER DISCUSSION, A MOTION WAS MADE BY BRIAN STUMPF AND SECONDED BY SHIRLEY ANDERSON TO APPROVE ENTERING INTO AN OPTION AGREEMENT WITH LAKE TOOL FOR LOT 3, OAKWOOD INDUSTRIAL. PARK 2ND ADDITION, FOR 3 YEARS AT A 3% ANNUAL FEE BASED ON THE 1996 ASKING PRICE OF $27,232 Motion carried unanimously. 11. Co sideration of hills for t_he month of Sp ern r. It was the consensus of Council to direct City staff to research the title of the recently -purchased Kruse property for the possibility of being reimbursed the cost of removing the contents from the underground tank and capping two wells found on the site. AFTER DISCUSSION, A MOTION WAS MADE BY SHIRLEY ANDERSON AND SECONDED BY TOM PERRAULT TO APPROVE THE BILLS FOR THE MONTH OF SEPTEMBER AS PRESENTED. Motion carried unanimously. There being no further business, the meeting was adjourned. Karen Doty Office Manager Page 5 0 Bonne Excavating was awarded the Southwest Area Utility Improvement Project in April of 1995. The project was completed recently with tho replacement of the lits station hatch. The original contract price on the project was $163,152.98. The total construction cost is $164,642.80. To date, we have paid $142,858.47, leaving a balance due the contractor of $11,684.33. "he difference between the actual construction cost and estimated construction cost is $8,610.18, which was related to normal construction modifications. The first alternative is to authorize final payment to Bonine Excavating for Southwest Area Utility Improvements, City Project No. 95-01C, in the amount of $11,684.33. The second alternative would be to not make final payment to the contractor. !^ STAFF RE .O MENDATION: It is the recommendation of the City Engineer and Public Works Director that the City Council authorize final payment to Bonine Excavating, Inc., as outlined in alternative #1. I)— RUPPORTLNC DATA - Copy of final payment request. OrrsdldmOctober 9, 1996 300 fGrk ILxc Gw 5775 Waynta bwkwwd MMWap Ais, MN 554lb- 1228 612.595.5775 1-800.753.5775 Honorable Mayor and City Council 1Ax595-5774 Palgincels City of Monticello AIihiu is P.O. Box 1147 K nm.. 250 East Broadway s 1�,•y„ Monticello, MN 55362-9245 Re: Southwest Arca Utility Improvements and Appurtenant Work City of Monticello Project No. 95 -OIC OSM Project No. 5562.00 Dear Mayor and City Council Members: Enclosed are four (4) copies of Final Construction Pay Voucher No. 3 for the referenced project in the amount of $11,684.33. We recommend final payment subject to receipt of the following items: 1) Satisfactory showing that the Contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding State Income Tax and; 2) Evidence in the form of an Affidavit that all claims against the Contractor by reasons of the contract have been fully paid or satisfactorily secured. Please make payment in this amount to Bonine Excavating, Inc., 12669 Meudowvalc Road, Elk River, MN at your earliest convenience. Sincerely, ORR•SCHELEN-MAYERON & ASSOCIATES, INC. 0t*ftarles A. Lepak, Y.E. Project Engineer Enclosures c: Tom Bose - City of Monticello Rick Wolfsteller - City of Monticello Boninc Excavating, Inc. cc l.Wnmlrn kC0P Y0J'M ,,*W I "I-.—, I "*— S,F4 CONSTRUCTION PAY VOUCHER Estimate Voucher Number: 3 Date: October 9, 1996 OSM Project Number: 5562.00 Period Ending: October 9, 1996 Project: SW AREA UTILITY IMPROVEMENTS AND APPURTENANT WORK /FINAL CITY OF MONTICELLO 95-01C Contractor: BOVINE EXCAVATING INC. 12669 MEADOWVALE ROAD ELK RIVER MN 55330 Contract Date: April 31, 1995 Work Started: April 25, 1995 Completion Date: Work Completed: Original Contract Amount 163,152.98 Total Additions 0.00 Total Deductions 0.00 Total Funds Encumbered 163,152.98 Total Work Certified to Date 154,542.80 Less Retained Percentage 0.00% 0.00 Less Previous Payments 142,858.47 Total Payments Incl This Voucher 154,542.80 Balance Carried Forward 8,610.18 APPROVED FOR PAYMENT, TRIG VOUCHER 11,684.73 APPROVALS ORR-SCHELEN-MAYERON & ASSOCIATES, INC. Pursuant to our field observation, as performed in accordance with our contract, and based on our professional opinion, materials are satisfactory and the work properly performed in accordance with the plane and specifications and that the total work is: 100% completed as of October 9, 1996. We herby recommend payment of this voucher. Signed: Signed<-- ► � Q{� Construction Observer Project Manager/Engineer BONINE EXCAVATING INC. This io to certify that to the beet of my knowledge, information, and belief, the quantities and values of work certified heroin is a fair approximate estimate for the period covered by this voucher. Contractor: Data: CITY OF MONTICELLO Chocked By: Data: Signed By Title Approved for payment: Authorized Representative Date: PAGE 1 Estimate Voucher Ruiner: 3 OSM Project Wear: 5362.00 for CITY Of MONTICELLO SCHEDULE A - VATERKAUN 11 V0UC MER of TAIL LIST Project, SV AREA UTILITY MPROVEIERTf AND APPURTENANT WORK /FINAL CITY OF MONTICELLO PROJ. NO.t 95 -OIC Item Spee No Description Ous"Ity Unite 1 2611.503 61 MATERIAIM-D.,CT IRON CL S2 160 LIN FT 2 2611.503 11 UATERMAIN-DUCT IRON CL 52 1171 LIN FT 3 2611.503 101 IUTERMAIN-DUCT IRON CL 32 40 LIN FT 4 2104.501 REMOVE 101 DIP WATERMAIN 33 LIN FT S 2611.503 121 WATER RAIN-OUCT IRON CL 52 142 LIN FT 6 2611.502 HYDRANT 2 EACR 7 2611.502 61 GATE VALVE AMD 00 4 EACN a 2611.502 Er GATE VALVE Alm Box 2 EMS 9 2611.502 101 GATE VALVE AND SOIL 1 EACN 10 2611.502 11 CORPORATION STOP 1 SACK 11 2611.502 /1 CIRIB STOP S BOX 1 EACH 12 2611.503 11 TYPE K COPPER PIPE 30 LIN FT 13 2611.502 21 CORPORATION STOP 1 EACN 14 2611.502 2. CURB STOP B BOX 1 EACH 13 2611.503 21 TYPE K COPPER PIPE 10 LIN FT 16 2611.502 COIINECT TO EXISTING WATER MIN 1 EACN 17 2611.SOS AI POLYSTYRENE INSULATION s0 KO TO 11 2611.520 DUCTILE IRON FITTINGS 2125 LB 19 2211.501 AGGREGATE BASE CLASS s 10 TON 20 DIV It REMOVE B REPLACE IIT ON 67 $0 TO 21 DIV II GMUNOMATER 01111 3 EACN 22 DIV it PM UTILITY CONSTRUCTION 1 LINA up 23 2573.502 SILT FENCE,NEAVT MTV ISO LIN FT 24 2577.505 SMING 70 W TD 25 2573.501 SEEDING 1.2 ACRE 26 2101.501 CLEANING .5 ACRE 27 2575.523 MOOD FIBER IIANCET SOO Ko ITU TOTAL SCKEOULE A - WTCMIN RMB -TOTAL Date: OCTOBER 9, 1996 Contract Contract Cotpleted This Month Total To Data Unit Price Total Price Ouentfty Total Otanti ty Total Price ................................................. 24.46 /,402.40 0 0.00 ......... 154 ............ 3,766.14 25.77 30,337.06 0 0.00 1152 29,617.04 30.30 1,212.00 0 0.00 63 2,314.90 3.10 102.30 0 0.00 75 232.SO 35.31 5,014.02 0 0.00 117 4,131.27 1,532.00 3,064.00 0 0.00 2 3,064.00 351.00 1,404.00 0 0.00 4 1,404.00 $01.10 1,002.20 0 0.00 1 SOMO 114.10 114.10 0 0.00 1 a14.to 13.30 13.30 0 0.00 2 26.60 49.40 49.40 0 0.00 2 91.0 10.15 304.50 0 0.00 40 406.00 142.00 142.00 0 0.00 0 0.00 170.30 170.30 0 0.00 0 0.00 13.55 IMSO 0 0.00 0 0.00 410.00 410.00 0 0.00 1 410.00 12.33 370.50 0 0.00 11 222.30 1.15 2,"3.75 0 0.00 2690 3,025.50 6.80 544.00 31 346.80 St 3".10 13.35 W4.45 0 0.00 49.31 651.29 0.01 0.03 0 0.00 0 0.00 513.00 513.00 0 0.00 1 313.00 1.05 307.50 0 0.00 0 0.01) 2.05 143.50 10 20.50 10 164.00 615.00 731.00 .5 307.SO 2 1,230.00 1.072.00 536.00 0 0.00 .5 536.00 1.35 675.00 0 0.00 0 0.00 .................... • 55,763.21 .................... B 674.250 .................... S 53,2521.06 B 55, 763.21 B 674.80 $ $3.621.06 2 OF 3 O V 1 d 3 OF 3 V O U C H E R D E T A I L L 1 6 T Estis,ate VOYCHer W, r: 3 Project: SW AREA UTILITY IMPROVEMENTS AND APPURTENANT WORK /FIRAL Date: OCTOBER 9, 1996 OSH Project Nurtber: 5562.00 CITY Of MONTICELLO PROD. RO.: 95-OIC for CITY OF MONTICELLO SCHEDULE B • SANIUIRY SEWER Contrect Contract Coapleted This Month Total To Date Item Spec NO Description Ouentlty Unita Unit Price Total Prise Guentlty Total 9WaBtlty Total Price .... ............................................ 28 2621.511 6• DIP CLASS 52 . fORCEMAIN ......... .......... ............. 116 LIN FT ............. 25.15 ......... 2,917.40 ............. 0 0.00 ... ...... 90 ............ 2,263.50 29 2621.511 4• PVC PIPE SEWER SDR 26 SERVICE 20 LIN FT 20.03 400.60 0 0.00 72 1,442.16 PIPE 30 2621.511 6• DIP CLASS 52 . POLY LINED 130 LIN FT 32.57 4,234.10 0 0.00 0 0.00 31 2621.511 6• PVC PIPE SEWER WR 26 SERVICE 60 LIN F1 21.09 1,265.40 0 0.00 68 1,434.12 PIPE 32 2621.511 1W DIP CLASS 53 . POLY LINED 450 LIN FT 39.36 17,712.00 0 0.00 449 17,672.6A 33 2621.511 1O- PVC PIPE SEWER SDR 26 717 LIN FT 25.69 18,419.73 0 0.00 719 18,471.11 34 2305.541 1S• RCP CLASS IV SEWER PIPE 173 LIN FT 41.15 7,118.95 0 0.00 169 6,954.35 35 2621.502 10" N 4• VYES 1 EACH 67.20 67.20 0 0.00 1 67.20 36 2621.502 10' X 6^ WYES 3 EACH 72.10 216.30 1 72.10 3 216.30 37 2621.502 POLY DUCTILE IRON FITTING 175 LB 2.03 358.75 0 0.00 0 0.00 38 2621.502 DUCTILE TRW FITTINGS 500 LB 1.30 650.00 0 0.00 525 682.50 39 2621.SO6 AN DESIGN 4028.48 STANDARD 66.05 LIN FT 103.30 6,822.97 0 0.00 66.4 6,859.12 40 2621.506 NN DESIGN 4028.48 WATERTIGHT 20.33 LIN FT 194.65 3,961.13 0 0.00 20 3,893.00 41 DIV II CONNECT TO EXISTING MANHOLE 1 EACH 512.50 512.50 0 0.00 2 1,025.00 42 2105.343 GRANULAR FOUNDATION MATERIAL 75 TON 0.01 0.75 0 0.00 0 0.00 43 DIV II LIFT STATION 1 LIM SUM 42,732.00 .................... 42,732.00 .08 3,418.56 .93 39,740.76 TOTAL SCHEDULE B • SANITARY SEVER .................... B 107,389.77 .................... .................... S 3,490.66 .................... .................... 5 100,721.76 "-TOIA1 • S 163,152.98 ..........6 S 4,165.46 .nna... 6 154,542.80 GRAND TOTAL S 163,112.98 4,165.46 S 154,x2.80 O V 1 d 3 OF 3 Council Agenda - 10/14!96 6. .:,, a: permit allowing comy�prcial sand restaurant nms in a PZM zone, Pnrtnprshhh (J.0.) Rob Hoffman, operator of Jala Peno's restaurant, and the owners of the Hillside Partnership request permission to allow outdoor seating in a portion of the parking area adjacent to the rear door of the building. The seating area will occupy 6 parking spaces and would be used when the weather allows. According to Huffman, the outside area will be closed lei hour after the kitchen closes, which is 10 p.m. Hoffman does not plan to build a deck or other structure at this time. The area will be designated perhaps by potted planta and a temporary fence. He expects that 4.6 tables will be situated in the area. Hoffman indicated that he does not plan on providing music or other entertainment activities outside of the facility. There will be muted decorative lighting installed, but no signs. In addition, as noted on the attached site plan, Hoffman plans to plant additional trees to help screen the area. NEIGHBORHOOD IMPACTS To the north of the site is the 66 -ft wide Burlington Northern/6th Street right-of-way. Beyond the tracks is Cedar Crest parking lot and senior citizen apartment building. The mall building will block the view of the outside seating area as seen from Cedar Crest Apartments. To the east and south of the site is the retaining wall and above are the 7th Street apartments. A screening fence is already installed along this property boundary. According to the conditional use permit now governing the site, a deficiency in parking was accounted for through a "proof of parking requirement," which requires that the owner install the full complement of parking if the need arises as defined by the Planning Commission. The parking will be extended easterly into the vacant area alongside the railroad tracks. In reviewing the operation of the facility, it does not appear that additional parking is warranted at this time. The development of the outside seating area resulting in the loss of 6 parking spaces will likely contribute to the eventual need to develop additional parking spaces. As you can see on the attached site plan, there is sufficient area to develop the full complement of parking required by ordinance, including the 6 spaces lost to the outdoor seating area. Council Agenda - 10/14/86 The owner of the site has indicated that they will enter into an agreement requiring installation of additional parking space if the need arises as defined by the Planning Commission. The agreement will include a letter of credit or financial guarantee that the City can tap if need be. B. Ai.TF.RNATIVE ACTIONS: 1. Motion to approve the proposed amendment to the conditional use permit allowing outside seating based on the fording that the proposed use is consistent with the purpose of the PZM zone; and due to the type of use and the conditions noted, the activity will not be detrimental to the neighborhood in which it is located. Therefore, the proposed use is consistent with the comprehensive plan for the city. Motion to approve is subject to the following conditions: 1. Compliance with the terms of the existing conditional use permit, including proof of parking provisions. 2. Outside seating hours end % hour atter the kitchen closes or at 10:30, whichever is sooner. 3. No music. 4. Lighting shall be subdued. 6. Additional tree plantings must be completed as identified on the site plan. 6. Liquor and beer may be served, but liquor may not be poured outside of the building. Under this alternative, the Planning Commission believes that the activity will not result in a problem for the neighbors, The area of outside seating is relatively small and not intended to be a raucous party area with loud music and tho like. It's just a place where patrons may eat outside during warm summer months. Sufficient separation exists between the outside seating area and residential uses that should limit any appreciable impact. It could be argued that outside seating could actually improve the security of the parking lot. This Is the alternative recommended by the Planning Commission. Council Agenda - 10/14/96 i 2. Motion to deny the proposed amendment to the conditional use permit. This motion could be based on the finding that the proposed use will likely result in problems for the neighborhood. Perhaps the conditions outlined will be difficult to enforce and result in activity and noise that would be a disturbance to the neighborhood. Therefore, due to the detriment to the neighborhood, the expansion is not consistent with the comprehensive plan for the city. C_ STAFF RFCOMMFNDATION: The Planning Commission recommends approval. The outside seating area proposed is relatively small and located some distance from the adjoining residential areas; therefore, it should have a benign effect on the neighborhood as long as the conditions are met. It might even be argued that the presence of people sitting outside will have a positive effect on the security of the area. More and more, zoning codes are changing to allow a mixing of commercial/entertainment and residential uses in urban areas. Sidewalk/outdoor cafes are in many places and are an integral part of the fabric of city life. As long as tho conditions are met, I beliovc it is safe to say that the proposed use is consistent with the purpose of the PZM zone and will not be a detriment to the neighborhood. Conditions from current conditional use permit; Copy of site plan. Council Minutes - 11/27/95 6. Consideration of an amendment to the zoning man which would chnngLju zoning district designation of Part of Lot 4. Bloch 1. L.auring Hillside Terrace Addition. from R-3 to PZM. Applicant. Vaughn Veit 7. Consideration of an amendment to a conditional use permit which would allow full use of thp Hillside Partnership mall. Applicant. Hillside partnership, 8. Consideration of a request to a mhdivid a portion of Lnt 4. Block 1. 1,.q firing Hillside Terrace. for combination with the Hillside mall prey Applicant. Vault n Veit Assistant Administrator O Neill reviewed the history of the Sixth Street Annex mall, noting that in 1994, the applicant failed to obtain sufficient votes necessary to rezone a portion of Lot 4, Block 1, Lauring Hillside Terrace, from R-3 to PZNM for additional parking to accommodate expansion of a restaurant within the mall; however, they did obtain an amendment to the conditional use permit which allowed expansion of the restaurant in the mall subject to a number of stipulations and conditions. One of the conditions required that 9,100 sq ft of the available space in the mall be left vacant in order to maintain sufficient parking for the restaurant and current uses tit the site. After two years of operating the mall under the restricted use of the facility, the developer has again requested rezoning so that land is available for future parking demands and the building can be fully occupied. O Neill noted that a buffer area would have to be established between the parking area and the neighboring residential area, and it was the recommendation of the Planning Commission that Council approve the requests. He also reported that the owner of the neighboring R-3 property would not support expansion of the restaurant or additional after-hours activity but was satisfied with the current use of the property. Councilmember Herbst expressed opposition to rezoning the proposed area for parking because it is adjacent to a residential area. Councilmembers suggested that perhaps rear entrances for customers should be required as retail spaces are leased to new tenants. It was their view that customers would not use the rear parking spaces if there were no entrances in the back of the building. The Assistant Administrator noted that Council could require additional rear entrances as a condition of the conditional use permit. Page 4 (n Council Minutes - 11/27/95 AFTER DISCUSSION, A MOTION WAS iYLADE BY BRLAA N STUMPF AND SECONDED BY TOht PERRaULT TO APPROVE AN ORDLNANCE AINIENDNIENT REZONING A PORTION OF LOT 4, BLOCK 1, LAURING HILLSIDE TERRACE, FROM R-3 TO PZM TO ACCO` NIODATE 56 ADDITIONAL PARKING SPACES. Motion is based on the finding that the expansion proposed and associated rezoning is consistent with the character of the area and is consistent with the comprehensive plan for the city. Voting in favor: Brian Stumpf, Tom Perrault, Shirley Anderson, Brad Fyle. Opposed: Clint Herbst. Motion passed. SEE ORDINANCE AMENDMENT NO. 276. AFTER DISCUSSION, A MOTION WAS MADE BY BRIAN STUM PF AND SECONDED BY SHIRLEY ANDERSON TO APPROVE THE CONDITIONAL USE PERMIT WHICH WOULD ALLOW FULL USE OF THE SDCTH STREET ANNEX MALL SUBJECT TO THE FOLLOWING CONDITIONS: 1. THE DEVELOPER SHALL PROVIDE PARKING, GRADING, AND DRAINAGE PLANS SUPPORTING DEVELOPMENT OF AN ADDITIONAL 56 STALLS. PRIOR TO THE CITY GRANTING AN OCCUPANCY PERMIT TO ANY OF THE RETAIL AREA J 9 PREVIOUSLY OFF LIMITS, THE DEVELOPER SHALL OBTAIN / WRITTEN APPROVAL OF THE PARKING, GRADING, AND DRAINAGE PLANS FROM THE CITY ENGINEER 2. THE DEVELOPER SHALL NOT BE REQUIRED TO INSTALL THE PARKING AREA PRIOR TO OCCUPANCY OF THE NEW RETAIL AREA; HOWEVER, A FINANCIAL GUARANTEE AND ASSOCIATED AGREEMENT SHALL BE ESTABLISHED THAT WOULD ALLOW THE PARKING LOT AND ASSOCIATED REQUIRED LANDSCAPING TO BE INSTALLED AT THE FULL DISCRETION OF THE PLANNING COMMISSION AT THE FULL COST OF THE DEVELOPER 3. THE PORTION OF LOT 4, BLOCK 1, LAURING HILLSIDE TERRACE, NEEDED FOR PARKING SHALL BE SPLIT AWAY FROM LOT 4, BLOCK 1, AND ADDED TO THE SL`{TH STREET ANNEX MAU PROPERTY. 4. PRIOR TO THE CITY GRANTING OCCUPANCY OF THE UNUSED RETAIL AREA, THE DEVELOPER SHALL PROVIDE A LANDSCAPING AND SCREENING PLAN THAT MEETS THE REQUIREMENTS OF THE CITY AS APPROVED BY CITY STAFF. 5. ALL OTHER CONDITIONS AS NOTED BY ORDINANCE AND INCLUDED IN PREVIOUS CONDITIONAL USE PERMITS ISSUED, 6. PARKING ALONG THE FRONT OF THE BUILDING SHALL BE LIMITED TO 15•NIINUTE PARKING ONLY AND SIGNED ACCORDINGLY. Page 5 (0 6 Council Minutes - 11/27/95 7. ADDITIONAL LIGHTING SHALL BE PROVIDED IN THE REAR OF THE FACILITY TO IMPROVE SECURITY. 8. REAR PUBLIC ENTRANCES MUST BE INSTALLED AS NEW TENANTS LEASE RETAIL SPACE. Motion carried unanimously. Motion is based on the finding that the conditional use permit with conditions as noted will result in a land use that is consistent with the character of the area, will not result in a depreciation of adjoining land values, and is consistent with the comprehensive plan. A MOTION WAS MADE BY BRIAN STUMPF AND SECONDED BY SHIRLEY ANDERSON TO APPROVE THE SUBDIVISION OF A PORTION OF LOT 4, BLOCK 1, LAURING HILLSIDE TERRACE. Voting in favor. Brian Stumpf, Shirley Anderson, Tom Perrault, Brad Fyle. Opposed: Clint Herbst. Motion passed. Council Agenda - 10/14/96 At our June 10 Council meeting, representatives of the Masonic Lodge approached the Council with a proposal for the City to take over ownership and operation of the Riverside Cemetery. The Council had generally approved the idea of taking over ownership of the cemetery after further investigating the cost of operations. Currently, the general day -today operations at the cemetery are handled by three individuals. Mr. Bill Kearin is probably the most knowledgeable of the cemetery's operation and has been a good resource for the staff to consult with regarding its day -today operations. Mr. Kearin has recently been more involved with the placing and setting of headstones, and the City hopes to continue utilizing his services for that purpose. Since Bill goes south for the winter, the Lodge has hired a separate caretaker as the contact for potential sales and marking of grave sites for upcoming funerals. Ms. Mary Bray is the current Sexton and is compensated $180 per month. At this point, it is the City's intention to continue utilizing her services over the winter months and finalize a job description that can be used for contracting next spring. During the winter, the City will be obtaining bids from interested parties for providing the caretaker service along with contract mowing and leaf cleanup. The Masonic Lodge has currently used Carefree Lawn Service on a contract basis for mowing and leaf pickup. It is the staff's intention to also contract this service by advertising for bids next spring in conjunction with our other requests for mowing bids at various public facilities. For your information, Carefree is our current contract mowing service that the City uses. The third primary contract service that is utilized is Mr. Ray Glunz of Buffalo who does the grave site excavation and backfilling, along with restoration services. Likewise, it would be our inanition to continue utilizing Mr. Glunz's services at this time based on tho recommendation of the Lodge, who has been happy with his services provided. It is our intention that the cemetery should be run as an enterprise fund similar to our sower, water, and liquor operations. In other words, the revenue generated from the operation should be sufficient to cover its expenditures. A preliminary budget was prepared outlining the general revenue and expenditures expected during the first year of operation. A copy Council Agenda - 10/14/96 is enclosed for your review. The Masons have indicated that they have had sufficient revenue from sales of grave sites annually to cover the cost of its general operations, and it may be assumed that the City would likewise be able to operate without using tax dollars to support it. Hopefully this is true; but I think the City will be expected to maintain the cemetery to a higher standard than maybe the Masonic Lodge was able to do. While there do not appear to be major improvements that need to be done immediately, it may be beneficial to repair some of the fencing surrounding the cemetery in the future and also add additional fencing to unfenced areas. Some interior road maintenance may be required, which could ultimately lead to some additional paving of driving areas to avoid washouts. If funding was tight for the Masons, mowing would be stretched out as far as possible, whereas the City will likely be expected to mow more often. Until we at least have a year's operation to go by, we can only assume the Masonic Lodge's general budget is fairly accurate, and we have utilized most of those coat estimates in our preliminary budget. For 1997, no additional funds were included in the City's budget, as it was assumed the operation would be self-sufficient; and any cost overruns would come from the approximate $12,000 to $13,000 surplus that will be transferred to the City as part of the overall ownership. After we've got a better handle on our expenditures annually, we can then decide whether we need to raise additional revenue by increasing the cost of future grave sales. According to state statutes, the City has the authority to accept and operate a cemetery. A basic resolution has been prepared for Council action that acknowledges the transfer of the cemetery and the perpetual care funds. Mr. Jim Fleming, attorney for the Masonic Lodge, is preparing the necessary deeds and documents for the transfer from the Lodge, and our City Attorney has reviewed the abstract and resolution. At this point, all that is left is the official acceptance of the operation and transferring of operating and perpetual care funds to the City. B_ ALTERNATIVE ACTIONS; 1. Adopt the resolution accepting the transfer of the Riverside Cemetery and perpetual care funds from the Masonic Lodge. C s en i k� 1 Ow-: w� Under this alternate, the City would officially take over the ownership and operation of the cemetery and continue to utilize the services of Mary Bray as caretaker and Carefree Lawn Service for leaf cleanup, along with Ray Glunz Excavating for grave digging services. 2. Do not accept transfer of the cemetery. Council Agenda - 10/14/96 C. STAFF RECOMMENDATION: It is the recommendation of the Public Works Director and myself that the City continue contract operations with the present services through the winter, allowing us time to finalize the contract specifications for the Sexton and to then advertise for proposals from interested parties in the spring. This would be the easiest transition for the City during the winter months, and we should be able to incorporate the contract mowing into our basic bid documents next spring and finalize the role of the contracted caretaker. On the recommendation of the Lodge officials, John and I can find no reason why we shouldn't continue with the excavating services of Glunz Construction of BaUo at this time. Our City Attorney, Dennis Dahlen, working on behalf of Paul Weingarden, has not yet had a chance to do a title opinion on the cemetery property. In addition, Mr. Dahlen also suggested that any transfer of funds be contingent upon a review of the cemetery finances to make sure the City is receiving all of the funds associated with the cemetery and isn't assuming some type of liability. If the Council accepts the transfer Monday night, any motion should be contingent upon a review of the accounting procedures and acceptable title opinion on the land. Copy of proposed resolution; Preliminary budget estimates. RESOLUTION 96 - RESOLUTION ACCEPTING THE TRANSFER OF RIVERSIDE CEMETERY AND PERPETUAL CARE FUNDS FROM MASONIC LODGE WHEREAS, the Monticello Masonic Lodge #16 A.F. & A.M. has owned and operated the Riverside Cemetery in Monticello since 1883; and WHEREAS, the Masonic Lodge has determined it would be increasingly difficult to continue to operate and maintain the cemetery due to declining association membership; and WHEREAS, the Masonic Lodge Board of Trustees has voted to authorize and request the City of Monticello to accept the transfer of the Riverside Cemetery and to continue to operate, maintain, manage, conduct, and control the cemetery, including the selling of lots and the administration of all remaining perpetual care funds; and NOW, THEREFORE, BE IT RESOLVED by the City Council of Monticello: The transfer of all records, property, and funds of the Masonic Lodge Cemetery Association is hereby accepted. The transfer of all perpetual caro funds is also accepted and will be used and administered by the City for the same purposes as originally established. The City Council may establish rules, regulations, and policies to conduct, manage, and maintain the transferred cemetery as needed. Adopted by the City Council this 14th day of October, 1986. Mayor City Administrator ESTIMATED 1887 RIVERSIDE CEMETERY BUDGET (Operating Fund) Beghuiing Cash Balance (est.) 11/1/96: $12,600 REVENUE: Grave sales - est. ave. 30 per year 0 $360 ea. $10,600 Grave openings/closings ® $325 ea. 4,876 Interest income 260 TOTAL REVENUE $16,626 EXPENDITURES: Caretaker - Sexton (currently $160/month) $1,800 Contract mowing/leaf cleanup (currently $600/time) 7,000 Excavating - grave openings/closings (16 0 $300) 4,600 Black dirt replacement 376 Fence repairs 2,000 Tree trimming - cleanup 600 Road - driveway maintenance/snow removal 1,600 Miscellaneous expenses 600 TOTAL EXPENDITURES $18,176 Est. Ending Balance 12/31/97 $9,960 CEMETERVAI: IWOM6 Pape t mI 1897 BUDGET L RIVERSIDE CEMETERY (Perpetual Care Fund) Est. Beginning Balance 11/1/86 $18,600 Additional charge from each grave opening ($60 X 15 openings) 760 Additional fee fi. on each grave sale (30 ® $60 e..ch) 1,600 Interest income _1-000 Est. Ending Balance 12/31/87 $22,760 7CJ CEMETERY.97: 1011M "2 t. A RIVERSIDE CEMETERY SPECIAL ITEMS 1. Surveying in west end. 2. Filing roadways blading. 3. Minor fill of graves with black dirt and seed. 4. Fence repair. 5. Weed spraying. 6. Snow plowing in winter for general access. 7. More frequent mowing. 8. Tree thinning and removal. 9. Pumphousc and faucet system maintenance. 10. Fence additions, spcciftcWly the east side. 11. Sweeping. 12. Stone straightening. 13. Pick up mid dispose of old flowerslbaskcts in the spring. C .�iQ7r.:�dI -M 7D Council Agenda - 10/14/96 C.1 1;1 1 r: 71 1 111 1,1 N 11 •'1 1 1 I • rl, i • x111 1 ii k= The Monticello Joint Fire Board recently met to review the 1997 proposed fire department budget, which included discussion on finalizing a policy allowing the fire department to charge individuals and businesses for false alarms and to consider establishing an annual salary structure for various officers of the fire department. FADE ALARM POLICY As you may recall, the Council discussed last December the idea of establishing a new policy that would allow the fire department to charge individuals or businesses for numerous false fire alarm calls. With the advent of security systems becoming more popular in businesses and residential properties, the fire department was seeing an increase in the number of false alarms that were occurring. Each fire call has to be responded to and costs the Joint Board money for salaries of firemen who respond. The Joint Board felt it would be appropriate to establish a policy that allows each property owner one false alarm annually; but after receiving a warning, the second false alarm would allow the department to send a bill for $100, and each false alarm thereafter would cost $250. Many false alarms occur when there may be a problem with their security alarm system that simply needs adjusting; and unless there's an incentive, many businesses or property owners fail to promptly have their system serviced. The policy is simply intended as a mechanism for the fire department to charge for obvious repeat offenders and as an inducement to have property owners make sure their systems are serviced and operating properly. In all likelihood, there will be very few individuals that will actually end up being charged for a fire call, but the Joint Board felt it would be appropriate to adopt this policy giving us the opportunity to charge if we find obvious violators. It was the consensus of the Council last December to table action on the adoption of this policy pending input from Silver Creek Township and the City of Otsego who are serviced by our fire contracts. Both jurisdictions were notified of our proposed policy, and we requested input from them. I have not received any official word from the City of Otsego regarding this potential policy, but Silver Creek Township has indicated they would be in agreement with such a policy and feel also that it's a way of keeping the fire department cost down, which will ultimately help them in keeping their contract fee reasonable. Monticello Township officials have also indicated support Ibr this policy. Council Agenda - 10/14/96 At this time, the fire department would not have the authority to place any unpaid bill as a lien against the property if the false alarm occurred outside of the city of Monticello. In our situation, it is assumed any unpaid false alarm charge could be placed as a Gen against their property taxes similar to any other delinquent charge; and if the bill occurred in Monticello Township, it would be the Township's responsibility to collect the bill in any manner they see fit. As far as charges occurring in the City of Otsego or Silver Creek Township, we are proposing that contract language be added to the renewals January 1 for these two jurisdictions that indicates if a bill is unpaid, it would be the responsibility of the Township or City to reimburse the fire department for the expenditures. In exchange for adding this language to a contract renewal, the Joint Board recommended keeping the fee the same at $35 per parcel for these contract renewals. If the Township and/or City governments were not agreeable to this contract language change, the Joint Board would have to look at increasing the annual fee higher than the present $35 amount. It is believed this would be enough incentive for the contract jurisdictions to accept a contract modification. DECISION 1- FALSE ALARM POLICY Adopt the policy recommended by the Joint Fire Board establishing a fee of $100 for the second false fine alarm within a 12 -month period and a fee of $250 for the third or more offense. Under this alternative, fire department personnel would hand or deliver a notice after the first false alarm of the City's policy outlining the future charges if false alarms continued to occur. Each individual or business would be then billed the appropriate amount; and in the case of the City of Monticello, any unpaid bill would simply be placed as a lien against the property after a public hearing notice. As far as other jurisdictions are concerned, it would be the responsibility of each jurisdiction to reimburse the fire department if the individual did not pay the bill. Do not adopt the policy on false alarm charges at this time. It is the recommondation of the Joint Fire Board that a policy be adopted as outlined under alternative 01 above. Council Agenda - 10/14/96 II. SALARY SCHEDULE • FIRE DEPARTMENT OFFICERS The second item discussed at the recent Joint Fire Board meeting Concerned the establishment of an annual wage structure for various fire department officers in lieu of the present policy of simply allowing officers to be paid $7 for each fire whether they attended or not. Fire Chief Mark Wallen had indicated a survey of various municipalities showed that some volunteer fire departments establish annual salaries for various officers such as Chief, Assistant Chief, Captains, Secretaries, and Treasurers, etc. It was his recommendation that the Joint Fire Board consider recommending to each jurisdiction that a salary schedule be adopted in lieu of our present policy. Currently, the Chief, Assistant Chief, Secretary, and Treasurer each receive $7 for every fire call, whether they attend or not. In reviewing the 1995 fire calls, the four positions received approximately $1,865 total for compensation above what they would have earned had they been paid only for the fire calls attended. This compensation varied amongst the individuals and ranged from $365 to $580 but did not necessarily reflect the amount of work each officer may have had to put in. It was recommended by the Joint Board that Monticello Township and the City Council consider the following proposed salary schedule for various officers of the department: J Chief $1,800 annually I S00 Asst. Chief 600 11, a t" Treasurer 160 ^� I, Secretary 300 U Captains 300 ;; a — Training Officer 1 600 b Training Officer 2 inn { A TOTAL . $4,350 lit) 0 In addition to the Pour officers who had previously been allowed additional compensation, it was recommended that the two Captains and the two Training Officers also be included if a salary schedule is adopted. The reason for adding additional officers is that it is becoming difficult to find volunteers to conduct training seminars each month when no additional compensation is provided. This small amount of annual compensation for each individual would acknowledge that extra time is needed for these various fhnctions performed. For example, the Fire Chief estimates that he spends up to 15 hours a week average on fire department -related business and in 1995 received approximately $485 above the fire call wages for these hour's spent. While the Fire Chiefs case may be unusual, a lot of unpaid time is put in by these various officers whether it's training or the Secretary who keeps the minutes and prepares the payroll documents. As far as the 1997 budget is 10 Council Agenda - 10/14/96 concerned, it was noted by the Joint Board that if the Township and City Council approve the establishment of a salary schedule beginning in 1997, the additional $2,500 that would be needed could simply be reallocated amongst other expenditures and would not require the total fire department budget to be increased at this time. DECISION 2 - SALARY SCHEDULE - FIRE DEPAMMENT OFFICERS The first alternative would be to approve the adoption of a salary schedule for the eight officers as outlined above rather than continuing the present policy of paying some of them $7 per hour for each fire call. Adoption of the above schedule would add about $2,500 to the salary category for 1997. Do not adopt a salary schedule at this time and continue with the present policy of paying $7 for each fire call to the four officers whether they attend the fire or not. Adopt a salary schedule different than the one proposed above. V STAFF RFCOMMRNnATION • DECISION 2: From my standpoint, the present policy of paying certain officers $7 for each fire call whether they attend or not does not seem to be logical in relation to the time that may be spent by that individual. For example, the Fire Chief might spend 15 hours a week on fire department duties and receive very little compensation for this if he attends most of the fires anyway; whereas, some other officer with limited responsibilities would receive the same amount of money even if they only attended half the fires. It would be my recommendation that a salary system be established similar to alternative ql and eliminate the present policy of paying whether they attend a fire or not. None. v Council Agenda - 10/14/96 9. Co aid ration of m n mnntn to .pion �d non pion sl lc 1_eave/severence policy, (R.W.) As part of our union negotiations and contract settlement last April, the City Council had agreed to investigate further the idea of amending our present sick leave policy in regard to the maximum number of days that could be accumulated and the severence policy relating to unused sick leave. A number of points were discussed by the negotiating committee, which included Councilmember Herbst and myself, that warranted further investigation. As part of the contract settlement, the City had agreed that if any changes were approved for the non-union members, the union membership would receive the same benefits retroactive to April 1, 1996. This agenda item is really covering two areas concerning our sick leave policy, one being possible amendments to the number of maximum days an individual is allowed to accumulate, and the second being how an individual is compensated for any unused sick days upon leaving the City employment in good standing or through retirement. Although these issues are certainly directly related, the Council may want to take action on each item separately. MAXIMUM BICE LEAVE ACCUMULATION Currently, both the union contract and our general personnel policy for non- union employees indicates that a maximum of 100 days is allowed to be accumulated under our sick leave program. Currently, all employees receive one day per month for sick leave benefits; and therefore, if no sick leave is used by an individual, it would take a little over eight years to accumulate the maximum number of days. For an employee who did not use any sick leave for whatever reason, he or she would no longer receive any additional sick leave accumulation once they've reached that 100 -day mark. Union personnel were asking for an increase in the maximum accumulation above the 100 -day amount, as they feel a good employee who has not abused or been required to use a large amount of sick leave days should not be penalized by no longer accumulating any additional days but should be rewarded by the City through some method, There certainly is merit to those comments in that if an employee uses sick leave benefits, they can continuo to cam now hours as time goes on. For someone who has boon fortunate enough to remain healthy and not use sick leave benefits, there comes a point where they no longer receive the additional sick leave benefit. It could be argued that there will no longer be an incentive for an employee to not take a day off hero or there under the sick leave provision once they've reached the 12 Council Agenda - 10/14/96 maximum since there is no reason to not use a day occasionally. From that standpoint, it may certainly be beneficial for the City to consider allowing some type of increase above the 100 -day maximum, and some ideas for amending this provision are as follows: 1. An employee could be allowed to continue banking sick days above 100, but they would only be used by the employee for a major illness after the 100 days were used up. This provision would at least indicate to an employee that the City will still keep records of additional days; and if a major illness did occur, days would be available. But you could establish that they're not available for severence pay benefits. 2. The City could allow an employee to accumulate one-half of a day per month for sick leave once they reach the 100 -day maximum. 3. The City could allow one-half of a day per month after 100 days to be set aside into a deferred compensation program that needed to be matched by the employee toward retirement benefits. This would be an incentive for an employee to put away funds for eventual retirement by requiring the employee to match the equivalent of the half -a -day that the City would be contributing after they've reached the maximum. 4. For those individuals that have already reached the maximum, the City could agree to provide an exchange of each additional year's worth of sick leave benefits to be exchanged toward the cost of providing single health insurance coverage to the employee upon retirement for one year. b. Increase the maximum number of days to be accumulated from 100 to 120 or some other amount. All of the above examples aro ones that are being currently used by other communities in Minnesota. It's very common for cities to reduce the amount of sick leave that has accumulated after they've reached a maximum number of days; but in many cases, the reduced accumulation is allowed to be used as vacation or toward paying for health insurance premiums upon retirement, or even paid in cash at the end of a year. The idea is to recognize and reward an employee for not utilizing sick leave unnecessarily but give them a reason for saving as much as possible. Council Agenda - 10/14/96 SEVERENCE PAY PROVISIONS The second part of this item concerns the amount of benefit that is payable from sick leave accumulation upon retirement. Although the percentages vary depending on the number of years between union and non-union employees, generally speaking, any employee who has worked for the City longer than 10 years can receive 50% of their unused sick leave benefits upon retirement up to a maximum of 50 days' pay. In other words, an employee who has accumulated the maximum of 100 days would receive 50 days' pay. The union had sought during the negotiation to have 100% of their sick leave benefits usable by the employee for maintaining health insurance coverage after retirement. The logic for this request is that it may encourage an employee to consider earlier retirement than age 62 if there is a method for continuing health insurance coverage until Medicare kicks in. Many communities do allow unused sick leave to be used for continuing health insurance coverage. There are actually benefits for both the employee and the employer if unused sick leave is paid out in health insurance premiums rather than in cash upon retirement. From the employer's standpoint, the City is able to spread out the coat of the eeverence pay over a number of years rather than in one lump sum. From the employee's standpoint, current tax codes do not ennsider as income any payment made by the City for continuing health insurance coverage to an employee who retires. If the employee received the sick days paid in cash, it is currently considered taxable income in the year received. From this standpoint, it may certainly be beneficial for an employee to have the eeverence pay used for continuing health insurance coverage if he needs health insurance anyway. Although it certainly doesn't seem to be a problem to allow an employee to use eeverence benefits for continuing health insurance coverage, the union had originally requested during negotiations that the percentage of the sick leave days be increased tom 50% to 100% eligible for payment. A possible suggestion for increasing the percentage may be to tie it to the years of employment. For example, non-union employees currently aro eligible for sick leave severence benefits as follows: After 5 years employment: 25% of unused sick leave After 10 years: 5096 To recognize longer-term employees, the policy could be amended to add 3% per year to the amount of benefit that would be payable upon retirement. For example, if someone is a 20 -year employee, they would receive 80% of the unused sick leave at retirement. After 27 or 28 years, they would reach the maximum of 100% of any unused sick days. The City could further tie the increase above 50% to how the soverence benefit was paid. If the employee opted for cash at retirement, we could leave the percentage at 50% or Council Agenda - 10/14/96 whatever is established but consider a higher percentage if the funds were used by the employee for continuing health insurance coverage. The higher percentage would probably still be beneficial to the City in that we would not have to come up with a lump sum upon retirement but could spread it out over a number of years to cover health insurance costs. Some of you may be questioning why would the City want to increase any of the benefits for severence pay or sick leave accumulation after a contract has been signed or separate them from salary negotiations? Aside from the fact that the negotiating committee had agreed and also the City Council by agreeing to the contract renewal that we would investigate and discuss possible sick leave benefit amendments, there can be a plus for the City under these types of changes. As we continue to have longer-term employees, incentives for someone considering early retirement may be important. Many times I've heard that an employee may consider early retirement, but the issue of continuing health insurance coverages is too costly, and they will continue working so that they can have this coverage available. In analyzing the pay structure for union employees, replacing a longer-term employee at the top of their wage scale with a new union employee, the City would save over $16,800 in wages over the first five years because of our step system. Similar savings would likely occur from almost any other position within the City and would certainly outweigh any additional cost the City would incur by increasing sick leave reverence benefits. R_ ALTERNATIVE ACTIONS: DECISION 1 • MAXIMUM SICK DAY ACCUNUI.AMON 1. The sick leave policy could be amended to allow accumulation of days over 100 to be used for a major illness only after the 100 days are used. 2. Allow days over 100 to be accumulated with half a day to be accumulated toward deferred sick leave and the other half for additional vacation days. 3. Amend the policy to allow conversion of % day over 100 to be paid into a matching deferred compensation program for the employee. 4. Allow maximum accumulation of 120 days. G STAFF, F..O MF.NDATION - D ..ISION L While 1 believe all of the above options am intended to acknowledge and roward an employee who has not used much sick leave benefits, it's hard to pick one as a specific recommendation. At a minimum, l would suggest that Council Agenda - 10/14/96 an employee be allowed to accumulate additional da yr above the 100 even if it's only used for a major illness of that employee and not for reverence benefits. Without any additional incentive, there really is no reason for an employee not to use an occasional sick day as time off once the 100 days are accumulated if the City is not willing to recognize this accomplishment. From a savings for retirement concept, the idea of accumulating S4 day of pay toward a deferred compensation program if the employee matches it certainly encourages an employee to save for future retirement purposes. DECISION 2 - SEVERENCE PAY FOR UNUSED NICK LEAVE DAYS 1. The present policy could be amended to allow a retiring employee the option of utilizing unused sick leave benefits to be paid by the City for continuing health insurance coverage upon retirement based on the following percentages: After 6 years of employment: 2696 of unused sick leave After 10 years: 60% For each year thereafter: An additional 3'% 2. Amend the policy to allow use of reverence benefits for continuing health insurance coverage at retirement but refer only 60% of the unused sick days. 3. Allow use of unused sick leave to be used toward health insurance at the percentages established under alternative 81; but if the benefits are accepted in cash upon retirement, the benefit would be payable at only 60'% of the unused days rather than the higher percentage. 4. Other options to be considered by Council. (: RT FF F .OMMF.NDATION -DECISION 2: It appears that its becoming more commonplace for cities to allow employees to use unused sick leave soverenco benefits as payment toward health insurance coverage upon retirement in lieu of a cash payment. From the City's standpoint, it becomes beneficial in that a lump sum does not have to be expended immediately; and from the employee's standpoint, it can be an inducement for early retirement. As I noted earlier with one example, a union employee at the top of the wage scale would currently be paid $15,800 more than a new employee would receive over the first five years of employment. This could certainly offset any increased cost the City would experience by allowing a larger percentage of sick leave benefits to be used by an employee toward retirement insurance cost. I believe that anything Council Agenda - 10/14/96 r the City can do to make it easier for someone who may be considering early retirement, to do so would not be detrimental to the City. Likewise, tieing in the amount of unused sick leave to length of employment seems logical as a way of rewarding longer-term employees. Alternative #1 would accomplish this recognition. Although the initial discussion on these sick leave benefit changes was part of our union contract negotiations, it is assumed any benefit changes would be made part of our overall personnel policy and would be applicable to all City employees retroactively to April 1, 1996. Copy of union contract addendum. MEMORANDUM OF UNDERSTANDING CONCERNING CONTINUED DISCUSSIONS ON POSSIBLE SEVERENCE PAY MODIFICATIONS (Section 82.01) As part of the negotiated labor agreement for the period April 1, 1996, to April 1, 1998, the City of Monticello and the International Union of Operating Engineers Local No. 49 mutually acknowledge that the City of Monticello will be considering possible amendments to the reverence pay provisions that would allow all City employees to utilize at least 50% of the accumulated sick leave benefits toward continuation of health insurance premiums by the employer upon retirement. It is understood that further discussions will occur on the feasibility of establishing a formula that may enhance the number of days that can be accumulated and/or percentage of accumulated sick leave that could be used toward continued health insurance coats. It is also mutually agreed that any modifications to the reverence benefit would be applied retroactive for Local No. 49 employees to April 1, 1996. CITY OF MONTICELLO (Z L�P,�City Admini Dated: April 0—, 1996. 8EVEMMEAM VITW INTERNATIONAL UNION OF OPERATING ENGINEERS LOCAL N0.49 Authorized Signature Council Agenda - 10/14/86 k REFERENCE AND BACKGROUND: In 1991 and 1892, $11,800 was included in the budgets for those years to cover the cost of office dividers for the city hall workstations. The intent at that time was to look at providing a workstation structure that would lessen the noise between each desk and also provide a better appearance from the present cluttered atmosphere one sees when now entering city hall. In 1992, quotes were obtained from office equipment suppliers for workstation enclosures that would not only provide soundproofing between workstations but would include the actual desk, file cabinets, and other office furniture as part of the package. Because of the high cost for the conversion estimated at between $10,000 and $20,000, the idea was dropped at that time but has now become more important, as it has become a problem with noise levels between workstations interfering with the employees' ability to conduct conversations or general work. In addition, with the additional filing cabinets, computer workstations, fax machines, and other office equipment purchased over the years, the appearance of our office has not improved but is becoming more cluttered. A quotation was received from Marco Business Products out of 3t. Cloud for the purchase and installation of various freestanding workstation dividers that could be placed around each desk location to not only beautify the office atmosphere but also provide noise reduction between each desk. Depending on the location of the workstation, the panels would be of various heights, still allowing each workstation the ability to see customers. We had initially hoped to find office dividers that were used to keep the cost down; but this has not been feasible, and the proposal is to purchase dividers as outlined for each location at a total cost of approximately $3,200, which would include a desk divider partition for the building inspection office. In comparing this cost to replacing the desk with a now workstation system that includes dividers with desk and file cabinets built in, this is a much more efficient way of creating a workstation separation and noise reduction and also to provide an attractive appearance to the public. B. ALTFRNATIVF ACTIONR: Authorize the purchase of the various desk divider partitions as outlined at a total cost not to exceed $3,200. Do not authorize the purchase. Council Agenda - 10/14/96 It is my recommendation that the workstation dividens be approved as outlined. Although the office work area will appear more attractive to the visiting public, the main reason is to provide some privacy between workstations and to reduce the noise level that is currently existing because of the close proximity of each desk. The dividers as proposed will not isolate anyone from viewing customers as they enter and will still allow each station to be easily accessible to each other and to the public. There are sufficient funds budgeted from prior years to cover this expenditure. Sketch of workstation areas to be provided dividers. r i y. 11 9� — v 1 � O �er.►w't , I/A H Yg/(.w Goa M 41ae.� �CP fiwk J Council Agenda - 10/14/96 t t . Consideration of advertisement for hide for a 100-hornenower 4- wheel thrive snow hlower/nlnw for elenring tyhe_Fa hway Rystem and sidewalks. (J.SJ A. F.F . F.N .. AND BACKGROUND: During our previous budget meeting, the City Council requested additional information on the possible purchase of a heavy duty piece of equipment ideally suited for snow removal from sidewalks and pathways. Rather than wait for the next budget meeting, City staff received a request from the Parks Commission and Monticello Community Partnere to bring this issue to the Council in the hopes of getting equipped as soon as possible to clear the pathways this winter. Consequently, prior to making a decision to advertise for bids or purchase a piece of equipment for this use, the City Council must first determine if they wish to remove snow from the pathway system. The actual pathways to be cleaned or not cleaned do not have to be determined at this time, they can be determined at a later meeting; however, I have enclosed a map of the pathway system for your review. This map was taken out of the Updated Comprehensive Plan. The School Boulevard pathway is projected to be a major problem due to drifting. The most suitable piece of equipment that we have been able to find for the snow removal and maintenance on sidewalks and pathway systems is the unit with the performance characteristics and size of the Trackless MT. This is a 4 -wheel drive articulated tractor with 100•horsepower and made for the use of several attachments. The Minnesota Cities User List for this type of equipment is extensive. Many cities have found this piece of equipment to be ideally suited for winter snow removal from pathways and sidewalks. In addition, the amount of different attachments available for this unit now make it suitable for year round usage. Some cities, such as the Anoka Parks Department, believe the piece of equipment is not the best piece of equipment for continual all summer long mowing. One can purchase less expensive mowing equipment which would allow the unit an extended life for its primary purpose of snow removal. For our specific purpose, we feel that the piece of equipment should be specifled with the snow blower, with an option to purchase a V plow and sand/salt spreader for the rear. It would be an impossible task to keep the pathway black and completely five of snow, but the sand/salt spreader would at least allow us to control any major icing problems. 20 Council Agenda - 10/14/96 We have included a brochure on the trackless unit, which is the type of equipment the specifications were drafted for, along with a list of the different attachments available for summer use as well as winter use. We also have a short video tape that would beneficial for the City Council to am. The Public Works Department recently had a demonstration of a blacktop cold planer, which was attached to a bobcat and used for removing blacktop for patching operations. The unit that attaches to a bobcat sells for around $20,000. In order to be able to use the MT style of tractor for a cold planer, the tractor specified must have a deep reduction transfer case installed at the factory during its manufacturing, to add such a transfer case later would be extremely expensive. With the deep reduction transfer case installed on the tractor unit, the cold planer could be added some time in the future at a cost of around $14,000. The planer cute the amount of time necessary to do street patching -significantly. As our core streets get a little older, patching becomes a major operation for the street department during the summer months. The estimated coat of a 4 -wheel drive articulated tractor with a snow blower is $64,000, excluding sales tax. The cost of the deep reduction transfer case to add an attachment like the cold planer in the future is $5,000, a hydraulic operated sand/salt rear -mounted spreader would be about $4,000, and the V plow is expected to be $2,300. Adding these items would bring the cost of the unit to about $75,300, excluding sales tax. The first alternative is to approve the specifications for the 100 - horsepower 4 -wheel drive tractor to include the snow blower, with options for the V plow, salt/sand rear -mounted spreader, and the deep reduction transfer case. Bids would be returned November 7, 1996, and would be reviewed by the City Council on November 11, 1996. Assuming a 30 -day delivery, this piece of equipment could be here in early December. The second alternative would be to advertise for bids for the tractor but to leave out the deep reduction transfer case or the option for a sandlsalt spreader. The third alternative would be to advertise for a used piece of equipment. Most cities trade after 12-15 years, so we could buy a 1981-1983 model, but probably well worn. Council Agenda - 10/14/96 The fourth alternative would be not to advertise for bids for this piece of equipment, either based upon the City Council deciding not to clear snow from the pathway system or to use other means to remove the snow such as contracting. C. STAFF RRRCOMMENDATION: The piece of equipment described above is a recognized standard for cleaning sidewalks and pathways among many communities across Minnesota. However, it does need an operator, and the City will have to look at the time frame on which they will clean the pathways. A normal snow event for us can mean plowing streets and parking lots for one or two days and hauling snow off Broadway the next evening, which puts the major part of the crew at home sleeping the following day. John Lukach is assigned to sidewalks (which we currently remove snow from) and could get started on the pathway system immediately after they are cleaned. If we do not have a major storm event, the Street Superintendent and/or people Brom the Water/Sewer Department could be utilized, but one would not normally expect the pathways to be cleaned until three days after the end of a snow event. More than likely, we may have them done earlier, but our main priorities are streets/parking lots; and with the variable weather conditions in the winter, it would be difficult to guarantee a one- or two-day time frame without adding additional manpower or contracting. It is the recommendation of the Public Works Director to approve the specifications and authorize advertisement for bids as outlined in alternative ql should the Council choose to remove snow from the pathways. Between now and the 11th of November, City staff will investigate the manpower issues and look at a more firm schedule for completing the pathways, and we could talk to a few contractors and get some estimated coats for contracting snow removal on the pathway system. Copy of the specifications and brochures; Copy of pathway system map. 22 pRAfl SPECIFICATIONS FOR ONE (1) NEW 100 HP DIESEL POWERED SIDEWALK/PATHWAY PLOW & SNOW BLOWER FOR THE CITY OF MONTICELLO, MINNESOTA Prepared by Jodm P- Simok Public {Yorks Director October 11, 1996 CITY OF MONTICELLO ADVERTISEMENT FOR BIDS FOR ONE (1) NEW 100 HP DIESEL POWERED SIDEWALK/PATHWAY PLOW & SNOW BLOWER Notice is hereby given that sealed bids for furnishing a new 100 HP Diesel Powered Sidewalk/Pathway Plow & Snow Blower will be received by the City of Monticello until ! 0 a.m. on Thursday, November 7, 1996. These bids will be publicly opened and read aloud at said time. Each bid shall be submitted on a proposal form which is attached to the specifications. Specifications are on file in the office of the City Administrator, 250 East Broadway, Monticello, Mumesota 55362. Specifications will be furnished free upon request. All bids must be sealed, marked "100 HP Sidewalk/Pathway Plow & Snow Blower", and addressed to the City Administrator. Each bid shall be accompanied by a certified check, cashier's check, or bid bond in the amount of 5% of the total amount of the bid. Bids shall be based on such payment for the product described in the specifications. The right is reserved to rejea any or all bids and to waive informalities therein. Bids may be rejected for any alterations or erasures. BY ORDER OF THE CITY COUNCIL Date: October 14, 1996 Rick Wolfsteller City Administrator ro M pub"ed hede mondca615wa1 WIN" 1 a74M cnmcwa W0gxV THP0W w wear Pap t 11B GENERAL SPECIFICATIONS FOR ONE (1) NEW 100 HP DIESEL POWERED SIDEWALKIPATHWAY SNOW PLOW & SNOW BLOWER Y:..01.I)�. All bids must be written in ink or typewritten. All bid envelopes must bear the inscription "100 HP Sidewalk/Pathway Snow Plow & Snow Blower", as well as the name and address of the bidder. Envelopes to be addressed to the City of Monticello, P.O. Box 1147, 250 East Broadway, Monticello, Minnesota 55362. Bids must be submitted on official bid proposal forms and must be in a sealed envelope. Product specifications and literature including warranty information must be provided with bid. 3. INTENT It is the intent of the City not to be restrictive to any one manufacturer. However, the unit desired must be a new current production model and meet or exceed the enclosed standards, and any unit firmished which does not meet or exceed the specifications may be rejected and returned to the bidder at his expense. All items appearing in the bidders regular specifications, which are in addition to these standards, are assumed to be included in the bidder's proposal. Requests for any major variations fi-om bid specifications, (such as engine, transmission) must be made in writing and received by the Director of Public Works at least five (5) days prior to the bid opening. Additionally, all variations from speciflcatiore (if any) must be noted and attached as pan of proposal form or bid will be disqualified. 4. BID AWARD Bid award will be made and contract executed by the City of Monticello. Award of contract will be based upon, but riot necessarily limited to: a) Price; b) Delivery date; c) Pans and service; and d) Analysis and comparison of specilication details. Bidder to include freight charges to the City of Monticello, additional freight charges are not allowed. All pages shall be signed or initialed by authorized bidder's representative as indicated at the bottom of the page(s) of the request for bid forms. All rights are reserved to reject any or all bids if in the best interest of the City. The successfltl bidder(s) shall fltmish manufacturer's new warranty (minimum one (1) year after delivery) and will replace or repair defective material, pans, workmanship and/or inadequate design, at no cost to the purchaser, in aocordance with such warranty. If the manufacturer's warranty is longs than one (1) year, that length shall be provided. Any new models that have not been in fLll production for three (3) years of more shall carry an extra year (2 -year) warranty on the drive train, such as the transmission, drive shafts and gear boxes. loll&.. rp.1 // V Bidders shall indicate on the attached proposal form the number of calendar days after notice of award by which time all items shall be delivered. Notification of award is expected to occur on Tuesday, November 12, 1996. laiiiiiiiiiiii-3c.1Y-K�63-molXILI):y.unsw( The successful bidder(s) will be required to execute a contract with the City of Monticello. A complete set of mawf wtura's specifications and illustrated descriptions shall be furnished in duplicate with each bid. Time of delivery is an essential and critical provision of these specifications. If the successful bidder fails to deliver the item pursuant to the delivery schedule the bidder indicated on the attached proposal form, The City shall have the right to deduct from any money or monies due or coming due to the successful bidder, as liquidated damages, the sum of Fifty Dollars (S50.00) per day for each calendar day delivery is postponed beyond the maximum delivery date as indicated on the attached proposal form, except for delays caused by Acts of God or other conditions beyond the control of the bidder. Any sums so e -ducted are not to be construed in any sense as a penalty, but rather liquidated damages sustaimea by reasons of extra costs incurred by the City to contract for snow blowing services or rem a comparably equipped machine. 10. MANUALS One (1) parts, One (1) service, and two (2) operator's manuals are to be provided to the City for each different model delivered to the City. Two (2) hours of training for operators and one (1) hour of training on maintenance will be provided upon delivery of unit by qualified trainer(s). 13. AUTHORIZED OR FRANCHISED DISTRIBUTOR Any successful bidder of a franchised item or of an item sold through an authorized distributorship program shall upon request of the City, present evidence of the franchise relationship or factory authorized distributorship. The City reserves the right to reject the bid if the bidder fails to provide the requested evidence. C'61C1UOt URM#AnCWM9W IVIM Pop // 13, EXCISE TAXES Instrumentalities of the State of Mmnesota are not subject to Federal Excise Taxes. Individual exemption catiScates wig be furnished on request if needed by the contractor to reclaim for himself such charges. 11. MINNESOTA STATE SALES TAX The City is not exempt from state sales tax. The bidder shall include the applicable state sales tax in the bid. 15. COLLUSION OF BIDDERS Collusion between bidders is just cause for rejection of all bids of bidders thus involved. The successful bidder(s) further agree to guarantee all materials and pans bid and supplied against inferiority as to specifications unless such variances are noted by the bidder on the bid documents, such guarantee to be unconditional. Failure or neglect of the City to require compliance with any term or condition of the contract or specification shall not be deemed a waiver of such term or condition. 17. LEGAL RIGHT OF MATERIAL The aucessftd bidder shall guarantee that they will have full legal right of material delivered under this agreement, and agree to pay all rents and royalties of every description on any/all patents or patent rights covering said material used in its construction and agree to indemnify and save the City entirely harmless from any and all claims, demands, damages, actions, or causes of reason of the construction of delivery of said material, or the use of any process, machinery or material in the construction of same. Because the maintenance of this equipment in good operating condition without protracted time out for repairs is critical, repair pans and service must be adequate and readily available. The bidder will certify that he maintains an adequate stock of pans and employs qualified service people available on short notice. The bidder shall state in his proposal the location of the service shop and pans depot. 19. TRADE IN None. C%DriWTU0WMCC"ArA WVM WW% :_ lu. .Y_ The City wig pay the bidder in full including state sales tax within thirty (30) days following delivery and acceptance of the new snow blower and pick-up of the trade-ins. Street Superintendent, Roger Mack; Phone N(612) 295-3170, extension 3. MIlmsm Mm //F Pap 6 BID PROPOSAL FOR ONE (1) NEW 100 HP DIESEL POWERED i SIDEWALK/PATKWAY SNOW PLOW & SNOW BLOWER Dedgested F.O.B. Pointe Bids Duez 901 Golf Coarse Road 10 a.m. Thursday, Monticello, MN MM2 Naromber 7,1996 REM S CITY WOM DESCRIPTION UNIT PRICE TOTAL PRICE 01 1 EACH 100 HP Diesel Powered S $ SWewalklPethwey Snow Plow and Snow Blower Complete As Per Specifications, Irlducirg Components, Dated: 1 OM 1188 List Mkt List Model: List Enpine Mkt List Erghre Model: APPLICABLE MN STATE SALES TAX S TOTAL BASE BID PRICE: Dollars S OPTIONAL EQUIPMENT 02 1 EACH Deep Reduction Transfer Case for $ $ Future Cold Planer, Irrehodbg Saha Tu i 03 1 EACH 42' Rear Mounted SatllSend Spreader $ $ As Spedfied, irmbmu p sales Tax 04 1 EACH 70' V Plow As Specified, Indwi ft safes $ S Tu OPTIONAL EQUIPMENT SUBTOTAL S L TOTAL BID PRICE (INCLUDING BASE BIO AND OPTIONAL EQUIPMENT BID) Dollars ` - — 3 DELIVERY: COMPANY NAME: ADDRESS: ADDRESS OF NEAREST SERVICE ♦ PARTS OUTLET BY: PLEASE PRINT (NAME) (SIGNATURE) DATE: (TITLE) 710Th PAGE$ a TNRU to AIM TO 0 e1CL UI)ED All SO ODCUMEM' C 0nV6U0NWdW"AT=M SM MM (TELEPHONE NUMBER) P.v 7 SPECIFICATIONS FOR ONE (1) NEW 100 HP DIESEL POWERED SIDEWALK/PATHWAY SNOW PLOW AND SNOW BLOWER rz_:.'.ham A. Four-wheel drive articulating, oscillating rubber tired diesel powered multi purpose tractor designed for year round use. B. Track width to outside of tire 48" to 49'1/2". C. Length without attachments 140" to 150" maximum. D. Height to top of cab 70" to 80" maximum. E. Weight approximately 5,000 to 5,500 pounds without attachments. The engine shall have a minimum 100 HP turbo charged diesel or equal, displacement to 39.3 (minimum 235) cubic inches, horsepower at 2500 rpms. Torque 184 lbs. Ft/1200 Cummins or approved equal spin on fuel filter, spin -on flow oil filters, air cleaner -dry type, dual element, Turbo 11 precleaned magnetic drain plugs. Low oil shutdown or high temperature. I TRANSMISSIONS: Hydrostatic type with foot controls for variable speeds in forward and reverse; has two working range and a neutral. Provide maximum cooling system for transmission. 4, DRIVE SYSTEM: The hydrostatic transmission is to drive at engine speed. The matching hydrostatic motor shall be attached to the mechanical transmission. Drive shafts shall connect to the front and rear differentials giving constant four-wheel drive. t PTO FRONT: Twin disc center type for driving attachments requiring direct engine drive. Clutch shall have an electric activator to engage and disengage, with indicator light. 1-3/8", 6 spline 540 rpm. 6. AXLES AND BRAKES: Front - Dana model 60 or approved equal, with limited slip differential and 12" x 2 'h" (minimum) hydraulic brakes, size on brakes or equal, with parking brake and warning buzzer. Rear - Dana model 44 or approved equal with limited dip differential and hydraulic brakes. Capacity: minimum 5,900 pounds each axle. puoota'S wm,usr CM*T7L1rJU"WMC GAnt0M rR MGM hP I //# 7. WHEELS AND TIRES: Furnish four 16.5' diameter x 10' wide rims with headlock. Tires to be 10.00 x 16.5 6 -ply truck -type mud and snow radials. Furnish one spare wheel and tire, same size & tread. &rgine mourned 13 g p.m. gear pump must be mechanically driven. Priority flow divider directs oil to hydrostatic steering control. Second flow divider directs oil to 3 -spool valve which has one spool with float position. All oil rehnns through oil cooler filter to tank. Reservoir has two internal screens with safety valve to feed transmission and auxiliary hydraulic system. Four low volume, two high volume couplers capable of maximum 12 g.p.m. No metric. Include extra kickout hydraulic pump. Articulated steering. Permits 40d turns either way, rear wheels to follow front track. Must have articulation and oscillation. ROPS certified one-person with 3 -speed heater -defroster, 2 -speed pantograph wiper, foot control for hydrostatic transmission, sound deadening material. Sliding side and rear window, tinted safety glass, two outside rear view mirrors, one inside rear view mirror and dome light. Removable door and removable panels. Hinged instrument panel. Conveniem controls. Deluxe cloth covered seat, torsion type FULLY ADJUSTABLE, tilt steering, am/fhn radio. Two headlights #360 strobe fight, yellow lens, tum signals, with four-way flashers and backup light. 13, ELECTRICAL: Shall have valet DC, neg ground with group 31 battery. It shall have an alternator with minimum capacity of 60 amp. Switches for headlights, header, wiper, horn, all gauges will be illuminated. Electric backup alarm hom. Tachometer, hour meter, voltmeter, water temperature, hydraulic oil temperature, and oil pressure. All gauges shall be illuminated, automatic engine shut down, low oil pressure and water temperature. IS, SPEEDS: ti Low range 0.10 mph. High range 0-20 mph. pui>»t:R'e amag) e10fsaVJ"4 =.PATVmUv tR 16 tg , r p 0 // 16, FUEL TANK: Not less than 19 gallon capacity. 17, PAINT: Highway yellow. I& ATTACHMENT MOUNTING: Unit shall be so constructed to quickly hook up to the tractor all the attachments called for. The mountings or hitch shall be heavy duty type. Must be ready for hookup with hoses and quick couplers of adequate size. Alfac6awry Incdrded VdA Base Bid: One (1) Frau PTO Driven Snow Blower 70" width twin auger two stage, at bottom sidewalk chute shall be maximum height of 93", chute rotators with hydraulic motor and chain, to include 6" arcing edge and shear bolts on PTO drive and auger drive. OpdoW B9eripureet: Deep reduction transfer can for fixture cold planer attachment. Rear mounted hydraulic driven 42" wide sand/sall spreader with 'h cubic yard capacity. Una to include adjustment for amount of spread. V Plow: Width at bottom 69", at wings 10',height at nose 28", at wings 38"t, cutting edge ''A" x 6" hardened steel (replaceable) nose edge 14" hardened plate (replaceable) hydraulic lift, float and down pressure. tmtmiR•s MI"AIBt CIDFsutuaaxPCC>w,movua MOM P4P to // T TRACKLESS INT USERS 3M Company -St. Paul (3 Units) City of Anoka City of Blaine City of Brooklyn Center (3 Units) City of Brooklyn Park (3 Units) Cho3awia Valley Vo -tech City of Champlin City of Columbia Heights -City of-Eau.Claire . -1. 1—. .. City of Crystal (2 Uints) City of Edina (5 Units) City of Fridley City of Glencoe City of Golden Valley (3 Units) City of LaCrosse. WI City of Lake City ' City of Lakeville City of Maple Grove (3 Units) City of Minnetonka City of Maplewood City of Mound City of New Brighton City of New Hope City of Oakdale City of Plymouth City. of Richfield (2Units) City of Rochester City of Shoreview City of Silver Bay City of St.louls Park (2 Units) City of Spring Lake Park City of Willmar ( 2 Units) City of Woodbury Kraft Foods Company (+ L 1/30/96 1.100HP 2-77HP 1-100HP 1-100HP 1-77HP 2-100HP 3-77HP 1.100HP 1.100HP 1.100HP 1.100HP 1.77HP 1.100HP 1.77HP 1.100HP Page 1 lip, N,y I �d•. . W�lm 4 A NEW' ADVANCED DESIGN FOR MAXIMUM PRODUCTIVITY, SAFETY AND COMFORT FROM THE LEADER IN THE MUNICIPAL TRACTOR FIELD vr 4'r low A NEW' ADVANCED DESIGN FOR MAXIMUM PRODUCTIVITY, SAFETY AND COMFORT FROM THE LEADER IN THE MUNICIPAL TRACTOR FIELD The Trackless MT Series V Diesel is the fifth generation of municipal tractors designed and manufactured by Trackless Vehicles Ltd. Twenty years ago Trackless began development of a totally new concept In North America, an articulated, four wheel drive tractor with interchangeable front mounted attachments. Our total commitment to the MT has resulted in continuous engineering and design Improvements to Increase user •atisfaction. We have increased power, dependability, comfort and safety, to make the MT the most productive machine available in its class. LOW Today, hundreds of municipalities from small villages to large cities, perform a wide variety of tasks with from 1 to 25 MTs. Parks departments, airports, transit authorities, U.S. and Canadian military bases, school boards, hospitals and contractors, have also purchased MTs for their specific requirements. The MT is manufactured in Canada using all Canadian and U.S. components. After carefully studying the contents of this brochure, we hope you will see the advantage 01 going Trackless. THE SERIES V iMTs POWER TEAM consists of the toughest, most durable and widely used drive train components in North America to ensure years of trouble-free service. A CUMMINS 483.9 diesel engine, DANA 80 axles, EATON 33 hydrostatic and twin disc clutch, form an unbeatable combination. Doneldeon a we-cloamer. Low Oil ores. wdtar IMDO phut down w warning. U.S. pane . eeervon. H,ghko-ft ..anon" Dano Model alta hat IOC Dana axles combined, are rated at 11,800 lbs. and have automatic limited slip differentials which frees the operator of engaging and disengaging a manual differential Ioc1L As for the engine, the name CUMMINS says It ati. For many years, most have agreed that hydrostatic drive on various types of equipment Is superior to multigear transmissions. Whether blowing snow, cutting grass or sweeping, an operator must speed up and slow down hundreds of times per day. Depending on the fob, he may also have to change rection repeatedly. With hydrostatic, changing direction or speed Is accomplished by simply pushing forward or backward on the foot podal redlatw P W.Ty guard. hydraulic Od Iroetet contra. orwe Eamon henamraeMn, � �•e Selina I roar hyareullca until the proper speed is established. The engine remains at a constant r.p.m, to obtain full p.t.o. horsepower for the attachment. Suitt -in relief valves eliminate the posaibllity of break down from operator abuse. Less operator fatigue, more time watching for obstructions and Infinitely variablo spood with no time loot shifting gears boat sums up the simplicity, safety and higher productivity of the hydrostatic drive system. I1 SIDE VIEW CAB Our new cab was carefully designed to Increase productivity by making the operator as sate and comfortable as possible. A 25% Increase in size, fully adjustable deluxe seat, carefully placed controls, better sound deadening, tilt steering, AM/FM radio and better visibility all contribute to a comfortable, easy to operate tractor. The MTV certified R.O.P.S. cab meets SAE J1040 -C cations. w FRAKEwORK 2.2.,tU wU R,0 P.S. tube ' . 2 ..250 wall 88. tub. Gmnel wlmowa Improve 1WbUUV whom watChlrlg pie onwmrrsm, curbs, obWUClWM am 4 - tow rotuma hydroulb coupes, 2 - High volurn. hydrdwo COu04ar.. 2 - Optlonal hlph velum. 11 oulic Coupwo. THINKING AHEAD specifi- REAR VIEW CAB This picture, from the operator's viewpoint, shows how well he can see the gauges and controls as well as the attachment. The front mounted attachments turn with the cab and, due to the MTs articulated steering, It Is very easy to guide the Implement around obstructions. Every MTV has the switch, wiring, coupler and ',star hoso inatallod to save Installation timo If a rotor tank Is purchased at a later data. Hydraulic hoses and fittings aro installed throughout the cab in case you wish to add the optional second sot of high output hydraulic couplers. An additional m c P4m to supply .p.r .ploy ball. l cytlndwo IM Chmanta. CKLEGS OUKK LARCH Pie and duke to MWM Chm ftl& a trot War. aUnchm mda say wfty ye. From P to. 540, P.m. Py: a apono auxiliary switch, fuse and wiring with a hack in the cab and at the rear Is ready for you to add any auxiliary electrical Itom you wish. Extra amperage you may require was takon Into Consideration when we chose to make the 61 amp. alternator standard equipment. D (I The Trackless Snow Blower is a highly efficient two stage, twin auger unit that has no equal in removing snow from sidewalks. It is available in two widths, 51 inch and 70 inch. Both will accept either a sidewalk chute or a quick change truck loading chute. Many municipalities utilize both chutes with their snow blower. After clearing their sidewalks, they change to the truck loading chute to load windrowed snow from the street or from cul de sacs. In both cases the maneuverability and physical size of the MT and blower are less apt to create traffic congestion than larger snow blowers. An average loading time for the MT and snow blower is 7 yards per minute. Overall heavy duty construction includes 3/8 Inch thick sideplates, a double wall Impeller housing and a 15 Inch diameter bearing assembly for smooth accurate chute rotation. High strength, low alloy steel augers with ice picks and a heavy duty balanced Impeller, isily handle the toughest snow conditions. the snow blower is manufactured by Trackless Vehicles to ensure that the quality and service parts availability Is equal to that of the MT. Positive and accurate steering of the blower in confined areas and around obstructions is due to the articulated steering of the MT. The ability to move the blower sideways by simply turning the steering wheel allows the operator to safety approach any obstruction. Truck Loading Chute Sidewalk Chute FOR FURTHER EVALUATION A DEMONSTRATION MAY BE ARRANGED SKCMCATX M> 1 -r Kouting. el' w M r 38' sigh rth r/i aro oaten. (7757 mm) Augare. 2 • 17' damctor ralral wtM tee pcka tmoollor' 6' r 24. - 3 base 91 fmcocear hWahtg Www' t peso 00019Caa1316)(2711 r Turn table 6011 beortrp. Chute rbta![1r• 1lymeuUC meter and ChaM Chute dohoctw trydraullc Cylinder Co"011W, Cutting 0000 6' r r/. hardened lrewn:ltle) 1 Shear bona On ougar &We ane main P 10. erhw uotablo CUn q ntngM US" top ane. .ukk Change truCk Wding Chute 11' C1M M" WaIgM 1,050100 H P rating 60 The Trackless mounted spreader is used to apply salt, sand or a mixture. It is hydraulically driven and the amount of spread is controlled by an adjustment lever. As illustrated, the Trackless spreader conserves material by dispersing It evenly in a diamond pattern rather than a solid layer. The delivery roller maintains a 41 Inch spread width. This prevents material waste as well as turf damage from salt, both of which can be a problem with spinner spreaders. As a result, reduced labour costs from fewer refills and lower material costs minimizes the overall cost of operation. The rigid rear mounting of the Trackless spreader does not interfere with daily 'rector maintenance. V PLOW The Trackless V Plow Is designed for higher speed plowing, Since It splits the snow into two banks It Is recommended for residential areas. The tapered nose and flexibility allows It to ride over sidewalk cracks and remain flat. The rearward taper of the cutting edges minimizes damage to the turf. 8PECIFICATTC"is: Wldtn at bopom' e9'• at wm93 81-, Haight at noon• 28', at wino 28'. CuMn9 0090 '/i . 6' norden.d (roploeaahle). Nooe 9000. '/r' harddnad dela (rodecoable) Down olooauro may be .nada ANGLE PLOW The Trackless Angle Plow is available in three widths using the same push frame. It Is a full trip -typo plow where the blade tips forward and rides up over the obstruction. This avoids those sudden stops encountered by cutting-edgo trip plows when a higher obstruction Is struck. SPECIFICATIONS: Wild longth 80-. 72', 8e' Stop. height 2]' Cutting edgo '/i . 6' hardanea (roptoceoble) Skid ChdeE' 2 adluatabb We angling 70- loft or rgM by Mdroullco ` %;Yonaaa 2 mold acting with cuohldrh •Sha Trip Full bto0o trip, roturna to uPASM pd.bbn when Made a.a onbly reload All tlucd btodca IntorcharhgCAbt0 do dam. pu.h dame adwrh praedurd may be ..aa 6 i� r< •� 'm '� n •a{ SPECtFICATtONS: Total wWM: e2'. Spread width. N'. Capacity:'/. cubho yard, Orbehydraulic. Spread distance: 2.0 -lea. SALT AND SAND SPREADER Know �l�li: BRdld m mule MW it (11110�1 ONG The Trackless mounted spreader is used to apply salt, sand or a mixture. It is hydraulically driven and the amount of spread is controlled by an adjustment lever. As illustrated, the Trackless spreader conserves material by dispersing It evenly in a diamond pattern rather than a solid layer. The delivery roller maintains a 41 Inch spread width. This prevents material waste as well as turf damage from salt, both of which can be a problem with spinner spreaders. As a result, reduced labour costs from fewer refills and lower material costs minimizes the overall cost of operation. The rigid rear mounting of the Trackless spreader does not interfere with daily 'rector maintenance. V PLOW The Trackless V Plow Is designed for higher speed plowing, Since It splits the snow into two banks It Is recommended for residential areas. The tapered nose and flexibility allows It to ride over sidewalk cracks and remain flat. The rearward taper of the cutting edges minimizes damage to the turf. 8PECIFICATTC"is: Wldtn at bopom' e9'• at wm93 81-, Haight at noon• 28', at wino 28'. CuMn9 0090 '/i . 6' norden.d (roploeaahle). Nooe 9000. '/r' harddnad dela (rodecoable) Down olooauro may be .nada ANGLE PLOW The Trackless Angle Plow is available in three widths using the same push frame. It Is a full trip -typo plow where the blade tips forward and rides up over the obstruction. This avoids those sudden stops encountered by cutting-edgo trip plows when a higher obstruction Is struck. SPECIFICATIONS: Wild longth 80-. 72', 8e' Stop. height 2]' Cutting edgo '/i . 6' hardanea (roptoceoble) Skid ChdeE' 2 adluatabb We angling 70- loft or rgM by Mdroullco ` %;Yonaaa 2 mold acting with cuohldrh •Sha Trip Full bto0o trip, roturna to uPASM pd.bbn when Made a.a onbly reload All tlucd btodca IntorcharhgCAbt0 do dam. pu.h dame adwrh praedurd may be ..aa 6 i� r< •� 'm '� n •a{ SPECtFICATtONS: Total wWM: e2'. Spread width. N'. Capacity:'/. cubho yard, Orbehydraulic. Spread distance: 2.0 -lea. POWER ANGLE SWEEPER The Trackless power angling sweeper may be utilized to perform a wide variety of tasks every month of the year. Snow can be swept from sidewalks, outside Ice rinks and inlaid brick walkways or sidewalks. Sand, gravel or debris can be swept from sidewalks, parking lots, cul de sacs, intersections, lawns and other confined areas. Dethatching large lawns and playing fields is another ideal application for the angle sweeper. The high output hydraulic system of the MT V powers the broom. The advantages of being hydraulically driven include simplicity, low maintenance and relief valve protection. A scissor '-eme automatically centres the sweeping pattern front of the MT as it is angled. The combination of articulated steering and the self -centering sweeper head, which may be used as sideshift, offers maximum maneuverability in confined areas. If dust control is required, the water tank system may be added. sveaFlCATIOW: eaown plamm.: ]Z' e+UWn w lh 60' aero" wpm 66" erooping pattern O 30' anclo 50' /fydroulit arhe WiGrouec o rco M7 V Tractor 6laneo fpr OrO pfol"lion In alwage Thr00 p01n1 hpCh, rear 010 The category t three point hitch and the 540 r.p.m. rear p.t.o. aro both optional equipment. Although noilhor are roquired for any of the Trackless attachmonts it is available for those who wish to utilize their own ottachmonts. PICKUP SWEEPER The Trackless Pickup Sweeper Is ideal for sidewalk cleaning in the spring to remove the sand 9ccumulation from winter. It is driven for one or Wore tris ks and then carried over the Curb at Intersections and hydraulically dumped by a bottom gate. The intersection is crossed, the sweeper lifted over the curb and continues. Rubber skirting on the sides and front eliminate most o1 the dust but best results are obtained by using the spray bar and rear mount water tank. apecmaTtM: sweeping width: u•. Main body dimentlwr.: ss• wwe . ell' high x 60' long. Broom dwaaw: 32'. Cauen: s ewlvel cash". nerd rubbh tire. Gump: Bottum gM. hydraulic controlled. Drive: PTO to geh Dd& shall to rlgm side. 60 chair to broom sprocket Wath Idur wrocku Broom height: Aoot.W for r.sar. Capacity: MtxmDnseb 6 M. It. SPRAYING SYSTEM A dust Control spraying system Is recommended for use with sweepers. It consists of a rear mounted 80 U.S. gallon tank with 12-V electric pump, relief valve and hoses. All MT's have electric wiring, hose and switch installed ready for this system. A front nozzle and hoses must be ordered separately for each type of sweeper. UNDER GUARD RAIL MOWER The Triumph Under Guard Rail Mower Is quickly attached to the MT V and uses the Trackless hydraulics and valves for operation. It will mow up to 10- behind rail posts at speeds up to 2 m.p.h. The floating 26' cutter head allows cutting from 10' above to 6' below ground level and rises to 90' for transport. BIRCIF1CSTMIMIi Blade: 25'. h: rovmelble Bpindlo. 11/r: Dearing dlamota. Mydraullc motor gor nmd to 25M rpm V•boll drhe to apindlo. Cuthno hagm: 0' SICKLE BAR MOWER The Triumph Sickle Bar Mower to quickly attached to the MT V and uses the Trackless hydraulic system and valves for operations. it Is front mounted and visibility to the operator Is excollont. 6MCuaCATM M , Tnumph aorlea 7500 Myarou"o pus Furan drew unor ow tingle —75' to W. 011—10'to.10' Curb Ilh' 17'. Oatery deck t.ck 00' Curter bor length: 5'. 0'. 7' 11.S The Trackless All Purpose Heavy Duty Flail was designed to cut grass, weeds and light brush whether on smooth lawn or rough terrain. Due to its versatility and durability, the Hail has become our most popular mower. Only 33 of the 2% Inch wide blades cut a 74 Inch width. The straight cutting edge of each blade Is parallel to the ground to obtain a velvet smooth cut on well maintained lawns. The weight and shape of the 'edea allow the mower to cut and mulch light „rush, shrubs and weeds. A unique feature of the Trackless flail mower is Its flexibility front to back as shown In the above Illustration. This ensures an even cut and no turf damage when cutting up and over knolls. It also prevents the need to raise the mower when approaching a hill. The 33 blades may be sharpened with a 5 Inch disc grinder without being removed from the mower. Shear pin protection avoids damage to the drive system if the mower blades strike an obstruction. The Trackless dealer in your area would be pleased to have the opportunity to demonstrate the MT and flail mower. FRONT TO REAR FLEXIBILITY AND HIGH LIFT J s aP[COMAT101018t Cutting lirkW W. ctming holgfa' 1.4'. HORIZONTAL Gauge whoolo r • 16' . e' eernl•aleurnatlo FLEXIBILITY Gouge rollor 5' dlomctor otool M moth Rotor tubo' 4' dmmdd won t r/rj knee. 1 �-• I 814M 33 • Jk/i rift Icon be toWarpenod) . _ •, plebe and rota cutbrlp 15'gem char 'r a PTO, gbo., croonozo onoh. g V•tloge with epinp bodes Idly OV A� ��_-1►�" Rear daf om, raimforced rubbd r Linkage Fle.lble for uneven gromla Rad epood 0 540 PTO 11`60 f o rn ,rr Mow tip e000d 0 Seo pro 6300 n, per mlmno �1 B TRACKLESS 72" ROTARY The Trackless front mounted 72" rotary mower Is designed for close trimming on both sides with a full width rear discharge. Four large gauge wheels and a nose roller allow close, accurate cutting on rolling ground. Due to the MT V's hydrostatic transmission, maximum speed of cutting can be maintained in various cutting conditions. Articulated steering gives the operator precise control in trimming. TRACKLESS 120" ROTARY The Trackless wing type mower was designed to drastically cut mowing time on those large areas such as campuses and parks. Normal undulating ground required flexibility in mowers to avoid scalping. Trackless solved this problem with a 3 section front mounted mower comprised of a 72" 3 spindle PTO driven centre section with a hinged 24• hydraulic driven wing on each side. Separate valves control each hydraulic motor and lift cyllndor giving the operator the option of 72', 96" and 120" cutting width. The MT V has a built-in hydraulic system to power the right wing and an optional pump and valve to power the left wing. PEMICATU MII: -7oek. 72' • tie' p=, rcY dUefl M. apinOroo: 7 - rimkon bearings, greeeade. 91aon: J - 25' . ?'a' . I:.' highlilt Caere*: Four er1v01 a th a' . te' pnwmaOo Ona. Orl.o: PTO Or right ongls gear boa. V-1»ns: 2. ldlere: 2. Catling Mlphte: 11Y - a' in'Y incremoms Cuttug by cooed. 18.5001 p.m. O 2200 ergine fo.m. Wings: 24'. 0451— 1 - a' . 10' pnaumatb. Roner. 1 gouge. Hydleulie motor dr"'" by V -601t. Lill Minder' Hydrsuli0 - 2' . 8'. Hinge: COmp&jM - I10' ARC. Control "Nos' 2 - 1 00ear. 1 O8 gee ring, i eD•a r.� �r1 Yet'JW. - � IMD 13771 10 II ENGINE Cummins Model 603.9 Diesel. Displacement: 239.3 cu. inch. Horsepower: 76 BHP ® 2500. Torque: 180 Ib. 8. / 1200. Equipped with cold start aid, block heater, Donaldson air cleaner and pre -cleaner, 61 amp, alternator. COOLING Cross flow radiator with shroud and finger guard. Cross Row oil cooler thermostatically controlled for cold conditions. P.T.O. CLUTCH Twin disc over centre. Electric over hydraulic actuation. POWER TAKE OFFS Front: 1 sit 6 spline, 540 r.p.m. Rear: 1 h 6 spline. 540 r.p.m. (optional). HITCHES From: Trackless quick attach with dual lift cylinders. Rear: Cat. 1 3 pL hitch with dual lilt cylinders (optional). P.T.O. REDUCTION BOX 100 h.p. Trackless 4:1 reduction with output shafts tar front and rear P.T.O.'s. TRANSMISSIONS Eaton series 33 hydrostatic and new Trackless 100 h.p. 2 speed mechanical gives Infinitely variable spoeds forward and reverse in two speed ranges. Foot controlled for convenience. For superior to clutches and mutilgoor tronsmisskm. HYDRAULICS Standard equipment. 15 g.p.m, engino driven gear pump. Priority valve, directs portion of oil to atooring, remainder goes to 5 spool valva -frond 118 cylinders, roar 3 pt. hitch 118 cylindom 2 other functions plus a power valvo for remain hydraulic driven oguipmom. An oil Is filtorod and cooled before returning to tank. 80 g.p.m. In tank return filter. DRIVE SYSTEM Hydrostatic transmission driven at engird opood. The marching hydraulic motor 10 ottachad to the Trackless 2 speed transfer east which drives the front and rear axloo. This gives constant 4 wheal drive. Since the MT in articulated, from and rear whools track perfectly. AXLES Dana Model 00 full hoot with Track-Lck dMoromiato front and rear Track -Lok on" Into action Immorllatoty, one whnool attempts to spin. Compotlllvo difforomlal lacking device cannot be engaged in a turn. Capacity 5900 Mo. par axis, BRAKES 12- X 21'i hydraulic on from wheels. Roar whoolo are braked through Warn lino. Parking broke mechanical on front broke shoot Warning butror denotes 'ON' whon ongino running. WHEELS Heavy duty 8 Dolt 0'a" B C. 15' and 16.8' diameter, TIRES Winter: 10.00 x 16.5 - 6 ply. Summer. 31 x 13.5 x 15 - d ply. LIGHTS 2 adjustable Halogen headlights. 1 adjustable Halogen back-up light. 2 tall lights with turn signals. 0 tum signal markers. 4 -way flashers. Revolving sealed beam flasher available in blue or amber. INSTRUMENTS Murphy automatic safety shut down control for low oil pressure and high water temperature. Tachometer with hourmeter, water temperature. oil Pressure, volt meter, hydraulic oil temperature, fuel gauge. Intematly Illuminated. Rocker type Illuminated switches in modern root type console. One unused auxiliary switch. Fuel tank: 19 U.S. gallons (72 Was). CAB Certified BOPS type meets J1040 -C epeclficallons. One man type with 6 timed selety glass windows. Including roof window for better visibility In truck loading. Two side and rear windows. sliding typo. All windows can be removed with e sharp push for emergency ex% Seat deluxe cloth covered torsion type. with 4 adjustment lovers plus weigh adjustment. Henn, heavy duty heater -defroster. 2-speod pantograph wiper, windshield washer. Inside rear view mirror. Dome Ugh, seat ball sound deadening lining. removable door and We panel convenient controls and AM -FM push button radio. STEERING Articulated hydraulic ateoring with WI clearing wheal heard button and tum signal lover aro mounted on etooring column. FRAME 3 pisco tabrkptod steel far articutation and oscillation. SPEEDS Low range: 0.8 m.p.h. High tango, 0-10 m p.h. DIMENSIONS Wheal base: 76.5" Length, loon 4flarms: 146.6' Haight top of cab: 78.8' Width: 49'.1' Wolghl — Rear axis approximately: 3,440 Ibo. Front We approximately: 1,820 line. %IzJ. 5.300 ft. OPTIONAL EQUIPMENT t, Transmission drhron. 12 g p.m. gear pump and vahe tar extra auxiliary equipment. Note. All cabs hovo hoses and coupango Installed for easy installation of this optional hydraulic package. 2. Electric water pump far sweeper spray trot. Home and wiring installed on ovary MT. 3 Back-up alarm horn, 4 Roar 3 of. hitch Cot. 1. 8. 840 r p m roar p 1,0. THE tracMMS TEAM "AT YOUR SERVICE" Our extensive dealer network will be pleased to discuss your requirements. demonstrate and deliver your equipment. Instructions will be given to your operators and mechanics in operation and service procedures. With their parts stock plus factory shipments within 24 hours, our dealers will help you keep your down-time to a minimum. /SOLD AND SERVICED BY (Waoolll TRACKLESS VEHICLES LTD. BOX 100, COURTLAND, ONTARIO CANADA NOJ1E0 PMONE15191 888.0970 FAX 15191 BBB -0002 tI Ah iJ M pOh[t AI C,'yt� u0ue pp011C1 ,mpMA0n1 CyOC!.JI.OnO �r1 Ou0�0.i^I� CtYtyo �I�JUI �IUK• C`.,rSJ w C - so A �,. ��' �y i�•, � § •.f . ••'0 'fit �� iv.^ frfPli:"i7R'�d•i►3S*�nY'ir'.':Tl'� J ` 9 Wim.— ^ . .• '-ipf;dhT�sSvr. 7�I�if$1�1��� � "� .� ,.% � .' "•1 �, ; !"moo^►, • 1. I f •' 'I�dwrldr •*' `xs''W r +S.'o6��MpN Slnpar �1•plaPaaf ��tYi �aMt �aadOptia � If1Y141bi Qi �I>I ��. . end ro&xn apsrttlnp costs. FOR Fl1RTH_8R IIFOiaAAIX'XI CON7nCT' ZM P:O. Box. 100, Cardand; 7 L ..t,' n� � + �. • t•'. Onmrb. Cmvda NOJ 1 ED. SI'/Of.7a/W�7� {�@i7%C�4'L.� PfWnB.1.51P88�0370 Fai•1•S1ae8t1�8�4 � BRIEF SPECIFICATIONS SERIES MT5 TRACTOR Engine: Cummins 76 hp or 102 hp diesel 'TO: from 540 rpm, optional rear 540 rpm Transmissions: hydrostatic with high/law/neutral trans Electrical: full gauges, safety shut down system, 61 amp att. Hydraulics: high flow Nord 8 rear to power attachments, low flow front 8 rear for control functions Dimensions: height to top of cab -76.5', width - min. 49.5' TRACKLESS 72" ROTARY Deck: 72' -'/: plate. rear discharge Spindles: 3 - Tfmken bearings, greasable Blades: 3.25' x 21/,'x lh'highlfft Casters: 4.4' x 10' swivel, pneumatic Drive: PTO to right angle gearbox shaft Flexible Hitch System V befts: 2. Idlers; 1 spring loaded Cutting height t Vi - 4' in '/? increments Skid shoes:3, 1 - centre, i - each side TRACKLESS 120" ROTARY Centre deck: 72' as above Wings: 2 - 24', each with 1 caster and 1 roller Drive: hydraulic motors drives spindle by V bell Hinge: compound -110° arc Wing Oft: hydraulic cylinder 2' x 8' Control valves: 2 - t power and 1 Oft per wing TRACKLESS 168" ROTARY -entre deck: 72' as above /Ings: 2 - 48', each with 3 rasters Discharge: 2 rear dLwharge dudes per wing Drive: hydraulic motors drives spindle by bell Hinge: compound -110° arc with break back Wing lit: hydraulic cylirdor 2' x 8' Contra valves: 2 - 1 power and 1 Oft per whlg Safety strut oft wigs shut off automatically when raised Tractor option: dual summer tires available BOOM FLAIL MOWER Width of cut: 51', overall width of head: 64.5' Horizontal reach: ctr of MTS to outside of cut -13.5 ft. Below grade cut: 53' below grade at 11.5 ft. MT5 Ctr to outside Vertical reach: 13.5 ft. Overkill level ground cutting coverage: 11 ft. starting 5' Inside outer fire Numbor of cutting bladoo: 36 Weight: wo18 with oountonwelghts - 1960 be. TRACKLESS VEHICLES LTD. r BOX 100. COURTLAND. ONTARIO CANADA NW 110 PHONE (519) 658.0370 FAX (5 19) 688.3644 DW d — a cv�,ow rr,+m+ce eripaacnrn gC(SC]C7U tl0 ma p -a U 0-0 "W ,KKL^O I Drive: 4 wheel drive Cab: certified R.O.P.S. Steering: articulated, hydrostatic with tltt column Tires b wheels: town or winter tread, singles or duals Weight: with no attachments - 5360 tbs. Speeds: low range 0.8 mph, high range 0 -19 mph Length: - less liftarms 146.5' TRACKLESS 74" FLAIL Culling width: 74' Cutting height: V - 4 - Gauge wheels: 2. 16' x 4' semi -pneumatic Gauge roller. 6' diameter steel Kube Rotor tube: 4' diameter with 1 -'/,: Blades: 33 - 2'/: wide (can be resharpened) Blade and rotor cutting diameter: 18 - Drive: PTO, gearbox, cross shaft, 2 V befts Rear defledor: reinforced nrbber TRACKLESS 63" SIDE FLAIL Cutting width: 63' Drive: PTO, gearbox, 2 - V bells PTO shaft: constant velocity with shear Angle of movement: 30' below grade, 90' above Brealdradc spring loaded Weight 1125 te. plus 4 steel couMenvelghtS Dual whiter tires required TRACKLESS/TRIUMPH SICKLE BAR Basic mower: Triumph series 2500 Drive: hydraulic phos Pibtlan drive Cutter bar angle: 25' to +90' Tilt -10' to +101 Curb W. 12' Safety break back 90' Cutter bar length: 5', V,'r OTHER TRACKLESS ATTACHMENTS 48' pickup sweeper 80' or 72' angle sweepors Water tank and pump Idt 5'. 6 or r angle snow plow V type snow plow Sats and Send spreader 51' or 70' snow blower SOLD AND SERVICED BY City of Monticello Monticdto Comprchen&e Mn Mareh, 19% Trail/Pathway Plan Existing Sidewalk Grid System —— — Ezisting Off - Road Path 00000. Proposed Off - Road Path 'ones, Proposed Sidewalk on Road (Bike Route) "Mmm"t Proposed on Road Pedestrian and Bike Route —r -moi i i_ (o1600 MUS U 14 1116 Council Agenda - 10/14/96 12. Review of hick for a 160 -horn ower diesel -powered rmow blower for street Plearrinw and widening, and congideration of gwrehase. W.S. ) A REFERENCE AND BACKGROUND: At the September 4, 1996, meeting, the City Council authorized advertisement for bids for replacement of the large snow blower that fits on the front of the City's cat loader. This snow blower is used for clearing the snow off of Broadway and for street widening. This purchase was originally proposed for the 1996 budget, however, was postponed to the 1997 budget. $70,000 has been allocated for the 1997 budget for this purpose. Bids were due Thursday, October 10, 1996, at 10 a.m. The following is a bid tabulation of the bids received: COMPANY NAIVE I TOTAL BID PRICE ABM Equipment "NO BID" Carlson Equipment "NO BID" MacQueen Equipment $59,745.440 *this Includes a 18,000 deduction for our trade-in and includes MN nate sales tai. Based upon the above bid information and the data supplied with the bids indicating specifications of the unit, the lowest bid for a suitable snow blower for the City of Monticello is $69,745.44, including our trade and all applicable sales tax. B. AINERNATIVE ACTIONS; 1. The first alternative is to award the purchase of a new snow blower to MacQueen Equipment of St. Paul, Minnesota, for $59,748.44, including our trade and sales tax. 2. The second alternative would be not to purchase a now snow blower at this time. C- STAFF (O MF.NDATION: It is the recommendation of the City Administrator, Public Works Director, and Street Superintendent that the City Council authorize punhase of a now snow blower from MacQueen Equipment as outlined in alternative 111. n. SUPPORTING DATA; None. Full copies of tho bids, specifications, and brochures aro available at city hall fbr your review. 23 Council Agenda - 10/14/96 13. ConaidArsdinn I amending11 dPSMdVt1nn1 Offleini and consider 1the Usay,111 1 City Council is asked to provide City staff with direction in filling the Chief Building Official position recently vacated by Joe Merchak. We are concerned that simply advertising the opening as is under the current pay will IIQt result in finding an employee with the experience needed to do the job. We are recommending that the job description be amended and the job points be re-evaluated, which would result in moving the position from grade 11 to grade 12. In addition, we are recommending that the overall salary structure for City employees be allowed to add step 7 to the salary schedule. The purpose of the proposed changes are two -fold: To establish a point level that is consistent with the job requirements of the Chief Building Official position. To maintain a competitive salary structure. As you may recall, in February of 1998, the City Council established the position of Chief Building Official. This new position included new duties relating to building inspection policy development, supervising the building inspection department, computer application development, and site grading and drainage analysis. Only seven individuals applied for the position, of which only two met the minimum requirements. Three were interviewed. Brian Stumpf, Brad Fyle, Jeff O'Neill, John Simola, and Tom Bose served on the interview team. The hiring process culminated in the hiring of Joe Merchak. The group involved in hiring Merchak was somewhat disappointed in the caliber of the applicants and was concerned about the possibility of turnover at the position. The current pay range is $31,831 to $39,789. According to Joe Merchak, his reason for leaving Monticello was for higher pay working for the City of Minneapolis. There is additional evidence that seems to indicate that the pay that we aro offering for the position is not competitive as shown on the attached table comparing pay at other comparable cities. In summary, there appears to be good evidence that the position is simply not paid a high enough salary at its current level to attract competent applicants. While the City determines its next step, it is proposed that we contract with Metro -West or Paul Waldron & Associates at the rate of $25/hour for building inspection assistance. Council Agenda - 10/14196 Motion to authorize staff to advertise the opening under the current pay scale. Under this alternative, Council is not convinced that the salary needs to be increased in order to attract a viable candidate; or perhaps the Council believes that another attempt needs to be made to seek qualified applicants, and that if a qualified applicant is not found after this try, then the City Council could reconsider increasing the pay for the position at a later date. Please note that in order to get Joe to take the position, the City had to start Joe at the midpoint of the current range. Again, given the prevailing rates of pay for Chief Building Officials, it would appear that it would be difficult to find a qualified candidate within the existing pay range. Therefore, to choose this alternative would simply result in a loss of time or the hiring of an individual that is not qualified for the position. Recently, the City of St. Peter raised its starling pay to $38,000 after experiencing significant disruptive turnover at the position. 2. Motion to amend the job description and comparable worth points for the Chief Building Official and/or modify the City pay structure by adding a 7th step. After reviewing the job description in more detail in terms of the criteria for establishing points for the position, it appears that a case could be made for increasing pointe for education and experience required. Currently, the position is awarded 60 points for degree of previous experience (moderate, 3-5 years) needed to perform effectively. It would appear reasonable to increase the required amount of experience from moderate to extensive (6-8 years). It could be argued that such a change is appropriate due to the work load, complexity, and varying demands of the position in addition to the supervisory and leadership role that the position must f dfill. In addition to increasing the points for education experience, it would be recommended that 4 additional points be added for responsibilities relating to planning. The changes proposed would put the position on a par with the Economic Development Director in this category. Raising the grade results in a pay range of $33,742 to $42,177, which represents a 6% increase in the position's pay. 25 Council Agenda - 10/14/96 In addition to raising the grade one level, the Council could consider amending the overall pay scale by adding back step 7 into the City- wide step system. Some of you may recall that when the pay equity program was established in 1991, the consultant at the time recommended that the City establish a 7 -step pay scale for employees. The pay scale program design was based on the consultant's analysis of the pay provided to rural and metro communities in the vicinity. In her analysis, she did tip the scale toward the metro pay scale so that the City could be somewhat competitive with metro pay scales; however, when the final pay system was established, the City Council did not completely agree with the method of weighting that was used and determined that by removing step 7, the proper pay scale would be established relative to the marketplace. For many of the positions, the current pay scale may accurately reflect the marketplace in the Monticello/fringe Twin Cities region; however, at least with regard to the Chief Building Official position, it appears that having step 7 would be helpful in attracting qualified candidates to the position. Adding step 7 to the current pay scale would have the following effect: It would provide an additional step for all employees to aspire to. Achieving step 7 should not be automatic and would require that employees meet certain predetermined objectives before step 7 could be achieved. In other words, we would try to match the increase in payroll cost to an increase in performance and efficiency. Adding step 7 will result in a potential increase in overall payroll cost in the amount of $20,000, assuming that each employee at some point in time achieves step 7. Not all employees will reach step 7 because they might leave their position prior to getting to that step or their performance in their position may not allow them to achieve the highest step. Also, adding step 7 will not result in an increase in the entry salary at any position. Adding the 7th step will allow the City to be more competitive in attracting new employees. Although the City has not had a big problem with turnover in the past, it is possible that as we seek to hire now employees as the city grows, and as we replace employees through attrition, we may not get the caliber of employees that we desire if we do not stay competitive with other communities. 26 Council Agenda - 10/14/96 With regard to the Chief Building Official position, adding step 7 along with ganging the grade of the position will result in a pay range increase from $31,831/$39,789 to $33,742/$43,864, which represents a 10% increase in pay at this position. We think by adding 10'% to the salary range at this position, we have a greater likelihood of finding a qualified candidate for the position. Authorize City staff to request proposals for building inspection contract for services. Council may be concerned about raising the pay scale for the entire City staff in order to make one position more competitive. As an alternative to hiring a Chief Building Official and associated payroll increases, City Council could explore the possibility of contracting for services for the building inspection department. As you may be aware, there are a number of cities that contract for building inspection services, namely, the cities of Buffalo, Annandale, Waconia, Becker, Rogers, and others. Of course, there are many that do not contract for services, including Elk River, Big Lake, and Chaska. The preliminary research we've done on this topic shows that contract for services expense will amount to approximately 50% of the building inspection revenue. The City of Monticello currently generates about $180,000 in revenues; therefore, we could expect that the building inspection contract will amount to about $90,000. Under such a contract, the services provided would be limited completely to plan review and building inspection services. The contracting firm would have no responsibility for any other duties now completed by the department, including civil defense or public nuisance/zoning enforcement. It is also likely that a contract service would streamline the number of inspections and provide service focusing on assurance of adherence to the minimums of the Uniform Building Code. Generally speaking, City employees acting in the building inspection capacity will provide more hands-on attention to individual projects and generally might be more committed to assuring adherence to building code and other City standards. The cost to operate the City's building inspection department based on the workload that ware now experiencing requires two full-time employees and at least 3/4 of the time of a clerical staff person. It is estimated that the cost to operate the department using in-house staff will amount to approximately $115,000. 27 Council Agenda - 10/14/96 In summary, it appears that utilizing building inspection contract services is leas expensive; however, the services provided by such an arrangement are more focused on building inspection only. Following this path would likely require that the City hire or shift duties in some other area to provide civil defense coordination and public nuisance/ zoning code enforcement. if you recall, the 1997 budget does call for hiring for additional planning assistance. This new position could be responsible for code enforcement. We are recommending that the City Council select alternative q2, which would call for moving the Chief Building Official position to grade 12 and establishing step 7. This alternative will likely result in the City being able to find a qualified candidate for the Chief Building Official position because it will increase the range in pay by about 10%, which will make the salary more competitive with what other communities are paying. It should be noted that even with this increase in pay, we may not get the caliber of employee that we desire; and if this happens, the City Council may wish again to look at the potential of contracting for services. It is my view that the timing of the introduction of step 7 to the salary structure makes sense. This move will add an additional 4% to the top end of the Chief Building Official pay scale, which will place it in the range of what other communities are paying. Such a move will obviously add to the potential payroll expense for the City as a whole. It would be our goal to make sure that obtaining the 7th step is tied to specific performance goals and objectives so that we can link higher payroll expense to improvements in public service or enhancements in individual employee efficiency. Further. I would recommend that the City Council be required to review the specific performance objective outlines for employees attempting to achieve step 7, thereby assuring the City Council that moving employees from step 6 to 7 is not an automatic action and that there is a set of expectations and a measurement of performance linked to obtaining this 4'% increase. Due to the low number of applicants and relatively poor qualifications of the applicants that applied last time, we are not recommending that we advertise for Chief Building Official under the current pay scale. We aro convinced that given the competitive marketplace and the pay that is now being offered, there is not likely to be anyone qualified for the position at the pay being offered. Furthermore, we will lose our ability to attract potential employees if we are constantly going out to the marketplace with now advertisements for the position. Any potential applicants are bound to wonder what's going on in Monticello and might, therefore, be discouraged from applying. 28 Council Agenda - 10/14/96 With re to the contract for services option, ption, this is our second choice. One of the concerns regarding this option is the status of the current Building Inspector position. It is possible that the current Building Inspector could continue to work for the City even with a contract service; however, it is more likely that the proposal submitted by a contract provider would call for complete control and operation of the building inspection department, which would require the elimination of the current Building Inspector position. In summary, hiring under the current pay scale will probably not result in finding an employee that meets our needs. Contracting for services will reduce our building inspection cost but will also reduce the level of service provided and could result in the elimination of the Building Inspector position. Raising the grade of the position and increasing the salary schedule to incorporate step 7 gives us our best hope of finding an employee that will meet the needs of the department and will also add an incentive to other employees currently at step 6 to improve performance. Excerpts from pay equity study and pay schedule; Chief Building Official job description; Summary table of building inspection department information -- comparable cities. 29 Chief Building Official City of Monticello Title of Class: Chief Building Official Effective Date: February 26, 1996 DESCRIPTION OF WORK General State of Dut4pic Performs administrative and skilled inspection work in administering regulations pertaining to building construction, including inspection and enforcement of building and zoning codes and ordinances and land use regulations, and performs related duties as required. Serves as Zoning Administrator. SLneryiAion Received: Works under the general direction of the Assistant City Administrator. Superviginn Exercised: Exercises general and technical supervision over the Building Inspector. TYPICAL DUTIES PERFORMED The listed examples may not include all duties performed by all positions in this class. Duties may vary somewhat from position to position within a class. Administers the City's building, plumbing, and mechnical code enforcement program, including plan review, permit issuance, inspection, and related responsibilities. Administers the City's public nuisance enforcement program, supervises and coordinates the enforcement of the public nuisance ordinance. Explains building code, zoning ordinance, and specifications of city contracts to contractors, property owners, and general public upon request. Inspects structures for compliance with zoning ordinance and fire safety regulations, and inspects damaged or deteriorated structures for compliance with building code. Inspects the work of contractors and subcontractors, updates contractors when licensing requirements change. Reviews development plans for consistency with site development standards, including grading and drainage, and other city ordinance requirements. Prepares and monitors building inspection budget; prepares local, state, and federal reports monthly. Purchases parts, equipment, and supplies costing up to $1,600 with Assistant Administrator's approval; obtain Council approval for purchases over $1,500. (continued on next page) /3 � Chief Building Official City of Monticello Reviews code reports and building and site plans for conformance to building and zoning codes; forwards report to Assistant Administrator. Performs on-site inspections for building construction work and land use permits to ensure code compliance. Investigates complaints regarding material and workmanship quality and violation of the zoning ordinance. Issues citations when necessary to enforce compliance with building codes and zoning ordinance; may testify in court concerning results of inspection. Verifies work permits with city certifications of persons engaged in building work. Prepares records and reports of investigations and violations of building codes, city contracts, specifications, and zoning ordinance, and work permits. May supervise maintenance of all necessary records for day-to-day activity and permit files. Attends professional development seminars and continuing education for license maintenance and to keep up on technical advances and code amendments. Makes recommendations jointly with other City personnel regarding policy development and ordinance amendments. Coordinates plan review and inspection activities with the City Engineer with respect to the construction or alteration of storm water drainage systems on private property. Coordinates development and preparation of policies and processes associated with the building permit application and inspection process. Supervises implementation and development of city-wide addressing system. Assists with conversion and maintenance of manual building inspection recordkeeping syste:a to a computerized system. Manages and evaluates the job performance of the Building Inspector. Assists Assistant Administrator in managing and evaluating other community development employees as requested. Assists in the selection of community development department employees. Monitors compliance with zoning ordinance and investigates violations. Attends Planning Commission and City Council meetings as requested, prepares agenda items pertaining to variance requests as needed, and prepares other information as requested by Assistant Administrator. Oversees civil defense activities. KNOWLEDGE, SKI" AND ABILITIES Considerable knowledge of local, state, and federal building codes pertaining to building materials and workmanship. Considerable knowledge of zoning laws, ordinance requirements, and procedures pertaining to Cho application/approval process. Considerable knowledge of building materials and workmanship. (continued on next page) 1,32 Chief Building Official City of Monticello Considerable ability to inspect, advise, and monitor construction for purposes of code and regulation compliance. Considerable ability to evaluate site plan design, including grading and drainage. Considerable ability to interpret blueprints and plans involving architectural, structural, mechanical, plumbing, and engineering designs. Working ability to communicate effectively, both orally and in writing. Working ability to work in unfinished structures and in unsafe or uncomfortable surroundings. Working ability to prepare the building inspection budget and written reports. Working ability to keep current on code amendments and technical advances in construction. Working ability to apply or utilize computer technology in the building inspection process. MF4U4UM QUALIFICATIONS High school education; three years experience in a building construction trade, or one year of experience in same and two-year building inspection technology degree; Must be certified by the State of Minnesota as a Building Official and maintain certification thmugh continuing education; Must have three years supervisory municipal inspection experience. 13 C.J duties had to be on both job descriptions. When determining the Knowledge, Skills, and Abilities, and Minimum Qualifications, I came to the same conclusions for both jobs. The job evaluation was done separately but was only one point different. It is normal for individual positions within a class to have some different duties. The issues addressed in 1-5 above are issues normally looked at in determining whether separate classifications should remain or jobs should be combined. We can still keep them separate if the Council prefers, but they will look almost identical, and the pay recommendation will be the same. Liquor Store: Prior to our coming out, the City decided to create an Assistant liquor Store Manager position to work primarily during the time the liquor Store Manager is off duty. It was felt that more management was needed during the evening hours. A job description was prepared based on the planned assignment of duties and the job was evaluated using this information. In addition, the fuUtime Liquor Store Clerk has some additional responsibilities above that of the parttime clerks. These additional responsibilities and the additional accountability this position has, results in significantly more job evaluation points. The City wished to maintain this difference so we evaluated the classes as they now exist. The liquor Store now has four job classes; Liquor Store Manager, Assistant liquor Store Manager, Senior liquor Store Clerk and liquor Store Clerk. These are based on restructuring decisions the City has made and actual differences as they have existed for some time. The job descriptions and the job evaluation points were done with this structure in mind. ryl PO R /.4/ilr Establishing the Salary Schedules The salary grade system (salary schedule) was designed using generally accepted practice in the field of compensation. There is some flexibility in the practice that allows one to gear the system to fit the employer. The number of grades needed depends on attaining a balance between too many (where any change in responsibility will change the salary grades) and too few (where it is obvious that jobs having different values are in the same grade). I developed more salary grades than you currently need in case you decide to add new job classes in the future or there are significant changes in duties and responsibilities to existing jobs. The number of grades that best fit the City of Monticello based on this criteria is 22. tried a number of alternatives to match the market and maintain the mathematical relationship the City needs for Pay Equity compliance. 13J The market information we used was obtained from both metro and non -metro cities with populations ranging from 3000 to 7500. More weight was given to the metro data as the City of Monticello is more like a metro suburb than an outstate city in many respects. The ratio determined to be the best match was 75/25 (Metro data weighted at 75% and non -metro data weighted at 25%). The resulting market figures fell between metro and non -metro figures within the identified population range, but closer to metro rates than the non -metro rates. The difference between the grades is also based on a mathematical relationship taking relevant market data into account. The increase between grades, that was the best match for your market data, is a gradually decreasing percentage. It starts with 6%, decreases by 1/2% with every five grades as you move up the salary grades. In other words, each grade between Grades 1-5 increases by 6%, Grades 6-10 increases by 5 1/2%, and so on. This relationship fits the market data quite well while maintaining the kind of mathematical relationship needed for pay equity compliance. It is important that the difference between the minimum and maximum salaries (percentage spread) for each grade also be competitive with the relevant labor market. To determine the percentage spread, I analyzed salaries found in both outstate and metro cities of comparable size in Minnesota. Using that information 1 found that the typical spread was approdmatety 30%. Therefore, the difference between the minimum and maximum salaries in the proposed salary ranges is 30%. The number of steps within each grade was determined with consideration given to three factors. One important factor was the typical number of steps found in the public sector labor market. Also considered was the difference in pay between the steps. Two many steps would make the increase between steps insignificant. Finally, we wanted to give the City the flexibility to institute some variation of pay for performance, if you so choose. You will want to be sure that performance appraisals are conducted on a regular basis for all employees prior to implementing the full flexibility the salary administration system allows. Based on all of the« i s Le th n Um t r Steps deter a�pr�nrinte was sev n In determining what market data within the selected cities was appropriate for comparison, we considered a number of issues. The most important of which is the comparability between the City's positions and the positions as they exist in the relevant labor market. Therefore, once we determined the cities to look at, we then reviewed the labor market data for benchmark jobs in the City. A benchmark job is a job where the contents are well known and uniform across employers and where the market is relatively consistent. /3 E To establish ranges where none exist, it is important to find benchmark jobs of varying point value (i.e. some low, some in the middle, and some high). The jobs used as benchmarks for the City of Monticello were: City Bookkeeper Operator Mechanic Building & Zoning Inspector Water/Sewer Collection Operator Street and Park Superintendent Public Works Director City Administrator After determining the relevant labor market and benchmark jobs, we pulled 1991 minimum and maximum salaries for jobs that matched the City's jobs. The market value used in developing the salary ranges is the median salary of the data selected. There is some adjustment calculated where the spread was too small. The salary schedules are included in the appendix. These ranges are based on 1991 data, so should be adjusted for 1992. The amount of the adjustment is a policy decision but the typical adjustment being considered by other cities ranges from 0 to 4% with 1-3% being the most common. The City will need to decide its pay philosophy. The City's relationship to the market, placement of employees in the salary ranges when the ranges are adopted, and adjusting the ranges to maintain the relationship to the market in the future are all policy decisions. There are, of course, other issues to consider in setting your pay policy besides pay equity such as: ability to pay, employee morale, recruitment and retention of employees, etc. The proposed salary schedule is included as Appendix G. It shows the salaries in hourly, monthly, and annual figures. Part time and Seasonal Jobs: Although the City could decide to pay all jobs in accordance with one of the proposed salary schedules, we do not recommend it. It is quite common for positions that are less than halftime to be paid differently than regular Rill time jobs. The Liquor Store Clerk class has only pan time employees who work less than halftime. For this job class we recommend an alternative range which is detailed in the Appendix. The range is shorter and the ranges do not have a mathematical relationship to the other salary grades. (See Appendix H) This recommendation was developed with consideration to the market, pay equity compliance, budgetary constraint, and some common sense. Because the reason for the difference in pay is not gender-based, and in fact the Liquor Store Clerk class is a balanced class by the Pay Equity Act's definition, this should not have any effect on your pay equity compliance. 10 13F There is also a chart showing how the job evaluation points convert to salary grades. All possible points and grades are included even though they are not all needed by the City at this time. In the future, if you add a new job class, or restructure a job enough so the job evaluation points change, you will be able to determine the most appropriate grade in which to place the job. The point to grade conversion chart is the tool that ties the internal value to the salary schedule (See Appendix 1). Assigning jobs to the salary grades based on their job evaluation points will ensure compliance with the Minnesota Loral Government Pay Equity Act. The type of salary administration system being proposed is a Step -Rate with Performance System. 'Phis type of system seems to be the best option for the City of Monticello. Because the City does not consistently and regularly conduct performance appraisals for all of the employees, we recommend that the performance component be phased in. Croce this has occurred, salary progression is based on a prescribed time schedule as long • as performance falls within a range of acceptability. if performance is significantly below or above the standards established for the job, the size and timing may be varied. With this type of system, the City can acknowledge and differentiate between different levels of performance. This AUm &9W1ipr to reyrard outctan in6 performers and to delav or ,= award increascL1a+oa&pedgrmem. The system works like this: Starting Salaries: New employees are normally hired in at the first step of the salary grade assigned to that job. Exceptions may be made upon approval of the Council under certain conditions. These are: 1) Additional education or training above that normally expected of the position 2) Additional experience or more relevant experience than that normally expected of the position. 3) Special qualifications of the individual. When considering pay above the minimum, thought should be given to salaries of current employees, the current salary of the candidate, the availability of other good candidates, and the benefit to the City of hiring this person. /3 G Salary Progression: The salary grades are established with normal time intervals for increases. Assuming a new employee begins at the first step, they would be eligible for movement to the second step after completion of the first six month probationary period (1040 hours). After that, normally employees would be eligible for a one-step increase annually (2080 hours). ' Employees who are not performing at a satisfactory level would not be awarded an increase or the increase could be delayed for any period determined reasonable by the • City Administrator, based upon the particular situation. In addition, employees who are performing substantially above the expectations for the position on a consistent basis, could be awarded an early increase or an increase of more than one step. (it is not recommended that more than two steps be awarded) Employees should never be placed below the minimum or above the maximum of the grade assigned to that job class. Salary upon Promotion: Employees who are promoted to another position within the City should move to the closest step in the new salary grade that meets or exceeds five percent of their current salary step (exclusive of overtime). In no case should an employee receive pay in excess of the maximum for the salary grade of the position for which they were hired or promoted. Movement Within The Range For Employees Brought In Above The Base: Employees who are hired in above the base salary (salary minimum) shall not be eligible for the probationary increase, but will be eligible for the annual increase until they have reached the salary maximum for the applicable salary grade. Once a pay philosophy has been determined and the salary ranges have been adopted, ongoing maintenance is minimal. The jobs are assigned to grades based on the job evaluation points. We recommend you take a few minutes to review and update the job descriptions on an annual basis. Every three to rive years, all jobs should be reviewed for significant changes and the job evaluation points should be updated. Updating is required by the Pay Equity Act but no frequency is mandated. If the total points should change enough to move the position into a different salary grade, the than will indicate where it should be moved. Normally the salary of any Incumbent would change to the new grade at the same step as their previous grade. 12 /34 To retain the City's pay relationship to the market uver time, the City can choose to collect information on what other cities of comparable size in metro and non -metro areas of Minnesota are considering for general adjustments. Care must be taken to exclude salary increases due to merit and to only consider those due purely to cost of living. For example, if cities in the relevant labor market are considering 1.3% cost of living increases, the City will want to consider an increase within that range if it wants to retain its relationship to the market. The City will want to consider several factors in making this decision such as its pay philosophy—where it feels it needs to be relative to the market, budget constraints, employee turnover rates, actual or potential recruitment problems, and employee morale. It is recommended that the annual increases (cost of living adjustment) go into effect on January 1, or the beginning of the first pay period of the year. As it is so close to the beginning of a new year now and adopting the proposed salary ranges will put the City into compliance with Pay Equity, you may want to consider adjusting the ranges for 1992 at the same time as you adopt the ranges. The City will have to determine when they would like the step increases to go into effect. They could be effective on the anniversary date of hire for each employee or at a fixed time during the year. As mentioned earlier, an important policy decision that has to be made is how to place the employees into the salary ranges the first time. Movement within the ranges after initial placement, and placement of new employees is already described. Because the salary ranges are new but the employees are not and are already being paid a particular salary, placement into the ranges now, is a unique situation. There is more than one way to accomplish this task In deciding what might be the best method, it is important to think about the following: Employee morale Money available for implementation of the new system Ongoing costs of the new system Consistency (non-discriminatory application) Compliance with the Pay Equity Act /3 = After thinking about these issues the range of alternatives has been narrowed down to the following: 1) Place employees into their respective salary grades at the salary step closest to, but not below, their current salary. No-one should receive a pay cut when adopting a new system; or 2) The same as #1 but with a minimum guarantee of at least X percent increase (for example 3-54'0). Costs per hour, by employee, have been determined for alternative #1 using the proposed 1991 salary schedules with the exception of placing the Liquor Store Clerk employees in the alternative range. These costs are outlined in Appendix J. These are costs associated with adopting salary ranges. The salary ranges are based on 1991 market data. Cost of living increases for 1992 are not included. The salary range design, assignment of jobs to salary grades, the salary administration system, and the alternatives for placing employees into the salary grades were all done with the Pay Equity Act in mind. Therefore, whichever employee placement alternative is chosen, the City should eventually be in compliance with the Minnesota Local Government Pay Equity Act. I have included three scattergrams showing the City's relationship between job evaluation points and salary. The first (Appendix K) shows how your current salaries compare with their job value as determined by the modified Princeton System. Upon review, it appears there is pay disparity between male and female classes. The City would not be found in compliance with the Pay Equity Act if no adjustments are made. You do not need to adopt the proposed salary ranges to comply with the Pay Equity Act. You could adjust individual salaries of incumbents up until the female -dominated classes came out paid similarly to the male -dominated clauses. But, adopting the proposed salary ranges will put you into compliance. In fact, because you have mostly single -incumbent jobs, adopting one of the proposed salary schedules is the easiest alternative for continuing compliance. if the City should move its female incumbents up and one of your lower paid 'm' incumbents leaves, with a female replacing that person, your compliance status could be affected. If the salary ranges are adopted as proposed, it doesn't matter what gender you hire into any of the classes. The proposal is completely gender neutral. 14 Mother reason to adopt ranges is to put a logical, rational system in place instead of trying to start from scratch each year. Salary ranges provide for additional increases for employees who stay and grow with the City. It is intended to reward employees for the increased productivity that comes with teaming the City and the job over time. It isn't a real long range though because the greatest learning and productivity improvement generally occurs during the first five years. After that (when employees reach the maximum of their grade) they would be eligible for only the cost of living adjustment. The second graph (Appendix L) shows the pay relationships based on placement of the jobs into the proposed market salary schedule and alternative salary schedule as compared to job evaluation points. 'rite graph shows the proposed maximum salaries for each class, based on the current gender of the incumbents, as compared to points. When a City has adopted salary ranges, the State Department of Employee Relations plots the maximum salaries and compares those to the points for each job class. Their primary focus is to review how female classes are paid compared to males. The third graph (Appendix M) shows the pay relationships with the actual highest salary plotted wherever an employee's current salary is above the maximum of the salary range for their class. The remaining classes are plotted using the maximums of the proposed ranges. You can see that only three classes move up. Because two are female and one is male, they effectively cancel each other out. If they had all been male, we may have to do further analysis of whether you would meet DOER'S evaluation criteria. If they had all been female, there would be no issue as the law doesn't require that males be paid comparably to females, only the converse. The reason using an alternative range for your Liquor Store class doesn't hurt your pay equity compliance efforts is based on the fact that there is a gender -neutral reason (the part time nature of the jobs) for the difference. In addition, the class is not female -dominated so this will not be questioned. There are a few other issues that need review for pay equity compliant:. If you provide different health insurance contributions to any of the employee classes included in the study, an analysis of the impact on female classes must be done. If any female class is 'disadvantaged', the health insurance contributions must be added to the maximum salaries prior to plotting the salaries on the graph. If you adopt the salary ranges as proposed, you will pass the salary range test. If any job classes are eligible for performance or longevity pay, an additional analysis must be done to ensure that no more than 20% of the female classes are "disadvantaged' as compared to your male classes. Please advise me if any of the additional analyses should be conducted. As was mentioned earlier, the deadline for compliance is December 31, 1991. The City must provide non -gender based reasons for salary disparities between female and male classes, 13K CITY OF MONTICELLO PAY SCHEDULE JANUARY 1, 19% 1 15.29 $8.40 102.70% Prupo x $9.08 $9.49 $9.92 STEPS $10.78 311.22, 2 30.44 $8.90 102.70% $9.14 ti $10.06 $10.521 1 21 3 1 4 1 5 1 6 7 R POINT I BASE PRCNT BAS $12.121 $12.60 4 60-74 15.0096, 120 $10.27 D RANGE 1995 COLA C 998 105.00% 11104.35% $10.66 104.17% 104.00%1 1 15.29 $17,472 102.70% $17,944 318,841 $19,738 $20,6361 $21,533 $22,4301$23,3271 2 30-4 $18,521 102.70% $19,021 $19,972 $20,923 $21,8741 $22,825 $23,776 $24,727 3 45-59 $19,632 102.70% $20,162 $21,170 $22,178 $23,186 $24,194 $25,202 $26,210 4 60.74 $20,809 102.70% $21,371 $22,439 $23,508 $24,576 $25,645 $26,713 $27,782 5 75-89 1 $22,058 102.70% $22,653 $23,786 $24,919 $26,0511 $27,184 $28,317 $29,449 6 90-104 $23,271 102.70% $23,899 $25,094 $26,289 $27,484 $28,679 $29,874 $31,069 7 105-119 I $24,667 102.70% $25,333 $26,600 $27,867 $29,733 $30,400 $31,6671$32,933 8 120-134 $26,148 102.70% $26,854 $28,197 $29,539 $30,882 $32,225 $33,567,$34,910 9 135-149 $27,716 102.70% $28,464 $29,888 $31,311 $32,7343 $34,157 $35,580 $37,0041 10 150-164 $29,379 102.70% $30,172 $31,681 $33,190 $34,698' $36,207 $37,716 $39,2241 11 165-179 $30,994 102.70% $31,831 $33,423 $35,014 $36,6061 $38,197 $39,789 $41,3601* 12 180-194 $32,855 102.70% $33,742 $35,429 $37,116 $38,800 $40,490 $42,177 $43,884 *c60 13 195-209 $34,826 102.70% $35,766 $37,554 $39,343 $41,131 $42,919 $44,708 $48,4961 14 210-224 $36,915 102.70% $37,911 $39,807 $41,703 $43,598 $45,494 $47,3891$49,2851 15 225.239 $39,130 102.70% $40,187 $42,196 $44,205 $46,215 $48,224 $50,233 $52,2431 16 240-254 $41,281 102.70% $42,395 $44,515 $46,635 $48,754 $50,874 $52,994 $55,114 17 255-269 $43,757 102.70% $44,938 $47,185 $49,432 $51,6791 $53,926 $56,173 $58,420 18 270-284 $46,382 102.70% $47,635 $50,016 $52,398 $54,780 $57,161 $59,543 $61,9251 19 285-299 $49,165 102.70% $50,493 $53,018 $55,5421 $58,0671 $60,592 $63,1161$65,641', 20 300.314 $52,116 102.70% $53,523 $56,199 $58,875 $61,5511 $64,227 $66,903 $69,580' 11 315-329 $54,977 102.70% $56,462 $59,285 $62,1081 $64,931 $67,754 $70,577 $73,400 22 330+ $58,277 102.70% $59,850 $62,843 $65,6351 $68,8281 $71,820 $74,8131$77,805] HOURLY RATE 1 15.29 $8.40 102.70% $8.63' $9.08 $9.49 $9.92 $10.35 $10.78 311.22, 2 30.44 $8.90 102.70% $9.14 $9.60 $10.06 $10.521 $10.97 $11.431 $11.891 3 45.59 $9.44 102.70% $9.69 $10.18 $10.661 $11.151 $11.63 $12.121 $12.60 4 60-74 $10.001 102.70% $10.27 $10.79 $11.301 $11.82 $12.33 $12.841 $13.361 5 75-89 1 $10.66 102.70% $10.89 $11.44 $11.98 $12.52 $13.07 $13.61 $14.16 6 90-104 $11.19 102.70% $11.49 $12.06 $12.64 $13.21 $13.79 $14.36 $14.94 71105.119 1 $11.861 102.70% $12.181 $12.79 $13.40 $14.01 $14.62 $15.221 $15.831 8 120-134 $12.57 102.70% $12.91 : 113.56 $14.20 $14.85 $15.491 $16.14 $16.78 91135.149 1 $13.321 102.70% $13.681 $14.37 $15.051 $15.741 $18,42 $17.11 $17.79 10 150164 $14.12 102.70% $14.51 $15.23 $15.961 $18.68 $17.41, $18.13, $18.88 11 165.179 $14.90 102.70% $15.301 $16.07 $16.831 $17.60 $16.361 $19.131 $19.89 12 180194 1 $15.801 102.70% $16.221 $17.03 $17.841 $18.66 $19.47 $20.281 $21.091 131 195-209 1 $16.74 102.70% $17.201 $18.08 $18.91 $19.77 $20.63 $21.491 $22.35' 14, 210224 I 151225-239 $17.751 $18.811 102.70% 102.70% 618.23 $19.321 $19.14 $20.29 $20.05 $21.251 $20.96 $22.221 $21.87 $23.18; $22.78 $23.69 $24.15 $25.12' 16 240254 $19.85' 102.70% $20.38 $21.40 $22.42 $23.441 $24.46' $25.48 $26.50 171 255-289 1 $21.041 102.70% $21.601 $22.69 $23.771 $24851 $25.931 $27.011 $28.09 18 270284 $22.30, 102.70% $22.90 $24.05 $25.19 $26.34 327.48 $28.63 $29.77 191285-299 623.84; 102.70% $24.281 $25.491 $28,701 827.921 $29.131 $30.341 $31.56 20 300314 $25.08 102.70% $25.73 927.02 $28.31 $29.59. $30.88 $32.17 $33.45 211 315.329 $28.431 102.70% $27.151 928.501 $29.881 $31.221 $32.57' $33.931 $35.29 22 330+ 1 $28.02 102.70% $26.771 $30.21, $31.65 $33.09 $34.53 $35.97 $37.41 /3L POINTLIS.WK4: 10/11 MO /3 M Page t INDIVIDUAL JOB EVALUATION POINT SUMMARY 5 CITY OF MONTICELLO Job Title Knowledge/ E3=f1ence AccounIBp1114r Planning $=ndalon Working Canditions Total Poimn Public Works At Ala 1A A 1C2 681 29 Assistant 10 10 0 0 281 1181 702 = 9 Sewer Collection Al Ala 1A A iC2 11D3 35 Assistant 10 10 0 0 2C2 1202 7133 = 68l 15 Seasonal Park Al Ala 1A B 1C2 7D3 36 Worker 10 10 0 part. 281 681 2 5C2 1102 6C2 ]2ffi 16 Lquor Store Al Ata 1A A 102 7131 96 "lerlc 10 10 0 0 2C2 SC2 3C2 981 4D3 1081 6D3 1181 16 Building and Al Ata 2A A 1C2 6C2 44 Grounds 10 10 1 0 2131 9C2 Maintenance 3E4 1103 4E4 = 7133 23 tltllityBilling clerk 81 Bib 2A A 5D3 I= 73 30 34 1 0 SE4 a Deputy Registrar Bt Sla 2A A 2C2 6E4 72 30 30 1 0 403 11 Bookkeelm 81 Bib 2A1 A 281 6E4 74 30 34 1 0 5D3 11!81 9 POINTLIS.WK4: 10/11 MO /3 M Page t ,l bQ ilm K AcammteAilibr 2lannlnp SuVeridgm Working ComttUo= IntsLPW= Liquor Store •terk/Cashier Al 10 82b 2B A 1C2 781 73 44 3 0 202 881 381 981 4D3 1081 SD3 1181 16 Asslstarn Liquor Store Manager At Gla 38 8 103 SC2 90 10 SO 7 pan. 2C2 961 3 3C2 1081 403 1181 603 1281 7B1 20 Operator/ 82 Bib 2A B 103 8C2 110 Mechanic 40 34 / pan. 2D3 9C2 4 3C2 1102 4D3 12D3 581 1381 6D3 14C2 7D3 1681 31 Water/Sewer B2 82a 2A 8 1C2 BC2 111 `dlecti n 40 40 1 Pan, 2 9 1160 4D3 1263 SU 13C2 6C2 1461 7D3 20 Construction Cl 82b 38 A 103 SC2 127 Inspector 60 44 7 0 2C2 903 3C2 11C2 4D3 1202 6C2 1302 760 28 Cornputer Support C2 C2b 3C A 181 603 142 Ana" 60 04 9 0 2C2 OM 9 Building and C2 C2b 38 A iC2 703 154 Zoning Inspector 60 64 7 0 2C2 BC2 3C2 9C2 481 1002 SC2 1181 6C2 = 23 POINTLIS. WK4: 10/11196 13Pop 2 Job Title Knowledge/ Experience Accmmtabilhy Planning %=rvIalon Workhtg inn Total Points Office Manager B2 C2c 4C C 1C2 SD3 149 40 68 13 comp. 2C2 fiB 16 3B1 12 Liquor Store B2 C3b 3C C 1D3 8C2 159 Manager 40 74 9 corttp. 2C2 9B1 16 3C2 1081 5C2 1181 6D3 12B1 7B1 ]381 20 Economic D1 C2b 41) A 3D3 7B1 160 Development 70 64 15 0 5D3 9111 Director 6D3 11 Street and Park B2 C3b 4C C 102 881 168 Superintendent 40 74 13 Comp. 2B1 9131 22 3131 1181 4B1 1202 5D3 1381 6C2 1481 7B1 1681 19 1 Water/Sewer C1 C3b 4C C 1C2 8C2 180 CoOection 50 74 13 comp. 2C2 802 Superintendent 13 381 10B1 403 1103 6C2 12D3 6C2 1302 7D3 1481 1981 30 Pubk Works 04 D3c 5E D 181 881 242 Director 80 g8 25 cone. 381 1002 25 5D3 1181 681 1381 781 1681 881 /3 Assistant City D2 D3c 6F C 300 7B1 241 Administrator 80 913 34 eortp. 503 881 16 6013 1= ' 13 POINTLIS.WK4: 10/110 /.30 Page 3 Job THe Knowledge! EMdenC t AGJolIntablifty Planning ,&Mn talon Worwrig Coalms Total Polm City AdrPonistrator D3 E4c 6E F 3C2 6C2 297 90 128 31 cane. 5D3 1081 40 8 Sr. Deputy B1 Bib 2) B3 202 6E4 82 Regi9rarClerk 30 34 3 4 403 1QS'r2 11 Developmerd 82 Ctb 4A AD 1B/ 9B1 111 Setvkes 40 54 9 0 3C2 1081 Tech*ian 6D3 8 Pubk Works Al Ata A2 AD 6E4 MI 30 Secretary 10 14 1 0 5 ChM Buk tg C3 C2C 4B C 1C2 2C2 180 Official (proposed) 70 68 11 11 3C2 SD3 6C2 7D3 8C2 902 1tBt 1= 21 1 /.3 P POINTLISNK4: 10/11/96 Pope 4 W A BUILDING INSPECTION DEPARTMENT WORK LOAD AND SALARY SURVEY Goes moiled by Permit volume iWORKLOAD COMPARISON PER EMPLOYEE Nurltber &along Anual I Corttrno Parnate Permrte of o Permrt Dopa Chid Butldng Corlaacl Service Per tingle per air �e Buiidrg Dep 1_995 Vduaaon Revenw V995 L Office) Pam S.. P_ I_nsPe,•toa Cloned Em ployeeo_� Big Lake 1 75 $9,472,000 not avail "$26,000 - S341000 Metro Wool 175 350 12 office Rogue' 177 $9,777.585 $84,164 Metro Wom $65,950 NA 1 354 12 otko St Peter 283 $7,332,000 1 $93,284 1 _$38,000 starting_ _ + NA 566_ _ _ 12 othce 1 $0,000 ChaWei-380 —$40,000,000 44 rButob 390 $42,008,374 1 $224,557 T $45,000 - B Yro Metro Wool i ' 190 507 NA 780 3 FT mopes • 314 aX¢o oharoodencal HutcMnom 553 $16,373,698 Morlacdb 581 $17,641,600 $183,77231 $123,562LS2$7 B7 - $56'347 • $38,789 ( Paul Waldron) 1 1 277 553 378 1134 2 FT mailed • 1 FT office 1 5 FT inaped - 12 oflKe ; While Boor 652 ' $23.529,058 $259,29100 - f45r000 217 652 3 FT moPlct • 1 FT ct tt LElk Rno 11601 $35,633,115 1 not oval3 • 45,480 . OT) 387 1 773 1"'3 FT inunct • 1 FT, 1 , otko , Rogme to uMer 1879 buadutg code fee ochodufe Big Lake oorttrocted in 1995 SWary noted in for 1996 Elk fiver Woo hao 1 FT houmrg irmpwtor (rental property), and 1 FT pari n(yroning odmnctrotor PLEASE NOTE: All building departments with permit volume roughly equal to Monticello have 1 FT ctorlul— Monticello hu 112 clerical In the building depeAment. RIGS U RV. W K4: 10/11196 INFORMATIONAL ITEM October 3, 1896 As you may recall, the Council approved budgeting for an additional 200 hours of police coverage next year. This was due to a recommendation from the Police Commission and the Sheriffs Department that the City consider gradually increasing the number of hours as the population grows and the city expands. The department has been experiencing more calls for service, which takes away from a deputy's time for other general police activities. During the recent Council discussion on the additional hours, questions were raised as to whether a specific schedule would be established in advance for these hours or whether the Sheriffs Department would be allowed the flexibility to schedule the hours as needed. Some concerns were noted that if the Sheriffs Department could not tell us when they needed the additional hours specifically, possibly the hours weren't that necessary. The Police Commission recently met again to discuss the need for the additional hours and again recommended that the City Council simply allow the Sheriffs Department to schedule the hours at their discretion by adding additional shifts when specific problems arise such as traffic concerns or a rash of burglaries, etc. Chief Deputy Don Lindell of the Sheriffs Department felt that adding an extra deputy under those situations would be far more beneficial to the community than simply scheduling a time in advance to use up the hours. For each additional shift that is added during the month, the Sheriffs Department would let the City know when the deputy was added and for what specific purpose they felt the additional time was needed. This will give us an idea of where the additional manhours are spent and will provide a good statistical background for determining whether additional hours are warranted in future years. vouce uvo; 1WM - 3>0 Westwood Lake Office WSA 8441 Wayzata Boulevard Minneapolis, MN 55426 612-541-4800 &Associates, Inc. FAX 541-1700 To: Honorable Mayor and City Council City of Monticello From: Bret A. Weiss, P.E. Ronald B. Bray, P.E. Date: October 9, 1996 Ba. Mlnduod,. P.E. Bm A. W6.. P.E Pan R. Wdk.1, ing. P.E Don.Ld W. Sn . P.E Ro-ld B. Buy. P.E Memorandum Re: Trunk Highway (TM 25/Chelsea Road(I-94 improvements Council Update WSB Project No. 1033.00 A meeting was held on September 26, 1996 at 10:00 a.m. with the Minnesota Department of "rransportation (Mn/DOT) and the Federal Highway Administration (FHWA) at their district office in St. Paul. Jeff O'Neill represented the City of Monticello, along with Ron Bray, WSB & Associates. Discussions included the history of the TH 25 corridor, the analysis of Options 2 and 3 for the Chelsea Road intersection, and projected traffic volumes on TH 25 and the 1-94 corridor. The discussion then focused on improving the operating efficiency of the interchange, along with discussing the different options available. The FHWA agreed that Alternative 4D, which included the loop ramp for southbound TH 25 to eastbound I-94, along with the new eastbound off -ramp coming into the Oakwood intersection, is a feasible alternative. They also requested that we perform a traffic analysis for the operational efficiency for the future and look at an urban interchange alternative. Their initial reaction was that modification at interchange would require approval from both the Chicago Regional Office, along with approval from the main office in Washington, D.C. Upon further review of the 1-94 corridor, we have also identified similar interchanges which are currently in existence similar to Option 4D. Those interchanges arc located at TH 101 infrnrtnr vre - Engine► - Plannen FQCAL 0"ORTUNrn' DAPI 01 -FO Honorable Mayor and City Council City ojblonticello October 9, 1996 Page 2 and 1-94 in Rogers, and County State Aid Highway (CSAH) 75 and I-94 in the St. Cloud area. WSB is currently finalizing its scope of services and proposal, which will include the analysis for the interchange revision and will submit to City Staff for review. Upon approval of City Staff, it will be forwarded to MnWT to further the cooperative agreement project on TH 25 and 1-94. In summary, revision of the interchange does seem feasible at this time and will result in a significantly improved TH 25 corridor, improved access to I-94, and minimal impact to business access along the TH 25 corridor. 1"MN)J OPM-Mfg' COUNCIL UPDATE i October 8, 1898 mavrm T.1 As you will recall, a preliminary tax levy and budget was adopted on September 9 that set our tax levy at $3,059,880, a 3% increase over the 1996 levy. The actual public hearing date for final adoption of next year's budget is scheduled for Wednesday, December 4, at 5 p.m. As part of our initial budget workshop, the Council did discuss a few of the capital expenditures, including the request by the MCP for up to $35,000 in matching funding for the downtown Community Partners revitalization program. A few other minor changes from the workshop included increasing the Bohanon Farm biosolids improvements from $8,000 to $10,000 and adding $1,800 to the sewer budget for an anti -fall device that will not be reimbursable through OSHA. I am assuming that the Council will want to have an additional workshop session to go over the budget in more detail prior to the December 4 public hearing date. If the Council wants to have an additional session, possibly a time could be scheduled Monday night. If the Council feels an additional meeting is not necessary at this time, we will simply bring forward the budget as originally adopted in September to the public hearing December 4. BLOW UP& 104aa COUNCIL UPDATE October 11, 1996 . U.S.) At the September 23, 1996, meeting of the Council, City staff reviewed wastewater treatment plant cost saving efforts totaling $459,870 in construction costs. By deleting the 3% contingencies and the projected 15% engineering fees, we would come to a total savings of $555,293, or about 28% of our over -budget. After the Council meeting of the 23rd, we began our second wave of cost saving efforts. On September 30, 1996, Rick Wolfsteller, myself, Chuck Keyes from PSG, and Councilmember Tom Perrault spent a portion of the day again at HI Ws office working with the various design team members. We came up with another 13 items which could lead to cuts on the project. The following is a list of those items considered: 1. Define construction debris to be located on site. Indicate drainfield/septic tank removal. 2. Vinyl floor in lab (administration building). 3. Delete alternate bid for epoxy flooring. 4. Blower Room - use exiting air intakes and provide a one -dryer system for both compressors. 5. Sludge Proc Bldg - relocate storm water manhole further north of building. 6. Keep existing breaktank. 7. Outfall structure on storm water pond too complicated (City to provide information). 8. Remove burnished block on SBR walls and remove architectural stripe. 9. Provide option to contractor to reuse existing aluminum handrail far SBR tanks. 10. Electrical: Provide note that the Owner has the right to first refusal t on all salvage items. 11. Define temporary pump siting. wwrv.uvo; IWIM pap 12. No spare digester mixer on bid form. 13. Relocate gas scrubber to lower level/headworks building: eliminate 15-20' from headworks building. In addition to the above list, we considered shortening the administration building by approximately 12 feet. However, after additional consideration, we decided to leave the administration building alone, as the few dollars saved from cutting this 12 feet could have repercussions in the future. The administration building is expected to serve not only this expansion, but the next two expansions. This item brought back memories of the city hall building when the full basement was cut from the proposal at the last minute. We have probably spent as much as the cost savings over the past years just to feed electronic cables for telephones and computers to different points. In addition, we are out of storage at city hall and will probably have to look at costly additions in the near future. The major cost saving found this time included on the above list is in the area of the headworks building. We are attempting to shorten the headworks building by 15 to 20 feet, which would not only delete a portion of the building itself, but the long basement. In addition, sliding the most easterly SBR tank 20 feet to the west allows us to use more common wall construction between tanks and saves us money. The roof on the building may go from a shingled gable -type roof to a flat roof to accommodate a make- up Sir unit for the odor control scrubber. In addition, we deleted the architectural striping on the exterior of the tanks to the east and north in favor of growing ivy on the walls until the trees are big enough to screen the tanks. We do not have the total estimated cost savings for these recent changes, as HDR's design team is currently working on those. We are hopefiilly going to gain between $150,000-$200,000 additional construction cost savings. The project is currently out for bid with the plans being delivered to the contractor hopefully on October 18, 1996. A pre-bid conference is scheduled for November 6, 1996, at city hall at 9 o'clock to review the project with prospective bidders. The meeting will then end with a tour of the existing wastewater treatment plant and expansion areas. The bide for the project are duo at 2 p.m. at city hall on November 20, 1996, to be reviewed by the City Council at the November 26, 1996, meeting, hopefully for award and notice to proceed, as we still have a very aggressive construction schedule having the first SBR tank in operation within a year of award of the project. wwrv.uao: +a++45 Papp 2 I COUNCEL UPDATE October 11, 1896 . U.S.) Pittsburg Tank & Tower Co., Inc., out of Henderson, Kentucky, is the firm contracted to paint the old water tower. This firm was awarded the contract on July 9, 1996, but took almost a month to get the necessary paperwork to us. The actual Notice to Proceed on the project was given August 6, 1996, after we received all the signed documents and insurance. The contract completion date for the project was October 8, 1996. The quality of the work performed by Pittsburg Tank & Tower Co., Inc., appears to be satisfactory. The crew scheduling, however, could have been more aggressive in light of the fact of the October 8 completion date. During the project, the contractor's air compressor went down. They were unable to obtain a rental unit locally, so we allowed them to use the City of Monticello's air compressor when it wasn't being used by the City, as the Water Superintendent and myself thought it best to keep the job going without delay. We have kept track of the time that it was used and will be talking to the contractor during final payment to recover some rental money for our air compressor. The painting crew left town on Saturday, October 6, 1996. 1 placed a call to Pittsburg Tank & Tower Co., Inc. on Monday, October 7, 1996, and left word with the project manager to inform me as to the status of the completion of our project. I had not heard from them by late in the day on Tuesday, October 8, 1996; consequently, I forwarded a certified letter to them indicating that liquidated damages as per the specifications of $60 per calendar day would begin on October 9, 1996, until the project is completed. A copy of this letter is enclosed for your review. This is the status of the project as of Friday, October 11, 1996. Any changes in project status between now and Monday evening's Council meeting will be brought up at that time. TOWER UVD: 1011140 250 East Broadway P. O. Box 1147 Monticello, MN 55362.9245 Phone: (612) 295-2711 Metro: (612) 333-5739 Fax: (612) 295-4404 Mr. Robert Benish PFMBURG TANK tit TOWER CO, INC. 515 Pennel Street P.O. Box 913 Henderson, KY 42420.0913 October 8, 1996 Intlrtsr of the City' -r Mr. Rmkh: All work on the above referenced project was to be in place and accepted by October 8, 1996. Portions of the work covered by the original contract yet to be completed aro the application of the logo on two sides of the tank and the completion of painting of the upper ladder and railing systems. This work is subject to the $50 per calendar day liquidated damages duarges beginning Wednesday, October 9, 1996. The completion of the wrapping text of the words "Monticello" on both sides of tank is not subject to the liquidated damages, as it was considered an addition to the contract I phoned your office on Monday. October 7, 1996, to discuss with you the reasons why your painting crew left thejob. I have yet to receive a response to my call. Please schedule the completion of this project as soon as possible. This project has drugged on and has become a nuisance to nearby businesses. Sincerely, CMMO LIO John E. Simoln Public Works Director `fig Rick Wollktdler, City Administrator Man Theism, Water Superintendent File/ Oj7ta of Public Works, W9 Ool f Courn Rd. Momicello, UN SM62 • Phoat: (e19/ 2M 170 • Fen (612) MJ/70, nt 1